Reports on Applications PLANNING APPLICATION: 14/01087/EIA In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports on Applications THE PROPOSAL Application for planning permission (as amended) for a wind farm with 6 turbines and associated ancillary infrastructure. Six (6) variable speed, 3-bladed turbines are proposed, each to be finished in a semi-matt grey colour (details to be agreed). Each turbine is 126.5m high (to blade tip) (80m hub height, 93m rotor diameter) with the proposed (candidate) turbine model (Seimens SWT-2.3-93) having a maximum rated capacity of 2.3MW, or 13.8MW for the total development. (Final turbine choice subject to procurement process but submission based on "worse case" scenario using the identified turbine parameters). For each turbine, a transformer and switchgear unit is required. Dependent on turbine choice, transformer to be located inside or outside of the turbine (and if the latter, a 5 x 3 x 3m kiosk is assumed (no details included). Each turbine to be located on reinforced concrete foundations, approx. 21m in diameter and 3 - 4m deep dependent on bedrock depth. A crane pad, approx. 40 x 22m and separate assembly area approx. 40 x 15m are proposed alongside each turbine, formed by an aggregate material surface laid over a geotextile membrane or similar. 1 permanent anemometer mast to be erected (to north-west of turbine 6), 80m high and of steel lattice construction set on a reinforced concrete foundation. 1 temporary anemometer mast to be erected (to west of turbine 5), 80 m high and of single pole construction with support guy wires. Substation compound with control building to be located adjacent to access track and north of existing overhead power lines. Compound area, approx. 55 x 25m to be enclosed by 3m high security fencing. Control building, approx. 25 x 7.5 x 6m (max) to include electrical plant, telecommunications equipment, staff welfare and parking facilities, etc. External switchgear equipment may also be located within the compound (design details to be agreed). Temporary construction compound, approx. 100 x 100m with aggregate surface laid over a geotextile membrane to be located approx. midway between site access and turbine 6, to include site offices, staff welfare accommodation, storage and laydown areas for construction vehicles, equipment and materials, oil and fuel storage, aggregate recycling and concrete batching facilities, etc. Turbines to connect to national grid network via underground cabling to substation and thereafter, to the existing Dallas substation. New up-graded junction to be formed at site entrance onto B9010. Approx. 6.6km of access track to be provided (approx. 1.4km of up-graded track and 5km of new access track) with approx. 5.5m wide with 45 x 5m passing places provided at regular intervals and formed using crushed stone (sourced from on-site borrow pits or locally, if shortfall in material). Tracks routed to avoid areas of deeper peat or ground instability, but "floating tracks" may be required (subject to pre- construction ground investigations). Approx, "j"-shaped track layout connects all turbines and the permanent wind mast, off which two spurs lead to turbines 2 and 4, and 5 respectively. Proposed drainage system to include SUDS with swales and cross drains for access tracks and settlement lagoons adjacent to turbine pads and watercourses. 2 existing watercourse crossings to be up-graded and 5 new crossings to be constructed (design details to be agreed). 2 borrow pits proposed within the site, to provide majority of aggregate materials required together with on-site use of mechanical plant to crush rock. One borrow pit (BP01, to south-east of turbine 1) is approx. 73 x 70 x 2m deep and the other pit (BP02, to north of turbine 4 and 5) is approx. 185 x 84 x 2m deep (detailed specifications including re-instatement to be agreed). Construction hours to be within 07:00 - 19:00 hrs, Mondays - Fridays, and 07:00 - 13:00 hours, Saturdays and no Sunday/Public Holiday working. Any working outwith stated hours to be with prior agreement. A micro-siting tolerance of 50m is sought for turbine locations and access tracks to accommodate design modifications due to unforeseen ground conditions. Construction phase expected to last approx. 18 months after which all temporary facilities removed but crane pads and access tracks to remain during operation of wind farm (for maintenance and/or replacement of turbine components). Development to have 25 year operational life and thereafter decommissioned in accordance with a restoration and decommissioning plan (details to be agreed). With a total generating capacity of 13.8MW, the development will contribute to national renewable energy targets, producing approx. 33.7GWh of electricity per year, equivalent to an average electricity consumption of over 8,088 homes, with a potential energy saving of 520,849 tonnes of carbon dioxide emissions over 25 years, equivalent to emissions from electricity from fossil fuel mix to approx. 