M 9 O IMPORTANT EVENTS OF 2013

The past year’s economic indicators show that over the sustainability and stability of the current system. 2013 realizations in growth were better than anti- However, massive corruption and bribery investigations in cipated but foreign trade and current transactions December forced Prime Minister Erdoğan to reshuffle his balance worse than expected… Cabinet. In this latest challenge, the markets were seve- rely affected. The lira lost more than 5 % of its value aga- The Turkish economy continued to move ahead of many inst the dollar in a week, reaching a record low of TL 2.17. other countries in 2013, especially in terms of its gross The stock market plummeted, with an immense outflow of domestic product (GDP) growth, foreign trade and stocks risk-sensitive foreign capital. performance for the most part of the year, yet the thre- ats, such as excessive sensitivity to external shocks, İn September, Bernanke stated that the program would the current account deficit (CAD) and growth that fails continue until all indicators pointed to a US recovery from to lower unemployment, also continued to hang over the the ongoing economic crisis, which many commentators economy’s head like the sword of Damocles. But the main believed would not occur before March 2014. This partial risk to the economy this year was political ambiguity. relief restored confidence to large foreign investors in Tur- key and other emerging economies, which promise better Overall the economy performed well, continuing its high returns despite their higher risk premiums. quarterly growth rates. The country’s GDP registered a growth rate of 3 % , 4.5 % and 4.4 % in the first three quarters respectively. The economic growth in the same   9-month period of the previous year was 4 % . The unemp-       loyment rate, however, climbed to 9.9 % as of Septem-    ber, a rise of 0.8 % above the same month of the previous      year. In terms of inflation, the central bank’s policies were          successful in maintaining a steady rate. The consumer          price index (CPI) was 6.16 % in December 2012, and ­€ € €  €  ‚ ƒ­    this edged up to 7.8 % in November 2013. The CAD was „ ‚  ‚ €    $39.55 billion in the Jan.-Oct. period of 2012, and it rose †‡ˆ‰        to $51.9 billion in the same period this year. 0‚‹Œˆ       ˆ Ž €‘’€ €    “ “ “ The year starts with encouraging scoring ‹ € €’€ € ” 0 “ “ “  The Turkish economy started the year 2013 with encou- ˆ† €“ ‘    raging statements from international credit rating agen- „ƒ †     cies. S&P raised ’s rating from BB to BB+, one –—     “ €‡—     notch below the level of investable country status. Fitch †‡ ‘       had already upgraded Turkey to investible status in the “0     last quarter of 2012, which was followed by Moody’s, the € €  “ “ “ Canadian Dominion Bond Rating Services (DBRS) and ­ ‚€ ’€ €     JCR in May. This was very welcome news for Turkey, ra- ising hopes that the economic plane was now ready for Stock Exchange displayes a negative trend take off. The government announced the launch of ambi- The Turkish stock market was one of the world’s worst tious projects such as the construction of a third İstanbul performers in 2013, while the TL dropped to unpreceden- airport, a third bridge over the Bosporus and a nuclear ted lows in the past 12 months due to growing tension on power plant in Sinop. Million dollarsthe markets prompted2010 by the U.S. Fed’s2011 announcement 2012 2012* 2013* But reality did not match the expectations. A massive I-CURRENT TRANSACT.ACCOUNTto scale back its asset-purchasing-45.447 program -75.092 and political -48.507 -39.553 -51.901 wave of demonstrations erupted in late May. This cau- A. FOREIGN TRADE BALANCEdevelopments -56.413 -89.139 -65.335 -54.684 -66.236 sed a loss of market confidence B.while SERVICES raising concerns BALANCE 16.658 20.130 22.602 20.451 21.636 C. REVENUE BALANCE -7.215 -7.841 -7.157 -6.340 -8.159 D. CURRENT TRANSFERS 1.523 1.758 1.383 1.020 858       II-CAPITAL ACCOUNTM 10 O -51 -25 -44 -44 -76 III-F0NANING ACCOUNTS 44093 65.684 47.316 35.851 48.140 Direct investments 7.572 13.698 8.944 7.820 7.211 Abroad -1.464 -2.349 4.074 -3.352 -2.015 0n the country 9.036 16.047 13.018 11.172 9.226 Capital 6.203 14.064 9.928 8.441 6.893 0nflow 6.238 16.055 10.561 8.791 7.409 Outflow -35 -1.991 -633 -350 -516 Other capital (Net) 339 -30 454 447 88 Real estate (Net) 2.494 2.013 2.636 2.284 2.245 Portfolio investments 16.093 21.986 40.789 30.276 22.770 Other investments 33.237 28.187 18.397 18.747 29.691 Reserve Assets -12.809 1.813 -20.814 -20.992 -11.532 IV-NET ERROR DEFAULT 1.405 9.433 1.235 3.746 3.837

Despite climbing up to an all-time high-level of 93,000 in put on sale by TMSF, for 402 mln TL on June 1. Former May, BIST main index, have gone through a bumpy se- Çukurova assets, Akşam daily, SKY 360 TV channel and cond half, mainly continuing downwards. Alem Radio, also seized by the TMSF, was sold to Ethem Sancak. Çalık group sold its Sabah-ATV to Zirve Holding Some further milestones: in December, which is owned by the Kalyon Group. The Turkey opened the world’s first underwater rail link bet- government introduced a private pension scheme, in ween two continents, Marmaray, on Oct. 29, connecting which the government will pay 25 percent of the pension Asia and Europe with the $2.8 billion tunnel that was ina- to participants every month as a state contribution. The ugurated A Turkish consortium on May 3 won a $29 bil- Competition Board fined 12 Turkish banks on March 8 lion tender to build and operate a 3rd airport in Istanbul, after finding evidence of collusion in determining loan ra- marking a milestone in the country’s ambition to become tes. Turkey paid its last loan installment of $412 million a global transit hub. A $5.7 billion highway and bridge pri- to the İMF in May after a 52-year relationship. Turkey’s vatization tender was cancelled on Feb. 22. Currently, the NATO allies voiced concern when it said in September government is working on plans to privatize toll roads and it had chosen China’s FD-2000 missile defense system   bridges through public offerings, which are expected to be over rival offers from Franco/Italian Eurosam SAMP/T     completed in the first quarter of 2014 Turkey and Japan and U.S.-listed Raytheon Co. In November, exports re-  signed an official agreement on Oct. 29 to build Turkey’s ached  the highest-ever monthly figure at $13.78 billion, second nuclear plant in Sinop.   Turkey and the KRG sig- rising 8.8 % above  the same month of the previous year.          The Asset Peace program attracted TL 10.5 billion, from ned an energy package in   late November that   will help     transform the semi-autonomous­€ € €  €  ‚ ƒ­ region into an oil and gas which  the state  took TL 209 million in tax revenue. To- powerhouse. TPAO and Royal„ ‚  ‚ € Dutch Shell signed an ag- tal gold  imports  reached the highest figure in history with †‡ˆ‰        reement on oil exploration in the western Black Sea regi- 270,669 kilograms in the first 11 months of the year. The 0‚‹Œˆ       on, envisaging drilling at leastˆ Ž €‘’€ €    one well within two years. “Central “ Bank’s “ reserves hit a historic high on Dec. 13 with Food company Torunlar ‹ € €’€ € ” 0 Gıda’s subsidiary, Torunlar “$135.96 “ billion. “  ˆ† €“ ‘    Energy, won the tender for Turkey’s second largest na- „ƒ †     tural gas grid, Başkent Doğalgaz,–—  with a $1.16 mln offer 2014  budget  deficit targetted to be 33.2 billion TL on Jan. 26. The privatization“ €‡—  of the power distribution İn the  first 9-month  period the target of 7.1% envisaged in †‡ ‘       market was completed after the final four tenders held the current transactions deficit reaching 8 % of GDP has “0     for Ayedaş, Toroslor, Dicle € € and Vangölü power grids on “not been “ changed “ in OVP whereas for 2014 a current March 15. ­ ‚€ ’€ €  transactions  deficit  of 6.4% of GDP has been forecast. Azerbaijan’s SOCAR has agreed to acquire Star Media The Budget deficit has been determined as 33.2 billion Group, which comprises of daily Star and broadcaster Ka- dollars for t his year. nal 24, in May. Ciner Group has agreed to buy Show TV,

Million dollars 2010 2011 2012 2012* 2013* I-CURRENT TRANSACT.ACCOUNT -45.447 -75.092 -48.507 -39.553 -51.901 A. FOREIGN TRADE BALANCE -56.413 -89.139 -65.335 -54.684 -66.236 B. SERVICES BALANCE 16.658 20.130 22.602 20.451 21.636 C. REVENUE BALANCE -7.215 -7.841 -7.157 -6.340 -8.159 D. CURRENT TRANSFERS 1.523 1.758 1.383 1.020 858 II-CAPITAL ACCOUNT -51 -25 -44 -44 -76 III-F0NANING ACCOUNTS 44093 65.684 47.316 35.851 48.140 Direct investments 7.572 13.698 8.944 7.820 7.211 Abroad -1.464 -2.349 4.074 -3.352 -2.015 0n the country 9.036 16.047 13.018 11.172 9.226 Capital 6.203 14.064 9.928 8.441 6.893 0nflow 6.238 16.055 10.561 8.791 7.409 Outflow -35 -1.991 -633 -350 -516 Other capital (Net) 339 -30 454 447 88 Real estate (Net) 2.494 2.013 2.636 2.284 2.245 Portfolio investments 16.093 21.986 40.789 30.276 22.770 Other investments 33.237 28.187 18.397 18.747 29.691 Reserve Assets -12.809 1.813 -20.814 -20.992 -11.532 IV-NET ERROR DEFAULT 1.405 9.433 1.235 3.746 3.837

      M 11 O

CAPACITY UTILIZATION RATE 76 % IN 2013

Capacity utilization rate in manufacturing industry rose 0.4 point in December 2013 over the same month of the previous year…

The Turkish Central Bank announced the December’ 13 The highest capacity in computer manufacturing industry capacity utility rates. İn December 2013, the highest Capacity Utilization rate according to dual sectors, was obtained in computers, The Capacity Utilization in Turkey increased to 76 percent electronic and optic products manufacturing sector with in December of 2013 from 75.60 percent in November of 87% . This was followed by paper products with 80.4%. 2013. Capacity Utilization in Turkey, reported by the Cent- The Capacity Utilization was the lowest in other manufac- ral Bank is averaged 74.15 Percent from 2007 until 2013, turing areas with 55.9%. reaching an all time high of 82 Percent in July of 2007 and a record low of 58.70 Percent in March of 2009. The capacity utilization rate in Turkey’s manufacturing in- dustry which had been 75,5 % in December 2011 became It is reported that December Capacity Utilization rose 4.1 73,6 % in December 2012. It dropped by 1.9 points. points in investment commodities to 76.1%, 3 points in intermediary commodities to 77.8% , 1.8 points in endu- The capacity utilization rate in Turkey’s manufacturing rable consumer goods to 72.9%. industry dropped 0.5 points to 74.7 % in May 2012 when compared to May 2011.

Capacity Utilization Rate of Manufacturing Industry (KKO) (%)

               

 &&( &&" '" '$ '' ' & '! &(% '' ' % '' &(!

 &&( &' &%( &'% &(! '" &(' ' &&" &$' & ' %#(

 % % %( $'& $(& %# %&$ %&( %'( %' %'! %(' %&&

  %'% %&' %&" &!& &"" &"" &## &" &"$ &$" &$( &$%

 &#% &" &"! &#( &$! &%& &$# &%  &%! && &%( &$$

 &#& &!( &"  &#& &#& &#% &#' &#" &# &#( &# &"%

 &!# &!! &!& &"% &#' &$" &$$ &$$ &$# &%# &$% &%

      M 12 O

TURKISH EXPORTS REALIZED $151.7 bln IN 2013

Exports rose by 9.8% in December Exports rose by 0.01 % in 2013, 2013 and became 12.996.556.000 dol- reaching 151.707.000.000 dollars... lars...

Economy Minister Nihat Zeybekci said that in 2013 Turkey major exports are: textiles and clothing, automo- Turkey’s exports were realized as 151,7 bln dollars. tive, iron and steel, white goods and chemicals and phar- maceuticals. Turkey is also one of the leading shipbuil- Regarding the global developments Zeybekçi has made ding nations. Turkey’s main export partners are European certain evaluations and said that required atmosphere of Union, United States and Russia. While exports to the EU stability has not been achieved yet in spite of the elimina- accounted for 42 % of Turkish exports in November 2012, tion of the damages to a great extent. The Minister stated the figure reached 44.1 % in November 2013. Exports to that, as a result of the political and economic stability in the EU countries increased from $5.7 billion to $6.2 billi- Turkey, the GDP that was 230 bln dollars in 2002 reac- on with an 8.7 % increase in November compared to the hed 786 bln dollars in 2012 and per capita income rose 3 same period last year. fold to 10.497 dollars Zeybekçi also said that the current deficit declined by 35.4% to 48.5 bln dollars in 2012 as Germany became the top export destination for Turkey in compared to previous year. He said that in the first 10 November with a 12.4 % increase to $1.3 billion in exports month period last year the current deficit rose by 31.2 to compared to the same period last year. Germany was fol- 51,9 bln dollars, adding that the reason for t his rise is the lowed by Iraq ($1.217 billion), the United Kingdom ($898 rise in imports of gold. Zeybekçi shared the 2013 exports mln) and Russia ($655 mln). In terms of imports, Russia data and said that overall exports have been realized as led the list with $2.3 billion, followed by Germany ($2.1 151 bln 707.000.000 dollars. He added that during the 11 billion), China ($2.071 billion) and Italy ($1.1 billion). Eco- moınth period exports excluding gold rose by 6.5% and nomy Minister Nihat Zeybekci said that last year’s primary imports by 2.6%. sector with most exports is the automotive with 11.8% rise and a value of 21 bln 305 mln dollars last year. The auto- Meanwhile TÜİK said exports in Turkey increased to motive is followed by chemical materials, ready wear and 14251.77 USD mln in November of 2013 from 12066.89 confectionery. USD mln in October of 2013. Exports in Turkey is repor- ted by the Turkish Statistical Institute. Exports in Turkey 11-month Foreign Trade Deficit… averaged 2273.24 USD mln from 1957 until 2013, reac- Turkish Statistics Institute said that foreign trade deficit is hing an all time high of 14251.77 USD mln in November of reported to have risen 16.8 % in the first 11 months of the 2013 and a record low of 7.10 USD mln in August of 1958. year compared to same period of the previous year to re-

      M 14 O ach $89.8 billion. During this period, exports declined 0.8 said that in all 2013, Turkish exports rose by 0.01% to % year-on-year to $138.7 billion and imports increased 151 bln 707 mln dollars. Büyükekşi said the exports in 5.4 % to $428.5 billion. In November, the export-import December 2013’ rose by 9.8% to 12 bln 996 mln dollars ratio was 66.6 % compared to 65.7 % in November 2012. as compared to the previous month. He also said that the The foreign trade deficit in November decreased 0.6 % most exports were realized by automotive sector in De- year-on-year to $7.151 billion. Exports in November inc- cember with 1.764.000.000 dollars followed by chemicals reased 3.6 % to $14.252 billion and imports went up 2.2 sector with 1.603.000.000 dollars and ready wear and % to $21.4 billion. Looking at seasonally and calendar- confectionery with 1.424.000.000 dollars. He stated that adjusted data, exports increased 4 % in November com- the defense and aviation industry sector raised its exports pared to the previous month, while imports decreased 0.9 by 10.4% in 2013 as compared to 2012. The value of its %. Calendar-adjusted data also show exports rising 3.4 exports is 1.391.603.000 dollars, he said. % in November year-on-year while imports went up 6 %. Turkey’s exports to its main trading partner, the European Union, increased 8.7 % in November year-on-year to total MONTHLY MINIMUM $6.287 billion, making the EU’s share in Turkish exports WAGE SET AT TL 868.50 44.1 %. The EU’s share in Turkish exports was 42 % in November of 2012. In November of this year, exports to Germany rose 12.4 % compared to the same month of The Ministry of Labor and Social Security set the net the previous year to reach $1.369 billion, making Ger- monthly minimum wage at TL 846 for the first half of the many the number one importer of Turkish goods, followed year and TL 891 for the second half, averaging TL 868.50 by Iraq at $1.217 billion, the United Kingdom at $898 mil- for the whole year, a figure which has been criticized by lion and Russia at $655 million. unions. The raise for 2014 was determined to be 5 % for the first half of the year and 6 % for the second half. Ac- The greatest importer of Turkish goods in November was cording to this change, minimum wage employees will Russia at $2.340 billion. Russian imports of Turkish go- receive TL 43 more a month in the first six months, but a ods saw a 3.1 % rise in November compared to same family of four can barely have dinner outside for this amo- month of 2012. It was followed by Germany at $2.131 bil- unt. The Eğitim-İş union, part of the Education and Sci- lion, China at $2.071 billion and Italy at $1.115 billion. In ence Workers’ Union (Eğitim-Sen), reacted to the raise, November, the category of “vehicles other than railway or noting that laborers are once again suffering as a result tramway vehicles and parts” category had the highest ex- of decisions made by those in power. Eğitim-İş President ports in terms of value at $1.7 billion and was followed by Veli Demir criticized the government, stating: “As govern- the “boilers, machinery and mechanical appliances and ment allies continue to get richer, the income of workers parts” category at $1.234 billion, the “electrical machinery keeps falling. Millions of dollars are found in the houses and equipment and parts” category at $935 million and of allies [referring to the Dec. 17 corruption scandal] while the “knitted and crocheted goods and accessories” cate- a higher raise for laborers is prevented using the excuse gory at $919 million. In the same month, the number one of a slowing economy.” Demir noted that the miserable category for imports was “fossil fuels and oils” at $4.776 conditions of the poor have grown in the past 11 years billion, which was followed by the “boilers, machinery and “while economic growth tales are spread by the govern- mechanical appliances” category at $2.537 billion, the ment,” adding that the “poverty line for a family of four was “electrical machinery and equipment and parts” category TL 3,523 in November while the hunger line for the same at $1.1750 billion, the “vehicles other than railway or tram- family is determined to be TL 1,082, which indicates that way vehicles and parts” category at $1.585 billion and the the poverty line is four-and-a-half times the monthly mini- “iron and steel” category at $1.487 billion. A lower trade mum wage. Considering these figures, even if a family of deficit would probably be welcomed by the central bank four works for minimum wage, they will still be under the for one key reason: It reduces the drain on Turkey’s fore- poverty line.” ign exchange reserves, which have been under pressure Confederation of Turkish Labor Unions (Türk-İş) repre- as they are spent on the defense of the lira. The central sentative Nazmi Irgat commented that the wage raise bank’s foreign reserves totaled $135.068 billion on Dec. does not meet their expectations. Underlining that purc- 20, but private sector analysts calculate that net reserves hasing power has declined the most recently, Irgat said -- resources which the central bank could access quickly the raise should have been by at least TL 205. “We feel -- are only around $40 billion. betrayed. Unemployment is used by employers to thre- aten us. But I thank the government for lifting the age TİM President Büyükekşi limitation and ask all the minimum wage workers to be President of the Turkish Exporters Assembly (TİM) Meh- excluded from taxes,” he added. met Büyükekşi evaluated the 2013 exports as well. He

      M 15 O ON- THE-SPOT CUSTOMS CLEARANCE ERA STARTS IN IMPORTS

The new system drafted enables the customs clearance to be held at the im- porter’s own facilities…

Minister of Customs and Trade Hayati Yazıcı said that the Yazıcı said that with the regulation, Customs Clearance “Customs Clearance “ system, which was previously put ‘ implementation will be in the imports after exports. The into action for exporters has now been applied on im- Minister stated that the goods imported by the firm that porting firms, adding that thus the Customs procedures owns the status of authorized liability will be subject to will be handled at the importer’s own facilities. He said Customs Clearance at its own place.These firms will also that the goods that have been imported will be delivered benefit from the permitted buyer with which they will be directly to its facilities without being transfered to the in- able to receive their goods directly under transit regime ternal customs. Minister Yazıcı said that, the draft regulation will take its final shape soon and thus the importers’ and transporters’ Yazıcı said that they are doing work in the way to be- customs clearance and transport costs will be reduced. come a reliable country with easier procedures and fort He added that costs will be down by 50% with the status his reason they are realizing various innovations in the of authorized liability implementation Customs regulations. Who can benefit ? Yazıcı noted that earlyl this year they enacted a regula- According to the draft regulation, the importer should tion to facilitate the Customs transactions and thus ex- have realized imports and exports worth 20 million dollars porters have been given the status of authorized liability in total in the last one year or made exports worth min. at international level. These companies have had the ad- 5 million dollars. vantages through the applications of “Customs Clearan- ce”, “authorized senders” and “common transit” The firms should have been in operation for at least3 years. Companies with the status of authorized liability will be able to carry out the Customs Clearance at their own faci- lities instead of the official Customs areas.

      M 16 O “Taşıt üst yapım ve ekipmanlarında KALİTE, TECRÜBE ve GÜVEN”

NESA TAŞIT ÜST YAPIM VE OTOMOTİV SAN. TİC. LTD. ŞTİ. Merkez : İstanbul Yolu 12. Km. GERSAN San. Sitesi 2310. Sok. No: 41 Fabrika : Modern Ankara Keresteciler Sitesi 18. Sokak No: Y. Mahalle - ANKARA 06 370 • Tel: 0.   312 257 24 40 Fax: 256 24 40  18  Saray - Kazan / ANKARA • Tel: 0. 312 815 2013 - 14 M 17 O www.nesaustyapim.com.tr CENTRAL BANK DISCLOSES TARGETS FOR ECONOMY IN 2014

Governor Başçı: At least $ 3 bln foreign exchange sale will be realized by end of the year…

Presenting the 2014 Monetary and Exchange Rate Policy, we will continue regular forex auctions if needed to de- Central Bank Governor Erdem Başçı said that the bank fend the currency,” Başçı said. It was last Tuesday that would not allow sharp moves and strong volatility in the Turkish lira slumped to a record low of 2.0992 against market. Erdem Başçı noted that the inflation in December the US dollar. This occurred as further corruption alle- was estimated to be at 7%, adding TCB has strong and gations surfaced, soon after those involving four Cabinet effective tools to deal with inflation and exchange rate vo- ministers, the CEO of state-run Halkbank and prominent latility. He said he expected a stronger year in terms of businessmen with close ties to the government. The lira stability and predictability, but did not avoid speaking of later recovered to 2.08 against the greenback. The main increasing global concerns and volatilities. benchmark Borsa İstanbul (BİST) also gained 1.13 % to rise above 68,500 following Monday’s decline. Big uncertainties will mark the global economy in the new year, Başçı said, noting that Turkey’s monetary policy In an initial measure, the central bank injected TL 500 will maintain flexibility while increasing predictability. “We million ($238 million) into the market in a one-week re- have strong predictability in Turkish Lira liquidity and we purchase agreement (repo) auction on Tuesday at a fixed would like to increase our predictability in US dollar li- simple rate of 4.50 %. Total bids for the repo, maturing quidity as well ” Başçı said. “This will be a year in which on Dec. 31, amounted to TL 4.683 billion. Turkey’s lira policy flexibility will constitute the bank’s objective and the fell to record lows on Friday, rattled by domestic political policy predictability will increase rapidly”, Başçı added. tensions and the US Federal Reserve’s decision to start The Central Bank chief said the bank would also track trimming its monetary stimulus program, prompting the financial stability in 2014. “We will not only focus on price central bank to threaten more market action. A row at the stability but also go on with ensuring financial stability.” highest levels of Turkish society, which has seen dozens of senior businessmen, officials and policemen detained Noting the inflation rate may exceed the expected % age this week, has only added to the bank’s headaches. The in December, Başçı reiterated that the bank’s inflation Central Bank, whose policies have been heavily influen- projection for the next three years would remain at 5%. ced by the Fed this year, kept interest rates static last Başçı also said the bank would sell foreign exchange week but tightened liquidity sharply due to worries about worth $ 450 million every day to stabilize the currency the impact of a withdrawal of the US’s monetary stimulus. until the end of the year. Central Bank Governor Erdem Başçı met with reporters to share the 2014 roadmap for Monetary Policy and Risks… monetary policy. Başçı said the bank will continue to de- fend the lira through changes to the reserve option mec- The Committee assessed that final domestic demand hanism and forex auctions, but it does not see a need to and exports continue to grow at a moderate pace and that change the reserve requirements. “We are not planning aggregate demand conditions do not exert an evident adjustments in its lira and forex reserve requirements, but downside or upside pressure on inflation. The present

      M 18 O policy framework is contributing to the improvement in the provided interest rate predictability will be reinforced. the current account balance. The Committee stated that The Committee has stated that with these developments, the cautious monetary policy stance, the announced mac- the cautious monetary policy stance will continue to cont- roprudential measures, and weak capital flows will bring ribute to domestic and foreign demand rebalancing, to down the loan growth rates to more reasonable levels. more plausible growth rates in especially consumer cre- Accordingly, the moderate decline in the current account dits and to the decline in inflation.The Committee moni- deficit excluding gold trade is expected to continue. tors fiscal policy developments and tax adjustments clo- Inflation is expected to fall further in the forthcoming peri- sely with regard to their effects on the inflation outlook. od. Meanwhile, core inflation indicators are likely to hover The baseline monetary policy stance takes the fiscal fra- above the inflation target for some time. The Committee mework outlined in the Medium Term Program as given. stated that the cautious monetary stance should be main- Accordingly, it is assumed that fiscal discipline will be tained until the inflation outlook is in line with the medium- sustained and there will be no unanticipated hikes in ad- term targets. The current policy stance is regarded to be ministered prices. A revision in the monetary policy stan- appropriate to contain inflationary risks. However, it was ce may be considered, should the fiscal stance deviate also stated caution should be exercised against develop- significantly from this framework and consequently have ments that may worsen the inflation outlook. an adverse effect on the medium-term inflation Outlook. Prudent fiscal and financial sector policies are crucial for The Committee made assessments on the reserve opti- preserving the resilience of our economy against existing ons mechanism (ROM). It was stated that the ROM functi- global imbalances. Strengthening the structural reform oned in accordance with its aim and steps might be taken agenda that will ensure the sustainability of the fiscal dis- to strengthen its feature as an automatic stabilizer in the cipline and reduce the savings deficit will support macroe- upcoming period. Accordingly, it was expressed that re- conomic stability in the medium-term. This will also provi- serve option coefficients especially in the last tranches de more flexibility for monetary policy and improve social might be gradually increased. The Committee also decla- welfare by keeping interest rates of long-term government red that increases in reserve option coefficients and the securities persistently at low levels. In this respect, imp- FX selling auctions would increase the funding require- lementation of the structural reforms outlined by the Me- ment of the financial system. Thus, the effectiveness of dium Term Program remains to be of utmost importance. TÜİK DISCLOSES 3RD QUARTER SOLID FUEL DELIVERY FIGURES Maximum production and delivery took place in lignite during July-September 2013…

Turkish Statistics İnstitute has announced the figures re- The lowest ratio of deliveries to marketable production is lated to the production and delivery of solid fuels. in hard coal by 6.3%. Beside this, ratio is 101.0% for ligni- te and 106.9% for coke derived from hard coal. According to TÜİK, marketable production of solid fuels were 474 542 tonnes for hard coal, 13 295 171 tonnes for Distribution of solid fuels according to breakdown of main lignite and 1 057 263 tonnes for coke derived from hard delivery places were 39.5% to thermal power plants, coal in the third quarter of 2013. For the same quarter de- 20.5% to coking plants, 9.4% to industry (except iron liveries were 7 523 324 tonnes for hard coal, 13 161 285 and steel industry) for hard coal, 86.8% to thermal power tonnes for lignite and 988 954 tonnes for coke derived plants, 7.4% to industry (except iron and steel industry) from hard coal. for lignite, 95.9% to iron and steel industry for coke deri- ved from hard coal.

      M 19 O TURKISH CONTRACTING SECTOR HAS RAISED THE BAR ABROAD

Turkish contractors’ projects in 45 countries have a total velue of $31.3 bln..

Economy Minister Nihat Zeybekçi said that the total cost mln , while this figure increased to $83.70 mln in 2013, of the 374 projects undertaken by Turkish contractors in representing a remarkable jump. Turkish contractors also 45 countries in 2013 reached $31.3 billion. The total va- started to secure more sophisticated and expensive pro- lue of overseas contracting projects was only $1 billion jects abroad following their quality work performance in in 2000, and Turkey boosted this industry by building on recent years. Major projects -- worth more than $1 billion improved political relations with a number of countries, -- for companies in 2013 include a port in Turkmenistan’s particularly in the Middle East and Africa along with the Turkmenbashi along with an airport and the third phase Turkic republics. of an Olympic village designed for possibly hosting the Olympics in Ashgabat. Noting that Turkish contractors secured 374 projects in 45 countries last year, Zeybekçi said the size of the cons- When looking at the types of construction projects un- truction industry’s overseas projects has exceeded the dertaken abroad, housing, trade centers and government $30 billion mark for the first time ever in history. “This is buildings took the lion’s share with $12.4 billion while a record level and a historic success; we also secured transportation projects comprised $10.3 billion and in- construction projects in South Sudan and Senegal for the dustrial and energy facility projects made up $6.2 billion. first time last year,” the minister said. Turkmenistan and Between 1972 and 2013, the construction industry has Russia stood out as the leaders of the list of countries undertaken 7,371 projects worth $274.1 billion in 103 co- where contractors won projects. untries. In the year 2023, the 100th anniversary of the founding of the Turkish Republic, the industry aims to inc- In terms of project size by country, Turkmenistan tops the rease the total value of projects to $100 billion list with $10.5 billion, while the size of projects in Russia, which comes in second place, was $5.6 billion. Azerba- ijan came in third on the list with $2.8 billion, while Iraq was fourth with $2.1 billion. The final country making up the top five was Kazakhstan with $1.8 billion. Turkish construction companies undertook 60 projects in Turk- menistan in 2013, representing the highest-ever figure for the industry.

The success achieved overseas by the construction in- dustry is not just limited to the total value of projects se- cured. In 2012, the average value of a construction pro- ject in foreign countries secured by companies was $60

      M 20 O       M 21 O HIDROMEK ACQUIRES WORLD GIANT

Turkish Hidromek, a leading manufacturer of construc- Hidromek has four local production bases and a global tion machinery based in the capital city of Ankara, has network of sales agents in 35 nations. Net sales in 2012 acquired the motor grader business of Japan’s Mitsubishi equated to approximately $342 million. The company has Heavy Industries (MHI). roughly 1,400 employees. MHI had solidly maintained its operations in motor graders even after transferring its bu- “It was just a dream for Turkish companies to acquire siness in hydraulic shovels and other types of constructi- foreign companies just 11 years ago, but the direct in- on machinery to Caterpillar Inc. during the first quarter of vestment of Turkish companies abroad has reached up 2012. “Its decision to transfer its motor grader operations to $25 billion,” said Economy Minister Zafer Çağlayan du- to Hidromek at this time was based on the company’s ring a signature ceremony between Hidromek and MHI. quest to further advance concentration on its core com- petencies,” MHI announced through a written statement. Production in Thailand Under the agreement, HIDROMEK will purchase MHI’s operations in motor graders, construction machinery used for land grading, MHI’s related technologies, design expertise and servicing operations, as well as the ow- nership of MHI-Pornchai Machinery Co. Ltd. a production base in Thailand that has until now manufactured MHI’s products for markets in the Middle East and Southeast Asia. “This is our third direct investment abroad after our in- vestments in Spain and Russia. We are aiming at beco- ming more active in Asian countries thanks to our new facilities in Thailand,” said Hidromek Chairman Hasan Basri Bozkurt.

      M 22 O BUDGET YIELDS 18.4 -bln-TL DEFICIT IN 2013

Finance Minister Şimşek: In 2013, revenue performance was stronger than ever befo- re...

Minister of Finance Mehmet Şimşek confirms that it was $3.9 billion in November 2013. The current acco- Turkey’s 2013 growth rate reached 4 percent; higher than unt deficit recorded $55.9 billion in January-November the world average of 3.2 percent. Turkey’s 2013 general indicating an increase of $12.3 billion, while the current budget deficit is the third lowest since 1985, in proportion account deficit excluding non-monetary gold decreased to GDP, Minister Şimşek announced, confirming that the by $3.5 mln over the same period of the previous year 2013 deficit stood at 18.4 billion Turkish lira ($8.3 billi- decreasing to $45.5 billion. The increase in the current on). He indicated that the total income from 2013 totalled account deficit is due to the increase in the foreign trade 389.4 billion lira, while total spending amounted to 407.9 and income deficits despite the net rise in the services billion lira. Comparing the 2013 budget with that of 2002, surplus mainly owing to increasing net revenues in travel Şimşek said that 86 percent of the total tax income acco- and other transportation items. The foreign trade deficit unted for interest payments. As it stands now, 85 percent increased by $11.5 billion reaching $71.5 bln in the re- of the country’s income is used for services. “Nearly 23 ferring period, as the foreign trade deficit excluding non- percent of tax revenues was allocated to education, and monetary gold declined by $4.3 bln, degrading to $61.5 over 20 percent was given to the health sector,” accor- bln. The travel revenues increased by $2.8 mln reaching ding to the budget figures of 2013. Şimşek said that the to $26.9 billion and the travel expenditures increased by expected growth in 2014 was at around four percent, in $881 mln recording $4.6 bln in the eleven-month period spite of a financial stagnation, adding that there could compared to the same period of the previous year. be a temporary uncertainty in the economy which could affect the public, due to the political developments that The main sub-items under investments income, which have taken place since December 17. are investments, portfolio investments and other invest- ments consisting of the interests income and expenditu- “We do not have to sustain our economy with orthodox res recorded a net outflow of $8.2 billion increasing by policies, as some want us to do,” Şimşek said. “Our goal $1.7 mln over the same period of the previous year. In is to gain macro sustainibility, financial stability, and de- terms of capital and financial account, non-residents’ net ficit control, besides inflation, thus achieving sustainable direct investments in Turkey recorded $10.4 billion in the growth,” he noted. Şimşek said that theTurkish economy eleven-month period decreasing by $1.6 billion over the can still improve its global appeal, adding that global in- same period in 2012. Residents’ net direct investments vestors have increased to 36,000 from 4,000 in 2002, abroad recorded $2.6 billion decreasing by $1.1 bln over while foreign direct investment has now exceeded 130 the same period of 2012. billion dollars, which indicates that reforms have been implemented and that transparency and predictablity is General Government borrowed through the lease certifi- increasing. cates from international capital markets with an amount of $1.6 billion in November 2013, increasing the net bor- Current Account Deficit $60.8 Bln… rowing to $4.6 billion in January-November 2013. As re- Central Bank released the current account deficit of Janu- gards to the bond issues in international capital markets, ary-November period of 2013. The current account deficit banks borrowed $131 mln, increasing the net borrowing of Turkey has become $60.8 billion on annual basis while to $7 bln in January-November 2013.

      M 23 O TÜDEMSAŞ KEEN ON 2023 OBJECTIVES

TÜDEMSAŞ (Turkish Railway Machines Industry Inc.), which was established in 1939 under the name of Sivas Cer Atelyesi for the purpose of repairing steam locomotives and freightwagons that belong to TCDD, has now become an ins- titution that realizes an annual productıon of 1.500 wagons, repair of 7.500 wagons and a tur- nover of 130 million TL

TÜDEMSAŞ is located on a total area of 418.000 m2 Between 2003-2011 , 3.587 ea wagons of various types (including 100.000 m2 closed area) and it employs 1.054 were manufactured..To achieve the 2023 goals, we ex- labourers and 270 civil servants. İn 2011 the company pect that Turkey’s freight wagon demand and require- manfactured 435 wagonsandrepaired 2.520 wagonsand ments willincrease in the coming period and therefore, between 2002-2011 it exported 240 wagons that brought our company as well as the developing private sector will in a revenue of 12 million dollars. be able to meet this demand.”

