Submarine Power Cable SUBMARINE POWER CABLE Submarine power cables are cables for electrical power running through the sea, below the surface. For transmission of large amounts of electric power through submarine cables, direct current(DC) is preferred, because DC cables require less reactive power than submarine AC cables. As well, for three phase AC-cables three conductors are necessary, while for DC only 1 or 2 conductors are required. A DC system may use the ground and seawater as a return path for current. However this cannot be always practiced because of disturbances to magnetic compass systems on vessels crossing the cable and because of ecological effects of electrochemical reactions at the electrodes. The length of AC cables is restricted by the capacitance between the active conductors and the surrounding earth (or water). If the cable were to be made long enough, the reactive power consumed by the cable would take up the entire current carrying capacity of the conductor, so no usable power would be transmitted. Submarine cables for AC . Sweden-Bornholm (110kV) . Spain-Morocco (380 kV) . Öresund (380 kV) . Strait of Messina (380kV), replaced overhead line crossing (Pylons of Messina) . Isle of Man to England Interconnector (90kV) Submarine cables for DC . HVDC Gotland (the first commercial HVDC submarine cable installation) . HVDC Cross-Channel (Submarine cable between UK and France) . HVDC Inter-Island (Power line between the islands of New Zealand) . Konti-Skan (Powerline between Sweden and Denmark) . HVDC Italy-Corsica-Sardinia (SACOI, Submarine cable link between Italy, Corsica and Sardinia) . HVDC Vancouver Island (link between Vancouver Island and the Canadian mainland) . HVDC Hokkaido-Honschu (between Hokkaido and Honshu) . Cross-Skagerak (between Norway and Denmark) . Kontek ( between Germany and Denmark) . Baltic-Cable (between Germany and Sweden) . Swepol (between Poland and Sweden) . HVDC Italy-Greece (between Italy and Greece) . HVDC Leyte - Luzon (between Leyte and Luzon) . Kii Channel HVDC system (through Kii-channel, Japan) . Cross Sound Cable (between New York and Connecticut, USA) . HVDC Moyle (between Scotia and Northern Ireland) . HVDC Bass-Strait (between Victoria, Australia and Tasmania, Australia) Source: http://engineering.wikia.com/wiki/Submarine_power_cable .
Recommended publications
  • Offshore Wind Submarine Cable Spacing Guidance
    Offshore Wind Submarine Cable Spacing Guidance Contract # E14PC00005 United States Department of Interior Bureau of Safety and Environmental Enforcement December 2014, For Public Use Offshore Wind Submarine Cable Spacing Guidance Contract # E14PC00005 United States Department of Interior Bureau of Safety and Environmental Enforcement December 2014, For Public Use The authors gratefully acknowledge permission of the Crown Estate to base parts of this report on their study “Principles of Cable Routing and Spacing (2012)”, Reference ID 8 in this report Document Control Responsible for Job Title Name Date Signature Chris Sturgeon Cables specialist Jim Hodder Cables specialist Colin Poat Cables specialist Content 2014-12-15 Cables specialist Steven Drew Principal Environmental Consultant Rachel McCall EHS Senior Consultant Tanjia Maynard Checked EHS Senior Consultant Tanjia Maynard 2014-12-15 Approval Principal Engineer Jim Doane 2014-12-15 Copyright: PMSS © Document Reference: 734300670/140708 Signatures in this approval box have checked this document in line with the requirements of QP16 This report has been prepared by TÜV SÜD PMSS and Red Penguin Associates with all reasonable skill and care, within the terms of the contract with the Client. The report contains information from sources and data which we believe to be reliable but we have not confirmed that reliability and make no representation as to their accuracy or completeness. The draft report is confidential to the Client and TÜV SÜD PMSS accepts no responsibility to any third party to whom information in this report may be disclosed. No part of this document may be reproduced without the prior written approval of TÜV SÜD PMSS © TÜV SÜD PMSS 2014 Offshore Wind Submarine Cable Spacing Guidance 1 Bureau of Safety and Environmental Enforcement Table of Contents Abbreviations 2 1.
