Bid Package Consists of TWO (2) Documents

Total Page:16

File Type:pdf, Size:1020Kb

Bid Package Consists of TWO (2) Documents Town of Needham Department of Public Works – Administration Public Services Administration Building 500 Dedham Avenue Needham, Massachusetts 02492 Telephone (781) 455 7550 ACKNOWLEDGEMENT OF RECEIPT Release Date Thursday, August 2, 2012 (on Web) Bid Title Purchase and Delivery of One (1) CCTV Truck Bid Number IFB 13-40-01 Number of The Bid Package consists of TWO (2) documents. Returning Documents this form confirms receipt of all the documents. Pre-Bid Meeting Refer to the IFB Questions Due 1:00 PM, Thursday August 9, 2012 10:00 AM Thursday, August 16, 2012, Administration Office of the Public Works Department, Public Services Administration Bids are Due Building (PSAB), Second Floor 500 Dedham Avenue, Needham, Massachusetts, 02492 Please provide the requested information below as acknowledgment that you have received our bid package noted above. It is recommended that interested bidders complete this acknowledgment and return via Fax to the Department of Public Works (781) 449-9023 or by mail. Only by doing this, will the Town be able to provide notification of any addenda or answered questions relating to this bid. Only those companies or individuals shown on the Distribution Register will receive addenda to this bid. By completing and returning this acknowledgement will ensure you are recorded on the Distribution Register. Proposals from companies or individuals not acknowledging the addenda may be rejected as not responsive. Name of Company or Individual (Print) Name / Title of Contact (Print) Address (line 1) (Print) Address (line 2) (Print) Telephone Number Fax Number E-mail Address (Print) Signature Date * Any hand delivery or facsimile received after the due date and time will not be addressed. Please allow enough time for hand delivery or facsimile transmissions. (Advertised in Needham TIMES issue of Thursday, August 2, 2012) (Published in Goods & Services Bulletin of Monday, July 30, 2012) LEGAL NOTICE TOWN OF NEEDHAM, MASSACHUSETTS INVITATION FOR BIDS (IFB) IFB 13-40-01 Purchase and Delivery of One (1) Closed Circuit Television (CCTV) Truck The Town of Needham invites sealed bids for the Purchase and Delivery of One (1) CCTV Truck. Information and details of bidding requirements will be available beginning August 2, 2012, at the Second Floor Administration Office of the Public Services Administration Building, 500 Dedham Avenue, Needham, Massachusetts, 02492, or by calling (781) 455-7550, or on-line at the Town’s website www.needhamma.gov/bids.aspx. Sealed bids will be received at the Second Floor Administration Office, Public Services Administration Building, 500 Dedham Avenue, Needham, Massachusetts 02492 until 10:00 AM, Thursday August 16, 2012 and then will be publicly opened and read aloud at 10:10 AM, in the Charles River Room at the Public Services Administration Building, 500 Dedham Avenue, Needham, MA 02492. Insurance Coverage required at time of award. Bids are subject to the provisions of M.G.L. Chapter 30B as amended to date. The Town, acting through its Town Manager, reserves the right to reject any or all bids if it is in the public interest to do so or to waive minor informalities. Kate Fitzpatrick Needham Town Manager Needham Department of Public Works Page 2 of 46 Purchase and Delivery of One (1) CCTV Truck IFB 13-40-01 IFB 13-40-01 Purchase and Delivery of One (1) CCTV Truck Procurement Schedule Bid Package Available: August 2, 2012 Information and details of bidding requirements may be obtained at the Public Services Administration Building, Second Floor Administration Office, 500 Dedham Avenue, Needham, MA 02492, or on-line at the Town’s web site http://www.needhamma.gov/bids.aspx Deadline for Written Questions: 1:00 PM, Thursday August 9, 2012 By Mail: Dylan Cook, Administrative Analyst, Public Works Department, 500 Dedham Avenue, Needham, MA 02492 By Fax: 781-449-9023, attn: Dylan Cook, Administrative Analyst By e-mail: [email protected] Questions are to be clearly labeled as: CCTV Truck – 13-40-01 - Questions Addenda: If any changes are made to this bid, an addendum will be issued. Addenda will be e-mailed, faxed, or mailed by USPS, as set forth in the IFB document, to all bidders on record as having received the bid package. When and where bids are due: 10:00 AM Thursday, August 16, 2012, Public Services Administration Building, Second Floor Administration Office, 500 Dedham Avenue, Needham, MA 02492. Late submissions will not be accepted. Where and where bids will be opened: 10:10 AM Thursday, August 16, 2012, Charles River Room, Public Services Administration Building, 500 Dedham Avenue, Needham, MA 02492. intentionally left blank Needham Department of Public Works Page 3 of 46 Purchase and Delivery of One (1) CCTV Truck IFB 13-40-01 IFB 13-40-01 