Environmental Impact Assessment Report of Shaanxi Small Towns

Total Page:16

File Type:pdf, Size:1020Kb

Environmental Impact Assessment Report of Shaanxi Small Towns E4461 V1 REV EIA Report of Shaanxi Zhongsheng Assessment Certificate Category: Grade A SZSHPS-2013-075 Assessment Certificate No.:3607 Public Disclosure Authorized Environmental Impact Assessment Report of Shaanxi Small Towns Infrastructure Project with World Bank Loan Public Disclosure Authorized (Draft for review) Public Disclosure Authorized Entrusted by: Foreign Loan Supporting Project Management Office of Shaanxi Province Assessed by: Shaanxi Zhongsheng Environmental Technologies Development Co., Ltd. March 2014 Public Disclosure Authorized Content 0 Foreword ................................................................................................................................................. 1 0.1 Project Background ................................................................................................................. 1 0.2 Assessment Category .............................................................................................................. 2 0.4 Project Feature ....................................................................................................................... 3 0.5 Major Environmental Problems Concerned in Environmental Assessment ......................... 4 0.6 Major Conclusion in Report .................................................................................................... 4 0.7 Acknowledgement .................................................................................................................. 4 1 General Provisions .................................................................................................................................. 6 1.1 Basis of Preparation ................................................................................................................ 6 1.2 Assessment Purpose ............................................................................................................... 9 1.3 Assessment Standard ............................................................................................................ 10 1.4 Assessment Period ................................................................................................................ 14 1.5 Environmental Impact Identification and Selection of Assessment Factor ........................ 15 1.6 Assessment Content and Emphasis....................................................................................... 19 1.7 Grade and Scope of Assessment ........................................................................................... 19 1.8 Environmental Protection Target ......................................................................................... 20 1.9 Assessment Procedure and Method ..................................................................................... 21 1.10 EIA team ................................................................................................................................ 24 2 Project Overview and Engineering Analysis .......................................................................................... 26 2.1 Project Overview ................................................................................................................... 26 2.2 Analysis of Project ................................................................................................................. 45 3.1 Overview of Shaanxi Province Condition .............................................................................. 49 3.2 Current Situation of Natural Environment in Project Area ................................................... 50 3.3 Ecological resource overview ....................................................................................................... 70 3.4 Project Area Social Environment Survey ............................................................................... 70 3.4.1 Overview of regional social and economic situation ................................................................... 70 3.4.2 The general situation of the material and cultural heritage area ................................................ 72 3.5 Investigation of Current Situation of Project Area Infrastructure and Environmental Sanitation .............................................................................................................................................. 73 3.6 That is associated with the project engineering overview of the survey ........................... 78 3.7 Survey of the Present Environment Quality of the Project Area ........................................... 83 3.8 Environment Object Concerned ............................................................................................ 88 4. Analysis of the World Bank's Safeguard Policies ................................................................................... 92 4.1 Screening of the Safeguard Policies ...................................................................................... 92 4.2 Evaluation and Analysis of the Safeguard Policies ................................................................ 92 5. Environment Impact Predictive Assessment and Mitigation Measures ................................................ 95 5.1 Impact on Water Environment .............................................................................................. 95 5.2 Atmospheric Environment Impact ...................................................................................... 