7,127 homes. During the construction phase, temporary workforce of approx. 20 people will be employed (equivalent to 2 full-time equivalents) and during operation, job opportunities reduce with only irregular maintenance and repair visits required. Application accompanied by various supporting documents including Environmental Statement (ES) (5 volumes, including Non-Technical Summary); Addendum to Environmental Statement (November 2014) (Addendum I, 9 turbines); Addendum to Environmental Statement (March 2015) (Addendum II, 6 turbines); Planning Statement (PS); Design and Access Statement (DAS); and Pre-application Consultation report (PAC). A Construction Method Statement is also included (subject to review). THE SITE Approx. 510ha site with all turbines located in the southern part of the site, on and between the side slopes of Meikle Hill (288 mAOD) to the west and Mill Buie (342 mAOD) to the east. Turbines located between approx. 245 and 270 mAOD (turbine 2 and 6 respectively). Turbine 1 is the southernmost turbine located close to the southern boundary, defined by a Right of Way and woodland which also extend along part of the eastern boundary. Turbine 6 and 5 are most northerly and westerly located turbines respectively. The topography across the area of the turbines is gently sloping. The most elevated (southern) part of the site comprises mainly upland moorland with some forestry plantation to the north-west on Meikle Hill and Hillockhead (235 mAOD), the latter forming a backdrop to Dallas. To the north/north west, the land slopes down towards Dallas and to agricultural land extending along the River Lossie valley and the B9010 road located along the northern boundary of the site. Beyond the site to the south and west there is a mix of agricultural and wooded land. To the south and east the land cover is moorland and forestry, on which the existing 40-turbine Rothes I and II wind farm development [the Rothes development] is located immediately to the south-east of the site. The nearest settlements, Dallas and Kellas are approx. 2km distant from the site boundary, with Elgin and Forres approx. 13.5km and 13km to the north east and north west respectively. Individual properties and farmsteads are located around the outer margins of the site including Blackhills, Park and Tombeck to the north, Scottlackleys and Ballachcraggan to the south west, and Aultahuish to the south. Water courses including Back Stripe and Cold Burn etc drain the site towards the River Lossie to the north. The B9010 road bounds the site to the north and the minor Dallas - Kellas road forms part of the western boundary of the site. An existing access onto the B9010 and access track leading to Blackhills will be up- graded and used for access to the site, including construction traffic. South of Blackhills, a new section of access track will be formed across agricultural land and moorland to/from the turbines. The proposal is not located within any national or local landscape designation nor within any international or national cultural heritage or nature conservation designation although the Pluscarden Area of Great Landscape Value (AGLV) and the Kellas Oakwood SSSI are located to the north and outwith the site. The site lies within a local (non-statutory) environmental designation, the Moss of Birnie Site of Interest to Natural Science (SINS) and there are archaeological interests within the site. For renewable energy policy purposes and as amended, all 6 turbines are located within an Area of Search and within the Upland Moorland and Forestry Landscape Character Area/Type (see below). HISTORY 12/02125/APP - Erect 80m high wind measurement mast at Meikle Hill - granted 7 February 2013 for limited period expiring 31 January 2018. 13/00867/SCO - Comments issued (5 July 2013) from the Moray Council in response to formal Scoping Opinion submitted to Scottish Ministers for a proposed Section 36 (S.36) application to erect 26 wind turbines at a maximum height of 126.5m to blade tip at Meikle Hill. The Scoping Opinion, issued by Scottish Ministers (23 September 2013), includes the comments made by the Moray Council. (Note: this S.36 application was not progressed). 13/00987/PAN - Proposal of Application Notice (PAN) for erection of up to 26 turbines and associated infrastructure for wind farm development at Meikle Hill - response (5 June 2013) identifies requirements for consultation with the local community based upon the 'hypothetical' consideration of a proposed S.36 application being submitted to and determined by the Moray Council. 13/01181/PAN - Proposal of Application Notice (PAN) for erection of up to 26 turbines and associated infrastructure for wind farm development at Meikle Hill - response (8 July 2013) confirms requirements for consultation with the local community based upon the 'hypothetical' consideration of a proposed S.36 application being submitted to and determined by the Moray Council.
