<<

Brief summary of the project Sl.No. Details 1 Project Establishment of Active Pharmaceutical Ingredients (APIs) manufacturing industry with R & D activity – “M/s. R L Finechem Pvt. Ltd.,” 2 Project M/s. R L Finechem Pvt. Ltd., developers HIG;#2000, Ray House; Near Yelahanka New Town Police Station; Yelahanka; Bangalore-560 064 3 Location of the Plot No. 27-29, KIADB Industrial Area, Gouribidanoor, site Karnataka. 4 Constitution of Private Limited Company the Organization 5 Raw materials Details of the raw materials required by the industry is appended in Section 3.6.1, Chapter 3 of this report. 6 Product/s The following APIs are proposed to be manufactured proposed to be Sl. APIs Production Production manufactured No. capacity capacity with production (kg/month) (kg/annum) capacities? # 1 Amtriptyline 10,000 1,20,000 hydrochloride 2 1,150 13,800 HCl/ HCl 3 HCl 700 8,400 4 Pitofenone HCl 700 8,400 5 Pyrimethamine 600 7,200 6 HCl 1,150 13,800 7 HCl 600 7,200 8 HCl 1,500 18,000 9 Succinate 1,400 16,800 10 Citrate/ 4,000 48,000 HCl 11 Maleate/ 500 6,000 Mesylate 12 HCl 40 480 13 HCl 300 3,600 14 Carbinoxamine Maleate 700 8,400 15 HCl 400 4,800 16 Sulfadoxine 2,400 28,800 17 HCl 280 3,360 18 Nitrazepam 240 2,880 19 Dothiepin HCl 1,200 14,400 20 Bromazepam 60 720 21 Flunarazine HCl 430 5,160 22 Cinnarazine 2,500 30,000 23 Clonazepam 130 1,560 24 Lorazepam 130 1,560 25 Duloxetine HCl 300 3,600 26 Dapoxetine HCl 50 600 27 Desvenlafaxine HCl 400 4,800 28 Trihexyphenadyl HCl 300 3,600 29 HCl 2,500 30,000 30 Sulfamethoxy Pyrazine 500 6,000 HCl 31 Tartarate 200 2,400 32 Alprazolam 110 1,320 33 Diazepam 120 1,440 34 Buclazine HCl 400 4,800 35 Meclazine HCl 400 4,800 36 Carbamezapine 2,000 24,000 Total 38,390 4,60,680

7 Project cost? Sl. Cost of ` (Crores) no. 1 Land 2.5 2 Construction 6.7 3 Proposed investment on Plant and 21 machinery 4 Environment Management Budget 3 TOTAL 33.2 Rupees Thirty Three Crores & Two Lakhs Only 8 Total man power requirement during  construction Construction phase: 50 people during peak construction phase period.  occupancy Occupancy/Operational phase: 110 employees. phase 9 Proposed trees to Tress proposed to be planted – 300 be planted? 10 Species of trees Araka, Silver Oak, Wild Badam, Mango, Neem trees, Michelia to be planted? champaca, Butea monosperma, Pongamia pinnata, Bauhinia purpurea, Cassia fistula, Alstonia scholaris, and several native species 11 Rain water 114 KL capacity harvesting tank details? 12 Groundwater 1.2 m dia x 2.5 m deep spaced at 10 m center to center all recharging pits along the storm water drain. details? 13 Elevation of the 686 m above MSL; Latitude: 13°42'23.74"N; Longitude: project site with 77°30'11.96"E respect to MSL? 14 Total area of the 24,290 SQM (about 6 Acres) project? 15 Hydrology and Gollapuram Lake at a distance of about 3.5 km towards North hydrogeology? East direction, Kudumaldkunta Lake at a distance of about 1 km towards South West direction, Yerrahalli Lake at a distance of about 2.5 km towards South direction, Yerrahalli Lake at a distance of about 2.5 km towards South direction, Gaudasandra Lake at a distance of about 4 km towards South East direction, Thumakunta Lake at a distance of about 2 km towards North direction, Penner River at a distance of about 2.5 km towards West direction, Melya Lake at a distance of about 5 km towards East direction. 16 Ground water Potabilty of water has to be tested. quality? 17 Noise levels? Noise levels are to be tested. 18 Facilities 1. Adequate potable drinking water supply provided for the 2. Septic tank and soak pit facility for treating wastewater workers during generated from the workers. construction phase at site?