World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [Original: December16, 2016: 1stRevision: June 28, 2017, 2nd Revision: August 18, 2017, 3rd Revision: August 14, 2018, 4th Revision August 30, 2018] 2. Date of General Procurement Notice: Jan 24, 2017 3. Period covered by this procurement plan: 2016-2022 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Public Disclosure Authorized Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 10million All 2. NCB (Goods) Above US$ 2million All 3. ICB (Works) Above US$ 40 million All 4. NCB (Works) Above US$ 10 million All 5. (Non-Consultant Services) Above US$ 2million All [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. Public Disclosure Authorized 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Yes, in procurement manual] 4. Reference to (if any) Project Operational/Procurement Manual: Yes 5. Any Other Special Procurement Arrangements: no 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] Public Disclosure Authorized 1 2 3 4 5 6 7 Ref. No. Description Estimated Packages Domestic Review Comments Cost Preference by Bank US$ million (yes/no) (Prior / Post) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of 1.208 18 No Post the Shopping (Works) Summary of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 1 million 2. Single Source (Firms) Above US$ 1 million 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: No 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. Description of Estimated Packages Review Comments No. Assignment Cost by Bank US$ million (Prior / Post) Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods PROCUREMENT China : Shaanxi Poor Rural Areas Community Development Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2017-03-20 Revised Plan Date(s): (comma delineated, leave blank if none)2018-09-04 Project ID: P153541 GPN Date: 2017-01-24 Project Name: Shaanxi Poor Rural Areas Community Development Project Loan / Credit No: IBRD / 86840 Executing Agency(ies): Shaanxi Poor Rural PMO WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual W/YA/YCH/2017/01 / Road Request for Single Stage - One IBRD / 86840 Post Open - National 55,582.83 Completed 2017-04-06 2017-06-01 2018-02-01 construction Quotations Envelope W/YA/Y/G/2017/01 / Apple Single Stage - One cold storage civil (4000 IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-06-01 2017-06-06 2017-07-18 2017-08-17 2017-09-21 2018-03-20 Envelope tons) W/YU/D/Y/2017/02 / Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-07-25 2017-09-19 2018-03-18 Peasant household sheep Envelope shed W/YU/D/Y/2018/01 / Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-02-06 2018-04-03 2018-09-30 Peasant household sheep Quotations Envelope shed W/W/B/J/2018/02 / Hail Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30 net 225 mu Envelope W/YU/D/Y/2018/02 / Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2018-02-01 2018-02-06 2018-03-20 2018-04-19 2018-05-24 2018-11-20 Peasant household sheep Envelope shed W/YU/D/Y/2018/03 / Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-02-06 2018-04-03 2018-09-30 Peasant household sheep Quotations Envelope shed W/W/B/F/2018/01 / Hail Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28 net 258 mu Envelope W/B/LX/QQ/2017/02 / Single Stage - One Pepper seedling greenhouse IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-09-01 2017-09-06 2017-10-18 2017-11-17 2017-12-22 2018-06-20 Envelope 6 W/W/H/2017/06 / Village Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-30 2017-08-25 2018-02-21 road 0.85km Quotations Envelope W/YU/M/2017/07 / Road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-02-01 construction Quotations Envelope W/YU/M/2017/06 / Road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 construction Quotations Envelope W/YA/YC/2017/08 / Road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 hardening 2.9km Quotations Envelope W/YA/YC/2017/03 / Yanchuan county. Constructed 5 bridges Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-07-15 2018-09-09 2019-03-08 cemented with M10 Quotations Envelope masonry and the wall is based on M12.5 fine stone materials. W/YA/YC/2017/04 / Yanchuan county. Constructed 3 bridges Request for Single Stage - One IBRD / 86840 Prior Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 cemented with M10 Quotations Envelope masonry and the wall is based on M12.5 fine stone materials. W/YA/YC/2017/01 / Yanchuan county. Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-07-25 2018-08-29 2018-11-29 Gaojiageta village, road Quotations Envelope hardening 0.875km W/YA/YC/2017/02 / Yanchuan county. Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-08-04 2018-09-09 2019-03-08 Production road 4.95km Quotations Envelope resurfacing with sand. W/YA/YC/2017/05 / Yanchuan county. 300 sets Request for Single Stage - One of soft rainwater cellars. IBRD / 86840 Post Open - National 0.00 Canceled 2018-08-04 2018-09-29 2019-03-28 Quotations Envelope Diameter: 3m and depth: 3m. W/YA/YC/2017/06 / Yanchuan county. Road Request for Single Stage - One hardening 2.032km. Shiyao IBRD / 86840 Post Open - National 0.00 Canceled 2018-08-04 2018-09-29 2019-03-28 Quotations Envelope village 1.282km and Fanjiachuan village 0.75km W/YA/Y/2017/03 / Yanchang County, Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 rainwater cellar Quotations Envelope construction in the Farming Orchard, Leichi Town. Page 1 W/YA/Y/2017/04 / Yanchang county: road construction in 5 Request for Single Stage - One communities including IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope Jing'gou, Xinglie, Jiechu, Zhongliang and Houlie of Leiduo village in Leichi township. W/YA/Y/2017/05 / Yangchang county, 3.448km road construction of Niangeda and Caiziliang Request for Single Stage - One communities of Xiadaya IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope village in Leichi township, and 0.285km road resurfacing and construction of Shiganliang community W/YA/Y/2017/06 / Yanchang county, 1.15km Request for Single Stage - One road construction of IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope Zhangtao and Shentou communities in Leichi township. W/YA/Y/2017/07 / Pending Request for Single Stage - One Yanchang county, 1.75km IBRD / 86840 Post Limited 0.00 Implementat 2018-07-16 2018-09-10 2019-03-09 Quotations Envelope productive road for Leichi ion township. W/YA/Y/2017/02 / Residential road hardening Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 from Leichi township to Quotations Envelope Wapenyaozi village.