Sl No Area Colliery Name Designation EIS No Mobile No EMAIL ID
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
LIST of REPORTS SENT to the SPONSORER from 1ST JANUARY, 2016 to 14Th JULY, 2021
LIST OF REPORTS SENT TO THE SPONSORER FROM 1ST JANUARY, 2016 TO 14th JULY, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”. -
Sl. No. Application Sl. No. Name of the Candidates and Father's JHARIA
JHARIA REHABILITATION AND DEVELOPMENT AUTHORITY List of Eligible Candidates for the post of Computer Operator Sl. Application Sl. Name of the No. No. candidates and Father's Sanjeev Kumar S/o Ramashish Yadav 1 173 B-11/94 Karmik Nagar, PO-ISM Campus, Dhanbad-826004 Manoj Kumar S/o HiralalAt-Loharkulhi 2 100 Post-Saraidhela, Dhanbad-828127 Shambhu Gupta S/o Nand Kishor Sahu 3 113 Gr-153, Gola Road Opp.-UCO Bank Ramgarh-829122 Ranglal Mandal S/o Subal Chandra Mandal 4 41 Qr. No.-A1/301, Koyla Nagar, Dhanbad Ajay Kumar S/o Krishna Sahu 5 17 Qr. No.-F-7B ACC Colony, Sindri, Dhanbad Neeraj Kumar Vishwakarma S/o Umashankar Vishwakarma 6 260 At-Bhuda C/o Gayatri Studio Rani Road, Dist.-Dhanbad PIN- 826001 Vikash Kumar S/o Kameshwar Pd. Singh 7 114 Gali No-10, Jai Prakash Nagar, Dhanbad PIN-826001 Rajat Kr. Singh S/o Akhilesh Singh 8 92 At-Bishanpur, Rajput Tola, Post-Mansahi, Distt.-Katihar (Bihar) PIN-854103 Md. Kadir Ansari S/o Md. Farid Ansari 9 101 At-Kanchandih, Post-Mugma Dhanbad-828204 Santosh Kr. Mandal S/o Ajit Kr. Mandal 10 103 At+Post-Mahuli, Distt-Darbhanga Bihar Pin-847201 Deepak Kumar S/o Gallu Mahto 11 74 At+Post-Badgaon Distt.-Ramgarh Jharkhand PIN-829134 Md Faiyaz Ansari S/o Muslim Ansari Shamsher Nagar, Near Quality bakery, Post-B.Polytechnic, 12 267 Dhanbd-828130 Sonali Saha D/o Lt. Shankar Kr. Saha 13 224 Telipara Kali Mandir , Masterpara Hirapur Dhanbad Kumari Janki Mahto D/o Kalipada Mahto 14 277 At-Baghmara, Post-Baliapur, dist.-Dhanbad PIN-828201 Shahjadi Khatoon D/o Md. -
Is the Head of the Administration of Our BCCL. Admini
ADMINISTRATION DEPARTMENT Director (Personnel) is the head of the Administration of our BCCL. Administration Department BCCL(HQ) successfully and smoothly functioning in the right direction and are always ready to undertake any type of challenging job for the Company as a whole and to develop image of the Company. Important activities of the Administration Department: (1) Koyla Bhawan Administration Activity : 1. Central Despatch 2. Central Store 3. Maintenance, repairing of office furniture /equipment new procurement. 4. Sanitation / Cleanliness 5. Gardening and beautification of land scap of Koyla Bhawan Complex (2) Koyla Bhawan Civil Deptt. : Maintenance of whole Building, Water Supply and Civil Jobs. (3) KNTA & JNTA, KARMIK NAGAR, EXEX----CBCBCBCB Colony a. Revenue Collection b. Within boundary Estate matter c. Maintenance of township . d. Transit Hostel e. Four Nos. Golambers maintenance and Gardening. i. Subhash Chowk ii. Ambedkar Chowk iii. Saheed Chowk iv. Rajiv Gandhi Chowk (4) BTA : Maintenance and repairing of Bhuli Township consisting of 6011 nos. of quarters (biggest workers colony of Asia) including water supply & electricity. (5) BCCL PRESS : Printing Jobs. (6) Guest House's/Transit Hostels : Maintenance and supervision of KNGH, JNGH, Expert Hostel & Executive Hostel. (7)CAW & CTP : 1. Departmental Vehicles, Repairing and Maintenance 2. Procurement & tender processing of LCV,TATA 407 for CISF & buses for school duty & CISF. (8) Regional Hospital, Bhuli ::: 1. 20 Bed Hospital, 2. PME 3. Outdoor function 4. Family welfare camp INFORMATION ON GUEST HOUSE OF HEAD QUARTER Sl. Name of Guest House Appx.Distance from Appx. Distance from Dhanbad Rail Station Dhanbad Bus Station No. 1. Jagjiwan Nagar Guest House 5 KM 5 KM 2. -
Coalmine Methane Under Indian Mining Scenario
Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations. -
