Port Mann/Highway 1 Pre-Design Concepts FEEDBACK FORM ON BACK www.gatewayprogram.bc.ca PORT MANN/HIGHWAY 1 PRE-DESIGN CONCEPTS Pre-Design Community Consultation Discussion Guide • February – April 2006 PRE-DESIGN COMMUNITY CONSULTATION : Port Mann/Highway 1 The Ministry of Transportation will conduct community consultation at three design stages: Pre-design Consultation Open House Schedule February – April 2006 Langley: February 18, 2006 Walnut Grove Community Centre The purpose of the pre-design consultation on the Port Mann and 10:00 am – 1:00 pm 8889 Walnut Grove Drive Highway 1 Project is to obtain community and stakeholder feedback on pre-design concepts for improvements to the Port Mann/Highway 1 New Westminster: February 25, 2006 Centennial Community Centre corridor between Vancouver and Langley. The consultation seeks 10:00 am – 1:00 pm 65 East 6th Avenue feedback on goals for interchange upgrades, and draft options for congestion reduction measures such as high occupancy vehicle lanes, Burnaby: March 4, 2006 Burnaby Eight Rinks HOV and transit priority on-ramps, commercial vehicle priority access to 10:00 am – 1:00 pm 6501 Sprott Street on-ramps, potential tolling, and improvements to the cycling network. Burnaby: March 8, 2006 Bonsor Recreation Centre 6:00 pm – 9:00 pm 6550 Bonsor Avenue Preliminary Design Consultation Vancouver: March 25, 2006 Hastings Community Centre 2007 10:00 am – 1:00 pm 3096 East Hastings Street With basic pre-design components determined, consultation on Auditorium preliminary design discusses refi nements to interchanges and accesses, lane use, congestion reduction measures and other key features. Vancouver: March 29, 2006 Roundhouse Community Centre 6:00 pm – 9:00 pm 181 Roundhouse Mews, Great Hall Surrey: April 8, 2006 Guildford Recreation Centre 10:00 am – 1:00 pm 15105 105th Avenue Detailed Design Consultation 2008 Surrey: April 11, 2006 North Surrey Arena Detailed design consultation generally focuses on fewer but more detailed 6:00 pm – 9:00 pm 10275 – 135th Street treatments, such as specifi c interchange and access features, lighting and landscaping. This stage also involves more fi nancial and technical analysis Coquitlam: April 22, 2006 Coquitlam Library, Poirier Branch to ensure designs are fi nancially and technically feasible. 10:30 am – 1:30 pm 575 Poirier Street Coquitlam: April 25, 2006 Planet Ice How Public Feedback Will Be Used: Feedback gathered through this pre-design 6:00 pm – 9:00 pm 2300 Rocket Way consultation via open houses, stakeholder meetings, web and fax will be recorded and summarized in a Consultation Summary Report, which will be considered Abbotsford: April 29, 2006 Abbotsford Recreation Centre along with technical and fi nancial information as the Ministry of Transportation refi nes improvement designs. The Consultation Summary Report will also be 11:30 am – 2:30 pm 34690 Old Yale Road posted on the web and participants will be notifi ed of the posting. 2 TABLE OF CONTENTS The Consultation Program . 2 The Gateway Program . 3 Environmental Review Process. 7 Port Mann Bridge . 8 Consultation Topics Pre-design Concepts . 9 Port Mann/Highway 1 Interchange Improvement Goals . 11 Tolling and Congestion Reduction. 16 Helping People Make Good Transportation Choices . 17 Lane Use: HOV/Buses/Transit . 18 HOV and Transit Priority Access to Highway On-Ramps. 19 Commercial Vehicle Priority Access . 20 Supporting Cycling . 21 Feedback Form . F1 - F4 1 Port Mann/Highway 1 Pre-Design Consultation • February – April 2006 THE CONSULTATION PROGRAM INTRODUCTION PUBLIC CONSULTATION FEEDBACK SCHEDULE The Gateway Program was established as part of a broader response by the Province of British Columbia to reduce congestion, improve people Consultation Milestones and goods movement and improve safety and reliability. Consultation on Pre-Design February – April 2006 Recognizing the importance of consultation and ongoing communication Environmental Assessment Review Process Late 2006 with interested stakeholders and the public, the Gateway Program is undertaking a comprehensive consultation program as well as ongoing Consultation on Preliminary Design 2007 (tentative) community relations to ensure community and public input is considered Consultation on Detailed Design 2008 (tentative) in the development of the improvements. PORT MANN/HIGHWAY 1 The Port Mann/Highway 1 project includes widening the highway, twinning the Port Mann Bridge, upgrading interchanges and improving access and safety on Highway 1 from the McGill interchange in Vancouver to 216th Street in Langley, a distance