102 5.3 Impact on Sound Environment ........................................................................................... 106 5.4 Impact of Solid Waste ......................................................................................................... 133 5.5 Ecological Impacts ............................................................................................................... 135 5.6 Impact of material and cultural resources .......................................................................... 137 5.7 Analysis of Impact on Road Safety ...................................................................................... 139 5.8 Accumulative Environment Impact Analysis ....................................................................... 141 6. Environment Risk Analysis and Preventive Measures ......................................................................... 144 6.1 Environment Risk Identification .......................................................................................... 144 6.2 Environment Risk Analysis .................................................................................................. 145 6.3 Environment Risk Preventive Measures .............................................................................. 147 7. Social Environment Impact Analysis ................................................................................................... 149 7.1 Environment Impact and Mitigation Measures for Resettlement and Removal ................. 149 7.2 Social Impact of Construction Works and the Mitigation Measures ................................... 158 7.3 Social Impact for Project Operation and Mitigation Measures ....................................... 160 8. Analysis of Alternatives ..................................................................................................................... 162 8.1 overall Analysis of Alternatives .......................................................................................... 162 8.2 part Analysis of Alternatives .............................................................................................. 163 8.2.1 mosque in LianFeng Road ...................................................................................................... 163 9. Public Participation and Information Disclosure ............................................................................... 167 9.1 Purpose and Meaning of Public Participation ................................................................... 167 9.2 Methods and Processes of Public Participation............................................................... 167 9.3 Public Participation Process and Its Content ..................................................................... 170 9.4 Public Survey ...................................................................................................................... 170 9.5 Summary of Public Participation........................................................................................ 177 10. Environmental Management Plan ............................................................................................ 179 10.1 Purpose of Preparing the Environmental Management Plan ......................................... 179 10.2 Main Content of Environmental Management Plan ......................................................... 179 10.3 Environmental Management System and Its Responsibility Definition ........................... 179 10.4 Summary of the Main Environment Items of This Project and Environment Protection Measures 187 10.5 Technical Support and Environment Management Training ............................................. 201 10.6 Environment Protection Completion Acceptance ............................................................... 202 10.7 Environment Monitoring Plan ............................................................................................ 203 10.8 Environment Reporting System ........................................................................................
Recommended publications
  • MISSION in CENTRAL CHINA
    MISSION in CENTRAL CHINA A SHORT HISTORY of P.I.M.E. INSTITUTE in HENAN and SHAANXI Ticozzi Sergio, Hong Kong 2014 1 (on the cover) The Delegates of the 3rd PIME General Assembly (Hong Kong, 15/2 -7/3, 1934) Standing from left: Sitting from left: Fr. Luigi Chessa, Delegate of Kaifeng Msgr. Domenico Grassi, Superior of Bezwada Fr. Michele Lucci, Delegate of Weihui Bp. Enrico Valtorta, Vicar ap. of Hong Kong Fr. Giuseppe Lombardi, Delegate of Bp. Flaminio Belotti, Vicar ap. of Nanyang Hanzhong Bp. Dionigi Vismara, Bishop of Hyderabad Fr. Ugo Sordo, Delegate of Nanyang Bp. Vittorio E. Sagrada, Vicar ap. of Toungoo Fr. Sperandio Villa, China Superior regional Bp. Giuseppe N. Tacconi, Vicar ap. of Kaifeng Fr. Giovanni Piatti, Procurator general Bp. Martino Chiolino, Vicar ap. of Weihui Fr. Paolo Manna, Superior general Bp. Giovanni B. Anselmo, Bishop of Dinajpur Fr. Isidoro Pagani, Delegate of Italy Bp. Erminio Bonetta, Prefect ap. of Kengtung Fr. Paolo Pastori, Delegate of Italy Fr. Giovanni B. Tragella, assistant general Fr. Luigi Risso, Vicar general Fr. Umberto Colli, superior regional of India Fr. Alfredo Lanfranconi, Delegate of Toungoo Fr. Clemente Vismara, Delegate ofKengtung Fr. Valentino Belgeri, Delegate of Dinajpur Fr. Antonio Riganti, Delegate of Hong Kong 2 INDEX: 1 1. Destination: Henan (1869-1881) 25 2. Division of the Henan Vicariate and the Boxers’ Uprising (1881-1901) 49 3. Henan Missions through revolutions and changes (1902-1924) 79 4. Henan Vicariates and the country’s trials (1924-1946) 125 5. Henan Dioceses under the
    [Show full text]
