5 June 2020 Kyrgyzstan
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
COUNTRY SECTION Kyrgyzstan Game Trophies Plants
Validity date from COUNTRY Kyrgyzstan 17/05/2018 00030 SECTION Game trophies plants Date of publication 17/05/2018 List in force Approval number Name City Regions Activities Remark Date of request 0005207 «SUPA» Ltd. S. Alikenov Bishkek Bishkek CAT2, CAT3 19/03/2013 000712 Kyrgyzohotorybolovsoiuz Federation Of Hunters And Fishers Of Bishkek Bishkek CAT2, CAT3 19/07/2011 The Kyrgyz Republic Zadorozhny N.N. 0010026 «KALPEN» Ltd. Bishkek Bishkek CAT2, CAT3 15/11/2016 0013894 «Joon-Terek» Ltd. Jalal-Abad Kyrgyzstan (general) CAT2, CAT3 28/08/2015 001680 «Eki Uul» Ltd. Tokmok Chuy CAT2, CAT3 24/10/2013 0016878 «Mountain Tour- -Talas» Ltd Bishkek Bishkek CAT2, CAT3 13/10/2015 ГРЮ 0025278 «Dibo Petfud» Ltd. Bishkek Bishkek CAT2, CAT3 16/05/2018 0034368 «Youg Eko Hant» Ltd. O. Sabirov Osh Osh CAT2, CAT3 06/08/2012 0038638 «Diana Travel» Ltd. A.V. Barykin Karakol Ysyk-Kol CAT2, CAT3 17/10/2011 003973 Kina Grupp Ltd. Bishkek Bishkek CAT2, CAT3 16/05/2018 0040129 «Burhan» Ltd. A.V.Barykin Karakol Ysyk-Kol CAT2, CAT3 17/10/2011 0049696 Baigeldi LTD Mambetakunov R. At-Bashy Naryn CAT2, CAT3 25/07/2011 0049784 «Argali» Ltd. B. Sydygaliev Naryn Naryn CAT2, CAT3 27/02/2012 0051379 Central Asian Safari Club LTD Godunin R. Karakol Ysyk-Kol CAT2, CAT3 10/10/2011 0055964 Hunting DepartmentBoshkoev S.T. Bishkek Bishkek CAT2, CAT3 19/07/2011 1 / 3 List in force Approval number Name City Regions Activities Remark Date of request 006487 Mountain Of Cholponbek Ltd. M. Omurakunov Naryn Naryn CAT2, CAT3 21/12/2012 0072537 Muflon LTD Kaldybaeva А. -
In Kyrgyzstan Agricultural Products
The Possibility of “Six Sector Industrialization” in Kyrgyzstan Agricultural Products ■Profile of Kyrgyz Republic The Kyrgyz Republic (Kyrgyzstan) is a state in Central Asia. Located in the western and central part of the Tien Shan mountain system. In the north it borders with Kazakhstan, in the west - with Uzbekistan, in the south-west - with Tajikistan, in the east and southeast - with China. The Kyrgyz Republic is a sovereign, democratic, legal, secular, unitary, social state. Independence Date - August 31, 1991. The state language is Kyrgyz; the official language is Russian. The territory is 199.9 thousand km2 (5.8% - forests, 4.4% - water, 53.3% - agricultural land, 36.5% - other lands). Almost 90% of which is located 1,500 m above sea level. The capital is Bishkek (859.8 thousand people). Big cities include Osh (255.8 thousand), Jalal-Abad (98.4 thousand), Karakol (68.0 thousand). Kyrgyzstan consists of 9 administrative-territorial units - Chui oblast, Talas oblast, Issyk-Kul oblast, Naryn oblast, Jalal-Abad oblast, Osh oblast, Batken oblast, Osh city and Bishkek city. Its key regional centers are Talas, Karakol, Naryn, Jalal-Abad, Osh, Batken. ■Overview of Agriculture Industry in Kyrgyzstan Republic The Kyrgyz Republic began implementing agrarian reforms after the collapse of the This case material, which is a product of the Joint Research Project of Case Writing by the Japan International Cooperation Agency (JICA) and the International University of Japan (IUJ), is subject to copyright protection. Tsutomu Yokose, Professor of Graduate School of International Management, International University of Japan (IUJ) and student Kubanychbek Isabekov had prepared this case document. -
Investment Profile of KARAKOL CITY КАРАКОЛ Karakol City
