July 16, 2021 Obstruction Notice

Total Page:16

File Type:pdf, Size:1020Kb

July 16, 2021 Obstruction Notice CITY OF SPOKANE OBSTRUCTION NOTICE For more information contact Jessica Fisher 509.625.6749; [email protected] July 16 – 23, 2021 Some construction projects have been suspended due to the pandemic and others are on different schedules. Please be prepared for changes in street obstructions. For details on projects throughout Spokane County, visit www.srtc.org. Don’t compete. Share the street. Visit StickmanKnows.org for rules of the road and safety tips. Projects highlighted in RED have notable changes this week. Construction is tentative and subject to change at any time. CONSTRUCTION PROJECTS ARTERIAL CHIP SEAL – ECONOMIC RECOVERY PROJECT Crews are starting work on the arterial chip seal project. Locations include: o Freya Street between Wellesley Avenue and Upriver Drive will have single lane closures on Friday, July 16 and Monday, July 19. Flaggers will be onsite. o Freya Street between 37th Avenue and Palouse Highway will have single lane closures on Monday, July 19 and Wednesday, July 21 through Friday, July 23. Flaggers will be onsite. o Southeast Boulevard between Perry Street and 29th Avenue will have single lane closures on Friday, July 16, and Monday, July 19 through Friday, July 23. Flaggers will be onsite. This project will apply chip seal to preserve pavement life. This is a $500,000 project. CENTENNIAL TRAIL – SUMMIT GAP – BOONE TO PETTET Work on this project spans from Boone Avenue to Pettet Drive on Summit Boulevard, Mission Avenue, and West Point Road. Mission Avenue is closed from Cochran Street to West Point Drive for a water main installation. This project will complete an unfinished section of the Centennial Trail in the West Central Neighborhood. This is a $2.2 million project. POST STREET BRIDGE REPLACEMENT The Post Street Bridge is closed. The intersection of Lincoln Street and Summit Boulevard is closed and half of the adjacent parking lot. Post Street is closed at Spokane Falls Boulevard with local access only. Parking is limited on Post Street, and the Riverfront Park parking lot on Post just south of the bridge is closed. The bridge will open in 2022. See the detour routes for pedestrians and bicyclists. This project will replace the Post Street Bridge and associated utilities. This is an $18.5 million project. SCHOOL SAFETY PROJECTS Crews are working at the following locations o Wellesley Avenue at Helena Street o Perry Street between Longfellow and Empire Avenue o Pittsburg Street between Queen and Everett Avenue This project includes sidewalk and crosswalk improvements at multiple Spokane Public Schools locations. This is a $1.2 million project funded with local funds. SOUTH GORGE TRAIL PHASE 2 Clarke Avenue is closed from Spruce to Elm Street. Landscaping work is taking place in the vicinity of Sandifur Bridge parking area. Please follow all traffic control signs and detours. This project will construct a 10-foot wide pedestrian and bike trail, water main and pavement reconstruction of Clarke Ave, and stormwater mitigation at various locations. This is a $4 million project funded with local and state funds. SPRAGUE AVENUE REBUILD PHASE 2B Sprague Avenue is closed between Grant and Division Street. Business access is available via First Avenue and also the alley north of Sprague Avenue from Grant to Cowley Street. Arterial traffic is detoured to Second and Third Avenues. This project will reconstruct Sprague Avenue from Division to Grant Street while enhancing pedestrian and cyclist safety and provide utility replacements/upgrades. This is a $3.8 million project funded with local and federal funds. STREET PRESERVATION NORTH PHASE 2 Full closures will take place the following days: o Wednesday, July 21, Nevada Street between Francis and Wellesley Avenue o Thursday, July 22, Nevada Street between Wellesley Avenue and North Foothills Drive o Saturday, July 24, Nevada Street between Francis and Wellesley Avenue o Sunday, July 25, Nevada Street between Wellesley Avenue and North Foothills o Saturday, July 31, Nevada Street between Francis and Wellesley Avenue o Sunday, August 1, Nevada Street between Wellesley Avenue and North Foothills Drive This project will apply chip seal to preserve pavement life. This is a $1.4 million project funded with local and federal funds. NON-CITY OBSTRUCTIONS Deer Heights Road will be closed north of Highway 2 for sewer manhole installation from 6/30/21 to 7/16/21. The