Master Plan for Dealing with Fire, Subsidence and Rehabilitation in the Leasehold of Bccl
STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The Information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government BHARAT COKING COAL LIMITED MASTER PLAN FOR DEALING WITH FIRE, SUBSIDENCE AND REHABILITATION IN THE LEASEHOLD OF BCCL UPDATED MARCH’ 2008. CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD REGIONAL INSTITUTE – 2 DHANBAD - 1 - C O N T E N T SL PARTICULARS PAGE NO. NO. SUMMARISED DATA 4 1 INTRODUCTION 11 2 BRIEF OF MASTER PLAN ‘1999 16 3 BRIEF OF MASTER PLAN ‘2004 16 CHRONOLOGICAL EVENTS AND NECESSITY OF 4 17 REVISION OF MASTER PLAN 5 SCOPE OF WORK OF MASTER PLAN 2006 19 MASTER PLAN FOR DEALING WITH FIRE 6 21 MASTER PLAN FOR REHABILITATION OF 7 UNCONTROLLABLE SUBSIDENCE PRONE 49 INHABITATED AREAS 8 DIVERSION OF RAILS & ROADS 77 9 TOTAL INDICATIVE FUND REQUIREMENT 81 10 SOURCE OF FUNDING 82 ` - 2 - LIST OF PLATES SL. PLATE PARTICULARS NO. NO. 1 LOCATION OF JHARIA COALFIELD 1 2 COLLIERY WISE TENTATIVE LOCATIONS OF FIRE AREAS 2 3 PLAN SHOWING UNSTABLE UNCONTROLLABLE SITES 3 4 LOCATION OF PROPOSED RESETTLEMENT SITES 4 5 PROPOSED DIVERSION OF RAIL AND ROADS 5 - 3 - SUMMARISED DATA - 4 - SUMMARISED DATA SL PARTICULARS MASTER PLAN’04 MASTER PLAN’06 MASTER PLAN’08 NO A Dealing with fire 1 Total nos. of fires 70 70 70 identified at the time of nationalisation 2 Additional fires identified 6 7 7 after nationalisation 3 No. of fires extinguished 10 10 10 till date 4 Total no. -
Official Gazette Government Of· Gqa,Daman and Diu
:Panafr; l1tllNovemher, 1971 IKartika 20. 1893) ··SERIESI·No,-3l ! :~ i I I i OFFICIAL GAZETTE GOVERNMENT OF· GQA,DAMAN AND DIU -OJ 0 GOVERNMENT OF GOA, DAMAN ,.,' Prqvidi,q tliat, AND DIU (~)tlJe maximuni<;lge limit specified in the Schedule in' resp<!ct of .direct recruitm~nt Special Departmem may be relaxed i~ the case of' candid~tes \ belonging to the Scheduled Castes and Sche Notification duled Tribes and' other 3pecial categories in OSD/RRVS/19/,Ta accordance with the orders issued by the In exercise of the powers conferred by the proviso Central Government from time to time; and to Article 309 of the Constitution, read with the (b) no lIIaie candidate, who has more than one Government of' India, Ministry of Home· Affairs wife living and no female candidate, who Notification No. F.1/29/68-GP dated the 29th June bas married a person having already a wife 1968, the Administrator of Goa, Daman and Diu is living, shall be eligible for appoitltm~nt, pleased to make the .foHowing rules regulating ·the . unless the Government, after having been Recruitment of persons to Class I postg:in·the River satisfied that there are special grounds for Navigation Department under the Government of doing so,exempts any such CMldidate from Goa, Daman and Diu. the operation of this rule. 1. Short title. - These rules may be, called Goa o. Power. to relax, _ Where the Administrator is Administration, Ports .officer, Class I Gazetted pos,t of the opinion that it is necessary or expedient SO Recruitment Rules, 1971. to do, he may, by order, for reasons to he recorded in writing and in consultation with the Union Public 2. -
Government. of Goa, Daman and Diu -,OFFICIAL GAZETTE
Panaji, 5th October, 1972 IAsvina 13, 1894) SERIES I No. 21 ,OFFICIAL GAZETTE GOVERNMENT. OF GOA, DAMAN AND DIU Section,;; GOVERNMENT OF GOA, DAMAN 15. Duty of persons in charge of management of coking coal mines or coke oven plants to deliver all assets, AND DIU etc. 16. Accounts and audit. law and Judicial Department CHAPTER V Provisions relating to employees of coking coal Notification mines and coke oven pla~ts 17. Employment of certain employees to continue. LDj3537/72 18. Provident fund. The Coking Coal Mines (Nationaiisation) Act, 1972 19. Superannuation, welfare and other funds. (36 of 1972), which was recently passed by Parlia ment and assented to by the President of India is CHAPTER VI hereby published for the general information of the Commissioner of Payments public. 