Energy Regulatory Commission Application
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Resettlement and Indigenous Peoples Plan PHI: Improving Growth Corridors in Mindanao Road Sector Project
Resettlement and Indigenous Peoples Plan Document stage: Draft August 2017 Project number: 41076-048 PHI: Improving Growth Corridors in Mindanao Road Sector Project PR07: Tampilisan-Sandayong Road Prepared by the Department of Public Works and Highways for the Asian Development Bank. Currency Equivalents (as of 21 July 2017) Currency unit – peso (P) P1.00 = $0.02 $1.00 = P50.75 Abbreviations AD – Ancestral Domain ADB – Asian Development Bank AH – Affected Households AP – Affected Persons BIR – Bureau of Internal Revenue CADC – Certificate of Ancestral Domain Claim CADT – Certificate of Ancestral Domain Title CCA – Community Consultative Assembly CALT – Community of Ancestral Land Title CLOA – Certificate of Land Ownership Award CAP – Corrective Action Plan COI – Corridor of Impact DEO – District Engineering Office DPWH – Department of Public Works and Highways DMS – Detailed Measurement Survey DDR – Due Diligence Report EA – Executing Agency EMA – External Monitoring – Agent EO – Executive Order ESSD – Environment and Social Safeguards Division FPIC – Free and Prior Informed Consent GOP – Government of the Philippines GRM – Grievance Redress Mechanism IGCMRSP – Improving Growth Corridors in Mindanao Road Sector Project IMA Internal Monitoring Agent IOL – Inventory of Loss IP/ICC – Indigenous Peoples/ Indigenous Cultural Communities IPP – Indigenous Peoples Plan IPRA – Indigenous Peoples Rights Act LA – Land Acquisition LARRIPP – Land Acquisition, Resettlement, Rehabilitation and Indigenous Peoples Policy (DPWH 2007) LGU – Local Government -
May 18, 2021 7:17 Pm May 18, 2021
Republic of the Philippines May 18, 2021 HOUSE OF REPRESENTATIVES 7:17 pm Quezon City EIGHTEENTH CONGRESS Second Regular Session COMMITTEE REPORT NO. ______971 Submitted by the Committee on Tourism and the Committee on Appropriations on ________May 18, 2021 Re : House Bill No. ____9362_______ Recommending its approval in substitution of House Bill No. 5613 Sponsors : Representatives Sol Aragones, Eric Go Yap and Isagani S. Amatong Mr. Speaker: The Committee on Tourism and the Committee on Appropriations, to which was referred House Bill No. 5613, introduced by Rep. Isagani S. Amatong, entitled: AN ACT DECLARING THE KALAWIT LAKE IN THE MUNICIPALITY OF KALAWIT, PROVINCE OF ZAMBOANGA DEL NORTE A TOURIST DESTINATION, PROVIDING FOR ITS DEVELOPMENT AND APPROPRIATING FUNDS THEREFOR have considered the same and recommend that the attached House Bill No. 9362_____, entitled: AN ACT DECLARING THE KALAWIT LAKE LOCATED IN BARANGAY POBLACION, MUNICIPALITY OF KALAWIT, PROVINCE OF ZAMBOANGA DEL NORTE, A TOURISM DESTINATION, PROVIDING FOR ITS DEVELOPMENT, AND APPROPRIATING FUNDS THEREFOR be approved in substitution of House Bill No. 5613 with Representative Isagani S. Amatong as author thereof. Respectfully submitted, REP. ERIC GO YAP REP. SOL ARAGONES Chairperson Chairperson Committee on Appropriations Committee on Tourism THE HONORABLE SPEAKER HOUSE OF REPRESENTATIVES QUEZON CITY Republic of the Philippines HOUSE OF REPRESENTATIVES Quezon City Eighteenth Congress Second Regular Session HOUSE BILL NO. 9362 (In substitution of House Bill No. 5613) Introduced by Representative Isagani S. Amatong AN ACT DECLARING THE KALAWIT LAKE LOCATED IN BARANGAY POBLACION, MUNICIPALITY OF KALAWIT, PROVINCE OF ZAMBOANGA DEL NORTE, A TOURISM DESTINATION, PROVIDING FOR ITS DEVELOPMENT, AND APPROPRIATING FUNDS THEREFOR Be it enacted by the Senate and the House of Representatives of the Philippines in Congress assembled: 1 SECTION 1. -
