Central Asia Regional Economic Cooperation Corridors 1 and 3 Connector Road Project: Epkin (Km 89) to Bashkugandy (Km 159) Initi

Total Page:16

File Type:pdf, Size:1020Kb

Central Asia Regional Economic Cooperation Corridors 1 and 3 Connector Road Project: Epkin (Km 89) to Bashkugandy (Km 159) Initi Initial Environmental Examination Project Number: 48401-007 June 2018 KGZ: CAREC Corridors 1 and 3 Connector Road Project (Section “Epkin [Km 89] to Bashkugandy [formerly Dyikan] [Km 159]”) This Initial Environment Examination in Detailed Design Stage was prepared by Japan Overseas Consultants/ DI”KYRGYZDORTRANSPROEKT for the Ministry of Transport and Roads of Kyrgyz Republic for the Asian Development Bank, by updating the IEE Report in the Feasibility Stage prepared by Kocks Consult GmbH / Finnish Overseas Consultants Ltd. / CAC Consulting This IEE is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ABBREVIATIONS A-2B Achaeological Survey and Assessment Report and Proposed Planfor Section 2B ADB - Asian Development Bank ADT - Average Daily Traffic AIDS - Acquired Immune Deficiency Syndrome AP - Affected People BoQ - Bill of Quantities CAREC - Central Asia Regional Economic Cooperation CEWP Construction Environmental Work Plan CITES - Convention on International Trade in Endangered Species CO - Carbon Monoxide CSC - Construction Supervision Consultant CW - Civil Works dBA - A-weighted decibels DO - Dissolved oxygen EA - Executing Agency EIA - Environmental Impact Assessment EIP - Environmental Impact Permit EMoP - Environmental Monitoring Plan EMP - Environmental Management Plan FCM - Family Medicine Centres GRM - Grievance Redress Mechanism h, hr - Hour Ha - Hectare HIV - Human Immunodeficiency Virus IA - Implementing Agency IEE - Initial Environmental Examination IES - International Environmental Specialist IPIG - Investment Projects Implementation Group KDTP - Kyrgyzdortransproekt Kg - Kilogram Km - Kilometer Kpa - Kilopascal LAR - Land Acquisition and Resettlement LARP - Land Acquisition Resettlement Plan LHS - Left Hand Side Ls - Lump Sum M2 - Square Meter M3 - Cubic Meter Max. - Maximum MESD - Ministry of Economic and Sustainable Department Min. - Minimum MOF - Ministry of Finance MOTR - Ministry of Transport and Road of the Kyrgyz Republic MoCIT Ministry of Culture, Information and Tourism of the Kyrgyz Republic MPC - Maximum Permissible Concentrations N-2B Noise Modelling and Assessment Report for Section 2B NES - National Environmental Specialist NGO - Non-Governmental Organization No. - Number NO2 - Nitrogen Dioxide OHCH - Objects of Historical and Cultural Heritage PAM - Project Administration Manual PAP - Project-Affected Person PBM - Performance-based maintenance PER - Public Environmental Review PPMS - Project Performance Management System PPTA - Project Preparatory Technical Assistance RAP - Resettlement Action Plan RHS - Right Hand Side ROW - Right-of-Way RP - Resettlement Plan SA - Social Assessment SAEPF - State Agency on Environment Protection and Forestry SER - State Environmental Review SO2 - Sulfur Dioxide SPS - Safeguard Policy Statement SSEMP - Site Specific Environmental Management Plan TA - Technical Assistance TS - Technical Survey TMP - Traffic Management Plan TOR - Terms of Reference TPH - Petroleum Hydrocarbon TSP - Total Suspended Particulates UNFCC - United Nations Framework Convention on Climate Change V-2B - Vibration Modelling and Assessment Report for Section 2B WHSP - Worker’s Health and Safety Plan Contents A. Executive Summary ...................................................................................................................... 8 B. Policy, Legal, and Administrative Framework ......................................................................... 14 1. Purpose and Context of the Report ...................................................................................... 14 2. Extent of IEE Study ................................................................................................................. 15 3. Environmental protection legislation of Kyrgyz Republic ................................................. 15 4. Required ADB Environmental Approval ............................................................................... 18 5. Permitting Processes in Kyrgyz RePublic ........................................................................... 19 6. Environmental Standards ....................................................................................................... 20 C. Description of the Project ........................................................................................................... 23 1. Need for the Project ................................................................................................................ 23 2. General information on project facility ................................................................................. 23 3. Type and Technical Road Category of the Project .............................................................. 24 4. Details of the Project ............................................................................................................... 25 4.1 RoadCross section ................................................................................................................ 25 4.2 Bridges and Culverts ............................................................................................................ 27 4.3 Powerlines .............................................................................................................................. 