TÜDEMSAŞ is made of 3 main production units and 8 What are the areas of use of freight wagons in administrative departments. TÜDEMSAŞ Genel Mana- the transport sector in Turkey?. İs the number ger Selim Dursun briefed DETAY Economic Magazine on of these wagons sufficient for transport firms? their activites. “İn Turkey freight wagons are primarily used for contai- Turkey’s freight wagon requirements will rise ner transport, ore transport, petroleum transport, military Upon ourquestıon that Turkish raılways haverecently ga- equipment, livestock transport, paletted Cargo transport ined a high speed of development, Genel Manager Se- and grains transport.Today the number of the wagons lim Dursun said that as from 2003 great importance hsa may not be adequate according to the types used for been attached to railway constructıon in Turkey, which logistics firms’ goods transports as they change seaso- has resulted in investing in passenger and freight trans- nally. İn the ensuing period there will appear more de- ports. mand for wagons with the liberalization of the rail freight wagon operations.” “ A policy has been determined to buildlines based on the centre being Ankara primarily the routes of Anka- What is the importance of TÜDEMSAŞ in terms ra-Eskişehir-İstanbul, Ankara-Konya, Ankara-Sivas high of the region Turkey is located in? What are the speed train (YHT) and to other locations in thelongrun. company’s contributions to economy? As a result of rising demand for freight transports on rail our company started to speed up the productıon of freight “Since 1939 TÜDEMSAŞ has successfully met the de- wagons as from 2003. mand for the conutry’s freight wagons and therecent

      M 24 O       M 25 O technological investments forquality and capacity imp- investments. We have given more emphasis on work- rovement, further efforts are underway to increase the shop plant renewal and sustainment-improvement mo- exports.TÜDEMSAŞ is the biggest industrial facility in Si- dernization projects. vas area and is themostimportantsource of employment. Since 2008 it has been place damong Turkey’s top 500 Under this, computer assisted dyeing-sanding-drying industrial enterprises.” plant, automativ boggie sanding plant and robot based boggie production plant were put into action. Also, we Could you give informatıon about the products have TS EN ISO 14001 Environment Management Cer- manufactured and maintenance Works at TÜ- tificate. The wastes that come out during the production DEMSAŞ? are discarged accordingly.

“Since 1939 when TÜDEMSAŞ was firstestablished , Forgıng And Pressıng Plant has a closed area of 6.695 around 20.000 units of various types of freight wagons m2 and in its workshops;- Free-forging up to 1500 kg per have been manufactured. Our products are for contai- part- Die- forging up to 15 kg per part- deep drawing up ner transport, ore transport, petroleum transport, military to 600 tons pressure force- Pressing with eccentric press equipment, livestock transport (closed types), paletted up to 450 tons processes can be done Machınıng Shop Cargo transport and grains transport. Also, the producti- has a closed area of 7.354 m2, In its workshops,- turning on covers such spare parts as Bogies Y25 , buffer, screw on lathe up to 1931 mm diameter and 6000 mm lenght- coupling, brake cylnders, brake house couplings, LH milling up to 7 tons weight per part- planing up to 3000 angle cocks, laminated suspension spring that are used mm lenght are done.” for used for trailing and trailed vehicles. Wagons opera- ted on TCDD lines are repaired periodically. Since the What is TÜDEMSAŞ’s potential of making ex- date of foundation, TÜDEMSAŞ has maintained 335.000 ports and repairing other countries’ wagons? freight wagons.” “Our production is in line with TCDD requirements. du- What are the quality policies you implement du- ring 2002-2003, we exported 240 ea petroleum transport ring the course of new product and maintenan- wagons to Iraq. Our efforts are underway for more ex- ce Works? ports of freight wagons and investments to that purpose. Our export markets are Middle East, North Africa, EU “TÜDEMSAŞ possessing ISO 9001 Quality Assurance countries.” Certificate is continuing to contribute to the development of railway transportation with the repair of freight and What are your medium and long term invest- passenger wagons and the production of freight wagons ment plans? and spare parts of any type.TÜDEMSAŞ has the guaran- tee of wagons under repair except for user’s and opera- “İn the medium and long run, we are carrying out invest- ting defaults.” ments for product diversity and capacity improvement in order to meet the demand that might appear in our co- Can you give information about the technology untry and European -Asian freight transportation sector used ? through observation of the developments in these areas. “İt is only very recvently that TÜDEMSAŞ has been able We have ongoing work to design new wagons with high to renewed its energy infrastructure by means of its latest cargo transport capacity.”

      M 26 O KARDEMİR STARTS INVESTMENT IN RAIL WHEELS FACTORY PROJECT

Turkey’s only rail supplier, Karabük İron and Steel Works- Kardemir, has started invest- ments to produce wheels for locomotives and wagons. The Railway Wheel Factory will have a 200.000 ea/year capacity and produce wheels for passenger and cargo wagons and locomotives.

TCDD’s plans towards railway transports and the fact when it was privatized, Kardemir has adopted a new visi- that railways privatization will enable private sector to on For this purpose it has sped up its investments. While enter the sector will raise the importance of the railway renewing its production technologies on one hand, it has transportation. raised its product range and capacitiies with new invest- ments, on the other. Kardemir General Director Fadıl Demirel in an intervi- Kardemir has now started investments to produce loco- ew said that they want Karabük to become a production motives and wagon wheels. Kardemir General Director centre for railway equipment. Railway transportation will Demirel said that they Karabük will become a production have a rising importance because of the TCDD’s railway centre for railway equipment in the region. projects and liberation of the railways as well as entry of the private sector in the railway transport sector. İn pa- Kardemir consists of main integrated plants such as Coke ralel to the rise in the railway transport’s importance, ve- Plants, Blast Furnaces, Steel Plant, Continuous Casters hicle parks will have a greater significance. Karabük İron Plants, Rolling Mills, Power Plant, Machinery Factories, and Steel Works- (KARDEMİR), has a pioneering role in Foundry Plant, Steel Construction Plants, Lime and Oxy- Turkey’s industrialization efforts. gen Plant. Our products which produced by 4000 workers according to TSE and International Standarts by testing Since its foundation, it has had a propelling force for the and controlling in our modern Laboratories are supplied National İndustry Concept. Starting from the year 1995 to domestic and world market.

      M 27 O Kardemir has recently invested in rail systems. İts to be completed in 2014. These investments will enable 450.000 ton/year capacity rail and profile Rolling plant the company to generate its own energy completely and was put into operation in 2007. İt meets all of the requi- even sell the surplus. rements of TCDD and the other partner company Çankırı Switch Factory is Turkey’s sole railway switch producer. The biggest factor that has brought KARDEMİR to this A new report is the signing of a contract for production of level is its management by an experienced Professional railway wheels. The factory makes up an important pier of staff. There is a decisive sense of management that is the strategy to produce products with high added value. able to direct the manpower to a common goal through The Railway Wheel Factory will have a 200.000 ea/year analysing the domestic and foreign markets very well. capacity. Kardemir’s capacity improvement work is still Though it was able to reach 1 million ton/year liquid steel underway in paralel to this. The liquid raw iron capacity capacity from 1939 when the company was established will be raised to 3 million tons and liquid steel capacity until 2010, today it has reached 2 million ton/year produc- to 3.4 million tons. Kardemir was able to reach only 1 tion level. million ton/year liquid steel production capacity from 1939 up to 2010 but today it has reached 2 million ton/year ca- İn the forthcoming period, investments will follow gradu- pacity. İ n the next several years it is planned to reach 3.4 ally to attain a liquid production capacity of 3.4 million ton/ million ton liquid steel production capacity. The company year. will produce the products that are not produced in Turkey as per its vision which aims at the production of minimum What is the present potential of the rail 3 million tons to compete globally. systems in Turkey and in the world?

Kardemir’s contribution to the country and İn Turkey not much investment had been made until re- the region… cently in terms of infrastructure for railways, except those The company has adopted a vision of producing mini- realized in the first era of the Republic.For this reason the- mum 3 million ton steel to attain the global power of com- re has been an unequal situation in the Turkish transport petition and through production of products that are not sector and land road transport has had the biggest share produced domestically. İntensive work is underway to this contrary to the developed countries. İn order to eliminate end. İn 2011 the new Sinter Factory and Blast Furnace this unbalanced situation, the government has adopted no 1 was built and in 2012 a new Limestone Factory and the policy of raising the share of railways as a state policy. in 2013 a new continuous casting plant was put into ope- İn the Transport Master Plan, which has highlighted the ration. Early this year, a new continuous casting plant railway transport as an important subject. The target has was put into operation. thus been set up as the increase of the share of railways in the overall transportation with the formation of a balan- Last month a 50 MW new energy plant and 70 –furnace ced and healthy transport system. coke factory was completed. Meanwhile, work is under- way to raise the steel plant production capacity and new While the length of railway lines remains within the nati- blast furnace and new bar and lump Rolling plant invest- onal borders was 4.138 km in 1923 when Republic was ments as well as the rail profile Rolling plant hardening published, it increased to the 7.153 km by 1938 as the re- facilities. The new bar and lump Rolling plant will have sult of railway oriented transport policies of the first years a capacity of 700.000 ton/year primarily for the automo- of the Republic. This policy was pursued until 1950s and tive and machinery manufacturing industries.The period the share of railways within the transport increased to the of investment is estimated to be 2.5 years. İt is expected 42 % for the passenger and 68 % for freight. However, to be completed by end of 2/15. A 50 MW energy plant after 1950s the share of railways was decreased to the 3 and 22.5 MW hydropower plant are the significant invest- % for passenger and 5 % for freight as the results of road ments in the energy sector. oriented policies. Todat, our Country has 10.991 km. total rail network, 8.697 of which is main track. İn the meantime, a hydropower plant Project is being car- ried out by the subsidiary ENBATI A.Ş. This is expected In this context, the Transport Ministry was defined the

      M 28 O       M 29 O railway sector as the prioritized sector in order to reach its • Enhancement of combined and logistic transport, deserved level. As the result of this choice which transfor- • Improvement of block train management, med into a new railway mobilization our • Establishment of R&D sector for rail sector.

Ministry defined three main target which are, make Tur- When was the rail and profile Rolling plant kish public meet with high speed trains by construction of built ? new railway lines, increase the speeds of the trains to the their normal level by rehabilitation of existing railways and The rail and profile rolling plant was put into operation in streamline the TCDD by restructuring. 2007. İt has 450.000 ton/year capacity.İt is the only plant even in the region that produces all sorts of rails of up TCDD aims at the realization of certain import projects to 72 m , big size profiles of up to 750 mm in width, 200 by 2023. Expansion of the vehicle parks, renewal of the mm wide angels and 200 mm diameter thick round and existing lines, construction of YHT lines (10.000 km), new quality steel products. With the rail and profile rolling conventional railway lines (4.000 km). plant investment KARDEMİR is able to meet all the requ- irements of TCDD an deven can make exports to Syria, TCDD has also announced that the future target is to re- İran, İraq and to all the world markets. ach 1.5 billion passengers by means of its Marmaray, VADEMSAŞ was founded with partnership of Karde- Egeray, Başkentray . Gaziray Projects by 2023 . TCDD’s mir, TCDD and VoestAlpine. the other partner company slogan “A Journey to the Future” has the aim of transpor- Çankırı Switch Factory is Turkey’s only railway switch ting 750 million passengers a year through Marmaray at producer. the 100th anniversary of the Turkish Republic. By means of its Marmaray, Egeray, Başkentray . Gaziray Projects Work on Railway Wheel Factory… TCDD plans to reach 1.5 billion domestic passengers annually. TCDD gives priority to YHT Projects . By 2023, it Turkey meets its railway Wheel requirements only thro- will have built 14.503 km railway network reaching a total ugh imports. Turkey is a direct importer of railway Whe- of 25.511 km rails. els. So this is an important market fort he company. As being an integrated facility, KARDEMİR is able to pro- The target also covers that İn the railway transportation, duce a great part of steel products at international stan- private sector share will have 50%. TCDD also plans to dards. Railway Wheels are in the class of a high quality develop the İstanbul-Basra, İstanbul-Kars-Tbilisi-Baku, steel poduct with high added value. And its production İstanbul-Aleppo-Mecca, İstanbul-Aleppo-North Africa is in congormitly to the company’s strategic quality steel transport corridores In accordance with these three tar- production goals. The Railway Wheel Factory will have gets, lots of project were started to accelerate the projects a 200.000 ea/year capacity and produce wheels for pas- in railway sector. While, our Country has 10.992 km. total senger and cargo wagons and locomotives. An invest- rail network today, 8.697 of which is main track, together ment of 140 million dollars will be made on this. A contract with sidelines (junction lines within Organized Industrial was signed with a foreign firm for the Project. The first Zones included), with the completion of these projects product is planned to be produced in the second half of importance of Turkey will be increased in its region and 2016. internationally and Turkey will be the heart of railway transport. Kardemir also cooperates with Karabük University and has provided important support in the field of education. In this context, our Ministry has comprehensive studies İn this sense the department of Rail Systems Engineering on the subjects below: was founded in the university. Also, the İron Steel İnstitute was established. Karçel A.Ş. started to manufacture car- • Improvement of railway sector, go wagons and has realized two experimental wagons. • Realization of high-speed trains, With these investments KARDEMİR has accelerated its • MARMARAY Project, efforts towards becoming a national brand in the railway • Rehabilitation of existing railway lines, transport sector in Turkey. • Modernization of railways and train sets,

      M 30 O TURKISHTÜRK ÇELİK STEEL SEKTÖRÜ SECTOR YILACHIEVES SONU HEDEFİNEYEAR-END TARGETSULAŞTI

Total steel exports became 13,9 billion dollars in 2013

The Turkish steel sector which experienced adverse con- Export target 18,5 million tons for 2014 ditions and unjust implementations due to the anti dam- ping measures as well as cases opened for protective Executive Board President of the Steel Exporters’ Union measures last year reached its year end targets after a Namık Ekinci evaluated the steel sector developments revision. and said that Turkey is placed seventh in sectoral exports and first in terms of debars exports in the world. However, According to the figures announced by the Steel Expor- the year 2013 was a hard time for the sector, he added. ters’ Union, export of steel products became 18.4 mln Financial fluctuations in the global markets, the long las- tons in quantity and 13.9 bln dollars in value in 2013 . The ting economic crisis in the EU , the Arab Spring in the sector mostly exported long products. The countries to important markets, embargo on İran, unjust anti damping which Turkey made the most exports last year are Iraq, cases opened against Turkey, as well as protectionist Portugal, Italy, Yemen and Thailand. implementations were all obstacles to the sector but it was able to reach the targeted figures. Ekinci said that According to the Steel Exporters’ Union, export of steel the sector’s target for 2014 is to achieve the exports at a products declined by 10.6% in value and by 7.3% in qu- level of 18.5 million tons under the conditions which will antity as compared to the same period in the previous hopefully be better. year. İn 2012, Turkey’s productıon rose by 5,2 % and became With the addition of the iron steel products that are in the 35,9 mln tons. Turkey, which had been placed 10th big- activity area of the other unions, the overall steel exports gest producer in the World in previous year, was 8th le- reached 19.2 million tons worth 15.9 bln dollars last year. aving Brazil and Ukraine back . According to The World The Middle East ranked first with 7.4 mln ton exports fol- Steel Associatıon report , the global productıon rose by lowed by African countries with 3.3 mln tons and America 1.2% amounting to 1 bln 548 mln tons in 2012. with 2.8 mln tons and the EU with 2.8 mln tons. Turkey raised its Iron- steel production the fastest of all Among the products, thohes most exported were bars and while it had a share of 2.2% within the global produc- with 8.5 mln tons, pipes with 1.8 mln tons, profiles with tion in 2011, its share was raised to 2.3% in 2012, thus 1.6 mln tons, bilet with 1.5 mln tons and hot flats with 1.4 becoming the 8th top producer. mln tons.

      M 31 O Together for a better future

(SWLVD0KHQGLVOLN/WGùWL

Eptisa is an international engineering, architecture and information technology company, clearly oriented towards service to the client, carrying out the most FRPSOH[SURMHFWVLQWKH¿HOGVRI7UDQVSRUW:DWHUDQGWKH(QYLURQPHQW%XLOGLQJ Energy and Industry; applying technological knowledge, creativity, innovation and the latest technologies to progress towards sustainable development of VRFLHW\WRWKHEHQH¿WRISHRSOH¶VZHOIDUH

7XUNH\LVDQLPSRUWDQWPDUNHWDQGDQRSHQGRRUWRJURZWKLQWKHFRXQWULHVRIWKH 0LGGOH(DVWDQG&HQWUDO$VLD6LQFH(SWLVDKDVEHHQZRUNLQJLQ7XUNH\IRU both the local administration and through multilateral programmes with various EHQH¿FLDULHV,QDQHZVXEVLGLDU\ZDVHVWDEOLVKHGEDVHGLQ$QNDUDDQGLQ ZHRSHQHGDQHZSURMHFWRI¿FHLQ,VWDQEXO&XUUHQWO\(SWLVDKDVPRUHWKDQ SURIHVVLRQDOVZRUNLQJLQLWVFHQWUDORI¿FHV

7KDQNVWRLWVJHRVWUDWHJLFORFDWLRQFORVHWRWKHFRXQWULHVLQ&HQWUDO$VLDDQGWKH&DXFDVXV(SWLVDPDQDJHVSURMHFWVLQ $]HUEDLMDQ8]EHNLVWDQ.\UJ\]VWDQDQG.D]DNKVWDQ

$VPDLQSURMHFWVGHYHORSHGE\(SWLVD7XUNH\ZHFDQHPSKDVL]H

‡ 3URMHFWPDQDJHPHQWDQGWKHFRQVWUXFWLRQVXSHUYLVLRQVHUYLFHVIRUWKH&H\KDQ:DVWH:DWHUDQG6WRUP:DWHU7UHDWPHQW3ODQW ‡ 0DUPDUD\3URMHFW*HE]H+DONDOL&RPPXWHU5DLO8SJUDGLQJ ‡ 7HFKQLFDODVVLVWDQFHDQGVXSHUYLVLRQRIWKH6ROLG8UEDQ:DVWH0DQDJHPHQW3URMHFWLQdDQDNNDOH ‡ 6XSHUYLVLRQVHUYLFHVIRUFRQVWUXFWLRQRIIRUHQVLFODERUDWRULHVLQWKHFLWLHVRI,VWDQEXO,]PLU'L\DUEDNLUDQG$GDQD ‡ 6WUDWHJLF(QYLURQPHQWDO$VVHVVPHQW 6($ RIWKH*UHDWHU%DNX5HJLRQDO'HYHORSPHQW3ODQ *%5'3 $]HUEDLMDQ ‡ 'HVLJQDQGVXSHUYLVLRQFRQVXOWDQF\IRULPSURYHPHQWRI:DWHU6XSSO\DQG6HZHUDJH6\VWHPXQGHU&RPSRQHQWLQ 2VKDQG-DODO$EDG.\UJ\]VWDQ ‡ )HDVLELOLW\6WXGLHVDQG'HVLJQ&RQVXOWDQF\6HUYLFHVIRUDUHJLRQDOVDQLWDU\ODQG¿OOVLWHLQWKH,VV\N±.XO2EODVW.\UJ\]VWDQ ‡ 6XUNKDQGDU\D:DWHU6XSSO\DQG6DQLWDWLRQ3URMHFW3URMHFW,PSOHPHQWDWLRQ$VVLVWDQFH8]EHNLVWDQ ‡ :DWHU6XSSO\DQG6DQLWDWLRQ6HUYLFHV,QYHVWPHQW3URJUDP±7UDQFKH0DQDJHPHQWRI,QYHVWPHQW3URJUDPZLWKLQ Multitranche Financing Facility, Uzbekistan

(SWLVD%UDQFKHV'HOHJDWLRQV Ongoing projects

'HYHORSPHQWSURJUDPPHVLQ7XUNH\LQWHQGHGWRPDLQWDLQFRQYHUJHQFHZLWKWKH(8WKURXJKUHGXFWLRQRIUHJLRQDOVRFLR HFRQRPLF GLIIHUHQFHV DQG LPSURYH WKH FRPSHWLWLYHQHVV RI WKH7XUNLVK HFRQRP\ DQG LWV PDLQ DJHQWV VXFK DV ORFDO DXWKRULWLHVFKDPEHUVRIFRPPHUFH60(VHWFWKURXJKWKHVXSSO\RIDZLGHYDULHW\RIDFWLYLWLHVIURPLQVWLWXWLRQDO UHLQIRUFHPHQWDQGWUDLQLQJWRDZDUHQHVVUDLVLQJFDPSDLJQVVWXG\YLVLWVHWF

(SWLVD¶VORFDOSUHVHQFHLQ7XUNH\RIIHUVFOLHQWVDQGEHQH¿FLDULHVSHUVRQDOVXSSRUWDQGFORVHWHFKQLFDODVVLVWDQFHIURP RXUWHDPDWWKH$QNDUDKHDGTXDUWHUV

.DGHU6RNDN1R*23dDQND\D$QNDUDÂ7UNL\H_ZZZHSWLVDFRP_7HO

OTOKAR RAISES ITS PRODUCTION BY 38% IN 2013

Otokar Deputy General Manager Basri Akgül said that Akgül also said that as Otokar they achieved to be the Otokar raised production by 38%, domestic sale quantiti- most preferred bus brand in 2013 when their 50th foun- es by 22% amounting to 4.600 units in 2013, adding that dation anniversary was celebrated. they increased their production and sales figures over İt is the 4th time that Otokar has become Turkey’s leader those in 2011. bus brand. Akgül stated that they raised their production by 38% and domestic market sales by 22% and 4600 Otokar held an evaluation meeting on 15 Jan. 2014 when units of vehicles were sold in 2013. it was stressed that Otokar was the most favourable bus brand in in Turkey in 2013. “3 of every 5 small buses and 1 of every 2 buses sold in city public transports were Otokar Deputy General Manager Basri Akgül and Do- Otokar brand “ mestic Market sales Manager Murat Tokatlı and Director of Marketing Department Tarkan Burak participated in the Otokar Deputy General Manager Akgül briefed about the meeting. As compared to 2012, Otokar raised commer- achievements of Otokar in 2013 and said that 70% of the cial vehicle production by 38 % and the quantity rose bus sales consisted of small size buses. Akgül added that from 3.600 units to a level higher than 5.000 units in there was a 45% rise in small bus sales and this means 2013. The company also raised domestic sale quantities that 3 of every 5 smalll buses sold were Otokar brand. by 22% amounting to 4.600 units in 2013. He said that sales of their 9-12 m buses increased by 113%. One of every 2 buses sold for city public transport Making an assessment of the sector in 2013, Otokar was Otokar. He noted that their exports also rose by 22% Deputy General Manager Basri Akgül said that in 2013 last year. More than 30 countries purchased Otokar ve- heavy commercial vehicle market did not change much hicles. and it was realized at a level of 40.000 units. He said that OSD report said the bus market rose by 67% because Akgül said, “We put into service our facilities located in of the positive developmets in the demand for city bus İETT’s İkitelli, Anadolu, Yunus and Ayazağa car parks.. İn transport services and it became 4.027 units. İn 2013 the 2013 we raised our deliveries by means of various ten- midibus market reached 3.959 units with a 28% rise. The ders in public transport sector. İETT tenders were impor- truck market declined by 8% to 32.000 units. tant for us.

      M 34 O İETT ordered us 900 units of buses in total. By end of the economy in line with our expectations. İts modular struc- year we delivered all the orders. We also contributed with ture is convenient for a lot of different missions. We have our 487 units of buses to Gaziantep’s public transport ser- had positive feedback shortly after its marketing. Ministry vices. We continued to extend our product range in 2013. of Environment has ordered 158 units in the first year.” We received orders from İzmir, Tekirdağ, Kastamonu, Gü- İn 2013 , they had innovations in trailer segment as well. müşhane, İzmit. Apart from public transport, we presen- Akgül said, “Last year we presented two new products ted our new vehicles to tourism and service transportati- in trailer segment: Mega Iceliner and Maxi Kesit Tanker on.With TEMPO, we added a new player to Sultan, which were added to our product range. İn 2013, we also beca- is Turkey’s most favourable small bus brand. İn 5 months me the first company to receive TSE’s Design Approval we sold 350 units of TEMPO. We also started its exports.” Certificate in eliptic tanker trailer and truck body tanker implementations.” “In commercial vehicles, we exceed oursel- ves with new products and new segments Since 1963, Otokar has introduced special solutions each year” convenient to the customers’ requirements based on the company’s own design and technological applications. İn Akgül also said that in commercial vehicles they are com- hazardous matter transport, the company has body bu- petitive with a favourable brand and added that they had ilding applications for tankers, semi trailers and trucks. started the year 2013 with a new segment. Atlas was pre- Otokar is today the most experienced one with ADR cer- sented to the market in the light truck segment and it will tificates in its tankers. attract great attention. As regards their targets in 2014, Akgül said: “in 2014, He noted that in commercial vehicle their brand is we aim to sustain our leadership. We also wish to raise Turkey’s most assertive one. He said, “we have stepped our market share in the truck market and we want to go into a new segment which is very important to us in 2013. ahead with hazardous matter and frigorific vehicles in the With Atlas, we are very competitive in light truck segment. trailer market. We see that the new year will be hard in Atlas has contributed a lot of activeness to the light truck respect of all the sectoral data. But we have decided on market with its favourable load transport capacity and new objectives that will force ourselves in 2014.”

      M 35 O MAN BREAKS RECORD IN CITY BUS SALES

With Municipalities’ procurements in 2013, sale of city buses rose 5 folds. MAN’s CEO Tun- cay Bekiroğlu said that their expectations have been exceded by 40% but that this year the way ahead is indistinct.

As many munici- FED decisions, Gezi and 17 December incidents, which palities ordered affected adversely the truck sales. “We had expected to buses for public sell 2.750 trucks last year but it remained at 2.059 units.” transportations Bekiroğlu said. before the local elections, the bus Total turnover declines sales doubled in MAN Truck & Bus CEO Bekiroğlu, upon a question as 2013. City bus regards the company’s consolidated turnover, said, “In sales are reporte 2012 our turnover was 460 million euro whereas it dec- dto have increased 5 folds. MAN Truck & Bus CEO Tun- lined to 435.5 million euro in 2013. The revenues from cay Bekiroğlu said, “City bus sales are normally 500-600 the bus exports manufactured in Ankara reached 167 mil- units. Last year the figure reached 2.352. lion euro. The 66% portion of the balance sheet was from exports.” Our forecast was around 900-1000 units of travel buses in 2013. But the year ended with a total of 1340 units of Bekiroğlu pointed out that they don’t have sufficient data travel buses”. to be able to see this year’s market progress and that if the elections result in stability, the truck sales will range Noting that MAN had a big share from these record high between 27 – 30.000. Otherwise the figures may decline sales, Bekiroğlu said that the 2013 forecasts of bus were to 15.000 and even to 12.000. exceeded to a great extent. He added that last year they had estimated to sell 275 buses but it reached 407. He He said this year the way ahead is indistinct. Bekiroğlu said that of them 222 are travel buses. 185 units city bu- said, “In 2014 we expected some narrowing in the market ses were sold. İn 2012 many tenders had been opened by around 10%. I hope it won’t be worse than we forecast. as the elections were in the offing. İn the truck sales, But we don’t like writing scenarios of disaster. We tell the there was some narrowing, Tuncay Bekiroğlu said, ad- Germany headquarters that our country will cope with the ding that truck sales were around 30.300 units in 2013. troubles.İn addition, big infrastructure investments can İn the market a 10% shrinking appeared as compared to bring about some revival in the truck market together with the previous year. Credit interest rates increased due to construction.”

MERCEDES-BENZ EVALUATES AUTOMOTIVE SECTOR IN 2013

Ending the year 2013 successfully, Mercedes-Benz Türk İn bus segment, it reached a sales figure of 1.174 units has evaluated the automotive sector in 2013 and fore- of buses in city and intercity groups. casts of 2014. Beyond this, Mercedes-Benz Türk exported 28% more Mercedes-Benz Board of Directors President Rainer Ge- buses in 2013 as compared to 2012. İt exported 2.864 nes and Director of Sales and Marketing Süer Sülün units to European countries mainly. Thus the company made speeches elaborating the sales figures realized in has reached a quantity of 30.000 units of buse sup to date. İn all groups, a total of 52.262 units (48.621 units new, 3.641 units 2nd hand ) of vehicles were sold which is ever İn truck segment, Mercedes-Benz Türk sold 17.003 units highest in history. Mercedes-Benz Türk continued with and exported 2.445 units last year. Since its foundation, new Technologies, human resource development, R&D the company has exported a total of 30.000 trucks. studies, investments on bus and truck factories, institutio- nal social responsibility projects. İn the light commercial vehicles segment,. Mercedes- Benz Türk reached a quantity of 10.421 units. İts second İn 2013 , €57 mln investment was made by the company, hand activities started in 2009 and since then a total of which has thus invested a total of 807 million euros since 3.641 units of vehicles were sold. 1967 , when it was founded.

Since 1968 when Mercedes-Benz Türk, first started pro- ductions has manufactured 69.000 buses and 185.000 trucks. İn 2013 Mercedes-Benz Türk produced 4.001 units buses and 18.394 units trucks and thus it kept on being the leader of the market.

İn automobile group, Mercedes-Benz Türk sold 20.023 units last year, which means 57% higher than previous year. İt presented its new generation E series, new CLA and new S-series to the market. İn 2014 , GLA will first join the product range and also, S-Series Coupé, rene- wed CLS and B-series will be launched to the market.

      M 38 O the total area of assembly from 7.705 m²’ to 17.250 m²’ With the new investment, it has been able to come to a level of reinforcing its position in export markets and res- ponding rapidly to the expectations of customers in do- mestic and foreign markets.

Social responsibility projects Apart from all these activities, Mercedes-Benz Türk, col- laborated with Türkiye Eğitim Gönüllüleri Vakfı (TEGV) , a charity for young education, to start a program, Mobile- Kids Traffic Training Project, which covers teaching child- Mercedes-Benz Türk supplies financial credit for one of ren with a suitable approach how to behave amid traffic every two vehicles sold by means of its “Mercedes-Benz flows in order to raise their awareness of safety against Finansman Türk A.Ş.” Mercedes-Benz Türk built a new possible dangers . This program had been in application production hall at Aksaray truck factory and expanded by Daimler AG in various countries since 2001.

      M 39 O OTOKOÇ AUTOMOTIVE’S 2013 TURNOVER REACHES 3,5 BILLION TL

Otokoç Automotive’s 2013 evaluation and 2014 forecasts “Development in product range for strate- has been made at a press meeting attended by General gic cooperations” Manager Görgün Özdemir, Finance Dept. Deputy Gene- ral Director Dr. Önder Kutman, Deputy General Director Noting that new investments have been underway unin- Uğur Güven, Birmot Deputy General Director Uğur Sa- terruptedly, Özdemir said, “Otokoç continued its invest- karya, Avis & Budget Deputy General Director İnan Ekici’ ments in 2013 and the total value of the investments reached 743 mln TL . A great part of these investments “Low interest and consumer condifedence comprise those for the purpose of maintaining our high of first half replaced by rises in rates and quality Standard and providing faster and better services interest rates in second half.” for our customers and developing our vehicle fleet”.

Otokoç Automotive General Manager Görgün Özdemir “Ranking top 36th in Capital 500 and 35th in in his speech said that economy in 2013 followed a fluc- Fortune 500 survey” tuating route and in the first half low interest rates and Özdemir said that they closed the year in line with the consumer confidence were replaced by rises in foreign targets keeping in the forefront the customer satisfaction Exchange rates and interest rates , adding that the au- and loyalty all the time. He said, “We thus obtained an 8% tomotive sector reached the highest second market vo- share from the automotive market at the end of 2013 with lume. Özdemir stated that new car sales rose by 9% as 72 .000 unit sales. The figures reached by Otokoç have compared to previous year, reaching 893.124 units. made us placed among the top. In the survey conduc-

      M 40 O ted by Capital 500 we were placed 36th among the best vehicle park and our service is still underway with our 150 and in Fortune 500 survey, 35th.” Özdemir stated that unit vehicle park in North Iraq. The 3rd operation abroad, they alone realized the 32.6% of the Ford brand vehicle our Office in Kazakhstan is opening in a short time. ” İn domestic sales , 21.3% of , Ford Trucks , 30.3% of, Fiat the recent partnership, Turkish Airlines (THY) had joined brand and 45.3% of Volvo brand vehicle sales. He said forces with Otokoç and Avis Budget Group to launch a “in sales of Alfa Romeo, Lancia and Jeep brand we have new project called “Fly & Drive” aiming to combine flight reached a sales share of 44.1% in total.” services with rental car bookings. Koç Automotive Group head Cenk Çimen said the part- Second hand sales 19.000 units nership, set to combine flight bookings with rental car ser- Özdemir also said that the second hand vehicle market vices in a single move, was important and would benefit realized a sale of 19000 units and the growth in the 2nd both sectors. He also stated that he “personally appreci- hand vehicle sales reached 36%. ated” Turkish Airlines’ recent growth, and the company’s representation of the country abroad. Avis Budget, a lea- “In 2014 a smaller automotive market” ding force in the car rental business that operates in over As regards the automotive sector forecasts in 2014, Öz- 10,000 locations, saw 7.5 billion dollars in revenue last demir said, “We expect a smaller sector due to the rising year, Nelson said, adding that the potential growth in re- foreign exchange rates and taxes, interest rates and new gions like the Middle East and India fueled the company’s arrangements on instalment sales and the adversities on search for new projects. the consumer confidenece and economy. As the 70% of the automotive market is composed of imported vehicles, Award to Otokoç the effects in line with the rate fluctuations will continue Otokoç upgraded its achievements further with the all year long. As Otokoç AUtomotive, we have already awards in 2013, as well. İn the Avis EMEA zone, Avis Tür- made our 2014 budgets before the rise in rates ,and we kiye 2013 was selected first in Europe in the customer review the budget once every quarter and make a revisi- satisfaction ranking, thus maintaining its successin the on if necessary.” same category in the 7th year. Avis was also given a prize of “The most Successful Licencing Country of the A total 845 mln TL investment Year” by EMEA Zone and of the Best Rent A Car Com- Özdemir pointed out that their competitiveness will again pany of the world be reinforced with the new facility and Office investments this year as well as investment for 19.000 unit vehicles About Otokoç and those worth 845 mln TL in 2014 .He added that they Otokoç, the first automotive industry investment of Koç plan to bring Zipcar, the world’s leading rent-a-car com- Holding, founded by the deceased Vehbi Koç in 1928, pany to Turkey. He said that in the first quarter of the year, had been the pioneer in many areas for these 80 years. It two new websites are being built for t he customers. Upon has brought many innovations into life. But only one thing a question regarding the fleet and vehicle renting, Özde- remained unchanged… Our conception of Quality and mir said that in short term, they have obtained a 40% mar- Service. Otokoç is providing the customers with services ket share with Avis, and 14% with Budget, adding that as in 15 modern Service Points throughout Turkey with our Otokoç, they have received in a short time the 54% sha- 800 employees and is solving any kind of possible requi- re of the short term rental market with the vehicle park rements of both of its corporate and individual customers comprising 9.400 units of cars. With Avis Filo the vehicle under a single umbrella and today, the company is selling park comprising 18.000 units has enabled the company 3 of every 10 Ford vehicles being sold in Turkey. Otokoç, to reach a 9.5% market share placing it 3rd top. With which has always emphasized the principle of “Uncondi- Budget, Otokoç having a vehicle park comprising 2.900 tional customer satisfaction” since its establishment and units and 40 rental points, has continued to advance furt- has been awarded with National Quality Award in 2004 her. He said, “With Budget, in 2013 at the prime season, thanks to this approach, is offering its services through we are on the way to our target of becoming second with its branches in the provinces of Istanbul, Ankara, Izmir, 2.900 unit-vehicle park and 40 ea rdental points whereas Adana, Antalya, Samsun, Konya, Eskişehir, and Kütahya with, Avis at the prime season, we have maintained our as well as in Tarsus district. Otokoç is diligently selecting, 40-year leadership in the short term vehicle rental sector training, and equipping our staff with updated information ith our 6.500 unit-vehicle park and 75 ea rental points.” and supporting and continuously renovating all of its faci- Özdemir noted, “In Azerbaijan where we are the leader of lities with the latest technologies. the market, we had 60% share in 2013 with a 1000 -unit

