10 th Embraer Day
Embraer Defense Systems
Orlando José Ferreira Neto Executive Vice President Defense Market
March, 2010 Forward Looking Statement
This presentation includes forward-looking statements or statements about events or circumstances which have not occurred. We have based these forward-looking statements largely on our current expectations and projections about future events and financial trends affecting our business and our future financial performance. These forward-looking statements are subject to risks, uncertainties and assumptions, including, among other things: general economic, political and business conditions, both in Brazil and in our market. The words “believes,” “may,” “will,” “estimates,” “continues,” “anticipates,” “intends,” “expects” and similar words are intended to identify forward-looking statements. We undertake no obligations to update publicly or revise any forward-looking statements because of new information, future events or other factors. In light of these risks and uncertainties, the forward-looking events and circumstances discussed in this presentation might not occur. Our actual results could differ substantially from those anticipated in our forward-looking statements.
EMBRAER PROPRIETARY INFORMATION 2 Retrospective – Embraer Defense in 2009
• Important contracts with the Brazilian Ministry of Defense
• KC-390 Program with the Brazilian Air Force (FAB) • A-4 Modernization Program with the Brazilian Navy • Super Tucano
• 100 th production aircraft delivered to FAB • First deliveries to the Dominican and Chilean Air Forces • New contracts for two undisclosed customers (9 aircraft) • Deliveries of all Phenom 100 (four aircraft) contracted by the Pakistan Air Force • Delivery of the two Brazilian presidential aircraft (E190PR) • First flight of the AMX prototype #1 in the A-1M program • Customer Services business expansion • Sales of US$ 1.6 billion and revenues of US$ 499 million AA very very special special year year for for Embraer Embraer Defense Defense with with excelle excellentnt results results andand significant significant achievements achievements
EMBRAER PROPRIETARY INFORMATION 3 Embraer Defense Products and Services
ISR (Intelligence, Surveillance and Advanced Training and Light Attack Reconnaissance) Transport of authorities
Modernization Programs Military Tactical Transport Systems and Services
EMBRAER PROPRIETARY INFORMATION 4 Super Tucano Deliveries to FAB
FAB • A-29 (FAB designation) • Single and twin-seat versions Brazilian Air Force • 99 firm orders • 85 already delivered
Ref.: 12/Mar/2010
EMBRAER PROPRIETARY INFORMATION 5 Super Tucano to Export Market – Delivering on time
Colombian Air Force Chilean Air Force
• 25 aircraft • 12 aircraft • All delivered • 4 already delivered Dominican Air Force Ecuadorian Air Force
• 8 aircraft • 24 aircraft • 2 already delivered • 4 already delivered Ref.: 12/Mar/2010 EMBRAER PROPRIETARY INFORMATION 6 Training and Operation Support System
• TOSS: Training and Operation Support System • Flight Simulator • CBT (Computer Based Training) • MPS (Mission Planning Station) and MDS (Mission Debriefing Station)
• Fully developed by Embraer • Customers: Colombia, Chile, Ecuador and Dominican Republic.
EMBRAER PROPRIETARY INFORMATION 7 Super Tucano
• Firm orders: 178 aircraft • Training and COIN aircraft Market • Brazil: 99 Forecast 2020 • Colombia: 25 • 700 aircraft / US$ 8 bi • Dominican Republic: 8 • Chile: 12 • Ecuador: 24 • Undisclosed: 10 • Prospects: • South East Asia • Africa • Deliveries: 121 aircraft Ref.: 12/Mar/2010 • Americas • To be delivered: 57 aircraft AnAn affordable affordable and and comprehensive comprehensive solution solution for for traini trainingng and and COIN COIN missions missions with with excellentexcellent market market acceptance acceptance and and with with promising promising pers perspectives.pectives. EMBRAER PROPRIETARY INFORMATION 8 EMB 145 AEW&C – India
Embraer platforms and DRDO/CABS mission systems Mission Systems: • Primary and Secondary Radars • Satcom • COMINT / ELINT • Countermeasure Systems
Platform improvements: Contract: • In-flight refueling system • Three EMB 145 platforms • New electrical generation system • Contract signed in July 2008 • New cooling system • First delivery in 2011
DRDO: Defence Research and Development Organization / CABS: Centre for Airborne Systems EMBRAER PROPRIETARY INFORMATION 9 Embraer ISR Systems
• Firm orders: 18 aircraft • Deliveries: 15 aircraft in operation
• Brazilian Air Force: 8 EMB 145 AEW&C Airborne Early Warning and Control • Hellenic Air Force: 4 • Mexican Air Force: 3 • Under development:
• DRDO/CABS: 3 EMB 145 AGS Airborne Ground Surveillance • Prospects: • Multimission Aircraft – India: 9 Legacy 600
• Opportunities in South Asia, South America and Middle East EMB 145 MP Maritime Patrol • ISR Market Forecast 2020 • 370 aircraft / US$ 30 bi
Cost-effectiveCost-effective solutions solutions to to address address a a growing growing marke market t Multimission Aircraft
EMBRAER PROPRIETARY INFORMATION 10 Transport of authorities • Recent deliveries: • 2 EMBRAER 190 PR (FAB) • 1 Legacy 600 (Panama) • 4 Phenom 100 (Pakistan Air Force) • 1 ERJ 135 (Royal Thai Army) • Next delivery: EMBRAER 190 PR • 1 ERJ 135 (Royal Thai Navy): 4Q2010 • Prospects: • Opportunities in South America, South Asia, Europe and Africa. Phenom 100 • Market Forecast 2020 • 400 aircraft / US$ 6.5 bi
Legacy 600 ERJ 135