27 5. Temporary Ancillary Facilities ............................................................................................... 27 5.1 Material Sources, Cut and Fill .............................................................................................. 27 5.2 Construction materials ......................................................................................................... 28 5.3 Asphalt and Cement Batching Plants ................................................................................. 29 5.4 Construction Camp ............................................................................................................... 30 6. Alternatives .............................................................................................................................. 30 7. Traffic Volume .......................................................................................................................... 31 8. Proposed Schedule for Implementation ............................................................................... 31 D. Description of the Environment ................................................................................................. 32 1. Topography, Geology and Soils ............................................................................................ 32 2. Climate ...................................................................................................................................... 32 3. Hydrology, Water Resources and Water Quality ................................................................. 33 4. Ecological Resources in Project Area .................................................................................. 33 4.1 Flora ........................................................................................................................................ 33 4.2 Fauna ...................................................................................................................................... 34 5. Endogenous and exogenous processes .............................................................................. 34 6. Socioeconomic Information ................................................................................................... 35 6.1 Regional Information ............................................................................................................ 36 6.2 Local Information .................................................................................................................. 36 7. Cultural and Archaeological Resources ............................................................................... 36 8. Sensitive Receptors ................................................................................................................ 39 9. Baseline Measurements ......................................................................................................... 40 9.1 Water Quality Measurements ............................................................................................... 41 9.2 Air Quality Measurements .................................................................................................... 41 9.3 Noise Measurements ............................................................................................................ 42 9.3 Vibration Measurements ...................................................................................................... 43 E. Environmental Impacts and Mitigation Measures ................................................................... 44 1. Impacts in the Project Phases ............................................................................................... 44 2. Mitigation measures ...............................................................................................................
Recommended publications
  • Final Evaluation of the Building a Constituency for Peace Project
    2016 Final Evaluation of the Building a Constituency for Peace Project FINAL REPORT [НАЗВАНИЕ ОРГАНИЗАЦИИ] | [Адрес организации] 0 Final Evaluation of the Building a Constituency for Peace Project Final Report December 2016 Prepared by: Natalia Kosheleva International Consultant E-mail: [email protected] Elmira Kerimalieva National Consultant E-mail: [email protected] 1 Content List of abbreviations ...................................................................................................................................... 4 Acknowledgements ....................................................................................................................................... 5 Executive Summary ....................................................................................................................................... 6 1 Background ............................................................................................................................................... 10 2 Object and context of evaluation ............................................................................................................. 10 2.1 Project Theory of Change and expected results ............................................................................... 10 2.2 Project implementation .................................................................................................................... 11 2.3 Project reach ....................................................................................................................................
