Program of the Work Meeting
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Snow Leopards and Other Animals of the Tien Shan Mountains of Kyrgyzstan
EXPEDITION REPORT Expedition dates: 9 June – 23 August 2014 Report published: June 2015 Mountain ghosts: protecting snow leopards and other animals of the Tien Shan mountains of Kyrgyzstan . EXPEDITION REPORT Mountain ghosts: protecting snow leopards and other animals of the Tien Shan mountains of Kyrgyzstan Expedition dates: 9 June – 23 August 2014 Report published: June 2015 Authors: Volodymyr Tytar I.I Schmalhausen Institute of Zoology of the National Academy of Sciences of Ukraine Matthias Hammer Biosphere Expeditions 1 © Biosphere Expeditions, an international not-for-profit conservation organisation registered in England, Germany, France, Australia and the USA Officially accredited member of the United Nations Environment Programme's Governing Council & Global Ministerial Environment Forum Officially accredited member of the International Union for the Conservation of Nature Abstract This study was part of an expedition to the Tien Shan Mountains (Kyrgyz Ala-Too range), run by Biosphere Expeditions and NABU from 9 June to 23 August 2014 with the aim of surveying for snow leopard (Uncia uncia) and its prey species such as argali (Ovis ammon) and Siberian ibex (Capra sibirica). Using a cell methodology adopted by Biosphere Expeditions for volunteer expeditions, 77 cells of 2 x 2 km were surveyed and 22 interviews with local people were conducted. The surveys yielded no evidence of snow leopard (camera trap photos, tracks, scrapes, marking places, etc.), but the interviews indicated that snow leopard was present in the area and confirmed the importance of the area as a habitat for snow leopard. The surveys also showed that the area’s habitat is sufficiently varied and capable of sustaining a healthy prey base for the snow leopard as well as for other carnivores such as the wolf. -
COUNTRY SECTION Kyrgyzstan Game Trophies Plants
Validity date from COUNTRY Kyrgyzstan 17/05/2018 00030 SECTION Game trophies plants Date of publication 17/05/2018 List in force Approval number Name City Regions Activities Remark Date of request 0005207 «SUPA» Ltd. S. Alikenov Bishkek Bishkek CAT2, CAT3 19/03/2013 000712 Kyrgyzohotorybolovsoiuz Federation Of Hunters And Fishers Of Bishkek Bishkek CAT2, CAT3 19/07/2011 The Kyrgyz Republic Zadorozhny N.N. 0010026 «KALPEN» Ltd. Bishkek Bishkek CAT2, CAT3 15/11/2016 0013894 «Joon-Terek» Ltd. Jalal-Abad Kyrgyzstan (general) CAT2, CAT3 28/08/2015 001680 «Eki Uul» Ltd. Tokmok Chuy CAT2, CAT3 24/10/2013 0016878 «Mountain Tour- -Talas» Ltd Bishkek Bishkek CAT2, CAT3 13/10/2015 ГРЮ 0025278 «Dibo Petfud» Ltd. Bishkek Bishkek CAT2, CAT3 16/05/2018 0034368 «Youg Eko Hant» Ltd. O. Sabirov Osh Osh CAT2, CAT3 06/08/2012 0038638 «Diana Travel» Ltd. A.V. Barykin Karakol Ysyk-Kol CAT2, CAT3 17/10/2011 003973 Kina Grupp Ltd. Bishkek Bishkek CAT2, CAT3 16/05/2018 0040129 «Burhan» Ltd. A.V.Barykin Karakol Ysyk-Kol CAT2, CAT3 17/10/2011 0049696 Baigeldi LTD Mambetakunov R. At-Bashy Naryn CAT2, CAT3 25/07/2011 0049784 «Argali» Ltd. B. Sydygaliev Naryn Naryn CAT2, CAT3 27/02/2012 0051379 Central Asian Safari Club LTD Godunin R. Karakol Ysyk-Kol CAT2, CAT3 10/10/2011 0055964 Hunting DepartmentBoshkoev S.T. Bishkek Bishkek CAT2, CAT3 19/07/2011 1 / 3 List in force Approval number Name City Regions Activities Remark Date of request 006487 Mountain Of Cholponbek Ltd. M. Omurakunov Naryn Naryn CAT2, CAT3 21/12/2012 0072537 Muflon LTD Kaldybaeva А. -
Almaty–Issyk-Kul Alternative Road Economic Impact Assessment