  • Summary Environmental Impact Assessment Shaanxi
    SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT SHAANXI ROADS DEVELOPMENT PROJECT IN THE PEOPLE’S REPUBLIC OF CHINA February 2001 CURRENCY EQUIVALENTS (as of 14 February 2001) Currency Unit – Yuan (Y) Y1.00 = $0.1208 $1.00 = Y8.2786 ABBREVIATIONS ADB – Asian Development Bank BOD – biochemical oxygen demand CO – carbon monoxide COD – chemical oxygen demand EIA – environmental impact assessment GB – Chinese National Standards HC – hydrocarbon IEE – initial environmental examination NOx – nitrogen oxides PRC – People’s Republic of China SPEPB – Shaanxi Provincial Environmental Protection Bureau SPCD – Shaanxi Provincial Communications Department SPHB – Shaanxi Provincial Highway Bureau SEIA – summary environmental impact assessment SPHSDI – Shaanxi Provincial Highway Survey and Design Institute TSP – total suspended particulate matter VOC – volatile organic compounds WEIGHTS AND MEASURES dB – decibel h – hour ha – hectare kg – kilogram km – kilometer km2 – square kilometer m – meter m2 – square meter m3 – cubic meter mg/l – milligram per liter mg/Nm3 – milligram per normal cubic meter t – ton (metric) NOTE In this report, “$” refers to US dollars. CONTENTS Page MAP i I. INTRODUCTION 1 II. DESCRIPTION OF THE PROJECT 1 III. DESCRIPTION OF THE ENVIRONMENT 2 A. Physical Setting 2 B. Biological Environment 3 C. Social and Economic Environment 3 IV. ALTERNATIVES 4 V. ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 6 A. Physical Setting 6 B. Socioeconomic Impacts 12 VI. ECONOMIC ASSESSMENT 14 VII. INSTITUTIONAL REQUIREMENTS AND ENVIRONMENTAL 16 MONITORING PROGRAM VIII. PUBLIC INVOLVEMENT 18 IX. CONCLUSIONS 18 APPENDIX 20 I. INTRODUCTION 1. The environmental impact assessment (EIA) for the Shaanxi Roads Development Project was undertaken by the Xi’an Highway University and the November 1999 EIA report was approved by the State Environmental Protection Administration on 1 March 2000.
    [Show full text]
  • Building Railways in the People's Republic of China: Changing Lives
    Building Railways in the People’s Republic of China Changing Lives Manmohan Parkash EARD Special Studies Building Railways in the People’s Republic of China: Changing Lives Manmohan Parkash © 2008 Asian Development Bank All rights reserved. Published 2008 Printed in the Philippines Publication Stock No. 092007 ISBN No. 978-971-561645-4 The views expressed in this publication are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank, of its Board of Governors, or of the governments they represent. The Asian Development Bank does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. Use of the term “country” does not imply any judgment by the authors or the Asian Development Bank as to the legal or other status of any territorial entity. ii Building Railways in the People’s Republic of China: Changing Lives Contents Contents .................................................................................. iii List of Tables and Figures .................................................................. iv Abbreviations and Acronyms .............................................................. v Acknowledgement ........................................................................ vi Foreword .................................................................................. vii Executive Summary ....................................................................... viii INTRODUCTION ..........................................................................
    [Show full text]
  • Internal Ex-Post Evaluation for Technical Cooperation Project
    Internal Ex-Post Evaluation for Technical Cooperation Project conducted by China Office: January, 2019 Country Name Project for Capacity Development on Mental Health Services for Reconstruction Support of People's Republic of China Sichuan Earthquake I. Project Outline In the disaster-affected area hit by the Sichuan Earthquake on May 12, 2008, reconstruction works were steadily being implemented with focus on infrastructure development. Programs on mental health and psychosocial support for those affected were also started right after the Earthquake by various governmental agencies and other organizations in and out of China. However, it was said that the average incidence rate of post-traumatic stress disorder (PTSD) in the quake-affected area was estimated as more than 10% (at the time of ex-ante evaluation) and cases of secondary damage including suicide were continuously reported. This indicated that there had still been Background urgent needs of the metal health and psychological support. What still remained as challenges were: how to cope with the lack of mental health care workers, how to ensure the quality of care program, how to secure the sustainability of care provision system, and what to do with the lack of comprehensive coordination and management. It was confirmed that these challenges were aggravated over the time. It was also pointed out that the self-care of mental health care workers should be given full consideration as it was often the case that they themselves were the disaster victims. In the disaster-affected area hit by the Sichuan Earthquake (Sichuan Province, Gansu Province, and Shaanxi Province), the project aims to establish the appropriate and sustainable community-based psychosocial support system(1) through human resource development of mental health care workers in multi-sectoral areas (education, psychology, social work and medicine) as well as strengthening of collaboration and cooperation among sectors with focus on affected people, thereby having the concept of established support system well accepted in those project areas.
