By Road Proximity to Milton Park Milton Park Is Located Close to the A34 Road Just 12 London West End 60 Miles 96 Km Miles South of Oxford

Total Page:16

File Type:pdf, Size:1020Kb

By Road Proximity to Milton Park Milton Park Is Located Close to the A34 Road Just 12 London West End 60 Miles 96 Km Miles South of Oxford DIRECTIONS TO ADAPTIMMUNE OFFICES Building 101 (Corporate): 101 Park Drive, Milton Park, Abingdon, Oxfordshire OX14 4RY Building 91 (R&D): 91 Park Drive, Milton Park, Abingdon, Oxfordshire OX14 4RY Switchboard/Reception: Tel. +44 (0)1235 430000 Location The Adaptimmune offices are located on Milton Park, just off the A34 close to the M4 and M40 and with fast train links from nearby Didcot Parkway station to London, Bristol, Oxford and Reading. Heathrow Airport is just one hours drive away. Directions to Adaptimmune Corporate office (building 101) from A34 101 Park Drive, Milton Park, Abingdon, Oxfordshire OX14 4RY Enter Milton Park from the A34 (Milton Interchange) and pass the Park Security Building on your left. At the first roundabout the Park Centre is on your right (a large ‘tent like’ building) – take the second exit to carry straight on. At the next roundabout take the second exit to carry on along the main road. Building 101 is the second turning on the right (just past the bus stop). See Milton Park map on page 3. Visitor’s car parking spaces are allocated in front of the building. If this parking is full, further parking is available in front of B91 (below) and it is a short walking distance between the two buildings. Directions to Adaptimmune R&D facility (building 91) from A34 91 Park Drive, Milton Park, Abingdon, Oxfordshire OX14 4RY Enter Milton Park as above. At the first roundabout the Park Centre is on your right (a large ‘tent like’ building) – take the second exit to carry straight on. At the next roundabout take the second exit to carry on along the main road, and then almost immediately take the next turning on the left (opposite the Innovation Centre, 99 Park Drive). Follow the road to the end and 91 Park Drive is on your right (see Milton Park map on page 3). Visitor’s car parking spaces are allocated in front of the building. By Road Proximity to Milton Park Milton Park is located close to the A34 road just 12 London West End 60 miles 96 km miles south of Oxford. There is direct access to the Oxford 12 miles 19.2 km M4 (13 miles south) and to the M40 (23 miles Heathrow airport 44 miles 70.4 km north). Milton Park is signposted directly from the Newbury 17 miles 27.2 km Milton Interchange turn off on the A34. Swindon 28 miles 44.8 km Birmingham 81 miles 129.6 km M40 23 miles 33.6 km M4 13 miles 20.4 km By Train Train travel times from Didcot Parkway The nearest train station to Milton Park is Didcot train station Parkway. It is located just 3 miles to the east of (based on fastest times) Milton Park and is a 10 minute taxi ride to the Oxford 14 minutes Adaptimmune offices. Didcot Parkway station provides frequent and fast rail connections to Reading 14 minutes London and the West. Taxis are readily available London Paddington 45 minutes from the taxi rank outside the station. Bristol Parkway 56 minutes London Heathrow 15 minutes (from London Paddington station via Heathrow Express) By Air The closest international airport is London Heathrow (LHR = A), from which a frequent Heathrow Express train link can take you directly into London Paddington train station (B) (approx. 15 minutes journey time). From Paddington station, pick up a train to Didcot Parkway station (approx. 1 hour journey). Adaptimmune offices are a short 10 minute taxi ride from Didcot Parkway train station. Alternatively, if travelling by road from Heathrow airport to Adaptimmune offices (C), it is recommended to allow 1 hour 30 minutes in case of heavy traffic. Milton Park London Paddington Train Station Heathrow Airport Adaptimmune - R&D Adaptimmune - Corporate 91 Park Drive, Milton Park 101 Park Drive, Milton Park, OX14 4RY OX14 4RY Tel: +44 (0)1235 430000 Tel: +44 (0)1235 430000 .