of approximately 37 kilometres. The Ministry of Transportation will be conducting the fi rst of three stages of public consultation in February, March and April, 2006 regarding proposed improvements to the Port Mann/Highway 1 corridor. This fi rst stage of consultation, the pre-design stage, will specifi cally consult on goals for upgrades to interchanges, congestion reduction measures such as HOV lanes, transit and commercial vehicle priority access to highway on-ramps, improvements to the cycling network and a proposed toll on the Port Mann Bridge. The public will be asked to consider the pros, cons and trade-offs of measures that limit growth in traffi c, such as tolls and HOV lanes. In addition, the public will have clear choices regarding the acceptability of tolling and other congestion reduction measures. The Port Mann/Highway 1 pre-design consultation program consists of 50 to 60 stakeholder meetings with community organizations, residents and businesses, 11 public open houses, and a web-based discussion guide and on-line feedback form. A Consultation Summary Report of the results of the consultation will be posted on www.gatewayprogram.bc.ca. 2 Introduction to the Gateway Program THE GATEWAY PROGRAM – COMPLEMENTS PLANNED REGIONAL ROAD AND TRANSIT IMPROVEMENTS INTRODUCTION including more transit, new bridge connections, better access to border Congestion on regional roads and highways is increasing, with growing crossings and expanded cycling networks. Key commuter and goods impacts on residents, communities, the environment and the economy. movement corridors also require attention. In 2003, the provincial Transportation is now the top concern for Lower Mainland residents, and government established the Gateway Program to complement other the B.C. Trucking Association estimates that goods movers are stopped or regional road and transit improvements planned or underway. Three slowed 75% of the time, costing approximately $500 million per year. priority corridors were identifi ed for consideration: Transportation infrastructure and service improvements are needed • The existing Highway 1 corridor from Vancouver to Langley throughout the region to address current and future transportation • The South Fraser Perimeter Road (SFPR) – a new east-west corridor needs and to support economic development associated with increasing along the south shore of the Fraser River trade and goods movement. A number of agencies have initiatives • The North Fraser Perimeter Road (NFPR) – an improved east-west underway in the Lower Mainland to provide needed improvements, corridor along the north shore of the Fraser River Forecast Growth in Gateway Truck Volumes, 1999-2031 Average Weekday Hourly Traffi c Volumes on the Port Mann Bridge 5000 12000 4000 BRIDGE CAPACITY 10000 2004 3500 1987 8000 3000 6000 2500 2000 4000 Number of cars per hour 1500 2000 Average Westbound Vehicle Volumes Vehicle Westbound Average Light and Heavy Truck Volumes (24 Hour) Volumes Light and Heavy Truck 1000 0 1999 2003 2011 2021 2031 500 This graph illustrates the projected growth in truck volumes associated with 0 the forecast growth in international trade. Approximately 50% of containerized 2 am 8 am 6 am 4 am 8 pm 2 pm 6 pm 4 pm Noon 10 am goods are currently transported to and from Greater Vancouver’s terminals by 10 pm truck; the other 50% move by rail. Midnight Time of day 3 Port Mann/Highway 1 Pre-Design Consultation • February – April 2006 RISING CONGESTION REDUCES QUALITY OF LIFE, INCREASES COSTS Change in Greater Vancouver Commuting Patterns The population of the Lower Mainland has grown by 750,000 over the past 20 years and is anticipated to reach over three million by 2031. Automobiles are increasing at a rate of 20,000 per year. This growth is creating gridlock on Greater Vancouver’s road network, which has had no signifi cant improvements since the 1980s. Greater Vancouver is a strategic North American gateway for international trade, emerging as Canada’s hub for the Asia-Pacifi c region. The Port of Vancouver has seen a 56% growth in trade with China in the past year and the volume of BC port container traffi c is expected to quadruple by 2020. Coupled with population growth, this economic growth means more pressure on regional transportation infrastructure, such as highways, transit and intercity buses. Existing roads and bridges cannot support forecast demand. In fact, a number of key routes are already at capacity. Changing Regional Travel Patterns The Ministry of Transportation and the Greater Vancouver Transportation Authority (TransLink) completed