Investment Profile of KARAKOL CITY КАРАКОЛ Karakol City Brief presentation of the city Karakol is the fourth-largest city in Kyrgyzstan and is located near the eastern tip of Lake Issyk-Kul, about 150 km west of the Chinese border and 380 km east of the capital, Bishkek. It is the administrative capital of the Issyk-Kul Region in the country’s far east. Karakol’s untapped potential offers investors a variety of investment opportunities at affordable costs, with municipally owned land available for greenfield investments. Thanks to a mild climate and beautiful scenery, the city is known world-wide for its abundant recreational opportunities: Lake Issyk-Kul, skiing, hot springs, and suitable conditions for extreme sports such as paragliding, mountain biking, and mountaineering. It attracts investors from all over the world thanks to rich investment potential in areas such as hotels and restaurants, mountain tourism, honey production, animal breeding, dairy production, and cultivation and processing of fruits and vegetables. 2 КАРАКОЛ Karakol City General Information about Karakol City • Area: 52,000 sq. m. • Population: 75,100 as of January 1, 2018. • 39,900 people within an hour’s drive eastward (Ak-Suu district) • 34,775 people within an hour’s drive on the lake’s north shore (Tyup district) • 69,589 people within an hour’s drive on the lake’s south shore (Jeti-Oguz district) • Location: Karakol sits at the foot of the Teskei-Ala-Too mountain range, downstream of Karakol River, 12 km from the shore of Lake Issyk-Kul, and at 1690-1850 m above the sea level. -
World Bank Document
Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: PAD1963 INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT Public Disclosure Authorized IN THE AMOUNT OF SDR 19.70 MILLION (US$27.50 MILLION EQUIVALENT) AND A PROPOSED GRANT IN THE AMOUNT OF SDR 19.70 MILLION (US$27.50 MILLION EQUIVALENT) TO THE Public Disclosure Authorized KYRGYZ REPUBLIC FOR THE THIRD PHASE OF THE CENTRAL ASIA REGIONAL LINKS PROGRAM (CARS‐3) SEPTEMBER 18, 2018 Transport Global Practice EUROPE AND CENTRAL ASIA Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective August 31, 2018) Currency Unit = Kyrgyz Som (KGS) KGS69.020 = 1 US$ US$0.015 = KGS 1 Special Drawing Currency Unit = Rights (SDR) SDR0.714 = 1 US$ US$1.401 = 1 SDR FISCAL YEAR January 1 ‐ December 31 Regional Vice President: Cyril E Muller Country Director: Lilia Burunciuc Senior Global Practice Director: Jose Luis Irigoyen Practice Manager: Binyam Reja Task Team Leader(s): Cordula Rastogi; Aidai Bayalieva ABBREVIATIONS AND ACRONYMS AADT Average Annual Daily Traffic IPIG Investment Project Implementation Group ADB Asian Development Bank ISA International Standards on Auditing ANS Air Navigation System JICA Japan International Cooperation Agency ATC Air Traffic Control JSC Joint Stock Company ATM Air Traffic Movement KAI -
Kyrgyz Republic: Issyk – Kul Wastewater Management Project
Environmental Monitoring Report Project number: 50176-002 July-December 2020 March 2021 Kyrgyz Republic: Issyk – Kul Wastewater Management Project Prepared by the Department of Drinking Water Supply and Sewerage Development (DDWSSD) under the State Agency for Water Resources under the Government of the Kyrgyz Republic in consortium with Temelsu International Engineering Inc., Design and Supervision Consultant for the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. -i- Table of Contents 1 INTRODUCTION ............................................................................................................ 1 1.1 Preamble .................................................................................................................. 1 1.2 Headline Information ................................................................................................ 2 2 PROJECT DESCRIPTION AND CURRENT ACTIVITIES .............................................. 5 2.1 Project Description .................................................................................................. -
Sdjr06020 Summary