Recommended publications
  • Lhanbryde Primary School Nursery Day Care of Children
    Lhanbryde Primary School Nursery Day Care of Children Garmouth Road Lhanbryde Elgin IV30 8PD Telephone: 01343 843778 Type of inspection: Unannounced Completed on: 4 March 2020 Service provided by: Service provider number: The Moray Council SP2003001892 Service no: CS2003016376 Inspection report About the service This service has been registered since 2002. Lhanbryde Primary School Nursery is registered to provide a care service to a maximum of 35 children at any one time aged from three years to those not yet attending primary school. The service operates from its own premises adjoining the primary school building; it has its own secure play area that is directly accessible from the play room. The service also has use of the adjacent school grounds. We check services are meeting the principles of Getting it Right for Every Child (also known as GIRFEC, Scotland's national approach to improving outcomes and wellbeing for children by offering the right help at the right time from the right people. It supports them and their parent(s) to work with the services that can help them. There are eight wellbeing indicators at the heart of GIRFEC, safe, healthy, achieving, nurtured, active, respected, responsible and included (also known as SHANARRI). What people told us There was a total of 28 children present during the inspection, although numbers fluctuated during the day due to the nature of the service provided. We saw that the children were relaxed, happy and assured. They appeared confident in their play, at times being engaged in play on their own, in pairs or small groups.
    [Show full text]
  • Of 5 Polling District Polling District Name Polling Place Polling Place Local Government Ward Scottish Parliamentary Cons
    Polling Polling District Local Government Scottish Parliamentary Polling Place Polling Place District Name Ward Constituency Houldsworth Institute, MM0101 Dallas Houldsworth Institute 1 - Speyside Glenlivet Moray Dallas, Forres, IV36 2SA Grant Community Centre, MM0102 Rothes Grant Community Centre 1 - Speyside Glenlivet Moray 46 - 48 New Street, Rothes, AB38 7BJ Boharm Village Hall, MM0103 Boharm Boharm Village Hall 1 - Speyside Glenlivet Moray Mulben, Keith, AB56 6YH Margach Hall, MM0104 Knockando Margach Hall 1 - Speyside Glenlivet Moray Knockando, Aberlour, AB38 7RX Archiestown Hall, MM0105 Archiestown Archiestown Hall 1 - Speyside Glenlivet Moray The Square, Archiestown, AB38 7QX Craigellachie Village Hall, MM0106 Craigellachie Craigellachie Village Hall 1 - Speyside Glenlivet Moray John Street, Craigellachie, AB38 9SW Drummuir Village Hall, MM0107 Drummuir Drummuir Village Hall 1 - Speyside Glenlivet Moray Drummuir, Keith, AB55 5JE Fleming Hall, MM0108 Aberlour Fleming Hall 1 - Speyside Glenlivet Moray Queens Road, Aberlour, AB38 9PR Mortlach Memorial Hall, MM0109 Dufftown & Cabrach Mortlach Memorial Hall 1 - Speyside Glenlivet Moray Albert Place, Dufftown, AB55 4AY Glenlivet Public Hall, MM0110 Glenlivet Glenlivet Public Hall 1 - Speyside Glenlivet Moray Glenlivet, Ballindalloch, AB37 9EJ Richmond Memorial Hall, MM0111 Tomintoul Richmond Memorial Hall 1 - Speyside Glenlivet Moray Tomnabat Lane, Tomintoul, Ballindalloch, AB37 9EZ McBoyle Hall, BM0201 Portknockie McBoyle Hall 2 - Keith and Cullen Banffshire and Buchan Coast Seafield
    [Show full text]
  • Ronnie's Cabs
