Procurement Plan

I. General Public Disclosure Authorized

1. Bank’s approval Date of the procurement Plan [Original: December16, 2016: 1stRevision: June 28, 2017, 2nd Revision: August 18, 2017, 3rd Revision: August 14, 2018, 4th Revision August 30, 2018] 2. Date of General Procurement Notice: Jan 24, 2017 3. Period covered by this procurement plan: 2016-2022

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

Public Disclosure Authorized Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 10million All 2. NCB (Goods) Above US$ 2million All 3. ICB (Works) Above US$ 40 million All 4. NCB (Works) Above US$ 10 million All 5. (Non-Consultant Services) Above US$ 2million All [Add other methods if necessary]

2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. Public Disclosure Authorized 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Yes, in procurement manual]

4. Reference to (if any) Project Operational/Procurement Manual: Yes

5. Any Other Special Procurement Arrangements: no

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement)

[List the Packages which require Bank’s prior review first and then the other packages]

Public Disclosure Authorized 1 2 3 4 5 6 7

Ref. No. Description Estimated Packages Domestic Review Comments Cost Preference by Bank US$ million (yes/no) (Prior / Post) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of 1.208 18 No Post the Shopping (Works) Summary of the ICB (Non- Consultant Services)

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 1 million 2. Single Source (Firms) Above US$ 1 million 3. Individual Above US$ 300,000

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: No

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6 Ref. Description of Estimated Packages Review Comments No. Assignment Cost by Bank US$ million (Prior / Post) Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods

PROCUREMENT : Poor Rural Areas Community Development Project PLAN General Information

Country: China Bank’s Approval Date of the Original Procurement Plan: 2017-03-20 Revised Plan Date(s): (comma delineated, leave blank if none)2018-09-04 Project ID: P153541 GPN Date: 2017-01-24 Project Name: Shaanxi Poor Rural Areas Community Development Project Loan / Credit No: IBRD / 86840 Executing Agency(ies): Shaanxi Poor Rural PMO

WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

W/YA/YCH/2017/01 / Road Request for Single Stage - One IBRD / 86840 Post Open - National 55,582.83 Completed 2017-04-06 2017-06-01 2018-02-01 construction Quotations Envelope

W/YA/Y/G/2017/01 / Apple Single Stage - One cold storage civil (4000 IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-06-01 2017-06-06 2017-07-18 2017-08-17 2017-09-21 2018-03-20 Envelope tons)

W/YU/D/Y/2017/02 / Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-07-25 2017-09-19 2018-03-18 Peasant household sheep Envelope shed

W/YU/D/Y/2018/01 / Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-02-06 2018-04-03 2018-09-30 Peasant household sheep Quotations Envelope shed

W/W/B/J/2018/02 / Hail Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30 net 225 mu Envelope

W/YU/D/Y/2018/02 / Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2018-02-01 2018-02-06 2018-03-20 2018-04-19 2018-05-24 2018-11-20 Peasant household sheep Envelope shed

W/YU/D/Y/2018/03 / Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-02-06 2018-04-03 2018-09-30 Peasant household sheep Quotations Envelope shed

W/W/B/F/2018/01 / Hail Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28 net 258 mu Envelope

W/B/LX/QQ/2017/02 / Single Stage - One Pepper seedling greenhouse IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-09-01 2017-09-06 2017-10-18 2017-11-17 2017-12-22 2018-06-20 Envelope 6

W/W/H/2017/06 / Village Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-30 2017-08-25 2018-02-21 road 0.85km Quotations Envelope

W/YU/M/2017/07 / Road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-02-01 construction Quotations Envelope

W/YU/M/2017/06 / Road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 construction Quotations Envelope

W/YA/YC/2017/08 / Road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 hardening 2.9km Quotations Envelope

W/YA/YC/2017/03 / . Constructed 5 bridges Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-07-15 2018-09-09 2019-03-08 cemented with M10 Quotations Envelope masonry and the wall is based on M12.5 fine stone materials.

W/YA/YC/2017/04 / Yanchuan county. Constructed 3 bridges Request for Single Stage - One IBRD / 86840 Prior Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 cemented with M10 Quotations Envelope masonry and the wall is based on M12.5 fine stone materials.

W/YA/YC/2017/01 / Yanchuan county. Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-07-25 2018-08-29 2018-11-29 Gaojiageta village, road Quotations Envelope hardening 0.875km

W/YA/YC/2017/02 / Yanchuan county. Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-08-04 2018-09-09 2019-03-08 Production road 4.95km Quotations Envelope resurfacing with sand.

W/YA/YC/2017/05 / Yanchuan county. 300 sets Request for Single Stage - One of soft rainwater cellars. IBRD / 86840 Post Open - National 0.00 Canceled 2018-08-04 2018-09-29 2019-03-28 Quotations Envelope Diameter: 3m and depth: 3m.

W/YA/YC/2017/06 / Yanchuan county. Road Request for Single Stage - One hardening 2.032km. Shiyao IBRD / 86840 Post Open - National 0.00 Canceled 2018-08-04 2018-09-29 2019-03-28 Quotations Envelope village 1.282km and Fanjiachuan village 0.75km

W/YA/Y/2017/03 / , Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 rainwater cellar Quotations Envelope construction in the Farming Orchard, Leichi Town.

Page 1 W/YA/Y/2017/04 / Yanchang county: road construction in 5 Request for Single Stage - One communities including IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope Jing'gou, Xinglie, Jiechu, Zhongliang and Houlie of Leiduo village in Leichi township.

W/YA/Y/2017/05 / Yangchang county, 3.448km road construction of Niangeda and Caiziliang Request for Single Stage - One communities of Xiadaya IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope village in Leichi township, and 0.285km road resurfacing and construction of Shiganliang community

W/YA/Y/2017/06 / Yanchang county, 1.15km Request for Single Stage - One road construction of IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope Zhangtao and Shentou communities in Leichi township.

W/YA/Y/2017/07 / Pending Request for Single Stage - One Yanchang county, 1.75km IBRD / 86840 Post Limited 0.00 Implementat 2018-07-16 2018-09-10 2019-03-09 Quotations Envelope productive road for Leichi ion township.

