20.11.2018 REPORT for WEBSITE.Xlsx

Total Page:16

File Type:pdf, Size:1020Kb

20.11.2018 REPORT for WEBSITE.Xlsx LIST OF REPORTS SENT TO THE SPONSORER FROM 1st JANUARY, 2016 TO OCTOBER'2018 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”. BCCL, Dhanbad 8 13.05.16 2016-17 2015-16 CNP/4369/2015-16 “Evaluation and advice on the present Damodar Ropeways & Infra condition of haulage rope of fixed grip Limited, Vansittart Row, Kolkata mono-cable passenger ropeway at Digha, Dist.Purba Medinipur, West Bengal”. 9 13.05.16 2016-17 2016-17 CNP/4381/2016-17 Evaluation and advice on the present Damodar Ropeways & Infra condition of haulage rope of mono- Limited, Vansittart Row, Kolkata cable passenger ropeway at Science City,Kolkata, West Bengal”. 10 15.06.16 2016-17 2011-12 CNP/3064/2011-12 Failure analysis of 32mm diameter Katras Choitudih Colliery, BCCL, guide rope of 6 pit Mine of Katras Sijua, Dhanbad Choitudih Colliery, Katras Area, BCCL, Dhanbad 11 29.06.16 2016-17 2016-17 CNP/4394/16-17 Advice on suitability of permitted Pathakhera Area, WCL, Dist- explosive and detonator involved in Betul (M.P.) accident at Chhatarpur Mine No.1, WCL for use in underground coal mines 12 08.07.16 2016-17 2016-17 CNP/4383/16-17 In-Situ non-destructive evaluation and Damodar Ropeways & Infra advice on the present condition of track Limited, Vansittart Row, Kolkata and haulage ropes of bi-cable aerial ropeway passenger cable car installation at Gangtok, Sikkim 13 11.07.16 2016-17 2012-13 CNP/3236/12-13 Ventilation investigation and advice to Orient Area, MCL, Brajrajnagar, improve ventilation at Orient Mine No. Dist – Jharsuguda, Odisha - 3, MCL 768216 14 11.07.16 2016-17 2015-16 CNP/4356/15-16 Advice on suitability of coal delay PREMIER EXPLOSIVES LTD., detonators with NHN for use in /”Premier House” # 11, Ishaq underground coal mines Colony, Secunderabad – 500 015,A.P. 15 13.07.16 2016-17 2012-13 CNP/N/3332/12-13 Geotechnical study for advice on the Sesa Goa Limited (Vedanta), Sesa stability of tailing dam Codli Mine Ghor, 20 EDC Complex, Patto, Panjim, Goa – 403001 16 19.07.16 2016-17 2016-17 CNP/4382/16-17 Analysis of Airborne Respirable dut Block-B Project, Gorbi, Dist- samples from Block-B Project (NCL) Singrauli (M.P.) 17 06.07.16 2016-17 2015-16 CNP/4230/15-16 Subsidence prediction due to extraction M/s Tata Steel Limited, of 2S panel of XV seam with hydraulic Jharia Collieries,Jamadoba- sand stowing at Jamadoba colliery of 828112 Dist: Dhanbad Tata Steel limited. 18 06.07.16 2016-17 2016-17 CNP/4401/16-17 Feasibility of extraction in 6-S panel of TATA STEEL LTD IX seam with hydraulic sand stowing at 6 and 7 pits Bhutgoria Amalgamated Colliery of Tata Steel Limited 19 22.07.16 2016-17 2015-16 CNP/4407/15-16 Evaluation of Rock Mass Rating (RMR) Orient Area, for Lajkura seam workings at 46 LN MCL,Brajrajnagar,Jharsuguda,Odi panel, Mine No.3, Orient Area, MCL sha - 768216 20 22.07.16 2016-17 2015-16 SSP/94/15-16 In-Situ evaluation and advice on the Jaduguda Mines,UCIL, present condition of winder ropes of Singhbhum (East) main & 3rd stage winders (cage & skip) of Jaduguda Mine (UCIL) 21 21.07.16 2016-17 2015-16 CNP/4375/15-16 Advice to assess and design the barrier Sr. Manager thickness between the running Gopinathpur Colliery, Mugma Gopinathpur O/C working and Pusai & Area Khoodia river nearby with suitable Nirsa - 828205, Dist - Dhanbad. stability aspects. 