    [Show full text]
  • CAREC Corridors 1 and 3 Connector Road Project (Section “Epkin [Km 89] to Bashkugandy [Formerly Dyikan] [Km 159]”)
    Environmental Monitoring Report January – June 2020 September 2020 KGZ: CAREC Corridors 1 and 3 Connector Road Project (Section “Epkin [Km 89] to Bashkugandy [formerly Dyikan] [Km 159]”) Prepared by Gentek Consulting Muhendislik for the Ministry of Transport and Roads of the Kyrgyz Republic and the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Table of Contents 1. INTRODUCTION 6 1.1 Preamble 6 1.2 General 6 2. PROJECT DESCRIPTION AND CURRENT WORKS 8 2.1 Project Description 8 2.2 Project Contracts and Management 11 2.2.1 Scope of Work under the Contract 15 2.2.2 Main Organizations Involved in the Project 17 2.3 Design Work during the Current Reporting Period 19 2.3.1 Road Construction Works 19 2.3.2 Construction of Bridges and Culverts 22 2.3.3 Quarries 23 2.3.4 Production Site Territory 24 2.3.5 Camp 26 2.3.6 Tree Management 28 2.3.7 Personnel Data 28 2.4 Description of any Design Changes 28 3. ENVIRONMENTAL ACTIVITIES 30 3.1 General Description of Environmental Protection Measures 30 3.1.1 Road Construction Works 30 3.1.2 Quarries 32 3.1.3 Production Site Territory 35 3.1.4 Tree Management 37 3.1.5 Objects of Historical and Cultural Heritage at the Site 37 3.1.6 Construction Waste 39 3.1.7 Storage Areas 42 3.2 Construction Site Monitoring 45 3.3 Observed Problems (Based on Non-Compliance Records) 46 3.3.1 Overview and Description of the Problems Observed during the Current Period 48 Observed Problems 48 4.
    [Show full text]
  • Snow Leopards and Other Animals of the Tien Shan Mountains of Kyrgyzstan
    EXPEDITION REPORT Expedition dates: 9 June – 23 August 2014 Report published: June 2015 Mountain ghosts: protecting snow leopards and other animals of the Tien Shan mountains of Kyrgyzstan . EXPEDITION REPORT Mountain ghosts: protecting snow leopards and other animals of the Tien Shan mountains of Kyrgyzstan Expedition dates: 9 June – 23 August 2014 Report published: June 2015 Authors: Volodymyr Tytar I.I Schmalhausen Institute of Zoology of the National Academy of Sciences of Ukraine Matthias Hammer Biosphere Expeditions 1 © Biosphere Expeditions, an international not-for-profit conservation organisation registered in England, Germany, France, Australia and the USA Officially accredited member of the United Nations Environment Programme's Governing Council & Global Ministerial Environment Forum Officially accredited member of the International Union for the Conservation of Nature Abstract This study was part of an expedition to the Tien Shan Mountains (Kyrgyz Ala-Too range), run by Biosphere Expeditions and NABU from 9 June to 23 August 2014 with the aim of surveying for snow leopard (Uncia uncia) and its prey species such as argali (Ovis ammon) and Siberian ibex (Capra sibirica). Using a cell methodology adopted by Biosphere Expeditions for volunteer expeditions, 77 cells of 2 x 2 km were surveyed and 22 interviews with local people were conducted. The surveys yielded no evidence of snow leopard (camera trap photos, tracks, scrapes, marking places, etc.), but the interviews indicated that snow leopard was present in the area and confirmed the importance of the area as a habitat for snow leopard. The surveys also showed that the area’s habitat is sufficiently varied and capable of sustaining a healthy prey base for the snow leopard as well as for other carnivores such as the wolf.
    [Show full text]
  • Page 1 GE.19-05427 (E) 071119 081119 Committee Against Torture
    United Nations CAT/C/KGZ/3 Convention against Torture Distr.: General 2 April 2019 and Other Cruel, Inhuman English or Degrading Treatment Original: Russian English, French Russian and or Punishment Spanish only Committee against Torture Third periodic report submitted by Kyrgyzstan under article 19 of the Convention pursuant to the optional reporting procedure, due in 2017*, ** [Date received: 31 January 2019] * The second periodic report of Kyrgyzstan (CAT/C/KGZ/2) was considered by the Committee at its 1192nd and 1195th meetings, held on 12 and 13 November 2013 (see CAT/C/SR.1192 and CAT/C/SR.1195). Having considered the report, the Committee adopted concluding observations (CAT/C/KGZ/CO/2). ** The present document is being issued without formal editing. GE.19-05427 (E) 071119 081119 CAT/C/KGZ/3 Introduction 1. The present report is being submitted pursuant to article 19 (1) of the Convention against Torture and Other Cruel, Inhuman or Degrading Treatment or Punishment. It was prepared in accordance with the general guidelines regarding the form and contents of periodic reports to be submitted by States parties. It includes information on the implementation of the concluding observations of the Committee against Torture (CAT/C/KGZ/CO/2), replies to the Committee’s list of issues (CAT/C/KGZ/QPR/3) and additional information on the implementation of the Convention. 2. The report was prepared by an inter-agency working group established by decision of the Coordinating Council on Human Rights, which made use of information received from the State Penal Correction Service, the Ministry of Internal Affairs, the Supreme Court, the State Committee on National Security, the State Committee on Defence, the Ministry of Health, the Ministry of Education and Science and the Ministry of Labour and Social Development.
