Vicroads Consent for Works

Total Page:16

File Type:pdf, Size:1020Kb

Vicroads Consent for Works Information update December 2016 Consent for works - utilities and public transport operators All works conducted Are you exempt from consent? Do you need a Memorandum by utilities or public If the works proposed to be conducted of Authorisation (MoA)? by a utility or public transport operator If you are a works manager for a utility transport operators are ‘minor works’, then those works or a public transport operator (or an are exempt from the need for consent agent for the works manager) then you (or their agents) within unless those works are also deemed are authorised to erect, remove or alter the road reserve need to be ‘traffic impact works’. the following traffic control devices The definitions of ‘minor works’ and without a Memorandum of Authorisation consent from the ‘traffic impact works’, as contained in (MoA): Coordinating Road the Road Management (Works and ∞ works advisory devices (as defined in Infrastructure) Regulations 2015, are the Road Safety (Traffic Management) Authority (CRA), unless set out at the end of this Fact Sheet. Regulations 2009) an exemption applies. When planning for the conduct and ∞ hand-held stop signs timing of your works (whether consent As a general rule, for freeways and is required or an exemption applies), ∞ work zone signs arterial roads the CRA is VicRoads, measures should be taken to ensure ∞ temporary works speed limit signs and for municipal roads the CRA is the safety of road users and to minimise (with a minimum speed of 40 km/h) the local municipal Council. disruptions to traffic, public transport, The works manager is responsible for abutting property owners, businesses getting written consent before any work and utility customers. starts. The consent application form is available on the VicRoads website at vicroads.vic.gov.au, and an application Are the works ‘minor works’? fee always applies. It is an offence to conduct work within the road reserve without consent. No Yes Are the works ‘ ? Yes No Consent required Exempt from consent Make application to Works may proceed Coordinating Road Authority without consent for consent to conduct works in the road reserve vicroads.vic.gov.au Victoria 3101. Kew STU691 11.16 Authorised and published by VicRoads 60 Denmark Street These authorisations are allowed When do you notify VicRoads? Definitions provided that: When you commence the works, ‘Minor works’ (as defined in the Road ∞ you have the consent of the CRA you should advise the CRA so they Management (Works and Infrastructure) for the works or you are exempt can determine if the public should Regulations 2015) are any of the following from consent (under either the be informed. kinds of works undertaken by a utility, Road Management Act 2004 or a provider of public transport, a On completion of the works, a utility the Road Management (Works and responsible road authority (or an agent or a public transport operator is exempt Infrastructure) Regulations 2015); and of any of these bodies): from the need to give notice to the CRA ∞ all traffic control devices are included of the completion of any ‘minor works’ a) the installation, repair or maintenance in a Traffic Management Plan (TMP), that are not: of aerial cables or other overhead which is available onsite for inspection non-road infrastructure; ∞ ‘traffic impact works’; or at all times when workers are present. b) works undertaken so as to enable ∞ works that consist of, or include, a person to be provided a service the excavation of any part of a What happens in an emergency? by a utility; roadway, pathway or shoulder (other ‘Works conducted in an emergency’ than an excavation conducted solely by or with the authority of a utility or c) the repair or maintenance of: to repair, maintain, install or replace public transport operator are exempt a single pole in an urban area or no i) street lighting; or from the consent of the CRA. This more than 3 poles in any other area). exemption includes: ii) bus stop infrastructure, tram For all works where a utility or public stop infrastructure or other ∞ works conducted in response to transport operator is not exempt from public transport related non-road incidents such as a burst water main, giving a notice of completion, the CRA infrastructure located on the gas main explosion or fallen power must be notified by the 14th day of the roadside; or lines on the road; or month next following the completion iii) tram tracks, including the roadway ∞ works in relation to a safety related of the works. area between and on the outside incident, customer service obligation of the tram tracks for which the or