W/YA/Y/2017/02 / Residential road hardening Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 from Leichi township to Quotations Envelope

Wapenyaozi village.

W/W/F/2017/01 / Fuping County, asphalt road Pending Single Stage - One construction with 3.3 IBRD / 86840 Post Request for Bids Open - National 0.00 Implementat 2017-04-01 2017-04-06 2017-05-18 2017-06-17 2017-07-22 2018-01-22 Envelope kilometers in width and 6 ion meters in length

W/W/F/2017/02 / Fuping county, 5.47km road Pending construction in which 3.5m Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Implementat 2018-04-19 2018-04-24 2018-06-05 2018-07-05 2018-08-09 2019-03-31 width of road for out use Envelope ion and 3m width for residence use.

W/W/F/2017/03 / Fuping county, 11.1km length and Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2018-04-01 2018-04-06 2018-05-18 2018-06-17 2018-07-22 2018-12-31 3m width of road Envelope construction.

W/W/F/D/2017/01 / Fuping county, construction of peeling factories of 1,000 square meters, cold Pending storage building of 500 Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Implementat 2018-04-19 2018-04-24 2018-06-05 2018-07-05 2018-08-09 2019-02-28 tons and 500 square Envelope ion meters, peeling factories of 2400 square meters , drying rooms of 400 square meters and 1500 square meters.

W/W/B/2017/03 / , 3.2km residential Request for Single Stage - One road construction in IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope Zhaoyao community in Lingao project area.

W/W/B/2017/04 / Baishui county. One cement concrete road from Xiguojiashan village to Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 Xiyou village 1.8km, Quotations Envelope another road from Guojiashan village to Dongsunjiashan village 1.1km, together is 2.9km.

W/W/B/2018/12 / Baishui Pending county. 2.2km road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-07-17 2018-09-11 2019-03-10 hardening for Lingao Quotations Envelope ion community.

W/W/B/2018/14 / Baishui Pending Request for Single Stage - One village. 1.27km road IBRD / 86840 Post Limited 0.00 Implementat 2018-07-17 2018-09-11 2019-03-10 Quotations Envelope hardening for Gaoxi village. ion

W/W/B/2018/15 / Baishui Pending Request for Single Stage - One county. 3.38km productive IBRD / 86840 Post Limited 0.00 Implementat 2018-07-17 2018-09-11 2019-03-10 Quotations Envelope road for Wuyao village. ion

W/W/B/2018/17 / Baishui Request for Single Stage - One county. 0.9km productive IBRD / 86840 Post Limited 0.00 Canceled 2018-07-17 2018-09-11 2019-03-10 Quotations Envelope road for Gaoxi village.

W/W/B/2018/18 / Baishui county. Repair 1 well for Pujun village and drill 3 Pending Request for Single Stage - One well for the following IBRD / 86840 Post Limited 0.00 Implementat 2018-07-17 2018-09-11 2019-03-10 Quotations Envelope palces: Lingao community, ion Wuyao village and Taowa village, 1 for each.

W/W/B/2018/19 / Baishui county, 200 square meters Pending Request for Single Stage - One biological fermented IBRD / 86840 Post Limited 0.00 Implementat 2018-07-17 2018-09-11 2019-03-10 Quotations Envelope fertilizer pits construction ion in Lingao project area.

Page 2 W/B/LX/2017/01 / Long county, construction of 4 wells in which 2 well constructed in Liujiazu community, 1 well Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 constructed in Hujiazhuang Quotations Envelope community and 1 well construction on Shangliang community with 150 meters depth respectively.

W/B/LX/2017/02 / Long county, new construction of 8.123 km diversion canal, in which 3.523 km in the crossing of Liangfuhe Request for Single Stage - One community in Shangliang IBRD / 86840 Post Open - National 0.00 Canceled 2017-08-01 2017-08-22 2018-02-18 Quotations Envelope village and Xialiang village, 1.1 km in Liujiazui village, and 3.5 km between tanyuanpo community in Liujiazui and railway.

W/B/LX/2017/03 / Long county, construction of 3 bridges, in which 1 bridge between Hujiazhuang community and Liujiazui Request for Single Stage - One community, 1 bridge in IBRD / 86840 Post Open - National 0.00 Canceled 2017-09-06 2017-11-01 2018-04-30 Quotations Envelope Yinqigou community in Sanjiaodian village, and 1 bridge in Duimianqiao community in Sanjiaodian village.

W/YU/D/2017/03 / , construction of 1 300 Request for Single Stage - One meters-deep water well for IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-04-01 Quotations Envelope farming use (equipped with pump, high- and low voltage wire, transformer, water collection pool).

W/YU/D/2017/01 / Dingbian county, 7 km residential concrete road Pending Single Stage - One construction Road IBRD / 86840 Post Request for Bids Open - National 0.00 Implementat 2018-07-24 2018-07-29 2018-09-09 2018-10-09 2018-11-13 2019-05-16 Envelope construction from ion Shangendi village to No. 303 provincial road of Shaanxi.

W/YU/D/2017/02 / Dingbian county, 5.4 km residential road from Xiaoqu community to Tuwozi community, which Pending Single Stage - One is divided into 2 parts: the IBRD / 86840 Post Request for Bids Open - National 0.00 Implementat 2018-04-19 2018-04-24 2018-04-29 2018-05-04 2018-05-30 2018-12-28 Envelope first part is 1.9 km from ion Xiaoqu community to a triple path, and the second part is 3.5 km from Liwazi community to Tuwozi community.

W/YU/D/Y/2017/01 / Dingbian county. 5700 Request for Single Stage - One square meter of peasant IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope household sheep shed for Yangwan village.

W/YU/D/2017/04 / Dingbian county, construction of sheep trading market covering Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-04-01 5,000 square meters, brick Quotations Envelope floor, 0.5 meter high wall on which welded 1 meter iron column.

W/YU/M/2018/01 / Mizhi Pending county. 1.4km road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-07-18 2018-09-12 2019-03-11 hardening for Aijiawa Quotations Envelope ion village.