a travel survey of Greater Vancouver A residents in 2004. One of the key trends from this survey shows increased job growth outside downtown areas. For example, in the past decade, growth in Vancouver residents working in other municipalities exceeded the growth of other municipal residents working in Vancouver by a factor of 9 to 1.This type of job growth creates a greater need for travel from Vancouver to other municipalities, and for inter-municipal travel, which is not easily served by transit. The consequences of not making the necessary road and bridge improvements include increasing congestion, longer and longer “rush hours”, increased costs to the economy, delayed goods movement, and unreliable transit connections through the region. Overall, the cost of living and quality of life will suffer without comprehensive improvements to the transportation and transit network. B Change in Nature of Trips - There has been in a shift in the traditional municipal to downtown travel pattern (A), to more complex travel patterns (B) as a result of increasing population and dispersed locations for job creation.
Recommended publications
  • YOF CITY CLERK's DEPARTMENT VANCOUVER Access to Information
    ~YOF CITY CLERK'S DEPARTMENT VANCOUVER Access to Information File No.: 04-1000-20-2017-335 October 13, 2017 !S.22(1) Re: Request for Access to Records under the Freedom of Information and Protection of Privacy Act (the "Act") I am responding to your request of September 15, 2017 for: Annexes to the "Coastal Flood Risk Assessment Report" prepared for the City by Northwest Hydraulic Consultants dated December, 2014. The report is available online at the following link http://vancouver.ca/files/cov/CFRA-Phase-1- Final Report.pdf, but the Annexes at the end of the report are blank. All responsive records are attached. Under section 52 of the Act you may ask the Information a: Privacy Commissioner to review any matter related to the City's response to your request. The Act allows you 30 business days from the date you receive this notice to request a review by writing to: Office of the Information a: Privacy Commissioner, [email protected] or by phoning 250·387-5629. If you request a review, please provide the Commissioner's office with: 1) . the request number assigned to your request (#04-1000-20-2017-335); 2) a copy of this letter; 3) a copy of your original request for information sent to the City of Vancouver; and 4) detailed reasons or grounds on which you are seeking the review. Please do not hesitate to contact the Freedom of Information Office at foi@vancouver. ca if you have any questions . City H~ll 453 West 12th Avenue Vancouver BC Y5Y 1V4 vancouver.ca City Clerk's Department tel: 604.873.7276 fax: 604.873.7419 Yours truly, Barbara J.
    [Show full text]
  • Vulnerability Assessment of Arizona's Critical Infrastructure
    Leadership in Sustainable Infrastructure Leadership en Infrastructures Durables Vancouver, Canada May 31 – June 3, 2017/ Mai 31 – Juin 3, 2017 SCOUR IN COMPLEX BRIDGE PIERS: FRASER AND PADMA RIVERS Jose A. Vasquez1,2, Kara I. Hurtig1, Matt S. Gellis1, Andre Zimmerman1, Bruce W. Walsh1. 1 Northwest Hydraulic Consultants Ltd. (NHC), North Vancouver, British Columbia, Canada 2 [email protected] ABSTRACT The construction of complex bridge piers in large sand-bed rivers has become increasingly common. These piers are made by driving or boring a group of piles deep into the riverbed and then connecting them by a pile cap on top, over which the stem of the pier supporting the deck is located. In contrast with conventional footings, the pile cap is located high above the riverbed and close to the water surface, functioning also as protection against ship collision. The combination of several piles, pile cap and stem above the riverbed gives the pier a complex geometry, which does not easily fit with the simple geometry commonly assumed by most scour prediction equations; hence the need for mobile-bed physical modelling in order to determine scour depths for design purposes. We report the results of several complex piers scour experiments carried out at Northwest Hydraulic Consultants’ laboratory including the Golden Ears Bridge, Port Mann Bridge and Pattullo Bridge in the Fraser River, British Columbia and the Padma River Bridge in Bangladesh. These pier tests encompass a wide range of conditions such as vertical and inclined piles (diameters from 1.8 to 3.0 m), rectangular, octagonal and dumbbell-shaped pile caps (pile cap lengths between 18 and 60 m), and flow discharges ranging from 2-year to 100-year floods.