    [Show full text]
  • COUNTRY SECTION Kyrgyzstan Game Trophies Plants
    Validity date from COUNTRY Kyrgyzstan 17/05/2018 00030 SECTION Game trophies plants Date of publication 17/05/2018 List in force Approval number Name City Regions Activities Remark Date of request 0005207 «SUPA» Ltd. S. Alikenov Bishkek Bishkek CAT2, CAT3 19/03/2013 000712 Kyrgyzohotorybolovsoiuz Federation Of Hunters And Fishers Of Bishkek Bishkek CAT2, CAT3 19/07/2011 The Kyrgyz Republic Zadorozhny N.N. 0010026 «KALPEN» Ltd. Bishkek Bishkek CAT2, CAT3 15/11/2016 0013894 «Joon-Terek» Ltd. Jalal-Abad Kyrgyzstan (general) CAT2, CAT3 28/08/2015 001680 «Eki Uul» Ltd. Tokmok Chuy CAT2, CAT3 24/10/2013 0016878 «Mountain Tour- -Talas» Ltd Bishkek Bishkek CAT2, CAT3 13/10/2015 ГРЮ 0025278 «Dibo Petfud» Ltd. Bishkek Bishkek CAT2, CAT3 16/05/2018 0034368 «Youg Eko Hant» Ltd. O. Sabirov Osh Osh CAT2, CAT3 06/08/2012 0038638 «Diana Travel» Ltd. A.V. Barykin Karakol Ysyk-Kol CAT2, CAT3 17/10/2011 003973 Kina Grupp Ltd. Bishkek Bishkek CAT2, CAT3 16/05/2018 0040129 «Burhan» Ltd. A.V.Barykin Karakol Ysyk-Kol CAT2, CAT3 17/10/2011 0049696 Baigeldi LTD Mambetakunov R. At-Bashy Naryn CAT2, CAT3 25/07/2011 0049784 «Argali» Ltd. B. Sydygaliev Naryn Naryn CAT2, CAT3 27/02/2012 0051379 Central Asian Safari Club LTD Godunin R. Karakol Ysyk-Kol CAT2, CAT3 10/10/2011 0055964 Hunting DepartmentBoshkoev S.T. Bishkek Bishkek CAT2, CAT3 19/07/2011 1 / 3 List in force Approval number Name City Regions Activities Remark Date of request 006487 Mountain Of Cholponbek Ltd. M. Omurakunov Naryn Naryn CAT2, CAT3 21/12/2012 0072537 Muflon LTD Kaldybaeva А.
    [Show full text]
  • In Kyrgyzstan Agricultural Products
    The Possibility of “Six Sector Industrialization” in Kyrgyzstan Agricultural Products ■Profile of Kyrgyz Republic The Kyrgyz Republic (Kyrgyzstan) is a state in Central Asia. Located in the western and central part of the Tien Shan mountain system. In the north it borders with Kazakhstan, in the west - with Uzbekistan, in the south-west - with Tajikistan, in the east and southeast - with China. The Kyrgyz Republic is a sovereign, democratic, legal, secular, unitary, social state. Independence Date - August 31, 1991. The state language is Kyrgyz; the official language is Russian. The territory is 199.9 thousand km2 (5.8% - forests, 4.4% - water, 53.3% - agricultural land, 36.5% - other lands). Almost 90% of which is located 1,500 m above sea level. The capital is Bishkek (859.8 thousand people). Big cities include Osh (255.8 thousand), Jalal-Abad (98.4 thousand), Karakol (68.0 thousand). Kyrgyzstan consists of 9 administrative-territorial units - Chui oblast, Talas oblast, Issyk-Kul oblast, Naryn oblast, Jalal-Abad oblast, Osh oblast, Batken oblast, Osh city and Bishkek city. Its key regional centers are Talas, Karakol, Naryn, Jalal-Abad, Osh, Batken. ■Overview of Agriculture Industry in Kyrgyzstan Republic The Kyrgyz Republic began implementing agrarian reforms after the collapse of the This case material, which is a product of the Joint Research Project of Case Writing by the Japan International Cooperation Agency (JICA) and the International University of Japan (IUJ), is subject to copyright protection. Tsutomu Yokose, Professor of Graduate School of International Management, International University of Japan (IUJ) and student Kubanychbek Isabekov had prepared this case document.