    [Show full text]
  • Development of Submarine MV AC Power Cable With
    B5.2 9th International Conference on Insulated Power Cables B5.2 Development of submarine MV-AC power cable with aluminum conductor Sven MUELLER-SCHUETZE, Heiner OTTERSBERG, Carsten SUHR, Ingo KRUSCHE, Norddeutsche Seekabelwerke GmbH/General Cable, Nordenham, Germany, [email protected], [email protected], [email protected], [email protected] Daniel ISUS FEU, General Cable, Manlleu, Spain, [email protected] ABSTRACT cables due to its very good conductivity. However, the high demand of copper material results in a very high A single armored MV-AC submarine power cable with an market value. This was set to above 6000 $/ton at the aluminum conductor was developed for offshore beginning of April 2015. renewable energy, interconnections between offshore platforms, islands and shore. For the cable design Aluminum has lower conductivity compared to copper process an intended installation in water depths up to 300 resulting in the need to select larger conductor cross m and the application of additional cable protection sections. Despite the larger conductor cross section, cost methods such as rock dumping for on-bottom stabilization reduction is achieved due to the lower material price of were considered. aluminum compared to copper. At the beginning of April 2015 the market value for aluminum was oscillating A type test has been successfully performed on 3x 800 around 1770 $/ton. Due to that market value difference mm² 19/33 (36) kV XLPE submarine power cable with an aluminum is a cost-effective replacement for copper as aluminum conductor. The qualification program was conductor material. During the selection conductor performed under consideration of the CIGRE Electra 171, material, both the electrical and mechanical material CIGRE TB 490, IEC 60502-2 and CENELEC HD620-10C properties were reviewed for all aluminum alloy standards.
    [Show full text]
  • Offshore Wind Submarine Cabling Overview Fisheries Technical Working Group
    OFFSHOREoverview WIND SUBMARINE CABLING Fisheries Technical Working Group Final Report | Report Number 21-14 | April 2021 NYSERDA’s Promise to New Yorkers: NYSERDA provides resources, expertise, and objective information so New Yorkers can make confident, informed energy decisions. Our Vision: New York is a global climate leader building a healthier future with thriving communities; homes and businesses powered by clean energy; and economic opportunities accessible to all New Yorkers. Our Mission: Advance clean energy innovation and investments to combat climate change, improving the health, resiliency, and prosperity of New Yorkers and delivering benefits equitably to all. Courtesy, Equinor, Dudgeon Offshore Wind Farm Offshore Wind Submarine Cabling Overview Fisheries Technical Working Group Final Report Prepared for: New York State Energy Research and Development Authority Albany, NY Morgan Brunbauer Offshore Wind Marine Fisheries Manager Prepared by: Tetra Tech, Inc. Boston, MA Brian Dresser Director of Fisheries Programs NYSERDA Report 21-14 NYSERDA Contract 111608A April 2021 Notice This report was prepared by Tetra Tech, Inc. in the course of performing work contracted for and sponsored by the New York State Energy Research and Development Authority (hereafter “NYSERDA”). The opinions expressed in this report do not necessarily reflect those of NYSERDA or the State of New York, and reference to any specific product, service, process, or method does not constitute an implied or expressed recommendation or endorsement of it. Further, NYSERDA, the State of New York, and the contractor make no warranties or representations, expressed or implied, as to the fitness for particular purpose or merchantability of any product, apparatus, or service, or the usefulness, completeness, or accuracy of any processes, methods, or other information contained, described, disclosed, or referred to in this report.
    [Show full text]
  • Submarine Cables, There's Power Under Water!
    Submarine cables, there's power under water! Marco Marelli, SC B1 Chair (IT) [email protected] Submarine power cables are now among the most important key enablers for the energy transition. Power generation from Renewable Energy Sources (RES) and interconnection among networks are, in fact ,the two main areas where energy links across water is developing massively and – as such – are driving the recent technological evolution. Figure 1 – Laying activities for Submarine cables (source TB 610) In recent years the number and size of installed offshore wind farms have increased rapidly and more and larger farms are being planned. Other types of offshore generation are expected to come in the near future, such as tidal and wave energy generation. Submarine cables are and will be an essential part of this development where they are used as array cables between the generators, as export cables to connect the offshore generation farms with the onshore transmission grid, and even as part of interconnections between different synchronous systems, countries, or price areas . Another important factor for the energy transition is the implementation of a large electrical grid. The number of HVDC interconnectors in the construction stage is larger than ever before. Also, there are many projects in progress at various preliminary stages (planning, studies, …), and they are typically very long and with higher power ratings, thus pushing voltages to new levels with new cable technologies. Typical drivers are the “political” change toward green energy production as well as the differential cost of energy between countries/areas that make viable and desirable the interchange of energy in parallel or in substitution of new generation plants.