20. Commissioner of Payments to be apPOinted. 21. Payment by the Central Government to the CommisM ld. S. Borkar, Under Secretary (Law). sioner. 22. Statement of "accounts in relation to the period of Panaji, 22nd September, 1972. m~nage~ent by the Central Government, etc. 23. Claims to be made to the CommiS$ioner. 24. Disbursement of money by the Cqmmissioner. 25. Amounts advanced by the Central Government how The Coking Coal Mines (Nationalisatwnl ~Act. 1972 to be recovered. ~6. Disputes how to be dealt with. 27. Undisbursed Of unclaimed amountf? to be deposited to ARRANGEMENT OF SECTIONS the general revenue account. CHAPTER VII CHAPTER I Miscellaneous Preliminary 28. Effect of Act on other laws. SectiOll.l 29. Contracts cease to have effect unless ratified by the 1. Short title and commencement. -
LIST of REPORTS SENT to the SPONSORER from 1St JANUARY, 2016 to MARCH, 2021
LIST OF REPORTS SENT TO THE SPONSORER FROM 1st JANUARY, 2016 TO MARCH, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”. -
CENTRAL INFORMATION COMMISSION August Kranti Bhawan, Bhikaji Cama Place, New Delhi-110066
CENTRAL INFORMATION COMMISSION August Kranti Bhawan, Bhikaji Cama Place, New Delhi-110066 F. No.CIC/SS/A/2013/001232 Date of Hearing : 27.06.2017 Date of Decision : 27.06.2017 Appellant/Complainant : Shri Madan Prasad Singh Respondent : Sr Manager-Personnel/Lodna-10 Bharat Coking Coal Limited Through: Sh. Pramod Kumar -PIO Information Commissioner : Shri Yashovardhan Azad Relevant facts emerging from appeal: RTI application filed on : 11.02.2017 PIO replied on : - First Appeal filed on : 13.04.2012 First Appellate Order on : - 2nd Appeal/complaint received on : 17.04.2013 Information sought and background of the case: Vide RTI application dated 11.02.2017, the appellant sought copy of the work order vide which construction of water tank and connections of water tape connections, for the use of the habitants or residing the surroundings of old Jealgora Hospital was required. The CPIO/Senior Manager(P)I/C transferred the RTI application to Subordinate Engineer (Civil) Lodna Area and Engineering Asstt. (Civil) vide letter dated 14/16.03.2012. Having not received any information from PIO, the appellant filed first appeal. The FAA did not adjudicate in the matter. Feeling aggrieved, the appellant approached the Commission. Relevant facts emerging during hearing: Both parties are present during the hearing. The appellant has submitted that he received information sought after filing of the instant appeal and is satisfied with the same. The Respondent had nothing further to add. Decision: In view of the submissions of the parties and perusal of record, the Commission finds that there is no further cause of action to be adjudicated in this case. -
Bharat Coking Coal Limited Sijua Area Ref
Bharat Coking Coal Limited Sijua Area Ref. No. GM/SA/CIVIL/ 397/2013 Dated 31.01/01.02 .2013 OPEN TENDER NOTICE Sealed tenders on percentage basis in two bids system (Tech./Com.Bid and Price Bid) are hereby invited from bonafide experienced eligible contractors for the under mentioned works:- ---------------------------------------------------------------------------------------------------------------------------------- Sl. Name of work & Estimated Earnest Cost of Time of No. Location cost money tender paper completion 1. Repair & maintenance of Qtr. no.121 to 124 occupied by Ramgopal Singh Shifting from Tetulmari fire area to Nichitpur township. `33,868=23 `339=00 `100=00 15 Days 2. Distempering w/washing, painting ‘D’ type bunglow newly allotted to Project Officer Nichitpur colliery. `45,569=40 `456=00 `100=00 20 Days 3. Repair & maintenance Qtr. no. B-40,44 & 47 at ‘B’ type campus of Nichitpur