inside eastbound lane of Francis Avenue closed between Market and Freya Street from 7/6/21 to 7/20/21 for Lariviere work. The eastbound curb lane of Francis Avenue between Nevada and Morton Street will be closed from 7/19/21 to 7/21/21 for Baker Construction work. The north curb lane of Trent Avenue between Regal and Greene Street will be closed from 7/12/21 to 7/23/21 for Track Utilities work. The southbound curb lane of Indian Trail Road between Ridgecrest Drive and Barnes Road will be shifted into the median from 6/24/21 to 7/23/21 for Quanta work. The westbound curb lane of Francis Avenue between Assembly Street and Nine Mile Road will be closed from 6/30/21 to 7/28/21 for Quanta work. The westbound lane of 29th Avenue between Martin Street and Southeast Boulevard will be closed from 8/2/21 to 8/5/21 for Sefnco Work. The northbound curb lane of Ray Street will be closed between 19th and 17th Avenue from 7/7/21 to 8/6/21 for Quanta work. The intersection of Crestline Street and 33rd Avenue is closed from 3/15/21 to 8/16/21 for the Garden District PUD project. The westbound curb lane of Francis Avenue between Lindeke Street and Indian Trail Road will be closed from 7/26/21 to 8/24/21 for Quanta work. The westbound and eastbound curb lanes of North Foothills Drive at intersection with Perry Street, as well as the westbound curb lane of North Foothills Drive at intersection with Hogan Street from 8/20/21 to 8/27/21 for Sefnco work. The northbound curb lane of Division Street between Spokane Falls Boulevard and North River Drive will be closed from 7/28/21 to 8/28/21 for Sefnco Communications work. The intersection of Mission Avenue and Havana Street will be have rotating lane closures with flaggers onsite from 9/7/21 to 9/9/21 for Sefnco work. There will be blasting near the intersection Strong Road and Indian Trail Road intersection from 5/24/21 to 11/1/21. There will be rock blasting near the intersection of Wieber Drive and Shawnee Avenue from 5/24/21 to 11/1/21. Shoulder work on Perry Street and North Foothills Drive for the Northeast Middle School project. Lane closures will be in place. Austin Road from Five Mile to Strong Road is open to local traffic only. The contractor is prepping for asphalt. Street closure on Granite Street at Upriver Drive starting 4/5/21 for the Riverview Granite Street project. This will eventually be a complete street vacation of Granite Street. SPECIAL EVENTS Food Truck Friday – Fridays Food Truck Friday is closing Wall Street between Main Avenue and Spokane Falls Boulevard from 9 a.m. to 2:30 p.m. Kendall Yards Night Market – Wednesdays The following streets will be closed from 12 – 10 p.m.: o Summit Parkway, Cedar Street to Jefferson Lane o Adams Lane north of Summit Parkway SPOKANE PARKS AND RECREATION RIVERFRONT PARK West Havermale: The StepWell art piece is slated for opening in the fall of 2021. North Suspension Bridge: Reconstruction of the bridge began in mid-May, and it will remain closed until winter/spring 2022. The eastbound lane of Broadway Avenue between Lincoln and Post Street, including the south sidewalk, is closed until early January. Snxw mene? island will also be closed to accommodate construction. The north bridge will receive a new deck, floor beams, lighting, and electrical components. The detour is across the Howard Street Promenade through Riverfront Park. More: The website for redevelopment is www.riverfrontparknow.com. MANITO PARK Nishinomiya-Tsutakawa Japanese Garden: The Koi Pond is undergoing a water conservation project that will improve pond quality and save 16 – 18 millions of gallons of water annually. The garden will remain closed until July 2021 to accommodate construction. SPOKANE PUBLIC LIBRARY DOWNTOWN LIBRARY CONSTRUCTION Lincoln Street is closed between Spokane Falls Boulevard and Main Avenue until March 2022. The sidewalks adjacent to the downtown library on Main Avenue, Monroe Street, and Spokane Falls Boulevard are closed. SPOKANE TRANSIT AUTHORITY CITY LINE CONSTRUCTION Cincinnati Street will be closed between Spokane Falls Boulevard and the Centennial Trail. Construction signage and detours will be in place. Springfield Avenue will be closed between Hamilton and Cincinnati Street. Construction signage and detours will be in place. Spokane Falls Boulevard between Pine Street/Riverpoint Boulevard and Sherman Avenue is closed until mid-July. Construction signage and detours are in place. Wall Street between Riverside and Main Avenue will be closed starting Monday, July 