    [Show full text]
  • Kyrgyz Republic DEV 200662
    Measuring results, sharing lessons sharing results, Measuring OPERATION EVALUATION Kyrgyz Republic - DEV 200662 Support for the National Productive Safety Nets and Long-Term Community Resilience A mid-term evaluation of WFP’s Operation (July 2014 – May 2016) Final Report August 2016 Evaluation Team: Sophia Dunn, Anara Alymkulova and Terrence Jantzi Evaluation Manager: Martin Fisher Commissioned by the WFP Office of Evaluation Report Number: OEV/2016/003 i Acknowledgements The evaluation team sincerely thanks the WFP Kyrgyzstan Country Office in Bishkek for the efficient facilitation of the evaluation process. The staff generously afforded their time to support the team with excellent planning and logistics and to provide relevant information. The passion of the team culture for this project was evident in their energy and enthusiasm to ensure a good evaluation process. Our gratitude also goes to all the stakeholders (Government authorities, the donor community, the United Nations agencies, the cooperating partners and other non- governmental organizations, the beneficiaries, and civil society), who dedicated their time to participate in informative discussions and contributed significantly to the findings of the evaluation. Sophia Dunn, Anara Alymkulova and Terrence Jantzi Disclaimer The opinions expressed are those of the Evaluation Team, and do not necessarily reflect those of the World Food Programme. Responsibility for the opinions expressed in this report rests solely with the authors. Publication of this document does not imply endorsement by WFP of the opinions expressed. The designation employed and the presentation of material in the maps do not imply the expression of any opinion whatsoever on the part of WFP concerning the legal or constitutional status of any country, territory or sea area, or concerning the delimitation of frontiers.
    [Show full text]
  • Gulzana KURMANALIEVA
    Gulzana KURMANALIEVA E-mail: [email protected] Work experience Part Time Teaching Assistant (2013 – present) Naryn State University named after S.Naamatov (Naryn/Kyrgyzstan) Focus on land management and agriculture economics Manager/Director (2013 – 2015) EDU – Education Centre (Naryn/Kyrgyzstan) Management of academic affairs Marketing of EDU academic programs Assistant to Manager of Academic Affairs (2011 – 2013) University of Central Asia (Naryn/Kyrgyzstan) General management of the educational process Preparation of reports on academic programs Outreach Coordinator (2008 – 2011) University of Central Asia (Naryn/Kyrgyzstan) General management of outreach of academic programs Coordination and monitoring of the Program activities in Naryn region Education Doctoral Studies, Naryn State University, Kyrgyzstan (2013 December – present) Economics and Natural Resource Management Title of the doctoral thesis: ‘Pasture Resource Conflict and Cooperation: Explaining the Coexistence of Conflict and Cooperation in Pastoral Border South Kyrgyzstan and Tajikistan’ Diploma, Kyrgyz National University n.a. J.Balasagyn (2007 – 2009) Economics and Management Diploma, Kyrgyz National University n.a. J.Balasagyn (2000 – 2005) Linguistics Language skills Kyrgyz (native) Russian (fluent) English (fluent) German (basic) Fellowships and awards Fellow of the EUCACIS PhD Support Programme since October 2016; Visiting researcher within Designing Social Institutions in Transition: Promotion of Institutional Development for Common Pool Resource
    [Show full text]