Recommended publications
  • Milestones & Waymarkers
    MILESTONES & WAYMARKERS The Journal of the Milestone Society incorporating On the Ground Volume Seven 2014 ISSN. 1479-5167 FREE TO MEMBERS OF THE MILESTONE SOCIETY MILESTONES & WAYMARKERS incorporating On the Ground Volume Seven 2014 MILESTONES & WAYMARKERS The Journal of the Milestone Society incorporating On the Ground Volume Seven 2014 The Milestone Society—Registered Charity No 1105688 ISSN 1479-5167 PRODUCTION TEAM John V Nicholls, 220 Woodland Avenue, Hutton, BRENTWOOD, Essex, CM13 1DA Email: [email protected] Supported by the Editorial Panel of Carol Haines, Mike Hallett, Keith Lawrence and David Viner MAIN CONTENTS INTRODUCTION This latest issue of one of the Society’s two principal Emergency Powers and the Milestones 3 publications in print marks ten years of publishing this A Cheshire milepost 6 Journal, now firmly established as an annual publication It happened at the milestone 7 and permanent place of record, especially as since 2011 The A34 – A Tribute to Ogilby? 11 it has incorporated the valuable On The Ground section, From the Archives previously published separately. Lost mileposts of the Middx & Essex Turnpike 12 Its seven issues between 2004 and 2010 together On the Ground 13 with seven issues of Milestones & Waymarkers since Scotland 2004 represents a significant archive, especially when 20 taken together with the Society’s six-monthly Newslet- ‘Crossing the Pennines’ Heritage Trail 21 ter, which by the turn of 2014/15 will have published 28 Milestones from Overseas issues since the very early days of the Society in 2001. Sri Lanka, Malta, New Zealand 22 Much has changed over that period, not least the Book Review: Moving Miles 26 growing use of the website to share new information and The Roehampton Mounting Block and ‘Milestone’ 27 increasingly to record activities.
    [Show full text]
  • M3 Junction 9 Improvement Scheme PCF Stage 2 – Report on Public Consultation
    M3 Junction 9 Improvement Scheme PCF Stage 2 – Report on Public Consultation March 2018 Registered office Bridge House, 1 Walnut Tree Close, Guildford, GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363 M3 Junction 9 Improvement Scheme PCF Stage 2 – Report on Public Consultation M3 JUNCTION 9 IMPROVEMENT SCHEME PCF STAGE 2 (OPTION SELECTION) REPORT ON PUBLIC CONSULTATION Highways England Date: March 2018 Project no: 70015218 HE PIN: 551511 Prepared for: Highways England Bridge House Walnut Tree Close Guildford Surrey GU1 4LZ Mountbatten House Basing View Basingstoke RG21 4HJ Hampshire United Kingdom Tel: +44-(0) 1256 318800 www.wsp.com ii M3 Junction 9 Improvement Scheme PCF Stage 2 – Report on Public Consultation QUALITY MANAGEMENT ISSUE/REVISION FIRST ISSUE REVISION 1 REVISION 2 REVISION 3 SUITABILITY Remarks P01 Date March 2018 Carole Lehman / Prepared by Adam Webb Signature Checked by Duncan Brooks Signature Authorised by Pradeep Agrawal Signature PIN: HE551511 Project number WSP ref: 70015218 Report number HE551511-WSP-GEN-M3J9PCF2-RP-TR-00048 iii M3 Junction 9 Improvement Scheme PCF Stage 2 – Report on Public Consultation PRODUCTION TEAM CLIENT (HIGHWAYS ENGLAND) Major Projects Programme Lead Steve Hoesli Major Projects Senior Project Neil Andrew Manager Major Projects Project Manager Simon Hewett Senior User Representative Paul Benham WSP Tel: +44 (0)1684 851 751 RIS Area 3 Programme Director Steve O’Donnell RIS Area 3 Programme Manager Stuart Craig Tel: +44 (0)1256 318 660 Project Director Roland Diffey Tel: +44 (0)1256 318 777 Project Manager Pradeep Agrawal Tel: +44 (0)2031 169 090 iv M3 Junction 9 Improvement Scheme PCF Stage 2 – Report on Public Consultation TABLE OF CONTENTS Executive Summary ...................................................................................9 1.