W/YU/M/2018/03 / Mizhi Pending county. Middle part of Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-07-18 2018-09-12 2019-03-11 Long town. Management of Quotations Envelope ion land and terrace for 125 Mu.

W/B/LY/2017/03 / , 2.2km road Request for Single Stage - One hardening in the first, IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope second and fourth group of Sujia village.

W/YU/M/2018/02 / , land management Pending and terracing in the front Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-07-18 2018-09-12 2019-03-11 part of Long Township, Quotations Envelope ion with a total dimension of 543 mu.

W/B/LY/2017/04 / Linyou county, 2.3km road Request for Single Stage - One hardening in Aoli IBRD / 86840 Post Open - National 0.00 Canceled 2017-08-06 2017-10-01 2018-03-30 Quotations Envelope community in Changfeng village.

W/B/LY/2017/05 / Linyou county, 3km road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 hardening from Quotations Envelope

Guanzhuang village to Zhujiayuan community.

Page 3 W/YU/M/2018/05 / Mizhi county. Water tower for Pending Request for Single Stage - One orchard irrigation. 10 high IBRD / 86840 Post Limited 0.00 Implementat 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope water tower and 1 low ion water tower.

W/YU/M/2018/04 / Mizhi County, land management Pending Request for Single Stage - One and terracing at the rear IBRD / 86840 Post Limited 0.00 Implementat 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope of Long Town, with a total ion dimension of 432 mu.

W/B/LY/2017/06 / Linyou county, 1.7km road Request for Single Stage - One hardening from Shenjia IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 Quotations Envelope community to Xizhuang community.

W/B/LY/2017/01 / Linyou county, 3.75km road Pending Single Stage - One hardening from Changfeng IBRD / 86840 Post Request for Bids Open - National 0.00 Implementat 2017-04-01 2017-04-06 2017-05-18 2017-06-17 2017-07-22 2018-02-21 Envelope township to Shenjia ion community.

W/YU/M/2018/06 / Mizhi Pending Request for Single Stage - One county. 10 well house for IBRD / 86840 Post Limited 0.00 Implementat 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope orchard irrigation. ion

W/B/LY/2017/02 / Linyou Pending county, 4.9km road Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Implementat 2017-05-01 2017-05-06 2017-06-17 2017-07-17 2017-08-21 2018-03-21 hardening from Changfeng Envelope ion township to Wushen village.

W/YU/M/2018/07 / Mizhi county. Water tower for Pending Request for Single Stage - One orchard irrigation and IBRD / 86840 Post Limited 0.00 Implementat 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope ancillary facility ion engineering with a total number of 10.

W/YU/M/2017/13 / Mizhi County, Irrigation pipeline Request for Single Stage - One construction in the orchard IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-08-01 Quotations Envelope garden with a total dimension of 550 mu.

W/YU/M/2018/08 / Mizhi Pending county. Pipeline for orchard Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-07-18 2018-09-12 2019-03-11 irrigation. The depth is Quotations Envelope ion 1m, and the material is PE.

W/YU/M/2017/14 / Mizhi County, irrigation and Request for Single Stage - One outlet pile construction in IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-08-01 Quotations Envelope the orchard garden with 1000 water piles.

W/B/LY/2017/07 / Linyou county, 5.775km road Request for Single Stage - One resurfaced with sand in the IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 Quotations Envelope farmland of in Changfeng village and Changle village.

W/B/LY/2017/08 / Linyou county, construction of 4.5km water pipelines from Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-01-28 the water factory in Quotations Envelope

Changfeng village to Changle village.

W/W/H/2017/01 / Heyang Request for Single Stage - One County, 2 wells in Xiyang IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-25 2017-09-19 2018-03-18 Quotations Envelope and Diantou Village.

W/W/H/2017/03 / , 2 wells in Xiao Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-30 2017-08-25 2018-02-21 Community and Meng Quotations Envelope

Community.

W/W/H/2017/02 / Heyang county. 1 well for Xiangong Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-05 2017-08-30 2018-02-26 village and another well for Quotations Envelope

Chengcun village.

W/W/H/2017/07 / Heyang County, production of 5 Request for Single Stage - One roads with a total length IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-30 2017-08-25 2018-02-21 Quotations Envelope of 6060 meters in Diantou Village.

W/W/H/2017/08 / Heyang county, 2.57km road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-30 2017-08-25 2018-02-21 construction in Xiaocun Quotations Envelope community.

W/W/H/2017/09 / Heyang Request for Single Stage - One county, 4.97km in Xiangong IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-30 2017-08-25 2018-02-21 Quotations Envelope village.

W/X/C/2017/01 / . Road hardening. The total length is 5298m: Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-05-01 2017-05-06 2017-06-17 2017-07-17 2017-08-21 2018-06-21 3919m for Santai village Envelope and 1379m for Fanluo village.

Page 4 W/X/C/2017/02 / Changwu county. Road hardening . The total length is 2562m: Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Canceled 2017-05-01 2017-05-06 2017-06-17 2017-07-17 2017-08-21 2018-02-21 2111m for Santai village Envelope and 451m for Fanluo village.

W/X/C/2017/03 / Changwu county. Associated drainage channel of hardening road Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-06-06 2017-08-01 2018-08-01 for Santai village and Quotations Envelope

Fanluo village, the total length is 3678m.

W/W/H/2017/05 / Heyang Pending Single Stage - One county. 5.8km village road IBRD / 86840 Post Request for Bids Open - National 0.00 Implementat 2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 2019-10-20 Envelope for Xiaocun community. ion

W/W/H/2017/04 / Heyang Pending county, 6.7km road Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Implementat 2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 2019-10-20 construction in Diantou Envelope ion village.

W/X/C/L/2017/01 / Changwu county. Controlling office area of 5650sqm, Cold storage refrigeration to build 2000t, Pending fence engineering 315m, Single Stage - One IBRD / 86840 Post Request for Bids Open - National 0.00 Implementat 2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 2019-10-20 refrigeration room door and Envelope ion controlling area, equipment room 400sqm, housing construction 300sqm, workshop 300sqm and 2 bathroom.