PURCHASE & DELIVERY OF ONE (1) CCTV Truck BID DESCRIPTION AND BIDDING REQUIREMENTS: The Town of Needham (Town) is circulating this invitation for bids with the intention of acquiring bids for the Purchase and Delivery of One (1) CCTV Truck for use by the Town’s Water, Sewer and Drains Division. All bids are subject to the provisions of M.G.L. Chapter 30B. The bidder shall submit his/her bid proposal on the bid form supplied within these specifications. All bid proposals shall be signed correctly with ink. All bid proposals shall be submitted to the Director of Public Works, Town of Needham, 500 Dedham Avenue, Needham, Massachusetts 02492. Each proposal shall be sealed in an envelope on which is clearly indicated the Company Name and Address, Bid for Purchase and Delivery of One (1) CCTV Truck, IFB 13-40-01, Bid Due Date: August 16, 2012 @ 10:00 AM. All submitted bids shall include the Invitation for Bids IFB 13-40-01, Bid Description, Bid Specifications and Bid Form. If forwarded by mail, preferably by registered mail, the above-mentioned envelope shall be enclosed in another envelope, which shall be addressed to the Director of Public Works, Town of Needham, 500 Dedham Avenue, Needham, Massachusetts 02492. Bid Proposals received at the Administration Office of the Director of Public Works after the time of opening of bids designated in the Procurement Schedule will be returned to the bidder unopened. Bid Proposals will be publicly opened and read at the date, time and place indicated in the Procurement Schedule. Bidders, or their authorized agents, are invited to be present. Before any contract is awarded, the bidder may be required to furnish a complete statement of the origin, composition and manufacturer of all materials to be supplied under his/her proposal. In the event that changes/additions are made to this Invitation for Bids (IFB), addenda will be issued. Addenda will be emailed to every potential responder on record as receiving the bid package, if an email address is not available then it will be faxed, if a fax number is not available then it will be mailed first class via USPS. The Bidder shall be satisfied as to the requirements of the contemplated services to enable intelligent preparation of this bid. The Bidder shall be familiar with all the IFB documents before submitting the bid in order that no misunderstanding shall exist in regard to the nature and character of the contemplated services to be performed. No allowance will be made for any claim that the bid is based on incomplete information. Inquiries concerning any part of this IFB shall be directed to the individual(s) listed under the Procurement Schedule. Bidders should note that oral communications are not binding on the Town. Questions must be sent in writing and may be delivered by hand, fax or email as referenced under the Procurement Schedule by the deadline. The Town will respond to written questions that are received by the deadline and will forward responses to all persons who are on record as receiving the bid package. Questions received after the due date will not be responded to unless the Town determines it is necessary. Needham Department of Public Works Page 4 of 46 Purchase and Delivery of One (1) CCTV Truck IFB 13-40-01 All prices quoted shall be for materials and/or services delivered to the Department of Public Works, 500 Dedham Avenue, Needham, MA 02492. Discounts for payment within stipulated time periods will not be considered in the comparison of bids. Any adjustment of said prices shall be outlined in sufficient detail to allow intelligent comparison of bids. Any decrease in the price of materials and/or services during the period of the contract shall be to the advantage of the Town. Insurance: The selected vendor will be required to supply Proof of Insurance listing the Town of Needham as additionally insured on an annual basis. See sample Short Form Agreement on the Town’s website for qualifying coverage amounts. Vendor Selection: The Town will review all bids, and will award the contract to the lowest responsive and responsible bidder. The Town reserves to itself the right to accept or reject any and all bids, or to allow or deny variations from these specifications. Such actions will be deemed to be in the best interest of the Town. Unless sooner rejected or accepted, all bid proposals must be firm and continue in effect for thirty calendar days (30) following the date of bid opening. Upon vendor selection, the Town of Needham will mail to the selected vendor, three (3) contracts to be executed by the vendor and returned to the Town of Needham with the appropriate insurance certificates. The Town of Needham will then counter execute the three (3) contracts and return one complete contract to the vendor. A sample Short Form Agreement prepared by Town Counsel of the Town of Needham is available on the Town’s website.
