ZAMBOANGA DEL NORTE ELECTRIC COOPERATIVE, INC. General Luna St., Central Barangay, Dipolog City
Total Page:16
File Type:pdf, Size:1020Kb
P ZAMBOANGA DEL NORTE ELECTRIC COOPERATIVE, INC. General Luna St., Central Barangay, Dipolog City, Telefax (065)212-2335; Tel. Nos. (065)-212-3444 e-mail: [email protected] =============================================================== INVITATION TO BID The Zamboanga del Norte Electric Cooperative, Inc. (ZANECO) Gen. Luna St., Dipolog City invites all accredited Contractor(s)/Bidder(s) that have track records with ZANECO to submit bids for Labor and Materials for the Construction of Single Phase Lines under NEA Subsidy Project for the following Sitios/Barangays, to wit; Sitio/Barangay Material Cost Labor Cost 1. Purok Gana—an, Poblacion, Sibutad 636,704.35 134,545.06 2. Purok 3, Sibulok, Sibutad 639,924.71 135,194.06 3. Purok 4, Delapa, Sibutad 402,805.33 76,502.34 4. Purok 4, Marapong, Sibutad 533,289.34 107,260.54 TOTAL 2,212,723.73 453,502.00 1. Purok 6, Bagakay, Sibutad 581,020.23 121,085.38 2. Purok A, Sipalok, Sibutad 912,337.52 189,609.78 3. Purok B, Sipaloc, Sibutad 634,728.54 133,491.06 TOTAL 2,128,086.29 444,186.22 Sitio/Barangay Material Cost Labor Cost 1. Purok Daisy, San Nicolas, Dapitan City 703,299.71 150,231.58 2. Purok Sinab, Opao, Dapitan City 759,716.89 163,019.26 3. Sitio Mahayag, Aseniero, Dapitan City 528,799.64 107,504.54 4. Sitio Mahayag, Masidlakon, Dapitan City 751,999.45 161,713.26 TOTAL 2,743,815.69 582,468.64 1. Sitio Mountain Side, Oyan, Dapitan City 770,877.72 166,819.26 2. Sitio Simai, Masidlakon, Dapitan City 553,149.51 113,245.38 3. Sitio Tiwalos, Masidlakon, Dapitan City 877,510.58 179,765.78 TOTAL 2,201,537.81 459,830.42 Sitio/Barangay Material Cost Labor Cost 1. Purok 1, Lapu-lapu, Pinan 460,226.38 91,424.02 2. Purok 2, Adante, Pinan 411,112.24 79,976.34 3. Purok 3, Segabe, Pinan 648,217.48 136,057.90 4. Purok 3, Bacuyong, Pinan 631,793.80 132,264.06 5. Purok 3-So. Calapun, Calican, Pinan 943,470.36 204,716.55 TOTAL 3,094,820.26 644,438.87 Sitio/Barangay Material Cost Labor Cost 1. Purok 3, San Jose, La Libertad 333,546.72 59,702.66 2. Purok 1, San Miguel, Mutia 855,763.10 174,928.94 3. Purok 4, Alvinda, Mutia 601,849.25 124,727.06 TOTAL 1,791,159.07 359,358.66 1. Purok 1, San Roque, Rizal 507,472.63 98,973.38 2. Purok 3, Mitimos, Rizal 595,999.23 121,986.22 3. Purok Marang, San Antonio, Polanco 414,446.93 83,919.32 TOTAL 1,517,918.79 304,878.92 Sitio/Barangay Material Cost Labor Cost 1. Sitio New Barlie, Lawaan, Tampilisan 569,367.09 120,886.70 2. Purok Palkatahan, Poblacion, Tampilisan 723,045.21 159,116.90 3. Purok Vervena Quarry, Poblacion, 720,004.38 158,178.90 Tampilisan 4. Purok 1, Banbanan, Tampilisan 872,806.87 196,069.10 TOTAL 2,885,223.55 634,251.60 1. Sitio Sto. Nino, Lux, Gutalac 1,144,556.06 242,310.93 TOTAL 1,144,556.06 242,310.93 Non-refundable Bid document in the amount of Thirteen Thousand Pesos (Php 13,000.00) shall be issued upon payment. A bid shall have three (3) components, namely; eligibility, technical and financial components which should be in separate envelopes and shall be submitted simultaneously by the BAC Secretary at ZANECO Main Office, Gen. Luna Street, Dipolog City on/before August 29, 2013 (office hours). Opening of Bids shall be on August 30, 2013 at 9:00 o’clock in the morning at the aforementioned place of which the said proposal shall be opened and read in the presence of the bidders or their authorized representatives. The specific amounts and allowable forms of the Bid security shall be as follows: Minimum Amount in % of Total Form of Security Contract Price 1. Cash, certified check, cashier’s check, manager’s check, bank draft or One percent (1%) irrevocable letter of credit 2. Bank guarantee Three percent (3%) 3. Surety bond Five percent (5%) Reference: Policy Bulletin No. 4-12D Failure to enclose the required bidder’s bond shall automatically disqualify the bid concerned. The winning bidders shall be required to post performance bond based on the following allowable forms; Minimum Amount in % of Total Form of Security Contract Price Cash, certified check, cashier’s check, manager’s check, bank draft or Five percent (5%) irrevocable letter of credit Bank guarantee Ten percent (10%) Surety bond Thirty percent (30%) Reference: Policy Bulletin No. 4-12D Said deposit shall remain valid and could only be withdrawn after the ZANECO receives certificate of final inspection of Electric Cooperative Inspectors stating that the construction of line has been completed and ready for energization. ZANECO reserves the right to reject any or all bids without offering any reason to waive any minor defects or informalities therein and to accept any or all offers or proposals as may be considered most responsive and advantageous to the cooperative. It assumes no obligation whatsoever for any expenses or loss that may be incurred by the bidders in the preparation of bids, nor does it guarantee that an award shall be made. (Sgd.) VIRGINIO F. CARDENAS, REE PBAC Chairperson .