W/W/F/2017/03A / Fuping Pending county, 11.1km length and Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 3m width of road Quotations Envelope ion construction.

W/X/C/2017/01A / Changwu county. Road Pending hardening. The total length Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 is 5298m: 3919m for Quotations Envelope ion Santai village and 1379m for Fanluo village.

W/X/C/2017/02A / Changwu county. Road Pending hardening . The total Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 length is 2562m: 2111m for Quotations Envelope ion Santai village and 451m for Fanluo village.

Pending W/YA/YCH/2017/06A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Road hardening Quotations Envelope ion

W/YA/YCH/2017/15A / The Pending total length of production Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 gravel road of Quotations Envelope ion Shuangquan Villege in Macha is 3.9km

W/B/LY/2017/03A / Linyou county, 2.2km road Pending Request for Single Stage - One hardening in the first, IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope second and fourth group of ion Sujia village.

W/YA/YCH/2017/14A / 1 hallucinogenic water stone Pending Request for Single Stage - One bridge and the total length IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope of hardening road of ion Shimengou is 0.2 km

W/YU/D/2017/04A / Dingbian county, construction of sheep Pending trading market covering Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 5,000 square meters, brick Quotations Envelope ion floor, 0.5 meter high wall on which welded 1 meter iron column.

W/B/LX/QQ/2017/02A / Pending Single Stage - One Pepper seedling greenhouse IBRD / 86840 Post Request for Bids Open - National 0.00 Implementat 2018-08-02 2018-08-07 2018-09-18 2018-10-18 2018-11-22 2019-05-21 Envelope 6 ion

Pending W/W/B/2018/11A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road 2.68km Quotations Envelope ion

Pending W/YA/YCH/2017/09A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Road hardening Quotations Envelope ion

Pending W/YU/M/2017/01A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Hardened Road Quotations Envelope ion

Pending W/W/B/2017/01A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road 1.5km Quotations Envelope ion

Page 5 Pending W/W/B/2017/07A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Production of road 5.25km Quotations Envelope ion

W/YA/YCH/2017/31A / Pending Request for Single Stage - One Construction of revetment: IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope 800 m3 ion

Pending W/W/B/2018/10A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road 0.99km Quotations Envelope ion

W/B/LY/2017/07A / Linyou county, 5.775km road Pending Request for Single Stage - One resurfaced with sand in the IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope farmland of in Changfeng ion village and Changle village.

W/YA/Y/2017/06A / Yanchang county, 1.15km Pending road construction of Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Zhangtao and Shentou Quotations Envelope ion communities in Leichi township.

W/YU/D/2017/03A / Dingbian county, construction of 1 300 Pending meters-deep water well for Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 farming use (equipped with Quotations Envelope ion pump, high- and low voltage wire, transformer, water collection pool).

W/YU/M/2017/13A / Mizhi County, Irrigation pipeline Pending Request for Single Stage - One construction in the orchard IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope garden with a total ion dimension of 550 mu.

Pending W/YA/YCH/2017/03A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Road hardening Quotations Envelope ion

Pending W/W/B/2018/02A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Production of road 6.38km Quotations Envelope ion

Pending W/W/B/2018/04A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road 3.2km Quotations Envelope ion

W/YA/Y/2017/03A / Yanchang County, Pending Request for Single Stage - One rainwater cellar IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope construction in the Farming ion Orchard, Leichi Town.

W/YA/YC/2017/01A / Pending Yanchuan county. Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Gaojiageta village, road Quotations Envelope ion hardening 0.875km

Pending W/W/B/2018/03A / Water Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 diversion canal 12 km Quotations Envelope ion

Pending W/YA/YC/2017/07A / Road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 hardening 2.9 km Quotations Envelope ion

W/YA/YCH/2017/19A / The Pending Request for Single Stage - One total length of IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope hardening0.81.0 km ion

W/B/LY/2017/04A / Linyou county, 2.3km road Pending Request for Single Stage - One hardening in Aoli IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope community in Changfeng ion village.

W/W/H/2017/08A / Heyang Pending county, 2.57km road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 construction in Xiaocun Quotations Envelope ion community.

Pending W/W/B/2018/01A / Road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 1.2km Quotations Envelope ion

W/YA/YCH/2017/23A / The Pending Request for Single Stage - One total length of hardening IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope road of Machagou is 0.3 ion km

W/YA/YC/2017/06A / Yanchuan county. Road Pending Request for Single Stage - One hardening 2.032km. Shiyao IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope village 1.282km and ion Fanjiachuan village 0.75km

W/W/H/2017/02A / Heyang Pending county. 1 well for Xiangong Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 village and another well for Quotations Envelope ion Chengcun village.

Page 6 W/B/LY/2017/08A / Linyou county, construction of Pending 4.5km water pipelines from Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 the water factory in Quotations Envelope ion Changfeng village to Changle village.

W/W/H/2017/09A / Heyang Pending Request for Single Stage - One county, 4.97km in Xiangong IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope village. ion

W/X/C/2017/03A / Changwu county. Associated Pending drainage channel of Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 hardening road for Santai Quotations Envelope ion village and Fanluo village, the total length is 3678m.

W/B/LX/2017/03A / Long county, construction of 3 bridges, in which 1 bridge between Hujiazhuang community and Liujiazui Pending Request for Single Stage - One community, 1 bridge in IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope Yinqigou community in ion Sanjiaodian village, and 1 bridge in Duimianqiao community in Sanjiaodian village.