      M 42 O

         AUTOMOTIVE       PRODUCTION, SALES, EXPORTS AND IMPORTS FIGURES FOR 2013 •     ­€ ‚ ƒ „   ­€ †ƒ   Turkish automotive production is reported to have surged dark picture for the sector in 2014, expressing worries by 5 % to 1.13 mln units in 2013 and car makers are over currency volatility and recently introduced govern- expectedTurkish to automotivepreserve those production levels by is reportedcovering tothe have drop mentpicture regulations for the sector and tax in hikes.2014, expressingHowever, the worries manufac over- surgedin domestic by 5demand % to through 1.13 mln raising units exportsTurkish in 2013 and auto car - turerscurrency are not volatility that hopeless and recently this introducedyear, as they government are con- makersmotive manufacturers are expected raised to preserve their output those 5 % levelsto 1.13 bymln sideringregulations whether and taxto balancehikes. domestic market losses by coveringunits last theyear drop thanks in domestic to soaring demand exports through and a raisinggrowing boostingHowever, export theefforts. manufacturers “I think the are automotive not that hopelessindustry exportsTurkish automotive manufacturers raised their this year, as they are considering whether to balance domestic market, the Automotive Manufacturers Associ- will compensate for the production drop caused in the do- output 5 % to 1.13 mln units last year thanks to domestic market losses by boosting export efforts. soaringation (OSD) exports has andsaid, awhile growing adding domestic that the market,sector would the mestic“I market think the by focusingautomotive on industryexports inwill 2014,” compensate Önen said for Automotivefocus on the Manufacturers overseas market Association in 2014 amid(OSD) expected has said, tro - duringthe production the meeting. drop caused in the domestic market by whileubles at adding home. that the sector would focus on the focusing on exports in 2014,” Önen said during the overseas market in 2014 amid expected troubles at “Themeeting. production “The productionis expected is to expected be at around to be 1.1 at aroundto 1.2 home.The sector, which is Turkey’s largest exporter, ramped mln1.1 units. to 1.2 The mln goal units. for The exports, goal for meanwhile, exports, meanwhile, is be betwe is- up exportsThe sector, by 14 which% to 828,000 is Turkey’s units largest by steering exporter, to al - enbe 810,000 between and 810,000850,000 units, and with 850,000 an expected units, withvalue anof expected value of $21 billion to $22 billion,” he said. rampedternative upmarkets exports despite by 14 continuing % to 828,000weaknesses units in by the $21 billion to $22 billion,” he said. The Turkish automotive steering to alternative markets despite continuing The Turkish automotive market sold 853,378 European market. Revenues from exports also soared by market sold 853,378 vehicles after a 9.72 % rise, posting weaknesses in the European market. Revenues from vehicles after a 9.72 % rise, posting the second highest 12 % to $21.5 billion in 2013. “The export growth in spi- exports also soared by 12 % to $21.5 billion in 2013. thenumber second of highest annual number sales sinceof annual 2011, sales the since Automotive 2011, “Thete of theexport contraction growth in in spite Europe of the is significant,”contraction in OSDEurope Chair theDistributors’ Automotive Association Distributors’ (ODD) Association said (ODD) said The isKudret significant,” Önen said OSD during Chair a Kudretmeeting Önen held saidto present during the a ODD’sThe 2014 ODD’s sales 2014 forecast sales currently forecast standscurrently at stands800,000- at meetinginstitution’s held evaluation to present of 2013 the institution’s and prospects evaluation for 2014. of 860,000800,000-860,000 vehicles this vehicles year, although this year,the institution although is ex the- 2013 and prospects for 2014. “This shows the industry pectedinstitution to revise is expected this number to revise downwards this number in thedownwards wake of is“This trying shows to cover the industry the losses is trying in Europe to cover by the entering losses newin Eu - freshin the problems wake of in fresh the sector.problems The in risethe sector.in capacity of some markets.”Turkey’srope by entering new vehicle markets.”Turkey’s industry, thevehicle country’s industry, of the The top manufacturers, rise in capacity Hyundai of Assan, some Ford of the Otosan top biggest source of exports, is Europe’s fifth-biggest, manufacturers, Hyundai Assan, Ford Otosan and the country’s biggest source of exports, is Europe’s fifth- and Toyota Turkey, is also expected to bolster total pro- according to the OSD.The domestic automotive sector Toyota Turkey, is also expected to bolster total biggest, according to the OSD.The domestic automotive duction. representatives in Turkey have been depicting a dark production sector representatives in Turkey have been depicting a

S  

           1 1  1 1       

     

       

              

   

       1 

      M  O       M 43 O

           1 1  1 1       

       

        

          

 1    

        

     

    

 2       

    

    

                 

  S   

December Production 12 -month Production Change (%)

12 2012 2013 2012 2013 DECEMBER months

Automobile 44.708 50.935 577.296 633.604 14 10

Commercial vehicles 42.236 32.231 495.682 491.930 -24 -1

Large truck 1.156 2.360 26.271 25.587 104 -3

Small truck 158 448 2.858 4.495 184 57

Pickup 37.108 26.682 426.633 410.556 -28 -4

Bus 497 516 6.427 8.345 4 30

Minibus 3.060 1.862 29.335 37.750 -39 29

Midibus 257 363 4.158 5.197 41 25

Commer.vehicles total 86.944 83.166 1.072.978 1.125.534 -4 5

Tractor 1.604 2.873 42.255 40.509 79 -4

GRAND TOTAL 88.548 86.039 1.115.233 1.166.043 -3 5

      M  O       M 44 O

           1 1  1 1       

       

        

          

 1    

        

     

    

 2       

    

    

                 

  S   

December Production 12 -month Production Change (%)

12 2012 2013 2012 2013 DECEMBER months

Automobile 44.708 50.935 577.296 633.604 14 10

Commercial vehicles 42.236 32.231 495.682 491.930 -24 -1

Large truck 1.156 2.360 26.271 25.587 104 -3

Small truck 158 448 2.858 4.495 184 57

Pickup 37.108 26.682 426.633 410.556 -28 -4

Bus 497 516 6.427 8.345 4 30

Minibus 3.060 1.862 29.335 37.750 -39 29

Midibus 257 363 4.158 5.197 41 25

Commer.vehicles total 86.944 83.166 1.072.978 1.125.534 -4 5

Tractor 1.604 2.873 42.255 40.509 79 -4

GRAND TOTAL 88.548 86.039 1.115.233 1.166.043 -3 5

      M  O

  

DECEMBER 12 MONTHS Capacity utility rate (%)

11- CAPACITY PRODUCTION CAPACITY PRODUCTION DECEMBER MONTH

Light vehicles 120.726 79.479 1.448.712 1.081.910 66 75

Truck 3.952 2.808 47.424 30.082 71 63

Bus 748 516 8.976 8.345 69 93

Midibus 561 363 6.732 5.197 65 77

Tractor 45.830 2.873 96.243 40.509 6 42

TOTAL 171.817 86.039 1.608.087 1.166.43 50 73

 S  

           1 1  1 1        

         



            

    

     1

      

            

          

 1     

       

      

      

 2    

   

  

                 

      M  O       M 46 O

  

DECEMBER 12 MONTHS Capacity utility rate (%)

11- CAPACITY PRODUCTION CAPACITY PRODUCTION DECEMBER MONTH

Light vehicles 120.726 79.479 1.448.712 1.081.910 66 75

Truck 3.952 2.808 47.424 30.082 71 63

Bus 748 516 8.976 8.345 69 93

Midibus 561 363 6.732 5.197 65 77

Tractor 45.830 2.873 96.243 40.509 6 42

TOTAL 171.817 86.039 1.608.087 1.166.43 50 73

 S  

           1 1  1 1        

         



            

    

     1

      

            

          

 1     

       

      

      

 2    

   

  

                 

      M  O PRICE ADVANTAGE FOR FIRMS PRODUCING LOCAL GOODS According to a draft law debated at the Plan and Budget Commission, industrial commo- dities to be listed by the Ministry of İndustry will have more advantage in public tenders…

The public bidding system is being changed in a way to the article 63 that regulates the arrangements regarding expand the scope of the advantages for producers of lo- local bidders in the Public bidding Law. The arrangement cal goods. Previously a firm, offering local goods, could may cover that onlyl local b.idders will be able to contest win the contract even if it proposed by up to 15% higher. in tenders of which the approximate costs remain below This state could be possible only when the tender autho- the cradle value. rity found it suitable.The business world demands this to be put into realization. Up to 15% price advantage will be made available for lo- cal bidders that procure services and Up to 15% price The draft stipulates the lifting up of the statement “com- advantage will be possible for bidders that offer domestic modities and services whose contract value is not over goods in tenders for commodity procurements. 2 trl 300 bln TL” in KİK article 3 (g) and its replacement by industrial participation comprising off-set applications. According to a draft law debated at Plan and Budget Commission, all the partners of a joint venture should be The Public bidding system is being changed with a wider local for the joint venture to be able to be considered scope of the advantage given to producers of local goods. local. There has been a great desire in the manufacturing According to a draft law being prepared, certain industrial industry for arrangement of price advantages for local go- goods will compulsorily be subject to advantage. ods and local bidders for a long time. Article 63 of Law no 4743 being revised. Off-set implementations out of the scope A new definition has been formed under title: “Medium and High Technology Industrial Products and, in the ten- Another change is that the draft stipulates the lifting up of ders for the commodities under this scope, the tender the statement “commodities and services whose contract commission will have to accept the offer even if submit- value is not over 2 trl 300 bln TL” in KİK article 3 (g) and ted up to 15% higher. Each year, ministry of Science and its replacement by industrial participation comprising off- Technology will announce the list of those commodities set applications being taken into the scope of exemption. that are locally produced under scope of the Medium Another article in the draft foresees authorization of the and High Technology Industrial Products. Producers will Council of Ministers to calculate as price difference the receive a certificate regarding these products they have change in the special consumption tax, and make a produced domestically in line with the regulations to be change in the index taken for price difference calculati- issued by the Ministry. A draft law consisting of 103 artic- ons concerning the fueloil used by the undertaken in the les was submitted to the Plan and Budget Commission at contracts subject to such implementations. the Parliament. The draft envisages the rearrangement of

      M 48 O 2             

he new cradle values and monetary limits     have been determined as per Public T Bidding Authority (K0K) decision to be in      force as from 1 Feb. 2014 "Circular No: 2014/1)" as     officially gazetted on 30 Jan. 2014.    

      ­ € ‚ƒ     ‚ „‚ †­ †  ‡    ˆ                       N          

       

     

     

         

             This circular entails that tenders with an estimated cost and contract cost of 7.262.940 TL will not be bound    by Public Bidding Law except for penalty terms. The  subject limit is applied as 6 mln 791.568 TL. With the     circular, the cradle values for general budget managements and annex budget managements’   service and commodity procurements have been raised from 811.892 TL' to 868.486 TL and the other      managements’ service and commodity procurements     from 1.353.164 to 1.447.479 TL. In construction tenders, the cradle value has been raised from    29.769.751 TL to 31.844.702 TL      With the arrangement it will not be compulsory for managements to make an announcement for the         service and commodity procurements with an     approximate cost of 157,923 TL .In the direct procurement procedure, limits regarding procurements     for accomodation travel, etc. For the purpose of     representation of administrations in the borders of Metropolitan municipalities have been raised from      44.287 TL to 47.373 TL and from 14.755 TL to 15.783     TL.       M  O       M 49 O              Negotiations on the 2014 central management The 2014 central management budget’s sub items budget draft were completed at the Turkish Grand of tax revenues will consist of the following: Tax National Assembly. The debates started with the revenues 70,8 billion TL, corporate tax 31,1 billion TL, submission by Finance Minister Mehmet 1im2ek of the ÖTV 89,4 billion TL, KDV received inland 39,6 billion final accounts draft to the commission on 22 October. TL, KDV received in imports 64,8 billion TL. The new medium-term economic plan raised the With the law, administrations under central budgets allocated to the defense and security management will employ around 74.000 personnel institutions in the general budget, while Finance under scope of excemption. Minister Mehmet 1im2ek said the government paid General budget revenues stand at a level of 394 attention to the budget discipline and budget billion 634 mln 401 000 TL , special budget revenues performance figures of this year, which were better than comprise 7 billion 222 mln 934 000 TL as their own anticipated revenies and, 41 billion 928 mln 551 000 TL as After the approval of the budgets allocated to the Treasury aid totalling 49 billion 151 mln 485 000 TL ; ministries and institutions, the final debate took place on revenues of the regulatory authorities , at a level of 2 the budget for Finance Ministry on 22 November billion 984 mln 186 000 TL as as their own revenues Following the commission’s approval, debates on and 19 mln 658 000 TL as Treasury aid totalling 3 the 2014 Yılı Central management budget law draft billion 3 mln 844 000 TL started. The 2014 budget entails allocation of Speaking at the closing session, Prime Minister 428.396.493.000 TL to public managements under Recep Tayyip Erdogan said that they would all together general budget, 48.647.481.000 TL to managements continue to have Turkey grow with stability, confidence, with private budget, and 3.003.844.000 TL to the brotherhood and solidarity in 2013. "I would like to regulatory managements. Spending will be 110 bln TL make another good news that Turkish Central Bank's for personel, 18.9 billion TL for state Premium of the foreign exchange reserves set another record with social security associations, 37.6 bln TL for $120.5 billion," Erdogan noted, adding that he expects procurement of commodities and services, 52 bln TL for that 2012 would end with several records. For his part, interests, 163.6 bln TL for current transfers, 36.7 billion Deputy Prime Minister Ali Babacan said that Turkey TL for capital expenses, 6.5 bln TL for capital transfers, would enjoy more balanced and sustainable growth 7.6 bln TL for lending, 3.5 bln TL fors pare allocations. rates in and as from 2013.

       2S     The Ankara Metropolitan Municipality’s Assembly drafts of EGO, ASK0 as well as the Metropolitan convened in November to discuss the budgets under Municipality were finalized. The total budget of the presidency of Mayor Melih Gökçek. Metropolitan Municipality and its subsidiaries was set Following the debates on the 2014 budget drafts of as 6 billion 746.100.000 TL. The approval was the district municipalities, the 2014 fiscal year budget obtained with the majority of votes at the assembly.

      M  O       M 50 O                         ­€ ‚  ­€ ‚   ƒƒ„   ƒ G

The Euro yielded the highest monthly real profit         according to the Turkish Statistics Institute in its report   “Rates of Real Profits created by Means of Financial        Investment in December 2013”. In December 2013, the Euro yielded the highest        monthly real profit with the rates 2.39 % and 3.06 %          according to Producer Price Index (PPI) and Consumer Price Index (CPI) respectively.          According to PPI, the monthly real profit rate of US    dollar was 0.85 %. However, investors of stock    ­    exchange, gold (ingot) and deposit interest lost by 6.31    ­   % , 3.54 % and 0.69 %, respectively. In term of CPI, €  the monthly real profit rates of US dollar investors was   ­­ ­ ­ 1.50 % while investors of stock exchange, gold (ingot) and deposit interest lost by 5.70 %, 2.92 % and 0.05 %    ­  respectively. ‚         The report shows that the Euro made the highest real quarterly profit with the rate of 2.47 % according to       ­  PPI and 2.62 % according to CPI. In the same quarterly ‚ƒ€  period, investors of gold (ingot) lost by 9.58 % and 9.44       ­ % according to PPI and CPI.       ­ The real bi-annual profit rate of Euro was 8.22 % ‚„  according to PPI and 9.40 % according to CPI. In the       same period, stock exchange investors made the highest losses with rates of 11.31 % and 10.34 %       ­ according to PPI and CPI respectively Euro investors         earn maximum annual real profit. The annual real profit rates of Euro were 13.17 %        and 12.72 % according to PPI and CPI respectively  †  while investors of gold (ingot) made the highest annual      ­ loss with the rates of 21.60 % and 21.92 % according to     ­   PPI and CPI. ‡ˆ     ­ ­  ­   ‡ˆ „ ƒ‰„   Š­‹ƒ­  Œ Š­ Ž     ­  ­   †         ­­   

                 ­             

      M  O       M 51 O  S      

   ­ ­ €SS ‚­  ƒ­„ † ­ ­‡ ­ƒˆ† ­ ‰­ˆŠ ‹†  ­‹ Œ‚ Ž­ˆ ‚ ­ ­    ­G

Turkey is reported to have been ranked 19th place country is Singapore in terms of investments, the U.S. as result of "Nation Brand Index’’ that is organized by in terms of products and services, Switzerland in terms Brand assessment agency Brand Finance. of talented people, Thailand in terms of tourism. Turkey Turkey is one of four countries which showed is ranked among 3 categories except talented people. highest increase in brand value. Brand Value of Turkey increased by 41% According to the survey the most valuable country compared previous year. Brand Finance Turkey brand in the world, was United States by brand value of Director Muhterem 0lgüner has stated about this issue: 17 trillion 990 billion dollars. The U.S. was followed by Turkey maintains its economic stability. Also shows China with 6 trillion 109 billion dollars. Turkey is ranked stability and best performance on tourism, investment 19th place."Nation Brand Index’’ survey has been and products. Turkey's these qualities naturally is viewed with 4 categories which are investment tourism reflected in brand value. and products and capabilities. The most successful

’ “ ” ”   •

2• —­­‡­ 24‡ 3 ˆˆ ­ ‚ —›2  ‚ ­  ­Ž ˆˆG

The General Directorate of State Airports Authority 0t is reported that the contract has been signed by (DHMI) has signed a contract for the construction and sözle2menin DHM0 Board of Directors President and operation the third Istanbul airport project with IGA General Director Orhan Birdal, Deputy General Director (Istanbul Grand Airport) Havalimani Isletme A.S., DHMI Funda Ocak, and Cengiz 0n2aat Sanayi ve Ticaret A1 officials said. Board of Directors President Mehmet Cengiz, Limak IGA Havalimani Isletme is the joint entity set up by 0n2aat Sanayi ve Ticaret A1 Board of Directors the consortium of local construction firms Cengiz Insaat, President Nihat Özdemir, Günal Mapa 0n2aat ve Ticaret Limak Insaat, Mapa Insaat, Kolin Insaat and Kalyon A1 Board of Directors President Mehmet Nafiz Günal, Insaat, for the airport Project. Kolin 0n2aat Turizm Sanayi ve Ticaret A1 Board of The consortium won the government tender for the Directors President Naci Kolo/lu and Kalyon 0n2aat airport's construction and a 25-year lease with a 22.152 Sanayi ve Ticaret A1 Board of Directors President billion euro ($29.925 billion) bid in May. On May 20, the Cemal Kalyoncu consortium and DHMI signed an initial agreement on the project, DHMI said.       M  O       M 52 O            

There are hundreds of projects worth at least 700 †„ƒ‚  ‚ €‚  „‡ billion TL (350 bln dollars) under scope of "Vision 2023" Weight is on transport and energy sectors in the ahead of Turkey. Some of them have started. Not all of 2023 projects. According to figures given during the them will be met through public sources. Public Private Transport Forum, the cost of the 2023 transport projects Sector Cooperation (KÖ0) and Build-Operate-Transfer is 200 bln dollars . Of this, 120 bln portion wil l be (Y0D) models have been put into action for t hem. But realized by the state and 80 bln dolar portion with KÖ0. there will be financing requirements for 70-80% of these By 2023’ Turkey’s passenger traffic is expected to projects out of the budget and loçal sources. Financial rise from today’s 266 billion passenger/km to 558 conditions have been hardened after FED’s plans to billion passenger/km, cargo traffic from 260 bln ton/km end up the monetary expansion. This state has led to to 625 bln ton/km. This needs to be met at land, sea increasing costs. and air. The cost of the projects envisaged in energy is 0t is 10 years to 2023, during when at least 250 115 bln dollars . of this, 40 bln dolar part is two nuclear billion dolar borrowing will be required to achieve the plants. 700 bln Project burden.Some of the projects have not started yet. So the question of financing is not for today. †ƒ­ƒ €ˆ­‚  ‚ †ƒ ‚ ‚ „‰ But some of these projects have been tendered. For 1) KANAL 0STANBUL: Survey project work is example Körfez Bridge and 0zmir highway, 3. airport, underway. After Council of Ministers decision, it was Haliçport... And there are priatizations. Financial burden taken into the KGM’s 2013 investment program with 5 bln TL Project cost ‘. The figure is not certain yet but will in thesales of bridges, highways, MP, 0GDA1, etc. can create troubles for t he buyers. Foreign appetite may reach billion dollars. Under these conditions its future seems hard. not be as before in these jobs and privatization tenders. 2) 3RD AIRPORT: Tender was held with 22.2 bln euro, t is seen that recently consortiums that provide 0 plus KDV cost.. The consortium is not yet in pursuit of financing are made up of local banks. finance. Construction will cost around 9 bln euro. This requires financial support. The consortium says banks  ­ €‚ ƒ„ƒ „ƒ‚ ‚‚‚ and financiers show interest. At the Transport Forum, financial conditions that 3) KÖRFEZ BRIDGE, 0ZM0R HIGHWAY: Project cost is became heavier were stressed in its report and a 6.3 bln dollars. Financial closure for Phase 1 has been great number of KÖ0 projects chasing finance at the made. On 15 March, 2013 , the credit contract was same time cause the projects not to be able to find the signed between OTOYOL A1 and 8 local banks for the required financing or to find excessively high cost 2.8 bln dollar procurement commitment. Financial financing. support is in question for Phase 2 again. President of the Turkish Contractors Union (TMB) 4) 3RD BRIDGE: IC 0ÇTA1–Astaldi Consortium signed a credit agreement worth 2.3 bln dollars with Emin Sazak has the same view. He says that participation of 7. fluctuations and uncertainty recently experienced in 5) EUROASIAN TUNNEL: Undertaker ATA1 concluded the markets affect the contracting sector deeply. Sazak a financial agreement worth 960 million dollars fort he notes that agreements have been signed for mega mega investment which has a value of 1.246 million projects such as Euroasian Tunnel, 0zmir highway, dollars. Körfez Crossing and 3rd bridge projects but that 6) TWO NUCLEAR P.PLANTS SANTRAL: 20 bln political risks and financial developments at glhobal dollar Akkuyu p.plant was awarded to Russians. scale may have reflections on the national banking Construction started. Sinop plant wil lbe built by sector. “Procurement of financing from abroad for big Japanese companies. The total cost is 42 bln dollars projects can become a more expensive issue.” Says for both. Financial liability is on the companies of those Sazak. countries.         M  O    M 53 O 7) HEALTH CAMPUSES: 0n 22 provinces 35 health *Galataport, Haliçport tenders were held. For two of campuses are being built with KÖ0 model. At certain them, 2 bln dollars investment is needed. estimates, investment required for 35 campuses is 11 Haydarpa2a Port Project to start. bln dollars . There are two big integrated campuses *0zmir Port will be re tendered. Estimated cost is more among them: 3.660 bed capacity Ankara Bilkent and than 1 bln dollars. 3.566 bed capacity Ankara Etlik Campus for which the *Derince Port is on the agenda for privatization. The estimated cost is 1 bln dollars. The bid commission is estimated cost is 500 million dollars.. Resettlement evaluating the financial model and offer. studies are underway. 8) F0LYOS PROJECT: Around River Filyos bed there *0BB’s 0GDA1 privatization is on the agenda. 0BB will be a big logistic port and 4 big industrial zones with sources are worth 5 bln dollars 10 bln dollar investment.. with 25 million ton/year capacity Turkey’s biggest port will be established. 9) ÇANDARLI PORT: 0nfrastructure work is about to       finish. Superstructure tender announcement was The total amount of cargoes handled at our ports is issued on 29 August. Total cost will reach 910 million 348 million tons. By 2023 the capacity is expected to euro. reach 850 million tons. 0n 2023 Turkish dockyards will 10) AF10N ELB0STAN COAL PLANT: Between Turkey be placed among the top 5 in global orders 0n the sea - UAE, an agreement was signed for Af2in-Elbistan tourism sector, , 7 ea new cruise ports will be built and basin 8.000 MW capacity power plant. But undertaker at least 3 of them will serve as homeport . TAQA quit the job.. 12 bln dollar Project seks new Yacht mooring capacity will reach 50.000 . According undertaker to projections, 34 bln dollar (68 bln lira) investment is 11) YUMURTALIK REF0NERY: Çalık-Indian Oil required by 2013. partership’s project. Project studies are underway. *0n the Mediterranean minimum 6 ea Sea 0ndustry 12) GAP PROJECTS: Financial requirement is facilities will be built to provide pool service for 250 - calculated to be 51.5 bln TL (at 2012 prices) for pusblic 400 m. Ships. investments to be made in order to reach the targets *0n ship maintenance and repair. High technology is determined in GAP Master Plan 51,5 bln TL olarak. targeted to become the leader in the region. 13) LOGISTICS VILLAGES: At 18 points 18 logistics villages are located. 12 of them are being established. *10 LNG ships wil lbe built to transport Turkey’s own 14) TPAO PROJECTS: Azeri Çırali Güne2li Petroleum naturalgas fieild Development and Production Project investment share is 2.8 bln dollars, 1ah Deniz Naturalgas Field          ­ Project Sahası projesinde investment share is 3.7 bln By 2023 railway network wil lreach 30.000 km. The dollars. Public will allot 70 billion TL to new lines, With TPAO has a total 5.7 bln dollar investment commitment Signalling electrification modernization it will need, 100 in Iraqi areas consortia. bln TL invesment.. YHT length will reach 10.000 km by 15) FINANCE CENTRE: 0nfrastructure work was 2023. 4.000 km new conventional railway lines will be tendered at 1.5 bln dollars and consturction underway. built.. Ankara-0zmir Project will cost 2.3 bln dollars. No financial trouble. Some sections have been tendered. Some parts of the 16) 0STANBUL PROJECTS: A new network will be 4 bln dollar Sivas-Kars lines have been tendered‘ The added to the existing metro network. Under this scope, rail systems will be put into action on Kadıköy- Kartal- other projects in the sector: *BA KENTRAY: The value of completion projects is Kaynarca, 0ncirli-Yenikapı-Hacıosman, Üsküdar- 1 Altunizade- Ümraniye, Kabata2-Mahmutbey, Bakırköy- 2.6 bln TL. Bahçelievler-Kirazlı, Otogar-0kitelli, Bakırköy-Beylikdüzü *EGERAY: Will be extended to Tepeköy, Selçuk and lines. Bergama. *0stanbul-Basra, 0stanbul-Kars-Tbilisi-Bakü, Kavkaz-    Samsun-Basra, 0stanbul-Aleppo-Mecca, 0stanbul-Halep- north Africa, southeast Asia transport corridores wil l be 0mportant privatizations for which buyers will need to find financing are: developed. *Highways and bridgek pricatization was canceled. *LAKE VAN RAILWAY CROSSING: 2 ea 50 wagon Their tenders are on the agenda again but the capacity ferries procurement and berth construction government may be directed to other models. underway *Milli Piyango sale is on the agenda. Estimated cost is. *Nusaybin-Cizre-Silopi-Habur Railway Project will be 1.6 bln dollars. BUyer should finance this. completed.

      M  O       M 54 O 7) HEALTH CAMPUSES: 0n 22 provinces 35 health *Galataport, Haliçport tenders were held. For two of         ones and those at review stage are considered, the campuses are being built with KÖ0 model. At certain them, 2 bln dollars investment is needed. By 2023 passenger capacity will reach 350 million. forecast investment value with the licences demanded estimates, investment required for 35 campuses is 11 Haydarpa2a Port Project to start. Civilian air fleet will reach 750 aircraft capacity. 0n reaches 110.00 MW. 0t can be said that private sector bln dollars . There are two big integrated campuses *0zmir Port will be re tendered. Estimated cost is more seven regions minimum 2 cargo airports will be built. investment plan is at around 60.000 MW, With the among them: 3.660 bed capacity Ankara Bilkent and than 1 bln dollars. Min.2 maintenance training airports will be built. An addition of two nuclear plants of the government to this, 3.566 bed capacity Ankara Etlik Campus for which the *Derince Port is on the agenda for privatization. The aircraft factory will be established. Total investment will a portfolio of 100 bln dollar investment appears. estimated cost is 1 bln dollars. The bid commission is estimated cost is 500 million dollars.. Resettlement * Two refineries each with a value of 5 bln dollars will be evaluating the financial model and offer. studies are underway. reach 62 bln TL. The other projects: built as well.. 8) F0LYOS PROJECT: Around River Filyos bed there *0BB’s 0GDA1 privatization is on the agenda. 0BB *TurkAster: The vehicle to be designed will be used to will be a big logistic port and 4 big industrial zones with sources are worth 5 bln dollars collect Samples after reaching the near space objects, * Pipeline projects such as TANAP in which Turkey has 10 bln dollar investment.. with 25 million ton/year *Turkish Space Centre establishment shares worth several bln dollars wqill be realized. capacity Turkey’s biggest port will be established. *New generation aircraft engine manufactures 9) ÇANDARLI PORT: 0nfrastructure work is about to       *Unmanned and Manned space flights finish. Superstructure tender announcement was The total amount of cargoes handled at our ports is     issued on 29 August. Total cost will reach 910 million 348 million tons. By 2023 the capacity is expected to *Local aircraft production TANAP: Preselection applications received on 15 euro. reach 850 million tons. 0n 2023 Turkish dockyards will *Local space observation vehicle. August. Turkey has20% and Azerbaijan 80 % 10) AF10N ELB0STAN COAL PLANT: Between Turkey be placed among the top 5 in global orders 0n the sea *Local satellite ground control station partnership. var. According to some forecasts, this - UAE, an agreement was signed for Af2in-Elbistan tourism sector, , 7 ea new cruise ports will be built and *Local satellite launching system Project is worth 7 bln and to some others, 10 bln basin 8.000 MW capacity power plant. But undertaker at least 3 of them will serve as homeport . dollars. Turkey should provide financing of between TAQA quit the job.. 12 bln dollar Project seks new Yacht mooring capacity will reach 50.000 . According 1.5 - 2 bln dollars according to its partnership status. undertaker to projections, 34 bln dollar (68 bln lira) investment is       By 2023 length of the divided roads will rise from 11) YUMURTALIK REF0NERY: Çalık-Indian Oil required by 2013. NABUCCO WEST: 0t was an alternative to TANAP but 22.253 km to 37.000 km, length of highways to 8.000 partership’s project. Project studies are underway. *0n the Mediterranean minimum 6 ea Sea 0ndustry now a weak option.. Nabucco pas been revised as 12) GAP PROJECTS: Financial requirement is facilities will be built to provide pool service for 250 - km . Expenditure of 29 billion TL is enviged on Divided Nabucco West.. Turkey is a partner and aim is to calculated to be 51.5 bln TL (at 2012 prices) for pusblic 400 m. Ships. roads and 58 bln lira on highways. distribute the gas in Europe after delivery to Turkey. investments to be made in order to reach the targets *0n ship maintenance and repair. High technology is *All the land road network that will reach 73.000 km will determined in GAP Master Plan 51,5 bln TL olarak. BTC: Bakü - Tbilisi - Ceyhan Lines capacity is planned targeted to become the leader in the region. be coated with bitumenous not mix asphalt . The cost 13) LOGISTICS VILLAGES: At 18 points 18 logistics to be raised from 1.2 to 1.6 mln barrel/day. *10 LNG ships wil lbe built to transport Turkey’s own 30 bln TL. villages are located. 12 of them are being established. SAMSUN-CEYHAN PIPELINES: Çalık Gr- EN are naturalgas *Storeyed roads 0 14) TPAO PROJECTS: Azeri Çırali Güne2li Petroleum parthers.. Source is being sought.. Foundation was laid *7 km Sabuncubeli Tüneli, 14,7 km’ Ovit Tunnel to be fieild Development and Production Project investment in April 2007. Russian side has not given the oil share is 2.8 bln dollars, ah Deniz Naturalgas Field completed. 1          ­ commitment yet. There is not much progress. Project Sahası projesinde investment share is 3.7 bln By 2023 railway network wil lreach 30.000 km. The dollars. Public will allot 70 billion TL to new lines, With       SOUTH STREAM: Aim is Russian naturalgas TPAO has a total 5.7 bln dollar investment commitment Signalling electrification modernization it will need, 100 transmission to European markets through a pipeline in Iraqi areas consortia. bln TL invesment.. YHT length will reach 10.000 km by Energy Ministry’s goals for energy fort he year 2023 under Black Sea and an agreement was signed on 6 15) FINANCE CENTRE: 0nfrastructure work was 2023. 4.000 km new conventional railway lines will be are: August 2009 with Russia for pipeline passing through tendered at 1.5 bln dollars and consturction underway. built.. Ankara-0zmir Project will cost 2.3 bln dollars. * Electricity requirement to reach 500 bln kWh. At Turkish waters. No financial trouble. present 230 bln kWh Electricity is being generated. Some sections have been tendered. Some parts of the The other projects: 16) 0STANBUL PROJECTS: A new network will be 4 bln dollar Sivas-Kars lines have been tendered‘ The This means that installed capacity should be raised to added to the existing metro network. Under this scope, * Via Caspian Türkmenistan - Turkey - European DGBH 100.000 MW. n other words, by 2023 50.000 MW new rail systems will be put into action on Kadıköy- Kartal- other projects in the sector: 0 project: This aims at transmission of Turkmen *BA KENTRAY: The value of completion projects is installed capacity should be added. For this, each year Kaynarca, 0ncirli-Yenikapı-Hacıosman, Üsküdar- 1 naturalgas to Turkey by a pipeline through Caspian Sea Altunizade- Ümraniye, Kabata2-Mahmutbey, Bakırköy- 2.6 bln TL. 5 bln worth of investment is needed. and then to Europe. *EGERAY: Will be extended to Tepeköy, Selçuk and * Government’s target is to raise wind power installed Bahçelievler-Kirazlı, Otogar-0kitelli, Bakırköy-Beylikdüzü * Iraq - Turkey Petroleum and N.Gas Pipelines lines. Bergama. capacity to 20.000 MW, (ITGEP): This aims at transmission of N.Iraqi gas. It will *0stanbul-Basra, 0stanbul-Kars-Tbilisi-Bakü, Kavkaz- * Solar energy installed capacity to 3.000 MW join with Bakü - Caspian energy lines for delivery into Samsun-Basra, 0stanbul-Aleppo-Mecca, 0stanbul-Halep-    * Geothermal energy installed capacity to 600 MW. central Europe. north Africa, southeast Asia transport corridores wil l be 0mportant privatizations for which buyers will need to * With 22 bln dollar investment two nuke plants will be developed. * East Mediterranean Sea (0srael – South Cyprus) find financing are: built each being of 5.000 MW capacity. *LAKE VAN RAILWAY CROSSING: 2 ea 50 wagon N.Gas Pipelines: Sale of gas drilled off 0srael and South *Highways and bridgek pricatization was canceled. * With private sector efforts, 20.000 MW capacity capacity ferries procurement and berth construction Cyprus in Europe via Turkey. Their tenders are on the agenda again but the hydropower plant will be built government may be directed to other models. underway * Egypt - Turkey. Gas Pipelines: Transmission of * According to EPDK, licence awards have been made *Milli Piyango sale is on the agenda. Estimated cost is. *Nusaybin-Cizre-Silopi-Habur Railway Project will be Egyptian gas to Turkey. already to 59.000 MW investments .When the eligible 1.6 bln dollars. BUyer should finance this. completed.             M  O M  O       M 55 O                     J     ­ €‚  €   ƒ„€  €† † ˆ  ‰ƒŠ   €††„€  €„‹ Œ ‰†  ‹Š‹†Š‹ Š ‹ ‚Ž„   ‰ €†‘  G

