Turnouts & Special Trackwork
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
216 Part 218—Railroad Operating Practices
Pt. 217, App. A 49 CFR Ch. II (10–1–12 Edition) APPENDIX A TO PART 217—SCHEDULE OF CIVIL PENALTIES 1 Willful viola- Section Violation tion 217.7 Operating rules: (a) ............................................................................................................................................ $2,500 $5,000 (b) ............................................................................................................................................ $2,000 $5,000 (c) ............................................................................................................................................ $2,500 $5,000 217.9 Operational tests and inspections: (a) Failure to implement a program ........................................................................................ $9,500– $13,000– 12,500 16,000 (b) Railroad and railroad testing officer responsibilities:. (1) Failure to provide instruction, examination, or field training, or failure to con- duct tests in accordance with program ................................................................. 9,500 13,000 (2) Records ............................................................................................................... 7,500 11,000 (c) Record of program; program incomplete .......................................................................... 7,500– 11,000– 12,500 16,000 (d) Records of individual tests and inspections ...................................................................... 7,500 (e) Failure to retain copy of or conduct:. (1)(i) Quarterly -
Operation of Points
9100-000-007 Safeworking Rules and Procedures PUBLIC TRANSPORT AUTHORITY SAFEWORKING RULES AND PROCEDURES 9012 OPERATION OF POINTS 9012 Operation of Points Rev1.00 Date: 01 November 15 Page 1 of 18 9100-000-007 Safeworking Rules and Procedures CONTENTS 1. Purpose ................................................................................................................. 3 2. General .................................................................................................................. 3 3. Setting Points ........................................................................................................ 4 3.1. Indications of Points Setting ......................................................................... 4 3.2. Restoration of Points .................................................................................... 4 4. Movement over Points ........................................................................................... 5 4.1. Rail Traffic .................................................................................................... 5 4.2. Competent Workers ..................................................................................... 5 4.3. Trailing Points .............................................................................................. 5 5. Damaged Points .................................................................................................... 6 6. Failed Electrically Operated Points ....................................................................... 6 -
the Swindon and Cricklade Railway
The Swindon and Cricklade Railway Construction of the Permanent Way Document No: S&CR S PW001 Issue 2 Format: Microsoft Office 2010 August 2016 SCR S PW001 Issue 2 Copy 001 Page 1 of 33 Registered charity No: 1067447 Registered in England: Company No. 3479479 Registered office: Blunsdon Station Registered Office: 29, Bath Road, Swindon SN1 4AS 1 Document Status Record Status Date Issue Prepared by Reviewed by Document owner Issue 17 June 2010 1 D.J.Randall D.Herbert Joint PW Manager Issue 01 Aug 2016 2 D.J.Randall D.Herbert / D Grigsby / S Hudson PW Manager 2 Document Distribution List Position Organisation Copy Issued To: Copy No. (yes/no) P-Way Manager S&CR Yes 1 Deputy PW Manager S&CR Yes 2 Chairman S&CR (Trust) Yes 3 H&S Manager S&CR Yes 4 Office Files S&CR Yes 5 3 Change History Version Change Details 1 to 2 Updates throughout since last release SCR S PW001 Issue 2 Copy 001 Page 2 of 33 Registered charity No: 1067447 Registered in England: Company No. 3479479 Registered office: Blunsdon Station Registered Office: 29, Bath Road, Swindon SN1 4AS Table of Contents 1 Document Status Record ....................................................................................................................................... 2 2 Document Distribution List ................................................................................................................................... 2 3 Change History ..................................................................................................................................................... -
December 2016 Inter City Railway Society Founded 1973
