Alderney Airport is operated by the States of . The was heavily oxidised and routine FOD sweeps were collecting on average over 400kg each month.

The sought a detailed solution for redeveloping Alderney’s runway. Treatment with RHiNOPHALT® would provide a major improvement in the surface quality of Alderney Airport’s runway, aprons and taxiway for aircraft.

Ü Airfield Preservation The fine Rhino-Dust enables immediate The Challenge friction recovery on the treated surfaces. Built in 1935, Alderney Airport was the first airport in the (UK). A line laser was also used for appliying The main runway, 08/26 is 880 m RHiNOPHALT® in smaller areas, and for (2,887 ft) long and is asphalt. The two finishing and edging. secondary runways are both grass. Following on-site truck calibration, a Runway 08/26 asphalt surface is 2 The contract was to preserve 28,000m 100m section was applied for reference approximately 18 – 20 years old and ® of asphalt surface with RHiNOPHALT . friction testing. heavily oxidised. Some large areas have been resurfaced over the last few years. • Runway and turn pads – 19000m² Routine FOD sweeps were collecting on • Bravo Taxiway – 3000m² average >300 kg each month since 2013, • Apron – 6000m² with a noticeable increase during the winter months. Application was carried out using a large The States of Guernsey wanted a combi-truck that was able apply fine solution that would seal the surface and Rhino-Dust at a calibrated rate in prevent further aggregate loss until full conjuction with the RHiNOPHALT®. rehabilitation could take place.

The Solution Using a Findlay Irvine MK2 Grip Tester the 100m section was recorded at 0.93, An application rate of 0.45 litre/m2 was compared to pre-application grip level recommended for all surfaces. This was of 0.83 determined by spraying 1m2 panels at various application rates on the different asphalt surfaces.

T: +44(0) 1908 246000 E: e T: +44(0) 1908 246000 E: [email protected] www.asisolutions.co.uk www.rhinophalt.co.uk

Ü Fast process minimises disruption Ü Extended pavement life of 3-5 years Ü Customer satisfaction Contract FOD Reduction The client has reduced the FOD sweeps Application commenced in September Any loose aggregate particles pose a to just one per month due to the ® 2018 and was programmed for 5 night significant FOD risk to aircraft. effectiveness of the RHiNOPHALT shifts. treatment. Bad weather caused delays, and full Substantial financial benefits are credit goes to the contractor as the job achieved through improved asset was completed in 3 shifts and still met management because RHiNOPHALT®: the 28,000m2 contract deadlines. • Adds years to the life of asphalt, All lines, piano keys and landing markers delaying expensive cost of were re-instated within the same shifts replacement once the RHiNOPHALT® had cured. • Reduces unplanned maintenance intervention • Minimises the FOD sweeping costs The treated asphalt surface will become associated with aggregate loss more resistant to abrasion, stone loss, • Maximises airfield availability water ingress and the severe ageing This delays the need for major effects of extreme temperatures. resurfacing operations and reduces One application of RHiNOPHALT® on whole life cost. older asphalt surfaces can extend pavement life by an additional 3 to 5 years, delaying the massive cost and “This project will result in a major disruption of a resurfacing intervention. improvement in the surface quality In 2018, the average monthly FOD mass collected was 414kg. Following of Alderney Airport’s runways, ÜFriction recovery treatment in September, the FOD mass aprons, and taxiway for aircraft and A fresh application of RHiNOPHALT® reduced to an average of just 30kg. it represents a significant investment covers the aggregate micro-texture, in the island’s transport effectively reducing the current grip infrastructure. value of the pavement surface, similar to 2018 FOD Mass a freshly laid asphalt surface course. JAN 311 kg All of the existing paint markings Fine Rhino-Dust is applied at the same FEB 412 kg have been enhanced, new markings time as the RHiNOPHALT® maintains MAR 728 kg have also been added to help visual references for pilots, and some grip, and helps to abrade the APR 1234 kg RHiNOPHALT® from the aggregate historic non-conformance with MAY 289 kg surface under trafficking. Once the current standards have also been aggregate micro-texture is exposed, the JUN 215 kg dealt with. The runway surfaces grip values are returned to pre- JUL 148 kg have been grip-tested each day to application levels. AUG 204 kg ensure continued safe operations A friction run was completed on 18 SEP 185 kg and the results show no significant September 2018, 2 days after OCT 15 kg change in friction levels compared to results taken before the work treatment, and the results can be NOV 43 kg commenced. All of the works took compared favourably to the pre- DEC 67 kg application run taken on 02 August place at night after the airport 2018. closed and this has enabled us 2019 FOD Mass maintain services during the day.” JAN 35 kg • 02 August 2018 = 0.83 FEB 13 kg Colin Le Ray General Manager of Ports • 18 September 2018 = 0.94 MAR 29 kg States of Guerney APR 8 kg Both results are well in excess of the airfield MPL of 0.55.

T: +44(0) 1908 246000 E: e T: +44(0) 1908 246000 E: [email protected] www.asisolutions.co.uk www.rhinophalt.co.uk