Recommended publications
  • LHC 02570-1 SECTION 02570 MANHOLE CONSTRUCTION PART 1 – GENERAL 1.1 Description A. Description of the Work the Work to Be Perf
    SECTION 02570 MANHOLE CONSTRUCTION PART 1 – GENERAL 1.1 Description A. Description of the Work The work to be performed in accordance with this section includes precast or cast in place concrete manhole construction for sewer and storm drain collection systems. The work shall include the furnishing of all labor, tools, equipment, materials and performing all required operations to provide a complete item in accordance with the project plans and these specifications. B. Related Work Specified Elsewhere Trench Excavation and Backfill..........................Section 02300 Sewer Line Construction...................................Section 02560 Storm Drain Construction..................................Section 02500 1.2 Quality Assurance A. Reference Test Standards and Specifications ASTM A48, Specifications for Grey Iron Castings ASTM C478, Specification for Precast Reinforced Concrete Manhole Sections ASTM C1107, Specification for Packaged Dry, Hydraulic-Cement Grout, Nonshrink ASTM D4101, Specification for Propylene Plastic Injection and Extrusion Materials AWWA C210, Standard for Liquid Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines LHC 02570-1 B. Leakage Test Test all manholes installed under this contract using the vacuum method described below. Provide all equipment necessary to perform the test. Coordinate test schedule with the OWNER. Test will not be accepted unless witnessed by the OWNER. 1. Test each manhole immediately after assembly and prior to backfilling. 2. Plug all lift holes with an approved non-shrink grout. 3. Plug all pipes entering the manhole, taking care to securely brace the plug from being drawn into the manhole. 4. Place the test head inside of the top of the cone section and inflate seal in accordance with the manufacturers recommendations.
    [Show full text]
  • Infiltration Trench & Soakaway
    An Infiltration Trench System includes an inlet pipe or water source, catch basin sump, perforated DESIGN PRINCIPLES distribution pipe, infiltration trench and overflow to the storm drainage system. ■ Infiltration Trench System: A Soakaway Manhole (Sump, or Dry Well) System includes an inlet pipe, a sedimentation manhole, and one or more infiltration shafts with connecting pipes. Use of Infiltration Shaft will be limited by hydro- a) Locate infiltration trench at least 3m geotechnical conditions in much of GVRD. from any building, 1.5m from Limitations of Infiltration Trench or Soakaway Manholes: property lines, and 6m from adjacent a) To avoid groundwater pollution, do not direct un-treated polluted runoff to Infiltration Trench or Shaft: infiltration facilities (or as recommended by a geotechnical ▪ Direct clean runoff (roof, non-automobile paving) to Infiltration Trench or Shaft. engineer). ▪ For polluted runoff (roads > 1000 vehicles / day, parking areas, other pollution sources), provide upstream source control for pollutant reduction prior to release to Infiltration Trench or Shaft. b) Sump: Provide a lid for periodic b) Use infiltration trench or shaft only in areas with footing drains. inspection and cleanout. Include a 1. Grass or Other Planting T-inlet pipe to trap oils, sediments 2. Finish Grade and debris. 3. Growing Medium Backfill 4. 100mm Dia PVC DR28 Perforated 19 c) Infiltration Trench: installation of Pipe distribution pipe and bottom of 5. Light Non-woven Polyester drainrock to be level. If more than Geotextile c/w Min. 400mm Laps one section of infiltration trench is 9 1 required, design so that underground 6. 50mm Drain Rock or Rock of water is temporarily ‘ponded’ in each Equal Porosity infiltration section.