    transport guide FOREWORD The Moray Forum is a constituted voluntary organisation that was established to provide a direct link between the Area Forums and the Moray Community Planning Partnership. The Forum is made up of two representatives of each of the Area Forums and meets on a regular basis. Further information about The Moray Forum is available on: www.yourmoray.org.uk Area Forums are recognised by the Moray Community Planning Partnership as an important means of engaging local people in the Community Planning process. In rural areas - such as Moray - transport is a major consideration, so in September 2011 the Moray Forum held its first transport seminar to look at the issues and concerns that affect our local communities in respect of access to transport. Two actions that came from that event was the establishment of a Passenger Forum and a Transport Providers Network. This work was taken forward by the Moray Forum Transport Working Group made up of representatives of the Area Forums, Moray Council, NHS Grampian, tsiMORAY, and community transport schemes. In September 2013 the Working Group repeated the seminar to see how much progress had been made on the actions and issues identified in 2011. As a direct result of the work of the Group this Directory has been produced in order to address an on-going concern that has been expressed of the lack of information on what transport is available in Moray, the criteria for accessing certain transport services, and where to go for further advice. The Moray Forum Transport Working Group would like to acknowledge the help of all the people who provided information for this Directory, and thereby made a contribution towards the integration of public, private and community transport services within Moray.
    [Show full text]
  • Secondary Rezoning
    Report by Education Scotland addressing educational aspects of the proposal by The Moray Council to vary the catchment areas of Forres Academy, Lossiemouth High School, Elgin Academy, Elgin High School and Milne’s High School. 1. Introduction 1.1 This report from Education Scotland has been prepared by HM Inspectors in accordance with the terms of the Schools (Consultation) (Scotland) Act 2010 and the amendments contained in the Children and Young People (Scotland) Act 2014. The purpose of the report is to provide an independent and impartial consideration of The Moray Council’s proposal to vary the catchment areas of Forres Academy, Lossiemouth High School, Elgin Academy, Elgin High School and Milne’s High School. Section 2 of the report sets out brief details of the consultation process. Section 3 of the report sets out HM Inspectors’ consideration of the educational aspects of the proposal, including significant views expressed by consultees. Section 4 summarises HM Inspectors’ overall view of the proposal. Upon receipt of this report, the Act requires the council to consider it and then prepare its final consultation report. The council’s final consultation report should include a copy of this report and must contain an explanation of how, in finalising the proposal, it has reviewed the initial proposal, including a summary of points raised during the consultation process and the council’s response to them. The council has to publish its final consultation report three weeks before it takes its final decision. Where a council is proposing to close a school, it needs to follow all legislative obligations set out in the 2010 Act, including notifying Ministers within six working days of making its final decision and explaining to consultees the opportunity they have to make representations to Ministers.