    [Show full text]
  • Fall 2011 Baseline Truck Traffic in Metro Vancouver
    Fall 2011 Baseline Truck Traffic in Metro Vancouver Watercrossings, Border Crossings and Top 10 Truck Volume Locations (Weekday, 6AM-10PM) Transportation Committee Map of the Month March 12, 2014 Legend Screenline Volumes Total Vehicles Counted (fall weekday in 2011) Light and Heavy Commercial Trucks Lions Gate Bridge Passenger Vehicles, Motorcycles, 61,000 Vehicles Second Narrows Bridge Transit Vehicles, Bicycles 1% Trucks 120,000 Vehicles Daily Average from Auto Counts (no truck data) 5% Trucks Regional Land Use Designations Burrard Bridge Industrial and Mixed Employment 53,000 Vehicles Cambie Bridge General Urban 2% Trucks 46,000 Vehicles Agricultural, Conservation & Recreation, Rural 2% Trucks Highway 1 - West of Granville Bridge North Road Brunette Ave. - Pitt River Bridge 51,000 Vehicles 103,000 Vehicles South of Highway 1 70,000 Vehicles 1% Trucks 8% Trucks 53,000 Vehicles 6% Trucks 13% Trucks Port Mann Bridge Arthur Laing Bridge 96,000 Vehicles Knight St Bridge 72,000 Vehicles, 2% Trucks 7% Trucks 89,000 Vehicles Golden Ears Bridge Airport Connector Bridge- 19,000 Vehicles, 5% Trucks 8% Trucks Pattullo Bridge 27,000 Vehicles 8% Trucks Moray Bridge- 17,000 Vehicles, 5% Trucks 63,000 Vehicles Oak St Bridge 7% Trucks Dinsmore Bridge- 21,000 Vehicles, 2% Trucks 78,000 Vehicles Queensborough Bridge 3% Trucks 79,000 Vehicles No. 2 Road Bridge- 30,000 Vehicles, 1% Trucks Highway 1 - West of Highway 91 - West of 9% Trucks 176th Street No. 8 Road Alex Fraser Bridge 70,000 Vehicles 82,000 Vehicles 102,000 Vehicles 12% Trucks 10% Trucks 8% Trucks George Massey Tunnel 77,000 Vehicles 7% Trucks Highway 1 - East of 264th Street 59,000 Vehicles 12% Trucks Point Roberts Border Crossing Highway 13 Border Crossing 5,500 Daily Average Highway 99 Border Crossing Highway 15 Border Crossing 4,400 Daily Average No truck data 13,000 Vehicles 13,000 Vehicles No truck data 1% Trucks 14% Trucks A Note About the Border Crossings Highway 99 Border Crossing prohibits all commercial vehicles, but a small number of commercial trucks were observed on the survey day.