    [Show full text]
  • The Winnallwinnall
    TheThe WinnallWinnall CommunityCommunity PlanPlan 1 Foreword This report presents the culmination of 4 years of work to identify the good points and bad points that make Winnall the place it is and what the people who live here really think about the place. There is a lot to like about Winnall, but there are always things to be improved. We spoke to the residents in person and undertook a questionnaire, we spoke to young and old Winnall residents in special consultations to try and find out as much as we could about what they felt needed to be fixed and what could be improved. There were plenty of suggestions. One significant thing we learned about Winnall was actually how good it is. While the residents who responded to questions were able to identify a number of problems and problems areas, this should not detract from the low crime rate, the large number of facilities and the excellent com- munity spirit. The questionnaire showed a large number of people who spent many years, indeed decades, in Winnall. Of the respondents who made a comment, one simply wrote “A great place to live!” That is not to say there isn't a lot to do, and that is the real purpose of the community plan. The best way of finding out what the problems are is to go to the people who know about them, and while everyone may have their own opinion, there are certainly a lot of problems that are shared by a large number of people. Transport featured regularly as did parking and queues on main routes to the motorway were considered a major problem in Winnall.
    [Show full text]
  • An Improved Backcalculation Method to Predict Flexible
    AN IMPROVED BACKCALCULATION METHOD TO PREDICT FLEXIBLE PAVEMENT LAYERS MODULI AND BONDING CONDITION BETWEEN WEARING COURSE AND BASE COURSE by BACHAR AL HAKIM BSc, MSc, MASCE, MIHT A thesis submitted to Liverpool John Moores University for the degree of Doctor of Philosophy Liverpool John Moores University School of the Built Environment Liverpool United Kingdom. April 1997. This thesis is dedicated to the souls of my mum and my twin brother, whom I lost during this research period. ACKNOWLEDGEMENTS The author wishes to express his sincere appreciation to Dr H. Al-Nageim, Professor L. Lesley and Mr D. Morley under whose supervision this research project was conducted. Sincere thanks are due to Dr D. Pountney for his advice concerning the mathematical, statistical and computer works. A special thank is also extended to Professor D. Jagger, the School Deputy Director for Research and Developments for his help and support. The author acknowledges the co-operation of Cheshire County Council for permission of access to the A34 road pavements, University of Ulster for the Nottingham Asphalt Tester provision and SWK Pavement Engineering Limited for providing the A41 pavement results for analysis. Researchers, staff and technicians of the School of the Built Environment are thanked for their friendship and help. Finally the author wishes to dedicate this thesis to his parents, his wife and his son for their understanding, love and moral support. ABSTRACT The aim of this research project is to develop an improved backcalculation procedure, for the determination of flexible pavement properties from the Falling Weight Deflectometer (FWD) test results. The conventional backcalculation methods estimate the pavement layer moduli assuming full adhesion exists between layers in the analysis process.
    [Show full text]
  • Project Name Construction Start Actual Construction End
    Construction Construction Construction Project Name Start Actual End Planned End Actual M5 J11a-12 MP 86/9 Geotech 10/01/2013 19/04/2013 21/03/2013 M5 J20-21 VRS MP 155/5 - 159/0 10/01/2013 17/01/2014 17/01/2014 M5 J31 Exminster Drainage 02/09/2011 30/10/2011 30/10/2011 A38 Lee Mill to Voss Farm FS C 01/10/2009 01/04/2011 01/04/2011 A30 SCORRIER-AVERS W/B & E/B C 02/02/2012 01/07/2012 01/03/2012 A30 PLUSHA KENNARDS HSE E/B C 18/09/2012 24/09/2012 25/09/2012 A38 WHISTLEY HILL DRAINAGE C 07/11/2011 24/12/2011 23/12/2011 A47 Guyhirn Bank C NP 19/09/2012 28/09/2012 29/09/2012 A120 Coggeshall Bypass East C 13/11/2012 16/11/2012 16/11/2012 A14 Orwell to Levington C 04/11/2013 11/11/2013 11/11/2013 A14SpittalsI/CResurfacingC NP 02/07/2012 07/08/2013 26/07/2012 A38 Clinnick R/W & White C 11/03/2012 06/07/2012 06/07/2012 A30 Whiddon Down to Woodleigh 01/12/2011 14/02/2012 14/02/2012 A49 KIMBOLTON RETAINING-CapRd 11/02/2013 10/04/2013 30/04/2013 NO3:A404 A308toA4130 SB Appl C 16/07/2012 18/07/2012 21/07/2012 NO3 M4 J6-7 EB Cippenham C 24/09/2012 11/08/2012 16/11/2012 A36 Southington Farm Geotech C 05/09/2011 24/06/2011 21/10/2011 A303 BOSCOMBE DOWN RS C 01/01/2011 30/06/2011 30/06/2011 M5 J18 Avonmouth slip lighti C 01/02/2012 31/03/2012 31/03/2012 A303 South Pethrton St Light C 01/05/2011 30/09/2011 30/09/2011 A303Cartgate RAB St Lighting C 01/01/2012 29/02/2012 29/02/2012 A4 Portway Signals C 01/02/2011 30/09/2011 30/09/2011 M4/M5 Alm.