Binali Yıldırım, who was the Minister of Transport, “” ‰† •‚Ž„   ‰ ­‹  ” –€ Maritime and Communications before, stated during his Yıldırm stated that they anticipated the projects in office that their 2014 budget’s investment allocations the transport, communication and maritime sectors, have reached 9 billion TL. He disclosed the projects which total 86 billion Turkish Liras, would be complete planned to be completed in 2014. within five or six years. Yıldırım said, "2013 budget was 19.1 billion TL. This He said the government made 268 billion lira means a 14.5% rise. " investments in these three sectors in the last decade. Yıldırım noted that their govermment is in its 11th There are currently 460 main projects, as the number year in power, adding that they are continuing to exert reached approximately 3,900 with the sub-projects great efforts to raise the living standards in the field of added, he said. transport, maritime and communications. He also said “The investment volume of these projects is 184.5 that the budget allocation for State Highways billion liras. As the realized part is worth 98.2 billion liras, Administration was 6.9 bln TL in 2013 whereas it will the rest is worth 86 billion liras and is expected to be reach 7.1 bln next year. completed within five or six years,” he said. He said that the budget of the civilian Aviation Yıldırım noted that some projects in the transport, General Directorate is now 25.174.000 TL. The budget of communication and maritime sectors worth 47 billion liras the 0nformatics Technologies (BTK) was 1.5 bln TL last were contracted within the public-private sector year and it is 1.8 bln TL this year, Yıldırım said, adding partnership (PPP) model, as alternative financing. 6 that this means 18% rise. billion liras of those projects are complete, he added. Yıldırım recalled the private sector’s involvement in Istanbul’s third bridge and third airport projects are railway transportation. A draft code, presented to based on PPP model. Parliament on March 6, aimed to establish a company ƒŠ • ‚ —˜ ‰††  under the name Transport A1 for train management units. Public and private legal entities   and firms will be licensed to build their own railway Binali Yıldırım stated that during the period of 2003- infrastructure, become infrastructure operators on these 2013 investments worth 212.5 billion TL have been railways and manage trains on the national railway achieved in the transport sector and that the Ministry’s network as well. investments have reached a value of 133 billion TL local He noted that they aimed for full integration with administrations’ 72 billion TL, other public enterprises’ their neighbors by railway. “The Baku-Tbilisi-Kars railway around 10 billion TL. He said that in the communications project will come into operation by the end of next year at sector, a great part of the investments were realized by the latest. This is a project carried out by three countries. the private sector. He said its rate is 58%, Ministry’s It isn’t enough to complete it unilaterally,” Yıldırım said. realizations have reached 41% and others 1% of the total Binali Yıldırım said they aimed to form the investments. During the last 11 years, projects worth 47 convergence of the Silk Road by completing the bln TL have been contracted with the public-private Marmaray, a rail transport project in Istanbul consisting sector partnership. Of them, 6 bln TL portion has been an undersea rail tunnel under the Bosphorus completed.With the addition of the communications

        M  O    M 56 O investments, 10 year investments total a value of 268 65.627 km and that there are 8 international road billion TL. corridors with a lenth of 12.573 km throughout the Binali Yıldırım, as regards subway Works in Ankara, country. said that the two lines will have been opened by the                    beginning of 2014; Kızılay-Çayyolu and Sincan-Batıkent Briefing on the projects with build-operate-transfer lines. Keçiören-Tando/an Line will be finished in mid model, Yıldırım said that work is underway on Yavuz 2014, he said. Sultan Selim Bridge, which will be the world’s widest        Yıldırım also said that construction of logistics platform bridge. centres is underway. A total of 19 centres have been Yıldırım also stated that the Euroasian Tunnel, with     built 14,5 km lines underwater and underground, will be completed by May 2015                 ­ €‚  €   ƒ„€  €† † ˆ  ‰ƒŠ J              €††„€  €„‹ Œ ‰†  ‹Š‹†Š‹ Š ‹ ‚Ž„   ‰ €†‘  G Ex-Minister of Transport, Maritime and    Communications Binali Yıldırım stated that during the Binali Yıldırım, who was the Minister of Transport, last 11 years, projects worth 47 billion TL have been “” ‰† •‚Ž„   ‰ ­‹  ” –€ concluded and 6 bln TL portion has been completed and Maritime and Communications before, stated during his 2  ­     € Yıldırm stated that they anticipated the projects in the rest is underway. office that their 2014 budget’s investment allocations the transport, communication and maritime sectors, ‚   ƒG have reached 9 billion TL. He disclosed the projects 0ncluding the communications investments, the which total 86 billion Turkish Liras, would be complete planned to be completed in 2014. investments made during the 10 year period are worth within five or six years. Ex-Transport Minister Yıldırım said that The Yıldırım said, "2013 budget was 19.1 billion TL. This 268 billion TL. He said the government made 268 billion lira Istanbul-Ankara high-speed railway may be opened in means a 14.5% rise. " Yıldırım pointed out that the share of transport investments in these three sectors in the last decade. February-March, noting the ministry’s projects, valued at Yıldırım noted that their govermment is in its 11th sector within GNP was 13.7% in 2003 whereas it has There are currently 460 main projects, as the number $43 billion, will be completed in six years year in power, adding that they are continuing to exert risen to 15.3% today. So longa as Turkish economy has reached approximately 3,900 with the sub-projects Turkey’s high-speed railway (YHT) between Istanbul great efforts to raise the living standards in the field of grown transport sector investments have indicated an added, he said. and Ankara will be opened by the first months of the next transport, maritime and communications. He also said upwards trend. The overall investments in 2003 rose “The investment volume of these projects is 184.5 year, Binali Yıldırım said. In addition to this, some 86 that the budget allocation for State Highways from 0.45 to 1% at OECD scales, he said. billion liras. As the realized part is worth 98.2 billion liras, billion TL ($43 billion) worth of transport, communication Administration was 6.9 bln TL in 2013 whereas it will the rest is worth 86 billion liras and is expected to be and maritime projects will be completed in five or six reach 7.1 bln next year. Yıldırım also said that in 2013, around 1,5 million completed within five or six years,” he said. years, he noted. He said that the budget of the civilian Aviation vehicles and 531.568 authorization certificates were Yıldırım noted that some projects in the transport, The government plans to construct high-speed and General Directorate is now 25.174.000 TL. The budget of arranged during the 10 month period. communication and maritime sectors worth 47 billion liras normal railways in the 15 cities in which majority of the the 0nformatics Technologies (BTK) was 1.5 bln TL last He said that the number of transport firms in Turke2 were contracted within the public-private sector population lives, said Yıldırım during the ministry’s 2014 year and it is 1.8 bln TL this year, Yıldırım said, adding is 44.357, adding that the number of vehicles is 90.600 partnership (PPP) model, as alternative financing. 6 budget presentation at the Parliament’s Plan and Budget that this means 18% rise. and the number of passengers transported annually is 1 billion liras of those projects are complete, he added. Commission. Yıldırım recalled the private sector’s involvement in bln 417 mln.He noted that through the public and private Istanbul’s third bridge and third airport projects are Yıldırım stated that they had begun testing for the railway transportation. A draft code, presented to partnership, more than 40 million vehicles were based on PPP model. Istanbul-Ankara YHT. “We’ll begin the initiation of the Parliament on March 6, aimed to establish a company inspected at 270 inspection stations. ƒŠ • ‚ —˜ ‰††  Ankara-Istanbul YHT,” he said, adding that it may open under the name Turkish State Railways Transport A1 for Yıldırım said that in the 10 month period in 2013, February. train management units. Public and private legal entities   foreign transports rose by 166% amounting from The Ankara-Istanbul YHT will also be linked to the and firms will be licensed to build their own railway Binali Yıldırım stated that during the period of 2003- 393.700 to 1 million 46.831' as compared to 2003, Marmaray, Istanbul’s massive rail tunnel project that was infrastructure, become infrastructure operators on these 2013 investments worth 212.5 billion TL have been adding that multiple transport certificates facilitate the opened on Oct. 29 and carries passengers under the railways and manage trains on the national railway achieved in the transport sector and that the Ministry’s foreign trade. 0n 2003, there were 141 quotas and the Bosphorus, through the Pendik suburban train station. It network as well. investments have reached a value of 133 billion TL local number of certificates used was 531 while now there are He noted that they aimed for full integration with administrations’ 72 billion TL, other public enterprises’ 538 quotas and the number of certificates used is 3.712. enabled an uninterrupted trek from Asia to Europe. The their neighbors by railway. “The Baku-Tbilisi-Kars railway around 10 billion TL. He said that in the communications Yıldırım said that a serious effort was made to this end. journey between Istanbul and Ankara is expected to last project will come into operation by the end of next year at sector, a great part of the investments were realized by Yıldırım said, "We have the biggest fleet of Europe. three hours. the latest. This is a project carried out by three countries. the private sector. He said its rate is 58%, Ministry’s Russians and Germans are after us. At present, Turkey The Project consists of 10 sections: It isn’t enough to complete it unilaterally,” Yıldırım said. realizations have reached 41% and others 1% of the total has been the country using the most UBAK certificates in • Binali Yıldırım said they aimed to form the investments. During the last 11 years, projects worth 47 the region.” Ankara-Sincan 24 Km • convergence of the Silk Road by completing the bln TL have been contracted with the public-private Ankara-High Speed Train Garı Marmaray, a rail transport project in Istanbul consisting sector partnership. Of them, 6 bln TL portion has been Yıldırım also said that 500 mln TL scrap payment • Sincan-Esenkent: 15 Km an undersea rail tunnel under the Bosphorus completed.With the addition of the communications was made for vehicles of1990 and older models. He • Esenkent-Eski2ehir 206 Km noted that the land road network has a total length of • Eski2ehirGar crossing

                 M  O M  O M 57 O • Eski2ehir-0nönü 30 Km • 0bis otel wall work underway. • 0nönü-Vezirhan 54 Km • Gar area L,U walls and fore jetty works underway. • Vezirhan-Köseköy 104 Km • Köseköy-Gebze 56 Km Progress (in percentage) •  2    Gebze-Haydarpa2a 44 Km         The Ankara-Istanbul YHT will be completed in two     stages. The first is Ankara-Eski2ehir lines, which were opened in 2009. The secondsection Eski2ehir 0stanbul Eski2ehir-0nönü Lines lines are under construction. The Köseköy-Gebze Progress (in percentage) section foundation was laid on 28.03.2012 • Ulusal Egemenlik Bulvarı road overpass bridge The 44 km Gebze-Haydarpa2a section will be built guardrails and asphalting and bridge work completed. under Marmaray Project. • Satılmı2o/lu mahallesi conventional lines vertical Sincan-Esenkent and Esenkent-Eski2ehir lines are deplacements completed. in service. • 57.765 m surrounding walls work completed. • Cellular filling work completed at slopes • 2.Regional directorate road superstructure completed.     2   • Çamlıca - Enveriye route 640 m route conventional    lines infra and superstructure completed.

Esenkent- Eski ehir Lines   2  2       25.000.000 m3 excavation and filling 0 164.000 truck travels transported 2.500.000 ton     ballast. . 254 ea trash screens completed. 0nönü- Vezirhan Lines 26 ea road overpasses, 30 ea road underpass, 4 ea • Underpass , overpass , box culvert works completed . channel crossing, 13 ea river bridges, 2 ea highway • A total (26.993 m) of 19 ea tunnels 18' completed. A bridges, 7 ea train bridges, total 4120 m 4 ea viaducts total 28.000 m. tunnel excavations completed. built. • on the 19.8 km section, superstructure starting. A total 471 m tunnel. A total of 412 km.superstructure coating. Progress (in percentage) Esenkent-Eski2ehir Lines will allow 250 km/hr speed   and in operation 0       .     Eski2ehir Gar crossing  ­ €  • The load centre and depots transported to Hasanbey to have the other areas integrated with Vezirhan-Köseköy Lines Eski2ehir to be a place of attraction. • 8 ea tunnels and viaducts completed. • With movement of Eski2ehir Gar’ facilities to • 146 ea vents, 31 adet underpasses completed. Hasanbey, the gar area will be brought to a suitable • Geyve-Vezirhan (VK12- T17 entry) route 48 km state to the city’s structure with coordination of local completed. Superstructure work underway. (21000 metre administrations. double way line panel laid down.) • “Eski2ehir Gar crossing” has been designed specially to prevent the road traffic accidents as well Progress (in percentage) as traffi jam that happens at the rail crossings            Eski ehir Gar crossing  2 ‚ ƒ • Of L walls , 239 m section, of U walls 386 m section  €   and the 1117 m of the closed cross have been completed. 1741 m of the Project starting from Köseköy- Gebze Lines Ankara side completed. • BalLast and sleeper laying underway • Underpass and peron manufacturing started • Pier foundation work underway. • Muttalip bridge closed cross manufacturing • Infrastructure deplacements starting completed. • Cable channel work ongoing.

      M  O       M 58 O Progress (in percentage) Kaya2-Kırıkkale Latest state • Tender canceled.           • After necessary preparations a new tender wil lbe       opened.

Kırıkkale-Yerköy Latest state 0zmit- 0stanbul north Crossing • Tunnels inlet and outlet portals artifact works • Adapazarı north Crossing urvey and engineering underway. services contracted on 16.02.2011 • On 07.01.2013, contract was signed with Cengiz- • 1 Stage corridor selection approved. Limak-Mapa-Kolin joint venture • 2. Stage route selection completed. • On 21.01.2013, land allocation was made and • 3. Stage final and detail Project work started. Mobilization work underway. • Contract period expired on 26 Sep. 2012 Yerköy-Sivas Latest state • 317 -day extension allowed. 3. stage çalı2maları • Section 1 Tunnels inlet and outlet portals artifact underway. works and station excavation underway. • Köseköy' foundation and drill Works started. • Section 2 tender was held on 26.08.2013 (DETAY- • Artifacts design started. 1336) • 1/2000 scale mapping work underway. • Section 3 Tunnels inlet and outlet portals artifact works and station excavation underway.        1          The high speed railways of Ankara - Konya was put  into operation on 23 Aug. 2011.0t is 212 km long and     was completed in 4.5 years. With the Project the travel time dropped from 10 hrs 30 min. To 1.30 hrs. The line A contract was signed with SWS on 15 June 2012 was made completely by Turkish engineers and for the Sivas Erzincan High Speed Train Lines Project. managers. On 27 June 2012 land allocation was made. 1/2000 The travel time between Konya- 0stanbul is now scale mapping Works are underway. Section 0-80 km 12 hrs 25 min and it will shorten to 3.30 hrs after the 1/2000' scale plan profile studies started. completion of the Ankara 0stanbul High Speed Train Project. The lines are convenient fort he 250 km speed.  2     Under the project, 7 bridges, 27 overpasses, 83 According to the ministry’s 2005 Transport Master underpasses, 143 vents, 2030 metre tunnels were built. Strategy Report, it was highlighted that the best means DAily 16 travels take place between Ankara and of transportation to carry passengers at a distance of Konya. 400-600 km is high speed trains today. The high speed trains and city rail systems will be the future’s basic transhort types.       Ankara- zmir road distance is 587 km and travel 0 time takes 8-9 hours, The air transport between Ankara- Ankara-0stanbul and Ankara-0zmir High Speed Train zmir is arounrd 3 hrs 25 min. ncluding checkins and lines will link the country’s east and west regions. 0 0 stays. 0n 2008, Yerköy-Sivas route ınfrastructure tender There has appeared a need to improve the was held and manufacturing work started. Ankara transportation between Ankara-0zmir, which are Turkey’s (Kaya )- Yerköy route aüpplication projects were not 2 most important cities. suitable for the High Speed Train operations and fort his The Ankara – 0zmir YHT Project carries importance reason the Project was revised upon a tender held in to this end. Thi Project consists of tne lines starting from 2010 by TCDD once again. Yerköy-Sivas route Yenice at the 22nd section up to Afyon, and the existing ınfrastructure Works are underway. lines b.etween Afyan-U2ak and Manisa up to Menemen, Ankara-Sivas High Speed Train Lines will be 405 km which wil l further be improved. whereas the existing lines are 602 km and thus the When the pqroject is completed, travel time travel time will drop from 12 to 2 hours. Ankara- 0stanbul between Ankara-Afyon will be 1 hr 20 min. and between High Speed Train Lines will enable the travel time Afyon 0zmir 2 hrs 30 min. and total time 3.50 hr between between 0stanbul-Sivas to be 5 hours. Ankara- 0zmir.         M  O    M 59 O The tender was held fort he Polatlı-Afyon section as  ‚  ‚ specified in the 2011 investment program. When Turkey’s largest PPP project up to today is 5 Completion of rail road industry that owns high Yeni2ehir - Bursa: added, the $29 billion-worth third Istanbul airport project, technology infrastructure ; rise of local production for The distances according to the project: • T-2,3,4,5,6,7,9,12 tunnels manufacturing underway. Ankara- zmir (via Manisa ) :663 Km which was tendered this year, the number rises worldwide competition. 0 • VK3 viaduct 4825m jetty work completed. Ankara- zmir (via Kemalpa a ) :624 Km considerably. In his remarks, over the weekend, Yıldırım 5 Development of smart infrastructure and systems to 0 2 • Box vents works underway. Ankara- zmir (via Manisa) :3 hr 50 min. introduced an even more ambitious plan. He stressed integrate tne railway network to the other transport 0 Ankara-0zmir (via Kemalpa2a) : 3 hr 20 min. that the government was mulling the generation of solar systems.           power in space and transporting this power to earth 5 Establishment of international combined transport 3 through radio waves by 2035. He said they were first     2        and rapid supply chain management planning to launch a locally manufactured satellite into 5 Completion of rail lines through the Bosphorus and   orbit in 2018. The tender for Ankara- Afyonkarahisar- zmir railway Yeni2ehir – Osmaneli: Bay and becoming an important railway corridor 0 The country’s top transportation officials and Lines feasibilty surveys was held on 23 Aug. 2004 by • Land allocation held on 29.12.2011. between Asia-Africa-Europe. academics, as well as 14 international foreign ministers DLH. • Corridor3 approved. 1. stage Corridor work 5 Further Training and certification in railways and 10 foreign deputy ministers convened in Istanbul The Ankara (Polatlı) – Afyonkarahisar route completed, route work starting. 5 20% share to be reached in cargo transports and between Sept. 5 and 7 to discuss Turkey’s transport and revisions were held and construction contract was • Projects submitted and review underway. 15% in passenger transports communication challenges and successes, and to further awarded to S GMA-YDA-MAK MSAN-BURKAY .O on 0 0 0 shape the country’s 2023 and 2035 objectives. 11 June 2012. (DETAY-1269) Bandırma - Bursa: Km.0+000 - Km.41+000 route The council agreed on the necessity for the speedy projects submitted by AYGM and güzergah projeleri elimination of all barriers to deepened communication           AYGM and reviews underway      and transport, Yıldırım said. 5 30 mln DWT Turkish mercant marine capacity to be  1 “Goods and service should be able to circulate raised to 50 mln DWT.     ƒ        „ freely. It’s no use for world peace to delay these through 5 17.500 yacht careening capacity to be raised to

visa obstacles,” he added. 60.000. Polatlı-Afyon (under construction): Akarçay 1 and Turkish transport sector running ahead to A 3,500-page document and a 500-page conclusion 5 Turkey will become a leading and managing country 2 columns and head beams works completed. T5 tunnel achieve the 2023 goals has drawn up the road map report on the council’s work has been prepared with the in maritime safety and control performance in IMO, 60 m. upper head work is awaiting. T6 and T8 for 2035. mportant targets and projects have been collaboration of universities, and private and public ILO, Paris, Mediterranean, Black Sea and Black Sea work underway. Underpasses, vents, slope 0 specified in 4 sub -sectors… actors. MoU arrangements and splitting works underway . 5 New cruiser ports; 2 in 0stanbul and one each in Afyon-E2me (Project stage): Construction tender Binali Yıldırım, the ex- Minister of Transport, said Çanakkale, Antalya, 0zmir, . under preparation .        that Turkey should successfully realize infrastructure 5 Taking the top 5th place in the world in terms of E2me- Salihli (Project stage):Contract awarded to During the Transportation, Maritime and students and sailors, maintaining the quality in investments worth $200 billion within the next 10 years in SWS on 08.03.2013 . Corridor works underway . Communication Council the following main points were education order to meet the needs of its meant-to-grow trade Salihli- Manisa (Project stage): Contract awarded highlighted: 5 Making Mersin region the prominent in South and “Turkey will have a $1.2 trillion foreign trade volume to Protek+ Mega joint venture on 25 Feb. 2013. Corridor 5 By 2035 4000 km highway Project will be realized to East Mediterranean region in terms of Transit within 10 years. It needs new highways, railways and works underway. raise the length to 12.000 km container handling . airports for this,” Yıldırım said on the final day of the 5 Transports on more than 500 km distance will be 5 Ship building sector will produce vessels with three-day Transportation, Maritime and Communication transfered to other transport modes by 2035 min.90% contribution share and Sea 0ndustry    ­€   Council. 5 By 2035 TEN-T core network will have a high facilities in the Mediterranean to serve for 6 ea According to Yıldırım, Turkey’s ambitious trade and   quality structure vessels in 250 - 400 m size growth targets make the $200 million-worth infrastructure The Bandırma-Bursa-Ayazma-Osmaneli High Speed 5 Periperal roads will be made common all in cities 5 Making Mersin a leader in the South and East investments a must, and require a doubling of the Train Lines will enable travel time between Ankara, with high Transit traffic Mediterranean Region in Transit container handling investments made up to today. 0zmir, 0stanbul and Bursa to shorten and become more 5 Management of rising passenger and cargo operations. comfortable. . With the completion of the Project the Transport and infrastructure projects make up the demands 5 Getting the 10% of the Turkish mercant marine to exissting operational problems will be eliminated and a core of the government’s economic development plans 5 Benefit from renewable energy sources in Roads comprise ships powered with environment friendly direct connection will be made possible between Asia and have been seen as the key for reinforcing the illumination, meeting electric vehicles requirements, alternative fuels. Consortiums wil lbe formed to and Europe at the same standards. Thus such problems country’s position as a hub of regional trade. traffic control arrangement and road maintenance produce LNG, LPG, CNG and tanker ships as a as the air pollution and traffic accident will lessen. The government will undertake around $120 billion etc. result of the joint projects with offshore structures, of these investments at the issue, while the remaining and having the Turkish dockyards become Tender process $80 billion will be carried out through the Build-Operate- competitive in this field. TCDD held an infrastructure tender as the first step Transfer model or private-public partnerships, Yıldırım          5 At least 90% added share in the shipbuilding for Bandırma-Bursa-Ayazma-Osmaneli High Speed Train said. Between 2003 and 2012, the total cost of projects 5 Between 2023-2035 6 000 km new railroad to be sector to manufacture ships. Project in order to link Bursa and Bandırma Port to implemented through the cooperation of public and 5 Foundation of the Maritime ndustry with sufficient built and total length will reach 31.000 km. 0 Turkey’s railway network. private actors amounted to $68 million, according to the infrastructure to provide pool services to minimum 6 5 To 15 provinces which are the most populous, high A tender wil lbe held for t he Yeni ehir World Bank’s Private Participation in Infrastructure (PPI) ea vessels of 250 to 400 m sizes in Mediterranean. 2 speed train links Osmaneli/Bilecik section that will connect Yeni2ehir to website. theAnkara 0stanbul High Speed Train Lines.             M  O M  O       M 60 O The tender was held fort he Polatlı-Afyon section as  ‚  ‚ specified in the 2011 investment program. When Turkey’s largest PPP project up to today is 5 Completion of rail road industry that owns high Yeni2ehir - Bursa: added, the $29 billion-worth third Istanbul airport project, technology infrastructure ; rise of local production for The distances according to the project: • T-2,3,4,5,6,7,9,12 tunnels manufacturing underway. Ankara- zmir (via Manisa ) :663 Km which was tendered this year, the number rises worldwide competition. 0 • VK3 viaduct 4825m jetty work completed. Ankara- zmir (via Kemalpa a ) :624 Km considerably. In his remarks, over the weekend, Yıldırım 5 Development of smart infrastructure and systems to 0 2 • Box vents works underway. Ankara- zmir (via Manisa) :3 hr 50 min. introduced an even more ambitious plan. He stressed integrate tne railway network to the other transport 0 Ankara-0zmir (via Kemalpa2a) : 3 hr 20 min. that the government was mulling the generation of solar systems.           power in space and transporting this power to earth 5 Establishment of international combined transport 3 through radio waves by 2035. He said they were first     2        and rapid supply chain management planning to launch a locally manufactured satellite into 5 Completion of rail lines through the Bosphorus and   orbit in 2018. The tender for Ankara- Afyonkarahisar- zmir railway Yeni2ehir – Osmaneli: Bay and becoming an important railway corridor 0 The country’s top transportation officials and Lines feasibilty surveys was held on 23 Aug. 2004 by • Land allocation held on 29.12.2011. between Asia-Africa-Europe. academics, as well as 14 international foreign ministers DLH. • Corridor3 approved. 1. stage Corridor work 5 Further Training and certification in railways and 10 foreign deputy ministers convened in Istanbul The Ankara (Polatlı) – Afyonkarahisar route completed, route work starting. 5 20% share to be reached in cargo transports and between Sept. 5 and 7 to discuss Turkey’s transport and revisions were held and construction contract was • Projects submitted and review underway. 15% in passenger transports communication challenges and successes, and to further awarded to S GMA-YDA-MAK MSAN-BURKAY .O on 0 0 0 shape the country’s 2023 and 2035 objectives. 11 June 2012. (DETAY-1269) Bandırma - Bursa: Km.0+000 - Km.41+000 route The council agreed on the necessity for the speedy projects submitted by AYGM and güzergah projeleri elimination of all barriers to deepened communication           AYGM and reviews underway      and transport, Yıldırım said. 5 30 mln DWT Turkish mercant marine capacity to be  1 “Goods and service should be able to circulate raised to 50 mln DWT.     ƒ        „ freely. It’s no use for world peace to delay these through 5 17.500 yacht careening capacity to be raised to

visa obstacles,” he added. 60.000. Polatlı-Afyon (under construction): Akarçay 1 and Turkish transport sector running ahead to A 3,500-page document and a 500-page conclusion 5 Turkey will become a leading and managing country 2 columns and head beams works completed. T5 tunnel achieve the 2023 goals has drawn up the road map report on the council’s work has been prepared with the in maritime safety and control performance in IMO, 60 m. upper head work is awaiting. T6 and T8 for 2035. mportant targets and projects have been collaboration of universities, and private and public ILO, Paris, Mediterranean, Black Sea and Black Sea work underway. Underpasses, vents, slope 0 specified in 4 sub -sectors… actors. MoU arrangements and splitting works underway . 5 New cruiser ports; 2 in 0stanbul and one each in Afyon-E2me (Project stage): Construction tender Binali Yıldırım, the ex- Minister of Transport, said Çanakkale, Antalya, 0zmir, Mersin. under preparation .        that Turkey should successfully realize infrastructure 5 Taking the top 5th place in the world in terms of E2me- Salihli (Project stage):Contract awarded to During the Transportation, Maritime and students and sailors, maintaining the quality in investments worth $200 billion within the next 10 years in SWS on 08.03.2013 . Corridor works underway . Communication Council the following main points were education order to meet the needs of its meant-to-grow trade Salihli- Manisa (Project stage): Contract awarded highlighted: 5 Making Mersin region the prominent in South and “Turkey will have a $1.2 trillion foreign trade volume to Protek+ Mega joint venture on 25 Feb. 2013. Corridor 5 By 2035 4000 km highway Project will be realized to East Mediterranean region in terms of Transit within 10 years. It needs new highways, railways and works underway. raise the length to 12.000 km container handling . airports for this,” Yıldırım said on the final day of the 5 Transports on more than 500 km distance will be 5 Ship building sector will produce vessels with three-day Transportation, Maritime and Communication transfered to other transport modes by 2035 min.90% contribution share and Sea 0ndustry    ­€   Council. 5 By 2035 TEN-T core network will have a high facilities in the Mediterranean to serve for 6 ea According to Yıldırım, Turkey’s ambitious trade and   quality structure vessels in 250 - 400 m size growth targets make the $200 million-worth infrastructure The Bandırma-Bursa-Ayazma-Osmaneli High Speed 5 Periperal roads will be made common all in cities 5 Making Mersin a leader in the South and East investments a must, and require a doubling of the Train Lines will enable travel time between Ankara, with high Transit traffic Mediterranean Region in Transit container handling investments made up to today. 0zmir, 0stanbul and Bursa to shorten and become more 5 Management of rising passenger and cargo operations. comfortable. . With the completion of the Project the Transport and infrastructure projects make up the demands 5 Getting the 10% of the Turkish mercant marine to exissting operational problems will be eliminated and a core of the government’s economic development plans 5 Benefit from renewable energy sources in Roads comprise ships powered with environment friendly direct connection will be made possible between Asia and have been seen as the key for reinforcing the illumination, meeting electric vehicles requirements, alternative fuels. Consortiums wil lbe formed to and Europe at the same standards. Thus such problems country’s position as a hub of regional trade. traffic control arrangement and road maintenance produce LNG, LPG, CNG and tanker ships as a as the air pollution and traffic accident will lessen. The government will undertake around $120 billion etc. result of the joint projects with offshore structures, of these investments at the issue, while the remaining and having the Turkish dockyards become Tender process $80 billion will be carried out through the Build-Operate- competitive in this field. TCDD held an infrastructure tender as the first step Transfer model or private-public partnerships, Yıldırım          5 At least 90% added share in the shipbuilding for Bandırma-Bursa-Ayazma-Osmaneli High Speed Train said. Between 2003 and 2012, the total cost of projects 5 Between 2023-2035 6 000 km new railroad to be sector to manufacture ships. Project in order to link Bursa and Bandırma Port to implemented through the cooperation of public and 5 Foundation of the Maritime ndustry with sufficient built and total length will reach 31.000 km. 0 Turkey’s railway network. private actors amounted to $68 million, according to the infrastructure to provide pool services to minimum 6 5 To 15 provinces which are the most populous, high A tender wil lbe held for t he Yeni ehir World Bank’s Private Participation in Infrastructure (PPI) ea vessels of 250 to 400 m sizes in Mediterranean. 2 speed train links Osmaneli/Bilecik section that will connect Yeni2ehir to website. theAnkara 0stanbul High Speed Train Lines.             M  O M  O       M 61 O        trade to and fromEurope as well as reduce freight 5 "Determination of airports where the concept of transportation costs. airport city is applicable. According to the scheme, the container freights of 5 0ncentives for local aircraft building Anatolian exporters will be picked up from their doors 5 A reconnaissance vehicle in space to observe Earth and collected at logistics centers of the Turkish State 5 Turkey will take place in regional cooperations such Railways (TCDD), to be brought to Bandırma port in the as SES northwest with block trains. 5 MOre Use of unmanned aerial vehicles The load will travel to the northwestern province of 5 Turkey will have its own LEO and GEO orbit Tekirda/ with container ships, from where they will launching system, establishment of national depart for European harbors. Imported goods coming launching base. And TurkAster Project to reach near fromEurope will be carried through the same route, the space objects TCDD said in a written statement. Solar panels to be installed in space to generate electricity Private sector support The TCDD has collaborated with commercial and         industrial chambers, commercial stock markets and     ­ € ‚   industrial zones in Anatolian cities, in order to link industrial regions with the main railway route. The 11th Transportation, Maritime Affairs and The block trains, which are the core of this combined Communications Forum 2013 kicked off in September in transportation model, have witnessed a raise in both their Istanbul, with the attendance of President Abdullah Gül. freight transportation amount and income recently. The The forum, organized with the theme “efficient first container train of the BALO project will hit the tracks transport and fast communication for all,” will specify after a farewell ceremony in the Aegean city of Manisa Turkey’s goals and policies on transportation, maritime on Sept. 8, attended by the Transport Minister Binali and communications for 2023 and 2035. Yıldırım, Union of Chambers and Bourses Chairman Gül said that as Turkey enhanced its transportation Rifat Hisarcıklıo/lu, and TCDD General Director opportunities, the economy had grown and citizens felt Süleyman Karaman. more confident, thus making Turkey a more open state and society. “In today’s world, where living and developing in a geography affects others with a domino effect, Turkey needs to plan its transportation and  ††  ˆ   RŠ‹     communications strategy within its global dimensions,”     S Gül said. The president said productivity formed by communications, informatics and innovation had become TCDD has determined its 2023 objectives. Under the main locomotive of both economic and human the slogan “Journey to Future” TCDD aims at growth, and that greater money should be invested in achieving 1.5 billion domestic passengers a year by information, information production, and research and means of the Marmaray, Egeray, Ba2kentray and development. Gaziray Projects. Stating that regional, economic and political integration projects like the European Union had TCDD has announced its 2023 objectives. 0n the changed the destiny of continents, Gül emphasized that 100th foundation anniversary of the Republic, TCDD Turkey had been situated throughout history at the aims at the transport of 750 million/year passengers intersection point of continents, civilizations and ancient through Marmaray and with Egeray, Ba2kentray, transportation corridors, leading the country to redefine Gaziray, the figure is to reach 1 .5 bln city passengers. its geostrategic position. Among TCDD’s primary targets, High Speed Train is placed first.  ‚ƒ „  „     †‡ Up to 2023, 14 bin 503 km railways will be built. and a total of 25.511 km railway network will have been Turkey is preparing to a combined railway project to built. Also high speed trains will be manufactured transport goods from Anatolia to Europewith a ceremony domestically. TCDD also plans to further raise the share to take place on Sept. 8. of railways within transport means. In the railway The Great Anatolian Logistics Organization (BALO) operations, the private sector share will also be project, which has been realized with the contribution of increased to 50%. leading local business organizations, aims to facilitate       M  O       M 62 O                P            trade to and fromEurope as well as reduce freight  ­€­‚ƒ„ Q transportation costs. 5 "Determination of airports where the concept of According to the scheme, the container freights of airport city is applicable. Ex-Minister of Transport and Communications New Minister of Transport, Maritime and Anatolian exporters will be picked up from their doors 5 0ncentives for local aircraft building Binali Yildirim said while promoting the "National Train Communications Lütfi Elvan said that Turkey’s high- and collected at logistics centers of the Turkish State 5 A reconnaissance vehicle in space to observe Earth Project" that Turkey will manufacture its own high-speed speed railway (YHT) line between Istanbul and Ankara 5 Turkey will take place in regional cooperations such Railways (TCDD), to be brought to Bandırma port in the train which will be on the railways by 2018, Turkey has will quadruple Turkey’s high-speed railway passenger as SES northwest with block trains. had to import rails, switches, traverses despite having a numbers. Elvant said, “2014 will be the year of records 5 MOre Use of unmanned aerial vehicles The load will travel to the northwestern province of 150-year railway history, said Yildirim adding "It will be for the YHT”. 5 Turkey will have its own LEO and GEO orbit Tekirda/ with container ships, from where they will able to manufacture its own trains now.""National Train Elvan, who took over as minister from Binali Yıldırım launching system, establishment of national depart for European harbors. Imported goods coming Project" was launched in 2012 and it will cost about $3 as part of a large recent Cabinet reshuffle, stated that launching base. And TurkAster Project to reach near fromEurope will be carried through the same route, the billion.“These trains will be produced in three factories of space objects TCDD said in a written statement. Turkey’s state railways (TCDD). We are planning to get high-speed trains in Turkey had transported almost 4.5 Solar panels to be installed in space to generate the first trains online in 2018,” Yildirim said. mln passengers in 2013, and said the figure would electricity Private sector support He said that TÜLOMSA1, leading local locomotive exceed 20 mln in 2014 once the line under construction The TCDD has collaborated with commercial and maker, will produce high speed trains and TÜVASA1, between Istanbul and Turkish capital Ankara was         industrial chambers, commercial stock markets and leading wagon maker, will be responsible for producing completed. Elvan praised the YHT system as fast,     ­ € ‚   industrial zones in Anatolian cities, in order to link electrical and diesel train sets, he said, adding that comfortable, economical and one of the safest possible industrial regions with the main railway route. TÜDEMSA1, Turkish Railway Machines Industry, would means of transport. The first introduction of YHT lines in The 11th Transportation, Maritime Affairs and The block trains, which are the core of this combined produce developed wagons with the contribution of Turkey was in 2009 with the Ankara-Eskisehir line. Elvan Communications Forum 2013 kicked off in September in transportation model, have witnessed a raise in both their Istanbul Technical University, local defense firm Aselsan stressed that the ministry would invest a total of $45 Istanbul, with the attendance of President Abdullah Gül. freight transportation amount and income recently. The and 153 other companies. billion in rail systems until 2023, and construct 10,000 km The forum, organized with the theme “efficient first container train of the BALO project will hit the tracks The Scientific and Technological Research Council of YHT lines and another 4,000 km of conventional new transport and fast communication for all,” will specify after a farewell ceremony in the Aegean city of Manisa of Turkey (TÜB TAK) will also be responsible for R&D 0 lines. Turkey’s goals and policies on transportation, maritime on Sept. 8, attended by the Transport Minister Binali activities. “This is entirely a national project,” Yıldırım The government plans to construct new high-speed and communications for 2023 and 2035. Yıldırım, Union of Chambers and Bourses Chairman said. “A total of 1,856 people will work for the project. and normal railway lines in 15 cities, where a majority of Gül said that as Turkey enhanced its transportation Rifat Hisarcıklıo/lu, and TCDD General Director Some 280 of them are scientists, 1,056 are engineers the population lives. Elvan named the new YHT lines to opportunities, the economy had grown and citizens felt Süleyman Karaman. and the remaining 520 are technical and managerial more confident, thus making Turkey a more open state professionals,” said Süleyman Karaman, general be opened soon as Ankara-Izmir, Ankara-Bursa, and and society. “In today’s world, where living and manager of TCDD, which will be the main holder of the Ankara-Sivas-Erzincan. The Ankara-Istanbul YHT that is developing in a geography affects others with a domino project. planned to be opened in February will also be linked to effect, Turkey needs to plan its transportation and  ††  ˆ   RŠ‹     The first official meetings for the projects were held the Marmaray, Istanbul’s massive rail tunnel project that communications strategy within its global dimensions,”     S in October 2012, and four different working groups were was opened on Oct. 29 and carries passengers under Gül said. The president said productivity formed by then developed, said Karaman, including Local High the Bosphorus, through the Pendik suburban train communications, informatics and innovation had become TCDD has determined its 2023 objectives. Under Speed Train group, Local Electrical Train group, Diesel station. This link would enable an unbroken journey from the main locomotive of both economic and human the slogan “Journey to Future” TCDD aims at Train group, Local New Generation Wagon group. “We growth, and that greater money should be invested in achieving 1.5 billion domestic passengers a year by Asia to Europe. The overall journey between Istanbul began working on the project in 2012. We believe our information, information production, and research and means of the Marmaray, Egeray, Ba kentray and and Ankara with the YHT is expected to last three hours. 2 first trains will be commercially available in 2018,” development. Gaziray Projects. Yıldırım said, adding Turkey now needed some 100 high Stating that regional, economic and political speed train sets after the completion of new railway  †    ‡ ˆ  ‰ Š integration projects like the European Union had TCDD has announced its 2023 objectives. n the 0 routes. “Such trains would be worth of around $3 billion. Minister Lutfi Elvan said that Turkish civil aviation changed the destiny of continents, Gül emphasized that 100th foundation anniversary of the Republic, TCDD We’ll enable Turkey to be able to save over 70 % of this broke a record with over 150 mln passengers in 2013. Turkey had been situated throughout history at the aims at the transport of 750 million/year passengers amount by launching this national train project,” Yıldırım Elvan noted that the number of passengers who travelled intersection point of continents, civilizations and ancient through Marmaray and with Egeray, Ba kentray, 2 said. by plane increased every single year, and reached its transportation corridors, leading the country to redefine Gaziray, the figure is to reach 1 .5 bln city passengers. Turkey has already been producing many parts and peak in 2013. its geostrategic position. Among TCDD’s primary targets, High Speed Train is Pointing to the 10.8 % increase in airline passenger elements of train sets and railways, sector placed first. representatives said. figures in 2012 when compared to the previous year,  ‚ƒ „  „     †‡ Up to 2023, 14 bin 503 km railways will be built. “We are talking about over $1 trillion worth of market Elvan said that this figure exceeded 150 mln passengers and a total of 25.511 km railway network will have been in the region surrounding Turkey. And Turkey should be with 14.6 % rise in 2013.He stated that there was 17.6 Turkey is preparing to a combined railway project to built. Also high speed trains will be manufactured more than a consumer by becoming a producer step by % increase in domestic flights last year and the number transport goods from Anatolia to Europewith a ceremony domestically. TCDD also plans to further raise the share step,” Yıldırım said, adding mainly local materials and of passengers reached 76.1 mln. to take place on Sept. 8. of railways within transport means. In the railway technologies would be used. Elvan said that international flight numbers reached The Great Anatolian Logistics Organization (BALO) operations, the private sector share will also be “If there are any materials or technologies which are 73.3 mln with a rise of 11.8 % .Noting that with 17.2 mln project, which has been realized with the contribution of increased to 50%. not locally available, we’ll import them. There is no domestic flight passengers, Istanbul's Ataturk Airport leading local business organizations, aims to facilitate problem with it. The point is here to become the main remains on first place among other airports. holder, main integrator of such projects,” he said.       M  O       M  O       M 63 O                    