19. Construction signage and detours will be in place. STREET DEPARTMENT PROJECTS ALLEY CREW (Monday) E 300 – 7th Ave. / 8th Ave. Alley, between Chandler and Sherman (Tuesday) E 100 – Everett / Sanson Alley, between Mayfair and Lidgerwood (Wed. – Thur.) E 00 – 100 – Rowan / Sanson Alleys, between Division and Lidgerwood CRACK SEALING Arterial Crack Sealing o Northwest Boulevard/Assembly Street, Garland to Olympic Avenue Residential Crack Sealing o Myrtle Street/Longfellow Avenue et al. GRIND AND OVERLAY Work continues on Hamilton Street between Desmet and Indiana Avenue. Drivers should expect lane closures and delays. POTHOLE CREWS City crews continue to fill potholes. If you see a pothole, report it by calling 3-1-1.
Recommended publications
  • LHC 02570-1 SECTION 02570 MANHOLE CONSTRUCTION PART 1 – GENERAL 1.1 Description A. Description of the Work the Work to Be Perf
    SECTION 02570 MANHOLE CONSTRUCTION PART 1 – GENERAL 1.1 Description A. Description of the Work The work to be performed in accordance with this section includes precast or cast in place concrete manhole construction for sewer and storm drain collection systems. The work shall include the furnishing of all labor, tools, equipment, materials and performing all required operations to provide a complete item in accordance with the project plans and these specifications. B. Related Work Specified Elsewhere Trench Excavation and Backfill..........................Section 02300 Sewer Line Construction...................................Section 02560 Storm Drain Construction..................................Section 02500 1.2 Quality Assurance A. Reference Test Standards and Specifications ASTM A48, Specifications for Grey Iron Castings ASTM C478, Specification for Precast Reinforced Concrete Manhole Sections ASTM C1107, Specification for Packaged Dry, Hydraulic-Cement Grout, Nonshrink ASTM D4101, Specification for Propylene Plastic Injection and Extrusion Materials AWWA C210, Standard for Liquid Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines LHC 02570-1 B. Leakage Test Test all manholes installed under this contract using the vacuum method described below. Provide all equipment necessary to perform the test. Coordinate test schedule with the OWNER. Test will not be accepted unless witnessed by the OWNER. 1. Test each manhole immediately after assembly and prior to backfilling. 2. Plug all lift holes with an approved non-shrink grout. 3. Plug all pipes entering the manhole, taking care to securely brace the plug from being drawn into the manhole. 4. Place the test head inside of the top of the cone section and inflate seal in accordance with the manufacturers recommendations.
    [Show full text]
  • Infiltration Trench & Soakaway
    An Infiltration Trench System includes an inlet pipe or water source, catch basin sump, perforated DESIGN PRINCIPLES distribution pipe, infiltration trench and overflow to the storm drainage system. ■ Infiltration Trench System: A Soakaway Manhole (Sump, or Dry Well) System includes an inlet pipe, a sedimentation manhole, and one or more infiltration shafts with connecting pipes. Use of Infiltration Shaft will be limited by hydro- a) Locate infiltration trench at least 3m geotechnical conditions in much of GVRD. from any building, 1.5m from Limitations of Infiltration Trench or Soakaway Manholes: property lines, and 6m from adjacent a) To avoid groundwater pollution, do not direct un-treated polluted runoff to Infiltration Trench or Shaft: infiltration facilities (or as recommended by a geotechnical ▪ Direct clean runoff (roof, non-automobile paving) to Infiltration Trench or Shaft. engineer). ▪ For polluted runoff (roads > 1000 vehicles / day, parking areas, other pollution sources), provide upstream source control for pollutant reduction prior to release to Infiltration Trench or Shaft. b) Sump: Provide a lid for periodic b) Use infiltration trench or shaft only in areas with footing drains. inspection and cleanout. Include a 1. Grass or Other Planting T-inlet pipe to trap oils, sediments 2. Finish Grade and debris. 3. Growing Medium Backfill 4. 100mm Dia PVC DR28 Perforated 19 c) Infiltration Trench: installation of Pipe distribution pipe and bottom of 5. Light Non-woven Polyester drainrock to be level. If more than Geotextile c/w Min. 400mm Laps one section of infiltration trench is 9 1 required, design so that underground 6. 50mm Drain Rock or Rock of water is temporarily ‘ponded’ in each Equal Porosity infiltration section.