Almaty–Issyk-Kul Alternative Road Economic Impact Assessment Almaty, a vibrant metropolis in Kazakhstan, is only kilometers away from lake Issyk-Kul in the Kyrgyz Republic, renowned for its mountains and moderate summers. However, the two destinations are separated by two magnificent mountain ranges. To bypass these mountains, the existing road stretches over kilometers, leading to long travel times. This economic impact assessment analyzes what impact a more direct road between the two destinations would have for tourism and economic development in both Kazakhstan and the Kyrgyz Republic. The report provides economically viable solutions that, within a supportive policy environment, would lead to strong economic development within the region. About Almaty–Bishkek Economic Corridor The Almaty–Bishkek Economic Corridor (ABEC) is the pilot economic corridor under the Central Asia Regional Economic Cooperation (CAREC) Program. The motivation for ABEC is that Almaty and Bishkek can achieve far more together than either can achieve alone. The two cities are only kilometers apart with relatively high economic density concentrated in services in the cities and agriculture in their hinterlands. Both Kazakhstan and the Kyrgyz Republic have acceded to the Eurasian Economic Union and the World Trade Organization. CAREC corridors and Belt and Road Initiative routes cross ABEC. The historic Silk Route, mountain ranges, and Lake lssyk-Kul underline the potential for tourism. But trade, especially in agricultural goods and services, between the two countries is below potential, and the region does not yet benefit from being one economic space. About the Central Asia Regional Economic Cooperation Program The Central Asia Regional Economic Cooperation (CAREC) Program is a partnership of member countries and development partners working together to promote development through cooperation, leading to accelerated economic growth and poverty reduction. -
In Kyrgyzstan Agricultural Products
The Possibility of “Six Sector Industrialization” in Kyrgyzstan Agricultural Products ■Profile of Kyrgyz Republic The Kyrgyz Republic (Kyrgyzstan) is a state in Central Asia. Located in the western and central part of the Tien Shan mountain system. In the north it borders with Kazakhstan, in the west - with Uzbekistan, in the south-west - with Tajikistan, in the east and southeast - with China. The Kyrgyz Republic is a sovereign, democratic, legal, secular, unitary, social state. Independence Date - August 31, 1991. The state language is Kyrgyz; the official language is Russian. The territory is 199.9 thousand km2 (5.8% - forests, 4.4% - water, 53.3% - agricultural land, 36.5% - other lands). Almost 90% of which is located 1,500 m above sea level. The capital is Bishkek (859.8 thousand people). Big cities include Osh (255.8 thousand), Jalal-Abad (98.4 thousand), Karakol (68.0 thousand). Kyrgyzstan consists of 9 administrative-territorial units - Chui oblast, Talas oblast, Issyk-Kul oblast, Naryn oblast, Jalal-Abad oblast, Osh oblast, Batken oblast, Osh city and Bishkek city. Its key regional centers are Talas, Karakol, Naryn, Jalal-Abad, Osh, Batken. ■Overview of Agriculture Industry in Kyrgyzstan Republic The Kyrgyz Republic began implementing agrarian reforms after the collapse of the This case material, which is a product of the Joint Research Project of Case Writing by the Japan International Cooperation Agency (JICA) and the International University of Japan (IUJ), is subject to copyright protection. Tsutomu Yokose, Professor of Graduate School of International Management, International University of Japan (IUJ) and student Kubanychbek Isabekov had prepared this case document. -
Investment Profile of KARAKOL CITY КАРАКОЛ Karakol City
Investment Profile of KARAKOL CITY КАРАКОЛ Karakol City Brief presentation of the city Karakol is the fourth-largest city in Kyrgyzstan and is located near the eastern tip of Lake Issyk-Kul, about 150 km west of the Chinese border and 380 km east of the capital, Bishkek. It is the administrative capital of the Issyk-Kul Region in the country’s far east. Karakol’s untapped potential offers investors a variety of investment opportunities at affordable costs, with municipally owned land available for greenfield investments. Thanks to a mild climate and beautiful scenery, the city is known world-wide for its abundant recreational opportunities: Lake Issyk-Kul, skiing, hot springs, and suitable conditions for extreme sports such as paragliding, mountain biking, and mountaineering. It attracts investors from all over the world thanks to rich investment potential in areas such as hotels and restaurants, mountain tourism, honey production, animal breeding, dairy production, and cultivation and processing of fruits and vegetables. 