regulatory service provider Do you have a traffic relevant provider of public obligation that requires attendance management plan? transport is responsible; within a specified priority response time of between 24 hours and 3 A Traffic Management Plan (TMP) must d) the excavation of: be prepared for all works on roads in business days. i) any part of a road other than a accordance with the Code of Practice roadway, pathway or shoulder; or Note: Further information on ‘works conducted in for Worksite Safety – Traffic Management. an emergency’ can be found in clause 37 of the The TMP must be available onsite for ii) an area of a roadway, pathway Code of Practice for Management of Infrastructure in Road Reserves (2016). inspection at all times when workers are or shoulder; present. All of the traffic control devices This exemption allows the responsible to be used must be included on the TMP. Note: Regulation 6(2)(b) provides that if works under (d) works manager to respond to the above also exceed 8·5 square metres, then those works emergency, make the site safe for road are not ‘minor works’. Notification users and other members of the public, e) the use of an access hole for the and undertake temporary works to For works on a freeway or arterial purpose of accessing, repairing reinstate any services where possible, road, please call the VicRoads Traffic or maintaining infrastructure including temporary reinstatement of Management Centre on 13 11 70. under a road; the road for traffic. Additional information f) the installation, repair or maintenance The CRA must be advised of the of traffic control devices carried out in emergency event as soon as These publications can be accessed accordance with the Road Safety Act reasonably practicable. from the VicRoads website: 1986 or any regulations made under Works that need to be undertaken in ∞ A Guide to Working in the that Act; Road Reserve the short term (whether planned or g) the repair or maintenance of poles; unplanned), or that can be deferred Companion to a Guide to Working ∞ h) the replacement or relocation of a to a later date, are not considered to in the Road Reserve (this contains single pole in an urban area (unless be ‘works conducted in an emergency’. FAQs, process flow charts and those works are part of works ‘works’ examples) to replace or relocate 2 or more consecutive poles); i) the replacement or relocation of ‘Traffic impact works’ (as defined in f) works conducted on a road in an not more than 3 poles in an area the Road Management (Works and urban area within metropolitan other than an urban area (unless Infrastructure) Regulations 2015) are: Melbourne, Geelong, Ballarat those works are part of works to or Bendigo: a) works conducted: replace or relocate more than 3 i) that are likely to have a duration consecutive poles); i) on a freeway; or of more than 2 hours; and j) the pruning of a tree or other ii) on an arterial road that require ii) that are likely to cause a delay vegetation; the deviation of vehicular traffic to a bus or tram for more than into an on-coming traffic lane; or k) the removal of a tree or other 5 minutes between 9 a.m. and vegetation in accordance with any iii) in a clearway when it is in 3 p.m. on a weekday; or Act other than the Road Management operation; or g) works that cause the temporary Act 2004; iv) in a bus lane when it is in closure or relocation of a bus stop or l) any other works conducted for operation; or tram stop or prevent access to the purpose of repairing, inspecting, a bus stop or tram stop in an urban v) on, or partly on, or that affect, operating or testing an asset or for the area for more than 15 minutes; or a bridge or other structure; or purpose of a survey. h) works conducted in an urban area, vi) on a roadway within 20 metres If any of the works listed in (a) to (l) above between 6 a.m. and 8 p.m., on the either side of a children’s crossing also consist of, or include any of the roadway of an arterial road, within 100 when that crossing is in operation, following works, then those works are not metres of an intersection with traffic unless parking is permitted ‘minor works’: signals, which require the closure to within 20 metres either side of vehicular traffic of one or more lanes a) service extension works (definition the crossing and the works are on that roadway that are available to below); conducted on that parking area; or through traffic. b) the excavation of an area of a vii) within a road reserve on, or in the ‘Peak hour traffic works’ are works roadway, pathway or shoulder vicinity of, a level crossing within conducted between 6 a.m. and 9 a.m. exceeding 8·5 square metres; the meaning of section 221U of or between 3 p.m.