  • Measuring the Impact and Financing of Infrastructure in the Kyrgyz Republic
    ADBI Working Paper Series MEASURING THE IMPACT AND FINANCING OF INFRASTRUCTURE IN THE KYRGYZ REPUBLIC Kamalbek Karymshakov and Burulcha Sulaimanova No. 988 August 2019 Asian Development Bank Institute Kamalbek Karymshakov is an assistant professor at the Finance and Banking Department, Central Asian Research Center of the Kyrgyz-Turkish Manas University in Bishkek, Kyrgyz Republic. Burulcha Sulaimanova is an assistant professor at the Economics Department also of the Kyrgyz-Turkish Manas University. The views expressed in this paper are the views of the author and do not necessarily reflect the views or policies of ADBI, ADB, its Board of Directors, or the governments they represent. ADBI does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequences of their use. Terminology used may not necessarily be consistent with ADB official terms. Working papers are subject to formal revision and correction before they are finalized and considered published. The Working Paper series is a continuation of the formerly named Discussion Paper series; the numbering of the papers continued without interruption or change. ADBI’s working papers reflect initial ideas on a topic and are posted online for discussion. Some working papers may develop into other forms of publication. In this report, “$” refers to United States dollars. The Asian Development Bank refers to “Kyrgyzstan” as the Kyrgyz Republic. Suggested citation: Karymshakov, K. and B. Sulaimanova. 2019. Measuring the Impact and Financing of Infrastructure in the Kyrgyz Republic. ADBI Working Paper 988. Tokyo: Asian Development Bank Institute. Available: https://www.adb.org/publications/measuring-impact-and-financing- infrastructure-kyrgyz-republic Please contact the authors for information about this paper.
    [Show full text]
  • CAREC Corridors 1 and 3 Connector Road Project, Phase 2 (Section 1)
    Initial Environmental Examination June 2018 KGZ: Proposed Loan and Grant for Additional Financing on CAREC Corridors 1 and 3 Connector Road Project, Phase 2 (Section 1) Prepared by the Ministry of Transport and Roads of the Kyrgyz Republic for the Asian Development Bank. This is an updated version of the draft originally posted in July 2017 available on https://www.adb.org/projects/documents/kgz-48401-008-iee. IЧТtТКХ EЧЯТЫШЧmОЧtКХ ExКmТЧКtТШЧ PЫШУОМt NШ.: TA 8887-KGГ MКy 2018 KGГ: CAREC CШЫЫТНШЫЬ 1 КЧН 3 CШЧЧОМtШЫ RШКН PЫШУОМt (SОМtТШЧ BКХyФМСy (Km 0) tШ ФТХШmОtОЫ - pШЬt 43 (Km 43)) TСТs InТtТal EnvТronment ExamТnatТon Тn DetaТled DesТРn StaРe was prepared bв Japan Overseas Consultants/ DI”KВRGВZDORTRANSPROEKT for tСe MТnТstrв of Transport and Roads of KвrРвг RepublТc and for tСe AsТan Development Bank, bв updatТnР tСe IEE Report Тn tСe FeasТbТlТtв StaРe prepared bв Kocks Consult GmbH / FТnnТsС Overseas Consultants Ltd. / CAC ConsultТnР. TСТs ТnТtТal envТronmental examТnatТon Тs a document of tСe borrower. TСe vТews expressed СereТn do not necessarТlв represent tСose of ADB's Board of DТrectors, ManaРement, or staff, and maв be prelТmТnarв Тn nature. In preparТnР anв countrв proРram or strateРв, fТnancТnР anв project, or bв makТnР anв desТРnatТon of or reference to a partТcular terrТtorв or РeoРrapСТc area Тn tСТs document, tСe AsТan Development Bank does not Тntend to make anв judРments as to tСe leРal or otСer status of anв terrТtorв or area. 1 ABBREVIATIONS A‐ ‐ Ahaeologial Assesset Repot fo Setio i ADB - AsТan Development Bank
    [Show full text]
  • “Chances and Opportunities in the Agricultural Sector of Kyrgyzsta