    [Show full text]
  • Service Elgin - Aberdeen 35 Daily (Not Bank Hols)
    Service Elgin - Aberdeen 35 Daily (not Bank Hols) Operated by: BB Stagecoach Bluebird Timetable valid from 19 Apr 2021 until further notice Service: 35 35 35 35 35 35 35 35 35 Notes: Day! Day! Day! Day! Day! Day! Day! Day! Day! Operator: BB BB BB BB BB BB BB BB BB Days: M-FX M-FX M-FX M-FX S M-FX M-FX S M-FX Elgin, Bus Station (Stance 2) Depart: .... .... .... .... .... .... .... .... .... Elgin, Pinefield Bus Depot .... .... .... .... .... .... .... .... .... Lhanbryde, The Terrace .... .... .... .... .... .... .... .... .... Fochabers, The Square .... .... .... .... .... .... .... .... .... Portgordon, Cross Lane .... .... .... .... .... .... .... .... .... Buckie, Shanks Lane Arrive: .... .... .... .... .... .... .... .... .... Buckie, Shanks Lane Depart: .... .... .... .... .... .... .... .... .... Findochty, Morven Crescent .... .... .... .... .... .... .... .... .... Portknockie, Admiralty Street .... .... .... .... .... .... .... .... .... Cullen, The Square .... .... .... .... .... .... 05:38 06:11 .... Portsoy, Seafield Street .... .... .... .... .... .... 05:48 06:21 .... Whitehills, Loch Lane .... .... .... .... .... .... 06:03 06:36 07:03 Banff, Banff Academy .... .... .... .... .... .... .... .... .... Banff, Low Street 04:19 04:49 05:19 05:49 05:49 .... 06:16 06:49 07:16 Macduff, Union Road Arrive: 04:24 04:54 05:24 05:54 05:54 .... 06:21 06:54 07:21 Macduff, Union Road Depart: 04:24 04:54 05:24 05:54 05:54 .... 06:24 06:54 07:24 Macduff, Barnhill Road 04:30 05:00 05:30 06:00 06:00 .... 06:30 07:00 07:30 Turriff, High Street Arrive: 04:48 05:18 05:48 06:18 06:18 .... 06:48 07:18 07:48 Turriff, High Street Depart: 04:50 05:20 05:50 06:20 06:20 .... 06:50 07:20 07:50 Fyvie, Cuminestown Road 05:05 05:35 06:05 06:35 06:35 .... 07:05 07:35 08:05 Oldmeldrum, The Square Arrive: 05:20 05:50 06:20 06:50 06:50 ...
    [Show full text]
  • Man in Moray
    10 0 I w! Fig.2.1 Moray. MANIN MORAY 5,000 years of history Ian Keillar Synopsis The extent of Moray is defined and the physical conditions briefly described. Traces of Mesolithic man have been found in the Culbin, and later Neolithic peoples found Moray an attractive place to settle. As metal working became established, trades routes followed and Moray flourished. As the climate deteriorated, so, apparently, did the political situation and defensive sites became necessary. The Romans came and went and the Picts rose and fell. The Vikings did not linger on these shores and MacBeth never met any witches near Forres. The Kings of Scots divided and ruled until they themselves set a pattern, which still continues, that if you want to get on you must go south to London. In distant Moray, brave men like Montrose and foolish men like Prince Charles Edward, fought for their rightful king. The Stuarts, however, ill rewarded their followers. Road makers and bridge builders half tamed the rivers, and the railways com­ pleted the process. With wars came boom years for the farmers, but even feather beds wear out and Moray is once more in apparent decline. However, all declines are relative and the old adage still has relevance: 'Speak wee] o the Hielans but live in the Laich.' Physical The name Moray is now applied to a local authority administrative District extending from west of Forres and the Findhorn to Cullen and stretching down in an irregular triangle into the highlands of the Cairngorms (Fig.2. l ). In Medieval times, Moray reached as far as Lochalsh on the west coast and there has always been some difficulty in defining the bound­ aries of the province.
    [Show full text]
  • The Counties of Nairnshire, Moray and Banffshire in the Bronze Age, Part
    The counties of Nairnshire, Moray and Banffshire Bronze inth e Age, Par* tII by lain C Walker INTRODUCTION dealinn I g wit bronzee hth s from these three countie traditionae sth l term Earlyf so , Middle, Latd an e Bronz have eAg e been used, though adapte prehistore th aree o dt th outlines aa f yo d thin i s paper span. A Brieflyperioe EB sth e dth , betwee introductioe nth d en e bronzf no th d ean of trade connections betwee aree Ireland nth aan Scandinaviad dan LBe th ; Amarkes i e th y db reappearance of contacts via the Great Glen with Ireland; and the MBA is the intervening period. Metallurgical analyses for Scottish Bronze Age material are in progress and their results, when integrated wit Europeae hth n evidence, necessitaty 1ma emajoa r reappraisa origine th f o ls r metallurgyoou f . However, pendin availabilite gth f thiyo s evidence, this study doe t consno - sider the ore groups found by recent analyses.2 BACKGROUND Hawkes,3 elaborating on the work of Coghlan and Case,4 has suggested that 'Classic' bell beaker folk from the Middle Rhine, arriving in S Ireland and mixing there with the settlers who had introduced the megalithic wedge-shaped tombs from France, were those who initially introduce a copper-usind g economy. Bronze came wit e arrivahth Irelann i l f battle-axo d e people fro Elbe mth e regio woulo nwh d have know rice th h f depositcoppen o ti e d th an rn si Upper Elbe and Saale valleys.