J      ­ € ‚ƒ€ ƒ„€  ‚  ‡  ƒ ˆ‰ Š Š ‹‹  ‹Š ‰ŒŽ‹G

There are new developments in a tender of the Ž ‹ ‰‹“‹ ŽŽ … Ministry of Transportation-Altyapı Yatırımları Genel The TCDD had earlier announced that it will Müdürlü/ü for construction of “Çandarlı (North Aegean) privatize the operation of the Port of Derince in the Port container Terminal facilities” on the basis of build- province of Kocaeli with a 36-year contract. The operate-transfer model according to law no 3996. operational rights to the port were to be put on sale, (DETAY-1336)“ with bidders being required to assure $30 million in DETAY was told that no bids were available on 5 funds, plus an additional $20 million for fees in order to November. Sabancı, MNG, Limak, Akfen, Yıldırım qualify. However the tender held on 22 January 2014 Holding and Arkas Grubu companies were reported to has been canceled. have picked up the tender documents. Sources said The contesting firms were YILPORT HOLD0NG, that a new invitation will be issued soon. The local SAF0 KATI ATIK T0CARET, KUMPORT L0MAN source of the bidder should not be less than 20% of the 01LETMEC0L0.0, CEYNAK LOJ0ST0K, CENG0Z total fixed investment value. The winner will pay 10% of 0N1AAT, DUBA0PORT. During the session with no the rental at the start and the rest will be paid in 14 elimination the highest bid was 180 mln dollars.At the equal instalments. Following the start of the port first session with elimination the bid amount rose to 252 operation, the 2nd stage will be completed in 40 mln dollars and Dubaiport was disqualified. At the 2nd months. Each stage will have annual 4 million container session highest bid was 302 mln dollars and Ceynak loading unloading capacity. North Aegean Port Lojistik was disqualified.. And at the 3rd, Yılport Holding container terminal area will have 2.000 m long berth was disqualified. .The firms joining the open auction and 18 m deep back area. (DETAY-1344) were SAF0 KATI ATIK T0CARET, KUMPORT L0MAN The local source of the bidder should not be less 01LETMEC0L0.0 and CENG0Z 0N1AAT. But these 3 than 20% of the total fixed investment value. The firms said they withdrew. Head of the Privatization winner will pay 10% of the rental at the start and the Administration Ahmet Aksu said the Derince tender was rest will be paid in 14 equal instalments. canceled. Following the start of the port operation, the 2nd  Ž ‹ Š‡  ‹G stage will be completed in 40 months. Each stage will Çandarlı Port will be the biggest 10th container have annual 4 million container loading unloading port. Çandarlı Port’s foundation was laid in 2011.The capacity. North Aegean Port container terminal area breakwave construction was undertaken by Kolin-Limak will have 2.000 m long berth and 18 m deep back area. at a cost of 230 million TL. 0n paralel port railway and road link constructions will start. The winner will rent ’‡ˆ „  G the port for 41 years after building the berth, logistics 5 port capacity will reach 12 mln TEU. area and container depot areas. Çandarlı Port will be 5 at one time 300 m. 6 container vessels will be able built in 3 stages and its first stage capacity will be 4 to approach.. million teu. When it is completed, it will reach 12 million 5 0t will have 800.000 m3 storage area TEU capacity, which is twice the existing national 5 0t will raise Turkey’s handling capacity by 70%. capacity that is 6 million now. For the 1.800 m 5 Breakwave length will be 1800 metre breakwave construction 2.850.000 tons of Stones will 5 For Breakwave 2 mln 850.000 ton Stone will be be used. And 102.000 ton steel piers jetty will be built. used There will be a 800.000 m2 storage area at the 5 102.000 ton steel pipe jetty will be done. port. 0t will raise Turkey’s handling capacity by 70%.       M  O       M 64 O                  2                     

     ­ € ‚ƒ€ ƒ„€  ‚  ‡  ƒ ˆ‰ Š Š J ‹‹  ‹Š ‰ŒŽ‹G General Director of the Electricity generation Co. He said that the Ministry of Energy, Ministry of (EÜA1) Halil Alı2 said that survey studies have started Social Security and universities are doing work in their regarding the 2nd nuclear power plant to be built in own field and measures to be taken have been There are new developments in a tender of the Sinop, adding that production will restart in Çöllolar coal determined. Ž ‹ ‰‹“‹ ŽŽ …

Ministry of Transportation-Altyapı Yatırımları Genel The TCDD had earlier announced that it will mines EÜA General Director Halil Alı stated that work Müdürlü/ü for construction of “Çandarlı (North Aegean) privatize the operation of the Port of Derince in the 1 2 €†‚   ‡ ‡ˆ ­ ‰€ has been carried out in thousands of pages on the Port container Terminal facilities” on the basis of build- province of Kocaeli with a 36-year contract. The ƒ­ €ƒ   ­ Sinop plant and that seismic studies have also started. operate-transfer model according to law no 3996. operational rights to the port were to be put on sale, Alı2 said Japanese, Chinese and S.Korean Prime Minister Recep Tayyip Erdo/an and his (DETAY-1336)“ with bidders being required to assure $30 million in companies are interested in the Af2in Elbistan areas in Japanese counterpart Shinzo Abe signed on Oct. 29 DETAY was told that no bids were available on 5 funds, plus an additional $20 million for fees in order to which 12 bln dolar investment is planned. the official agreement for building Turkey's second November. Sabancı, MNG, Limak, Akfen, Yıldırım qualify. However the tender held on 22 January 2014 Alı2 said that negotiations are underway with nuclear plant in the Black Sea province of Sinop. Holding and Arkas Grubu companies were reported to has been canceled. Japanese, Chinese and S.Korean companies for the The two countries signed a $22 billion deal in May have picked up the tender documents. Sources said The contesting firms were YILPORT HOLD NG, 0 Af2in Elbistan coal areas and if an intergovernmental for the construction of a plant with a total capacity of that a new invitation will be issued soon. The local SAF KATI ATIK T CARET, KUMPORT L MAN 0 0 0 agreement is signed, the studies carried out by EÜA1 4,800 megawatts (mW), by a Japanese-French alliance source of the bidder should not be less than 20% of the 01LETMEC0L0.0, CEYNAK LOJ0ST0K, CENG0Z will speed up, he added. of Mitsubishi Heavy Industries and French firm Areva. total fixed investment value. The winner will pay 10% of 0N1AAT, DUBA0PORT. During the session with no Halil Alı2 pointed out that they have started the Abe came to Istanbul to attend the official opening the rental at the start and the rest will be paid in 14 elimination the highest bid was 180 mln dollars.At the survey studies regarding the 2nd nuclear power plant to ceremony of the Marmaray tunnel, which has also been equal instalments. Following the start of the port first session with elimination the bid amount rose to 252 be built in Sinop. After the Mersin Akkuyu nuclear built by a Japanese firm. operation, the 2nd stage will be completed in 40 mln dollars and Dubaiport was disqualified. At the 2nd power plant deal concluded with Russian Federation , Erdo/an told reporters during a joint press months. Each stage will have annual 4 million container session highest bid was 302 mln dollars and Ceynak Sinop 0nceburun has been annonced by the ministry of conference after the Marmaray's opening ceremony loading unloading capacity. North Aegean Port Lojistik was disqualified.. And at the 3rd, Yılport Holding Energy to be the next area for a second nuclear plant that the nuclear plant would be built with the most container terminal area will have 2.000 m long berth was disqualified. .The firms joining the open auction Project and EÜA1 has decided to be the partner on developed technology. and 18 m deep back area. (DETAY-1344) were SAF0 KATI ATIK T0CARET, KUMPORT L0MAN behalf of public in the Sinop plant. He said that studies "We know that it is impossible to say something like 'accidents will never happen.' Even if it is one in a The local source of the bidder should not be less 01LETMEC0L0.0 and CENG0Z 0N1AAT. But these 3 have continued since mid 1970’s up to now and a report million, such a danger, such an accident, might occur, than 20% of the total fixed investment value. The firms said they withdrew. Head of the Privatization of thousands of pages has been prepared. and it is impossible to ignore this," Erdo/an said, winner will pay 10% of the rental at the start and the Administration Ahmet Aksu said the Derince tender was Alı2 said, “We have now started work on area earthquake state, meteorological modelling, sea water commenting on the Fukushima nuclear disaster in rest will be paid in 14 equal instalments. canceled. temperature and flow metering, analysis of external Japan. Following the start of the port operation, the 2nd  Ž ‹ Š‡  ‹G natural and humane threats, collection of data for "There is no investment without risks, in any field. stage will be completed in 40 months. Each stage will Çandarlı Port will be the biggest 10th container emergency plans, atmospheric distribution and But every firm, every company should take 100 percent have annual 4 million container loading unloading port. Çandarlı Port’s foundation was laid in 2011.The demographical structure.” security measures. The ideal thing is without a doubt to capacity. North Aegean Port container terminal area breakwave construction was undertaken by Kolin-Limak minimize the margin of error," he added.   ­ €‚ will have 2.000 m long berth and 18 m deep back area. at a cost of 230 million TL. 0n paralel port railway and "Moreover, I believe that Japan will put forward the Halil Alı2 also said that during the privatization road link constructions will start. The winner will rent most developed technology in the works that we will process of Seyitömer and Kangal thermal p.plants and ’‡ˆ „  G the port for 41 years after building the berth, logistics undertake together at the Sinop nuclear plant. This is Hamitabat naturalgas combined conversion plan in 5 port capacity will reach 12 mln TEU. area and container depot areas. Çandarlı Port will be necessary for both Japan and Turkey," the prime 2013, local firms applied to contest. The privatization 5 at one time 300 m. 6 container vessels will be able built in 3 stages and its first stage capacity will be 4 minister said. Administration is at present carrying out the work on to approach.. million teu. When it is completed, it will reach 12 million The first unit of the nuclear plant is set to be active Yeniköy, yata/an Kemerköy and Çatala/zı thermal 5 0t will have 800.000 m3 storage area TEU capacity, which is twice the existing national by 2023, while the last unit will come online by 2028. p.plants”, he added 5 t will raise Turkey’s handling capacity by 70%. capacity that is 6 million now. For the 1.800 m Turkey's first nuclear plant is being constructed in 0 5 Breakwave length will be 1800 metre breakwave construction 2.850.000 tons of Stones will Akkuyu in the southern province of Mersin by 5 For Breakwave 2 mln 850.000 ton Stone will be be used. And 102.000 ton steel piers jetty will be built. ­ ­€ƒ­  „­ the Russian state atomic energy corporation. The plant used There will be a 800.000 m2 storage area at the Halil Alı2 said that coal production is starting soon will be made with four reactors and will have a total in Çöllolar mines two years after an incident took place 5 102.000 ton steel pipe jetty will be done. port. 0t will raise Turkey’s handling capacity by 70%. installed power of 4,800 mW. and coal production was stopped.       M  O         M  O    M 65 O      P   QQQ

The Government has begun studies for the giant Esenler, Güngören, Gaziosmanpa2a where Kanal Istanbul Project, which will set up an artificial earthquakes might lead to great destruction. waterway that will split Istanbul’s European side into Just before the national elections, Prime Minister two and create an island between the European and Erdo/an had announced ambitious plans to dig a new Asian sides, is the one of the most ambitious of the canal through Istanbul that would bypass the existing giant projects the Turkish government has been putting Bosphorus Strait. a special emphasis on. "Today we are rolling up our sleeves for one of the The project will be a private-public partnership biggest projects of the century, which will outshine the project as it will be undertaken according to a build- Panama and Suez Canals," Erdo/an said at a party conference. operate-transfer model, and all of these projects The proposed Istanbul Canal would run for more required a custom-made preparation process. than 45 kilometers, or about 28 miles, from the Black Meanwhile, notice letters of expropriations have Sea through Turkey's largest city and commercial been sent to 5 villages under the scope of the Kanal capital, to the Marmara Sea -- roughly parallel to the stanbul and to 7 mining companies to evacuate the 0 Bosphorus Strait, the natural body of water that already fields they own in the Project area. After the ÇED bisects Istanbul. (environmental impact assessment) report has been The Panama Canal is 77 kilometers (roughly 48 prepared, the Ministries of Environment and Energy miles) in length, while the Suez Canal in Egypt is more have warned the seven companies about the than 190 kilometers (118 miles) long. cançcelation of their certificates of operation. Premier Erdo/an said one of the goals of the proposed canal would be to reduce the huge amount of   international cargo ships that regularly traverse the Under "Kanal 0stanbul" Project, two cities and an congested Bosphorus. airport will be built on 325.000 dönüms of land "One of the most important reasons for this project Permissions have been given to Milten Holding for will be to reduce Bosphorus traffic and minimize further studies and these have been registered into the threats," Erdo/an said. plans of Arnavutköy Municipality. Letters of Meanwhile, people of Yeniköy, Akpınar, A/açlı, expropriation have been sent to villages fort he Tayakadın and 0hsaniye villages living in the area of immovables located in the borders of Yeniköy of the airport Project are nowadays disappointed of the Arnavutköy based on the Prime Ministry decision dated prices of their land for expropriations. The prices range 6 May 2013. between 22-55 TL per m2. 0n Yeniköy, around 400 "Kanal 0stanbul" route will be at the axis of houses were sent letters of expropriation Yeniköy-Sazlıdere Barajı-Arnavutköy-Ba2ak2ehir- Lake The route is almost certain to pass through Küçükçekmece. Regarding the basin areas to be set up Küçükçekmece-Ba2ak2ehir-Arnavutköy and at the in the region, the Ministry of Environment recently Black Sea axis where a third airport will be located, a demanded DS0, TOK0, 0stanbul M. Municipality and big port, luxury houses, residences on both sides of the Municipalities of Küçükçekmece, Arnavutköy and channel, finance centres, villas in the woods, watchout Ba2ak2ehir to submit their studies on the 50-100 year terraces, etc. will be built . The 3rd airport route will go approach plans on the route to the Ministry. The through the Arnavutköy-Karaburun Axis and connect to reason fort he selection of this route is that 80% of the Thrace past Durusu, Çatalca Regions fields at the channel axis belongs to Treasury. This will Half of the 5 billion m3 of debris that will come out help reduce the expropriational costs. Thanks to the of thne construction Works will be used to fil lup the Project, first announced by Premier Recep Tayyip land under the airport Project. There will be a serious Erdo/an, risks of damage will lessen in the areas of soil excavation work at the 21 km section of the 44 km Zeytinburnu, Bakırköy, Küçükçekmece, Ba/cılar, route.

      M  O       M 66 O       2 

0stanbul Mayor Kadir Topba2 has received the €‚  € € approval of the 2014 budget draft at the Municipal 0stanbul Mayor Topba2 said that the Metrobus Assebmly . During his speech he gave good news system is providing service more than its capacity and about the future ambitious projects. that the metrobus should be turned into a subway line. Topba2 said that they have allotted a bsig amount THe metrobus line will be left but there will be a subway of fineancing to green areas and subway investments, line on the same route as well. adding that they would build a new park with 700.000 m2 area in Cendere and make the Haliç dockyard an innovation and science technology centre. ƒ ‡ ‡€ ˆ‰Š ƒ  stanbul Metropolitan Municipality allotted 8.5 bln 0 TL for investments in 2014 . The total cost of the     environmental investments is 3.6 bln TL. This figure is Mayor Kadir Topba2 also briefed on the work 43% of the total budget. The share of the transport regarding landscape investments and noted that the investments in the budget is 42%b The amount to be expropriations of the water basins reached 23 million spent on the transportation is 3.5 bln TL. m2 and fort hem, around 1 bln dollar expenditure has been made. 2€ƒ ‹ „   „ ƒ‰

About 0stanbul’s vision projects,Topba2 pointed out With the additior of company balance sheets, the that the city of 0stanbul is rapidly progressing towards Metropolitan Municipality’s consolidated budget has becoming the centre of the world. been determined as 25 bln 730 mln TL, Topba2 said, He said there are lots of important ongoing adding that they will equip the city with parks and green projects such as Canal 0stanbul, Two Cities at Two areas. Sides, 3rd airport, Euroasian Tubeway, City Hospitals,     ­ Democracy and Freedom 0sland, Haliç Metro Bridge, Topba2 gave detailed information on transport Marmaray, investments and said their target is a "Metrokent”. “When we first took power the number of passengers €‡ ­ using the rail system was 400.000 whereas now this Topba2 also said that in 2004 the number of figure is 2 million. The number will reach 7 million in tourists visiting the city was 3.5 million but in 2013 its 2016 and 11 million in 2019.” annual tourist number has exceeded 10 million

He noted that they have brought 0stanbul to a level €‚  €ƒ‚ƒ  „ 4„ of being a congress centre of the world, and added that Topba2 also said that people of 0stanbul closelly in 2004 , there were 514 hotels but now this number follow the metro projects and added that people living will reach 1260 with those under construction in Sultanbeyli and Bahçe2ehir are insistant on construction of a subway. He said they hope this will be 2Œ2S ‡  ƒ   ‘ made real. A metro line of 6.5 km length will be built 0stanbul Metropolitan Municipality Assembly has from Sancaktepe to Sultanbeyli. ratified the 2014 budget draft of 0SK0. 0t is 4 bln 762 mln Through negotiations with the Transport Ministry TL. Of the budget, around 2 bln TL portion has been the work for rail system lines up to Bahçe ehir' will be 2 allotted to investments. The meeting was presided over completed. by 1st Vice Chairman of the Assembly Ahmet Selamet. “While it is being argued whether we can complete 0SK0 General Director Prof. Dr. Ahmet Demir the 400 km rail system by 2019, we have already said the 2014 budget 2014 has been determined as 4 declared that we will go beyond the 400 km.” bln 762 mln TL.

      M  O       M 67 O             

The Treasury cash balance yielded a deficit of 11 comparison of December 2013 and Jan.-Dec. of 2013 bln 170 mln TL in December 2013 and 12 bln 365 mln (in million TL): TL during January- December 2013 According to the data issued by the Treasury CASH REVENUES 30.980 376.536 Undersecretariat, in December last year, 30 bln 980 CASH EXPENDITURES 42.275 398.716 million TL revenue was collected on a cash basis and Non-Interest Expenditures 40.239 352.194 non-interest expenditure was performed as 40 bln 239 Interest Payments 2.036 46.522 million TL, and accordingly, the decrease in the primary PRIMARY BALANCE -9.259 24.342 balance realized as 9 bln 259 million TL. Thus in 2013, CASH BALANCE (1+4-2) -11.170 -12.365 the primary balance was realised as 24. Bln 342 mln BORROWING (NET) -2.857 17.991 TL. FOREIGN BORROWING (NET) -410 4.857 According to the whole year realizations, a total DOMESTIC BORROWING (NET) -2.447 13.134 of 376 bln 536 million TL revenues was collected on a RECEIPTS FROM ONLENDING 123 1.585 cash basis. Below are the cash realization figures in CHANGE IN BANK ACC. (11-12) 13.226 -9.842

2               ­ Turkish Statistics 0nstitute has announced the ­€ €‚  ƒ„ †€   results of address based population registration system. The median age of the population in Turkey TÜ0k said that in 2013, the population living in Turkey increased from 30.1 in 2012 to 30.4 in 2013. While the increased 1 040 480 persons compared to the previous median age was 29.8 for males, it was 31 for females in year. 50.2% of the total population were males (38 473 2013. Provinces with the highest median ages were 360 persons) and 49.8% were females (38 194 504 Sinop (38.2), Balıkesir (37.7) and Edirne (37.6) persons).Annual population growth rate increased to respectively. Provinces with the lowest median ages 13.7‰ in 2013 from 12‰ in 2012. were 1ırnak (18.7), 1anlıurfa (19) and A/rı The proportion of population living in the province (19.7).Population in 15-64 working age group increased and district centers was 91.3% in 2013 while this figure by 0.1 points from 67.6% in 2012 to 67.7% in 2013 (51 was 77.3% in 2012. The main reason of this sharp rise 926 356 persons). Children aged 0-14 in 2013 were was establishment of 14 new metropolitan 24.6% (18 849 814 persons) of the total population and municipalities and enlarging the municipal borders by population aged 65 and over was 7.7% (5 891 694 abolition of towns and villages in all of the 30 persons) of the total population. metropolitan provinces. The population density which is the number of The most populated province was 0stanbul with persons per square kilometer increased by 2 person 18.5% (14 160 467 persons) of total population in 2013. compared to 2012 and reached to 100 persons in This province was followed by Ankara with 6.6% (5 045 Turkey in 2013. The province with the highest number 083 persons), 0zmir with 5.3% (4 061 074 persons), of persons per square kilometer was 0stanbul with 2 725 Bursa with 3.6% (2 740 970 persons) and Antalya with persons. This province was followed by Kocaeli with 2.8% (2 158 265 persons), respectively. The least 464 persons, 0zmir with 338 persons, Gaziantep with populated province was Bayburt with 75 620 inhabitants 270 persons and Bursa with 263 persons.

        M  O    M 68 O             

The Treasury cash balance yielded a deficit of 11 comparison of December 2013 and Jan.-Dec. of 2013 2         bln 170 mln TL in December 2013 and 12 bln 365 mln (in million TL): TL during January- December 2013 CASH REVENUES 30.980 376.536 According to the data issued by the Treasury • Undersecretariat, in December last year, 30 bln 980 CASH EXPENDITURES 42.275 398.716       ­€‚ƒ „   ­ ƒ­­­ million TL revenue was collected on a cash basis and Non-Interest Expenditures 40.239 352.194 non-interest expenditure was performed as 40 bln 239 Interest Payments 2.036 46.522 •  „ „† „‡ ˆ†„‰Š   Š ‹­€ ƒ Œ„   ‚­Ž‹ ƒ ­­­ million TL, and accordingly, the decrease in the primary PRIMARY BALANCE -9.259 24.342 balance realized as 9 bln 259 million TL. Thus in 2013, CASH BALANCE (1+4-2) -11.170 -12.365 the primary balance was realised as 24. Bln 342 mln BORROWING (NET) -2.857 17.991 FOREIGN BORROWING (NET) -410 4.857 TL. According to the whole year realizations, a total DOMESTIC BORROWING (NET) -2.447 13.134 of 376 bln 536 million TL revenues was collected on a RECEIPTS FROM ONLENDING 123 1.585 The Turkish Statistics Institute (TÜ0K) has cash basis. Below are the cash realization figures in CHANGE IN BANK ACC. (11-12) 13.226 -9.842 Š‰Œ†‘ Œ„’   „† ‘ ­ƒ announced the December inflation figures as follows:

Consumer Price Index (CPI) up by 0.46% in A rise in general index was realised in the Producer December 2013. Price Index (PPI) on the previous month basis by A rise in general index was realized in CPI 1.11%, and on December of the previous year basis by (2003=100) on the previous month by 0.46%, on 6.97%, on same month of the previous year by 6.97% 2          December of the previous year by 7.40%, on same and on the twelve months moving averages basis by month of the previous year by 7.40% and on the twelve 4.48% in December 2013. months moving averages basis by 7.49% in December PPI of agriculture increased by 7.58% compared      ­ 2013. with December of the previous year, increased by The indices rose for transportation 1.10%, for 7.58% compared with the same month of the previous housing 0.89%, for hotels, cafes and restaurants year, and decreased by 1.34% on the averages of Turkish Statistics 0nstitute has announced the ­€ €‚  ƒ„ †€   0.81%, for health 0.78%. twelve months basis. results of address based population registration system. The median age of the population in Turkey In December 2013, the indices declined for clothing PPI of industry section increased by 6.85% TÜ0k said that in 2013, the population living in Turkey increased from 30.1 in 2012 to 30.4 in 2013. While the and footwear by 2.58%, for communications by 0.13% compared with December of the previous year, 6.85% increased 1 040 480 persons compared to the previous median age was 29.8 for males, it was 31 for females in compared with the same month of the previous year year. 50.2% of the total population were males (38 473 2013. Provinces with the highest median ages were and for miscellaneous goods and services by 0.01% and by 5.68% on the averages of twelve months basis. 360 persons) and 49.8% were females (38 194 504 Sinop (38.2), Balıkesir (37.7) and Edirne (37.6) amongst the main groups. persons).Annual population growth rate increased to respectively. Provinces with the lowest median ages Education (10.05%), hotels, cafes and restaurants PPI monthly increased by 0.66% in the index for 13.7‰ in 2013 from 12‰ in 2012. were 1ırnak (18.7), 1anlıurfa (19) and A/rı (9.86%), transportation (9.77%), food and non-alcoholic mining and stone quarrying, increased by 0.82% in the The proportion of population living in the province (19.7).Population in 15-64 working age group increased beverages (9.67%) were the other main groups where index for manufacturing and decreased by 1.00% in the and district centers was 91.3% in 2013 while this figure by 0.1 points from 67.6% in 2012 to 67.7% in 2013 (51 high annual increases were realized index for electricity, gas and water. was 77.3% in 2012. The main reason of this sharp rise 926 356 persons). Children aged 0-14 in 2013 were The highest increases in CPI were recorded in The highest rates of monthly increase in PPI by was establishment of 14 new metropolitan 24.6% (18 849 814 persons) of the total population and TRC1 (Gaziantep, Adıyaman, Kilis) region (8.51%) sub divisions of industry were indices for coke and municipalities and enlarging the municipal borders by population aged 65 and over was 7.7% (5 891 694 refined petroleum (3.67%), for paper and paper abolition of towns and villages in all of the 30 compared with the same month of the previous year persons) of the total population. products (2.47%), for wearing apparel (2.26%). On the and in TRC1 (Gaziantep, Adıyaman, Kilis) region metropolitan provinces. The population density which is the number of other hand indices declined for furniture and products persons per square kilometer increased by 2 person (9.08%) on the twelve months moving averages basis. The most populated province was 0stanbul with n.e.c. (-0.90%), for publishing and printing (-0.18%), for 18.5% (14 160 467 persons) of total population in 2013. compared to 2012 and reached to 100 persons in In December 2013 within average prices of 437 dressing of leather (-0.15%). This province was followed by Ankara with 6.6% (5 045 Turkey in 2013. The province with the highest number items in the index, average prices of 59 items remained In December 2013, within average prices of 788 083 persons), 0zmir with 5.3% (4 061 074 persons), of persons per square kilometer was 0stanbul with 2 725 unchanged while average prices of 260 items increased items in the index; average prices of 164 items Bursa with 3.6% (2 740 970 persons) and Antalya with persons. This province was followed by Kocaeli with and average prices of 118 items decreased. remained unchanged while average prices of 460 items 2.8% (2 158 265 persons), respectively. The least 464 persons, 0zmir with 338 persons, Gaziantep with Producer Price Index, December 2013 populated province was Bayburt with 75 620 inhabitants 270 persons and Bursa with 263 persons. increased and average prices of 164 items decreased.             M  O M  O       M 69 O

    

            January 10.80 11.13 1.88 4.90 10.61 7.31 February 10.87 9.15 1.84 4.16 10.43 7.3 March 10.08 8.22 2.30 3.99 10.43 7.29 April 8.21 7.65 1.70 4.26 11.14 6.13 May 9.63 8.06 2.17 7.17 8.28 6.51 June 10.19 6.44 5.23 6.24 8.87 8.30 July 10.34 9.88 6.61 6.31 9.11 8,88 August 11.00 9.33 6.38 6.65 8.88 8.18 September 12.15 4.03 6.23 6.15 9.19 7.88 October 12.58 2.57 6.77 7.66 7.8 7.71 November 13.67 3.60 5.67 9.48 6.37 7.32 December 13.33 2.45 6.97 10.45 6.16 7.40

       

            January 2.36 0.38 -0.18 0.41 0.56 1.65 February 1.72 -0.09 -013 0.73 0.56 0.30 March 1.22 0.36 0.81 0.42 0.41 0.66 April 0.61 0.08 -0.51 0.87 1.52 0.42 May 0.15 0.53 1.00 2.42 0.21 0.15 June 0.01 1.49 1.46 -1.43 0.90 0.76 July -0.03 -0.31 0.99 -0.41 -0.23 0.31 August 1.76 0.26 0.04 0.73 0.56 -0.10 September 1.55 1.03 0.88 0.75 1.03 0.77 October 1.60 0.17 0.69 3.27 1.96 1.18 November 0.65 1.66 0.62 1.73 0.38 0.01 December 1.00 -0.12 1.11 0.58 0.38 0.46

      M  O       M 70 O                    

The Union of Chambers and Commodity 51 were with Syrian partner, 32’ German partner, 20’ Exchanges of Turkey (TOBB) has announced that The Dutch partner. 0n 2013, 3.875 companies with foreign number of the newly established companies and partner capital were set up. Of them 489 were with cooperatives decreased by 7,59% and 16,42% Syrian partner, 394 German partner and , 280 0ranian respectively while sole proprietorships increased by partner. 55,00% according to the previous month. Of the 3.875 companies with foreign partner, 801 The number of the closed companies, cooperatives were anonimous, 3.074’ limited companies. Of them, and sole proprietorships increased by 131,44%, 66,67% 1.395 were in the wholesale, and retail, and motor and 48,63% respectively according to the previous vehicles and motorbikes repair, 571 were in month. TOBB said that the number of the newly manufacturing and 417 in civil engineering sector. established companies, cooperatives and sole In the first eight months of 2013, 21.63 % more proprietorships increased by 33,72%, 17,54% and new companies were founded in Turkey than in the 27,32% respectively in November, according to the same period of last year, while the number of company previo previous month in 2013. closures also registered an increase of 13.83 % . The number of the closed companies and sole According to the TOBB, 32,621 new companies were proprietorships increased by 16,39% and 2,48% founded during this period. The number of cooperatives respectively while cooperatives decreased by 3,82% established grew by 2.8 % , with 662 new additions. according to the previous month. Individual proprietorships logged a dramatic decline According to TOBB data, last year a total of 49.028 of 13.58 % with 41,050 in the January-August period of companies were established which means 26.08% rise 2012, the numbers showed. Company closures as compared to 2012. The number of companies closed amounted to 10,221 in these eight months. was 15.538 which means 9.67% rise in 2013. In August, new company openings showed a large 0t is reported that the number of cooperatives decrease of 24.41 % compared with the same month a established in 2013 rose by 4.33% and of sole year ago, with 3,010. Newly formed cooperatives also proprietorships decreased by 12.55%. The number of sustained a decline in the same month of 12.2 %, companies closed rose by 9.67% in 2013. The amounting to 72. Individual proprietorships also number of cooperatives closed decreased by1.74% registered a significant fall of 34.97 % in the month of last year. 0n December 2013, of the companies and August in 2012, dropping to 2,883. cooperatives established (4351), the 78.95% were However, company closures then declined in limited, 19.77% anonimous and 1.29% cooperatives. Of August by 35.78 % . In this month, TOBB received a them, 39.76% were in 0stanbul, 11.19% in Ankara, total number of 858 company closure applications. In 6.21% in 0zmir. 0n December, in Kır2ehir’ 42 August, 180 cooperatives informed TOBB that they had companies were set up and 41 closed; in Tunceli 11 ceased their operations. Individual proprietorships saw companies were set up and 6 companies closed, in a decline in terms of the number of closures, which was Bayburt 10 companies were set up and 6 companies 1,218, meaning a 54.33 % drop compared to August closed and in Ardahan 12 companies were set up 2012. The newly opened companies and cooperatives and no companies closed. in August mostly occurred in 0stanbul (39.23 %), Ankara A total of 49.943 companies were set up in 2013. (11.71 %) and 0zmir (6 %). No company or cooperative The total capitals of the companies set up in December establishment applications were received in this month 2013 decreased by 29.64% as compared to in the seven provinces of Artvin, Bingöl, Gümü2hane, November. 40.287 limited companies were set up in Tunceli, Bayburt, Ardahan and Kilis. 2013 and they occupied 36.74% and 8.703 anonimous Of the 253 newly opened companies in August, 31 companies 63.22% of the total capital. included Syrian partners. The second nationality on the TOBB said that in december 2013, 340 companies list was Germans at 22, while Iranians came in third with foreign partner capital were set up. And of them with 19

      M  O       M 71 O 2S                  ­€­‚ƒ‚­ƒ„   † ‡ ˆ ‰    ­Š­Šƒ­€   †  ˆ‹  ­­ Œ†  Ž Ž  ˆ  ˆG The Privatization Department (Ö0B) obtained a According to DETAY’s information, ongoing revenue of 11.153.797.934 dollars from various privatization implementations, those at bid invitation privatization operations of the assets and facilities in stage and with transfer-sales procedures completed are 2013. as follows: Block sales brought in a revenue of 1.306.693.523 dollars in 2013.