    [Show full text]
  • Annex 1 Consultation Questionnaire
    Annex 1 Consultation Questionnaire A34 Perry Barr Highway Improvement Scheme Consultation Questionnaire If you are able to access the internet, please respond to this consultation using the online survey at: www.birminghambeheard.org.uk/economy/a34perrybarr. If you do not have internet access, please complete this paper form and place it in the box provided or post it (no stamp required) to: A34 Perry Barr Highway Consultation Transportation & Connectivity FREEPOST NEA14876 PO BOX 37 Birmingham B4 7BR Your responses will be used solely for this consultation and will be kept confidential. Any comments used will be kept anonymous and individuals will not be identified. Your personal data will be held by Birmingham City Council as the data controller and by Pell Frischmann Consultants Ltd as data processors. Personal data will not be shared with any other organisation. This survey is being conducted in accordance with the Data Protection Act 2018 and General Data Protection Regulations (GDPR) and if you would like to know more about our Data Protection Policy please visit www.birmingham.gov.uk/privacy. By filling out the survey you are giving permission for Birmingham City Council to use the data for the purposes outlined above. Introduction Perry Barr will see unprecedented change over the coming years thanks to more than £500m of investment into the area. This regeneration will deliver new homes, improvements to public transport, walking and cycling routes, new community facilities and high-quality public spaces. In order to help with the regeneration of Perry Barr, highway improvement works need to be undertaken. To open up the heart of Perry Barr and make the area more accessible by sustainable forms of transport, we plan to redesign the roads between the Greyhound Stadium and Aston Lane/Wellington Road.
    [Show full text]
  • Unit 2 3716 Sq M
    UNIT 2 3,716 SQ M (40,000 SQ FT) B1, B2 & B8 CONSENT TO LET PROMINENT BRAND NEW WAREHOUSE PREMISES • CLEAR INTERNAL HEIGHT TO HAUNCH 11.76M • WAREHOUSE FLOOR SLAB TO FM2 UDL 50KN/M² • YARD DEPTH TO 50M SKIMMINGDISH LANE, LONGLANDS ROAD, • 4 DOCK LEVEL LOADING DOORS PLUS 1 SURFACE LEVEL LOADING BICESTER, OX26 5AH • GRADE A OPEN PLAN OFFICES AT FIRST FLOOR WWW.BROWN-CO.COM SERVICES ACCOMMODATION All mains services are connected. We have The property provides the following not carried out tests on any of the services or gross internal floor area. appliances and interested parties should arrange their own test to ensure these are in working order. Unit 2 sq m sq ft GF Warehouse 3,535.77 38,060 BUSINESS RATES FF Office 179.95 1,937 Business Rates will be the responsibility of the Total GIA 3,715.72 39,997 occupier. We advise that all parties make their own enquiries. TERMS A new fully repairing and insuring lease will be offered for a term to be agreed by negotiation. DESCRIPTION RENT Unit 2 is a semi-detached unit owned by British Bakels and More particularly the unit features the following: developed by Albion Land. It is part of a first class commercial £300,000 per annum exclusive. warehouse development completed in August 2018. There may • Unit 2 has a dedicated service • 1 surface level loading door be the opportunity for distribution companies to work with the yard, depth approx 50 m • Highly insulated cladding system VAT owners British Bakels from a logistics and distribution point of • Internally height to the underside within a steel portal frame It is understood that VAT is applicable.