    [Show full text]
  • Protection and Utilization of Confucian Temple in Southern Shaanxi from the Perspective of Cultural Heritage
    Open Journal of Social Sciences, 2020, 8, 225-237 https://www.scirp.org/journal/jss ISSN Online: 2327-5960 ISSN Print: 2327-5952 Protection and Utilization of Confucian Temple in Southern Shaanxi from the Perspective of Cultural Heritage Hongdan Guo School of Literature and Media, Ankang University, Ankang, China How to cite this paper: Guo, H. D. (2020). Abstract Protection and Utilization of Confucian Temple in Southern Shaanxi from the As a precious historical and cultural heritage, we should not only pay attention Perspective of Cultural Heritage. Open to protection and inheritance, but also fully consider how to develop and utilize Journal of Social Sciences, 8, 225-237. the Confucian temples. For this purpose, we carried out field research on the https://doi.org/10.4236/jss.2020.812017 remaining Confucian temples in southern Shaanxi, where social attention is Received: November 10, 2020 low. After investigation, it was found that: the situation of surviving Confucian Accepted: December 15, 2020 temples in southern Shaanxi is different. There are some Confucian temples Published: December 18, 2020 where the ancient buildings are relatively well preserved, or got seriously dam- aged but have been restored or rebuilt. There are also some Confucian temples Copyright © 2020 by author(s) and Scientific Research Publishing Inc. where only a few buildings or a single building exist, or even no physical build- This work is licensed under the Creative ings in the ruins. In terms of the utilization of the existing Confucian temples, Commons Attribution International except for some Confucian temples, which are now integrated with museums License (CC BY 4.0).
    [Show full text]
  • The Systematic Review and Meta-Analysis of X-Ray Detective
    Wang et al. BMC Musculoskeletal Disorders (2019) 20:78 https://doi.org/10.1186/s12891-019-2461-z RESEARCHARTICLE Open Access The systematic review and meta-analysis of X-ray detective rate of Kashin-Beck disease from 1992 to 2016 Xi Wang1,2†, Yujie Ning1†, Amin Liu1, Xin Qi1, Meidan Liu1, Pan Zhang1 and Xiong Guo1* Abstract Background: Kashin-Beck disease (KBD) is a serious human endemic chronic osteochondral disease. However, quantitative syntheses of X-ray detective rate studies for KBD are rare. We performed an initial systematic review and meta-analysis to assess the X-ray detective rate of KBD in China. Methods: For this systematic review and meta-analysis, we searched five databases (PubMed, Web of Science, Chinese National Knowledge Infrastructure (CNKI), WanFang Data and the China Science and Technology Journal Database (VIP))using a comprehensive search strategy to identify studies of KBD X-ray detective rate in China that were published from database inception to January 13, 2018. The X-ray detective rate of KBD was determined via an analysis of published studies using a random effect meta-analysis with the proportions approach. Subgroup analysis and meta- regression were used to explore heterogeneity, and study quality was assessed using the risk of bias tool. Results: A total of 53 studies involving 14,039 samples with X-ray detective rate in 163,340 observations in total were included in this meta-analysis. These studies were geographically diverse (3 endemic areas). The pooled overall X-ray detective rate for KBD was 11% (95%CI,8–15%;Z = 13.14; p < 0.001).
    [Show full text]
  • Is It the Appropriate Time to Stop Applying Selenium Enriched Salt in Kashin-Beck Disease Areas in China?