    [Show full text]
  • Inverness Nairn Elgin Huntly Inverurie Aberdeen 10 10A 10C
    bustimes Service 10 from 19 August 2019 page 1 of 10 Inverness l Nairn l Elgin l Huntly l Inverurie l Aberdeen 10 10A 10C X10 MONDAY TO FRIDAY (continued overleaf) Service No. 10 10 11A 10 10 10 10 10 10C 10 31A 10 10 10 10 10 10 10 10 10 Inverness Bus Station - - 0510 - - - - 0553 - 0700 - 0800 0830 0900 0930 1000 1030 1100 1130 1200 Inverness Shopping Park - - 0519 - - - - 0603 - 0712 - 0812 0842 0912 0942 1012 1042 1112 1142 1212 Balloch Wellside - - 0524 - - - - q - q - q q q q q q q q q Tornagrain opp Road End - - 0530 - - - - 0611 - 0721 - 0821 0851 0921 0951 1021 1051 1121 1151 1221 Inverness Airport - - 0534 - - - - q - q - q q q q q q q q q Nairn Tradespark Co-op - - 0546 - - - - 0624 - 0734 - 0834 0904 0934 1004 1034 1104 1134 1204 1234 Nairn Bus Station arr - - 0552 - - - - 0630 - 0740 - 0840 0910 0940 1010 1040 1110 1140 1210 1240 Nairn Bus Station dep - - 0554 - - - - 0632 - 0742 - 0842 0912 0942 1012 1042 1112 1142 1212 1242 Auldearn School - - 0603 - - - - 0640 - 0750 - 0850 0920 0950 1020 1050 1120 1150 1220 1250 Brodie opp Village Hall - - - - - - - 0646 - 0756 - 0856 0926 0956 1026 1056 1126 1156 1226 1256 Forres St Leonards Church - - - - 0600 - - 0655 - 0805 0810 0905 0935 1005 1035 1105 1135 1205 1235 1305 Forres Academy - - - - q - - q - q q q q q q q q q q q Forres Enterprise Park - - - - 0606 - - 0701 - 0811 0816 0911 0941 1011 1041 1111 1141 1211 1241 1311 Alves Crooked Inn - - - - 0613 - - 0708 - 0818 0823 0918 0948 1018 1048 1118 1148 1218 1248 1318 Elgin Bus Station arr - - - - 0625 - - 0720 - 0830 0835 0930
    [Show full text]
  • Community Engagement in Lhanbryde Good Places, Better Health Report
    EDPHIS Good Places, Better Health Project in Lhanbryde 2011 Community Engagement in Lhanbryde Good Places, Better Health Report Autumn 2011 Lhanbryde Community Centre Page 1 EDPHIS Good Places, Better Health Project in Lhanbryde 2011 Contents Executive Summary Page 4 1 Background Page 6 2 Aims of Community Engagement Page 6 3 Methodology Page 7 4 Summary of Findings Page 9 5 Research Stages Page 13 1. Rapid Appraisal with the local community Page 13 2. Open Engagement Event Page 21 3. Workshop (DPSEEA Mapping) Page 29 4. Action Planning Meeting Page 37 6 Conclusions and Next Steps Page 41 Appendix Page 42 Researched and compiled by REAP 177 Mid Street Keith Moray AB55 5BL : 01542 888070 : [email protected] : www.reapscotland.org.uk REAP is a registered Scottish Charity No: SC037988 and a Company registered in Edinburgh No: 316989 Page 2 EDPHIS Good Places, Better Health Project in Lhanbryde 2011 Acknowledgements REAP would like to thank all those who contributed to this report particularly Celia McKenna, Communities Analytical Services, Scottish Government The Lhanbryde Community Challenge, especially Anita Milne and Alison Lowes Lhanbryde Primary School Councillor Douglas Ross Moray Council Community Support Unit, Housing Manager East, Youth Work Team, Community Warden and Health Improvement Manager NHS staff Lhanbryde business managers and staff and most importantly the people of Lhanbryde themselves Ann Davidson, REAP, Dec 2011 Page 3 EDPHIS Good Places, Better Health Project in Lhanbryde 2011 Executive Summary The semi-rural village of Lhanbryde, Moray (population just under 2,000) has been one of the venues for evidence gathering and community engagement for the Good Places Better Health (GPBH) Project: a groundbreaking project set up to explore the complex relationship between environment and health in Scotland.