    [Show full text]
  • Socio-Economic Baseline Reviews for Offshore Renewables in Scottish Waters
    RPA. Marine Scotland Socio-economic Baseline Reviews for Offshore Renewables in Scottish Waters Volume 1: Main Text Report R.1905 September 2012 RPA. Marine Scotland Socio-economic Baseline Reviews for Offshore Renewables in Scottish Waters Volume 2: Figures Report R.1905 September 2012 Marine Scotland Socio-economic Baseline Reviews for Offshore Renewables in Scottish Waters Date: September 2012 Project Ref: R4032/3 Report No: R.1905 © ABP Marine Environmental Research Ltd Version Details of Change Authorised By Date 1 Working Copy C E Brown 02.12.11 2 Final C E Brown 07.02.12 3 Final C E Brown 26.04.12 4 Final C E Brown 28.06.12 5 Final C E Brown 24.09.12 Document Authorisation Signature Date Project Manager: C E Brown Quality Manager: H Roberts Project Director: S C Hull ABP Marine Environmental Research Ltd Quayside Suite, Medina Chambers Town Quay Tel: +44(0)23 8071 1840 SOUTHAMPTON Fax: +44(0)23 8071 1841 Hampshire Web: www.abpmer.co.uk SO14 2AQ Email: [email protected] ABPmer is certified by: All images copyright ABPmer apart from front cover (wave, anemone, bird) and policy & management (rockpool) Andy Pearson www.oceansedgephotography.co.uk Socio-economic Baseline Reviews for Offshore Renewables in Scottish Waters Summary ABP Marine Environmental Research Ltd (ABPmer) and RPA were commissioned by Marine Scotland to prepare a baseline socio-economic review to inform impact assessments of future sectoral plans for offshore wind and wave and tidal energy in Scottish Territorial Waters and waters offshore of Scotland (hereafter „Scottish Waters‟). This report provides a national overview of socio-economic activities together with regional baseline reviews covering the six Scottish Offshore Renewable Energy Regions (SORERs).
    [Show full text]
  • The Scottish Marine Protected Area Project – Developing the Evidence Base for Impact Assessments and the Sustainability Appraisal Final Report
    Planning Scotland’s Seas The Scottish Marine Protected Area Project – Developing the Evidence Base for Impact Assessments and the Sustainability Appraisal Final Report Marine Scotland The Scottish Marine Protected Area Project – Developing the Evidence Base for Impact Assessments and the Sustainability Appraisal Final Report Date: July 2013 Project Ref: R/4136/1 Report No: R.2097 © ABP Marine Environmental Research Ltd Version Details of Change Date 1.0 Draft 29.04.2013 2.0 Draft 15.05.2013 3.0 Final 07.06.2013 4.0 Final 28.06.2013 5.0 Final 01.07.2013 6.0 Final 05.07.2013 Document Authorisation Signature Date Project Manager: S F Walmsley PP 05.07.2013 Quality Manager: C E Brown 05.07.2013 Project Director: S C Hull 05.07.2013 ABP Marine Environmental Research Ltd ABPmer is certified by: Quayside Suite, Medina Chambers, Town Quay, Southampton, Hampshire SO14 2AQ Tel: +44 (0) 23 8071 1840 Fax: +44 (0) 23 8071 1841 Web: www.abpmer.co.uk Email: [email protected] All images copyright ABPmer apart from front cover (wave, anemone, bird) and policy & management (rockpool) Andy Pearson www.oceansedgepzhotography.co.uk The Scottish Marine Protected Area Project – Developing the Evidence Base for Impact Assessments and the Sustainability Appraisal Summary Introduction The Marine (Scotland) Act and the UK Marine and Coastal Access Act contain provisions for the designation of a network of Marine Protected Areas (MPAs) in Scottish territorial and offshore waters in order to protect marine biodiversity and geodiversity and contribute to a UK and international network of MPAs.