Recommended publications
  • Dealer Online Authority to Register This Form Is for Use by Dealers on Dealer Certification Scheme Only
    ABN 61 760 960 480 Dealer online authority to register This form is for use by dealers on Dealer Certification Scheme only. Please complete this form and sign below. Please print clearly in ink using The registered operator of a vehicle cannot be changed unless an BLOCK letters and cross where applicable. You need to provide original documents application for transfer of registration is submitted with applicable for evidence of identity if you do not provide an existing Victorian photo licence fees and supporting documents (eg Certificate of Roadworthiness). or learner permit or confirmed client number. For more information visit vicroads.vic.gov.au Section 1 - Registered operator details (to be completed by the registered operator) Individual Company# *Please provide your Victorian licence/permit/customer number - You will have a customer number with VicRoads Victorian licence/permit/customer no.* if you have held a Victorian licence or learner permit or have had a vehicle registered in your name in Victoria. Surname (or company name) First given name or ACN/ARBN Second given name Third initial (if any) Previous name(s) (if applicable) Date of birth D D M M Y Y Y Y Residential (or company) address Postcode Postal address (if different from above) Postcode Garage address (if different from residential (or company) address) Postcode Mobile phone no. (or other if not applicable) Email Additional information (indicate where applicable) D.S.S. concession D.V.A. concession TPI Health care card Card number ‡ § Primary producer Charitable and benevolent rate Hire/drive Common expiry date D D M M Y Y Y Y Custom/Euro Slimline Govt.
    [Show full text]
  • Part 7: New and Emerging Treatments (2021) Version 2.1, April 2021
    Network Technical Guideline Supplement to Austroads Guide to Road Design (AGRD) Part 7: New and Emerging Treatments (2021) Version 2.1, April 2021 Supplement to Austroads Guide to Road Design Part 7: New and Emerging Treatments (2021) This Supplement must be read in conjunction with the Austroads Guide to Road Design. Reference to any Department of Transport or VicRoads or other documentation refers to the latest version as publicly available on the Department of Transport’s or VicRoads website or other external source. Document Purpose This Supplement is to provide corrections, clarifications and additional information to the Austroads Guide to Road Design Part 7: New and Emerging Treatments (2021). This Supplement refers to the content published in the First Edition of this part to the guide. If this Part to the Austroads Guide to Road Design is updated, or the information is moved to another Austroads publication, then the content in this supplement should be adopted as supplementary content to the current equivalent Austroads content. Where there is conflicting content in this Supplement with updated content, contact the Department of Transport for clarification as to which content takes precedence. Version Date Description of Change V1.0 July 2010 Development of Supplement (VicRoads Supplement for AGRD Part 7) V1.1 Sept 2010 Minor updates and edits to text (VicRoads Supplement for AGRD Part 7) V2.0 Dec 2012 Minor updates and edits to text (VicRoads Supplement for AGRD Part 7) V2.1 April 2021 Interim update to indicate V3.0 coming soon Additional notes on current version VRS Supplement to AGRD Part 7 – Geotechnical Investigation and Design (v2.0) has been withdrawn and superseded by the content in Appendix A of DoT Supplement to AGRD Part 1: Objectives of Road Design (2021).