    ’ “  ”Ž • –—˜ –Œ ”—

       

BLOCK SALE : 1 . . 1          0 0 0  0­ 1    €    ‚0ƒ ‚0 ­00 „0  †‡ 1    ˆ‰  ˆ      ŠŠ   2     ASSET-FACILITY SALES OR TRANSFER 1‰‹†Œ/ †‘‘’ “” •   – Š 1‰—/” †‘‘’ “” €    1‰†”‡†‹ †‘‘’ “” Š   Š 1‰™‡  †‘‘’ “”    •  1‰†”‡†‹R  †‘‘’ “”    €– € 1‰0›œ“—”  †‘‘’ “”    • € 1‰œ†™”†RŒ  †‘‘’ “” •    • 1‰’‡”†  †‘‘’ “”    €  1‰’‡”† †‘‘’ “”    € • 1‰0›œ“—” †‘‘’ “” •   •  0‰‹ ž “ 1      ‚0„ 1‰0™‘† œŒ †‘‘’ “” € ‰€ ž‡”    €• 1 M †”‡†‹ 0‘‘’ “”      1 M 0™‘† 0‘‘’ “”     Š 1 M œ‹ 0‘‘’ “”      Š 1 M 0™‘† 0‘‘’ “”    • ¡­  „‚‰“‹ †‘‘’ “” ž”’› œ’ € ž‡” œ’   •   – 1‰†”‡†‹ †‘‘’ “” •   € ¡­  „‚‰’œˆ—”Œ‹ †‘‘’ “” – – ƒ‡” œ’ –  €     1‰0™‘† †‘‘’ “” €   Š– 1‰œ” †  ž ž”œ›     €  1 M ‹¢‰— 0‘‘’ “”    

           M M  72OO

1M0       1M0      1M0      0M      0M0­      €  1M0     1M0‚0      1Mƒ­„ 0      1 ƒ       1   €     1M‚2‡0 €   €  1M0­0 €   €  1M0‚0        1M‚2‡0      ˆ‰ŠŠ‹ ŒŽ‘Œƒ ’ €“       1ŒˆM/ ’ “     € 1ŒˆM/ ’  “     1ŒˆM/ ’  “      ˆ‰ŠŠ‹ ŒŽ‘Œƒ –’ “      ˆ‰ŠŠ‹ ŒŽ‘Œƒ ’ —“      1  – šŒ‚       1 › – ­/š‚Œ‚      1 ž‚Œ‚      ˆ‰ŠŠ‹ ŒŽ‘Œƒ ­’  “      1 0‚       ˆ‰ŠŠ‹ ŒŽ‘Œƒ ’ —“      € 0 0­’ ˆ “       1 0­     1 0‚     € ˆ‰ŠŠ‹ ŒŽ‘Œƒ ’ €—“     €  1 Œ‚       1  ‚ Œ‚      1  ‚   €  ˆ‰ŠŠ‹ ŒŽ‘Œƒ Š/’ —“     ˆ‰ŠŠ‹ ŒŽ‘Œƒ ’ —“     €  ˆ‰ŠŠ‹ ŒŽ‘Œƒ – ’ “      €  1 0‚       ‹ ¡‚’€ — “       ˆ‰ŠŠ‹ ŒŽ‘Œƒ ’ —“      ˆ‰ŠŠ‹ ŒŽ‘Œƒ ¢’ —“       ˆ‰ŠŠ‹ ŒŽ‘Œƒ ’ —“      € ˆ‰ŠŠ‹ ŒŽ‘ŒƒM‚’ “     € 1        ˆ‰ŠŠ‹ ŒŽ‘Œƒ ’ €  “       1 Ž–R      ˆ‰ŠŠ‹ ŒŽ‘Œƒ ‚’€ “      ˆ‰ŠŠ‹ ŒŽ‘Œƒ ‚’€ “     € ˆ‰ŠŠ‹ ŒŽ‘Œƒ /’ —“     € ˆ‰ŠŠ‹ ŒŽ‘Œƒ /’ € — “     € ˆ‰ŠŠ‹ ŒŽ‘Œƒ ’  —“      1 –         1 1      €  1     €  1 R     1ŒˆM/ ’   “     € €  1ŒˆM/ ’   “         1ŒˆM/ ’  “         1ŒˆM/ ’   “     € €  1ŒˆM/ ’ €  “    €  € 1ŒˆM/ ’  “       1ŒˆMŽ‚    € 1ŒˆMŽ‚    € 

      M  O       M 73 O

         ­€   ‚­ƒ     „ €‚    ‚­ƒ    †­   ‡­ƒ     †­   ‡­ƒ    „0‰Š1M0 ­    ­ ‚­ƒ    †­    ‡­ƒ     ‘10’€ “        1• † ­–­ † ­‚‚ €’   ‘1M• ƒ †R€        1 †‚­ ­‚‚ €’    ‘1M›€Rœ       „0‰Š1M†­   ‚­ƒ      „0‰Š1M†­   œ    ‘1ƒ        •“­œ“­   œ–      ­€   ‚­ƒ     œ   ‚­ƒ      /œ        ‘10 ­         ‘10 ­        † ­œ/        ‰Š0›0Ÿ0M­’    ‚­ƒ      ‘1M›€       ‘1M0’€ “        „ €‚    ‚­ƒ      ‘1M†œ  †€­ †‘/ € 1    ‘1•/  †€­ †‘/ € 1    ‘1„œ  †€­ †‘/ € 1    ‰›¡Š‘0„‰ €   ‚­ƒ     M ­ ††     ‚­ƒ     ‘1M         ‘1M0’€ “       1¢ –­ƒ 2–›2‚ ­‚‚ €’    1 ­†   ‚­ƒ     ‘1M0’€ “ 0       ‘00 ­’¤‚’œ­’€“­€   œ   ‚­ƒ     ‘1M0’€ “       ‘1M0’€ “       ‘1M• ƒ †Rœ      ‘1M†­       ‘1M0 ­      1 € ­€¤­  ‚‚ €   M¡­œ“   ‚­ƒ     † ­œ/   ‡­ƒ     M        1›­† ›œ†–‡ ­†† –• † ­‚‚ €’   „0‰Š1M0 ­    ‚­ƒ    ‘1M0 ­       M­’    ‚­ƒ    ‘‘0’€ “    ‚­ƒ     †­   ‡­ƒ      †­   ‡­ƒ    ‰“/       ‘1 †€­ †‘/ € 1    ‘1‘ ƒ  †€­ †‘/ € 1   ‘1œ    ‚­ƒ     ‘1Mœ R      ‘1M0’€ “       †­    œ    ‘1Mƒ        

        M  O    M 74 O

        M       ­  ­€   ‚­ƒ     €‚ƒ„         ­  „ €‚    ‚­ƒ    †1Mˆ‰R‹     ­Œ †­   ‡­ƒ     €Ž„    Œ Œ­Œ  †­   ‡­ƒ    MŽ‘       ­Œ „0‰Š1M0 ­    ­ ‚­ƒ    MŽ‘       ­Œ †­    ‡­ƒ     †1M ˆR‹    ­ ‘10’€ “        ­1 Ž­M/      €€€€€ €€    ­­  1• † ­–­ † ­‚‚ €’   €‹      ­ ‘1M• ƒ †R€        €‹      ­ 1 †‚­ ­‚‚ €’    €ˆ  Œ    ­­Œ ‘1M›€Rœ       €ˆ  Œ    ­­ „0‰Š1M†­   ‚­ƒ      †1M      ­  „0‰Š1M†­   œ    €ˆ  ŒŒ    ­  ­ Œ ‘1ƒ        €ˆ  ŒŒ     ­Œ­  •“­œ“­   œ–     €ˆ  ŒŒ    ­ ­ Œ  ­€   ‚­ƒ     €ˆ  ŒŒ    ­­ŒŒ œ   ‚­ƒ     €ˆ  ŒŒ     ­ ­Œ  /œ        †1€•–  ˆ„ˆ†/ „ ­1­    ­­ ‘10 ­         †1M0„ ‘    Œ ­ ‘10 ­        †1M      ­  † ­œ/        †1€0„ ‘ ‹ ‘ˆ  ˆ„ˆ†/ „ ­1­  ­­­ ‰Š0›0Ÿ0M­’    ‚­ƒ      †1M0„ ‘      ­  ‘1M›€       †1M0„ ‘      ­ ‘1M0’€ “        M„       ­ „ €‚    ‚­ƒ      €‹         ­ ­Œ ‘1M†œ  †€­ †‘/ € 1    †1M0„ ‘      ­ ‘1•/  †€­ †‘/ € 1    M™ˆ          ­   ‘1„œ  †€­ †‘/ € 1    M™ˆ          ­  ‰›¡Š‘0„‰ €   ‚­ƒ     M™ˆ           ­   M ­ ††     ‚­ƒ     €    š     ­  ‘1M         €›‹        ­Œ­Œ  ‘1M0’€ “       1€– ž  ­ „   Œ ­­ 1¢ –­ƒ 2–›2‚ ­‚‚ €’    †1Mˆ‰     ­ 1 ­†   ‚­ƒ     †1Mˆ2ž      ­Œ ‘1M0’€ “ 0       †1M       ­ Œ ‘00 ­’¤‚’œ­’€“­€   †1M0„ ‘      ­ œ   ‚­ƒ     †1M       ­ ‘1M0’€ “       M ƒ /   š      ­  ‘1M0’€ “       †1M†ƒR‹     ­ ‘1M• ƒ †Rœ      €‘          Œ ­  ‘1M†­       €ˆ‰         ­­ ‘1M0 ­      MŽ‘‹‘       ­  1 € ­€¤­  ‚‚ €   €ˆ  Œ       ŒŒ­  M¡­œ“   ‚­ƒ     M‰‹       Œ  ­ † ­œ/   ‡­ƒ     †1M0„ ‘    Œ  Œ­Œ M        †1M0„ ‘    Œ  Œ­  1›­† ›œ†–‡ ­†† –• † ­‚‚ €’   €ˆ  ŒŒ   Œ  ­ ­  „0‰Š1M0 ­    ‚­ƒ    MŽ‘      Œ  ­ ‘1M0 ­       †0€0„ ‘ ˆŽ‰ˆ‹•‘0ˆ  ‘ ‹– Œ ­Œ­ M­’    ‚­ƒ    †1M0„ ‘     Œ ­  ‘‘0’€ “    ‚­ƒ     M‹‰ž   M š Œ ­ ­  †­   ‡­ƒ      M†ƒ        Œ  ­ Œ †­   ‡­ƒ    †1M¡‹‘R‹   Œ ­ ‰“/       †1M¡‹‘R‹    Œ Œ­   ‘1 †€­ †‘/ € 1    †1M0„ ‘    ŒŒ ­Œ  ‘1‘ ƒ  †€­ †‘/ € 1   †1M‰‹    Œ  ­Œ ‘1œ    ‚­ƒ     MŽ‘      Œ  ­ Œ ‘1Mœ R      †1M0ƒ    Œ ­Œ ‘1M0’€ “       †1M0„ ‘    Œ ­  †­    œ    †1M‰‹    Œ ­ ‘1Mƒ         †1M›‘/    Œ ­ Œ 

            M  O M  O       M 75 O

M                 M         ­  ­    M      M          ­  ­ 1M0­€‚   ƒ    „ M        ­  €­ †‡ˆ‰0ŠM‹Œ  ƒ  ƒ  M     ­   ­  ­€ 1Ž‘ MŽ€“”      ‚1M‚ „     ­  €€€  Š0†Ž‰ 1 M0Œ•Œ‹ €02 —“Œ”˜‚•€      ƒ  „ ‚1 † ‡ ‚/ ‡ 1    1MŽ— „    „  M Š/        1Ž‘ M „      ‚1M0†‡ Œ       €­€­ Š0†Ž‰ 1 M‘ ‹­Œ      ‚1MŽŠŒ         1M1 ‚ŒšR    ƒ   ‚1M‘ †        ­ Š0†Ž‰ 1 M    „   ‚1M‘ †       ­ Š0†Ž‰ 1 M‘ ‹­Œ     ƒƒ ‚1M’      €    Š0†Ž‰ 1 M0Œ    ƒ  “0”’•1M0„     €      €   1M­‹2“Œ     ƒ  M–             € Ž0M‹Œ  Œ ƒ „  „ ƒ ƒ „  M‘Œ†    € ­    € 1Ž‘ M/Œ  „ „    ‚1M‘Œ†         1MŽ€“”  „  „ „  M“ †Œ     Š­         1M /     ƒ  M„ /         € Š0†Ž‰ 1 MŽ Œ‹Œ      M“ 2™     ‡€  Š­    € 1Ž‘ Mž‹ Œ      ƒ ‚1M0†‡ Œ          Total of transfers based on cost   ‚1M–         € GRAND TOTAL   ‚1M’          “0”’•1MšŠ              ­ ”œŽ•‚0“M’š †™ ­­                       

‚1M0†‡ Œ       ­€ M”Š    €      ­€ BETTING GAMES: deadline for bids was fixed as 05 Feb. 2014 but it was later ”œŽ•‚0“M’‡™š    ­     ­ 0n the tender for privatization of the betting games extended to 30 April 2014. ‚1M‘Œ†RŠ     €   € through licencing, the deadline for bids was fixed as 13 Feb. 0n the tender for privatization of the Çatala/zı Thermal  šŠ            € 2014. But it was extended to 20 May 2014 later. P.Plant belonging to Elektrik Üretim A.1. the deadline for bids was was extended from 05 Feb. 2014 to 21 April 2014, ‚1M          TCDD Derince Port and for Kemerköy Elektrik Üretim ve Ticaret A.1.’s Kemerköy “0”’•1M’š†         The privatization of the TCDD’s Port of Derince was not Thermal P.Plant and Yeniköy Yata/an Elektrik Üretim ve ‚1M        € concluded in a deal on a tender held as the final bidders Ticaret A.1.’s Yeniköy Thermal P.Plant , and Kemerköy Port ‚1M‚ „         ­€ withdrew their auction offers after reception of bids on 16 area privatization, the deadline for bids was extended from ‚1M’‡™š      ­ Jan.2014. Ö0B said the tender was canceled. Currently, 24 Jan. 2014 to 10 April 2014. ‚1M     ­   € Turkish State Railways (TCDD) has the operational rights of 0n the tender for privatization of Elektrik Üretim A.1’s 52 ‚1MšŠ     ­   €­ the port, but the tender envisaged handing over the rights to river power plants through turnover of operating rights, the ‚1M         the winner for 36 years. deadline for bids was fixed as 19 Feb. 2010 when 613 bids ‚1M         The contesting firms during the open auction: were received. As a result of the final negotiations held

‚1M0„         € Z SAF0 KATI ATIK T0CARET between 4 May–3 June 2010 , revised bids were received ‚1M     €     Z KUMPORT L0MAN 01LETMEC0L0.0 and sale of 18 groups was ratified by the Privatization ‚1M        ­ Z CENG0Z 0N1AAT Supreme Board on 26 Aug. 2010. The other 10 groups’ ‚1M Š/           € turnover contracts were signed. And 6 others’ canceled.      POWER PLANTS : The turnover contract negotiations are underway for t   0n the tender for privatization of the Yeniköy Yata/an he rest 3 groups; Gr 3: Kayaköy, Gr. 6: , Bozyazı, • ‡  1  €    Elektrik Üretim ve Ticaret A.1.’s Yata/an Thermal P.Plant, the Mut-Derinçay, , Zeynel, Gr. 8: Dere, 0vriz.

‚”0  €   œ’11  €  

01‘’1  €  ­ PRIVATIZATION OPERATIONS REALIZED BETWEEN 1985 – 2013 ’Ž–œŽ•‚0“1  €  ­ 0“Ž1  €  ­  1985 - 2011 2012 2013 TOTAL  ’  ‘ †   €   ($) ($) ($) ($) Ÿ1  €   Share sales of managements under privatization scope 20.257.066.639 186.520.000 1.306.693.523 21.750.280.162 –0”Ž1  €    Asset/Facility sales belonging to managements under 13.777.916.667 312.305.159 11.153.797.934 25.244.019.760 Ÿ ’‚0‘’1  €  ­ privatization scope      Public offering of managements under privatization scope 7.053.283.819 2.519.616.050 0 9.572.899.869 TRANSFERS BASED ON COST :   0MKB sales of managements under privatization scope 1.261.053.768 0 67.283 1.261.121.051 1’ ‘M/           € “0”’•1M‡        ­€­ 0ncomplete facility sales 4.368.792 0 0 4.368.792 Transfer based on cost of the managements under 1’ ‘M/       ­€ 720.255.422 2.251.038 0 722.506.460 privatization scope, or of their Assets/Facilities, subsidies “0”’•1M”† ’Œ       ­€ “0”’•1M”† “Š †      ­ TOTAL 43.073.945.107 3.020.692.247 12.460.558.740 58.555.196.094

      M  O             M  O M 76 O

M                 M         ­  ­    M      M          ­  ­ 1M0­€‚   ƒ    „ M        ­  €­ †‡ˆ‰0ŠM‹Œ  ƒ  ƒ  M     ­   ­  ­€ 1Ž‘ MŽ€“”      ‚1M‚ „     ­  €€€  Š0†Ž‰ 1 M0Œ•Œ‹ €02 —“Œ”˜‚•€      ƒ  „ ‚1 † ‡ ‚/ ‡ 1    1MŽ— „    „  M Š/        1Ž‘ M „      ‚1M0†‡ Œ       €­€­ Š0†Ž‰ 1 M‘ ‹­Œ      ‚1MŽŠŒ         1M1 ‚ŒšR    ƒ   ‚1M‘ †        ­ Š0†Ž‰ 1 M    „   ‚1M‘ †       ­ Š0†Ž‰ 1 M‘ ‹­Œ     ƒƒ ‚1M’      €    Š0†Ž‰ 1 M0Œ    ƒ  “0”’•1M0„     €      €   1M­‹2“Œ     ƒ  M–             € Ž0M‹Œ  Œ ƒ „  „ ƒ ƒ „  M‘Œ†    € ­    € 1Ž‘ M/Œ  „ „    ‚1M‘Œ†         1MŽ€“”  „  „ „  M“ †Œ     Š­         1M /     ƒ  M„ /         € Š0†Ž‰ 1 MŽ Œ‹Œ      M“ 2™     ‡€  Š­    € 1Ž‘ Mž‹ Œ      ƒ ‚1M0†‡ Œ          Total of transfers based on cost   ‚1M–         € GRAND TOTAL   ‚1M’          “0”’•1MšŠ              ­ ”œŽ•‚0“M’š †™ ­­                       

‚1M0†‡ Œ       ­€ M”Š    €      ­€ BETTING GAMES: deadline for bids was fixed as 05 Feb. 2014 but it was later ”œŽ•‚0“M’‡™š    ­     ­ 0n the tender for privatization of the betting games extended to 30 April 2014. ‚1M‘Œ†RŠ     €   € through licencing, the deadline for bids was fixed as 13 Feb. 0n the tender for privatization of the Çatala/zı Thermal  šŠ            € 2014. But it was extended to 20 May 2014 later. P.Plant belonging to Elektrik Üretim A.1. the deadline for bids was was extended from 05 Feb. 2014 to 21 April 2014, ‚1M          TCDD Derince Port and for Kemerköy Elektrik Üretim ve Ticaret A.1.’s Kemerköy “0”’•1M’š†         The privatization of the TCDD’s Port of Derince was not Thermal P.Plant and Yeniköy Yata/an Elektrik Üretim ve ‚1M        € concluded in a deal on a tender held as the final bidders Ticaret A.1.’s Yeniköy Thermal P.Plant , and Kemerköy Port ‚1M‚ „         ­€ withdrew their auction offers after reception of bids on 16 area privatization, the deadline for bids was extended from ‚1M’‡™š      ­ Jan.2014. Ö0B said the tender was canceled. Currently, 24 Jan. 2014 to 10 April 2014. ‚1M     ­   € Turkish State Railways (TCDD) has the operational rights of 0n the tender for privatization of Elektrik Üretim A.1’s 52 ‚1MšŠ     ­   €­ the port, but the tender envisaged handing over the rights to river power plants through turnover of operating rights, the ‚1M         the winner for 36 years. deadline for bids was fixed as 19 Feb. 2010 when 613 bids ‚1M         The contesting firms during the open auction: were received. As a result of the final negotiations held

‚1M0„         € Z SAF0 KATI ATIK T0CARET between 4 May–3 June 2010 , revised bids were received ‚1M     €     Z KUMPORT L0MAN 01LETMEC0L0.0 and sale of 18 groups was ratified by the Privatization ‚1M        ­ Z CENG0Z 0N1AAT Supreme Board on 26 Aug. 2010. The other 10 groups’ ‚1M Š/           € turnover contracts were signed. And 6 others’ canceled.      POWER PLANTS : The turnover contract negotiations are underway for t   0n the tender for privatization of the Yeniköy Yata/an he rest 3 groups; Gr 3: Kayaköy, Gr. 6: Anamur, Bozyazı, • ‡  1  €    Elektrik Üretim ve Ticaret A.1.’s Yata/an Thermal P.Plant, the Mut-Derinçay, Silifke, Zeynel, Gr. 8: Dere, 0vriz.

‚”0  €   œ’11  €  

01‘’1  €  ­ PRIVATIZATION OPERATIONS REALIZED BETWEEN 1985 – 2013 ’Ž–œŽ•‚0“1  €  ­ 0“Ž1  €  ­  1985 - 2011 2012 2013 TOTAL  ’  ‘ †   €   ($) ($) ($) ($) Ÿ1  €   Share sales of managements under privatization scope 20.257.066.639 186.520.000 1.306.693.523 21.750.280.162 –0”Ž1  €    Asset/Facility sales belonging to managements under 13.777.916.667 312.305.159 11.153.797.934 25.244.019.760 Ÿ ’‚0‘’1  €  ­ privatization scope      Public offering of managements under privatization scope 7.053.283.819 2.519.616.050 0 9.572.899.869 TRANSFERS BASED ON COST :   0MKB sales of managements under privatization scope 1.261.053.768 0 67.283 1.261.121.051 1’ ‘M/           € “0”’•1M‡        ­€­ 0ncomplete facility sales 4.368.792 0 0 4.368.792 Transfer based on cost of the managements under 1’ ‘M/       ­€ 720.255.422 2.251.038 0 722.506.460 privatization scope, or of their Assets/Facilities, subsidies “0”’•1M”† ’Œ       ­€ “0”’•1M”† “Š †      ­ TOTAL 43.073.945.107 3.020.692.247 12.460.558.740 58.555.196.094

      M  O           M  O  M 77 O MANAGEMENT T Table VEHICLE TYPE Qty COURT OF STATE T10 Midibus (With driver max. 26 passenger cap.) 1 ea T11a Bus (With driver max.27 -passenger cap.) 2 ea          T02 Cabs 4 ea COURT OF AUDITORS T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea T02 Cabs 10 ea          T04 Offroad car (Min. 4, max. 8 -passenger cap.) 4 ea PRIME MINISTRY T05 Minibus (With driver max. 15 -passenger cap.) 4 ea T09 Panel 1 ea •  ­€‚ ƒ€ƒ‚ ‚„ ­ †‡ˆ ­‚‰ Š‹ ­€‚ ƒ€ƒ‚ Œ ­‚ „Ž PRESS AND INFO. GEN. DIREC T02 Cabs 20 ea ‘‹  Š„‚ ‹‰ ‚„‚€ ’ ­‚“““ T02 Cabs 15 ea T05 Minibus (With driver max. 15 -passenger cap.) 15 ea T02 Cabs 15 ea • ‚‘ ‚  Š­‹‘ Œ’ ­‚‰ ƒ Œ’ ­‚‰    †‰ €‹­‚­ ‚ RELIGIOUS AFFAIRS T05 Minibus (With driver max. 15 -passenger cap.) 15 ea † ­‚ „Ž ‘‹  Š„‚ ‹“““ T10 Midibus (With driver max. 26 passenger cap.) 2 ea T11b Bus (With driver max.41 -passenger cap.) 2 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad • T08 11 ea ”ƒ­ƒ Š­‹‘€ ‹„‚ „Ž ‚‘ ‘‹ ‚„  Š„‹­G services) DISASTER AND EMERGENCY SSTATE T22 Other vehicles (Type and price to be determined by Finance Ministry) 23 ea MANAGEMENT T05 Minibus (With driver max. 15 -passenger cap.) 20 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea With the adoption of the central management 5963 units of these vehicles will be purchased by T22 Other vehicles (Type and price to be determined by Finance Ministry) 123 ea budget law at the Parliament on 20 December 2013 general budget managements and, 1180 units by T02 Cabs 50 ea (Law no 6512), the list of vehicles to be procured by special budget managements. T05 Minibus (With driver max. 15 -passenger cap.) 10 ea T05 Minibus (With driver max. 15 -passenger cap.) 85 ea general and special budget managements in 2014 Health Ministry is reported to buy the most vehicles T05 Minibus (With driver max. 15 -passenger cap.) 1 ea according to Law no 5018 Annex Tables (I), (II) and (III) with 1287 units followed by the Gendarmerie General T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea has been disclosed. Command with 1817 units, and National Defense T09 Panel 95 ea T09 Panel 1 ea According to a DETAY survey, a total of 7143 ministry with 513 units and Agriculture Ministry with 350 JUSTICE MINISTRY T11a Bus (With driver max.27 -passenger cap.) 50 ea units of ea Transports vehicles are planned to be units. T11b Bus (With driver max.41 -passenger cap.) 15 ea procured by managements with general and special Below are the subject vehicle procurements in T09 Panel 30 ea budgets in 2014. 2014; T18 Motorbikes min. 45-250 cc. 20 ea T02 Cabs 2 ea T02 Cabs 3 ea T02 Cabs 3 ea

T02 Cabs 21 ea             T05 Minibus (With driver max. 15 -passenger cap.) 5 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea

Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 23 ea services) MANAGEMENT T Table VEHICLE TYPE Qty T09 Panel 3 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T01b Cabs 5 ea T13 Truck, Chassis cabin full weight min. 12.000 kg 2 ea T09 Panel 2 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 1 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea T02 Cabs 1 ea OFFICE OF PRESIDENCY T15 Ambulances (With medical equipment) 1 ea NATIONAL DEFENSE MINISTRY T03 Statin-Wagon 22 ea T05 Minibus (With driver max. 15 -passenger cap.) 6 ea T19 Motorbikes min. 600 cc. 5 ea Cabs with security measures (Type and price to be determined by T09 Panel 10 ea T21a 2 ea Gen. Secretariat, Office of Presidency) T11a Bus (With driver max.27 -passenger cap.) 2 ea

Other vehicles (Type and price to be determined by Gen. Secretariat, T11b Bus (With driver max.41 -passenger cap.) 3 ea T22 5 ea Office of Presidency) T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T02 Cabs 20 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 2 ea T15 Ambulances (With medical equipment) 2 ea TURKISH GRAND NATIONAL T09 Panel 1 ea T03 Station-Wagon 40 ea ASSEMBLY (TBMM) T10 Midibus (With driver max. 26 passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 21 ea T07 Pick-Up (Sm.truck, With driver 3 or 6 -passenger cap.) 12 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 2 ea T09 Panel 16 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 1 ea ANAYASA MAHKEMES0 T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea       COURT OF APPEALS T02 Cabs 6 ea M  O T11a Bus (With driver max.27 -passenger cap.) 2 ea       M  O       M 78 O MANAGEMENT T Table VEHICLE TYPE Qty COURT OF STATE T10 Midibus (With driver max. 26 passenger cap.) 1 ea T11a Bus (With driver max.27 -passenger cap.) 2 ea          T02 Cabs 4 ea COURT OF AUDITORS T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea T02 Cabs 10 ea          T04 Offroad car (Min. 4, max. 8 -passenger cap.) 4 ea PRIME MINISTRY T05 Minibus (With driver max. 15 -passenger cap.) 4 ea T09 Panel 1 ea •  ­€‚ ƒ€ƒ‚ ‚„ ­ †‡ˆ ­‚‰ Š‹ ­€‚ ƒ€ƒ‚ Œ ­‚ „Ž PRESS AND INFO. GEN. DIREC T02 Cabs 20 ea ‘‹  Š„‚ ‹‰ ‚„‚€ ’ ­‚“““ T02 Cabs 15 ea T05 Minibus (With driver max. 15 -passenger cap.) 15 ea T02 Cabs 15 ea • ‚‘ ‚  Š­‹‘ Œ’ ­‚‰ ƒ Œ’ ­‚‰    †‰ €‹­‚­ ‚ RELIGIOUS AFFAIRS T05 Minibus (With driver max. 15 -passenger cap.) 15 ea † ­‚ „Ž ‘‹  Š„‚ ‹“““ T10 Midibus (With driver max. 26 passenger cap.) 2 ea T11b Bus (With driver max.41 -passenger cap.) 2 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad • T08 11 ea ”ƒ­ƒ Š­‹‘€ ‹„‚ „Ž ‚‘ ‘‹ ‚„  Š„‹­G services) DISASTER AND EMERGENCY SSTATE T22 Other vehicles (Type and price to be determined by Finance Ministry) 23 ea MANAGEMENT T05 Minibus (With driver max. 15 -passenger cap.) 20 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea With the adoption of the central management 5963 units of these vehicles will be purchased by T22 Other vehicles (Type and price to be determined by Finance Ministry) 123 ea budget law at the Parliament on 20 December 2013 general budget managements and, 1180 units by T02 Cabs 50 ea (Law no 6512), the list of vehicles to be procured by special budget managements. T05 Minibus (With driver max. 15 -passenger cap.) 10 ea T05 Minibus (With driver max. 15 -passenger cap.) 85 ea general and special budget managements in 2014 Health Ministry is reported to buy the most vehicles T05 Minibus (With driver max. 15 -passenger cap.) 1 ea according to Law no 5018 Annex Tables (I), (II) and (III) with 1287 units followed by the Gendarmerie General T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea has been disclosed. Command with 1817 units, and National Defense T09 Panel 95 ea T09 Panel 1 ea According to a DETAY survey, a total of 7143 ministry with 513 units and Agriculture Ministry with 350 JUSTICE MINISTRY T11a Bus (With driver max.27 -passenger cap.) 50 ea units of ea Transports vehicles are planned to be units. T11b Bus (With driver max.41 -passenger cap.) 15 ea procured by managements with general and special Below are the subject vehicle procurements in T09 Panel 30 ea budgets in 2014. 2014; T18 Motorbikes min. 45-250 cc. 20 ea T02 Cabs 2 ea T02 Cabs 3 ea T02 Cabs 3 ea

T02 Cabs 21 ea             T05 Minibus (With driver max. 15 -passenger cap.) 5 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea

Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 23 ea services) MANAGEMENT T Table VEHICLE TYPE Qty T09 Panel 3 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T01b Cabs 5 ea T13 Truck, Chassis cabin full weight min. 12.000 kg 2 ea T09 Panel 2 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 1 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea T02 Cabs 1 ea OFFICE OF PRESIDENCY T15 Ambulances (With medical equipment) 1 ea NATIONAL DEFENSE MINISTRY T03 Statin-Wagon 22 ea T05 Minibus (With driver max. 15 -passenger cap.) 6 ea T19 Motorbikes min. 600 cc. 5 ea Cabs with security measures (Type and price to be determined by T09 Panel 10 ea T21a 2 ea Gen. Secretariat, Office of Presidency) T11a Bus (With driver max.27 -passenger cap.) 2 ea

Other vehicles (Type and price to be determined by Gen. Secretariat, T11b Bus (With driver max.41 -passenger cap.) 3 ea T22 5 ea Office of Presidency) T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T02 Cabs 20 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 2 ea T15 Ambulances (With medical equipment) 2 ea TURKISH GRAND NATIONAL T09 Panel 1 ea T03 Station-Wagon 40 ea ASSEMBLY (TBMM) T10 Midibus (With driver max. 26 passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 21 ea T07 Pick-Up (Sm.truck, With driver 3 or 6 -passenger cap.) 12 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 2 ea T09 Panel 16 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 1 ea ANAYASA MAHKEMES0 T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea       COURT OF APPEALS T02 Cabs 6 ea M  O T11a Bus (With driver max.27 -passenger cap.) 2 ea       M  O       M 79 O MANAGEMENT T Table VEHICLE TYPE Qty NATIONAL DEFENSE MINISTRY T10 Midibus (With driver max. 26 passenger cap.) 23 ea T11b Bus (With driver max.41 -passenger cap.) 8 ea T13 Truck, Chassis cabin full weight min. 12.000 kg 6 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 8 ea T15 Ambulances (With medical equipment) 15 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 4 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 4 ea T03 Station-Wagon 50 ea T05 Minibus (With driver max. 15 -passenger cap.) 36 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 8 ea T09 Panel 11 ea T10 Midibus (With driver max. 26 passenger cap.) 5 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 10 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 2 ea T15 Ambulances (With medical equipment) 9 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 3 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 1 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 1 ea T03 Station-Wagon 5 ea T05 Minibus (With driver max. 15 -passenger cap.) 17 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 11 ea T09 Panel 24 ea T10 Midibus (With driver max. 26 passenger cap.) 14 ea T11b Bus (With driver max.41 -passenger cap.) 22 ea T13 Truck, Chassis cabin full weight min. 12.000 kg 4 ea T15 Ambulances (With medical equipment) 4 ea T02 Cabs 5 ea T03 Station-Wagon 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 5 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 1 ea services) T10 Midibus (With driver max. 26 passenger cap.) 1 ea T15 Ambulances (With medical equipment) 1 ea T20 Bikes 45 ea T01a Cabs 5 ea T01a Cabs 10 ea T02 Cabs 50 ea T02 Cabs 50 ea INTERIOR MINISTRY T02 Cabs 10 ea T01a Cabs 10 ea Cabs with security measures (Type and price to be determined by T21a 5 ea Finance Ministry ) T05 Minibus (With driver max. 15 -passenger cap.) 75 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 175 ea services) T09 Panel 175 ea GENDARMERIE GEN. COMM. T10 Midibus (With driver max. 26 passenger cap.) 20 ea T11a Bus (With driver max.27 -passenger cap.) 8 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 9 ea T15 Ambulances (With medical equipment) 5 ea T02 Cabs 80 ea SECURITY GENERAL DIREC. T04 Offroad car (Min. 4, max. 8 -passenger cap.) 50 ea T05 Minibus (With driver max. 15 -passenger cap.) 80 ea