22 .08.16 2016-17 2015-16 SSP/N/98/15-16 Estimation of RMR and Support Design A.P.TRIVEDI SONS of stope for Ramrama Underground Managanese Mine 23 05.08.16 2016-17 2014-15 CNP/4140/14-15 Advice on feasible mining methods in Western Jharia Area, BCCL, coal seams in total perspectives with an Moonidih, Dhanbad aim to have no adverse impact due to mining subsidence on surface at Lohapatti Colliery, West Jharia Area,BCCL 24 05.08.16 2016-17 2015-16 CNP/4272/15-16 Scientific study for designing a suitable Orient Area, method for systematic liquidation of MCL,Brajrajnagar,Jharsuguda,Odi already developed contiguous workings sha - 768216 and further development of Lajkura seam at Orient Colliery Mine No. 3, Orient Area, MCL 25 08.08.16 2016-17 2016-17 CNP/4411/16-17 Advice on design of support system for Reliance Cement Co.Pvt.Ltd.,Sial development workings at Sial Ghori Ghori Coal Mine,Gulabra, Mine, Chhindwara Mine, M.P. Chhindwara (M.P.) 26 08.08.16 2016-17 2016-17 CNP/4397/16-17 In-Situ investigation and advice on the ASIA RESORTS present condition of four nos of track LTD,PARWANOO (H.P.) ropes and two nos. of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) - Two visits 27 12.08.16 2016-17 2015-16 CNP/4322/15-16 Scietific study for design of continuous The Singareni Collieries Company miner panels in No.2 seam and Limited, Kothagudam Collieries- Salarjung seam of Shantikhani 507101, Bhadrachalam Road Mandamarri Area, SCCL. Railway Station, A.P. िजला/Dist-Khammam (A.P.) 28 17.08.16 2016-17 2015-16 CNP/4357/15-16 Advice on suitability of Colex-1 PREMIER EXPLOSIVES LTD., emulsion explosives for use in /”Premier House” # 11, Ishaq underground coal mines as a P1 Colony, Secunderabad – 500 explosives. 015,A.P. 29 16.08.16 2016-17 2014-15 CNP/3978/14-15 Periodic evaluation and advice on The Singareni Collieries Company quality of permitted explosives, Limited, Kothagudam Collieries- detonators, SMS/SME, lD explosives 507101, Bhadrachalam Road and accessories supplied to SCCL for Railway Station, A.P. blasting in underground and opencast िजला/Dist-Khammam (A.P.) coal mines. 30 18.08.16 2016-17 2016-17 CNP/4412/16-17 Scientific study to assess the Crossing Orient Area, point temperature and Incubation MCL,Brajrajnagar,Jharsuguda period of 46LN section of Lajkura ,Odisha - 768216 seam, Orient Colliery-3, Orient Sub Area, MCL and advice thereof 31 17.08.16 2016-17 2015-16 CNP/4364/15-16 Determination of crossing point Neyveli Lignite Corporation temperature, Ignition point temperature Limited,Barsingsar Lignite Mine, and incubation period of Lignite seam, Udairamsar, Barsingsar – 334 Barsingsar Mine, NCL, Rajasthan and 402,Rajasthan advice thereof. 32 22.08.16 2016-17 2015-16 CNP/4318/15-16 Advice on design of suitable support Dy.General Manager(M)/Sub system for Chanda Rayatwari Colliery, Area Manager,Rayatwari Sub UG Mine, Chandrapur Area Area, WCL,P.O.-Babupeth,Dist- Chandrapur (Rajasthan) 33 22.08.16 2016-17 2014-15 CNP/4145/14-15 Control of open fire at 23 D near B- Jhanjra Area, ECL,P.O.