TheThe most most complete complete portfolio portfolio delivering delivering satisfaction satisfaction and and flexibility flexibility to to our our customers customers
EMBRAER PROPRIETARY INFORMATION 11 Modernization programs
Brazilian Air Force – A-1M • 43 aircraft • Three prototypes in ground and flight tests
• A-1 revitalization contract under discussion Brazilian Air Force – F-5M Brazilian Navy – A-4
• 46 aircraft • 33 already delivered • 12 aircraft • Additional batch of F-5s and A-Darter missile integration under discussions • First prototype at GPX-CS Ref.: 12/Mar/2010 Tailor-madeTailor-made to to fulfill fulfill the the Brazilian Brazilian Armed Armed Forces Forces n needseeds EMBRAER PROPRIETARY INFORMATION 12 Customer Support – Defense Market
• Material Support • Pool • CLS (Contractor Logistic Support) • ESSG (Embraer Support Solutions for Government)…
Customer Support Revenue
70 63 60
50 44 39 40 32 30
US$ US$ million 20 10 0 2006 2007 2008 2009
GrowingGrowing business business opportunities opportunities related related to to new new trend trendss in in support support programs programs
EMBRAER PROPRIETARY INFORMATION 13 EMBRAER KC-390
• New tactical military transport aircraft • Payload: 19 ton / Range: 1450 nm (2685 km) • Contract signed with Brazilian Air Force in April 2009 • Currently in “Preliminary Design Phase”
• Market Forecast 2025 • 700 aircraft / US$ 50+ bi
EMBRAER PROPRIETARY INFORMATION 14 EMBRAER KC-390 Three-view
EMBRAER PROPRIETARY INFORMATION 15 EMBRAER KC-390 Master schedule
2009 2010 2011 2012 2013 2014 2015 2016
Preliminary Design Initial Definition Joint Definition Detailed Design and Certification Phase Phase - PD Phase - IDP Phase - JDP DDP
Wind Tunnel PDR CDR Testing LoadsLoads CalculationCalculation
StructuresStructures CalcCalc
DrawingsDrawings Partnership and Supplier Procurement ToolingTooling 1 2
Prototypes
IOCIOC
FOCFOC
StructuralStructural TestingTesting ProgramProgram running running on on schedule, schedule, geared-up geared-up for for full-sca full-scalele development development and and also also for for selectionselection of of the the main main partners. partners.
EMBRAER PROPRIETARY INFORMATION 16 EMBRAER KC-390 Program Update
Preliminary Design Phase • Aerodynamic configuration definition • Structural architecture definition • Systems technologies definition • Several wind tunnel test campaigns performed or KC-390 model for the wind tunnel test under execution • Cockpit mock-up and Engineering simulator in use • Cargo compartment volumetric mock-up
Section of the cargo compartment volumetric mock-up
MainMain focus: focus: risk risk mitigation mitigation
EMBRAER PROPRIETARY INFORMATION 17 F-X2 Program Status
• Brazilian F-X program restarted in May 2008 Short-listed contenders: • Multi-role fighter to replace the current fleet of fighters (F-2000, F-5M, A- 1M) • Initial batch of 36 airplanes • Strong emphasis in offset and technology transfer mainly for the Brazilian aerospace industry and Government agencies. Boeing F -18 E/F Super Hornet • Embraer preliminary agreements with each of the short-listed contenders covering cooperation in technological areas related to the fighter development, manufacture and support, and other Embraer projects. • In 2009: Proposals delivered in February 2009, and revised in May 2009. • Final decision by the Brazilian Government expected soon. Dassault Rafale • Negotiations of FAB/winning bidder purchase contract and offset agreements with industry negotiations through 2010.
Saab Gripen NG
EMBRAER PROPRIETARY INFORMATION 18 Embraer C4I System
• Embraer’s experience in C4I System (Mexico) SATCOM Aerial • R&D projects on-going Surveillance Tactical Maritime Patrol related to C4ISR systems Radars • Several solutions for
Command and Control Fighters IntranetIntranet System • Data Link specification and Military and development Civilian Meteorologic Telephone al Information C4ISR – Command, Control, Communication, Net • Customized solutions (e.g. Computer, Information, Intelligence, Link BR2 for Brazil) Surveillance and Reconnaissance
• Data links for Embraer SENEAM InterceptorsInterceptors Civilian ATC aircraft Vehicles and C2 Other Mobile Stations Hangars Command & Radars Control Centers
C4I:C4I: Command, Command, Control, Control, Communications, Communications, Computer Computer and and Intelligence Intelligence
EMBRAER PROPRIETARY INFORMATION 19 Embraer Defense Results
Embraer Defense Results
700 650 14 600 13 505 499 13 12 500 11 400 346 9,1 10 8 9 300 227 8 200
6,6 Participation (%) 6 7 Revenues (US$ million) (US$ Revenues 100 6 0 5 2006 2007 2008 2009 2010 (projection)
2010:2010: entirely entirely based based on on firm firm contracts contracts
EMBRAER PROPRIETARY INFORMATION 20 Embraer Defense
•We are delivering to customers’ satisfaction • … Establishing the future growth basis • AEW India • Super Tucano for the Export Market • Phenom 100 Pakistan • New VIP product (EMBRAER 190 PR) • ERJ 135s Thai Armed Forces • KC-390 (development 2009-2016) + (future serial production) • Super Tucano FAB and Colombia … • Potential offsets and industrial participation in •Revenue stream stable and sustainable the F-X2 program • A-1M (~ US$ 780M – 2002-2015) • C4I • F-5M, additional batch, A-Darter integration • A-4 Brazilian Navy (~ US$ 144M – 2009-2014) •Sound positioning in all business segments we are involved…
2008/2009 2009/2010 Beyond
EMBRAER PROPRIETARY INFORMATION 21 EMBRAER PROPRIETARY INFORMATION 22