Integrated Development Plan of the Issyk-Kul Zone Summary 8 ENVIRONMENTAL ASSESSMENT AND MANAGEMENT Environmental Capacity and Pollutant Loads For the integrated regional development plan of the Issyk-Kul zone, the strategic environmental assessment (SEA) has been applied to evaluate overall pollutant loads to be caused by changes in land use and development projects envisaged under the moderate growth scenario. As discussed previously, the most sensitive is the pollution of water quality in the Issyk-Kul Lake. Under the moderate growth scenario, the lake water quality will be degraded to some extent as predicted in the table below. The extent of pollutant loads in terms of BOD, total nitrogen (NH4-N, NO2-N and NO3-N) and total phosphorus (PO4-P) appears to be permissible in the light of international standards for lake water quality. Table S.10 Predicted Water Quality under Moderate Growth Scenario (mg/l) Current Moderate Growth Scenario Permissible (2002) 2010 2025 Level BOD 0.61 0.66 0.75 1 T-N 0.15 0.16 0.18 0.2 T-P 0.0011 0.0012 0.0014 0.005 Source: JICA Study Team Quality of river water flowing into the Issyk-Kul Lake should also be assessed and monitored. The available data, though limited as they are, indicate that river water flowing through agricultural lands has been degraded to some extent. Table S.11 Water Qualities of Major River Inflows into Lake Issyk-Kul (Average of 1988~1992) (mg/l) Djyr Djeti Cholpon Chon River Name Tyup Karakol Tamga Ton Akk-Sai -Galan Oguz -Ata AK Suu BOD5 1.70 1.99 1.90 1.60 2.10 1.10 0.56 0.79 0.83 T-N 1.17 1.14 1.02 1.10 0.91 1.22 0.91 0.91 0.81 T-P 0.016 0.017 0.013 0.011 0.016 0.014 0.013 0.011 0.009 Source: JICA Study Team Emission of air pollutants from stationary sources will not be a serious concern as far as the industrial proposals are controlled individually. -
50176-002: Issyk-Kul Wastewater Management Project
Social Monitoring Report Project number: 50176-002 July-December 2020 March 2021 Kyrgyz Republic: Issyk – Kul Wastewater Management Project Prepared by Prepared by the Department of Drinking Water Supply and Sewerage Development (DDWSSD) under the State Agency for Water Resources under the Government of the Kyrgyz Republic in consortium with Temelsu International Engineering Inc., Design and Supervision Consultant for the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Issyk – Kul Wastewater Management Project Semi-Annual Social Safeguard Monitoring Report No.2 TABLE OF CONTENTS 1. INTRODUCTION ...................................................................................................... 4 1.1. Project Description ................................................................................................ 5 1.1.1. Description of Balykchy sub-project ................................................................... 5 1.1.2. Description of Karakol sub-project ..................................................................... 6 1.1.3. Sanitary Protection -
Poverty Alleviation Through Sustainable Development of Local Communities
UNITED NATIONS DEVELOPMENT PROGRAMME IN THE KYRGYZ REPUBLIC “ENVIRONMENT PROTECTION FOR SUSTAINABLE DEVELOPMENT” PROGRAMME POVERTY ALLEVIATION THROUGH SUSTAINABLE DEVELOPMENT OF LOCAL COMMUNITIES Bishkek 2008 UDK 364 BBK 66.3(2) П 72 Coordination group: Mira Djangaracheva Talaybek Makeev Zhyldyz Uzakbaeva Ular Mateev Aigul Bolotova Authors: Elvira Ilibezova Larisa Ilibezova Elena Selezneva Rustam Toktosunov Gulsina Bigeldieva Bakyt Moldokmatov Editor: David Hutton POVERTY ALLEVIATION THROUGH SUSTAINABLE DEVELOPMENT OF LOCAL COMMUNITIES Design: Murat Sagimbaev Proof in sheets: Vitaly Lyan Format 60х84 1/16. Offset printing. Volume 10,25 Circulation 1000 c. Poverty alleviation through sustainable development of local communities. П 72 Bishkek.: 2008. - 204 p. ISBN 978-9967-24-854-0 UDK 364 П 0803010200-08 BBK 66.3(2) ISBN 978-9967-24-854-0 © UNDP, 2008 LIST OF ABBREVIATIONS