    [Show full text]
  • Boundary Commission for England
    BOUNDARY COMMISSION FOR ENGLAND PROCEEDINGS AT THE 2018 REVIEW OF PARLIAMENTARY CONSTITUENCIES IN ENGLAND HELD AT COUNTY BUILDINGS, MARTIN STREET, STAFFORD, ST16 2LH ON MONDAY 14 NOVEMBER 2016 DAY ONE Before: Ms Margaret Gilmore, The Lead Assistant Commissioner ____________________________________________________________ Transcribed from audio by W B Gurney & Sons LLP 83 Victoria Street, London, SW1H 0HW Telephone Number: 020 3585 4721/22 ____________________________________________________________ Time noted: 10.00 am THE LEAD ASSISTANT COMMISSIONER: Good morning ladies and gentlemen. It is great to be here in Stafford and welcome to this public hearing on the Boundary Commission for England’s initial proposals for new parliamentary constituency boundaries in the West Midlands. My name is Margaret Gilmore, I am an Assistant Commissioner of the Boundary Commission for England and I was appointed by the Commission to assist them in their task of making recommendations for new constituencies in the West Midlands. I am responsible for chairing the hearing today and tomorrow and I am also responsible, with my fellow Assistant Commissioner David Latham, who is here, for analysing all of the representations received about the initial proposals and then presenting recommendations to the Commission as to whether or not those initial proposals should be revised. I am assisted here today by members of the Commission staff led by Glenn Reed, who is sitting beside me and Glenn will shortly provide an explanation of the Commission’s initial proposals for new constituencies in this region and he will tell you how you can make written representations and will deal with one or two administrative matters. The hearing today is scheduled to run from 10.00 am until 8.00 pm and tomorrow it is scheduled to run from 9.00 am until 5.00 pm and I can vary that timetable and I will take into account the attendance and the demand for opportunities to speak.
    [Show full text]
  • Whitchurch Neighbourhood Development Plan 2014-2029
    Whitchurch Neighbourhood Development Plan 2014 to 2029 Whitchurch Neighbourhood Development Plan, 2014 to 2029 July 2017 This document is the Whitchurch Neighbourhood Development Plan intended for final submission under the Neighbourhood Planning (General) Regulations 2012 (As Amended). Disclaimer: every effort has been taken to ensure that the information in this document is as accurate as possible but no responsibility is implied or taken for errors or omission. Contents Policies of the Whitchurch Neighbourhood Development Plan 4 Foreword 5 1. Introduction 7 2. The Neighbourhood Area 10 3. National and Local Planning Policy Context 20 4. Sustainability 24 5. Community Engagement 27 6. Vision and objectives 31 7. General Design 35 8. Traffic and Parking 50 9. Infrastructure 54 10. Employment 60 11. Housing 71 12. Community Projects 89 Acknowledgements 93 The Whitchurch Neighbourhood Development Plan should be read as a whole. Proposals will be judged against all relevant policies in the Development Plan as set out in paragraph 1.2 July 2017 Page 3 of 93 Policies of the Whitchurch Neighbourhood Development Plan GD1 Re-enforcement of the adoption of the Whitchurch Design Statement as 36 supplementary guidance to be used in the planning process GD2 Development of Pedestrian and Cycle Routes and improved access to the River 38 Test GD3 Protection of Assets of Community Value and other Community Facilities 40 CS1 Retention of Functionality of Railway Tunnels for Future Benefit 40 LD1 Protection and Enhancement of Open Spaces 41 LD2 Protection
    [Show full text]
  • Dunlop Msa British Touring Car Championship
    DUNLOP MSA BRITISH TOURING CAR CHAMPIONSHIP www.btcc.net Contents 02 Welcome 04 The Championship 08 The Contenders 12 NGTC 16 2012 Calendar 18 TV & Media 24 Sponsorship & Marketing 30 Hospitality 32 Spectator Appeal 36 TV & Spectator Data 40 Support Races 44 TOCA Team & Contacts 2012 Dunlop MSA BRITISH TOURING CAR CHAMPIONSHIP A few facts about the BTCC in 2011 35% 13% Increase in UK TV Increase in viewing figures spectator numbers Record-equalling 18% number of makes Increase in UK TV broadcast hours First five-way title showdown Welcome Record grid sizes Whichever way you cut it, 2011 There was a further record in 2011 Our valued title sponsor I’d like to express my sincere has been a phenomenal year for that was notable – our first five- Dunlop has a continuing deep gratitude and appreciation to the Dunlop MSA British Touring Car way title showdown at the final passion and enthusiasm for all our commercial and media Championship. round. The fact that five different this championship and we are partners, for everything they 0602 drivers in four different makes of delighted that its market share in do for the BTCC. Similarly, thank 0703 Our UK TV viewing figures rose car from four different teams all the UK has increased through its you to the many hundreds of by a staggering average of 35 had a chance of the big prize on involvement and key message of volunteer marshals and officials per cent, our UK TV airtime is up ‘Finals Day’ speaks volumes for the ‘motorsport technology for the for the excellent work they do by more than 50 per cent, our level – yet unpredictable – playing road’.