    [Show full text]
  • Vehicle Registration ABN 61 760 960 480 Please Complete the White Sections, Print in Ink Using BLOCK Letters, Show Us Your Evidence of Identity, and Sign Below
    Vehicle registration ABN 61 760 960 480 Please complete the white sections, print in ink using BLOCK letters, show us your evidence of identity, and sign below. The vehicle register records the identification details of each vehicle and the name and address of the registered operator of the vehicle. The register is not a register of vehicle ownership (title). What type of registration are you applying for? (please cross where applicable) .Dealers write reg’n no. then place VicRoads barcode here Light vehicle Recreation Bus Concessional Heavy vehicle Trailer Taxi Primary producer* Low emission vehicle Farm bike Hire Pensioner/DVA card (tailpipe CO2 of 120g/km Motorcycle Tow truck Health Care card* OFFICE USE ONLY or less) (office use) LAMS approved *You must complete the Date of issue D D M M Y Y Y Y Registration concessions form. Appointment no. Date of expiry D D M M Y Y Y Y Applicant details (the minimum age to register a light vehicle is 16 years, and 18 years to register a motorcycle or heavy vehicle) Surname or company name LMCT no. Vic licence/client no. First given name or ACN/ARBN Second given name Third initial (if any) Gender Health Care Card/ Date of birth D D M M Y Y Y Y Pensioner concession no. Residential (or company) address Postcode Postal address (if different from above) Postcode Garage address (VicRoads will only register vehicles garaged in Victoria) Postcode Mobile phone no. (or other if not applicable) Email Vehicle details (for a trailer, non-standard vehicle or vehicle over 4.5 tonnes GVM, also complete the Trailer and heavy vehicle specifications section overleaf) Please cross one circle per category below Year manufactured Y Y Y Y Previous registration number State Vehicle condition Transmission New Automatic Make Model Second-hand Manual Body type Colour Engine type Fuel type Piston (ie.
    [Show full text]
  • Standard Infrastructure - Tram Stop Platform Design
    Standard Infrastructure - Tram Stop Platform Design CE-021-ST-0012 1.01 17/03/2020 Disclaimer: This document is developed solely and specifically for use on Melbourne metropolitan tram network managed by Yarra Trams. It is not suitable for any other purpose. You must not use or adapt it or rely upon it in any way unless you are authorised in writing to do so by Yarra Trams. If this document forms part of a contract with Yarra Trams, this document constitutes a “Policy and Procedure” for the purposes of that contract. This document is uncontrolled when printed or downloaded. Users should exercise their own skill and care or seek professional advice in the use of the document. This document may not be current. Current standards are available for download internally from CDMS or from https://yarratrams.com.au/standards. Infrastructure - Tram Stop Platform Design Table of Contents 1 PURPOSE ................................................................................................................................................ 4 2 SCOPE .................................................................................................................................................... 4 3 COMPLIANCE ......................................................................................................................................... 4 4 REQUIREMENTS ..................................................................................................................................... 5 4.1 General .........................................................................................................................................
    [Show full text]
  • Vicroads Supplement to the Austroads Guide to Road Design Part 6A – Pedestrian and Cyclist Paths
    VicRoads Supplement to Austroads Guide to Road Design – Part 6A VicRoads Supplement to the Austroads Guide to Road Design Part 6A – Pedestrian and Cyclist Paths NOTE: This VicRoads Supplement must be read in conjunction with the Austroads Guide to Road Design. Reference to any VicRoads or other documentation refers to the latest version as publicly available on the VicRoads website or other external source. Rev. 2.0 – Dec 2012 Part 6A – Page 1 VicRoads Supplement to the Austroads Guide to Road Design Updates Record Part 6A – Pedestrian and Cyclist Paths Rev. No. Section/s Description of Authorised By Date Released Update Revision Rev. 1.0 First Edition Development of ED - Network & Asset July 2010 Supplement Planning Rev. 1.1 Various Minor updates and Principal Advisor- Sept 2010 edits to text Design, Traffic & Standards Rev 2.0 General General edits & Principal Advisor - Road Dec 2012 corrections Design, Traffic & References Additional references Standards and web sites COPYRIGHT © 2010 ROADS CORPORATION. The VicRoads Supplement to the Austroads Guide to Road Design provides additional This document is copyright. No part of it can information, clarification or jurisdiction be used, amended or reproduced by any specific design information and procedures process without written permission of the which may be used on works financed wholly Principal Road Design Engineer of the Roads or in part by funds from VicRoads beyond that Corporation Victoria. outlined in the Austroads Guide to Road Design guides. ISBN 978-0-7311-9159-8 Although this publication is believed to be correct at the time of printing, VicRoads does VRPIN 02671 not accept responsibility for any consequences arising from the information contained in it.