TTRRAA CCKKSS Inter City Railway Society - December 2016 Inter City Railway Society founded 1973 www.intercityrailwaysociety.org Volume 44 No.12 Issue 528 December 2016 The content of the magazine is the copyright of the Society No part of this magazine may be reproduced without prior permission of the copyright holder President: Simon Mutten (01603 715701) Coppercoin, 12 Blofield Corner Rd, Blofield, Norwich, Norfolk NR13 4RT Chairman: Carl Watson - [email protected] Mob (07403 040533) 14, Partridge Gardens, Waterlooville, Hampshire PO8 9XG Treasurer: Peter Britcliffe - [email protected] (01429 234180) 9 Voltigeur Drive, Hart, Hartlepool TS27 3BS Membership Sec: Colin Pottle - [email protected] (01933 272262) 166 Midland Road, Wellingborough, Northants NN8 1NG Mob (07840 401045) Secretary: Stuart Moore - [email protected] (01603 714735) 64 Blofield Corner Rd, Blofield, Norwich, Norfolk NR13 4SA Magazine: Editor: Trevor Roots - [email protected] (01466 760724) Mill of Botary, Cairnie, Huntly, Aberdeenshire AB54 4UD Mob (07765 337700) Sightings: James Holloway - [email protected] (0121 744 2351) 246 Longmore Road, Shirley, Solihull B90 3ES Photo Database: Colin Pottle Website: Trevor Roots - [email protected] contact details as above Events: Sales Stand: Christine Field Trip Co-ordinator: vacant Books: Publications Manager: Carl Watson - [email protected] Publications Team: Trevor -
A Bibliography of the History of Inland Waterways, Railways and Road Transport in the British Isles, 2001
A Bibliography of the History of Inland Waterways, Railways and Road Transport in the British Isles, 2001 This is the seventeenth of these annual bibliographies. annual listing. (Michael Woods is collecting data on Peter Somervail has been one of the regular the ever-growing number of railway-related official contributors from the beginning, submitting details publications.) As regards periodical publications, of historical articles published in Waterways World however, only historical articles are noted; the and of books reviewed there; however, he has now contemporaneous literature is too just too extensive. requested leave to retire. Fortuitously this followed There is also a degree of selection: short items of an offer from Tony Harvey to widen the range of less than a page and articles that are a re-working of waterway periodicals that are systematically searched previously published work are generally omitted. (the first results of this appear below) and to lead the Publication of annual bibliographies was always compilation of the Canal and River Navigations seen as an interim service. As their number increases, section. This is also the last year that John Langford searching through them becomes ever more daunting. is able to provide the main input on Irish publications. Some form of cumulative publication is needed, In thanking these member for their past and future back-dated to cover earlier years. The accumulated support, this is an opportunity to thank also the other data on railway books and pamphlets up to 1995 was regular contributors, several of whom have also been included in Ottley’s Bibliography of British Railway involved since 1985: Alan Jackson, Paul Reynolds, History: second supplement and it is expected that Paul Sowan, Donald Steggles, Richard Storey and there will be a third supplement in due course. -
Collision Between Freight Wagons (For Train 4MP5) and Passenger Train 8622 Moonee Ponds Creek Junction, South Dynon, Victoria
ATSB TRANSPORT SAFETY INVESTIGATION REPORT Rail Occurrence Investigation 2005001 Final Collision Between Freight Wagons (for train 4MP5) and Passenger Train 8622 Moonee Ponds Creek Junction, South Dynon, Victoria 19 January 2005 ATSB TRANSPORT SAFETY INVESTIGATION REPORT RAIL REPORT 2005/001 Final Collision Between Freight Wagons (for Train 4MP5) and Passenger Train 8622 Moonee Ponds Creek Junction, South Dynon 19 January 2005 Released in accordance with section 25 of the Transport Safety Investigation Act 2003 – ii – Published by: Australian Transport Safety Bureau Postal address: PO Box 967, Civic Square ACT 2608 Office location: 15 Mort Street, Canberra City, Australian Capital Territory Telephone: 1800 621 372; from overseas + 61 2 6274 6590 Accident and serious incident notification: 1800 011 034 (24 hours) Facsimile: 02 6274 6474; from overseas + 61 2 6274 6474 E-mail: [email protected] Internet: www.atsb.gov.au © Commonwealth of Australia 2006. This work is copyright. In the interests of enhancing the value of the information contained in this publication you may copy, download, display, print, reproduce and distribute this material in unaltered form (retaining this notice). However, copyright in the material obtained from non- Commonwealth agencies, private individuals or organisations, belongs to those agencies, individuals or organisations. Where you want to use their material you will need to contact them directly. Subject to the provisions of the Copyright Act 1968, you must not make any other use of the material in this publication unless you have the permission of the Australian Transport Safety Bureau. Please direct requests for further information or authorisation to: Commonwealth Copyright Administration Copyright Law Branch Attorney-General’s Department Robert Garran Offices National Circuit BARTON ACT 2600 www.ag.gov.au/cca ISBN and formal report title: see ‘Document retrieval information’ on page vi. -