    [Show full text]
  • Aquincumi Füzetek 13 (2007)
    AQUINCUM A BTM Aquincumi Múzeumának ásatásai és leletmentései 2006-ban Excavations and rescue work at the Aquincum Museum in 2006 Budapest, 2007 Szerkesztő: Edited by: Zsidi Paula, Vámos Péter Paula Zsidi, Péter Vámos Fordítás: Translation by: Simán Katalin, Alice M. Choyke Katalin Simán, Alice M. Choyke Technikai szerkesztő: Technical assistance by: Kolozsvári Krisztián Krisztián Kolozsvári A külső borítón elöl: Front cover: Sír feltárása a volt Óbudai Gázgyár Excavation of a grave in the territory of területén (Budapest, III. ker., Záhony the former Óbuda Gas Factory (Budapest utca 7., Graphisoft Park) III, 7 Záhony Street, Graphisoft Park) A külső borítón hátul: Back cover: Kora császárkori sírkertek feltárása az Excavation of Early Imperial Period M6-os autópálya Érd és Nagytétény graveyards on the route of M6 highway közti szakaszán (Budapest, XXII. ker., between Érd and Nagytétény (Budapest Nagytétény) XXII, Nagytétény) A belső borítón: Inside cover: A 2006-ban végzett megelőző Locations of larger investment led feltárások helyszínei excavations in 2006 Budapesti Történeti Múzeum, 2007 Felelős kiadó: Dr. Bodó Sándor főigazgató Budapest Historical Museum, 2007 Editor-in-chief: Dr. Sándor Bodó, Director A BTM Aquincumi Múzeumának ásatásai és leletmentései 2006-ban Excavations and rescue work at the Aquincum Museum in 2006 Budapesti Történeti Múzeum Aquincumi Múzeum Aquincumi füzetek 13. szám ISSN 1219-9419 (Aquincumi füzetek) ISSN 1219-9427 (Aquincum) Tartalom Contents Régészeti feltárások Budapest területén Archaeological excavations in the territory 2006-ban . 8 of Budapest in 2006 . 8 A 2006-ban végzett nagyobb megelőző Sites of the larger investment-led feltárások helyszínei . 10 excavations conducted in 2006 . 10 Korarómai településrészlet és római The excavation of part of an early temető feltárása Budaújlakon Roman settlement and Roman cemetery (Anderkó Krisztián – R.
    [Show full text]
  • Section 02308 Tunnel Shafts Note to Specifier: This
    THE CITY OF GALVESTON TUNNEL SHAFTS SECTION 02308 TUNNEL SHAFTS NOTE TO SPECIFIER: THIS SPECIFICATION IS INCLUDED FOR REFERENCE BUT SHALL BE THOROUGHLY REVIEWED FOR APPLICABILITY AND REVISED AS NECESSARY FOR PROJECT SPECIFIC REQUIREMENTS. PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Construction, maintenance, and backfilling requirements of tunnel shafts. 1.02 UNIT PRICE A. Tunnel shafts, both those shown on Drawings and those needed for Contractor's access, are bid as a lump sum for all shafts, collectively. Prior to construction, the Contractor shall provide a schedule of values as specified in Section 01292 - Schedule of Values. Itemize the cost by station for each shaft designated on the Drawings and additionally required for construction operations. Seventy-five percent of the itemized amount will be submitted on a pay estimate upon shaft installation; twenty-five percent will be submitted on a pay estimate upon backfill and site restoration (including topsoil, sodding and hydromulching). Payment will include excavation, disposal of excavated materials, ground support systems, backfilling, and cleanup. Manholes constructed in tunnel shafts are to be paid separately at the contract unit price as specified in Section 02601 - Precast Concrete Manholes or 02600 - Cast in Place Manholes. B. Removal and replacement of surface improvements necessary for shaft construction, such as sidewalks, asphaltic and concrete pavement, base and subbase, curbs, curb and gutter, driveways, topsoil, sodding and hydromulch shall be included in the lump sum for shafts. C. Relocation of Owner’s utilities shall be paid for at the contract unit price, only when included in the bid proposal.