    [Show full text]
  • Vicroads Access Management Policies May 2006 Version 1.02 2 Vicroads Access Management Policies May 2006 Ver 1.02
    1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT The safe and efficient movement of people and goods plays a key role in the future sustainability of Victoria. The emphasis on using the road network more effectively and efficiently has grown significantly over recent years. With this, the need to manage our existing road space more effectively will be of paramount importance. Access management is a key component to achieving this goal. Access management focuses on ensuring the safety and efficiency of the road network, by providing appropriate access to adjoining properties. This requires a systematic approach to facilitate logical and consistent decision making. This VicRoads Access Management Policies sets out the legislative and practical mechanisms to assist in achieving the above objectives. DAVID ANDERSON CHIEF EXECUTIVE 3 VicRoads Access Management Policies May 2006 Ver 1.02 Table of Contents FORWARD FOR ACCESS MANAGEMENT.............................................................1 PART 1: INTRODUCTION .........................................................................................4 PART 2: USING THE MODEL POLICIES FOR MANAGING VEHICLE ACCESS TO CONTROLLED ACCESS ROADS........................................................................5 2.1 Introduction..........................................................................................................5 2.1.1
    [Show full text]
  • Public Safety Review
    OFFICE OF THE DIRECTOR MELBOURNE CITY LINK DEPARTMENT OF INFRASTRUCTURE Public Safety Review September 2002 CONTENTS Executive Summary iii Findings and Recommendations viii Chapter 1 Introduction Terms of Reference 1 Background to the Review 2 Scope of the Review 2 Methodology of Review 3 Terminology 3 Chapter 2 Background The Project 4 Structure of Transurban 5 Contractual Regime 6 Chapter 3 Term of Reference 1 Contractual Regime 9 Legislation 22 Chapter 4 Term of Reference 2 Introduction and Overview 29 Safety Features of City Link 30 Legal Analysis of Safety Features 35 Other Legal Issues 39 Impact of Proposals on the State 44 Findings 46 Chapter 5 Term of Reference 3 Introduction 48 Context 48 Ongoing State Safety Role 49 Wider Ongoing State Tasks to be Performed 50 Factors for Administration of the City Link Arrangements 53 Models for the Management of the Contractual Arrangements 53 Findings 55 Chapter 6 Term of Reference 4 Overview 57 Preparation, Review and Implementation of Diversion Route Plans 57 Tunnel Closure Procedures 58 Co-ordination Issues 59 Findings 60 Chapter 7 Case Studies Recent European Tunnel Incidents 61 Burnley Tunnel Closure 64 Dislodgement of Rebroadcast Cable 66 Response to a Vehicle Breakdown in the Burnley Tunnel 67 Glossary of Terms 68 Diagrams Map of City Link and the Road Network 72 Map of City Link Road Interchanges 73 Diagram of Contractual Arrangements 74 Public Safety Review Executive Summary Terms of Reference 1. On 9 March 2001, the Minister for Transport, the Hon Peter Batchelor MP, announced a review of the public safety and traffic management aspects of City Link to be conducted by the Melbourne City Link Authority.