AMS Project Specifications: AMS Trackside Design Guideline
Reference material AMS Project Specifications: AMS Trackside Design Guideline This document is published as reference material to support the implementation of Automatic Train Protection as part of the roll out of the Advanced Train Control Migration System project. The content described might be of assistance to individuals and organisations performing work on NSW Rail Assets. When reading this document, any inconsistencies with Transport for NSW Network Standards shall be raised with the Asset Standards Authority (ASA) for clarification. This document does not comply with accessibility requirements (WCAG 2.0). If you are having trouble accessing information in these documents, please contact the ASA. Authorised by: Chief Engineer, Asset Standards Authority Published: November 2018 Important message This document is developed solely and specifically for use on the rail network owned or managed by the NSW Government and its agencies. It is not suitable for any other purpose. You must not use or adapt it or rely upon it in any way unless you are authorised in writing to do so by a relevant NSW Government agency. If this document forms part of a contract with, or is a condition of approval by, a NSW Government agency, use of the document is subject to the terms of the contract or approval. This document is published for information only and its content may not be current. AMS PROJECT SPECIFICATIONS: AMS TRACKSIDE DESIGN GUIDELINE DeskSite Reference: 5188811 only Principle – Applicable to Transport Projects AMS Program Quality Management -
Investigation Report 2011-R001 Laois Traincare Depot Derailment 20
Investigation Report 2011-R001 Laois Traincare Depot Derailment th 20 January 2010 Laois Traincare Depot Derailment Document History Title Laois Traincare Depot Derailment, 20th January 2010 Document type Investigation Report Document number 2011-R001 Document issue date 19th January 2011 Revision Revision Summary of changes number date RAIU ii Investigation Report 2011-R001 Laois Traincare Depot Derailment Function of the Railway Accident Investigation Unit The Railway Accident Investigation Unit (RAIU) is a functionally independent investigation unit within the Railway Safety Commission (RSC). The purpose of an investigation by the RAIU is to improve railway safety by establishing, in so far as possible, the cause or causes of an accident or incident with a view to making recommendations for the avoidance of accidents in the future, or otherwise for the improvement of railway safety. It is not the purpose of an investigation to attribute blame or liability. The RAIU’s investigations are carried out in accordance with the Railway Safety Act 2005 and European railway safety directive 2004/49/EC. Any enquiries about this report should be sent to: RAIU Trident House Blackrock County Dublin Ireland RAIU iii Investigation Report 2011-R001 Laois Traincare Depot Derailment Executive Summary At 15.25 hours on the 20th January 2010 a Class 22000 six carriage train was scheduled to leave Laois Traincare Depot after routine servicing. The intended destination of the train was Heuston Station. The Train Driver performed his pre-departure checks and the Shunter authorised the train to proceed out of Laois Traincare Depot as far as signal PL278, which controls the exit from the depot onto the down loop adjacent to the main line. -
Network Safeworking Rules and Procedures
Network Safeworking Rules and Procedures Clipping Points Procedure Number: 9000 Version 1.0, 31 March 2016 Clipping Points Procedure Number: 9000 Document Control Identification Document title Number Version Date 9000 – Clipping Points 1.0 31 March 2016 Document History Reasons for and Publication version Effective date Page(s) affected extent of change(s) 9000 – Clipping Points 4 May 2016 Authorisation Adam Sidebottom Rail Safety Manager Brookfield Rail 31 March 2016 DISTRIBUTION AND CHANGE: Brookfield Rail maintains the master for this document and publishes the current version of the Brookfield Rail website. Any changes to the content of this publication require the version number to be updated. Changes to this publication must be approved according to the procedure for developing Brookfield Rail products. To view the latest version of this document visit www.brookfieldrail.com 9000 Clipping points, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED Table of Contents Glossary for this Procedure ....................................................................................... 4 Purpose ......................................................................................................... 5 General .......................................................................................................... 5 Fitting a Points Clip ........................................................................................... 6 3.1. Competent Worker ................................................................................................... -