    [Show full text]
  • Design and Construction of MSE Slopes Associated with the Port Mann Bridge, Vancouver, British Columbia
    Design and Construction of MSE Slopes Associated With the Port Mann Bridge, Vancouver, British Columbia Gordon Fung, E.I.T. Geotechnical Engineer, MEG Consulting Ltd., Richmond, BC. German Cajigas, M. Eng., P. Eng. Regional Design Engineer, Tensar International Corporation, Burnaby, BC. Ryan Tones, P. Eng. Project Sponsor, Kiewit Flatiron General Partnership, Vancouver, BC Dan MacDonald, P. Eng. Manager, MSE Group, Nilex, Burnaby, BC. John R. Kerr, M. Eng., P. Eng. Regional Manager, Tensar International Corporation, Calgary, Alberta Ender Parra C., Ph.D. Principal, MEG Consulting Ltd., Richmond, BC. John P. Sully, Ph.D., P.Eng. Principal, MEG Consulting Ltd., Richmond, BC. ABSTRACT This paper presents the seismic modeling performed for the design of a 9-m high 70 o SierraSlope® with an upper 2H:1V fill slope up to 4 m high. The SierraSlope®, a Mechanically Stabilised Earth (MSE) reinforced soil slope using geogrids, was introduced by Tensar International Corporation (Tensar). The facing of the slope is composed of welded wire mesh forms with a synthetic wrap system of Tensar Biaxial Geogrid. The FLAC (Fast Lagrangian Analysis of Continua) finite difference program was used to model the SierraSlope® under seismic loading conditions. The FLAC analyses are considered to provide a comparison and evaluation of the standard design approaches as well as an additional insight into the seismic performance of the SierraSlope®. (Coquitlam), Bridge (the site of the new bridge at the Project Overview Fraser River Crossing), and East (Surrey, Langley). The critical SierraSlope® section considered in the The Port Mann/Highway 1 Improvement Project is a $2.4 dynamic soil structure interaction analysis is located in billion design-build project that includes the widening of 37 Central Segment’s Cape Horn Interchange on the western kilometers of Highway 1, from McGill Street to 216th Street approach to the new Port Mann Bridge.
    [Show full text]
  • Dodam Bridge
    A GLOBAL BRIDGE World’s Longest Sea Bridge NETWORK SYSTRA has been a world leader in the World’s Longest Floating Bridge fi eld of transportation infrastructure for 60 years. Bridges are a major product SHEIKH JABER AL-AHMAD AL-SABAH CAUSEWAY line and a cornerstone of our technical Kuwait MONTREAL excellence in providing safe, effi cient, PARIS SEOUL and economical solutions. SAN DIEGO EVERGREEN POINT FLOATING BRIDGE World’s Longest Span International Bridge Technologies joined Seattle, Washington Railway Cable-Stayed Bridge NEW DELHI SYSTRA in 2017. The two companies DUBAI have combined their complementary World’s Longest technical expertise to offer specialized Concrete Span engineering services in all facets of bridge TIANXINGZHOU BRIDGE design, construction, and maintenance. China World’s Fastest Design & SYSTRA’s Global Bridge Network consists Construction Supervision on any Metro Project of over 350 bridge specialists deployed 3rd PANAMA CANAL CROSSING worldwide, with Bridge Design Centers Colón, Panama World’s Longest located in San Diego, Montreal, São Paolo, Double Suspension Bridge SÃO PAOLO Paris, Dubai, New Delhi, and Seoul. MECCA (MMMP) METRO Saudi Arabia CHACAO BRIDGE BRIDGE DESIGN CENTERS Chacao, Chile • SERVICES • Tender Preparation • BIM / BrIM • Conceptual Design • Complex Drafting & Specialized Detailing • Pre-Bid Engineering • Realistic Graphics • Proposal Preparation - 3D Renderings - Visual Animation • Specifications Preparation - Construction Sequence Animation • Bids Analysis • Technical Assistance During Construction
    [Show full text]
  • Land for LEASE
    Partnership. Performance. Image Source: Google River Road 1611 Patrick Street 0.912 acres (39,727 SF) Patrick Street Savage Road 1600 Savage Road 1.305 acres (56,846 SF) LAND FOR LEASE Opportunity 1600 SAVAGE ROAD & To lease two properties totalling 1611 PatrICK STREET approximately 2.22 acres of fenced RICHMonD, BC yard area in North Richmond Ryan Kerr*, Principal Angus Thiele, Associate 604.647.5094 604.646.8386 [email protected] [email protected] *Ryan Kerr Personal Real Estate Corporation 1600 SAVAGE ROAD & 1611 PatrICK StrEET RICHMonD, BC Location Property Details The subject properties provide the opportunity to lease up to 2.22 acres of fenced and secured yard space conveniently located off of River Road between Available Land Area Savage Road and Patrick Street, east of No. 6 Road, in north Richmond, BC. This site boasts a central location, with convenient access to Vancouver and the rest 1600 Savage Road 1.305 acres (56,846 SF) of the Lower Mainland via major arterials such as Knight Street, SW Marine Drive, 1611 Patrick Street 0.912 acres (39,727 SF) Highway 91, and Highway 99. Total 2.22 acres (96,573 SF)* Zoning *Approximately I-L (Light Impact Industrial Zone) is intended to accommodate and regulate Lease Rate the development of light impact industry, transportation industry, warehouses, $2.25 PSF Net distribution centres and limited office and service uses. Access Each property has one (1) point of access & Property Features egress • 1600 Savage Road is fenced and paved Available Immediately • 1611 Patrick Street is fenced and compacted gravel • Rare opportunity to lease yard of this size in Richmond Ryan Kerr*, Principal 604.647.5094 DriveD riveTime MapTimes Map [email protected] To Snug Cove To Langdale *Ryan Kerr Personal Real Estate Corporation Cypress Provincial Park ture Bay) par Horseshoe o (De Bay aim Nan To Whytecli HORSESHOE BAY Park Ferry Terminal Whytecli Lynn Headwaters MARINE DR.