The Regional Development Report Scorecard Xix Joint RDC IX and RPOC IX Resolution Xxi Foreword Xxiii Message Xxiv Executive Summary Xxv
Zamboanga Peninsula 2019Regional Development Report Table of Contents Acronyms and Abbreviations iii List of Tables and Figures xi The Regional Development Report Scorecard xix Joint RDC IX and RPOC IX Resolution xxi Foreword xxiii Message xxiv Executive Summary xxv Chapter 02 Global and Regional Trends and Prospects 1 Chapter 03 Overlay of Economic Growth, Demographic Trends and 5 Physical Characteristics Chapter 04 Zamboanga Peninsula Regional Development Plan 2017-2022 9 Overall Framework Chapter 05 Ensuring People-Centered, Clean and Efficient Governance 13 Chapter 06 Pursuing Swift and Fair Administration of Justice 21 Chapter 07 Promoting Philippine Culture and Values 29 Chapter 08 Expanding Economic Opportunities in Agriculture, Forestry, 33 and Fisheries Chapter 09 Expanding Economic Opportunities in Industry and Services 49 through Trabaho at Negosyo Chapter 10 Accelerating Human Capital Development 57 Chapter 11 Reducing Vulnerability of Individuals and Families 67 Chapter 12 Building Safe and Secure Communities 71 Chapter 13 Reaching for the Demographic Dividend 75 Chapter 14 Vigorously Advancing Science, Technology and Innovation 79 Chapter 15 Ensuring Sound Macroeconomic Policy 85 Chapter 17 Attaining Just and Lasting Peace 95 Chapter 18 Ensuring Security, Public Order and Safety 105 Chapter 19 Accelerating Infrastructure Development 117 Chapter 20 Ensuring Ecological Integrity, Clean and Healthy 133 Environment Chapter 22 Plan Implementation and Monitoring 145 Glossary of Terms 153 2019 Zamboanga Peninsula Regional Development -
Mindanaohealth Project Program Year 6 – Quarter 3 Accomplishment Report (April 2018-June 2018)
1 MindanaoHealth Project Program Year 6 – Quarter 3 Accomplishment Report (April 2018-June 2018) Vol. 01: Quarterly Progress Report Submitted: August 3, 2018 Submitted by: Dolores C. Castillo, MD, MPH, CESO III Chief of Party MindanaoHealth Project E-mail: [email protected] Mobile phone: 09177954307 2 On the cover: Top left: Another pregnant woman who went to the Saguiran Rural Health Unit and completed her fourth antenatal care check-up receives her dignity package and maternity kit/bag from USAID, handed over by Department of Health-ARMM’s Universal Health Care Doctor-on-Duty Dr. Baima Macadato (2nd from left). (NJulkarnain/Jhpiego) Bottom left: USAID-trained Family Planning Nurse Ruby Navales (left) talks about Family Planning to postpartum mothers. (Jhpiego) Top right: USAID-trained Family Health Associate Ailleene Jhoy Verbo uses the material/toolkit that the MindanaoHealth Project provided to FHAs to aid them in delivering correct messages and in answering questions on Family Planning from her listeners. (Photo by: Jerald Jay De Leon, Siay Rural Health Unit, Zamboanga Sibugay) Bottom right: A teen mother and now advocate of the adolescent and youth reproductive health, Shanille Blase (extreme right) expresses her gratitude to USAID Mission Director to the Philippines Lawrence Hardy II (extreme left) for USAID’s support to the Brokenshire Hospital’s Program for Teens, which provided her free antenatal, birthing and postpartum care. Also in photo: Dr. Dolores C. Castillo (second from left), MindanaoHealth Project Chief of Party. (Photos: MCossid/Jhpiego) This report was made possible by the generous support of the American people through the United States Agency for International Development (USAID), under the terms of the Cooperative Agreement AID-492-A-13-00005. -