2 КАРАКОЛ Karakol City General Information about Karakol City • Area: 52,000 sq. m. • Population: 75,100 as of January 1, 2018. • 39,900 people within an hour’s drive eastward (Ak-Suu district) • 34,775 people within an hour’s drive on the lake’s north shore (Tyup district) • 69,589 people within an hour’s drive on the lake’s south shore (Jeti-Oguz district) • Location: Karakol sits at the foot of the Teskei-Ala-Too mountain range, downstream of Karakol River, 12 km from the shore of Lake Issyk-Kul, and at 1690-1850 m above the sea level. -
5 June 2020 Kyrgyzstan
5 June 2020 Kyrgyzstan: Human rights defender Kamil Ruziev sentenced to house arrest On 29 May 2020, human rights defender Kamil Ruziev was detained outside a courthouse in Karakol, Kyrgyzstan. He was then interrogated and spent two days in detention, before being placed under two months’ house arrest on 31 May, on charges of forgery. Kamil Ruziev is a human rights defender and lawyer, and acting head of the Karakol-based organisation Ventus. He has been working for more than 20 years on combatting torture, violence and arbitrary law enforcement, defending the rights of victims of torture and victims of domestic violence. On 29 May, Ruziev was detained by officers of the State Committee for National Security (GKNB) of the Issyk-Kul district while leaving the Karakol city court. The officers allegedly detained him as a witness. Following his detention, he was interrogated and denied access to his lawyer. Kamil Ruziev received a detention order which listed him as a suspect, rather than a witness. On 31 May, after spending two days in the Karakol detention centre, Kamil Ruziev was informed that he was being accused of forgery of documents (Art. 359, part 2 of the Criminal Code) by the GKNB. On the same day, he was notified of a criminal case that had been opened against him on 11 March 2020, for the same charge, of which he had never been informed. Also on 31 May, the GKNB sent a press release to Kyrgyz media which stated that Kamil Ruziev is suspected of fraud (article 204 of the Criminal Code) and forgery of documents. -
World Bank Document
Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: PAD1963 INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT Public Disclosure Authorized IN THE AMOUNT OF SDR 19.70 MILLION (US$27.50 MILLION EQUIVALENT) AND A PROPOSED GRANT IN THE AMOUNT OF SDR 19.70 MILLION (US$27.50 MILLION EQUIVALENT) TO THE Public Disclosure Authorized KYRGYZ REPUBLIC FOR THE THIRD PHASE OF THE CENTRAL ASIA REGIONAL LINKS PROGRAM (CARS‐3) SEPTEMBER 18, 2018 Transport Global Practice EUROPE AND CENTRAL ASIA Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective August 31, 2018) Currency Unit = Kyrgyz Som (KGS) KGS69.020 = 1 US$ US$0.015 = KGS 1 Special Drawing Currency Unit = Rights (SDR) SDR0.714 = 1 US$ US$1.401 = 1 SDR FISCAL YEAR January 1 ‐ December 31 Regional Vice President: Cyril E Muller Country Director: Lilia Burunciuc Senior Global Practice Director: Jose Luis Irigoyen Practice Manager: Binyam Reja Task Team Leader(s): Cordula Rastogi; Aidai Bayalieva ABBREVIATIONS AND ACRONYMS AADT Average Annual Daily Traffic IPIG Investment Project Implementation Group ADB Asian Development Bank ISA International Standards on Auditing ANS Air Navigation System JICA Japan International Cooperation Agency ATC Air Traffic Control JSC Joint Stock Company ATM Air Traffic Movement KAI -
Kyrgyz Republic: Issyk – Kul Wastewater Management Project