    [Show full text]
  • STORM DRAINAGE B-2A Directional Vaned Grate
    TABLE OF CONTENTS CITY OF SPOKANE STANDARD PLANS B-101B = Revised Standard Plan ***W-108A = New Standard Plan Plan No. Plan Title Current Plan Date SECT B: STORM DRAINAGE B-2A Directional Vaned Grate .......................................................................................... 5/07 B-2B Bi-Directional Vaned Grate ..................................................................................... 5/07 B-2C Grate Guard ............................................................................................................ 5/07 B-3A Frame and Grate for CB – Type 1........................................................................... 4/13 B-3B Frame and Grate for CB – Type 3........................................................................... 4/13 B-3C Frame and Grate for Inlet – Type 3 ......................................................................... 4/13 B-15A Proper Method for Determining Ground Water Height ............................................ 2/86 B-18C Utility Trench Backfill – Pipe Zone .......................................................................... 2/17 B-18D Utility Trench Backfill – Above Pipe Zone................................................................ 4/12 B-18E Utility Trench Backfill – Requirements using CDF ................................................... 1/17 B-19 Cut-Off Wall ............................................................................................................ 1/17 B-101B Catch Basin – Type 0 .............................................................................................
    [Show full text]
  • Transit Rapid Transit System
    TRANSIT RAPID TRANSIT SYSTEM EXTENSIONS COMPENDIUM OF DESIGN CRITERIA VOLUME III AERIAL GUIDEWAY DESIGN CRITERIA CHAPTER 4 ELECTRICAL DESIGN CRITERIA INTERIM RELEASE REV 1 OCTOBER 30, 2008 PROGRAM MANAGEMENT CONSULTANT – Intentionally Left Blank – TRANSIT – Intentionally Left Blank – VOLUME III – AERIAL GUIDEWAY CHAPTER 4 – ELECTRICAL INTERIM RELEASE REV 1 TRANSIT DOCUMENT REVISION RECORD ISSUE NO. DATE REVISION DESCRIPTIONS 0 5-8-07 Interim Release 1 10-30-08 Revisions to incorporate MIC-EH design specifications that have been adopted by MDT. ISSUE NO. SECTIONS CHANGED 1 4.05.1.1 Corrosion Control -Scope- (grammar correction) 4.05.1.2 Corrosion Control -Scope- included other utilities within list 4.05.2.3 Corrosion Control -Electrical Equipment - FRE only for Traction Power. 4.05.3.1.A.1 Corrosion Control - Stray Current Corrosion Control - Stray Current Control – (grammar correction) 4.05.3.1.A.5a&b Corrosion Control - Stray Current Corrosion Control - Stray Current Control 4.05.3.1.B.3 Corrosion Control - Stray Current Corrosion Control - Stray Current Control – (formatting correction) 4.05.3.2.F Corrosion Control - Stray Current Corrosion Control – Utilities – (formatting correction) 4.05.5.2 Corrosion Control - Test Stations - Ground Fault Monitoring Stations 4.06.1 Systems-Facilities Interface Raceway - Scope 4.06.2.9.B Systems-Facilities Interface Raceway - Physical Relationships - Wayside Facilities 4.06.2.10.B Systems-Facilities Interface Raceway - Physical Relationships - Raceway Transitional Areas 4.06.3.2.C Systems-Facilities Interface Raceway - Physical Installation - Construction Guidelines - Traction Power Pullboxes 4.06.4.3.C Systems-Facilities Interface Raceway - Materials of Construction-Application of Raceway-Cableway 4.06.5.2.A Systems-Facilities Interface Raceway -Raceway Identification Methods - Raceway Designations VOLUME III – AERIAL GUIDEWAY CHAPTER 4 – ELECTRICAL INTERIM RELEASE REV 1 TRANSIT ISSUE NO.