    Nutrients 2015, 7, 6195-6212; doi:10.3390/nu7085276 OPEN ACCESS nutrients ISSN 2072-6643 www.mdpi.com/journal/nutrients Article Is It the Appropriate Time to Stop Applying Selenium Enriched Salt in Kashin-Beck Disease Areas in China? Yujie Ning :, Xi Wang :, Sen Wang, Feng Zhang, Lianhe Zhang, Yanxia Lei and Xiong Guo * School of Public Health, Health Science Center, Xi’an Jiaotong University, Key Laboratory of Trace Elements and Endemic Diseases, National Health and Family Planning Commission, Xi’an, Shaanxi 710061, China; E-Mails: [email protected] (Y.N.); [email protected] (X.W.); [email protected] (S.W.); [email protected] (F.Z.); [email protected] (L.Z.); [email protected] (Y.L.) : These authors contributed equally to this work. * Author to whom correspondence should be addressed; E-Mail: [email protected]; Tel.: +86-029-82655091; Fax: +86-029-82655032. Received: 5 June 2015 / Accepted: 20 July 2015 / Published: 28 July 2015 Abstract: We aimed to identify significant factors of selenium (Se) nutrition of children in Kashin-Beck disease (KBD) endemic areas and non-KBD area in Shaanxi Province for providing evidence of whether it is the time to stop applying Se-enriched salt in KBD areas. A cross-sectional study contained 368 stratified randomly selected children aged 4–14 years was conducted with 24-h retrospective questionnaire based on a pre-investigation. Food and hair samples were collected and had Se contents determined with hydride generation atomic fluorescence spectrometry. Average hair Se content of 349.0 ˘ 60.2 ng/g in KBD-endemic counties was significantly lower than 374.1 ˘ 47.0 ng/g in non-KBD counties.
    [Show full text]
  • The Spreading of Christianity and the Introduction of Modern Architecture in Shannxi, China (1840-1949)
    Escuela Técnica Superior de Arquitectura de Madrid Programa de doctorado en Concervación y Restauración del Patrimonio Architectónico The Spreading of Christianity and the introduction of Modern Architecture in Shannxi, China (1840-1949) Christian churches and traditional Chinese architecture Author: Shan HUANG (Architect) Director: Antonio LOPERA (Doctor, Arquitecto) 2014 Tribunal nombrado por el Magfco. y Excmo. Sr. Rector de la Universidad Politécnica de Madrid, el día de de 20 . Presidente: Vocal: Vocal: Vocal: Secretario: Suplente: Suplente: Realizado el acto de defensa y lectura de la Tesis el día de de 20 en la Escuela Técnica Superior de Arquitectura de Madrid. Calificación:………………………………. El PRESIDENTE LOS VOCALES EL SECRETARIO Index Index Abstract Resumen Introduction General Background........................................................................................... 1 A) Definition of the Concepts ................................................................ 3 B) Research Background........................................................................ 4 C) Significance and Objects of the Study .......................................... 6 D) Research Methodology ...................................................................... 8 CHAPTER 1 Introduction to Chinese traditional architecture 1.1 The concept of traditional Chinese architecture ......................... 13 1.2 Main characteristics of the traditional Chinese architecture .... 14 1.2.1 Wood was used as the main construction materials ........ 14 1.2.2
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management Project (Cofinanced by the Global Environment Facility)
    Technical Assistance Consultant’s Report Project Number: 39321 June 2008 PRC: Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management Project (Cofinanced by the Global Environment Facility) Prepared by: ANZDEC Limited Australia For Shaanxi Province Development and Reform Commission This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. FINAL REPORT SHAANXI QINLING BIODIVERSITY CONSERVATION AND DEMONSTRATION PROJECT PREPARED FOR Shaanxi Provincial Government And the Asian Development Bank ANZDEC LIMITED September 2007 CURRENCY EQUIVALENTS (as at 1 June 2007) Currency Unit – Chinese Yuan {CNY}1.00 = US $0.1308 $1.00 = CNY 7.64 ABBREVIATIONS ADB – Asian Development Bank BAP – Biodiversity Action Plan (of the PRC Government) CAS – Chinese Academy of Sciences CASS – Chinese Academy of Social Sciences CBD – Convention on Biological Diversity CBRC – China Bank Regulatory Commission CDA - Conservation Demonstration Area CNY – Chinese Yuan CO – company CPF – country programming framework CTF – Conservation Trust Fund EA – Executing Agency EFCAs – Ecosystem Function Conservation Areas EIRR – economic internal rate of return EPB – Environmental Protection Bureau EU – European Union FIRR – financial internal rate of return FDI – Foreign Direct Investment FYP – Five-Year Plan FS – Feasibility