    [Show full text]
  • IMPROVED APPROACHES to MANAGE ROAD SAFETY INFRASTRUCTURE by PAUL DE LEUR
    IMPROVED APPROACHES TO MANAGE ROAD SAFETY INFRASTRUCTURE by PAUL DE LEUR B Sc., University of Saskatchewan, 1988 M.A.Sc, University of British Columbia, 1992 A THESIS SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY in THE FACULTY OF GRADUATE STUDIES Department of Civil Engineering We accept this thesis as conforming To the required standard THE UNIVERSITY OF BRITISH COLUMBIA January 2001 © Paul de Leur, 2001 Authorization: In presenting this thesis in partial fulfillment of the requirements for an advanced degree at The University of British Columbia, I agree that the Library shall make it freely available reference and study. I further agree that the permission for the extensive copying of this thesis for scholarly purpose may be granted by the Head of my Department or by his representatives. It is understood that copying or publication of this thesis for financial gain shall not be allowed without my written permission. Department of Civil Engineering The University of British Columbia 2324 Main Mall Vancouver, BC Canada, V6T1Z4 ||§ University of British Columbia Preliminary Pages Improving the Management of Road Safety ABSTRACT Due to the importance of road safety, most road authorities and safety agencies employ some type of road safety management program, designed to improve the safety performance for the system users. One road safety management program is delivered through road planning and engineering, aimed to improve the road design features to reduce the frequency and/or severity of collisions. These road safety management programs can be divided into two categories: reactive road safety initiatives (i.e., responding to existing road safety problems) and proactive road safety initiatives (i.e., actions taken to prevent the emergence of problems).
    [Show full text]
  • 573 Sherling Place Port Coquitlam, Bc
    FOR LEASE UNIT 1165 573 SHERLING PLACE PORT COQUITLAM, BC BRAND NEW 3,051 SF INDUSTRIAL LEASE OPPORTUNITY Kevin Volz Rick Eastman Personal Real Estate Corporation Personal Real Estate Corporation Vice President, Industrial Senior Vice President, Industrial 604 640 5851 604 640 5863 [email protected] [email protected] Suite 700 - 700 West Georgia Street / PO Box 10023, Pacifi c Centre / Vancouver, BC V7Y 1A1 / 604 683 3111 / 1 877 788 3111 / cushmanwakefi eld.com FOR LEASE UNIT 1165 573 SHERLING PLACE PORT COQUITLAM, BC LOCATION LEASE RATE 573 Sherling Place, Port Coquitlam is situated at the high exposure $3,295.00 per month, plus GST corner of Fremont Street and Sherling Place in the brand new River’s Edge Business Park in the heart of the Dominion Triangle area. With close proximity to the Pitt River Bridge and Golden Ears Bridge to ADDITIONAL RENT (2017) the east, Coast Meridian Overpass to the west and being only minutes Estimated at $1,057.94 per month, plus GST from the new Cape Horn Interchange, Port Mann Bridge and Highway #1. River’s Edge Business Park off ers a superb location for warehouse and distribution, with excellent profi le for accessory retail and offi ce. COMMENTS Minimum 3 year lease term or longer. FEATURES • High end architecturally designed building • Extensive ground & mezzanine level glazing • 24’ clear ceiling height • 500 lbs per square foot fl oor load rating • ESFR rated sprinkler system • T-5 fl uorescent lighting • 100 amp, 347/600 volt, 3 phase electrical service • Rear grade level loading • Three (3) parking spaces • Forced airgas warehouse heaters AVAILABLE AREA Main Floor Warehouse 2,088 sf Mezzanine Floor 963 sf Total Available Area 3,051 sf ZONING M-3 (Clean Industrial) zoning allows for uses including clean manufacturing, high tech, commercial indoor recreation, warehousing and select offi ce and retail uses.