    [Show full text]
  • Manhole Security Protecting America’S Critical Underground Infrastructure
    Manhole Security Protecting America’s Critical Underground Infrastructure Irwin M. Pikus, PH.D., J.D. Irwin M. Pikus, PH.D., J.D. November 2006 November 2006 Table of Contents Section Page Executive Summary 3 Introduction 4 Ownership and Control 6 of Manholes and Covers Characterizing Manholes 7 and Underground Infrastructure Potential Threats to Underground 9 Infrastructure through Manholes Consequences of an Attack on 11 Underground Infrastructure Simulations: Underground Attack 13 Scenarios and Consequences The Tiering System: Setting Priorities 15 and Assessing Risks Mitigating Risk and Reducing Vulnerabilities 16 Conclusion and Suggested Actions 17 Appendices A. Examples of Underground Infrastructure Vulnerabilities 18 B. References 19 Irwin M. Pikus, Ph.D., J.D. Dr. Pikus is a physicist and attorney who served the United States government in Senior Executive positions dealing with science, technology and national secu- rity over a 25 year span. Prior to that, Dr. Pikus led research projects in the aerospace and electronics industry. He was appointed a Commissioner of the Presi- dent’s Commission on Critical Infrastructure Protection and since his retirement from government service has provided expert and consulting services in critical infrastructure protection to a number of public and private organizations. He is currently Visiting Professor of Systems Engineering at the University of Virginia. Dr. Pikus chairs the Methodology sub-committee of ASCE’s Water Infrastructure Security Enhancements Standards Committee and was principal investigator for the ASCE-EPA project on early warning systems for water utilities. Acknowledgements The following individuals provided comments and insight critical to the development and editing of this paper: Ed Badolato, President & CEO of Integrated Infrastructure Analytics, Inc.
    [Show full text]
  • Kennings/Sixt Hire Centre, Duke Street Ipswich, Suffolk IPS 634
    ARCHAEOLOGICAL EVALUATION REPORT SCCAS REPORT No. 2010/160 Kennings/Sixt Hire Centre, Duke Street Ipswich, Suffolk IPS 634 S. Cass & M. Sommers © December 2010 www.suffolkcc.gov.uk/e-and-t/archaeology Lucy Robinson, County Director of Economy, Skills and Environment Endeavour House, Russell Road, Ipswich, IP1 2BX. HER Information Planning Application No: Pre-application (IP/10/00629/FUL) Date of Fieldwork: 16th-17th August 2010 & 29th-30th November 2010 Grid Reference: TM 1711 4397 Funding Body: Barnes Construction (for Travelodge) Curatorial Officer: Keith Wade Project Officer: Simon Cass Oasis Reference: suffolkc1-81200 Digital report submitted to Archaeological Data Service: http://ads.ahds.ac.uk/catalogue/library/greylit Contents Summary Page 1. Introduction 1 2. Geology and topography 1 3. Archaeological and historical background 3 4. Methodology 3 5 Results 4 5.1 Introduction 5.2 Trench 1 5.3 Trench 2 5.4 Trench 3 5.5 Trench 4 6. Finds and environmental evidence 13 7. Discussion 13 8. Conclusions and recommendations for further work 17 9. Archive deposition 17 10. List of contributors and acknowledgements 18 11. Bibliography 18 Disclaimer List of Figures 1. Site and trench location 2 2. Plan of Trench 4 7 3. Reconstruction of the likely profile of structure 0009 11 4. Ordnance Survey (1883) 1:1250 Scale Sheet (rescaled extract) 14 5. Ordnance Survey 3rd Edition (c. 1900) 1:2500 Scale Sheet (rescaled extract)14 6. Plan showing location of air-raid shelter and the manhole entrance 15 List of Plates I. Brick-lined well in Trench 1, facing west 4 II. Trench 3, facing north 5 III.