Environmental Monitoring Report Project number: 50176-002 July-December 2020 March 2021 Kyrgyz Republic: Issyk – Kul Wastewater Management Project Prepared by the Department of Drinking Water Supply and Sewerage Development (DDWSSD) under the State Agency for Water Resources under the Government of the Kyrgyz Republic in consortium with Temelsu International Engineering Inc., Design and Supervision Consultant for the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. -i- Table of Contents 1 INTRODUCTION ............................................................................................................ 1 1.1 Preamble .................................................................................................................. 1 1.2 Headline Information ................................................................................................ 2 2 PROJECT DESCRIPTION AND CURRENT ACTIVITIES .............................................. 5 2.1 Project Description .................................................................................................. -
Bishkek–Osh Road) Improvement Project, Phase 4 (RRP KGZ 45169) Initial Environmental Examination
Central Asia Regional Economic Cooperation Corridor 3 (Bishkek–Osh Road) Improvement Project, Phase 4 (RRP KGZ 45169) Initial Environmental Examination P45169-KGZ TA 8107-KGZ August 2013 KGZ: CAREC Corridor 3 (Bishkek–Osh Road) Improvement Project, Phase 4 (Bishkek–Kara-Balta Section) The IEE is an update of the IEE report disclosed on ADB and MOTC website in August 2013 available on http://www.adb.org/projects/45169-001/documents. Prepared By the KOCKS Consult GmbH for ADB and Ministry of Transport and Communications of the Kyrgyz Republic. The IEE is a document of the Borrower. CONTENTS EXECUTIVE SUMMARY 1 I. INTRODUCTION ................................................................................................................1 A. BACKGROUND ..................................................................................................................1 B. ENVIRONMENTAL CLEARANCE REQUIREMENTS .........................................................3 II. DESCRIPTION OF THE PROJECT ...................................................................................6 A. OVERVIEW ........................................................................................................................6 B. TYPE AND CATEGORY OF PROJECT .............................................................................6 C. NEED FOR PROJECT .......................................................................................................7 D. LOCATION .........................................................................................................................7 -
Sdjr06020 Summary
Integrated Development Plan of the Issyk-Kul Zone Summary 8 ENVIRONMENTAL ASSESSMENT AND MANAGEMENT Environmental Capacity and Pollutant Loads For the integrated regional development plan of the Issyk-Kul zone, the strategic environmental assessment (SEA) has been applied to evaluate overall pollutant loads to be caused by changes in land use and development projects envisaged under the moderate growth scenario. As discussed previously, the most sensitive is the pollution of water quality in the Issyk-Kul Lake. Under the moderate growth scenario, the lake water quality will be degraded to some extent as predicted in the table below. The extent of pollutant loads in terms of BOD, total nitrogen (NH4-N, NO2-N and NO3-N) and total phosphorus (PO4-P) appears to be permissible in the light of international standards for lake water quality. Table S.10 Predicted Water Quality under Moderate Growth Scenario (mg/l) Current Moderate Growth Scenario Permissible (2002) 2010 2025 Level BOD 0.61 0.66 0.75 1 T-N 0.15 0.16 0.18 0.2 T-P 0.0011 0.0012 0.0014 0.005 Source: JICA Study Team Quality of river water flowing into the Issyk-Kul Lake should also be assessed and monitored. The available data, though limited as they are, indicate that river water flowing through agricultural lands has been degraded to some extent. Table S.11 Water Qualities of Major River Inflows into Lake Issyk-Kul (Average of 1988~1992) (mg/l) Djyr Djeti Cholpon Chon River Name Tyup Karakol Tamga Ton Akk-Sai -Galan Oguz -Ata AK Suu BOD5 1.70 1.99 1.90 1.60 2.10 1.10 0.56 0.79 0.83 T-N 1.17 1.14 1.02 1.10 0.91 1.22 0.91 0.91 0.81 T-P 0.016 0.017 0.013 0.011 0.016 0.014 0.013 0.011 0.009 Source: JICA Study Team Emission of air pollutants from stationary sources will not be a serious concern as far as the industrial proposals are controlled individually. -