    [Show full text]
  • The Norned Hvdc Link – Cable Design and Performance
    ReturnClose and to SessionReturn THE NORNED HVDC LINK – CABLE DESIGN AND PERFORMANCE Thomas WORZYK, ABB Power Systems, Sweden, [email protected] Mats SJÖBERG, ABB Power Systems, Sweden, [email protected] Jan-Erik SKOG, Statnett, Norway, [email protected] Kees KOREMAN, TenneT, The Netherlands, [email protected] ABSTRACT The NorNed link is the longest submarine power cable +450 kV system ever with a distance of 580 km. The bipolar HVDC DC-cable system with ± 450 kV dc represents the state-of-the-art of “classic” HVDC technology while modern production and installation technology helped to push forward the limit of Eemshaven -450 kV Feda HVDC power transmission. This paper describes some of the characteristics of the power cables in the NorNed link. Figure 1. NorNed main circuit configuration KEYWORDS NorNed, HVDC, mass-impregnated cable, submarine cable. CABLE ROUTE INTRODUCTION The challenging cable route includes the following components: The cables for NorNed were supplied by two manufacturers. o Trenched land cable in the Netherlands Technical data given in this paper relate to the cables o Submarine cable in the tidal flats off the Netherlands, supplied from one manufacturer for approx. 70% of the with strict environmental installation requirements, and cable route. risks of moving sands changing the thermal cable ambient o Long portions of flat sea bottom with boulder fields with NORNED HVDC CABLE LINK water depth <100 m The NorNed link connects the Dutch to the Norwegian o The Norwegian trench with up to 400 m of water national power grid. Since these grids belong to different o Steep tunnels in Norway power frequency control areas in Europe (UCPTE and Nordel, resp.) they are asynchronous.
    [Show full text]
  • Submarine Power Cables Submarine Power Cables
    Submarine Power Cables Submarine Power Cables Since decades Nexans‘ plant in Han- The properties of cross-linked poly- a lead sheath. Their construction is nover is specialised in the design, ethylene (XLPE) and ethylene propylene therefore of lighter weight permitting production and installation of low and rubber (EPR) insulated cables longer continuous delivery lengths and medium voltage submarine power cab- Cross linked polyethylene and EPR have easier handling during transportation les required for river or lake crossings, proven as excellent cable insulating com- and laying. The bending radius is power supply to islands and platforms pounds for submarine power cables. small. The solid dielectric and the hea- for offshore oil and gas production and The main reasons are the outstanding vy steelwire armouring are superior to offshore wind mill parks. electrical and mechanical properties of the paper insulated and lead sheathed Numerous successfully completed these materials. Compared to oil filled cables and are much less sensitive to projects with our cables in Europe and paper insulated submarine cables, severe stresses to which submarine cab- overseas have proven the capability of XLPE and EPR insulated cables offer the les are subjected during transportation, Nexans ‘s highly skilled technical staff following advantages: laying and operation. to cope with submarine cable design, • XLPE and EPR are solid dielectrics. They • The main electrical and mechanical production, transportation and laying are maintenance free, no supervision characteristics of XLPE and EPR insula- problems. and control of the oil level in the cable ted medium voltage cables compared The experience gained by Nexans in systems is necessary.
    [Show full text]
  • Talk 20Th Jan 2021
    21/01/2021 Mike Bamford BBC News Feb 2020 Britain has increasingly managed to wean its electricity supply off coal. In 2019 the country's power networks went for more than a fortnight without burning a single lump, thought to be the first time since the 1880s. Coal was supplying only 2% of the country's energy needs. It has largely been replaced by gas, which provided2 50% and wind, 17%. 1 2 3 4 5 4 5 How is electricity made and controlled? 7 8 7 8 1 21/01/2021 9 11 9 11 Grid operator is obligated to keep the 13 14 frequency within 49.5 and 50.5Hz 13 14 Hundreds of renewable energy projects may be asked to turn off this weekend to avoid overloading the grid as the UK’s electricity demand plummets to record lows. Britain’s demand for electricity is forecast to tumble to a fifth below normal levels due to the spring bank holiday and the shutdown of shops, bars and restaurants mandated by the coronavirus lockdown. National Grid is braced for electricity demand to fall to 15.6GW on Saturday afternoon – a level usually associated with the middle of the night – and continue to drop even lower in the early hours of Sunday morning. January 2021 National Grid warned last month that the low demand for electricity could mean that renewable energy is turned off to avoid overloading the grid with more electricity than the UK can use. 16 17 16 17 2 21/01/2021 Saturday 10 August 2019 at 1:20am A one bar electric fire uses 1,000 watts.