    [Show full text]
  • Surfcoast Highway and Corio Waurn Ponds Road, Belmont, Greater Geelong – Bus Lane
    May 2020 Project Evaluation Finding Surfcoast Highway and Corio Waurn Ponds Road, Belmont, Greater Geelong – Bus Lane Project Description This project helped to improve the functionality, efficiency and reduced travel times for Public Transport Victoria (PTV) bus system and users during peak times. More Information For more information please contact: Output Regional Roads VicRoads – South Western Region on 133 778 Project delivered: • Installation of a dedicated bus lane (additional bus traffic signal provides priority access opportunity for the bus to bypass peak traffic queuing) • Line-marking Cost & Duration • The bus jump lane was delivered under the original budget. • The project was delivered on time and within the expected time frames. Working with others During the development of this project, RRV worked with key stakeholders including City of Greater Geelong, Public Transport Victoria, McHarry’s Bus Lines, Utility authorities and the general community including businesses and residents. Figure 1 – Before Benefits Achieved Improved Road Safety • Safer Public Transport network for busses when merging into through traffic with a clear lane to the front and cross the intersection prior to other vehicles. Bus jump lanes not only improved the travel times, but also more consistent and more usage. Improved transport efficiency • Increased the Public Transport reliability along the route, it also decreased the travel time as the traffic built up. Travel time data indicates that travel time for busses have been recused by 45 seconds in the AM peak and 1.48 seconds in the PM peak. Figure 2 – After .
    [Show full text]
  • Application for Transfer of Registration
    Application for transfer of registration This form is to be used to change the registered operator(1) of a currently registered(2) vehicle (e.g. car, motorcycle, caravan) with Victorian number plates attached. This form must be completed and signed by both the seller(3) and the buyer(4) and returned to VicRoads within 14 days of vehicle sale. You can now transfer your vehicle online! Sellers must first submit an online Notice of Disposal via their myVicRoads account. Once the vehicle has been transferred, buyers complete the transfer in their myVicRoads account by providing the roadworthy certificate and paying the transfer fee and motor vehicle duty (if applicable). Pre-transfer checklist Seller Buyer Vehicle status Confirm the Victorian registration is current (not suspended or cancelled) and not subject to any sanctions that will prevent the registration transfer. Refer to vicroads.vic.gov.au/registration-check Confirm that there is no money owing on the vehicle, it’s not reported stolen or recorded as written-off. Check the Personal Property Security Register (PPSR) online at ppsr.gov.au or call 1300 007 777. Right to transfer Confirm the seller has the right to transfer the vehicle by sighting a certificate of registration/renewal or by confirming the vehicle is recorded in the seller’s myVicRoads account. Check the details, including the Vehicle Identification Number (VIN)(5), match the physical vehicle. Confirm the buyer (individual or company) has a Victorian licence/customer number(6). If the buyer does not have a Victorian licence/customer number, full evidence of identity documentation must be provided in person at a VicRoads Customer Service Centre.
    [Show full text]
  • Palmers Road Corridor (Western Freeway to Calder Freeway) EES and Psas
    VicRoads 28-Aug-2014 Doc No. Version 6 Palmers Road Corridor (Western Freeway to Calder Freeway) EES and PSAs Land Use Planning Report AECOM Palmers Road Corridor (Western Freeway to Calder Freeway) EES and PSAs – Land Use Palmers Road Corridor (Western Freeway to Calder Freeway) EES and PSAs Land Use Planning Report Client: VicRoads Prepared by AECOM Australia Pty Ltd Level 9, 8 Exhibition Street, Melbourne VIC 3000, Australia T +61 3 9653 1234 F +61 3 9654 7117 www.aecom.com ABN 20 093 846 925 28-Aug-2014 Job No.: 60267382 AECOM in Australia and New Zealand is certified to the latest version of ISO9001, ISO14001, AS/NZS4801 and OHSAS18001. © AECOM Australia Pty Ltd (AECOM). All rights reserved. AECOM has prepared this document for the sole use of the Client and for a specific purpose, each as expressly stated in the document. No other party should rely on this