    [Show full text]
  • City of Houston Design Manual Chapter 8 WASTEWATER
    City of Houston Design Manual Chapter 8 WASTEWATER COLLECTION SYSTEM DESIGN REQUIREMENTS CITY OF HOUSTON DESIGN MANUAL Houston Public Works Wastewater Collection System Design Chapter 8 WASTEWATER COLLECTION SYSTEM DESIGN REQUIREMENTS 8.01 CHAPTER INCLUDES A. Criteria for the design of wastewater collection systems. B. This Chapter addresses the design of the wastewater collection systems within the public Right-Of-Way or a dedicated public easement. Sanitary sewers located on private property that are not in such a dedicated easement, are under the jurisdiction of the Plumbing Code, and will be reviewed by the Code Enforcement Branch. 8.02 REFERENCES A. Refer to the list of references in Chapter 1, General Requirements. B. City of Houston Engineering Design Guidelines Manual for Submersible Lift Stations. C. City of Houston Design Guideline Drawings for Submersible Lift Stations. D. Uniform Plumbing Code, latest edition adopted by the City. 8.03 DEFINITIONS A. Public Sewer - A closed conduit which conveys wastewater flow and which is located within the public Right-Of-Way or dedicated public sanitary sewer easement. A public sewer (or public sewer system) is intended to serve more than one residential, commercial, or industrial site. B. Private Sewer - A closed conduit which conveys wastewater flow and is constructed and maintained by a private entity (i.e. homeowner's association). Private sewers may be located in areas such as a private street or common area. Private sewers are subject to the design and construction requirements of the Plumbing Code and must discharge to a public sewer. C. Sewer Line -A public sewer located within public Right-Of-Way or Permanent Access Easement (PAE) I Public Utility Easement (PUE) that is maintained and operated by the City.
    [Show full text]
  • Bid Package Consists of TWO (2) Documents
    Town of Needham Department of Public Works – Administration Public Services Administration Building 500 Dedham Avenue Needham, Massachusetts 02492 Telephone (781) 455 7550 ACKNOWLEDGEMENT OF RECEIPT Release Date Thursday, August 2, 2012 (on Web) Bid Title Purchase and Delivery of One (1) CCTV Truck Bid Number IFB 13-40-01 Number of The Bid Package consists of TWO (2) documents. Returning Documents this form confirms receipt of all the documents. Pre-Bid Meeting Refer to the IFB Questions Due 1:00 PM, Thursday August 9, 2012 10:00 AM Thursday, August 16, 2012, Administration Office of the Public Works Department, Public Services Administration Bids are Due Building (PSAB), Second Floor 500 Dedham Avenue, Needham, Massachusetts, 02492 Please provide the requested information below as acknowledgment that you have received our bid package noted above. It is recommended that interested bidders complete this acknowledgment and return via Fax to the Department of Public Works (781) 449-9023 or by mail. Only by doing this, will the Town be able to provide notification of any addenda or answered questions relating to this bid. Only those companies or individuals shown on the Distribution Register will receive addenda to this bid. By completing and returning this acknowledgement will ensure you are recorded on the Distribution Register. Proposals from companies or individuals not acknowledging the addenda may be rejected as not responsive. Name of Company or Individual (Print) Name / Title of Contact (Print) Address (line 1) (Print) Address (line 2) (Print) Telephone Number Fax Number E-mail Address (Print) Signature Date * Any hand delivery or facsimile received after the due date and time will not be addressed.
    [Show full text]
  • Precast Concrete Manholes Why Provide Guidelines?