    [Show full text]
  • About Bank of China
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. 中國銀行股份有限公司 BANK OF CHINA LIMITED (a joint stock company incorporated in the People’s Republic of China with limited liability) (the “Bank”) (Stock Code: 3988 and 4619 (Preference Shares)) ANNOUNCEMENT Corporate Social Responsibility Report of Bank of China Limited for 2020 In accordance with the Chinese mainland and Hong Kong regulatory requirements, the meeting of the Board of Directors of the Bank held on 30 March 2021 considered and approved the Corporate Social Responsibility Report of Bank of China Limited for 2020. Set out below is a complete version of the report. The Board of Directors of Bank of China Limited Beijing, PRC 30 March 2021 As at the date of this announcement, the directors of the Bank are: Liu Liange, Wang Wei, Lin Jingzhen, Zhao Jie*, Xiao Lihong*, Wang Xiaoya*, Zhang Jiangang*, Chen Jianbo*, Wang Changyun#, Angela Chao#, Jiang Guohua#, Martin Cheung Kong Liao#, Chen Chunhua# and Chui Sai Peng Jose#. * Non-executive Directors # Independent Non-executive Directors Corporate Social Responsibility Report of Bank of China Limited for 2020 March 2021 1 Preface In 2020, a year unseen before, Bank of China upheld its missions as a large state-owned financial enterprise and leveraged its advantages of globalisation and integration to contribute to the people’s well-being and serve the social development.
    [Show full text]
  • Addition of Clopidogrel to Aspirin in 45 852 Patients with Acute Myocardial Infarction: Randomised Placebo-Controlled Trial
    Articles Addition of clopidogrel to aspirin in 45 852 patients with acute myocardial infarction: randomised placebo-controlled trial COMMIT (ClOpidogrel and Metoprolol in Myocardial Infarction Trial) collaborative group* Summary Background Despite improvements in the emergency treatment of myocardial infarction (MI), early mortality and Lancet 2005; 366: 1607–21 morbidity remain high. The antiplatelet agent clopidogrel adds to the benefit of aspirin in acute coronary See Comment page 1587 syndromes without ST-segment elevation, but its effects in patients with ST-elevation MI were unclear. *Collaborators and participating hospitals listed at end of paper Methods 45 852 patients admitted to 1250 hospitals within 24 h of suspected acute MI onset were randomly Correspondence to: allocated clopidogrel 75 mg daily (n=22 961) or matching placebo (n=22 891) in addition to aspirin 162 mg daily. Dr Zhengming Chen, Clinical Trial 93% had ST-segment elevation or bundle branch block, and 7% had ST-segment depression. Treatment was to Service Unit and Epidemiological Studies Unit (CTSU), Richard Doll continue until discharge or up to 4 weeks in hospital (mean 15 days in survivors) and 93% of patients completed Building, Old Road Campus, it. The two prespecified co-primary outcomes were: (1) the composite of death, reinfarction, or stroke; and Oxford OX3 7LF, UK (2) death from any cause during the scheduled treatment period. Comparisons were by intention to treat, and [email protected] used the log-rank method. This trial is registered with ClinicalTrials.gov, number NCT00222573. or Dr Lixin Jiang, Fuwai Hospital, Findings Allocation to clopidogrel produced a highly significant 9% (95% CI 3–14) proportional reduction in death, Beijing 100037, P R China [email protected] reinfarction, or stroke (2121 [9·2%] clopidogrel vs 2310 [10·1%] placebo; p=0·002), corresponding to nine (SE 3) fewer events per 1000 patients treated for about 2 weeks.
    [Show full text]