AC Administrative Code ADB Asian Development Bank APR JK KR Assembly of People’s Representatives of the Jogorku Kenesh of the Kyrgyz Republic CBD Convention on Biological Diversity CDM Clean Development Mechanism CDS Country Development Strategy CIDA Canadian International Development Agency CIS Commonwealth of Independent States DFID Department for International Development of the UK Goverment EDS Environment Development Strategy FCCC Framework Convention on Climate Change FGD Focus Group Discussions GDP Gross Domestic Product GEC Global Environmental Conventions GEF Global Environment Facility Gosregistr State Agency for the Registration of Rights to Immovable Property -
Desk-Study on Core Zone Karakoo Bioshere Reserve Issyk-Kul
Potential for strengthening the coverage of the core zone of Biosphere Reserve Issyk-Kul This project has been funded by the German Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety with means of the Advisory Assistance Programme for Environmental Protection in the Countries of Central and Eastern Europe, the Caucasus and Central Asia. It was supervised by the Federal Agency for Nature Conservation (Bundesamt für Naturschutz, BfN) and the Federal Environment Agency (Umweltbundesamt, UBA). The content of this publication lies within the responsibility of the authors. Bishkek / Greifswald 2014 Potential for strengthening the coverage of the core zone of Biosphere Reserve Issyk-Kul prepared by: Jens Wunderlich Michael Succow Foundation for the protection of Nature Ellernholzstr. 1/3 D- 17489 Greifswald Germany Tel.: +49 3834 835414 E-Mail: [email protected] www.succow-stiftung.de/home.html Ilia Domashev, Kirilenko A.V., Shukurov E.E. BIOM 105 / 328 Abdymomunova Str. 6th Laboratory Building of Kyrgyz National University named J.Balasagyn Bishkek Kyrgyzstan E-Mail: [email protected] www.biom.kg/en Scientific consultant: Prof. Shukurov, E.Dj. front page picture: Prof. Michael Succow desert south-west of Issyk-Kul – summer 2013 Abbreviations and explanation of terms Aiyl Kyrgyz for village Akim Province governor BMZ Federal Ministry for Economic Cooperation and Development of Germany BMU Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety of Germany BR Biosphere Reserve Court of Ak-sakal traditional way to solve conflicts. Court of Ak-sakal is elected among respected persons. It deals with small household disputes and conflicts, leading parties to agreement. -
Program of the Work Meeting
“IMPLEMENTATION OF EU EXPERIENCE NQF, SQF AND LEARNING OUTCOMES DEVELOPMENT” WORKSHOP of the Tempus project “QUADRIGA - QUALIFICATION FRAMEWORKS IN CENTRAL ASIA: BOLOGNA-BASED PRINCIPLES AND REGIONAL COORDINATION” AGENDA AND INFORMATION Issykkul State University named after K.Tynystanov Karakol 18-23 June, 2013 Partners Partners from EU: 1. University of Koblenz-Landau [Koblenz, Germany] (Coordinator) 2. Maria Curie-Skłodowska University [Lublin, Poland] 3. University of Algarve [Faro, Portugal] 4. National University of Córdoba [Cordoba, Spain] 5. Quality Assurance Netherlands Universities [Utrecht, Netherlands] 6. World University Service – Austrian Committee [Graz, Austria] Partners from Kyrgyzstan: 1. The Ministry of Education and Science of the Kyrgyz Republic [Bishkek] 2. Kyrgyz State Technical University [Bishkek] 3. Issyk-Kul State University [Karakol] 4. Talas State University [Talas] 5. Osh State Technological University [Osh] 6. Association "Education Network» [Bishkek] 7. External expert Partners from Tajikistan: 1. Ministry of Education of Republic of Tajikistan [Dushanbe] 2. Khujand State University named after academician B.Gafurov [Khujand] 3. Khorog State University named after M.Nazarshoev [Khorog] 4. Kulob State University named after Rudaki [Kulob] 5. State Committee on TV and Broadcasting of Sogd Region [Khujand] Partners from Kazakhstan: 1. Ministry of Education and Science of Kazakhstan [Astana] 2. Al-Farabi Kazakh National University [Almaty] 3. Karaganda State Industrial University [Karaganda] 4. East Kazakhstan -