-Jhanjra shaft in R-VI seam at MIC unit of (B.O.), Dist-Burdwan Jhanjra Project colliery, ECL. 34 30.08.16 2016-17 2013-14 CNP/3838/13-14 Periodic evaluation and advice on The Singareni Collieries Company quality of SMS / SME of SCCL owned Limited, Kothagudam Collieries- plants and OC/UG explosives and 507101, Bhadrachalam Road accessories of other firms Railway Station, Dist-Khammam (A.P.) 35 30.08.16 2016-17 2015-16 SSP/86/15-16 Investigation on methane emission at R- Pandaveswar Area,ECL,Burdwan IV and R-VI Coal seams of (W.B.) Pandaveswar colliery for the categorization of degree of gassiness and advice on associated gas hazards. 36 30.08.16 2016-17 2016-17 CNP/4408/16-17 Advice on the use of coal ash from Korba Thermal Super Thjermal Korba Thermal Super Thjermal Power Power Station, Station, NTPC for underground stowing NTPC,Jamnipalli,Korba,C.G. at SECL Mines 37 02.09.16 2016-17 2016-17 CNP/4399/16-17 Evaluation of Rock Mass Rating (RMR) Bararee Colliery, BCCL, Bhulan for VII top seam workings at 6 pit, Bararee -838133, Dhanbad Bararee Colliery, Lodna Area, BCCL 38 12.09.16 2016-17 2016-17 SSP/136/16-17 Assessment and advice on surface M/s Marathon Electic Motors temperature rise of HT Induction (India) Ltd.,Large Machine Flameproof motor rated at 750KW, 4 Unit,1, Taratala Road,Kolkata – Pole, 6.6KV in frame size:KF450, 700 024 suitable for use in hazardous area 39 01.09.16 2016-17 2015-16 SSP/103/15-16 & Safety evaluation of different surface TATA STEEL LTD CNP/4352/15-16 features and structures lying over depillaring panels in Jharia Coalfield of Tata Steel.
Recommended publications
  • Eastern Coalfields Limited
    1 Eastern Coalfields Limited (A subsidiary of Coal India Limited) Office of the General Manager, Kajora Area Materials Management wing - Purchase Department P.O.- Kajora Gram, District- Paschim Burdwan, West Bengal- 713338 Phn no.:9434795751 /, email: [email protected] website: www.easterncoal.gov.in; CIN - U10101WB1975GOI030295 NOTICE INVITING TENDER (Single bid system) Domestic Open e-tender for procurement of Dognails for Kajora Area, ECL Tender No. ECL/KAJ/OPEN/MM/19C53/P69, Date: 25.07.2019 1 Offer is invited from Indian firms for supply of items/stores as per item wise requirement listed at annexure-2 through on line bidding process. 2 The key indicators of the tender is given below, Sl Key indicator Details 1 Tender value Rs. 441792.00 2 EMD Rs. 8836.00 3 Tender Fee NIL 4 Reverse auction of prices Applicable /not applicable 5 Tendered items- Input Tax Credit Eligible 6 GST registration of bidder Compulsory 7 GST unregistered firm Not allowed to participate 3 Time schedule of the tender shall be as under, Sl Event list Date Time 1. Tender publishing date in CIL portal 19.08.2019 At 10.00 hrs IST 2. Document download start date 19.08.2019 From 11.00 hrs IST 3. Bid submission start date 20.08.2019 From 11.00 hrs IST 4. Seek clarification start date 19.08.2019 From 11.00 hrs IST 5. Seek clarification end date 26.08.2019 Up to 11.00 Hrs IST 6. Furnishing clarification end date 02.09.2019 Up to 11.00 Hrs IST 7. Document download end date 09.09.2019 11.00 hrs IST 8.