    [Show full text]
  • July 16, 2021 Obstruction Notice
    CITY OF SPOKANE OBSTRUCTION NOTICE For more information contact Jessica Fisher 509.625.6749; [email protected] July 16 – 23, 2021 Some construction projects have been suspended due to the pandemic and others are on different schedules. Please be prepared for changes in street obstructions. For details on projects throughout Spokane County, visit www.srtc.org. Don’t compete. Share the street. Visit StickmanKnows.org for rules of the road and safety tips. Projects highlighted in RED have notable changes this week. Construction is tentative and subject to change at any time. CONSTRUCTION PROJECTS ARTERIAL CHIP SEAL – ECONOMIC RECOVERY PROJECT Crews are starting work on the arterial chip seal project. Locations include: o Freya Street between Wellesley Avenue and Upriver Drive will have single lane closures on Friday, July 16 and Monday, July 19. Flaggers will be onsite. o Freya Street between 37th Avenue and Palouse Highway will have single lane closures on Monday, July 19 and Wednesday, July 21 through Friday, July 23. Flaggers will be onsite. o Southeast Boulevard between Perry Street and 29th Avenue will have single lane closures on Friday, July 16, and Monday, July 19 through Friday, July 23. Flaggers will be onsite. This project will apply chip seal to preserve pavement life. This is a $500,000 project. CENTENNIAL TRAIL – SUMMIT GAP – BOONE TO PETTET Work on this project spans from Boone Avenue to Pettet Drive on Summit Boulevard, Mission Avenue, and West Point Road. Mission Avenue is closed from Cochran Street to West Point Drive for a water main installation. This project will complete an unfinished section of the Centennial Trail in the West Central Neighborhood.
    [Show full text]
  • Aquincumi Füzetek 13 (2007)
    AQUINCUM A BTM Aquincumi Múzeumának ásatásai és leletmentései 2006-ban Excavations and rescue work at the Aquincum Museum in 2006 Budapest, 2007 Szerkesztő: Edited by: Zsidi Paula, Vámos Péter Paula Zsidi, Péter Vámos Fordítás: Translation by: Simán Katalin, Alice M. Choyke Katalin Simán, Alice M. Choyke Technikai szerkesztő: Technical assistance by: Kolozsvári Krisztián Krisztián Kolozsvári A külső borítón elöl: Front cover: Sír feltárása a volt Óbudai Gázgyár Excavation of a grave in the territory of területén (Budapest, III. ker., Záhony the former Óbuda Gas Factory (Budapest utca 7., Graphisoft Park) III, 7 Záhony Street, Graphisoft Park) A külső borítón hátul: Back cover: Kora császárkori sírkertek feltárása az Excavation of Early Imperial Period M6-os autópálya Érd és Nagytétény graveyards on the route of M6 highway közti szakaszán (Budapest, XXII. ker., between Érd and Nagytétény (Budapest Nagytétény) XXII, Nagytétény) A belső borítón: Inside cover: A 2006-ban végzett megelőző Locations of larger investment led feltárások helyszínei excavations in 2006 Budapesti Történeti Múzeum, 2007 Felelős kiadó: Dr. Bodó Sándor főigazgató Budapest Historical Museum, 2007 Editor-in-chief: Dr. Sándor Bodó, Director A BTM Aquincumi Múzeumának ásatásai és leletmentései 2006-ban Excavations and rescue work at the Aquincum Museum in 2006 Budapesti Történeti Múzeum Aquincumi Múzeum Aquincumi füzetek 13. szám ISSN 1219-9419 (Aquincumi füzetek) ISSN 1219-9427 (Aquincum) Tartalom Contents Régészeti feltárások Budapest területén Archaeological excavations in the territory 2006-ban . 8 of Budapest in 2006 . 8 A 2006-ban végzett nagyobb megelőző Sites of the larger investment-led feltárások helyszínei . 10 excavations conducted in 2006 . 10 Korarómai településrészlet és római The excavation of part of an early temető feltárása Budaújlakon Roman settlement and Roman cemetery (Anderkó Krisztián – R.