townmship. `34,563=10 `346=00 `100=00 15 Days 4. Repair & maintenance of Qtr. no. A/269,B/4,2,2/5 total 4 units Qtr. of Nichitpur colliery employee. `71,191=83 `722=00 `100=00 20 Days 5. Repair & maintenance of Qtr. no. SQ-86 at Sijua Area (Shifting of CISF company commander of area-V) under Sijua Area. `31,595=45 `316=00 `100=00 15 Days 6. White washing, colour washing & misc. work of Tetulmari OCP, store room, boundary wall etc. `71,080=75 `711=00 `100=00 20 Days 7. Repairing of drain for Qtr. of Sri Pramod Battra to Basudew Chouhan centre at ‘O’ seam of Tetulmari colliery. `69,068=85 `691=00 `100=00 -do- 8. -
Ranchi December 2015
Jharkhand State Electricity Regulatory Commission Provisional Tariff Order on Review of ARR for FY 2013-14 (6 th January 2014 to 31 st March 2014) & FY 2014-15 and ARR and Transmission Tariff for FY 2015-16 for Jharkhand Urja Sancharan Nigam Ltd (JUSNL) Ranchi December 2015 Review of ARR for FY 2013-14 and FY 2014-15; ARR & Tariff Determination for FY16 TABLE OF CONTENTS A1: INTRODUCTION ......................................................................................................................................... 6 JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION (JSERC) ....................................................................... 6 THE PETITIONER - JHARKHAND URJA SANCHARAN NIGAM LTD .................................................................................... 8 THE PETITIONER ’S PRAYERS .......................................................................................................................................... 9 SCOPE OF THE ORDER ..................................................................................................................................................... 9 A2: PROCEDURAL BACKGROUND ............................................................................................................. 11 INFORMATION GAPS IN THE PETITION .......................................................................................................................... 12 INVITING PUBLIC COMMENTS / SUGGESTIONS .............................................................................................................. -
Government of Jharkhand Office of the Accountant General (Audit)
Annual Technical Inspection Report on Local Bodies for the year ended 31 March 2016 Government of Jharkhand Office of the Accountant General (Audit), Jharkhand, Ranchi TABLE OF CONTENTS Reference to Paragraph Page Preface v Overview vii PART – A CHAPTER – I AN OVERVIEW OF THE FUNCTIONING, ACCOUNTABILITY MECHANISM AND FINANCIAL REPORTING ISSUES OF PANCHAYATI RAJ INSTITUTIONS Introduction 1.1 1 Organisational setup of Panchayati Raj Institutions 1.2 2 Functioning of Panchayati Raj Institutions 1.3 3 Formation of various committees 1.4 4 Audit arrangement 1.5 5 Response to Audit Observations 1.6 6 Ombudsman 1.7 7 Social Audit 1.8 7 Submission of Utilisation Certificates 1.9 8 Internal Audit and Internal Control System of Panchayati Raj 1.10 8 Institutions Financial Reporting Issues 1.11 8 CHAPTER – II COMPLIANCE AUDIT – PANCHAYATI RAJ INSTITUTIONS RURAL DEVELOPMENT DEPARTMENT (PANCHAYATI RAJ) Audit on Construction activities by the Panchayati Raj Institutions in 2.1 15 the State of Jharkhand PART – B CHAPTER – III AN OVERVIEW OF THE FUNCTIONING, ACCOUNTABILITY MECHANISM AND FINANCIAL REPORTING ISSUES OF URBAN LOCAL BODIES Introduction 3.1 37 Orgnisational setup of Urban Local Bodies 3.2 37 Functioning of Urban Local Bodies 3.3 39 Formation of various committees 3.4 41 Audit arrangement 3.5 42 Response to Audit Observations 3.6 43 Ombudsman 3.7 44 Social Audit 3.8 44 Submission of Utilisation Certificates 3.12 45 Internal Audit and Internal Control System of Urban Local Bodies 3.13 45 Financial Reporting Issues 3.14 46 CHAPTER – IV PERFORMANCE