W/YA/YCH/2017/17A / 2 Pending Request for Single Stage - One hallucinogenic water stone IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope bridges in Machagou ion

W/YA/Y/2017/05A / Yanchang county, 3.448km road construction of Niangeda and Caiziliang Pending Request for Single Stage - One communities of Xiadaya IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope village in Leichi township, ion and 0.285km road resurfacing and construction of Shiganliang community

W/W/H/2017/01A / Heyang Pending Request for Single Stage - One County, 2 wells in Xiyang IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope and Diantou Village. ion

Pending W/W/B/2018/08A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road 3.5km Quotations Envelope ion

W/YA/YCH/2017/18A / Pending Request for Single Stage - One total length of hardening IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope road of Machagou is 1.0 ion km

Pending W/YA/YCH/2017/07A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Gravel road construction Quotations Envelope ion

Pending W/W/B/2018/05A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road 1.57km Quotations Envelope ion

W/YA/YCH/2017/13A / The Pending total length of production Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 gravel road of Shimengou Quotations Envelope ion is 3.0 km

Pending W/W/B/2018/06A / Road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 0.68 Km Quotations Envelope ion

W/YA/YCH/2017/25A / The Pending total length of hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road of Machagou is 1.0 Quotations Envelope ion km

W/YA/YCH/2017/26A / The Pending total length of hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road of Xinzhaigou Villege Quotations Envelope ion is 0.5 km

W/YA/YCH/2017/30A / The Pending Request for Single Stage - One total length of hardening IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope road of Machagou is 1.0 ion km

W/YA/YCH/2017/22A / 2 Pending Request for Single Stage - One hallucinogenic water stone IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope bridges in Shitaisi ion

Pending W/W/B/2018/09A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road 3.5km Quotations Envelope ion

W/W/H/2017/03A / Heyang Pending County, 2 wells in Xiao Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Community and Meng Quotations Envelope ion Community.

W/B/LY/2017/06A / Linyou county, 1.7km road Pending Request for Single Stage - One hardening from Shenjia IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope community to Xizhuang ion community.

Page 7 W/YA/YCH/2017/10A / The Pending total length of production Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 gravel road of Liuchagou Quotations Envelope ion is 5.0 km

W/YA/YCH/2017/24A / The Pending total length of hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road of Xinzhaigou Villege Quotations Envelope ion in Shike is 2.7 km

W/YA/YCH/2017/20A / The Pending total length of hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road of Guanshang Villege Quotations Envelope ion is 0.6km

W/YA/YCH/2017/28A / 2 Pending Request for Single Stage - One hallucinogenic water stone IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope bridge in Yadi Villeges ion

W/B/LX/2017/01A / Long county, construction of 4 wells in which 2 well constructed in Liujiazu Pending community, 1 well Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 constructed in Hujiazhuang Quotations Envelope ion community and 1 well construction on Shangliang community with 150 meters depth respectively.

W/YA/YC/2017/04A / Yanchuan county. Pending Constructed 3 bridges Request for Single Stage - One IBRD / 86840 Prior Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 cemented with M10 Quotations Envelope ion masonry and the wall is based on M12.5 fine stone materials.

W/B/LX/2017/02A / Long county, new construction of 8.123 km diversion canal, in which 3.523 km in the crossing of Liangfuhe Pending Request for Single Stage - One community in Shangliang IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope village and Xialiang village, ion 1.1 km in Liujiazui village, and 3.5 km between tanyuanpo community in Liujiazui and railway.

W/YU/D/Y/2017/01A / Dingbian county. 5700 Pending Request for Single Stage - One square meter of peasant IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope household sheep shed for ion Yangwan village.

W/YA/YCH/2017/21A / The Pending total length of production Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 gravel road road of Quotations Envelope ion Machagou is 5.1 km

W/YU/M/2017/14A / Mizhi County, irrigation and Pending Request for Single Stage - One outlet pile construction in IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope the orchard garden with ion 1000 water piles.

W/W/B/2017/04A / Baishui county. One cement concrete road from Pending Xiguojiashan village to Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Xiyou village 1.8km, Quotations Envelope ion another road from Guojiashan village to Dongsunjiashan village 1.1km, together is 2.9km.

W/YA/Y/2017/04A / Yanchang county: road construction in 5 Pending communities including Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Jing'gou, Xinglie, Jiechu, Quotations Envelope ion Zhongliang and Houlie of Leiduo village in Leichi township.

W/YA/YCH/2017/16A / The total length of production Pending Request for Single Stage - One gravel road of Nanwan IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope Village in Guanshang is ion 3.0 km

W/YA/YC/2017/03A / Yanchuan county. Pending Constructed 5 bridges Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 cemented with M10 Quotations Envelope ion masonry and the wall is based on M12.5 fine stone materials.

W/YA/YC/2017/02A / Pending Yanchuan county. Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Production road 4.95km Quotations Envelope ion resurfacing with sand.

W/YA/YCH/2017/27A / The Pending total length of hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road of Machagou is 5.5 Quotations Envelope ion km

Page 8 W/B/LY/2017/05A / Linyou Pending county, 3km road Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 hardening from Quotations Envelope ion Guanzhuang village to Zhujiayuan community.

W/YA/YCH/2017/29A / The Pending total length of production Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 gravel road of Yadi Quotations Envelope ion Village is 1.0 km

W/YA/YCH/2017/11A / 2 Pending Request for Single Stage - One hallucinogenic water stone IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope bridges in Liuchagou ion

W/YA/YCH/2017/32A / Pending Request for Single Stage - One Construction of irrigation IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope canals:600m ion

W/W/B/2017/03A / Baishui county, 3.2km residential Pending Request for Single Stage - One road construction in IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope Zhaoyao community in ion Lingao project area.

Pending W/W/B/2018/07A / Village Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 road 3km Quotations Envelope ion

W/YA/Y/2017/02A / Pending Residential road hardening Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 from Leichi township to Quotations Envelope ion Wapenyaozi village.

W/YA/YC/2017/05A / Yanchuan county. 300 sets Pending Request for Single Stage - One of soft rainwater cellars. IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope Diameter: 3m and depth: ion 3m.

W/W/H/2017/07A / Heyang County, production of 5 Pending Request for Single Stage - One roads with a total length IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope of 6060 meters in Diantou ion Village.

Pending W/YA/YCH/2017/02A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Road construction. Quotations Envelope ion

W/YA/YCH/2018/07 / Pending Yichuan county. The 2km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 harden road for Mashan Quotations Envelope ion village and Lijialing village.

W/YA/YCH/2018/08 / Pending Yichuan county. 2 bridges Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 for Miaogoukou and Quotations Envelope ion Yunwanggou. And 1 culvert.