New Data on the Ancient Settlement of Ak-Beshim (Chu River Valley, Northern Kyrgyzstan)
New data on the ancient settlement of Ak-Beshim (Chu River Valley, Northern Kyrgyzstan) Bakyt Amanbaeva Institute of History, Archaeology and Ethnology of the National Academy of Sciences of Kyrgyz Republic Bishkek, Kyrgyz Republic KG Abstract According to the archaeological data, a series of ancient settlement appeared on the territory of the Chu River Valley (Dzhety-Suu, Semirechie) in VI-VIII centuries. Some of them were composed of the citadel and shakhristan and transformed later (IX-XI centuries) into the territories surrounded with one-two rings of so-called “long walls” with considerable size in the perimeter. Of these cities was Suyab, which ruins correspond to the ancient settlement of Ak-Bashim known as a capital of three Turkic Khaganates in VI-X centuries: Western Turkic, Türgesh and Karluk. Scientific studies were implemented by Kyrgyz (National Academy of Sciences) and Janapese (National Research Institute for Cultural Properties, Tokyo and Teikyo University since 2016) archaeologists. Excavation site No 15 put in place on the territory of shakhristan No 2 revealed the concentration of grey-clay tile, which corresponds to the remains of the collapsed wall of the building. Probably, the revealed construction may the component of the garden-park ensemble of the Tang Dynasty Period. Analysis of the aerial photo of 1967 and further geophysical studies of the territory of the “second” Buddhist temple have shown that it was a part of the larger complex with the walls of 140-150 m in length. As the result of the excavation site No 18 the revealed temple was occupying only its south-western corner, while another construction the role of which has to be identified during the further archaeological studies, was situated nearby. -
Strengthening Cooperation in Adaptation to Climate
STRENGTHENING COOPERATION IN ADAPTATION TO CLIMATE CHANGE IN TRANSBOUNDARY BASINS OF THE CHU AND TALAS RIVERS KAZAKHSTAN AND KYRGYZSTAN Summary Strengthening Cooperation in Adaptation to Climate Change in Transboundary Basins of the Chu and Talas Rivers, Kazakhstan and Kyrgyzstan Summary © Zoї Environment Network, 2014 Summary of the full report on the “Strengthening Cooperation in Adaptation to Climate Change in Transboundary Basins of the Chu and Talas Rivers (Kazakhstan and Kyrgyzstan)” was prepared by Zoї Environment Network in close cooperation with the United Nations Economic Commission for Europe (UNECE) Water Convention Secretariat and the authors of the full report and experts of Kazakhstan and Kyrgyzstan in the framework of the Environment and Security Initiative (ENVSEC ). Financial This publication may be reproduced in whole or in part in any form Authors of the full report: Svetlana Dolgikh, Auelbek Zaurbek, support was provided by the Government of Finland. for educational or non-profit purposes without special permission Alexsandr Kalashnikov (Kazakhstan), Shamil Iliasov, Nurdudin from the copyright holders, provided acknowledgement of the Karabaev, Ekaterina Sahvaeva, Gulmira Satymkulova, Valerii source is made. UNECE and partners would appreciate receiving a Shevchenko (Kyrgyzstan) copy of any material that uses this publication as a source. No use of this publication may be made for resale or for any commercial Original text of summary: Lesya Nikolayeva with the participation purpose whatsoever without prior permission in written form from of Viktor Novikov, Nickolai Denisov (Zoї Environment Network) the copyright holders. The use of information from this publication concerning proprietary products for advertising is not permitted. Russian editing: Marina Pronina The views expressed in this document are those of the authors Translation into English: Elena Arkhipova and do not necessarily reflect views of the partner organizations and governments.