    [Show full text]
  • Section 02308 Tunnel Shafts Note to Specifier: This
    THE CITY OF GALVESTON TUNNEL SHAFTS SECTION 02308 TUNNEL SHAFTS NOTE TO SPECIFIER: THIS SPECIFICATION IS INCLUDED FOR REFERENCE BUT SHALL BE THOROUGHLY REVIEWED FOR APPLICABILITY AND REVISED AS NECESSARY FOR PROJECT SPECIFIC REQUIREMENTS. PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Construction, maintenance, and backfilling requirements of tunnel shafts. 1.02 UNIT PRICE A. Tunnel shafts, both those shown on Drawings and those needed for Contractor's access, are bid as a lump sum for all shafts, collectively. Prior to construction, the Contractor shall provide a schedule of values as specified in Section 01292 - Schedule of Values. Itemize the cost by station for each shaft designated on the Drawings and additionally required for construction operations. Seventy-five percent of the itemized amount will be submitted on a pay estimate upon shaft installation; twenty-five percent will be submitted on a pay estimate upon backfill and site restoration (including topsoil, sodding and hydromulching). Payment will include excavation, disposal of excavated materials, ground support systems, backfilling, and cleanup. Manholes constructed in tunnel shafts are to be paid separately at the contract unit price as specified in Section 02601 - Precast Concrete Manholes or 02600 - Cast in Place Manholes. B. Removal and replacement of surface improvements necessary for shaft construction, such as sidewalks, asphaltic and concrete pavement, base and subbase, curbs, curb and gutter, driveways, topsoil, sodding and hydromulch shall be included in the lump sum for shafts. C. Relocation of Owner’s utilities shall be paid for at the contract unit price, only when included in the bid proposal.
    [Show full text]
  • STORM DRAINAGE B-2A Directional Vaned Grate
    TABLE OF CONTENTS CITY OF SPOKANE STANDARD PLANS B-101B = Revised Standard Plan ***W-108A = New Standard Plan Plan No. Plan Title Current Plan Date SECT B: STORM DRAINAGE B-2A Directional Vaned Grate .......................................................................................... 5/07 B-2B Bi-Directional Vaned Grate ..................................................................................... 5/07 B-2C Grate Guard ............................................................................................................ 5/07 B-3A Frame and Grate for CB – Type 1........................................................................... 4/13 B-3B Frame and Grate for CB – Type 3........................................................................... 4/13 B-3C Frame and Grate for Inlet – Type 3 ......................................................................... 4/13 B-15A Proper Method for Determining Ground Water Height ............................................ 2/86 B-18C Utility Trench Backfill – Pipe Zone .......................................................................... 2/17 B-18D Utility Trench Backfill – Above Pipe Zone................................................................ 4/12 B-18E Utility Trench Backfill – Requirements using CDF ................................................... 1/17 B-19 Cut-Off Wall ............................................................................................................ 1/17 B-101B Catch Basin – Type 0 .............................................................................................