    [Show full text]
  • Mill Hall, Pigeons Farm Road, Near Newbury RG19
    Mill Hall, Pigeons Farm Road, Near Newbury RG19 Development opportunity. Mill Hall, Pigeons Farm Road, Near Newbury, Berkshire RG19 8XA Imposing Grade II* listed Elizabethan style property ● Newbury c.2 miles ● Thatcham c.3.5 miles ● Reading c.17 miles ● Central London c.60 miles All distances are approximate ● Multi use property – educational, wedding venue and part office/workshop/laboratory uses ● Potential for alternative uses and development subject to obtaining the necessary consents ● Accommodation: approx 31,000 sq ft (2,900 sq m) in total ● Land: approx 16.8 acres and 6.8 ha in total ● For sale freehold and will be available with vacant possession Location Historical note The property is conveniently located within the suburb of Greenham on the south Formerly known as Greenham Lodge and was built in 1838. eastern edge of Newbury – a popular commuter town. The property is accessed from Originally owned by James Croft and was once described as a Pigeons Farm Road, which links to the A339 via Burys Bank Road and Pinchington Lane. “commodious residence”. The Greenham Lodge estate was later The A339 provides access to Newbury, the A34 and the M4 (J13) only six miles to the bought by Lloyd Baxendale Senior, a partner in the haulage company north, and Basingstoke and the M3 (J6) 18 miles to the south east. Pickfords, in 1873. He commissioned a new house to be built on the existing site by the eminent architect Norman Shaw. Designed on Newbury railway station is easily accessible and is located less than two miles from Shaw House in Newbury, it was completed in 1881 at a cost of £1,970.
    [Show full text]
  • A34 Safety Review
    A34 Safety Review Project Summary December 2017 A34 Road Safety Review Project Summary 1 Introduction 1.1 Project background An in-depth safety review of the A34 was announced by the minister John Hayes in order to identify incident ‘hot spots’ and whether the incidents that took place during 2016, many involving HGVs, could be happening due to the current road conditions. Highways England recognises that the route requires some improvement work to help tackle congestion, particularly between the M4 and M40 and that a larger investment to the A34 will be needed in the future. As found in the Project Status Report, the A34 performs within the national averages for safety. This was also documented by the BBC who stated “Road Safety Analysis found the A34 is 30% safer than similar roads” after carrying out their own independent review of the road. http://www.bbc.co.uk/news/uk-england-oxfordshire-39182703 Notwithstanding that finding, we continued with the Safety Review. This report contains recommendations for a number of proposed schemes to achieve the desired safety benefits. It should be noted that the suggested improvements have not been assessed for feasibility or performance and do not have committed funding. Following the Project Status Report which provides a summary of the collision data analysis, this document will provide a summary of the recommendations made in the A34 Safety Review. 1.2 Purpose of this document The purpose of this document, as outlined in the Project Status Report, is to: Determine why collisions are happening in the identified Focus Areas (see figure 1) and identify packages of improvements that could be delivered in response to this review The packages will be identified by assessing the condition of the carriageway against the current standards.
    [Show full text]