United States Bankruptcy Court Southern District of New York
21-11051-lgb Doc 44 Filed 07/06/21 Entered 07/06/21 22:24:34 Main Document Pg 1 of 71 UNITED STATES BANKRUPTCY COURT SOUTHERN DISTRICT OF NEW YORK x : Chapter 11 In re: : : Case No. 21-11051 (LGB) Kumtor Gold Company CJSC and Kumtor Operating : Company CJSC,1 : Jointly Administered : Debtors. : ____________________________________________ x STATEMENT OF FINANCIAL AFFAIRS FOR KUMTOR GOLD COMPANY CJSC (CASE NO. 21-11051) 1 The Debtors’ corporate headquarters is located at 24 Ibraimova Street, 720001, Bishkek, the Kyrgyz Republic. 21-11051-lgb Doc 44 Filed 07/06/21 Entered 07/06/21 22:24:34 Main Document Pg 2 of 71 UNITED STATES BANKRUPTCY COURT SOUTHERN DISTRICT OF NEW YORK ____________________________________________ x : In re Chapter 11 : : Case No. 21-11051 (LGB) Kumtor Gold Company CJSC and Kumtor Operating : 1 Company CJSC, : Jointly Administered : Debtors. : ____________________________________________ x BASIS OF PRESENTATION AND RESERVATION OF RIGHTS REGARDING SCHEDULES OF ASSETS AND LIABILITIES, SCHEDULES OF CURRENT INCOME AND EXPENSES, SCHEDULES OF EXECUTORY CONTRACTS AND UNEXPIRED LEASES AND STATEMENTS OF FINANCIAL AFFAIRS The Schedules of Assets and Liabilities (collectively, the “Schedules”) and the Statements of Financial Affairs (collectively, the “Statements” and, together with the Schedules, the “Schedules and Statements”) filed by Kumtor Gold Company CJSC (“KGC”) and Kumtor Operating Company CJSC (“KOC”) (each, a “Debtor”) in these jointly administered chapter 11 cases in the United States Bankruptcy Court for the Southern District of New York (the “Bankruptcy Court”) have been prepared pursuant to section 521 of title 11 of the United States Code, 11 U.S.C. §§ 101 et seq. -
Kyrgyz Republic CAREC Transport Corridors in the Kyrgyz Republic
CAREC Corridor Implementation Progress, Planned Actions, and Support Needs Ministry of Transport and Roads Kyrgyz Republic CAREC Transport Corridors in the Kyrgyz Republic CAREC 1 Bishkek-Naryn- Torugart, 539 km CAREC 3 Bishkek-Osh-Sarytash Corridor 1: Europe – East Asia (PRC- -Karamyk, 987 km Torugart-Bishkek-Chu-Astana-RF) Corridor 2: Mediterranean-East Asia (PRC-Irkeshtam-Osh-Andijan-Tashkent- Samarkand-Bukhara-Caspian ports) Corridor 3: Russian Federation- Middle East and South Asia (RF-Semei-Almaty- Bishkek-Osh- Satytash-Karamyk- Tajikistan-Afghanistan-Iran-Persian Gulf ports Corridor 5: East Asia-Middle East and South Asia (PRC- Irkeshtam-Satytash- CAREC 5 CAREC 2 Karamyk-Tajikistan-Afghanistan- Sarytash-Karamyk, Osh-Satytash- Pakistan) 136 km Irkeshtam - 258 km Out of 6 (six) transport corridors identified by CAREC as priority and competitive corridors in the region, 4 (four) traverse the territory of the Kyrgyz Republic: 1) CAREC 1 - Europe - East Asia (along Bishkek-Naryn-Torugart road); 2) CAREC 2 - Mediterranian - East Asia (along Osh-Satytash-Irkeshtam road); 3) CAREC 3 - Russian Federation - Middle East and South Asia (along Osh-Satytash-Karamyk road); 4) CAREC 5: East Asia - Middle East and South Asia (along Irkeshtam- Satytash-Karamyk road). Corridor 1: Europe - East Asia (PRC-Torugart-Bishkek-Chu-Astana-RF). The total length of Bishkek-Naryn-Torugart road via Kuvaky pass is 479 km. At present this corridor is fully completed and ensures safe and smooth transport operations. Corridor 2: Mediterranean - East Asia (PRC-Irkeshtam-Osh-Andijan-Tashkent-Samarkand- Bukhara-Caspian ports). The total length of Osh-Satytash-Irkeshtam road is 258 km. This corridor was fully completed in 2012 and ensures safe and smooth transport operations.