    [Show full text]
  • Transit Rapid Transit System
    TRANSIT RAPID TRANSIT SYSTEM EXTENSIONS COMPENDIUM OF DESIGN CRITERIA VOLUME III AERIAL GUIDEWAY DESIGN CRITERIA CHAPTER 4 ELECTRICAL DESIGN CRITERIA INTERIM RELEASE REV 1 OCTOBER 30, 2008 PROGRAM MANAGEMENT CONSULTANT – Intentionally Left Blank – TRANSIT – Intentionally Left Blank – VOLUME III – AERIAL GUIDEWAY CHAPTER 4 – ELECTRICAL INTERIM RELEASE REV 1 TRANSIT DOCUMENT REVISION RECORD ISSUE NO. DATE REVISION DESCRIPTIONS 0 5-8-07 Interim Release 1 10-30-08 Revisions to incorporate MIC-EH design specifications that have been adopted by MDT. ISSUE NO. SECTIONS CHANGED 1 4.05.1.1 Corrosion Control -Scope- (grammar correction) 4.05.1.2 Corrosion Control -Scope- included other utilities within list 4.05.2.3 Corrosion Control -Electrical Equipment - FRE only for Traction Power. 4.05.3.1.A.1 Corrosion Control - Stray Current Corrosion Control - Stray Current Control – (grammar correction) 4.05.3.1.A.5a&b Corrosion Control - Stray Current Corrosion Control - Stray Current Control 4.05.3.1.B.3 Corrosion Control - Stray Current Corrosion Control - Stray Current Control – (formatting correction) 4.05.3.2.F Corrosion Control - Stray Current Corrosion Control – Utilities – (formatting correction) 4.05.5.2 Corrosion Control - Test Stations - Ground Fault Monitoring Stations 4.06.1 Systems-Facilities Interface Raceway - Scope 4.06.2.9.B Systems-Facilities Interface Raceway - Physical Relationships - Wayside Facilities 4.06.2.10.B Systems-Facilities Interface Raceway - Physical Relationships - Raceway Transitional Areas 4.06.3.2.C Systems-Facilities Interface Raceway - Physical Installation - Construction Guidelines - Traction Power Pullboxes 4.06.4.3.C Systems-Facilities Interface Raceway - Materials of Construction-Application of Raceway-Cableway 4.06.5.2.A Systems-Facilities Interface Raceway -Raceway Identification Methods - Raceway Designations VOLUME III – AERIAL GUIDEWAY CHAPTER 4 – ELECTRICAL INTERIM RELEASE REV 1 TRANSIT ISSUE NO.
    [Show full text]
  • Manhole Security Protecting America’S Critical Underground Infrastructure
    Manhole Security Protecting America’s Critical Underground Infrastructure Irwin M. Pikus, PH.D., J.D. Irwin M. Pikus, PH.D., J.D. November 2006 November 2006 Table of Contents Section Page Executive Summary 3 Introduction 4 Ownership and Control 6 of Manholes and Covers Characterizing Manholes 7 and Underground Infrastructure Potential Threats to Underground 9 Infrastructure through Manholes Consequences of an Attack on 11 Underground Infrastructure Simulations: Underground Attack 13 Scenarios and Consequences The Tiering System: Setting Priorities 15 and Assessing Risks Mitigating Risk and Reducing Vulnerabilities 16 Conclusion and Suggested Actions 17 Appendices A. Examples of Underground Infrastructure Vulnerabilities 18 B. References 19 Irwin M. Pikus, Ph.D., J.D. Dr. Pikus is a physicist and attorney who served the United States government in Senior Executive positions dealing with science, technology and national secu- rity over a 25 year span. Prior to that, Dr. Pikus led research projects in the aerospace and electronics industry. He was appointed a Commissioner of the Presi- dent’s Commission on Critical Infrastructure Protection and since his retirement from government service has provided expert and consulting services in critical infrastructure protection to a number of public and private organizations. He is currently Visiting Professor of Systems Engineering at the University of Virginia. Dr. Pikus chairs the Methodology sub-committee of ASCE’s Water Infrastructure Security Enhancements Standards Committee and was principal investigator for the ASCE-EPA project on early warning systems for water utilities. Acknowledgements The following individuals provided comments and insight critical to the development and editing of this paper: Ed Badolato, President & CEO of Integrated Infrastructure Analytics, Inc.