    [Show full text]
  • Appendix 2 TRADING AS ADDRESS ON/OFF SALES 41 the Square, Tomintoul, Ballindalloch, Moray, AB37 9ET OFF 5 Seaview Road, Findocht
    Appendix 2 TRADING AS ADDRESS ON/OFF SALES 41 The Square, Tomintoul, Ballindalloch, Moray, AB37 9ET OFF 5 Seaview Road, Findochty, Buckie, Moray, AB56 4QJ OFF 5 Southfield Drive, Elgin, Moray, IV30 6GR ON Allarburn Farm Shop, Edgar Road, Elgin, Moray, IV30 6XQ BOTH Aroma, Covesea Links, Lossiemouth, Moray, IV31 6SP, OFF Drummuir Castle, Keith, Moray, AB55 5JE OFF Portgordon Bowling Club, Station Road, Portgordon, ON Buckie, Moray, AB56 5RZ Speyburn Distillery, Rothes, Aberlour, Moray, AB38 7AG OFF Upper Hempriggs Farmhouse, Kinloss, Forres, Moray, IV36 OFF 2UB A & K McKenzie 89-91 New Mill Road, Lesmurdie, Elgin, IV30 4AH OFF A Taste of Speyside 10 Balvenie Street, Dufftown, Keith, Moray, AB55 4AB ON Abbey Inn Findhorn Road, Kinloss, Forres, Moray, IV36 3TX OFF Aberlour Distillery Aberlour Distillery, Aberlour, Moray, AB38 9PJ BOTH Ada Turkish Restaurant 29 South Street, Elgin, Moray, IV30 1JZ BOTH Against the Grain 25 Batchen Street, Elgin, Moray, IV30 1BH BOTH Al-Bahar Tandoori Restaurant 156 High Street, Elgin, Moray, IV30 1BD ON Aldi Stores Ltd 11 Trinity Place, Elgin, IV30 1VL OFF Archiestown Hotel Archiestown Hotel, The Square, Archiestown, Aberlour, ON Moray, AB38 7QL Asda Store Asda Stores Ltd, Edgar Road, Elgin, Moray, IV30 6YQ OFF Ashvale Fish Restaurant 13 Moss Street, Elgin, Moray, IV30 1LU ON Aultmore Distillery Aultmore Distillery, Aultmore, Keith, Moray, AB55 6QY OFF B&B Parrandier Parrandier, Meft Road, Urquhart, Elgin, Moray, IV30 8NH ON Badenoch's 178 High Street, Elgin, Moray, IV30 1BA BOTH Ballindalloch Castle Golfing
    [Show full text]
  • Russell's Morayshire Register, and Elgin & Forres Directory, for 1844
    e. 2-Ul.c>^ ? /^ ) Digitized by tine Internet Arcliive in 2010 witli funding from National Library of Scotland http://www.archive.org/details/russellsrti'orayshi1850dire RUSSELL'S MORAYSHIEE REGISTER AND ELGIN AND FORKES DIRECTORY, FOR 1 8 5 0. DEDICATED (BY SPECIAL PERMISSION) TO THEl RIGHT HON. THE EARL" OF FIFE. ELGIN : PRINTED AND PUBLISHED BY ALEX. RUSSELL, COURANT OFFICE, AND SOLD BY ALL BOOKSELLERS. Pnce Is. 6d. Bound in Cloth. !lAURisTM~clSTL?l USRARYACCESSluN] • INDEX TO THE CONTENTS. PART I.—GENERAL ALMANACK. Arebbishops of England ....56 Measures, Imperial Standard. ..42 Assessed Taxes ...45 Monies, Foreign and Colonial.. 32 Bank Holidays - 10 Palaces, Hereditary Keepers. ..73 Banks and Banking Com[> inies 47 Parliaments, Imperial • — 70 Banks & Branches in Scotland 47 Peerage, Scottish 75 Bill Card for 1850 52 Peers. Scottish Representative 59 Bishops of England... 