T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 10 ea       M  O

      M 80 O MANAGEMENT T Table VEHICLE TYPE Qty MANAGEMENT T Table VEHICLE TYPE Qty NATIONAL DEFENSE MINISTRY T10 Midibus (With driver max. 26 passenger cap.) 23 ea SECURITY GENERAL DIREC. Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 30 ea T11b Bus (With driver max.41 -passenger cap.) 8 ea services) T13 Truck, Chassis cabin full weight min. 12.000 kg 6 ea T09 Panel 600 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 8 ea T10 Midibus (With driver max. 26 passenger cap.) 50 ea T15 Ambulances (With medical equipment) 15 ea T11a Bus (With driver max.27 -passenger cap.) 60 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 4 ea T11b Bus (With driver max.41 -passenger cap.) 10 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 4 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 35 ea T03 Station-Wagon 50 ea T13 Truck, Chassis cabin full weight min. 12.000 kg 7 ea T05 Minibus (With driver max. 15 -passenger cap.) 36 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 6 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 8 ea T15 Ambulances (With medical equipment 1 ea T09 Panel 11 ea T17 Pick-Up (Sm.truck) (To be converted to hearse ) 5 ea T10 Midibus (With driver max. 26 passenger cap.) 5 ea T18 Motorbikes min. 45-250 cc. 15 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea T19 Motorbikes min. 600 cc. 80 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 10 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 4 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 2 ea T02 Cabs 1 ea T15 Ambulances (With medical equipment) 9 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 3 ea T02 Cabs 190 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 1 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 5 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 1 ea services) T03 Station-Wagon 5 ea T09 Panel 140 ea T05 Minibus (With driver max. 15 -passenger cap.) 17 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 5 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 11 ea T19 Motorbikes min. 600 cc. 140 ea T09 Panel 24 ea T02 Cabs 3 ea T10 Midibus (With driver max. 26 passenger cap.) 14 ea T05 Minibus (With driver max. 15 -passenger cap.) 6 ea T11b Bus (With driver max.41 -passenger cap.) 22 ea T07 Pick-Up (Small truck, with driver 3 or 6-passenger cap.) 5 ea T13 Truck, Chassis cabin full weight min. 12.000 kg 4 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 2 ea T15 Ambulances (With medical equipment) 4 ea COAST GUARD COMM, services) T02 Cabs 5 ea T09 Panel 6 ea T03 Station-Wagon 1 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 5 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 1 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 1 ea T01a Cabs 5 ea services) T01a Cabs 20 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea T01a Cabs 2 ea T15 Ambulances (With medical equipment) 1 ea T04 Offroad car (Min. 4, max. 8 -passenger cap.) 15 ea T20 Bikes 45 ea T04 Offroad car (Min. 4, max. 8 -passenger cap.) 2 ea T01a Cabs 5 ea T05 Minibus (With driver max. 15 -passenger cap.) 2 ea T01a Cabs 10 ea T05 Minibus (With driver max. 15 -passenger cap.) 28 ea T02 Cabs 50 ea T05 Minibus (With driver max. 15 -passenger cap.) 2 ea T02 Cabs 50 ea INTERIOR MINISTRY FOREIGN AFFAIRS MINISTRY T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 2 ea T02 Cabs 10 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea T01a Cabs 10 ea T10 Midibus (With driver max. 26 -passenger cap.) 1 ea Cabs with security measures (Type and price to be determined by T21a 5 ea T11b Bus (With driver min.. 41 -passenger cap.) 1 ea Finance Ministry ) T13 Truck, Chassis cabin full weight min. 12.000 kg 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 75 ea T18 motorbikes min. 45-250 cc. 5 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad Cabs with security measures (Type and price to be determined by T08 175 ea T21a 15 ea services) Finance Ministry ) T09 Panel 175 ea Cabs with security measures (Type and price to be determined by GENDARMERIE GEN. COMM. T21b 10 ea T10 Midibus (With driver max. 26 passenger cap.) 20 ea Finance Ministry ) T11a Bus (With driver max.27 -passenger cap.) 8 ea T02 Cabs 10 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 9 ea FINANCE MINISTRY T05 Minibus (With driver max. 15 -passenger cap.) 5 ea T15 Ambulances (With medical equipment) 5 ea T09 Panel 20 ea T02 Cabs 80 ea T02 Cabs 20 ea T04 Offroad car (Min. 4, max. 8 -passenger cap.) 50 ea T05 Minibus (With driver max. 15 -passenger cap.) 15 ea SECURITY GENERAL DIREC. REVENUE ADMIN. DEPART. T05 Minibus (With driver max. 15 -passenger cap.) 80 ea T09 Panel 40 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 10 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea             M  O M  O

      M 81 O MANAGEMENT T Table VEHICLE TYPE Qty MANAGEMENT T Table VEHICLE TYPE Qty T05 Minibus (With driver max. 15 -passenger cap.) 50 ea CULTURE AND TOURISM MINISTRY Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 1 ea T02 Cabs 20 ea services) NATIONAL EDUCATION MINISTRY T02 Cabs 100 ea T09 Panel 2 ea T05 Minibus (With driver max. 15 -passenger cap.) 150 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 100 ea T02 Cabs 2 ea T05 Minibus (With driver max. 15 -passenger cap.) 2 ea T02 Cabs 30 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea FAMILY AND SOC.POLICIES T05 Minibus (With driver max. 15 -passenger cap.) 30 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea MINISTRY T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 70 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T10 Midibus (With driver max. 26 passenger cap.) 15 ea T13 Truck, Chassis cabin full weight min. 12.000 kg 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 10 ea SCIENCE INDUST., TECH., MINISTRY T02 Cabs 15 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 30 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 7 ea T07 Pick-Up (Sm.truck, With driver 3 or 6 -passenger cap.) 75 ea services) T10 Midibus (With driver max. 26 -passenger cap.) 10 ea ENVIRONMENT AND URBAN. T07 Pick-Up (Sm.truck, With driver 3 or 6 -passenger cap.) 1 ea HEALTH MINISTRY T12 Truck, Chassis cabin full weight min. 3.501 kg 10 ea MINISTRY T09 Panel 41 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 10 ea T08 10 ea services) services) T15 Ambulances (With medical equipment) 200 ea T09 Panel 2 ea T15 Ambulances (With medical equipment) 500 ea T10 Midibus (With driver max. 26 passenger cap.) 5 ea T16 Ambulances (Offroad services ) 50 ea T11b Bus (With driver max.41 -passenger cap.) 8 ea T16 Ambulances (Offroad services ) 100 ea T13 Truck, Chassis cabin full weight min. 12.000 kg 1 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 5 ea T02 Cabs 18 ea T15 Ambulances (With medical equipment) 200 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 10 ea T16 Ambulances (Offroad services ) 75 ea T05 Minibus (With driver max. 15 -passenger cap.) 2 ea T02 Cabs 4 ea T09 Panel 133 ea T05 Minibus (With driver max. 15 -passenger cap.) 4 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 5 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 4 ea services) TURKISH PUBLIC HOSPITALS INSTIT. T09 Panel 12 ea T05 Minibus (With driver max. 15 -passenger cap.) 4 ea T02 Cabs 12 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 13 ea T05 Minibus (With driver max. 15 -passenger cap.) 15 ea FOOD AND AGRICULTURE , services) T09 Panel 8 ea LIVESTOCK MINISTRY T09 Panel 26 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 5 ea T05 Minibus (With driver max. 15 -passenger cap.) 21 ea T09 Panel 10 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 32 ea T02 Cabs 5 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad TURKISH PUBLIC HEALTH INSTIT. T08 32 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 5 ea services) T02 Cabs 13 ea T10 Midibus (With driver max. 26 passenger cap.) 11 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 10 ea T11a Bus (With driver max.27 -passenger cap.) 3 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea STATE PERSONNEL BOARD T11a Bus (With driver min.. 27 -passenger cap.) 1 ea T20 Bikes 10 ea T01a Cabs 1 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 9 ea T02 Cabs 2 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea ENERGY AND NATURAL RES. T02 Cabs 4 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 20 ea MINISTRY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 3 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T02 Cabs 2 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 1 ea T02 Cabs 5 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 5 ea T08 1 ea services) services) T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T09 Panel 10 ea T02 Cabs 1 ea T02 Cabs 13 ea T11a Bus (With driver max.27 -passenger cap.) 5 ea CUSTOMS AND TRADE MINISTRY Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad CULTURE AND TOURISM MINISTRY T08 4 ea T02 Cabs 1 ea services)

T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T09 Panel 5 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea T02 Cabs 28 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 10 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 10 ea

            M  O M  O

      M 82 O MANAGEMENT T Table VEHICLE TYPE Qty MANAGEMENT T Table VEHICLE TYPE Qty T05 Minibus (With driver max. 15 -passenger cap.) 50 ea CULTURE AND TOURISM MINISTRY Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 1 ea T02 Cabs 20 ea services) NATIONAL EDUCATION MINISTRY T02 Cabs 100 ea T09 Panel 2 ea T05 Minibus (With driver max. 15 -passenger cap.) 150 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 100 ea T02 Cabs 2 ea T05 Minibus (With driver max. 15 -passenger cap.) 2 ea T02 Cabs 30 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea FAMILY AND SOC.POLICIES T05 Minibus (With driver max. 15 -passenger cap.) 30 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea MINISTRY T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 70 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T10 Midibus (With driver max. 26 passenger cap.) 15 ea T13 Truck, Chassis cabin full weight min. 12.000 kg 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 10 ea SCIENCE INDUST., TECH., MINISTRY T02 Cabs 15 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 30 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 7 ea T07 Pick-Up (Sm.truck, With driver 3 or 6 -passenger cap.) 75 ea services) T10 Midibus (With driver max. 26 -passenger cap.) 10 ea ENVIRONMENT AND URBAN. T07 Pick-Up (Sm.truck, With driver 3 or 6 -passenger cap.) 1 ea HEALTH MINISTRY T12 Truck, Chassis cabin full weight min. 3.501 kg 10 ea MINISTRY T09 Panel 41 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 10 ea T08 10 ea services) services) T15 Ambulances (With medical equipment) 200 ea T09 Panel 2 ea T15 Ambulances (With medical equipment) 500 ea T10 Midibus (With driver max. 26 passenger cap.) 5 ea T16 Ambulances (Offroad services ) 50 ea T11b Bus (With driver max.41 -passenger cap.) 8 ea T16 Ambulances (Offroad services ) 100 ea T13 Truck, Chassis cabin full weight min. 12.000 kg 1 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 5 ea T02 Cabs 18 ea T15 Ambulances (With medical equipment) 200 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 10 ea T16 Ambulances (Offroad services ) 75 ea T05 Minibus (With driver max. 15 -passenger cap.) 2 ea T02 Cabs 4 ea T09 Panel 133 ea T05 Minibus (With driver max. 15 -passenger cap.) 4 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 5 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 4 ea services) TURKISH PUBLIC HOSPITALS INSTIT. T09 Panel 12 ea T05 Minibus (With driver max. 15 -passenger cap.) 4 ea T02 Cabs 12 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 13 ea T05 Minibus (With driver max. 15 -passenger cap.) 15 ea FOOD AND AGRICULTURE , services) T09 Panel 8 ea LIVESTOCK MINISTRY T09 Panel 26 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 5 ea T05 Minibus (With driver max. 15 -passenger cap.) 21 ea T09 Panel 10 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 32 ea T02 Cabs 5 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad TURKISH PUBLIC HEALTH INSTIT. T08 32 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 5 ea services) T02 Cabs 13 ea T10 Midibus (With driver max. 26 passenger cap.) 11 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 10 ea T11a Bus (With driver max.27 -passenger cap.) 3 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea STATE PERSONNEL BOARD T11a Bus (With driver min.. 27 -passenger cap.) 1 ea T20 Bikes 10 ea T01a Cabs 1 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 9 ea T02 Cabs 2 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea ENERGY AND NATURAL RES. T02 Cabs 4 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 20 ea MINISTRY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 3 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T02 Cabs 2 ea T22 Other vehicles (Type and price to be determined by Finance Ministry) 1 ea T02 Cabs 5 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 5 ea T08 1 ea services) services) T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T09 Panel 10 ea T02 Cabs 1 ea T02 Cabs 13 ea T11a Bus (With driver max.27 -passenger cap.) 5 ea CUSTOMS AND TRADE MINISTRY Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad CULTURE AND TOURISM MINISTRY T08 4 ea T02 Cabs 1 ea services)

T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T09 Panel 5 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea T02 Cabs 28 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 10 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 10 ea

            M  O M  O

      M 83 O MANAGEMENT T Table VEHICLE TYPE Qty CUSTOMS AND TRADE MINISTRY T12 Truck, Chassis cabin full weight min. 3.501 kg 3 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 5 ea T05 Minibus (With driver max. 15 -passenger cap.) 10 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 10 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 15 ea T05 Minibus (With driver max. 15 -passenger cap.) 3 ea T02 Cabs 8 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 1 ea FORESTRY AND WATER MINISTRY services) T15 Ambulances (With medical equipment) 1 ea T02 Cabs 1 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 1 ea services) METEOROLOGY GENERAL DIRECT. T10 Midibus (With driver max. 26 passenger cap.) 1 ea T15 Ambulances (With medical equipment) 1 ea

            

T MANAGEMENT VEHICLE TYPE QTY Table

YÖK T02 Cabs 1 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea ANKARA UN0VERS0TY T02 Cabs 1 ea MIDDLE EAST TECHNICAL T11b Bus (With driver max.41 -passenger cap.) 2 ea UN0VERS0TY HACETTEPE UN0VERS0TY T11b Bus (With driver max.41 -passenger cap.) 2 ea GAZ0 UN0VERS0TY T11b Bus (With driver max.41 -passenger cap.) 1 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea T02 Cabs 2 ea 0STANBUL UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 2 ea T02 Cabs 1 ea 0STANBUL TECH.UN0VERS0TY T10 Midibus (With driver max 26 -passenger cap.) 1 ea MARMARA UN0VERS0TY T02 Cabs 5 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea YILDIZ TECH.UN0VERS0TY T02 Cabs 1 ea M0MAR S0NAN FINE ARTS T02 Cabs 1 ea UN0VERS0TY T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea T11a Bus (With driver max.27 -passenger cap.) 1 ea T18 Motorsiklet min. 45-250 cc. 5 ea T02 Cabs 2 ea EGE UN0VERS0TY T10 Midibus (With driver max. 26 passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T15 Ambulances (With medical equipment) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T02 Cabs 3 ea DOKUZ EYLÜL UN0VERS0TY T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 1 ea services)       M  O       M 84 O T MANAGEMENT VEHICLE TYPE QTY Table

TRAKYA UN0VERS0TY T02 Cabs 2 ea T20 Bikes 2 ea ULUDA. UN0VERS0TY T02 Cabs 1 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea ANADOLU UN0VERS0TY T13 Truck, Chassis cabin full weight min. 12.000 kg 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea SELÇUK UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T02 Cabs 1 ea AKDEN0Z UN0VERS0TY T02 Cabs 2 ea T02 Cabs 2 ea ERC0YES UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 2 ea T07 Pick-Up (Sm.truck, With driver 3 or 6 -passenger cap.) 1 ea CUMHUR0YET UN0VERS0TY T11b Bus (With driver min.. 41 -passenger cap.) 1 ea ONDOKUZ MAYIS UN0VERS0TY T02 Cabs 2 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 1 ea KARADEN0Z TECH.UN0VERS0TY services) T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea ATATÜRK UN0VERS0TY T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea 0NÖNÜ UN0VERS0TY T11a Bus (With driver max.27 -passenger cap.) 1 ea T02 Cabs 1 ea FIRAT UN0VERS0TY T11b Bus (With driver max.41 -passenger cap.) 1 ea

D0CLE UN0VERS0TY T10 Midibus (With driver max. 26 passenger cap.) 1 ea

YÜZÜNCÜ Y IL UN0VERS0TY T11a Bus (With driver max.27 -passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T09 Panel 1 ea T11a Bus (With driver max.27 -passenger cap.) 1 ea GAZ0ANTEP UN0VERS0TY T15 Ambulances (With medical equipment) 1 ea Other vehicles (Type and price to be determined by Finance T22 1 ea Ministry ) T02 Cabs 2 ea HARRAN UN0VERS0TY T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea T09 Panel 1 ea SÜLEYMAN DEM0REL UN0VERS0TY Other vehicles (Type and price to be determined by Finance T22 1 ea Ministry ) ADNAN MENDERES UN0VERS0TY T11b Bus (With driver max.41 -passenger cap.) 1 ea

BÜLENT ECEV0T UN0VERS0TY T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T09 Panel 1 ea MERS0N UN0VERS0TY T18 Motorbikes min. 45-250 cc. 2 ea T02 Cabs 1 ea PAMUKKALE UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T15 Ambulances (With medical equipment) 1 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 1 ea services) BALIKES0R UN0VERS0TY T10 Midibus (With driver max. 26 passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea KOCAEL0 UN0VERS0TY T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea

      M  O       M 85 O T MANAGEMENT VEHICLE TYPE QTY Table

SAKARYA UN0VERS0TY T10 Midibus (With driver max. 26 passenger cap.) 1 ea

CELAL BAYAR UN0VERS0TY T11b Bus (With driver max.41 -passenger cap.) 1 ea

ABANT 0ZZET BAYSAL ÜN0V. T11b Bus (With driver max.41 -passenger cap.) 1 ea T02 Cabs 5 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea T11a Bus (With driver max.27 -passenger cap.) 2 ea MUSTAFA KEMAL UN0VERS0TY T20 Bikes 50 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 1 ea services) T11a Bus (With driver max.27 -passenger cap.) 2 ea AFYON KOCATEPE UN0VERS0TY T11a Bus (With driver max.27 -passenger cap.) 2 ea AFKAS UN0VERS0TY T11a Bus (With driver max.27 -passenger cap.) 1 ea T02 Cabs 2 ea ÇANAKKALE ONSEK0Z MART ÜN0V. T11a Bus (With driver max.27 -passenger cap.) 1 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea T18 Motorbikes min. 45-250 cc. 2 ea T20 Bikes 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea DUMLUPINAR UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea GAZ0OSMANPA1A UN0VERS0TY T15 Ambulances (With medical equipment) 1 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea T03 Station-Wagon 1 ea T20 Bikes 3 ea MU.LA SITKI KOÇMAN UN0VERS0TY T02 Cabs 2 ea T20 Bikes 1 ea KAHRAMANMARA1 SÜTÇÜ 0MAM T15 Ambulances (With medical equipment) 2 ea UN0VERS0TY T10 Midibus (With driver max. 26 passenger cap.) 1 ea

KIRIKKALE UN0VERS0TY T11a Bus (With driver max.27 -passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea ESK01EH0R OSMANGAZ0 ÜN0V. T11b Bus (With driver max.41 -passenger cap.) 1 ea AH0 EVRAN UN0VERS0TY T14 Truck, Chassis cabin full weight min. 17.000 kg 1 ea

DÜZCE UN0VERS0TY T15 Ambulances (With medical equipment) 1 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea MEHMET AK0F ERSOY UN0VERS0TY T20 Bikes 50 ea T18 Motorbikes min. 45-250 cc. 6 ea T03 Station-Wagon 1 ea U1AK UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad RECEP TAYY0P ERDO.AN ÜN0V. T08 1 ea services) T22 Other vehicles (Type and price to be determined by Finance Ministry) 1 ea NAMIK KEMAL UN0VERS0TY T02 Cabs 4 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea

      M  O       M 86 O T MANAGEMENT VEHICLE TYPE QTY Table T02 Cabs 2 ea ERZ0NCAN UN0VERS0TY T13 Truck, Chassis cabin full weight min. 12.000 kg 2 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea AKSARAY UN0VERS0TY T11b Bus (With driver max.41 -passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea G0RESUN UN0VERS0TY T10 Midibus (With driver max. 26 passenger cap.) 1 ea T15 Ambulances (With medical equipment) 1 ea H0T0T UN0VERS0TY T02 Cabs 2 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea BOZOK UN0VERS0TY T11a Bus (With driver max.27 -passenger cap.) 1 ea T02 Cabs 1 ea ADIYAMAN UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea T03 Station-Wagon 1 ea ORDU UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea AMASYA UN0VERS0TY T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea T02 Cabs 1 ea A.RI 0BRAH0M ÇEÇEN UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea S0NOP UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea

S00RT UN0VERS0TY T02 Cabs 4 ea

NEV1EH0R UN0VERS0TY T02 Cabs 1 ea

KARABÜK UN0VERS0TY T11b Bus (With driver max.41 -passenger cap.) 1 ea

K0L0S 7 ARALIK UN0VERS0TY T10 Midibus (With driver max. 26 passenger cap.) 1 ea T11a Bus (With driver max.27 -passenger cap.) 1 ea ÇANKIRI KARA TEK0N UN0VERS0TY T13 Truck, Chassis cabin full weight min. 12.000 kg 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea ARTV0N ÇORUH UN0VERS0TY T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea B0TL0S EREN UN0VERS0TY T02 Cabs 1 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea OSMAN0YE KORKUT ATA ÜN0V. T02 Cabs 2 ea T02 Cabs 1 ea B0NGÖL UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 1 ea T02 Cabs 1 ea MU1 ALPARSLAN UN0VERS0TY T18 Motorbikes min. 45,250 cc. 3 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea T02 Cabs 1 ea MARD0N ARTUKLU UN0VERS0TY T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea BATMAN UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T02 Cabs 2 ea ARDAHAN UN0VERS0TY T11b Bus (With driver max.41 -passenger cap.) 1 ea T15 Ambulances (With medical equipment) 1 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea BARTIN UN0VERS0TY T12 Truck, Chassis cabin full weight min. 3.501 kg 1 ea

      M  O       M 87 O T MANAGEMENT VEHICLE TYPE QTY Table T10 Midibus (With driver max. 26 passenger cap.) 1 ea BAYBURT UN0VERS0TY T13 Truck, Chassis cabin full weight min. 12.000 kg 1 ea GÜMÜ1HANE UN0VERS0TY T02 Cabs 1 ea Other vehicles (Type and price to be determined by Finance HAKKAR0 UN0VERS0TY T22 1 ea Ministry ) T02 Cabs 1 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 1 ea I.DIR UN0VERS0TY services) T04 Offroad car (Min. 4, max. 8 -passenger cap.) 1 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea 1IRNAK UN0VERS0TY T02 Cabs 1 ea T02 Cabs 1 ea TUNCEL0 UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T02 Cabs 1 ea YALOVA UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea TURKISH -GERMAN UN0VERS0TY T10 Midibus (With driver max. 26 passenger cap.) 1 ea

YILDIRIM BEYAZIT UN0VERS0TY T11b Bus (With driver max.41 -passenger cap.) 1 ea

BURSA TECH.UN0VERS0TY T02 Cabs 1 ea T02 Cabs 1 ea 0STANBUL MEDEN0YET ÜN0V. T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea 0ZM0R KAT0P ÇELEB0 UN0VERS0TY T10 Midibus (With driver max. 26 passenger cap.) 1 ea T02 Cabs 1 ea NECMETT0N ERBAKAN UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea T02 Cabs 1 ea T11b Bus (With driver max.41 -passenger cap.) 1 ea ABDULLAH GÜL UN0VERS0TY T20 Bikes 5 ea T02 Cabs 1 ea ERZURUM TECH. UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T02 Cabs 2 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea ADANA SCIENCE AND TECH. T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 1 ea UN0VERS0TY Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 1 ea services) T11a Bus (With driver max.27 -passenger cap.) 1 ea ANKARA SOCIAL SCIENC. T07 Pick-Up (Sm.truck, With driver 3 or 6 -passenger cap.) 1 ea UN0VERS0TY T05 Minibus (With driver max. 15 -passenger cap.) 1 ea T02 Cabs 3 ea ATATÜRK CULTURE, LANGUAGE, T05 Minibus (With driver max. 15 -passenger cap.) 1 ea HISTORY SUPREME BOARD

TURKISH LANGUAGE INSTIT. T10 Midibus (With driver max. 26 passenger cap.) 1 ea

TURKISH SCIENTIF. AND TECHNOL. T02 Cabs 2 ea RESEARCH ASSOC.

HIGHER EDUCATION , CREDITS T02 Cabs 10 ea AND HOSTELS BOARD T02 Cabs 2 ea

      M  O       M 88 O T MANAGEMENT VEHICLE TYPE QTY Table

SPORTS GENERAL DIRECTORATE T11a Bus (With driver max.27 -passenger cap.) 100 ea T11b Bus (With driver max.41 -passenger cap.) 2 ea STATE THEATERS GENERAL T11a Bus (With driver min.. 27 -passenger cap.) 2 ea DIRECTORATE

STATE OPERA AND BALLET T09 Panel 1 ea GENERAL DIRECTORATE T05 Minibus (With driver max. 15 -passenger cap.) 3 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 100 ea FORESTRY GENERAL services) DIRECTORATE T14 Truck, Chassis cabin full weight min. 17.000 kg 6 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 50 ea services) CHARITIES GENERAL T02 Cabs 10 ea DIRECTORATE T02 Cabs 20 ea T05 Minibus (With driver max. 15 -passenger cap.) 4 ea TURKISH STANDARDS INSTIT. T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 30 ea T09 Panel 1 ea T02 Cabs 3 ea TURKISH PATENT INSTIT T10 Midibus (With driver max. 26 passenger cap.) 1 ea TURKISH COOP.AND COORD. T04 Offroad car (Min. 4, max. 8 -passenger cap.) 7 ea AGENCY T02 Cabs 100 ea T05 Minibus (With driver max. 15 -passenger cap.) 20 ea T09 Panel 65 ea T12 Truck, Chassis cabin full weight min. 3.501 kg 2 ea T05 Minibus (With driver max. 15 -passenger cap.) 10 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 10 ea PENAL EXECUTION AND T09 Panel 60 ea PRISONERS WORKSHOP ASSOC. T11a Bus (With driver max.27 -passenger cap.) 50 ea T15 Ambulances (With medical equipment) 3 ea T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 6 ea T11a Bus (With driver max.27 -passenger cap.) 1 ea T13 Truck, Chassis cabin full weight min. 12.000 kg 4 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 1 ea T02 Cabs 11 ea T04 Offroad car (Min. 4, max. 8 -passenger cap.) 8 ea T05 Minibus (With driver max. 15 -passenger cap.) 2 ea HIGHWAYS GENERAL T07 Pick-Up (Small truck, with driver 3 or 6 -passenger cap.) 65 ea DIRECTORATE T09 Panel 3 ea T10 Midibus (With driver max. 26 passenger cap.) 1 ea T13 Truck, Chassis cabin full weight min. 12.000 kg 11 ea T14 Truck, Chassis cabin full weight min. 17.000 kg 3 ea T02 Cabs 1 ea KONYA PLAIN PROJ. REIONAL T04 Offroad car (Min. 4, max. 8 -passenger cap.) 1 ea DEVELOP. ADMINISTRATION T05 Minibus (With driver max. 15 -passenger cap.) 1 ea Pick-Up (Small truck, with driver 3 or 6 -passenger cap., offroad T08 12 ea services) STATE HYDRAULIC WORKS T14 Truck, Chassis cabin full weight min. 17.000 kg 15 ea T15 Ambulances (With medical equipment) 10 ea

      M  O       M 89 O                

T MANAGEMENT VEHICLE TYPE QTY Table INFORMATICS TECHNOLOGIES AND T04 Offroad car (Min. 4, max. 8 -passenger cap.) 10 ea COMMUNIC. BOARD T02 Cabs 1 ea BDDK T02 Cabs 13 ea T05 Minibus (With driver max. 15 -passenger cap.) 1 ea PUBLIC BIDDING BOARD T02 Cabs 1 ea

COMPETITION BOARD T02 Cabs 1 ea

 N  €          

Max. Purchasing cost No VEHICLE TYPE (TL) 1-a (*) Cabs 111.000 1-b (**) Cabs 122.500 2 Cabs 40.000 3 Station-Wagon 41.500 4 Offroad car (Min. 4, max. 8 -passenger cap.) 71.000 5 Minibus (With driver max. 15 -passenger cap.) 64.500 6 Small truck (Offroad services ) 94.000 7 Pick-up (Sm.truck, 3 or 6 -passenger cap. With driver) 57.000 8 Pick-up (Sm.truck, offroad services with driver 3 or 6 -passenger cap.) 72.500 9 Panel 56.000 10 Midibus (With driver max. 26 passenger cap.) 123.500 11-a Bus (With driver max.27, Max 40 -passenger cap.) 193.500 11-b Bus (With driver max.41 -passenger cap.) 441.000 12 Truck, Chassis cabin full weight min. 3.051 kg 72.500 13 Truck, Chassis cabin full weight min. 12.000 kg 107.000 14 Truck, Chassis cabin full weight min. 17.000 kg 130.000 15 Ambulances (With medical equipment) 130.500 16 Ambulances offroad services 163.000 17 Pick-up (Sm.truck) to be converted to hearse 57.000 18 Motorbikes (Max. 600 cc.) 8.300 19 Motorbikes (Min. 601 cc.) 20.600 20 Bikes 1.900 21-a Cabs with security measures (Type and price to be determined by Finance Ministry.) 21-b Service car with security system (Type and price to be determined by Finance Ministry.) 22- Other vehicles (Type and price to be determined by Finance Ministry)

      M  O       M 90 O                  S        T MANAGEMENT VEHICLE TYPE QTY Table      INFORMATICS TECHNOLOGIES AND T04 Offroad car (Min. 4, max. 8 -passenger cap.) 10 ea COMMUNIC. BOARD T02 Cabs 1 ea   ­€€‚ ƒ‚ „­ƒ  †‡ ˆ­€€‚ ƒ‚ „€‰ Š‚‹„ ‹Œ ƒŽ ‘  ‚­’ BDDK T02 Cabs 13 ea Š‚  G T05 Minibus (With driver max. 15 -passenger cap.) 1 ea PUBLIC BIDDING BOARD T02 Cabs 1 ea ˆ ­€€‚ ƒ‚ „­ƒ ”Š‚ƒ ­  ‹Œ ƒŽ  ­‚ƒŽ Š‚ COMPETITION BOARD T02 Cabs 1 ea

The Private sector cement mills are reported to Factories in the Mediterranean Region produced  N  €           have produced 66 mln 281.047 ton cement by end of 15 million 179.078 ton cement and Marmara factories November in 2013 14 million 662.909 tons. The other regions Central

According to the data from the Turkish Cement Anatolian factories produced 10 mln 195.382 ton and Max. Purchasing cost No VEHICLE TYPE Suppliers Association, Turkey’s monthly cement Southeast Anatolia factories 6 mln and 833.661 ton (TL) production has been realized as 6 million ton on and Aegean factories 5 mln and 526,258 ton. 1-a (*) Cabs 111.000 average. Factories in the produced 8 mln 1-b (**) Cabs 122.500 Of the total production, 9 million 67,543 ton part 768.704 tons and East Anatolian factories 5 mln 2 Cabs 40.000 was exported. The rest was consumed domestically. 115.055tons of cement by end of November Below are Turkey’s cement and clinker 3 Station-Wagon 41.500 Contrary to previous years, Mediterranean region factories produced the most cement and it is followed production, sales and export figures by end of 4 Offroad car (Min. 4, max. 8 -passenger cap.) 71.000 by Marmara factories. November of 2013: 5 Minibus (With driver max. 15 -passenger cap.) 64.500

6 Small truck (Offroad services ) 94.000 7 Pick-up (Sm.truck, 3 or 6 -passenger cap. With driver) 57.000 CEMENT PRODUCTION, SALES, STOCKS BY REGIONS BY END OF NOVEMBER, 2013 8 Pick-up (Sm.truck, offroad services with driver 3 or 6 -passenger cap.) 72.500   9 Panel 56.000      10 Midibus (With driver max. 26 passenger cap.) 123.500 

11-a Bus (With driver max.27, Max 40 -passenger cap.) 193.500           11-b Bus (With driver max.41 -passenger cap.) 441.000 12 Truck, Chassis cabin full weight min. 3.051 kg 72.500   13 Truck, Chassis cabin full weight min. 12.000 kg 107.000                       14 Truck, Chassis cabin full weight min. 17.000 kg 130.000                    15 Ambulances (With medical equipment) 130.500  16 Ambulances offroad services 163.000                          17 Pick-up (Sm.truck) to be converted to hearse 57.000                      18 Motorbikes (Max. 600 cc.) 8.300                    19 Motorbikes (Min. 601 cc.) 20.600   20 Bikes 1.900                    21-a Cabs with security measures (Type and price to be determined by Finance Ministry.)                        21-b Service car with security system (Type and price to be determined by Finance Ministry.) 22- Other vehicles (Type and price to be determined by Finance Ministry)  

                      

            M  O M  O       M 91 O CLINKER PRODUCTION, SALES, STOCKS BY REGIONS BY END OF NOVEMBER, 2013

                                                                                                                                                                  

                            

CEMENT PRODUCTION, SALES, STOCKS BY REGIONS IN NOVEMBER 2012

                                                                                                                                                                                                         

CLINKER PRODUCTION, SALES, STORAGE BY REGIONS IN NOVEMBER, 2012                                                                                                                                                                                            

      M  O       M 92 O                 ­€ ‚ƒ„  †  ‡ˆ  ‰‚  ‡  Š‚  ­€ ƒ‹† „ƒ‰ ‡   ­€  

Turkey’s 2013 fertilizer statistics have been    Œ Ž‘ ‘Œ announced. (Unit Ton) 0t is reported that in 2013 a total of 2.312.724 ton fertilizer was consumed. Of this, 1.386.634 ton was    ‘Œ     produced in the facilities owned by firms operating in       Turkey.       ­ According to DETAY’s information, out of the    2.312.724 ton fertilizer consumed, the 1.167.508 ton      ­ part was imported.      ­    n the same year 87.283 ton fertilizer was exported. 0      According to information from the Ministry of Food, Agriculture and Livestock, in 2012, a total of 2.065.354      ­ ton fertilizer was consumed. Of this, 1.414.622 ton was    € ‚ produced in the facilities owned by Turkish firms . ƒ   € ‚    DETAY is told that out of the 2.065.354 ton    fertilizer consumed, the 895.319 ton part was imported   € ‚ in 2012. 0n the same year 129.181 ton fertilizer was †  ‚ exported whereas in 2013, 87.283 ton fertilizer was ‡‡    exported. ‡‡ˆ‰    Among the fertilizer types, Ammonium Nitrate (26 %N) was the one produced most of all in 2013. ‡‡ Below are the fertilizer statistics covering ‡‡    production, imports, exports and consumption, for the ‡‡ˆ‰    periods of 2011, 2012, 2013: ‡‡       M  O       M 93 O                      (Unit Ton)         (Unit Ton)

   „‡€ ‚ ƒ „                „‡ €‡ ­­€              ˆ‡ € €‡ ­­€                     Š ­­€                        ‹                                                         ­              €€                €‚ƒ    ­                €€    Ž„‹ „‡                €€€‚ƒ                    €€    €€        €€‘‚ƒ      €€                           €€   €€                      €€                  €€   ‚ƒ   ­€       €€    €€  Physıcal Total       €€  NITROGEN ‚ ƒ „          €€  phosphor. (17%p205)                            potass (50%k20)             €€        

Equivalent Total               €€    Nıtrog.               €€       Phosphor.                „ ƒ     Potassıum         ­€            „‡ „                 „ ƒ     „‡‡  ˆ         Nıtrog ‚ƒ „        „ „†„           Phosphor ‚ ƒ               „‡‡  ˆ         Potass.‚ƒŒ       „      † ‰ Š  „       Equivalent Total    „‡ „    „          Nıtrog ‚„            „‡ „      „‡‡ ‹ ’    Phosphor ‚          „‡‡ ‹  ˆ    (Unit Ton)        ‚†                                       ­€       „                   „‡€ ‚ƒ „          ˆ    ˆ     „‡€ ‚ ƒ„     †                 „‡€ ‚ ƒ „            

            M  O M  O       M 94 O         (Unit Ton)         (Unit Ton)

       

                                                           ­    €€         €‚ƒ    ­    €€    Ž„‹ „‡

€€€‚ƒ    €€   

€€    €€‘‚ƒ 

  €€       €€ €€    €€     €€   ‚ƒ €€    €€  €€ €€         €€        

   €€   

€€      

     „ ƒ           „‡ „      „ ƒ     „‡‡  ˆ    „†„            „‡‡  ˆ    „      ‰ Š  „    „‡ „   „         

„‡ „      „‡‡ ‹ ’    „‡‡ ‹  ˆ                            ˆ    ˆ             

      M  O       M 95 O       R       S      ­€ ­ ‚ƒ„ †­­‡†€   €ˆ €­€‚ ‰Š €­€‰­„   €‰ ‰† ­‹G

The Foreign Trade Undersecretariat of the Prime in 2004 90 firms and in 2005 122 others received the Ministry awarded the status of international status. The number which was 129 in 2006 became 118 inspection status to 10 private and public in 2007. And in 2008 120 firms were given the status managements in 2012 whereas it canceled 11 other whereas in 2009 it became 128, in 2010 136 and in awards. 2011 143. Last year the number reached 130. DETAY is told that the number of firms receiving the Meanwhile, some of the firms’ activity areas were status of international inspection company is 129 rearranged. (including those whose status was returned). In 1998, 42 Below are the firms that received the status of firms had received the status while in 2003 73 firms and international inspection companies last year.