Resettlement and Indigenous Peoples Plan ______
Resettlement and Indigenous Peoples Plan _________________________________________________________________________ July 2019 PHI: Improving Growth Corridors in Mindanao Road Sector Project PR07: Tampilisan-Sandayong Road Prepared by Department of Public Works and Highways for the Asian Development Bank. {This is an updated version of the draft originally posted in August 2017 available on https://www.adb.org/projects/documents/phi-41076-048-remdp.} i Currency Equivalents (As of 1 July 2019) Currency unit – peso (PhP) PhP1.00 = $ 0.020 $ 1.00 = P 51.233 Abbreviations AD Ancestral Domain ADB Asian Development Bank AH Affected Household AP Affected Person BIR Bureau of Internal Revenue CADT Certificate of Ancestral Domain Title CCA Community Consultative Assembly CALT Community of Ancestral Land Title CLOA Certificate of Land Ownership Award CAP Corrective Action Plan COI Corridor of Impact DEO District Engineering Office DPWH Department of Public Works and Highways DMS Detailed Measurement Survey DDR Due Diligence Report EA Executing Agency EMA External Monitoring- Agents EO Executive Order ESSD Environmental and Social Safeguards Division FBI Field based investigation FPIC Free and Prior Informed Consent GOP Government of the Philippines GRM Grievance Redress Mechanism Improving Growth Corridors in Mindanao Road IGCMRSP Sector Project IMA Internal Monitoring Agent IOL Inventory of Loss IP/ICC Indigenous People/Indigenous Cultural IPP IndigenousCommunity People Plan IPRA Indigenous People’s Rights Act LA Land Acquisition Land Acquisition, -
DPWH Strategic Infrastructure Programs in Mindanao Secretary MARK A
DPWH Strategic Infrastructure Programs in Mindanao Secretary MARK A. VILLAR Department of Public Works and Highways Presented by: DIMAS S. SOGUILON, CESO II Undersecretary Regional Operations in Mindanao 1 2017-2022 Philippine Development Plan Strategic Framework 2 0+10 POINT SOCIOECONOMIC AGENDA OF THE DUTERTE ADMINISTRATION: 0 Peace and Order Continue and maintain current macroeconomic policies, including fiscal, monetary, and trade policies 1 Institute progressive tax reform and more effective tax collection, indexing taxes to inflation. 2 3 Increase competitiveness and the ease of doing business. Accelerate annual infrastructure spending to account for 5% of GDP, with PPP playing a key role. 4 Promote rural and value chain development toward increasing agricultural and rural enterprise productivity and 5 rural tourism. Ensure security of land tenure to encourage investments, and address bottlenecks in land management and 6 titling agencies. Invest in human capital development, including health and education systems, and match skills and training. 7 Promote science, technology, and the creative arts to enhance innovation and creative capacity towards self- 8 sustaining, inclusive development. Improve social protection programs, including the government’s Conditional Cash Transfer (CCT) program. 9 10 Strengthen implementation of the Responsible Parenthood and Reproductive Health Law. Slide 3 of 50 4 DPWH Mandate: The DPWH is mandated to undertake (a) the planning of infrastructure, such as national roads and bridges, flood control, water resources projects and other public works, and (b) the design, construction, and maintenance of national roads and bridges, and major flood control systems. Condition of Philippine Road Network: Road Network Total (km) Paved (km) % Paved National Road 32,868 31,035 94.42% Primary 7,067 7,066 99.99% Secondary 14,249 13,524 94.91% Tertiary 11,553 10,445 90.41% Local Road 177,595 33,479 18.85% Total 210,463 64,514 30.65% National Bridges: Total Permanent % Permanent No. -