W/YA/YCH/2018/09 / Pending Yichuan county. 1.4km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 hardening road and 1.7km Quotations Envelope ion new drainage ditch.

W/YA/YCH/2018/10 / Pending Yichuan county. 10km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 productive road for Ruyi Quotations Envelope ion village.

W/YA/YCH/2018/11 / Yichuan county. 2.6km Pending hardening road for Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 Shijiazhuang village, as Quotations Envelope ion well as 0.7km new drainage ditch.

W/YA/YCH/2018/12 / Pending Request for Single Stage - One Yichuan county. 1 water IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope well for Shijiazhuang ion village.

W/YA/YCH/2018/13 / Pending Yichuan county. 8.05km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 productive road for Quotations Envelope ion Shijiazhuang village.

W/YA/YCH/2018/14 / Pending Yichuan county. 10km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 gravel road for Quotations Envelope ion Shijiazhuang village.

W/YA/YCH/2018/15 / Pending Yichuan county. 9.5km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 gravel road for Guantou Quotations Envelope ion and Shijiazhuang village.

W/YA/YCH/2018/16 / Pending Yichuan county. 4 bridges. Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 2 for Shishao village and Quotations Envelope ion other 2 for Taiping village.

W/YA/YCH/2018/17 / Pending Yichuan county. 9km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 productive road and 7 Quotations Envelope ion culvert for Shishao village.

Page 9 W/YA/YCH/2018/18 / Yichuan county. 0.825km Pending Request for Single Stage - One hardening road and 0.5km IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope drainage ditch for Shishao ion village.

W/YA/YCH/2018/19 / Pending Yichuan county. 1.8km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 hardening road for Quotations Envelope ion Nanbutou village.

W/YA/YCH/2018/20 / Yichuan county. 11km Pending Request for Single Stage - One productive road and 2 IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope culvert for Nanbutou ion village and Yanqu village.

W/YA/YCH/2018/21 / Yichuan county. 8km Pending productive road for Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 Nanbutou village, 0.5km Quotations Envelope ion road for Guanzhuan village and 2km road for Mayuan.

W/YA/YCH/2018/22 / Yichuan county. 2 bridges Pending Request for Single Stage - One for Zuishang and Yadi IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope village, 2 culverts for ion Guanzhuang village.

W/YA/YCH/2018/23 / Yichuan county. 5km Pending Request for Single Stage - One productive road for Nantou IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope village and 3km road for ion Dahumiao village.

W/YA/YCH/2018/24 / Pending Yichuan county. 10km Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 productive road for Nantou Quotations Envelope ion village.

W/YA/YCH/2018/25 / Yichuan county. 4 watering place for 4 villages, Pending Request for Single Stage - One Zuishang, Taiping, IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope Shijiazhuang and Heling ion village. 1km drainage ditch for Lingshang village.

W/YA/YCH/2018/26 / Pending Request for Single Stage - One Yichuan county. Gravel IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope road for Taiping village. ion

W/YA/YCH/2018/27 / Pending Request for Single Stage - One Yichuan county. bridge for IBRD / 86840 Post Limited 0.00 Implementat 2018-08-18 2018-10-13 2019-04-11 Quotations Envelope Nanbutou village. ion

W/YU/M/2018/09 / Mizhi Pending Request for Single Stage - One county. Road hardening for IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Yangjiagou village. ion

W/YU/M/2018/10 / Mizhi Pending Request for Single Stage - One county. Hardened Road for IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Sigou village. ion

W/YU/M/2018/11 / Mizhi Pending Request for Single Stage - One county. Hardened Road for IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Gongjiagou village. ion

W/YU/M/2018/12 / Mizhi Pending Request for Single Stage - One county. Hardened Road for IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Gongjiagou village. ion

W/YU/M/2018/13 / Mizhi Pending Request for Single Stage - One county. Hardened Road for IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Li village. ion

W/YU/M/2018/14 / Mizhi Pending Request for Single Stage - One county. Hardened road for IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Yuejiacha village. ion

W/YU/M/2018/15 / Mizhi Pending Request for Single Stage - One county. Hardened road for IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Yuejiacha village. ion

W/YU/M/2018/16 / Mizhi Pending Request for Single Stage - One county. Hardened road for IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Majiaxiaogou village. ion

W/YU/M/2018/17 / Mizhi Pending Request for Single Stage - One county. Hardened road for IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Houjiagou village. ion

Pending W/YU/M/2018/18 / Mizhi Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 county. Land governance. Quotations Envelope ion

W/YU/M/2018/19 / Mizhi county. Well engineering Pending Request for Single Stage - One for Yangjiagou village, IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Gongjiagou village and Li ion village.

Page 10 Pending W/YU/M/2018/20 / Mizhi Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 county. Well engineering Quotations Envelope ion

W/YU/M/2018/21 / Mizhi Pending Request for Single Stage - One county. Water storage IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope engineering. ion

W/YU/M/2018/22 / Mizhi Pending Request for Single Stage - One county. Water supply IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope irrigation. ion

W/YU/M/2018/23 / Mizhi Pending Request for Single Stage - One county. Water supply IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope Engineering. ion

W/YU/M/2018/24 / Mizhi Pending Request for Single Stage - One county. Drainage system IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope construction service. ion

W/YU/M/2018/25 / Mizhi Pending Request for Single Stage - One county. Environmental IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope engineering. ion

W/YU/M/2018/26 / Mizhi Pending Request for Single Stage - One county. Market IBRD / 86840 Post Limited 0.00 Implementat 2018-08-28 2018-10-23 2019-04-21 Quotations Envelope construction. ion

W/YA/Y/2018/01A / Pending Request for Single Stage - One Yanchang county. Irrigation IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 Quotations Envelope project. ion

W/YA/Y/2018/02 / Pending Yanchang county. Repair Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 the 4km productive road Quotations Envelope ion for Donggou village.

W/YA/Y/2018/03 / Pending Yanchang county. Repair Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 the productive road for Quotations Envelope ion Liku village.