    [Show full text]
  • Gujarat State Electricity Corporation Limited
    REVISED FORM I, PROPOSED TOR & REVISED PRE-FEASIBILITY REPORT GARE PALMA SECTOR-I: PHASE 1 (OPENCAST AND CAPTIVE COAL WASHERY) IN MAND RAIGARH COALFIELD, TAMNAR TEHSIL, RAIGARH DISTRICT, STATE CHHATTISGARH (PHASE I AREA-3583.81 HA) PROJECT AT DISTRICT RAIGARH, CHHATTISGARH TOTAL LEASE AREA: 5738.75 HA AREA FOR PHASE I: 3583.81 HA CAPACITY: 15 MTPA CAPACITY OF COAL WASHERY: 15 MTPA PROJECT DEVELOPER: GUJARAT STATE ELECTRICITY CORPORATION LIMITED, VADODARA, GUJARAT ENVIRONMENTAL CONSULTANT GREENCINDIA CONSULTING PRIVATE LIMITED GHAZIABAD, UTTAR PRADESH NABET/EIA/1619/RA0058 JANUARY, 2018 FORM I AND PROPOSED TOR REVIISED FORM I & TOR ENVIIRONMENT CLEARANCE For GARE PALMA SECTOR-I: PHASE 1 (OPENCAST AND CAPTIVE COAL WASHERY) IN MAND RAIGARH COALFIELD, TAMNAR TEHSIL, RAIGARH DISTRICT, STATE CHHATTISGARH (PHASE I AREA-3583.81 HA) FORM-I I. BASIIC INFORMATIION Sl. No. Item Details 1. Name of the project/s Gare Palma Sector-I: Phase 1 (Opencast and captive coal washery) in Mand Raigarh Coalfield, Tamnar Tehsil, Raigarh District, State Chhattisgarh (Phase I Area-3583.81 Ha) 2. Sl. No. of the schedule Category ‘A’ of Activity 1(a); >150 ha of Mining Lease area in respect of coal mine projects. 3. Proposed capacity / area / length / Tonnage to be handled Opencast: 15 MTPA tonnage to be handled / command area / of Coal Mine lease area / lease area / number of wells to be drilled Captive Coal Washery 15 MTPA Total Gare Palma Sector -1 area: 5738.75ha Total area for Phase I: 3583.81 ha (including Query excavation 1620.31 ha, external OB dump 1447.50ha, Future Underground mining 40.6ha and coal washery 40.0ha, Colony for Opencast and washery 47.57ha and other infrastructure 387.83ha) Out of the 3583.81 ha, 3092.165 ha is agricultural land 4.
    [Show full text]
  • Dr. Sahendra Ram Academics Area of Interests Research Experience
    CURRICULUM-VITAE Dr. Sahendra Ram Assistant Professor Department of Mining Engineering National Institute of Technology Rourkela India, PIN-769008. Email: [email protected] / [email protected] Mobile No.: +91 9470313115 / 6207066199 Academics Post-doctoral Research, Numerical simulation for assessment of yielding characteristics of coal pillars at Great Depth (900m), Institute of Geonics of the Czech Academy of Sciences, Ostrava, Czech Republic. Ph.D., Mining Engineering, Indian Institute of Technology (ISM) Dhanbad, India. B.Tech., Mining Engineering, Birsa Institute of Technology, Sindri, India. Area of Interests Rock Mechanics; Numerical Modelling; Ground Control; Underground Coal Mining; Thick/Contiguous Seam Mining; Instrumentation and Strata Monitoring; Stability of Geotechnical Structures in Underground Coal Mine. Research Experience April, 1999 - December, 2020 I was associated with CSIR- Central Institute of Mining and Fuel Research (CIMFR), Dhanbad. I applied basics of rock mechanics principles to minimize strata control problems for safe and efficient recovery of coal from underground mines. I carried out different R&D investigations related to different underground coal mining methods in more than 80 in-house and industry-sponsored projects, including two S&T projects of the Ministry of Coal, Govt. of India and one S&T project with international collaboration. Extensive field-based rock mechanics investigations during continuous miner based mechanized and semi-mechanized workings in underground coal mines and studies on numerical models are the basic tools of the study. Research Skills Field studies, numerical simulation, instrumentation and monitoring Important R&D skills Design of different geotechnical structures including rib/snook and breaker line supports for continuous miner based mechanized depillaring.