Download 591.55 KB
ASIAN DEVELOPMENT BANK PCR:PHI 24070 PROJECT COMPLETION REPORT ON THE RURAL INFRASTRUCTURE DEVELOPMENT PROJECT (Loan 1332-PHI[SF]) IN THE PHILIPPINES July 2004 CURRENCY EQUIVALENTS Currency Unit – peso (P) At Appraisal At Project Completion (August 1993) (April 2004) P1.00 = $0.039 $0.018 $1.00 = P28.00 P55.75 ABBREVIATIONS ADB – Asian Development Bank BBLIMS – barangay-based labor intensive maintenance scheme BMC – barangay maintenance crew CIS – communal irrigation system DA – Department of Agriculture EIRR – economic internal rate of return M&E – monitoring and evaluation MTPDP – Medium-Term Philippine Development Plan NIA – National Irrigation Administration NGO – nongovernment organization O&M – operation and maintenance OMA – office of the municipal agriculturist PAM – project administration memorandum PMO – project management office ROS – research outreach station GLOSSARY barangay – The smallest local government unit, with population generally in the range of 100 to 350 households. pakyaw – Small contract implemented by the beneficiaries or village people. NOTES (i) The fiscal year (FY) of the Government ends on 31 December. (ii) In this report, "$" refers to US dollars. CONTENTS Page BASIC DATA ii MAP vii I. PROJECT DESCRIPTION 1 II. EVALUATION OF DESIGN AND IMPLEMENTATION 2 A. Relevance of Design and Formulation 2 B. Project Outputs 3 C. Project Costs 5 D. Disbursements 5 E. Project Schedule 6 F. Implementation Arrangements 6 G. Conditions and Covenants 6 H. Consultant Recruitment and Procurement 7 I. Performance of Consultants, Contractors, and Suppliers 7 J. Performance of the Borrower and the Executing Agency 8 K. Performance of ADB 8 III. EVALUATION OF PERFORMANCE 8 A. Relevance 8 B. Efficacy in Achievement of Purpose 9 C. -
Zampen Priority Programs and Projects for Resource Mobilization
ZAMBOANGA PENINSULA PRIORITY PROGRAMS AND PROJECTS FOR RESOURCE MOBILIZATION December 2015 FOREWORD This document is the output of the Regional Development Council (RDC) IX Secretariat’s effort to push the development of the region by facilitating the identifi cation of the priority interventions that need the support of donor agencies, policymakers, particularly the region’s congressional representatives, national government agencies, and the Mindanao Development Authority. It is largely based on the submissions of ZamPen’s regional line agencies and local government units. Following a set of RDC-approved criteria, the projects identifi ed shall sail the region towards its vision of becoming the Southern Agri-Fisheries Corridor of the Philippines. This portfolio is anticipated to jumpstart resource mobilization as it equips a potential investor with the details of the region’s priority programs/projects. It shall be a living document, which needs periodic updating and monitoring. The continued concerted efforts among the RDC IX sectoral committee members and the Council itself are therefore fervently sought, in pursuit of regional development. Together as one region, we build a better Zamboanga Peninsula! The RDC IX Secretariat Table of Contents Title Page Background 1 Overview of the ZamPen Priority Programs and Projects for 2 Resource Mobilization Agri-Fishery Development Projects 3 Integrated Rice-Duck Farming, Processing and Marketing 5 Duck Meat Processing and Marketing Project 7 Organic Rice Post-Harvest Processing Facilities 9 Organic Cassava Production and Organic Fertilizer Development Project 11 Establishment of Organic Fertilizer Manufacturing Facility 14 Integrated Development Project for Abaca 16 Rehabilitation/Improvement of Farm-to-Market Road at Sitio Quatro Ojos (West 18 Basilan and Sta. -