    Ministry of Agriculture, Food Industry and Melioration of the Kyrgyz Republic “Chances and opportunities in the agricultural sector of Kyrgyzsta 2020 1 Strategic location Ac t i ve member of the Integrational Unions ( WTO, EAEU, CIS etc.). On the way of “Silk Road”: access toEAEU, Eu r op e , China , Middle Ea s t and South-Ea s t As i a . 2 Agriculture of Kyrgyzstan 12, 6 % ( 20 19 ) ~ 2,6% (2017-20 19 ) Sh a r e o f GDP Development ~400 thous. 445 Fa r ms Cooperatives 10 , 4 m l n h a 9,0 mlnha Agricultural lands Pasture 14 % 65% Active population Rural population 3 Priorities Organic production Intensive gardening Digitalization Consolidation (inc. breeding, seed farms) Processing 4 Export Capacitythous ( . tons) 70,0-85,0 BEANS 125– 135 FRUITS AND VEGETABLES 30-50 MILK AND DAIRY 20 PRODUCTS MEAT AND MEAT PRODUCTS 25 – 30 150 COTTON POTATO 1,5 6 HONEY NUTS 5 Food Industry(entities) 337 CANNED FRUITS 342 AND VEGETABLE MEAT AND MEAT PRODUCTS 541 MILK AND DAIRY PRODUCTS 798 REFINED VEGETABLE AND ANIMAL OILS, FATS FISH PRODUCTS 18 7 Food Industry(entities) 268 SOFT DRINKS AND BOTTLED MINERAL WATER 4643 FLOUR AND FLOUR PRODUCTS 19 NATIONAL DRINKS SUGAR AND 94 CONFECTIONERY 8 Specialization of regions of the Kyrgyz Republic in crop and livestock produc LEGEND GRAIN CROP RICE SUNFLOWER COTTON TOBACCO SUGAR BEET Chui region POTATO Talas region VEGETABLES Jalal-Abad region MELONS Naryn region Osh region FRUITS AND BERRIES Batken region GRAPE Issyk-Kul region LIVESTOCK FARMING 9 Operating trade and logistics centers in the Kyrgyz Republic Sokuluksky
    [Show full text]
  • Pliocenepleistocene Initiation, Style, and Sequencing of Deformation In
    PUBLICATIONS Tectonics RESEARCH ARTICLE Pliocene-Pleistocene initiation, style, 10.1002/2013TC003394 and sequencing of deformation Key Points: in the central Tien Shan • Dates of folded terraces constrain structure timing Joseph K. Goode1, Douglas W. Burbank1, and Cholponbek Ormukov2 • Geologic and geodetic deformation rates are consistent 1Department of Earth Science, University of California, Santa Barbara, California, USA, 2Central-Asian Institute for Applied • Naryn basin structures originated about 1 Ma Geoscience, Bishkek, Kyrgyzstan Abstract In response to the Indo-Asian collision, deformation of the Tien Shan initiated at ~25 Ma along Correspondence to: the northwestern margin of the Tarim Basin. 300 km north, the Kyrgyz Range began deforming ~15 Ma later. J. K. Goode, Although multiple intervening structures across the Tien Shan are currently active, the sequencing of initial [email protected] deformation across the orogen’s entire width remains poorly known. To determine whether deformation migrated sequentially northward or developed less predictably, we documented deformation patterns Citation: within the Naryn Basin in south-central Kyrgyzstan. Detailed mapping and a published balanced cross section Goode, J. K., D. W. Burbank, and C. Ormukov (2014), Pliocene-Pleistocene across the Naryn Basin suggest that deep-seated, relatively steeply dipping thrust faults have disrupted the initiation, style, and sequencing of defor- basin during late Cenozoic deformation. Dating of deformed fluvial terraces with ages between ~10 and 250 ka mation in the central Tien Shan, Tectonics, constrains the rate of deformation across relatively young structures in the Tien Shan interior. Based on geodetic 33, 464-484, doi:10.1002/2013TC003394. surveys of dated terraces, local rates of relative rock uplift span from 0.3 to 3.5 mm/yr.
    [Show full text]