    [Show full text]
  • Refund Against So Closed Under Road E-Auction Mode for the Period 21-01-2021
    REFUND AGAINST SO CLOSED UNDER ROAD E-AUCTION MODE FOR THE PERIOD 21.01.2021 to 20.02.2021 Deduction for Forest Tr. Fees ( Customer Net Refundable Customer Name Pan Cardno Area Desc So No Closed Date Refund Amt 1.1.21-20.2.21) & Code Amount Ledger Balance ( As on 20.02.21) Associated Ceramics Ltd AABCA9234A Kajora Area 2020118588 15-Feb-21 101.90 Satgram Area 2020118589 15-Feb-21 680.68 500012 Consignee WiseTotal: 782.58 0.00 783 M/S Evergreen Coal Industries AAAFE5419M Salanpur Area 2020118082 06-Feb-21 610.75 500030 Consignee WiseTotal: 610.75 8551.80 0.00 Shree Balaji Glass Manufacturing Pvt.Ltd. AADCS8283K Kajora Area 2020118396 15-Feb-21 110.93 Kajora Area 2020118397 15-Feb-21 101.79 500031 Consignee WiseTotal: 212.72 0.00 212.72 United Trading Company ACFPJ9860Q Kunustoria Area 2020108677 06-Feb-21 84.03 500040 Consignee WiseTotal: 84.03 31798.20 0.00 Shree Enterprises Coal Sales Pvt. Ltd. AADCS6017K Bankola Area 2020108695 04-Feb-21 729.55 500044 Consignee WiseTotal: 729.55 0.00 730 Industrial Fuels And Commodities AIOPG1874C Pandaveswar Area 2020108242 29-Jan-21 898.02 Bankola Area 2020108687 04-Feb-21 673.71 Bankola Area 2020108696 04-Feb-21 291.34 Pandaveswar Area 2020109040 04-Feb-21 430.26 Pandaveswar Area 2020118524 15-Feb-21 4081.01 Kajora Area 2020118804 15-Feb-21 60462.11 Satgram Area 2020118812 15-Feb-21 197.01 500060 Consignee WiseTotal: 67033.46 17865.00 49168 Total Fuels Private Ltd. AACCT1679D Kajora Area 2020118058 15-Feb-21 86975.93 500070 Consignee WiseTotal: 86975.93 57029.40 29947 Shree Bahubali Mercantile Pvt.
    [Show full text]
  • LIST of REPORTS SENT to the SPONSORER from 1ST JANUARY, 2016 to 14Th JULY, 2021
    LIST OF REPORTS SENT TO THE SPONSORER FROM 1ST JANUARY, 2016 TO 14th JULY, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”.
    [Show full text]
  • Sl No Area Colliery Name Designation EIS No Mobile No EMAIL ID
    List of Nodal Officers of Public Grievances in BCCL Sl No Area Colliery Name Designation EIS No Mobile No EMAIL ID. 1 Koyla Bhawan HQ S K Singh GM(P)VIP/CPGRAM/Legal 90183591 7547835164 [email protected] 2 Koyla Bhawan HQ B K Das Dy Manager(P)VIP/CPGRAM 90295379 6287695458 [email protected] 3 Sijua SIJUA AREA SUNIL KUMAR CHIEF MGR (PERS.)/APM 90077751 6287697496 [email protected] 4 LOYABAD COLLIERY RAKESH MACHAL MANAGER (PERS.) 90210055 6287697305 [email protected] 5 REGIONAL HOSPITAL LOYABAD RAKESH MACHAL MANAGER (PERS.) 90210055 6287697305 [email protected] 6 SIJUA AREA CHANDAN KR SRIVASTAVA DY.MGR (PERS.) 90293994 9438877160 [email protected] 7 SENDRA BANSJRA COLLIERY NILESH JOSHI DY.MGR (PERS.) 90294224 9470596699 [email protected] 8 BASDEOPUR COLLIERY NILESH JOSHI DY.MGR (PERS.) 90294224 9470596699 [email protected] 9 NICHTPUR COLLIERY MUKESH KUMAR ASSTT.MGER (PERS.) 90311762 6287698708 [email protected] 10 MUDIDIH COLLIERY TARA SINGH MT(HR) 90368085 7310096226 [email protected] 11 KANKANEE COLLIERY TARA SINGH MT(HR) 90368085 7310096226 [email protected] 12 TETULMARI COLLIERY JOHN SINGH ASSTT.MGER (PERS.) 90294950 6287695898 [email protected] 13 Govindpur Area Office Manoj Kumar Saha CM(P)/APM 90042060 6287696411 [email protected] 14 Area Office O P Singh Dy Manager(P) 90292491 6287695891 [email protected] 15 New Akashkinree Colliery Rajesh Kumar Kar Manager(P) 90216466 6287696885 [email protected] 16 Area Office (Legal) Anant mishra Dy Manager(P) 90267659
    [Show full text]
  • Screening and Brief Intervention to Reduce Occupational
    Introduction Mental health is an under-recognized area in occupational health in India, although principles of occupational health and safety includes enhancement of mental well-being of workers. Tobacco and alcohol have higher prevalence rates among different occupational groups as compared to general population in India. Both lead to significant occupational harm in terms of absenteeism, injuries, sickness and lost productivity. Population Coal industry in India is one of the largest with a turnover of INR 80,000 crore (US$ 13 billion) and worker strength of approximately 3,60,000. However, regular consumption of tobacco and alcohol among workers in mining higher among occupational groups (almost 40%) increasing to almost 70% among workers with occupational injuries. In absolute terms, at least 1,10,000 