ZAMBOANGA DEL NORTE ELECTRIC COOPERATIVE, INC. General Luna St., Central Barangay, Dipolog City
P ZAMBOANGA DEL NORTE ELECTRIC COOPERATIVE, INC. General Luna St., Central Barangay, Dipolog City, Telefax (065)212-2335; Tel. Nos. (065)-212-3444 e-mail: [email protected] =============================================================== INVITATION TO BID The Zamboanga del Norte Electric Cooperative, Inc. (ZANECO) Gen. Luna St., Dipolog City invites all accredited Contractor(s)/Bidder(s) that have track records with ZANECO to submit bids for Labor and Materials for the Construction of Single Phase Lines under NEA Subsidy Project for the following Sitios/Barangays, to wit; Sitio/Barangay Material Cost Labor Cost 1. Purok Gana—an, Poblacion, Sibutad 636,704.35 134,545.06 2. Purok 3, Sibulok, Sibutad 639,924.71 135,194.06 3. Purok 4, Delapa, Sibutad 402,805.33 76,502.34 4. Purok 4, Marapong, Sibutad 533,289.34 107,260.54 TOTAL 2,212,723.73 453,502.00 1. Purok 6, Bagakay, Sibutad 581,020.23 121,085.38 2. Purok A, Sipalok, Sibutad 912,337.52 189,609.78 3. Purok B, Sipaloc, Sibutad 634,728.54 133,491.06 TOTAL 2,128,086.29 444,186.22 Sitio/Barangay Material Cost Labor Cost 1. Purok Daisy, San Nicolas, Dapitan City 703,299.71 150,231.58 2. Purok Sinab, Opao, Dapitan City 759,716.89 163,019.26 3. Sitio Mahayag, Aseniero, Dapitan City 528,799.64 107,504.54 4. Sitio Mahayag, Masidlakon, Dapitan City 751,999.45 161,713.26 TOTAL 2,743,815.69 582,468.64 1. Sitio Mountain Side, Oyan, Dapitan City 770,877.72 166,819.26 2. Sitio Simai, Masidlakon, Dapitan City 553,149.51 113,245.38 3. -
Region IX.Xlsx
FY 2015 DPWH INFRASTRUCTURE PROGRAM Based on GAA (RA 10651) REGION IX Target ( km, lm, Amount Released to/To be UACS Programs/Activities/Projects Scope of Work No of Proj.) (P'000) implemneted by ISABELA CITY DEO (ARMM) 772,755 (Basilan Lone District) 6.98 km 130,000 MF02 3 projs. 51,000 VIILP 15 projs. 489,855 LIP 47 projs. 101,900 I. PROGRAMS 181,000 6.98 km 130,000 MF02 3 projs. 51,000 1. Operations a. MFO 1 - National Road Network Services 0.73 km 30,000 1. Asset Preservation of National Roads a. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) (Intermittent Sections) 1. Arterial Roads 165003010300612 1. Basilan Circumferential Rd - Upgrading from 0.73 km 30,000 Isabela City DEO/ K0000 + 902 - K0001 + 602 asphalt to concrete Isabela City DEO b. MFO 2 - Flood Management Services 1. Construction/ Maintenance of Flood Mitigation 3 projs. 51,000 Structures and Drainage Systems 162003020101249 1. Construction of Kahibaan Bridge 1 proj. 10,000 Isabela City DEO/ Revetment along Isabela-Lamitan Isabela City DEO Road, Km 11+160, Basilan Lone District 162003020101250 2. Construction of Revetment 1 proj. 10,000 Isabela City DEO/ (Grouted Riprap) at Batungal Isabela City DEO Bridge, Km 26+450, Isabela- Maluso Road, Basilan Lone District 162003020101567 3. Construction of Flood Control 1 proj. 31,000 Isabela City DEO/ structure (concrete sheet Piling Isabela City DEO with coping) along Basilan Circumferential road, Isabela - Maluso Road (Garlayan Section) , Sta. 23+960.91 to Sta. -
XA0404125 HEALTH and ENVIRONMENTAL IMPACT of MERCURY in the PHILIPPINES USING NUCLEAR TECHNIQUES Francisco-Rfvera