Technical Investigation Report on Train Derailment Incident at Hung Hom Station on MTR East Rail Line on 17 September 2019
港鐵東鐵綫 紅磡站列車出軌事故 技術調查報告 Technical Investigation Report on Train Derailment Incident at Hung Hom Station on MTR East Rail Line 事故日期︰2019 年 9 月 17 日 Date of Incident : 17 September 2019 英文版 English Version 出版日期︰2020 年 3 月 3 日 Date of Issue: 3 March 2020 CONTENTS Page Executive Summary 2 1 Objective 3 2 Background of Incident 3 3 Technical Details Relating to Incident 4 4 Incident Investigation 8 5 EMSD’s Findings 19 6 Conclusions 22 7 Measures Taken after Incident 22 Appendix I – Photos of Wheel Flange Marks, Broken Rails, Rail Cracks and Damaged Point Machines On-Site 23 1 Executive Summary On 17 September 2019, a passenger train derailed while it was entering Platform No. 1 of Hung Hom Station of the East Rail Line (EAL). This report presents the results of the Electrical and Mechanical Services Department’s (EMSD) technical investigation into the causes of the incident. The investigation of EMSD revealed that the cause of the derailment was track gauge widening1. The sleepers2 at the incident location were found to have various issues including rotting and screw hole elongation, which reduced the strength of the sleepers and their ability to retain the rails in the correct position. The track gauge under dynamic loading of trains would be even wider, and this excessive gauge widening caused the train to derail at the time of incident. After the incident, MTR Corporation Limited (MTRCL) have reviewed the timber sleeper condition across the entire EAL route and replaced the sleepers of dissatisfactory condition. MTRCL were requested to enhance the maintenance regime to closely monitor the track conditions with reference to relevant trade practices to ensure railway safety. -
Working of Level Crossings - Rules 1 to 11
Section 9 Working of Level Crossings - Rules 1 to 11 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1.2 04 September 2011 2.0 04 October 2015 © Australian Rail Track Corporation Limited (ARTC) Disclaimer This document is uncontrolled when printed. Authorised users of this document should visit ARTC’s website (www.artc.com.au) to access the latest version of this document. Section 9 Working of Level Crossings - Rules 1 to 11 TA20 – ARTC Code of Practice for the Victorian Main Line Operations 9. Table of Contents 1. Working of Level Crossings .............................................................................................................. 9-5 a. Flashing Light Signals at Level Crossings ................................................................................. 9-5 b. Boom Barriers at Level Crossings.............................................................................................. 9-5 c. Test Switch for Boom Barrier ..................................................................................................... 9-5 d. Testing Flashing Lights, Bells and Boom Barriers ..................................................................... 9-6 e. Defective Flashing Lights and Boom Barriers ............................................................................ 9-6 f. Boom Barriers Remain in Lowered Position .............................................................................. 9-6 g. Communication Available at Level Crossing ............................................................................. -
Scrra Standard Specifications Table of Contents
SCRRA STANDARD SPECIFICATIONS TABLE OF CONTENTS SECTION TITLE PAGES REVISION NO. DATE DIVISION 01 – GENERAL REQUIREMENTS 01 11 13 Work Covered by the Contract Documents 3 01.07.2013 01 11 15 Definition of Terms and Referenced Standards 14 01.07.2013 01 11 16 Work by SCRRA 3 01.07.2013 01 14 00 Work Restrictions 11 01.07.2013 01 14 16 Coordination With SCRRA 5 01.07.2013 01 14 19 Coordination with Utilities 5 01.07.2013 01 21 00 Allowances 3 01.07.2013 01 22 00 Unit Prices 2 01.07.2013 01 22 05 Lump Sum Prices 1 01.07.2013 01 23 00 Options 2 01.07.2013 01 23 50 Time Related Overhead 4 01.07.2013 01 24 13 Value Engineering Change Proposals (VECP) 3 01.07.2013 01 25 00 Substitution Procedures 5 01.07.2013 01 26 14 Request for Information 3 01.07.2013 01 29 73 Schedule of Values 4 01.07.2013 01 31 00 Project Management and Coordination 10 01.07.2013 01 31 19 Partnering 1 01.07.2013 01 31 99 Period of Performance 5 01.07.2013 01 32 17 Construction Project Schedule 14 03.10.2015 01 32 33 Photographic Documentation 5 01.07.2013 01 33 00 Submittal Procedures 18 01.07.2013 01 35 15 Maintenance and Protection of Railroad Traffic 2 01.07.2013 01 35 23 Site Safety Requirements 6 11.14.2016 01 35 44 Environmental Safety and Health Program 5 01.07.2013 01 35 91 Historic Treatment Procedures 15 01.07.2013 01 40 00 Quality Requirements 10 01.07.2013 01 43 23 Contractor Qualifications and Requirements 18 01.07.2013 01 55 26 Maintenance and Protection of Traffic 3 01.07.2013 01 56 37 Worksite Security Requirements 3 01.07.2013 01 56 38 Bird Protection