57 Peers, Irish Representative ....59 British Empire, Extent and Peers. Officers of the House.. ..60 Population of 54 Peeresses in their own Right. ..60 British Ministry 55 Prelates, Irish Representative 60 Cattle, Rule :or Weighing 43 Railway Communication 75 Chronicle and Obituiry, Royal Famil.' 64 1848-9 79-80 Salaries and Expenses, Table Clironological Cycles 10 for calculating 3S Commons, House of , ..60 Savings Bank, National Secu- Commons, Officers of the rity.. ...46 House of .70 Scotland, Extent, &c.... ' 46 Corn, Duties on 42 Scotland, Judges and Officers. ..71 Courts of Jus iciary, Exche- Scotland, Officers of State in. ..73 quer, Session and Teinds 77 Scotland, Population, Lords- Distance Table of Places in Lieutenant, and Sheriffs 71 Elginshi e 9 Scotland, Summary of the Po- Eclipses of the Sun and Moon 10 pulation in 1821, 1831, and European States, Population, 1841 ......72 and Reigning Sovereigns 54 Scotland, Universities of..
    [Show full text]
  • Rothes Flood Alleviation Scheme – Scheme Development
    RURAL AFFAIRS AND ENVIRONMENT COMMITTEE FLOODING AND FLOOD MANAGEMENT INQUIRY SUBMISSION FROM MORAY COUNCIL Document 1: Rothes Flood Alleviation Costs Summary Heading Current Cost Rothes Ground Investigation £372,514.57 Contaminated Land £264,001.84 Topographic Survey £199,762.10 Hydraulic Modelling £30,401.65 Option Appraisal £2,618,805.07 Economic Appraisal £218,694.10 Public consultation £58,225.01 Planning supervisor (CDM & H&S) £69,920.32 EIA, ecological, statutory consents, other specialist £156,392.98 consultants Design fees £765,659.73 Council staff £144,213.30 Total Costs £4,998,360.23 The costs of printing and postage for the FPO and Planning Application documents are included above. For FPO 161 addresses. For Planning Application 181 addresses. Document 2: Rothes Flood Alleviation Scheme – Scheme Development Flooding – November 2002 1st Public Exhibition in Rothes March 2003 •Hydraulic modeling; •Flood Frequency estimation; Scoping of Options Report •Flood chronology; (MFAG087) •Climate change review; May 2003 •Option development; •Risk Registers. Value Management Workshop (Council, & statutory consultees SEPA, SNH etc) August 2003 •Scheme objectives; •Option development; •Hydraulic modelling; 2nd Public Exhibition in Rothes •Cost estimates; September 2003 •Scheme economics; •Sustainability assessment; •Risk registers; •Preliminary Geotechnical Desk Study (MFAG101); •Flood risk mapping; •Rothes Geomorphology Audit (June 2003); •Flood damage calculation; Phase 1 Report (MFAG093) •Rothes FAS Environmental Opportunities and •Health
    [Show full text]