W/YA/Y/2018/04 / Pending Yanchang county. Repair Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 the productive road for Quotations Envelope ion Liku village.

W/YA/Y/2018/05 / Pending Yanchang village. Repair Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 road from Liku village to Quotations Envelope ion Yanliujiaxigou village.

W/YA/Y/2018/06 / Pending Yanchang county. Repair Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 the 2.5km productive road Quotations Envelope ion for Zhaojialiang village.

W/YA/Y/2018/07 / Pending Request for Single Stage - One Yanchang county. 2 IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 Quotations Envelope productive road for ion Yanliujia village.

W/YA/Y/2018/08 / Pending Request for Single Stage - One Yanchang county. The IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 Quotations Envelope productive road for ion Luozizui village.

W/YA/Y/2018/09 / Pending Request for Single Stage - One Yanchang county. The IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 Quotations Envelope productive road for ion Kushuizuiliang village.

W/YA/Y/2018/10 / Pending Request for Single Stage - One Yanchang county. 3 IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 Quotations Envelope productive roads for ion Shangjia village.

W/YA/Y/2018/11 / Pending Request for Single Stage - One Yanchang county. Repair 2 IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 Quotations Envelope productive roads for ion Shangpan village.

W/YA/Y/2018/12 / Pending Request for Single Stage - One Yanchang county. Repair 2 IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 Quotations Envelope productive roads for ion Shangpan village.

W/YA/Y/2018/13 / Pending Request for Single Stage - One Yanchang county. 3 IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 Quotations Envelope productive roads for ion Yangjia village.

W/YA/Y/2018/14 / Pending Request for Single Stage - One Yanchang county. The IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 Quotations Envelope productive road for ion Dongjinggou village.

W/YA/Y/2018/15 / Pending Yanchang county. The Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 productive road from Quotations Envelope ion Nanling village to Gadamao village.

W/YA/Y/2018/16 / Pending Request for Single Stage - One Yanchang county. 2 IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 Quotations Envelope productive roads for ion Xiayuan village.

W/YA/Y/2018/17 / Pending Request for Single Stage - One Yanchang county. IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 Quotations Envelope Hardening road for Anhe ion community.

Page 11 W/YA/Y/2018/18 / Pending Request for Single Stage - One Yanchang county. New IBRD / 86840 Post Limited 0.00 Implementat 2018-09-04 2018-10-30 2019-04-28 Quotations Envelope road. ion

GOODS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

G/YA/YCH/F/2017/04 / Request for Single Stage - One Provide 1400 sheep(70 poor IBRD / 86840 Post Open - National 216,070.23 Signed 2017-07-06 2017-08-31 2018-02-27 Quotations Envelope Families)

G/YA/YC/C/2017/01 / 342 Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-10-06 2017-12-01 2018-05-30 heads of moggy Quotations Envelope

G/B/LY/CF/SYJ/2017/03 / associated equipment of spawn production Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 baseautoclave equipment Quotations Envelope of culture room sun shading facilities

G/YA/YC/C/2018/01 / 342 Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 heads of moggy Quotations Envelope

G/YA/YC/C/2018/03 / 342 Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-10-06 2018-12-01 2019-05-30 heads of moggy Quotations Envelope

G/YA/YC/C/2019/01 / 342 Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2019-06-06 2019-08-01 2020-01-28 heads of moggy Quotations Envelope

G/W/F/D/2018/02 / 1 set of Request for Single Stage - One cold storage refrigeration IBRD / 86840 Post Open - National 0.00 Canceled 2018-04-01 2018-04-22 2018-10-19 Quotations Envelope equipment

G/W/F/D/2017/05 / Stainless steel workbench, Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-09-01 2017-09-22 2018-03-21 persimmons hang 30 Quotations Envelope square meters, 2.189 million

G/YA/Y/Z/2017/02 / Carrier Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 (4) Quotations Envelope

G/W/F/D/2017/03 / Drying Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-08-06 2017-10-01 2018-03-30 shed 6020 square meters Quotations Envelope

G/W/F/D/2017/01 / Automatic peeling IBRD / 86840 Post Direct Selection Direct 0.00 Canceled 2017-04-01 2017-04-06 2017-05-11 2017-12-11 machines, drying machines, drying trolleies

G/W/B/F/2018/01 / A cold Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-03-01 2018-03-22 2018-09-18 storage equipment Quotations Envelope

G/YU/D/Y/2017/02 / little Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-10-06 2017-12-01 2018-05-30 ewes Quotations Envelope

G/YU/D/Y/2018/01 / little Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-09-06 2018-11-01 2019-04-30 ewe Quotations Envelope

G/YU/M/L/2018/01 / Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30 donkeys Quotations Envelope

G/YU/M/L/2017/01 / Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 donkeys Quotations Envelope

G/YA/YC/2018/01 / Yanchuan county. laptop computer3, computer 5, Pending Request for Single Stage - One printer 3, copier 1, camera IBRD / 86840 Prior Limited 0.00 Implementat 2018-07-20 2018-09-14 2019-03-13 Quotations Envelope 1, fax machine 1, video ion camera 1, projector 1, scanner 1, office software 8

G/YA/Y/2018/01 / Yanchang County, 10 kinds of office suppliers including desktop computers 5, Pending notebook computers 3, laser Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-07-16 2018-09-10 2019-03-09 printers 3, photocopier 1, Quotations Envelope ion laser fax machine 1, video projector 1, scanner 1, digital camera 1, video camera 1, and office suite software.

G/W/B/2018/01 / Baishui county, 2 sets of equipment Pending Request for Single Stage - One for biological fermented IBRD / 86840 Post Limited 0.00 Implementat 2018-07-19 2018-08-06 2018-09-06 Quotations Envelope fertilizer in Shiguan project ion area.

G/W/B/2018/02 / Baishui Pending county, 1 set of equipment Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-07-17 2018-09-11 2019-03-10 for fermented fertilizer pits Quotations Envelope ion in Lingao project area.