    [Show full text]
  • Kennings/Sixt Hire Centre, Duke Street Ipswich, Suffolk IPS 634
    ARCHAEOLOGICAL EVALUATION REPORT SCCAS REPORT No. 2010/160 Kennings/Sixt Hire Centre, Duke Street Ipswich, Suffolk IPS 634 S. Cass & M. Sommers © December 2010 www.suffolkcc.gov.uk/e-and-t/archaeology Lucy Robinson, County Director of Economy, Skills and Environment Endeavour House, Russell Road, Ipswich, IP1 2BX. HER Information Planning Application No: Pre-application (IP/10/00629/FUL) Date of Fieldwork: 16th-17th August 2010 & 29th-30th November 2010 Grid Reference: TM 1711 4397 Funding Body: Barnes Construction (for Travelodge) Curatorial Officer: Keith Wade Project Officer: Simon Cass Oasis Reference: suffolkc1-81200 Digital report submitted to Archaeological Data Service: http://ads.ahds.ac.uk/catalogue/library/greylit Contents Summary Page 1. Introduction 1 2. Geology and topography 1 3. Archaeological and historical background 3 4. Methodology 3 5 Results 4 5.1 Introduction 5.2 Trench 1 5.3 Trench 2 5.4 Trench 3 5.5 Trench 4 6. Finds and environmental evidence 13 7. Discussion 13 8. Conclusions and recommendations for further work 17 9. Archive deposition 17 10. List of contributors and acknowledgements 18 11. Bibliography 18 Disclaimer List of Figures 1. Site and trench location 2 2. Plan of Trench 4 7 3. Reconstruction of the likely profile of structure 0009 11 4. Ordnance Survey (1883) 1:1250 Scale Sheet (rescaled extract) 14 5. Ordnance Survey 3rd Edition (c. 1900) 1:2500 Scale Sheet (rescaled extract)14 6. Plan showing location of air-raid shelter and the manhole entrance 15 List of Plates I. Brick-lined well in Trench 1, facing west 4 II. Trench 3, facing north 5 III.
    [Show full text]
  • City of Houston Design Manual Chapter 8 WASTEWATER
    City of Houston Design Manual Chapter 8 WASTEWATER COLLECTION SYSTEM DESIGN REQUIREMENTS CITY OF HOUSTON DESIGN MANUAL Houston Public Works Wastewater Collection System Design Chapter 8 WASTEWATER COLLECTION SYSTEM DESIGN REQUIREMENTS 8.01 CHAPTER INCLUDES A. Criteria for the design of wastewater collection systems. B. This Chapter addresses the design of the wastewater collection systems within the public Right-Of-Way or a dedicated public easement. Sanitary sewers located on private property that are not in such a dedicated easement, are under the jurisdiction of the Plumbing Code, and will be reviewed by the Code Enforcement Branch. 8.02 REFERENCES A. Refer to the list of references in Chapter 1, General Requirements. B. City of Houston Engineering Design Guidelines Manual for Submersible Lift Stations. C. City of Houston Design Guideline Drawings for Submersible Lift Stations. D. Uniform Plumbing Code, latest edition adopted by the City. 8.03 DEFINITIONS A. Public Sewer - A closed conduit which conveys wastewater flow and which is located within the public Right-Of-Way or dedicated public sanitary sewer easement. A public sewer (or public sewer system) is intended to serve more than one residential, commercial, or industrial site. B. Private Sewer - A closed conduit which conveys wastewater flow and is constructed and maintained by a private entity (i.e. homeowner's association). Private sewers may be located in areas such as a private street or common area. Private sewers are subject to the design and construction requirements of the Plumbing Code and must discharge to a public sewer. C. Sewer Line -A public sewer located within public Right-Of-Way or Permanent Access Easement (PAE) I Public Utility Easement (PUE) that is maintained and operated by the City.
    [Show full text]
  • Precast Concrete Manholes Why Provide Guidelines?