    [Show full text]
  • Durham Research Online
    Durham Research Online Deposited in DRO: 15 November 2019 Version of attached le: Published Version Peer-review status of attached le: Peer-reviewed Citation for published item: Giampieri, Alessandro and Ma, Zhiwei and Chin, Janie Ling and Smallbone, Andrew and Lyons, Padraig and Khan, Imad and Hemphill, Stephen and Roskilly, Anthony Paul (2019) 'Techno-economic analysis of the thermal energy saving options for high-voltage direct current interconnectors.', Applied energy., 247 . pp. 60-77. Further information on publisher's website: https://doi.org/10.1016/j.apenergy.2019.04.003 Publisher's copyright statement: c 2019 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY license. (http://creativecommons.org/licenses/by/4.0/) Additional information: Use policy The full-text may be used and/or reproduced, and given to third parties in any format or medium, without prior permission or charge, for personal research or study, educational, or not-for-prot purposes provided that: • a full bibliographic reference is made to the original source • a link is made to the metadata record in DRO • the full-text is not changed in any way The full-text must not be sold in any format or medium without the formal permission of the copyright holders. Please consult the full DRO policy for further details. Durham University Library, Stockton Road, Durham DH1 3LY, United Kingdom Tel : +44 (0)191 334 3042 | Fax : +44 (0)191 334 2971 https://dro.dur.ac.uk Applied Energy 247 (2019) 60–77 Contents lists available at ScienceDirect
    [Show full text]
  • [email protected] Norned – World's Longest Power Cable J.E
    21, rue d’Artois, F-75008 PARIS B1_106_2010 CIGRE 2010 http : //www.cigre.org NorNed – World’s longest power cable J.E. SKOG H. van ASTEN T. WORZYK T. ANDERSRØD Statnett TenneT ABB Nexans Norway The Netherlands Sweden Norway SUMMARY The NorNed cable was commissioned on 6 May 2008 after three years of intensive engineering and construction. It was important for this efficient implementation that a core project team had been maintained over a relatively long period, preparing all licences, all major supply contracts, etc. The paper will describe the way of detailed engineering, manufacturing and installing altogether 1160 km of high voltage cable, some of it in form of a two core cable and a major part as ordinary single- core cable. The strict magnetic compass deviation requirements as well as environmental concerns related to the magnetic field set up by a single cable led to the special two-core mass-impregnated cable used in the NorNed project. In the northerly deeper part of the cable route ordinary single-core cable was applied. The North Sea is a rough working place and the work scope offshore was far beyond all other known submarine power cable projects. How NorNed managed the resulting challenges is being described. The extensive offshore jointing activities have resulted in experiences which are important for future projects of a similar kind. After having been laid, the cables were protected by water jet trenching over close to 97% of the cable route. The rest, including the crossings, has been given protection by rock dumping. Following successful after installation test NorNed experienced two offshore cable failures and had to mobilise extra vessel spreads in order to get the situation restored.
    [Show full text]
  • Feasibility Analysis of Turkey-North Cyprus Submarine
    FEASIBILITY ANALYSIS OF TURKEY-NORTH CYPRUS SUBMARINE ELECTRIC INTERCONNECTOR CABLE INCLUDING EXTERNALITIES A THESIS SUBMITTED TO THE BOARD OF GRADUATE PROGRAMS OF MIDDLE EAST TECHNICAL UNIVERSITY, NORTHERN CYPRUS CAMPUS BY AHMAD RASHEED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF SCIENCE IN SUSTAINABLE ENVIRONMENT AND ENERGY SYSTEMS AUGUST 2019 Approval of the Board of Graduate Programs _______________________ Prof. Dr. Gürkan Karakaş Chair person I certify that this thesis satisfies all the requirements as a thesis for the degree of Master of Science. ______________________ Asst. Prof. Dr. Ceren İnce Program Coordinator This is to certify that we have read this thesis and that in our opinion it is fully adequate, in scope and quality, as a thesis for the degree of Master of Science. _______________________ Assoc. Prof. Dr. Murat Fahrioğlu Supervisor Examining Committee Members Assoc. Prof. Dr. Murat Fahrioğlu EEE Program METU NCC __________________ Asst. Prof. Dr. Hayriye Kahveci PSIR Program METU NCC __________________ Assoc. Prof. Dr. Hasan Güngör Dept. of Eco. EMU __________________ DECLARATION I hereby declare that all the information in this document has been obtained and presented in accordance with academic rules and ethical conduct. I also declare that, as required by these rules and conduct, I have fully cited and referenced all material and results that are not original to this work. Name, Surname: Signature : i ABSTRACT FEASIBILITY ANALYSIS OF TURKEY-NORTH CYPRUS SUBMARINE ELECTRIC INTERCONNECTOR CABLE INCLUDING EXTERNALITIES Rasheed, Ahmad M.Sc. Sustainable Environment and Energy Systems Supervisor: Assoc. Prof. Dr. Murat Fahrioğlu August 2019, 78 pages Heavy dependency of electrical industry on fossil fuels have led to overexploitation of natural resources, which causes emission of greenhouse gases and climatic change.