    PRECAST CONCRETE MANHOLES WHY PROVIDE GUIDELINES? Past Problems • Was tedious to keep track of variables • Was easy to make mistakes • Wanted: A design tool to reduce problems TOPICS • Overview on Precast Manholes • Applications • Design Procedures and Applicable Standards • Watertight Structures • Quality • Installation PRECAST CONCRETE MANHOLES Round Structures • ASTM C478, “Standard Specification for Precast Reinforced Concrete Manhole Sections” PRECAST CONCRETE MANHOLES Rectangle / Square Structures • ASTM C913, “Standard Specification for Precast Concrete Water and Wastewater Structures” • DO NOT Specify a Box Culvert for a vertical application. Box Culverts are designed for horizontal installations and loading conditions. • Specify ASTM C913 for square structures. COMMON SIZES Round – ASTM C478 • Internal Diameter (I.D.) • 36” – 144” • Check with local manufacturer for availability of larger diameter structures. Custom box structures are easily fabricated using universal forming equipment. COMMON SIZES Rectangle / Square ASTM C913 • 24” x 24” to 72” x 72” • sizes increase by 6” increments MANUFACTURING METHODS Wet-Cast • Cast with an inner and outer form. • Product cured in the form. • Blockouts/hole formers can easily be incorporated. MANUFACTURING METHODS Wet-Cast • Cast with conventional concrete or self-consolidating concrete. • Base sections are typically wet-cast. • Wet-cast is common for sanitary applications. MANUFACTURING METHODS Dry-Cast (Machine Made) • Product is cast utilizing mechanized equipment. • Form vibrators consolidate zero-slump concrete between core and jacket. Manufacturing Methods • The product is immediately stripped and the form is reused. • Products typically cured in a kiln or a combination of tarps and moisture curing is used. MANUFACTURING METHODS Dry-Cast (Machine Made) • Both round and square structures may be dry-cast.
    [Show full text]
  • Line Manhole (Sewer and Storm Drain)
    CUT TO CONFORM TO BASE CONTOUR FLOWLINE & CONCRETE FIELD JOINT (TYP.) SIDES OF MANHOLE SEE NOTE 2 BELOW 1 . : P Y 12 T PIPE / MANHOLE CONNECTION (TYP.) SHAPED CHANNELS (SEE NOTE 1 BELOW) IN CONCRETE BASE CONCRETE BASE SECTION A-A INSTALL 1/4" TO 1/2" LOWER 30" MANHOLE RING, FRAME AND COVER THAN ASPHALT SURFACE MARKED "SEWER" OR "STORM DRAIN" (SEE ALSO NOTES 3,5 & 6 BELOW) FINISHED GRADE GRADE RINGS AS REQ'D (12" MAX.) GROUT GRADE RING INTO PLACE (TYP.) 4' DIA. MANHOLE 5' DIA MANHOLE FOR 15" AND LARGER PIPE MANHOLE STEPS (SEE NOTE 4 BELOW) (COPOLYMER POLYPROPYLENE PLASTIC) INSTALLATION OF STEPS SHALL BE WATERPROOF. GROUT ALL JOINTS ON PRECAST CONCRETE SECTION PRECAST CONCRETE MANHOLE SECTION GROUT IN CONCRETE BASE PIPE / MANHOLE CONNECTION (TYP.) MANHOLE FLOOR ALL JOINTS SHALL BE WATERPROOFED (SEE NOTE 1 BELOW) 6" MAX. CONCRETE FIELD JOINT (TYP.) SEE NOTE 2 BELOW 18" CUT PIPE BEFORE PLACING IN CONCRETE BASE F.L. CHANNEL A A CONCRETE BASE 9" MIN. THICKNESS GROUT NEOPRENE BOOT REQ'D UNDER PIPE INTO PLACE THEN SHAPE M.H.FLOOR & F.L. OF CHANNEL TO MEET PIPE FOUNDATION TO REST ON FIRM UNDISTURBED SOIL ON 6" MIN. DEPTH OF 1" MAX. GRADED ROCK WHEN DIRECTED NOTES: BY CITY ENGINEER 1. INSTALL NEOPRENE BOOT WITH STAINLESS STEEL BANDS & GROUT INSIDE OF MANHOLE FOR SANITARY SEWER PIPE CONNECTIONS. GROUT INSIDE & OUTSIDE PIPE CONNECTIONS FOR STORM DRAIN & OTHER DRAINAGE PIPES. 2. INSTALL 8" THICK CONCRETE FIELD JOINT AROUND ALL STORM DRAINAGE PIPES (TYP.). INSTALL AROUND ALL CONCRETE SEWER PIPES 18" DIA.
    [Show full text]