    [Show full text]
  • Think Big. Vancouver Think Richmond Industrial Centre
    Think Big. Vancouver Think Richmond Industrial Centre. International Vancouver Airport Richmond Industrial Centre is the largest business park campus in the history of Metro Vancouver, providing over 2.8 million square feet of leasable space in a new 170-acre industrial estate. Highway 91 Richmond Industrial Centre offers a wide range of capacity Westminster Highway and design options suitable for various sizes of business. Highway 99 The current phase of development is 8011 Zylmans Way totaling 500,000 square feet, with anticipated delivery Q2 2021. Blundell Road Facts & Figures Total Area: 2.8 M SF 170 Acres Buildings: 12 Green Space: 40 Acres Employment Jobs Generation: 4,800 Port of Vancouver’s Richmond Logistics Hub Richmond Industrial Centre campus buildings offer state-of-the-art features including: • 36’ clear ceiling heights • 185’ loading courts • 9’ x 10’ dock doors equipped with 40,000 lb • LED lighting hydraulic levelers, seals and bumpers Market-leading design focused on efficiency • ESFR sprinkler systems More – Richmond Industrial Centre incorporates • 55’ x 35’ standard column grid sustainable and innovative design features • 2,000A, 347/600V, 3-phase electrical service to cost-effectively deliver optimum building • 60’ staging bays (additional capacity available) Efficient specifications. • 50’ reinforced concrete loading aprons • High volume destratification fans • 16’ x 16’ drive-in loading doors • Offices built-to-suit • Warehouse floors designed for 750 lbs per • Designed to the latest ASHRAE standards square foot live load Built-To-Suit Key Plan BLUNDELL ROAD 8020 8015 Zylmans By Montrose Pierson Way 8011 Zylmans Way Road 500,000 SF 100% • Site preparation has been progressing rapidly with the recent completion of the LEASED Blundell Road extension.
    [Show full text]
  • Industrial/Office Unit 2140-570 Sherling Place Port Coquitlam
    FOR SALE | INDUSTRIAL/OFFICE UNIT 2140-570 SHERLING PLACE PORT COQUITLAM X 4,650 SF Office/warehouse unit X River Edge Business Park Location Highlights Situated in the heart of the Dominion Triangle area of Port Coquitlam, 570 Sherling Place X Concrete tilt-up with insulated exterior is located at the high exposure corner of Sherling Place and the Fremont Connector in the walls brand new River’s Edge Business Park. With close proximity to the Pitt River Bridge and the X Grade level loading Golden Ears Bridge to the east, the Coast Meridian Overpass to the west and being only X Approx. 22’ foot warehouse ceiling minutes from the Cape Horn Interchange, the Port Mann Bridge and Highway #1, River’s heights Edge Business Park offers a superb location for warehousing and distribution. Surrounded X 3-phase electrical power by the Fremont Village Shopping Centre, Mosaic’s Dominion residential development, X Five (5) Parking stalls with loading area Carnoustie Golf Club and recreational riverside parks and trails. River’s Edge Business Park X High exposure to Fremont Connector also offers unparalleled retail and lifestyle amenities. X High end architechually designed building X Fully finished offices over two levels with HVAC Ryan Barichello Chris McIntyre D 604.630.3371 C 604.889.4146 Personal Real Estate Corporation [email protected] D 604.630.3392 C 604.889.0699 [email protected] 475 West Georgia Street, Suite 800 | Vancouver, BC V6B 4M9 | 604.684.7117 | leevancouver.com FOR SALE | INDUSTRIAL/OFFICE UNIT 2140-570 SHERLING PLACE PORT COQUITLAM Zoning Strata Fees Asking Price M3 Industrial - Allows for clean manufacturiing, high tech, service $689.47 $1,930,000.00 and distribution use Taxes & Operating Costs (2019) Availability Features $16,540.94 Contact Agent X Fully finished offices over two levels with HVAC X Private offices, boardroom, lunchroom with kitchen and Floor Plans 100 WARE reception/showroom areas.