Page 12 G/B/LX/2017/01 / Long county, 3 laptop computers, 5 desktop computers, 3 laser printers, 1 Pending Request for Single Stage - One photocopier, 1 digital IBRD / 86840 Post Limited 0.00 Implementat 2018-07-17 2018-09-11 2019-03-10 Quotations Envelope camera, 1 laser fax ion machine, 1 video camera, 1 video projector, 1 scanner, 8 suites of office software.

G/YU/D/2017/01 / Dingbian county, 3 laptop Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-07-06 2017-08-31 2018-02-27 computers,, 1 camera, 8 Quotations Envelope suites of office software.

G/B/LY/2017/01 / Linyou county, 3 laptop computers, 5 desktop computers, 3 laser printers, 1 Request for Single Stage - One IBRD / 86840 Post Open - National 0.00 Canceled 2017-03-06 2017-05-01 2017-10-28 photocopier, 1 digital Quotations Envelope camera, 1 laser fax machine, 1 video camera, 1 video projector, 1 scanner.

G/W/H/2017/01 / Heyang County, Notebook computers 3, Desktop computers 5, Scanner 1, Request for Single Stage - One Office suite softwares 8, IBRD / 86840 Post Open - National 0.00 Canceled 2017-04-06 2017-06-01 2017-11-28 Quotations Envelope Photocopiers 1, Digital camera 1, Laser printer 3, Video projector 1, Digital voice recorder 1, Laser fax machine 1.

G/W/H/J/2018/01 / Heyang county. 1050mu of drip irrigation: 300mu for Request for Single Stage - One Diantou village, 150mu for IBRD / 86840 Post Open - National 0.00 Canceled 2018-01-25 2018-03-22 2018-09-18 Quotations Envelope Chengcun village, 100mu for Xiaocun village and 500mu for Mengcun village.

G/W/H/J/2018/02 / Heyang Pending Single Stage - One county. 557 acres of new IBRD / 86840 Post Request for Bids Open - National 0.00 Implementat 2018-12-01 2018-12-06 2019-01-17 2019-02-16 2019-03-23 2019-09-19 Envelope varieties of apple tree. ion

G/W/F/D/2017/01A / Pending Automatic peeling IBRD / 86840 Post Direct Selection Direct 0.00 Implementat 2018-08-02 2018-08-07 2018-09-11 2019-04-13 machines, drying machines, ion drying trolleies

Pending G/SH/2018/01A / Office Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 equipment 176 set Quotations Envelope ion

G/W/H/2017/01A / Heyang County, Notebook computers 3, Desktop computers 5, Scanner 1, Pending Request for Single Stage - One Office suite softwares 8, IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope Photocopiers 1, Digital ion camera 1, Laser printer 3, Video projector 1, Digital voice recorder 1, Laser fax machine 1.

G/W/H/J/2018/01A / Heyang county. 1050mu of drip irrigation: 300mu for Pending Request for Single Stage - One Diantou village, 150mu for IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope Chengcun village, 100mu ion for Xiaocun village and 500mu for Mengcun village.

Pending G/YA/YCH/F/2018/01A / Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Providing 2130 sheep Quotations Envelope ion

G/YU/D/2017/01A / Pending Dingbian county, 3 laptop Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 computers,, 1 camera, 8 Quotations Envelope ion suites of office software.

G/YA/YCH/F/2017/02A / Pending Request for Single Stage - One Livestock breeding: 100 IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope rams ion

G/B/LY/2017/01A / Linyou county, 3 laptop computers, 5 desktop computers, 3 Pending laser printers, 1 Request for Single Stage - One IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 photocopier, 1 digital Quotations Envelope ion camera, 1 laser fax machine, 1 video camera, 1 video projector, 1 scanner.

G/W/B/2017/01A / Notebook computers, Desktop computers, Pending Request for Single Stage - One Scanners, Office suite IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope software, Digital cameras, ion Video projectors, Printers, Fax machines, Copiers

G/YA/YCH/F/2017/06A / Pending Request for Single Stage - One 100 rams (demonstration IBRD / 86840 Post Limited 0.00 Implementat 2018-08-07 2018-10-02 2019-03-31 Quotations Envelope farms) ion

Page 13 NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CONSULTING FIRMS Activity Reference No. / Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Request for Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach (US$) Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

C/SH/2018/02 / studies on Consultant sustainable development Pending IBRD / 86840 Post Qualification Open - National 0.00 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 under the background of Implementation Selection relative poverty

Consultant C/SH/2017/07 / Project Under IBRD / 86840 Post Qualification Open - National 0.00 2017-10-20 2017-11-10 2017-12-24 2018-01-23 2018-03-07 2018-03-07 purchasing agent Implementation Selection

C/SH/2017/05 / studies on Consultant Pending cooperatives and ways of IBRD / 86840 Post Qualification Open - National 0.00 2018-06-30 2018-07-21 2018-09-03 2018-10-03 2018-11-07 2019-11-07 Implementation poverty alleviation Selection

Consultant C/SH/2018/04 / Entrust IBRD / 86840 Post Qualification Open - National 0.00 Canceled 2018-05-31 2018-06-21 2018-08-04 2018-09-03 2018-10-08 2019-10-08 training and investigation Selection

C/SH/2017/06 / studies on Consultant ways for supporting IBRD / 86840 Post Qualification Open - National 0.00 Canceled 2017-09-01 2017-09-22 2017-11-05 2017-12-05 2018-01-09 2018-07-08 inclusive finance (including Selection insurance) in poor areas

C/SH/2018/01 / studies on Consultant city and countryside IBRD / 86840 Post Qualification Open - National 0.00 Canceled 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 integration of poor areas Selection

C/SH/2018/03 / studies on Consultant value chain and IBRD / 86840 Post Qualification Open - National 0.00 Canceled 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 industrialization poverty Selection alleviation in poor areas

C/SH/2017/02 / project Quality And Pending IBRD / 86840 Post Open - National 0.00 2018-12-01 2018-12-22 2019-02-04 2019-03-04 2019-04-03 2019-05-08 2019-06-12 2020-06-11 monitoring and evaluation Cost-Based Implementation

Selection

INDIVIDUAL CONSULTANTS

Page 14