    PRECAST CONCRETE MANHOLES WHY PROVIDE GUIDELINES? Past Problems • Was tedious to keep track of variables • Was easy to make mistakes • Wanted: A design tool to reduce problems TOPICS • Overview on Precast Manholes • Applications • Design Procedures and Applicable Standards • Watertight Structures • Quality • Installation PRECAST CONCRETE MANHOLES Round Structures • ASTM C478, “Standard Specification for Precast Reinforced Concrete Manhole Sections” PRECAST CONCRETE MANHOLES Rectangle / Square Structures • ASTM C913, “Standard Specification for Precast Concrete Water and Wastewater Structures” • DO NOT Specify a Box Culvert for a vertical application. Box Culverts are designed for horizontal installations and loading conditions. • Specify ASTM C913 for square structures. COMMON SIZES Round – ASTM C478 • Internal Diameter (I.D.) • 36” – 144” • Check with local manufacturer for availability of larger diameter structures. Custom box structures are easily fabricated using universal forming equipment. COMMON SIZES Rectangle / Square ASTM C913 • 24” x 24” to 72” x 72” • sizes increase by 6” increments MANUFACTURING METHODS Wet-Cast • Cast with an inner and outer form. • Product cured in the form. • Blockouts/hole formers can easily be incorporated. MANUFACTURING METHODS Wet-Cast • Cast with conventional concrete or self-consolidating concrete. • Base sections are typically wet-cast. • Wet-cast is common for sanitary applications. MANUFACTURING METHODS Dry-Cast (Machine Made) • Product is cast utilizing mechanized equipment. • Form vibrators consolidate zero-slump concrete between core and jacket. Manufacturing Methods • The product is immediately stripped and the form is reused. • Products typically cured in a kiln or a combination of tarps and moisture curing is used. MANUFACTURING METHODS Dry-Cast (Machine Made) • Both round and square structures may be dry-cast.
    [Show full text]
  • Line Manhole (Sewer and Storm Drain)
    CUT TO CONFORM TO BASE CONTOUR FLOWLINE & CONCRETE FIELD JOINT (TYP.) SIDES OF MANHOLE SEE NOTE 2 BELOW 1 . : P Y 12 T PIPE / MANHOLE CONNECTION (TYP.) SHAPED CHANNELS (SEE NOTE 1 BELOW) IN CONCRETE BASE CONCRETE BASE SECTION A-A INSTALL 1/4" TO 1/2" LOWER 30" MANHOLE RING, FRAME AND COVER THAN ASPHALT SURFACE MARKED "SEWER" OR "STORM DRAIN" (SEE ALSO NOTES 3,5 & 6 BELOW) FINISHED GRADE GRADE RINGS AS REQ'D (12" MAX.) GROUT GRADE RING INTO PLACE (TYP.) 4' DIA. MANHOLE 5' DIA MANHOLE FOR 15" AND LARGER PIPE MANHOLE STEPS (SEE NOTE 4 BELOW) (COPOLYMER POLYPROPYLENE PLASTIC) INSTALLATION OF STEPS SHALL BE WATERPROOF. GROUT ALL JOINTS ON PRECAST CONCRETE SECTION PRECAST CONCRETE MANHOLE SECTION GROUT IN CONCRETE BASE PIPE / MANHOLE CONNECTION (TYP.) MANHOLE FLOOR ALL JOINTS SHALL BE WATERPROOFED (SEE NOTE 1 BELOW) 6" MAX. CONCRETE FIELD JOINT (TYP.) SEE NOTE 2 BELOW 18" CUT PIPE BEFORE PLACING IN CONCRETE BASE F.L. CHANNEL A A CONCRETE BASE 9" MIN. THICKNESS GROUT NEOPRENE BOOT REQ'D UNDER PIPE INTO PLACE THEN SHAPE M.H.FLOOR & F.L. OF CHANNEL TO MEET PIPE FOUNDATION TO REST ON FIRM UNDISTURBED SOIL ON 6" MIN. DEPTH OF 1" MAX. GRADED ROCK WHEN DIRECTED NOTES: BY CITY ENGINEER 1. INSTALL NEOPRENE BOOT WITH STAINLESS STEEL BANDS & GROUT INSIDE OF MANHOLE FOR SANITARY SEWER PIPE CONNECTIONS. GROUT INSIDE & OUTSIDE PIPE CONNECTIONS FOR STORM DRAIN & OTHER DRAINAGE PIPES. 2. INSTALL 8" THICK CONCRETE FIELD JOINT AROUND ALL STORM DRAINAGE PIPES (TYP.). INSTALL AROUND ALL CONCRETE SEWER PIPES 18" DIA.
    [Show full text]