    [Show full text]
  • Port Mann/Highway 1 Improvements
    Port Mann/Highway 1 Improvements McGill St. Hastings St. First Ave. Port Coquitlam Boundary Rd. Willingdon Ave. Grandview Hwy. Sprott St. Kensington Ave. Brunette Ave. Cape Horn Gaglardi Way Port Mann Bridge 152nd St. 160th St. 176th St. 192nd St. 200th St. Consultation on Access and Interchange Improvements 216th St. Pre-design Community Consultation Phase 2 200 St Discussion Guide on Access and Interchange Improvements www.gatewayprogram.bc.ca September – November 2006 CONSULTATION ON ACCESS AND INTERCHANGE IMPROVEMENTS: PRE-DESIGN COMMUNITY CONSULTATION PHASE 2 The Ministry of Transportation conducts community consultations at three design stages, including: Pre-design Consultation: Phase 1 Pre-design Consultation: Phase 2 Preliminary Design Consultation Detailed Design Consultation February – April 2006 September – November 2006 2008 2009 Pre-design consultation discussion topics This phase of consultation focuses on With basic pre-design components Detailed design consultation generally focuses included goals for interchange upgrades, proposed conceptual improvements determined, consultation on preliminary on fewer but more specifi c treatments, such congestion reduction measures such as high to existing and new interchanges and design discusses refi nements to interchanges as detailed interchange and access features, occupancy vehicle lanes (HOV) and transit overpasses. These proposed modifi cations and accesses, lane use, specifi cs of congestion lighting and landscaping. This phase also priority on-ramps, commercial vehicle priority and upgrades would improve safety, access reduction measures and other key features. involves more fi nancial and technical analysis access to on-ramps, potential tolling, and and connections across the highway, support to confi rm that designs are fi nancially and improvements to the cycling network.
    [Show full text]
  • 573 Sherling Place Port Coquitlam, Bc
    FOR LEASE UNIT 1115 573 SHERLING PLACE PORT COQUITLAM, BC 1,892 SF SHELL WAREHOUSE Kevin Volz Rick Eastman Personal Real Estate Corporation Personal Real Estate Corporation Vice President, Industrial Executive Vice President, Industrial 604 640 5851 604 640 5863 [email protected] [email protected] Suite 700 - 700 West Georgia Street / PO Box 10023, Pacifi c Centre / Vancouver, BC V7Y 1A1 / 604 683 3111 / 1 877 788 3111 / cushmanwakefi eld.com FOR LEASE UNIT 1115 573 SHERLING PLACE PORT COQUITLAM, BC LOCATION LEASE RATE The subject property is situated at the high exposure corner of $2,672.45 per month, net, plus GST (shell) Fremont Street and Sherling Place in the River’s Edge Business Centre in the heart of the Dominion Triangle area. It is within close proximity to the Pitt River Bridge and Golden Ears Bridge to the east, Coast ADDITIONAL RENT (2020) Meridian Overpass to the west and being only minutes from the Estimated at $1,102.55 per month, plus GST Cape Horn Interchange, Port Mann Bridge and Highway #1. River’s Edge Business Centre off ers a superb location for warehouse and distribution, with excellent profi le for accessory retail and offi ce. ZONING M-3 (Clean Industrial) zoning allows for uses including clean manufacturing, high tech, commercial indoor recreation, warehousing and select offi ce and retail uses. BUILDING FEATURES • Concrete tilt-up construction • High end architecturally designed building • Extensive ground & mezzanine level glazing • Minimum 24’ clear ceiling height • 500 lbs per square foot fl oor load rating • ESFR rated sprinkler system • Forced air gas warehouse heater • T-5 fl uorescent lighting • 100 amp, 347/600 volt, 3 phase electrical service • One (1) rear 12’ x 12’ grade level loading door with generous truck maneuvering • Three (3) parking spaces AVAILABLE AREA Shell Warehouse 1,892 sf AVAILABILITY September 1, 2020 1185 1180 1175 1170 1165 1145 1140 1135 1130 1125 1120 1115 1110 1105 35,712 S.F.