workers in Indian coal mines are prone to adverse consequences of harmful substance use. Study Site & Participants Coal mine workers engaged in mining activities (skilled/semi-skilled/unskilled) ≥ 18 years of age of either sex are recruited from the Raniganj – Asansol coal mining areas of Eastern Coalfields Ltd. (ECL). During the initial phase of the study workers from Nimcha coal mine area, Satgram area and Ningha coal mine area are screened. All study procedures are community or primary care based. Objectives ASSIST screening to identify patterns of tobacco, alcohol and cannabis use among coal mine workers. Brief intervention as secondary prevention among “hazardous and harmful” users. Brief intervention along with referral
    [Show full text]
  • Impact of Coal Mining on Environment: a Study of Raniganj and Jharia Coal Field in India Sribas Goswami1
    Impact of Coal Mining on Environment: A Study of Raniganj and Jharia Coal Field in India Sribas Goswami1 Abstract Coal mining adversely affects the eco-system as a whole. On the unstable earth; the unresting mankind constantly uses a variety of resources for their daily lives. Coal is recognized to have been the main source of energy in India for many decades and contributes to nearly 27% of the world’s commercial energy requirement. Coal is mainly mined using two methods – surface or ‘opencast’ and underground mining. The geological condition determines the method of mining. Coal mining is usually associated with the degradation of natural resources and the destruction of habitat. This causes invasive species to occupy the area, thus posing a threat to biodiversity. Huge quantities of waste material are produced by several mining activities in the coal mining region. If proper care is not taken for waste disposal, mining will degrade the surrounding environment. The method of waste disposal affects land, water and air and in turns the quality of life of the people in the adjacent areas. This paper throws light on the burning issues of coal mines and its impact on the environment. Keywords: coal mining, development, displacement, explosive, pollution Introduction: Mining activity puts tremendous pressure on local flora and fauna, particularly where division of forest land for mining takes place. The effect of mining on ground water level, silting of surrounding water bodies and land are also of great concern. Coal mining contributes greatly towards the economic development of the nation, although it also has a great impact upon human health.
    [Show full text]
  • Exploration Strategy for Hot Springs Associated with Gondwana Coalfields in India
    Proceedings World Geothermal Congress 2010 Bali, Indonesia, 25-29 April 2010 Exploration Strategy for Hot Springs Associated with Gondwana Coalfields in India P.B. Sarolkar Geological Survey of India, Seminary Hills, Nagpur [email protected] Keywords: Strategy, Gondwana Coalfield, Geothermal, 2. GONDWANA BASINS IN INDIA Hotsprings The Gondwana basins of Peninsular India are restricted to the eastern and central parts of country and are dispersed in ABSTRACT linear belts along major river valleys, including the Damodar The Gondwana coalfields in India are a warehouse of fossil Koel, Son-Mahanadi, Narmada (Satpura area) and Pranhita- fuel energy sources. The coal bearing formations are Godavari basins. The present day basins are likely to be the deposited in deep subsiding basinal structures confined to faulted and eroded remnants of past ones (Dy. Director half-grabens. The Talchir, Barakar, Barren Measures and General, 2007). The Gondwana Coalfields in India are Raniganj formations were deposited in this subsiding basin scattered in the states of West Bengal, Jharkhand, Bihar, with basement rocks separated by faulted margins. The Chhattisgarh, Madhya Pradesh, Maharashtra and Andhra contact of Gondwana rocks with the basement is marked by Pradesh. The important coal fields are shown in Figure 1. faulted margins, while the downthrown side represents a basin of deposition where a huge pile of sediments were All these coalfields have basements with faulted margins, deposited. The cumulative thickness of the sedimentary pile along which Gondwana sedimentation took place. The in the basins varies from 1200 m to 3000 m, depending on Gondwana supergroup of formations hosts coal, coal bed the Gondwana formations deposited.