XA0404125 HEALTH AND ENVIRONMENTAL IMPACT OF MERCURY IN THE PHILIPPINES USING NUCLEAR TECHNIQUES 'NELIA CoRTEs-MkRANMA, J.P. REYEs, L.C.P. PANGANIBAN, 2ANA TRiNiDAD FRANcisco-RfvERA '3 M.L. SUPLIDO 4HiRoKATsu AKAGi National Poisons Control and Information Service, Philippine General Hospital, UP Manila, Taft-Avenue, Manila, Philippines Nuclear Research Institute, National Institute for Minamata Disease 2Occupational Health Division, Non-Communicable Disease Control Service, 2 nd Floor, Bldgl3, Department of Health, San Lazaro Compound, Rizal Avenue Sta. Cruz, Manila 3UpOpen University, Manila, Philippines 4National Institute for Minarnata, Disease-Japan Abstract Mercury pollution in most parts of the regions in the world are caused by release into the environment of metallic mercury used in the recovery of gold by an amalgamationtechnique ith subsequent mercury emission into the atmosphere by blowtorchingoperations. Significant small-scalegold mining operations in other countries such as Tanzania, Philippines,Indonesia, China and Vietnam have been reported with roughly 10 million people estimatedto be involved in these activities Artisanalgold mining activities using mercury has proliferatedin various parts of the country since the early 1980's. In Southern Philippines, it is estimated that a small-scale gold processor utilizes one kilogram of mercury every week or an average of fifty-two kgs.1yr. Production is estimated at 30 kilogramsofgoldperday. Ithasbeenestimatedthat]40tonsofmercui3,fluxhasbeendumpeddirectly into the river systems from small-scale gold mining operations in one of the gold rush areas in the country In the 1980's, gold rush activities intensified in Northeastern Mindanao providing livelihood opportunities to about 80,000-120,000 people at the height of mining activities in the area ]. -
ZAMBOANGA PENINSULA Population by Province, City, Municipality, and Barangay August 2016
CITATION: Philippine Statistics Authority, 2015 Census of Population Report No. 1 – M REGION IX – ZAMBOANGA PENINSULA Population by Province, City, Municipality, and Barangay August 2016 ISSN 0117-1453 ISSN 0117-1453 REPORT NO. 1 – M 2015 Census of Population Population by Province, City, Municipality, and Barangay REGION IX - ZAMBOANGA PENINSULA Republic of the Philippines Philippine Statistics Authority Quezon City REPUBLIC OF THE PHILIPPINES HIS EXCELLENCY PRESIDENT RODRIGO R. DUTERTE PHILIPPINE STATISTICS AUTHORITY BOARD Honorable Ernesto M. Pernia Chairperson PHILIPPINE STATISTICS AUTHORITY Lisa Grace S. Bersales, Ph.D. National Statistician Josie B. Perez Deputy National Statistician Censuses and Technical Coordination Office Minerva Eloisa P. Esquivias Assistant National Statistician National Censuses Service ISSN 0117-1453 Presidential Proclamation No. 1269 Philippine Statistics Authority TABLE OF CONTENTS Foreword v Presidential Proclamation No. 1269 vii List of Abbreviations and Acronyms xi Explanatory Text xiii Map of Region IX– Zamboanga Peninsula xxi Highlights of the Philippine Population xxiii Highlights of the Population: Region IX – Zamboanga Peninsula xxvii Summary Tables Table A. Population and Annual Population Growth Rates for the Philippines and Its Regions, Provinces, and Highly Urbanized Cities: 2000, 2010, and 2015 xxxii Table B. Population and Annual Population Growth Rates by Province, City, and Municipality in Region IX – Zamboanga Peninsula: 2000, 2010, and 2015 xxxv Table C. Total Population, Household Population, Number of Households, and Average Household Size by Region, Province, and Highly Urbanized City as of August 1, 2015: Philippines xxxvii Statistical Tables Table 1. Total Population, Household Population, Number of Households, and Average Household Size by Province, City, and Municipality as of August 1, 2015: Region IX – Zamboanga Peninsula, 2015 1 Table 2.