document without the prior written consent of AECOM. AECOM undertakes no duty, nor accepts any responsibility, to any third party who may rely upon or use this document. This document has been prepared based on the Client’s description of its requirements and AECOM’s experience, having regard to assumptions that AECOM can reasonably be expected to make in accordance with sound professional principles. AECOM may also have relied upon information provided by the Client and other third parties to prepare this document, some of which may not have been verified. Subject to the above conditions, this document may be transmitted, reproduced or disseminated only in its entirety. 28-Aug-2014
    [Show full text]
  • Vicroads Purpose, Aims and Organisational Values
    VICROADS PURPOSE, AIMS AND ORGANISATIONAL VALUES PURPOSE To serve the community by managing the Victorian road network and its use as an integral part of the overall transport system. VicRoads, in partnership with other State and Federal Government agencies, local government and the private sector, contributes to the social and economic development of Victoria and Australia through its role in management of the transport system. AIMS > To assist economic and regional development by improving the effectiveness and efficiency of the transport system. > To assist the efficient movement of people and freight, and improve access to services for all transport system users. > To achieve a substantial reduction in the number and severity of road crashes and the resultant cost of road trauma. > To be sensitive to the environment through responsible management of the transport network. > To provide efficient and effective, nationally consistent, customer-oriented driver licensing, vehicle registration, revenue collection, and driver and vehicle information services. ORGANISATIONAL VALUES > We put our customers’ and stakeholders’ needs first. > We develop as individuals and contribute as members of a team. > We are open, honest and fair. > We take pride in our success and continuous improvement. > We take responsibility for our actions. > We take a commercial approach to our service delivery. 3 LETTER TO THE MINISTER THE HONORABLE PETER BATCHELOR MP MINISTER FOR TRANSPORT LEVEL 26, NAURU HOUSE 80 COLLINS STREET MELBOURNE VICTORIA 3000 Dear Minister VicRoads 2001–02 Annual Report I have much pleasure in submitting to you, for presentation to Parliament, the Annual Report of the Roads Corporation (VicRoads) for the period 1 July 2001 to 30 June 2002.
    [Show full text]
  • Citylink Melbourne
    CITYLINK, MELBOURNE, AUSTRALIA OVERVIEW LOCATION : MELBOURNE, AUSTRALIA SCOPE: INTRA -URBAN TRANSPORT MODE: ROAD PRINCIPAL CONSTRUCTION: GRADE/TUNNEL/ELEVATED NEW LINK : PARTIALLY PRINCIPAL OBJECTIVES CONGESTION RELIEF LOCAL & STRATEGIC TRANSPORT LINK ACCESSIBILITY LOCAL AREA IMPROVEMENTS INTRODUCTION PLANNING AND IMPLEMENTATION PLANNING START DATE: 03/1992 CityLink is a 22km road scheme in two sections. The Western Link CONSTRUCTION START DATE: 05/1996 upgrades an existing freeway to eight lanes and adds a six-lane OPERATION START DATE: 12/2000 elevated road and bridge crossing over the River Yarra. The MONTHS IN PLANNING: 38 MONTHS IN CONSTRUCTION: 55 Southern Link upgrades an arterial roadway to five and six lanes, and PROJECT COMPLETED: IN 8 SECTIONS, provides two three-lane tunnels (of 3.4km and 1.6 km in length) ON AVERAGE 2.5 MONTHS BEHIND under the Yarra. It opened in 2000. Toll charges are collected SCHEDULE (MAXIMUM 12 MONTHS) through an electronic system developed as part of the project. COSTS (IN 2010 USD) The project is associated with the redevelopment of unused PREDICTED COST: 2.80BN docklands between the central business district and the Yarra, and ACTUAL COST: 2.46BN PROJECT COMPLETED: 12% UNDER the expansion of container traffic through the port. BUDGET FUNDING : 100% PRIVATE BACKGROUND The primary objective of the project was to relieve congestion in the city centre, by linking the existing radial highways and bypassing the centre’s urban and residential streets. This in turn would improve the urban environment and provide better access for industry to port, rail and airport facilities. INFRASTRUCTURE QUANTITIES LENGTH: 22KM The project was supported by a variety of national and state NUMBER OF JUNCTIONS: 10 government policy statements relating to transport and urban BRIDGE: 4.2KM development between 1987 and 1992.
    [Show full text]