    [Show full text]
  • Coalmine Methane Under Indian Mining Scenario
    Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations.
    [Show full text]
  • Eastern Coalfields Limited (A Subsidiary of Coal India Ltd.)
    HALF YEARLY ENVIRONMENT CLEARANCE COMPLIANCE REPORT OF CLUSTER 11 J-11015/245/2011-IA.II(M) FOR THE PERIOD OF OCTOBER 2018 TO MARCH 2019 Eastern Coalfields Limited (A subsidiary of Coal India Ltd.) Half Yearly EC Compliance report in respect of mines Area (Cluster 11), ECL Period:- October 2018 to March 2019 Specific Conditions Condition no.(i) The Maximum production from the mine at any given time shall not exceed the limit as prescribed in the EC. Compliance Kenda - Complied S.No Name of Mines Peak EC Production from(Oct ’18 to Capacity March ’19) (MTPA) (MT) 1 Krishnanagar 0.05 Temporarily closed. (U/G) 2 Haripur Group 2.30 0.565458 of Mines A Haripur(U/G + 0.75 Haripur UG is Temporarily OC ) closed & OCP Not yet started. B CBI(U/G) 0.10 0.029889 C Chora 7,9 & 10 0.15 0.07793 pit(U/G) D Bonbahal OC 0.5 0.102754 Patch(OCP) E Shankarpur/CL 0.8 0.354885 Jambad OC Patch/Mine(52 Ha) 3 New Kenda 2.00 0.119282 Group of Mines A New Kenda (UG) 0.05 0.015802 B West Kenda OC 0.75 Not yet started. Patch/Mines C New Kenda OC 1.2 0.10348 mine(240 Ha) 4 Bahula Group of 0.45 0.146471 Mines A Lower 0.15 0.035949 Kenda(U/G) B Bahula (U/G) 0.25 0.085078 C CL Jambad 0.05 0.025444 (U/G) 5 Siduli(U/G +OC) 1.2 0.054887, OCP not yet started.
    [Show full text]
  • Master Plan for Dealing with Fire, Subsidence and Rehabilitation in the Leasehold of Bccl
    STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The Information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government BHARAT COKING COAL LIMITED MASTER PLAN FOR DEALING WITH FIRE, SUBSIDENCE AND REHABILITATION IN THE LEASEHOLD OF BCCL UPDATED MARCH’ 2008. CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD REGIONAL INSTITUTE – 2 DHANBAD - 1 - C O N T E N T SL PARTICULARS PAGE NO. NO. SUMMARISED DATA 4 1 INTRODUCTION 11 2 BRIEF OF MASTER PLAN ‘1999 16 3 BRIEF OF MASTER PLAN ‘2004 16 CHRONOLOGICAL EVENTS AND NECESSITY OF 4 17 REVISION OF MASTER PLAN 5 SCOPE OF WORK OF MASTER PLAN 2006 19 MASTER PLAN FOR DEALING WITH FIRE 6 21 MASTER PLAN FOR REHABILITATION OF 7 UNCONTROLLABLE SUBSIDENCE PRONE 49 INHABITATED AREAS 8 DIVERSION OF RAILS & ROADS 77 9 TOTAL INDICATIVE FUND REQUIREMENT 81 10 SOURCE OF FUNDING 82 ` - 2 - LIST OF PLATES SL. PLATE PARTICULARS NO. NO. 1 LOCATION OF JHARIA COALFIELD 1 2 COLLIERY WISE TENTATIVE LOCATIONS OF FIRE AREAS 2 3 PLAN SHOWING UNSTABLE UNCONTROLLABLE SITES 3 4 LOCATION OF PROPOSED RESETTLEMENT SITES 4 5 PROPOSED DIVERSION OF RAIL AND ROADS 5 - 3 - SUMMARISED DATA - 4 - SUMMARISED DATA SL PARTICULARS MASTER PLAN’04 MASTER PLAN’06 MASTER PLAN’08 NO A Dealing with fire 1 Total nos. of fires 70 70 70 identified at the time of nationalisation 2 Additional fires identified 6 7 7 after nationalisation 3 No. of fires extinguished 10 10 10 till date 4 Total no.
    [Show full text]