COMPANY NAME COMPANY NAME

1 A.B.S. YED0TEPE ULUSLARARASI GÖZET0M 27 POSEYDON DEN0ZC0L0K DANI1MANLIK 2 ALESTA ULUSLARARASI GÖZET0M 28 SGS SUPERVISE GÖZETME ETÜD KONTROL 29 TÜB TAK-BURSA TEST VE ANAL Z LAB. 3 SZUTEST TEKN0K KONTROL 0 0 30 TÜRK STANDARDLARI ENST TÜSÜ 4 ALFRED H. KNIGHT GÖZETME 0 31 TÜV SÜD TEKN0K GÜVENL0K VE KAL0TE 5 M0L ULUSLARARASI GÖZET0M 32 ULUSAL MÜHEND SL K EKSPERT Z 6 ATLANT0K DEN0ZC0L0K GÖZETME 0 0 0 33 UMUR ULUSLARARASI GÖZET M 7 AYMAK ULUSLARARASI GÖZET0M 0 34 PARION ULUSLAR ARASI GÖZET M H Z. 8 BALTIC CONTROL GÖZET0M 0 0 35 V TSAN GÖZET M MÜMESS LL K VE T C. A . 9 B0LEN-ISC GENEL GÖZETME VE KONTROL 0 0 0 0 0 1 36 10 BUREAU VER0TAS GÖZET0M H0Z. LTD. 1T0. DELTA DANI1MANLIK E.0T0M LOJ0ST0K 11 ITS. CALEB BRETT/DEN0Z SURVEY GÖZETME 37 ARTIMET MÜHEND0SL0K KONTROL 12 SAYBOLT GÖZET0M VE LAB. H0Z. A.1. 38 ARTI DEN0Z SÖRVEY VE MÜM. LTD.1T0. 13 EGE ULUSLARARASI GÖZET0M LTD. 1T0. 39 TÜRK LOYDU VAKFI 0KT0SAD0 01LETMES0 14 GENERAL SURVEY GÖZETME LTD. 1T0. 40 V.I.S. VAKIFEL GÖZET0M 15 GETA1 ULUSLARARASI GÖZETME 41 S&Q MART KAL0TE GÜVEN. SAN. VE T0C. A.1. 16 GLOBAL GÖZET0M VE ANAL0Z H0ZM. LTD. 1T0. 42 L0NK GÖZET0M EKSPERT0Z H0ZM. LTD. 1T0. 17 GST GÖZETME SURVEY TEST TEKN0K H0Z. A.1. 43 L.D.S. ULUSLARARASI GÖZET0M VE DANI1M. 18 0NCOLAB 0NTERNAT0ONAL GÖZETME SERV0SLER0 44 MOODY INTERNATIONAL KAL0TE SERV0SLER0 19 INSPECTORATE ULUSLARARASI GÖZET0M 45 TÜV RHEINLAND ULUSLARARASI SERT0F0KA 20 0STANBUL DEN0ZC0L0K VE SÖRVEY H0Z. 46 STAN LOZA GÖZET0M ETÜD KONTROL SERV0S 21 0ZM0R DEN0Z GÖZET0M VE TEK. H0Z LTD. 1T0. 47 PERFORMANS ULUSLARARASI GÖZET0M 22 ALBERK QA ULUSLARARASI TEKN0K KONTROL 48 CIS KARKONT GÖZET0M DANI1MANLIK 23 KARADEN0Z GÖZET0M VE LABORATUVAR 49 ROCHEM INSPECTORS 0SKENDERUN LTD.1T0. 24 KOTEKNA GÖZET0M A.1. 50 GRUP ULUSLARARASI GÖZET0M SÖRVEY 25 MERS0N DEN0Z GÖZET0M 51 METRO ULUSLARARASI GÖZET0M H0ZMETLER0 26 EKOTEKS LABORATUVAR VE GÖZET0M 52 CONTROL UN0ON GÖZET0M       M  O       M 96 O COMPANY NAME COMPANY NAME

53 STANDART EKA ULUSLARARASI GÖZETME 96 MARTEST ANAL0Z LAB. SAN. T0C. LTD. 1T0. 54 STANDART ORGAN0ZE EKSPERT0Z 97 INTEGRA96 ULUSLARARASI BELGELEND0RME 55 USAS ULUSLARARASI SURVEY VE ARA1TIRMA 98 TUNA KURUMSAL H0ZMETLER BELGELEND0RME 56 P0-ES ULUSLARARASI GÖZET0M SÖRVEY 99 OL0MPOS ULUSLARARASI GÖZET0M 57 MP ULUSLARARASI GÖZET0M 100 STAR ULUSLARARASI GÖZET0M LTD.1T0. 58 KONF RM ULUSLARARASI BELGELEND RME 0 0 KONLAB SERT F KALANDIRMA GÖZET M 101 0 0 0 59 BOSPHORUS GÖZET0M DANI1MANLIK H0ZMETLER0 60 RC ULUSLARARASI GÖZET0M LTD.1T0. 102 AVRUPA BA.IMSIZ GÖZET0M H0ZMETLER0 61 0STANBUL TEKN0K KONTROL E.0T0M H0ZM. 103 ATOMTEK NÜKLEER ENERJ0 DANI1MANLIK 62 ALTINTA1 GEM0 ACENTEL0.0 DEN0Z NAKL0YAT 104 AYDEM0R GEM0 GER0 DÖNÜ1ÜM DEM0R ÇEL0K 63 H0T0T GÖZET0M ANAL0Z DANI1MANLIK 105 MAREKS GÖZET0M EKSPERT0Z VE SURVEY 64 RINA DEN0ZC0L0K VE BELGELEND0RME LTD.1T0. 106 SLC GÖZET0M LABARORATUVAR H0ZMETLER0 65 AVRASYA GÖZET0M VE DANI1MANLIK H0ZM. 107 INSPECT ULUSLARARASI BELGELEND0RME 66 UDEM ULUSLARARASI BELGELEND0RME 108 MAYA GÖZET0M KONTROL H0ZMETLER0 67 K WA MEYER BELGELEND RME H ZMETLER A. . 0 0 0 0 1 109 ORBEY GÖZET0M DENET0M KONTROL EKSPERT0ZL0K H0ZMETMER0 LTD. 1T0. 68 PGM PROJE GÖZET0M MÜH VE KAL0TE KONT. HASER GEM0 SÖKÜM ULUSLARARASI GÖZET0M 69 ALFA ULUSLARARASI GÖZET0M VE SURVEY 110 SURVEY H0ZMETLER0 70 L0MAN TEKN0K H0Z. T0C. LTD. 1T0. 111 KP FITTER AND ASSOCIATES INTERNATIONAL 71 PETROMAR GÖZET0M DANI1MANLIK GÖZET0M LTD. 1T0. 72 S.K.G.S. STANDART KONTROL GÖZETME 112 KALIMBASISIERIS MARITIME DEN0ZC0L0K OKYANUS ÇEVRE SA LI I VE DEN ZC L K NAK. 73 OMEGA GÖZET0M DANI1MANLIK VE DEN0ZC0L0K 113 . . 0 0 0 GIDA SAN. T0C. LTD. 1T0. 74 AKAYA ULUSLARARASI GÖZET0M H0ZMETLER0 INSPECCO BELGELEND RME VE GÖZET M 114 0 0 75 B.E.C. BELGELEND0RME VE MUAYENE H0ZMETLER0 LTD. 1T0. 76 M0TRA S.K. TEST VE TETK0K LTD. 1T0. MERS0N TRANS SURVEY GROUP GÖZET M EKSPERT Z 115 0 0 H ZMETLER T C. LTD. T . 77 RMN MAR0NE MAK0NE SANAY0 DANI1MANLIK 0 0 0 1 0 ACE AVRASYA DENET M KONTROL EKSPERT Z 78 TÜMSER T ULUSLARARASI GÖZET0M 116 0 0 H0ZMETLER0 A.1. 79 STANDART BM TRADE BELGELEND RME A. . 0 1 TCERT ULUSLARARASI SERT F KASYON VE 117 0 0 80 PROKSIMAR ULUSLARARASI GÖZET0M TEKN0K DEN0T0M H0ZMETLER0 T0C. LTD. 1T0. 81 BERGEN DENZ0C0L0K LTD.1T0. 118 FA-BER DANI1MANLIK GÖZET0M VE DENET0M 82 VELA DEN0ZC0L0K-ATILAY ÖZAY 119 ANIL DEN0ZC0L0K 0N1AAT MÜH. H0ZMETLER0 83 TÜB0DER B0L010M SEKTÖRÜ DERNE.0 IATCA ULUSLAR ARASI AKADEM K VE MESLEK 120 0 0 84 AKTAN DEN0ZC0L0K GÖZET0M GIDA VE 0N1AAT E.0T0M BELGELEND0RME DENET0M H0ZMETLER0 85 CCI ULUSLARARASI GÖZET0M H0ZMETLER0 121 BT GÖZET0M VE SURVEY H0ZMETLER0 86 SETA GEM0 MÜHEND0SL0K MAK0NE 0N1AAT 122 ES0M TEST H0ZMETLER0 SANAY0 VE T0CARET A.1. 87 INCOMAR GÖZET0M EKSPERT0Z H0ZMETLER0 123 TT MAR0NE ULUSLARARASI GÖZET0M LTD.1T0. 88 ALEX STEWART DENET0M VE ANAL0Z 124 ATEK GÖZET0M EKSPERT0Z DAN. H0ZMETLER0 89 KAS ULUSLARARASI SERT0F0KASYON GÖZET0M 125 UKB ULUSLAR ARASI KAL0TE BELGELEND0RME 90 SO0NCO DEN0ZC0L0K GÖZET0M SAN. T0C. LTD. 1T0. 126 M0L GÖZET0M VE EKSPERT0Z H0ZMETLER0 91 INTERTEK TEST H ZMETLER A. . 0 0 1 127 0STANBUL UYGULAMALI GAZ VE ENERJ0 TEKNOLOJ LER ARA TIRMA MÜHEND SL K 92 AGM MÜHEND0SL0K M0MARLIK DANI1MANLIK 0 0 1 0 0 DHG GÖZETIM DENETIM MUAYENE 93 ERO S0STEM 0LAÇLAMA VE LOJ0ST0K SANAY0 128 BELGELENDIRME E.ITIM HIZM. LTD. 1TI. 94 BBS B0RLE10K BELGELEND0RME 129 DO.U AKDENIZ ULUSLARARASI GÖZETIM 95 GCNTR ULUSLARARASI BELGELEND0RME

      M  O

      M 97 O          

J             ­     €  ‚ G New arrangements have come into force as regards     the electricity market. Licence types are determined as production, OSB 0t will be compulsory to obtain a suitable licence for production, transmission, market transactions, generation, transmission, distribution, export, import, of distribution, OSB distribution and procurement licence, electrical energy in the market according to official which are able to be received from the EPDK. gazete publication on 2 November. Duration of the pre- licence will not exceet 24 This entails reception of separate licences for each months except force majeure conditions.While the facility if the subject activities will be executed at more licence i s being awarded, this period will be extended than one, excluding the exceptions under the regulation. up to 36 months depending on the source type and Generation activities at the following facilities will be installed capacity, according to the EPDK decisions. The exempt from the liability of reception of a licence and of Licence will be given for 10 years mnimum and 49 years founding a company: maximum, based on the activity type. Corporate bodies that wish to apply for an pre- Z A production plant operated as isolated with no link licence to operate in the market should be subject to the to transmission or distribution systems special law terms and be a limited or joint-stock company Z A production plant based on renewable energy as per Turkish Trade LAw no 6102. 0f a joint-stock sources of up to installed capacity limit as company, all its shares except those in the stock determined with council of Ministers decision within Exchange should be written on behalf of bearer the framework of Electricity Market Law’s relevant according to the capital market regulations. The article, company boar d of directors president and members Z A production plant established to be used for including those who left the post within one year before a disposing the treatment plant sludge and licence cancelation should not be under scope of banned municipalities’ solid waste facilities as per relevant article of the Electricity Market Law. Z Microgeneration facilities and Cogeneration facilities that are in the category of supplying the Ministry’s   efficiency values The regulation also arranges the way to maket he Z A production plant based on renewable energy applications for licence.0t will be compulsory for t he sources that use all the energy it generates, without company to submit the main contract that confirms that supplying it into the transmission or distribution the company’s capital is minimum 2 million TL in terms of system. the procurement licence applications, and is in the Meanwhile, corporate bodies whose half of capital amount/rate that has been determined by the EPDK in belongs to the municipality directly or indirectly will be terms of distribution licence, market transactions licence able to built a generation plant with no licencing liability, and procurement licence. The terms related to the capital on condition of being found suitable by State Hydraulic requirements for corporate bodies that own distributionr Works (DS 0) and having technical possibilities on the licences and assigned procurement companies during water outpouring lines and wastewater outpouring lines the period of licencing will be determined with EPDK operated by the municipality. decisions.       M  O       M 98 O 0n case of contradictory actions to the relevant beginning of April 2015, and wind power by the end of terms, sanctions prescribed in the the Electricity Market the same month, Electricity Market Regulatory Authority - Law will be put into force according to the nature of the EPDK President Hasan Kökta2 said. act. Production licence wil lbe canceled if the “We’ll take the latest changes in the related           construction is not possibl e to be finished in due time. 0n regulations stipulating the requirements of solar and wind this case, the company partners (with more than 10% power over the last three years, in line with the standards shares) will not be able to receive a new licence for 3 lasting at least one year,” Kökta2 said. years. The share of wind power has reached 4.5 % of The amount of The total electrical energy production Turkey’s 61,000 (megawatts) mW total installed power J           that can be achieved by firms managed by a corporate capacity, with a number of wind power plants having a   ­     €  ‚ body or private body cannot be more than 20% of the capacity of over 1,000 mW. overall nationwide electricity energy published in the G “Some $4 billion has been invested in wind power previous year’s report. over the last decade,” Kökta2 said. The EPDK has provided licenses for the installment            of 9,679 mW of wind power plants until now.  2  G “Some 2,676 mW of these are online now. Twenty- one projects are in the process of getting a pre-license,” New arrangements have come into force as regards Meanwhile, Turkey plans to start to accept     applications for new pre-license in solar power by the he added. the electricity market. Licence types are determined as production, OSB

0t will be compulsory to obtain a suitable licence for production, transmission, market transactions, generation, transmission, distribution, export, import, of distribution, OSB distribution and procurement licence, electrical energy in the market according to official which are able to be received from the EPDK. gazete publication on 2 November. Duration of the pre- licence will not exceet 24 This entails reception of separate licences for each months except force majeure conditions.While the facility if the subject activities will be executed at more licence i s being awarded, this period will be extended than one, excluding the exceptions under the regulation. up to 36 months depending on the source type and Generation activities at the following facilities will be installed capacity, according to the EPDK decisions. The 2     ­€­‚­ exempt from the liability of reception of a licence and of Licence will be given for 10 years mnimum and 49 years founding a company: maximum, based on the activity type.  ƒ­­­ Corporate bodies that wish to apply for an pre- Z A production plant operated as isolated with no link licence to operate in the market should be subject to the to transmission or distribution systems special law terms and be a limited or joint-stock company Z A production plant based on renewable energy as per Turkish Trade LAw no 6102. f a joint-stock 0 „  † ‡    1   sources of up to installed capacity limit as company, all its shares except those in the stock determined with council of Ministers decision within Exchange should be written on behalf of bearer the framework of Electricity Market Law’s relevant according to the capital market regulations. The article, company boar d of directors president and members The public bidding system is being changed in a Kastamonu Governor Erdo/an Bekta2 said that Z A production plant established to be used for including those who left the post within one year before a way to expand the scope of the advantages for they had made great efforts fort his stage and he hoped disposing the treatment plant sludge and licence cancelation should not be under scope of banned municipalities’ solid waste facilities as per relevant article of the Electricity Market Law. producers of local goods. Previously a firm, offering that the process that started with Governor Sırrı Pa2a in Z Microgeneration facilities and Cogeneration facilities local goods, could win the contract even if it proposed 1882 will come to an end. The first projection is a 5 that are in the category of supplying the Ministry’s   by up to 15% higher. This state could be possible only million ton cargo capacity port and to join the two sides efficiency values The regulation also arranges the way to maket he when the tender authority found it suitable.The business of Black Sea, he said Z A production plant based on renewable energy applications for licence.0t will be compulsory for t he world demands this to be put into realization sources that use all the energy it generates, without company to submit the main contract that confirms that Kastamonu Governor Erdo/an Bekta2 said that ‰ Š       supplying it into the transmission or distribution the company’s capital is minimum 2 million TL in terms of 0nebolu Port was claimed by Cengiz Holding but the nebolu Port was allotted to nebolu municipality system. 0 0 the procurement licence applications, and is in the winner will be determined as a result of the evaluation with a Council of Ministers decision in 1955. But with a Meanwhile, corporate bodies whose half of capital amount/rate that has been determined by the EPDK in of the tender. new with a Council of Ministers decision, this allocation belongs to the municipality directly or indirectly will be terms of distribution licence, market transactions licence He said that it is important for the port to be turned was lifted up. Construction was first started in 1882 with able to built a generation plant with no licencing liability, and procurement licence. The terms related to the capital over to the Privatization Administration . He added that a budget sent by Ambülhamit the 2nd during the ruling on condition of being found suitable by State Hydraulic requirements for corporate bodies that own distributionr time of Kastamonu Governor Sırrı Pa2a. The port acted Works (DS ) and having technical possibilities on the too much effort was taken to come to this stage. The 0 licences and assigned procurement companies during as an entry gate to Anatolia for ammunition and water outpouring lines and wastewater outpouring lines first projection is an annual 5 million ton cargo capacity the period of licencing will be determined with EPDK weapons during the National Struggle era. operated by the municipality. decisions. port and to join both sides of the Black Sea.             M  O M  O       M 99 O                      

The Energy Market Regulatory Authority (EPDK) is than one for one place. Companies are reported to reported to have received applications as regards solar have made measurements on, 510 points for solar energy licences for construction of power plants. resource. If more applications are received for one There was intensive interest in the licences that place, a tender will be necessary. The highest bidder has filled up the quota of 1.000 MW. will have the right to build the plant. The first application was made by RES ANATOL0A Sources said that no licence awards will be for licences on 8 points. The number of demands has made for agricultural areas and aquatic environments. reached 58. Sources said that applications may reach 6-7 .000 High solar potential MW and thus tenders will have to be held for licence Turkey is among the countries with highest solar determination energy potential. Turkey’s annual energy potential is At first stage, licences will be given for 600 MW 380 bln kWh. Thus annual average solarization is 1.311 power plant. The first day application was received for kWh/ m2-year, and annual average solar period is 1.000 MW. Applications may reach 6-7.000 MW. 2.640 hours. There is a possibility that applications may rise Below are the locations for which licence because of solar energy. Applications may be more applications have been made by firms;

                           UTM 6 GRADE COORDINATES CAPACITY REGION NO VALUE TO VALUE SUBSTATIONS SLICE (MW) RIGHT UPWARDS AK1EH0R 363003,68 4244202,67 36 AL0BEYHÖYÜ.Ü 468914,86 4152368,07 36 BEY1EH0R 385119,41 4178209,90 36 1 ÇUMRA 477976,38 4158640,94 36 46 KONYA KONYA-3 465965,76 4201426,91 36 KONYA-4 478084,91 4188168,14 36 LAD0K 448984,86 4225276,45 36 SEYD01EH0R 399320,23 4146404,44 36 ALTINEK0N 489600,00 4241126,00 36 ERE.L0 596063,21 4155309,15 36 2 GÜNEYSINIR 476806,00 4125254,00 36 46 KONYA KARAPINAR 548582,72 4176118,36 36 KIZÖREN 515451,42 4221725,76 36       M  O       M 100O UTM 6 GRADE COORDINATES CAPACITY REGION NO VALUE TO VALUE SUBSTATIONS SLICE (MW) RIGHT UPWARDS BA1KALE 380 422375,00 4214015,00 38 ENG0L 341774,89 4250656,88 38 3 ERC01 356470,71 4323712,78 38 77 VAN A.RI VAN 356151,46 4266051,89 38 VAN 380 353339,00 4272418,00 38 AKORSAN 288284,98 4105398,68 36 F0N0KE 243601,68 4022992,66 36 4 KA1 739819,93 4009356,82 35 29 ANTALYA KEMER 280848,33 4051178,88 36 KORKUTEL0 251423,04 4107777,90 36 SERBEST BÖLGE 285295,90 4080899,59 36 AKSEK0 392152,86 4099905,78 36 ALANYA 1 403101,84 4047677,75 36 ALANYA 2 421598,00 4039770,45 36 5 ALARA 382006,76 4058900,64 36 29 ANTALYA GAZ0PA1A 434882,94 4018240,64 36 GÜNDO.DU 348585,41 4080207,22 36 SER0K 329845,31 4088658,25 36 VARSAK 295883,34 4092710,06 36 ERMENEK 497480,00 4046971,00 36 6 KARAMAN 517251,94 4115608,13 36 38 KARAMAN KARAMAN OSB 528638,87 4118954,31 36 AKBELEN 642238,91 4076734,87 36 ANAMUR 488029,38 3994216,37 36 ERDEML0 623476,36 4061385,66 36 7 GEZENDE HES 524430,00 4046223,00 36 35 MERS0N MERS0N 2 638211,30 4074606,00 36 MERS0N 380 651630,00 4086526,00 36 TA1UCU 580282,55 4021214,33 36 ADIYAMAN GÖLBA1I 382167,26 4182023,49 37 ANDIRIN 267050,97 4164486,69 37 ÇA.LAYAN HAVZA 294250,00 4188600,00 37 8 DO.ANKÖY 339816,60 4240831,15 37 K.MARA1 GÖKSUN 284506,67 4211959,56 37 27 ADIYAMAN KAHRAMANMARA1 318325,74 4159659,26 37 KILAVUZLU 306924,48 4163770,22 37 NARLI 335040,33 4138942,78 37 SIR 287662,45 4153122,35 37       M  O       M 101O UTM 6 GRADE COORDINATES CAPACITY REGION NO VALUE TO VALUE SUBSTATIONS SLICE (MW) RIGHT UPWARDS BUCAK 285301,82 4147289,58 36 9 BURDUR 265275,00 4182062,81 36 26 BURDUR TEFENN0 746616,45 4131937,67 35 10 BOR 637055,13 4192947,76 36 N0.DE DER0NKUYU 650664,00 4249967,00 36 26 NEV1EH0R M0SL0OVA 653310,23 4233043,98 36 AKSARAY N0.DE 2 651096,87 4205497,32 36 Ç0NKUR 697185,53 4287853,18 36 KAYSER0 KAPAS0TÖR 731652,26 4304550,88 36 11 PINARBA1I 270748,38 4286429,53 37 25 KAYSER0 SEND0REMEKE 700765,87 4254903,75 36 TAKSAN 690510,44 4270232,83 36 YE10LH0SAR 686546,07 4234913,69 36 ADIYAMAN 433191,92 4178413,97 37 DARENDE 368064,67 4270579,87 37 12 HASANÇELEB0 401548,23 4315745,32 37 MALATYA 22 MALATYA 1 443003,20 4246805,79 37 ADIYAMAN MALATYA 2 449991,34 4243417,47 37 MALORSA 426761,63 4243431,44 37 13 BA.I1LI 415269,78 4175325,53 38 21 HAKKAR0 HAKKAR0 386391,66 4161760,65 38 BOZDO.AN 615860,48 4171161,21 35 DALAMAN 660740,42 4074513,71 35 DATÇA 560837,75 4068096,54 35 14 FETH0YE 690567,05 4060459,75 35 MU.LA 20 MARMAR S 611173,42 4080002,94 35 AYDIN 0 MU.LA 619632,23 4119791,11 35 YATA.AN 597369,44 4132070,13 35 YEN0KÖY 578150,67 4111153,27 35 BARLA 306218,17 4209359,44 36 E.0RD0R 315216,01 4190934,79 36 15 ISPARTA 280865,05 4195296,87 36 ISPARTA KEÇ0BORLU 262583,91 4204507,41 36 18 AFYON KOVADA 2 308496,76 4163690,43 36 KULEÖNÜ 291080,79 4194079,55 36 1ARK0KARAA.AÇ 351391,79 4222500,43 36 ACIPAYAM 709190,00 4143300,00 35 16 BOZKURT 728452,31 4188557,29 35 18 DEN0ZL0 TAVAS 672121,45 4165984,43 35

      M  O       M 102O UTM 6 GRADE COORDINATES CAPACITY REGION NO VALUE TO VALUE SUBSTATIONS SLICE (MW) RIGHT UPWARDS 17 AD0LCEVAZ 305568,10 4297936,75 38 16 B0TL0S TATVAN 262382,99 4266494,75 38 B0NGÖL 630576,45 4306512,98 37 18 ÖZLÜCE HES 593746,48 4331589,46 37 B0NGÖL 11 PÜLÜMÜR 576928,37 4371470,93 37 TUNCEL0 TUNCEL0 546358,62 4327825,75 37 PS-3 270648,69 4124983,21 38 19 1IRNAK 272110,39 4154418,63 38 11 1IRNAK ULUDERE 302013,36 4146165,11 38 BAHÇE 280856,49 4118420,88 37 20 KARA0SALI 679557,37 4130446,16 36 ADANA 9 OSMAN YE 253829,02 4105880,92 37 OSMAN0YE 0 665263,14 4147840,78 36 21 MU1 MU1 719277,11 4291321,29 37 9 KIZILTEPE 645487,90 4122895,43 37 22 MARD0N 652907,89 4130656,93 37 S00RT S00RT 380 747334,00 4202795,00 37 9 BATMAN MARD0N S00RT Ç0M 738406,26 4204605,85 37 S00RT TM 756573,14 4203396,88 37 23 S0VAS KANGAL 352696,65 432708,20 37 9 ELAZI. 2 523072,47 4276260,06 37 HANKEND0 512221,90 4276806,08 37 24 HAZAR 1 531935,16 4266441,38 37 8 ELAZI. HAZAR 2 532376,57 4269567,27 37 MADEN 559742,66 4250141,68 37 25 1ANLIURFA S0VEREK 530460,27 4177950,47 37 7 D0YARBAKIR ERZURUM-1 694608,98 4422984,84 37 26 ERZURUM-2 680208,79 4422056,56 37 5 ERZURUM HINIS 733851,45 4360097,29 37 27 ERZ0NCAN 544811,57 4398734,39 37 3 ERZ0NCAN ERZ0NCAN-OSB 532729,67 4402383,58 37

Note: Total of the solar energy plants’ connecting capacities in substations of each region cannot be more than the capacity of the subject region indicated in the above table.

      M  O       M 103O 2S           

The number of source contribution share projects called Table-2 being handled by the State Hydraulic Works (DS0) under the scope of the Electricity Market Licencing Regulations, which was put into force in 2005, has reached 638 in 2013 DETAY Economic Magazine has been closely following the developments of these projects as reported in various issues to date. Below are the projects, installed capacities, locations, and contract winners:

                

       1 12 1  1  2  /  ­      ­    1 ­/     1  2  ‚ € ‚2 „ ­  ­   †   ƒ1 1  1  2  0„ˆ  ‰ ˆ      1 1 12   1 ­  † Š 2        ƒ1 2  ‡  „ˆ   € ‹      2 ƒ1  ­/ 1  2 † ˆ 0ŒŽ  ‘   ’    1‰ ƒ1 1  ­ 12  1  2  Š  “’  Ž     ­­  ƒ1    2 †† Œ  „   Ž‚    ­  ƒ1 1 12 1  2  Ž €•  2  ’      ƒ1     1  2    “ ‹  ‘  ’    1‘2 ƒ1 1  1  2   ˜ ‹  ™™  € ˆ  †   ’ 12 ƒ1  ­2  ‚  “    ’    ‰ ƒ1 1  1  2   €  ‚ ‘ ‰ ˆ †    ’ ­ 11   1  2  †   ‘  ‰ ˆ † † † ‘1   1 1 2  ‡  • ‘  ‰ ˆ  † †  ’ ­ 11   1  2  ˆ ›‹  Ž     ­1  1 1 2  Š ’ „œ™  Ž     ’ ƒ1 1   1  ­ 21  Œ € ‘ ‘  Ž     1  1   1  1  ­21  Ž €‹ ‘   ’ †   ‰ ƒ1 1  1  2   ›  œ™™  ž ­     ƒ1 2  € „   Ž‚ †† †  ­/ ƒ1  1  2  ‚ ˜ ­ œ™™  € ˆ    POSTPONED   ™œ™™  Ÿ/ †    ƒ1 1  1  2  † › „ ‘  Ž     1  ­11     12 ’ ­  ‡  ˆ          ƒ1 1 2  ˆ  ‚  ¡˜’ “¢    ‹    ‰­/ ƒ1 2  Š Ÿ  ‚‘ Žœ™™ ‘  Ž  †    ­    1 ­/    1  2  Œ ž Ž / ‘   ’   † 1‘2 ƒ1 1  1  2  ‚Ž  2„ ¡ Ž¢  ‘   † ­’ ƒ1 1 11 ­ 21  ‚ Ÿ  “’ ‘   ’    ­   1 1   1  ­  ‚ ‰ /      ‹    ƒ1 ƒ1 1 2 

      M  O       M 104O                 

          1     1        /    ­€ 1  1 11 2  „ ­/ € ‚    ‚ ƒ ƒ   1 11  1  2      „   €†‡†    1­1 1 1   €  1  ˆ †  €‰  Š­    1  1 11 2  ‡ ‰ ‚  € ‚    €  1     ‰ Œ Ž  ‘† ’€ ƒ  ˆ 1Š2 1 1  1  2  ‹  Œ† ­‚“ Œ    / ˆ  ˆ ­€ 1  1 11 2 ˆˆ Œ ”  ‡Œ   ƒ 11 1 1 1   1  2  Ž €       ƒ 1  1     1  21   • Œ € –— ’ ˆ   1  1 11 21 ˆ  “  Œ   ‚ ƒ   ‘€ 1 1  1 2  „ ’   †„ ’ ˆ    11   1 2  ˜ ‚„  • €“    Œ €  ˆ   1 111   21  † “ •‡ –——  €†‡†  ƒ ˆ   1 2  ‡     € ‚   ƒ ‘€ 1 1   1 2  ‰ ‚Œ € —–——   ™‚ ˆ    €    1 2  „‹ ‡Œ   •   ’†€    ­   1 1 2  „Œ   ‰    ’†€ ˆ ˆ  €€‘€  1 1  1  21  „Ž ††š –——   ’†€  ƒ  NO BIDDERS „ ‡ €  € ‚      1 1 2  „ 1 „2  • €“   „†€     1  1 1 2  „„ ‘ †€ ‚  ‡Œ  ˆ ƒ POSTPONED „ ž Œ 2 Œ €“  Š ‡­€  ƒ  1 1 1 2  „†    †‡  ƒ  ‘ 1 1   2  „‡   €  ‘† ’€     1 2  „‰ ˜    ‘† ’€      1   1   1­2  ‹ ­‚ €  • €“  Š ‡­€  ˆ   1 2 ƒ Œ ž† † Ž  ‘† ’€  ƒ  ‘  1 12  1  21  Ž Ÿ†“   ’ Œ­€  ƒ ˆ ‘ 1 2    †  • €“   ’†€   ƒ ­ 1 1  1 2 ˆ  „    / ƒ    1 11   1 2  „ Š­ Œ–——  •  ‡Œ ƒ  ˆ €’  1 12  1 2 ƒ ­‡  ”“   ˆ 11 1 1 1   1 2  † Ÿ   •  € ‚ ˆ  ˆˆ    1 1   1 2  ‡ /“ Œ  •   „†€ ƒ  ƒˆ  1  1 1 2  ‰ ­/ € ‚  “ €  ƒ ˆ € 1 1 2  †‹  • €  ”’Œ €†‚   ˆ  1 1  1 1   †Œ  / 2 2–—  ‡†€‰ €   ˆ  1  1 1 2  †Ž ‡€•–——  Š ‡­€   ˆ  1  1 1 2  † ‘€ ‚‰    Š ‡­€   ˆ 1Š2 1 1  1 2  † ž ‚   •  Š ‡­€  ƒ ˆ 2  1 /­  1 2 ˆ †„  ‚   ­   ˆ 1  1 1   1  2  † ž €  ——–———  ‘† ’€   ˆ 2  1 ‘ 1  2        M  O

      M 105O                 

           1 1    1  1  ­21 ­ ‚ ‚/„ ‚† „         ­ 1 1  1 2 ‡ ƒ ˆ„    ‰  Šˆ  ­     1 1  1  ­21  ‚„ ‹Œ‹Ž ‘ ’  ­    1 1  1 2 ­ ‚ “ „„ ‹ Ž   ’  Ž  ­ † 1 1  1 2 ­ ‚‡   †  ˆ  ­  1 1 12 1  ­21  ‚ˆ   ‚   ’     † ­ 11   1 2  ‚‰ ‚’†‘  ” ­ ‡ ‡  1  11   1  ­  ‚Š   Ž† 2    Ž ‡­ ‡ ­  †/  1 1 2 ­ ‚Œ ‹‰ ‚ /   ˆ  ­­ ­   1 1 ­21  ‚  ˆ  – ’‚ ‡ ­ ­ ­   1 1   1 2  ‚‚  † 2   †   —„   ­ ­† 1 1 11 ­21  ‚ƒ  Ž  ‰ ˆ  ‡ ­ 2 ­ 1 ­  1  ­21  ƒ„ ˜  ‰ ˆ ‡ ‡ ‡­ 1 1 1   1 ­21  ƒ   ‰ ˆ    ­ 2 ­ 1 ­  1  ­21  ƒ‡ ’  ŠŽ2    ­  1 2  ƒˆ š‚ˆ   ˆ2 ­  ­­ POSTPONED ƒ‰ ‰   – ’‚   ­ ­2  1 ­/Ž  1 2  ƒŠ — ’ „ Ž   ›‚ Ž ‡  ­    1 1 1  ­  ƒŒ     † „ ­  ­ ­   1 1   1 2  ƒ ˆ Ž„   œˆ‘ † ‡    ­ ‘ ­ Ž 1   1 2  ƒ‚ ’   —„ ‡  ­ ­1Ž  1 1 ­21  ƒƒ ‚/„ Œ ˆ „  ž /„ ­ ‡­ ­ 1 /† Ž1112 1  2  „„  2  ‹ ’„  ­ ­  † 1 1 ­21  „ – 2‘ —  †‰  ­‡    1    1  1 ­21  „‡   ‚ „   ’  Ž  ­  ˆ 1  1 1 2  „ˆ   ˆ  Œœœ  ”ˆŽ   ‡   1  1 1  1 ­21  „‰ ’„  ›‚   ’  Ž ‡    † ­ 11   1  ­  „Š ”†  ‚„  – ’‚  ‡ ­ ­   1 1 2 ­ „Œ › Ž„  †‰  ­   2     1 121 1 2  „  2  ’        1 1 2 ­ „‚ Š  —   Šˆ    ‡   1 1  1  ­21  „ƒ  Œœœœ  žˆ  ‡   1­1 1   1 2  „  Œœ¡  žˆ  ‡    1 1   1  2  Ž      ’ ­    1‘  1  1 11  1 2 ‡ ‡ „† 2  ŠŽ2  ­     1 1 2 ­ ˆ ‚  ŠŽ2       1 1 2  ‰       † 1 1 2 ‡ Š ˆ Œ ‚„ ›‚  ’  Ž  ­ ­ ‘ 1  1 1 2  Œ ‹/Ž   —  ˆ† Ž‚ ­    1 2   –‚„  Šˆ    Ž† 1  1 11 2  ‚    —   „ ˆ ­   ­ NO BIDDERS ƒ    œŒœœ  ’    1 1 1 ­21  ‡„ ›† ‹ Ž   † ­ ­     1Ž  122 ­       M  O       M 106O                 

         1 1 €21         €‚     1  1 1 2  ƒ ƒ ‚„ ‚        1 1€ 1  2  „ †ƒ ‡   € „ˆ ‚    1   1 1 2 ‰‰ †  ‚ ƒ‚     €‚     1      1  €  ‡ 0  ‹   ‹     1  1 1 2  ˆ Œ ƒ  Ž  ‘ ’ˆ ‰‰   €   1 1 1  €21 ‰ ‰ ˆ‚ “ „    €‚     12 €  ŠŠ 1  2  ‹ ”    ‹  ‘ ’ˆ      1 €/ Ž   1  2  ƒ‘  / 2 2—††    ‡     €1Ž 1 121 2  ƒ ‚ ‚ƒ —’2   ƒ   ‰    1 €/  1  2  ƒ     ‚ ‚„    1 €11 12  1  €21 ‰‰‰ ƒƒ      ‘‚ ‡ƒ     1 1 €21  ™ˆ €‚  € 2“ ‰    € 11 Š1Ž  1  €21  ƒ„     ‘ ’ˆ ‰   ’ 1  Ž€  1 €  ƒ†   Ž   €‚   ‰  1  € 11   1 2  ƒ‡    š €  ‰ ‰   1 12  1  € 21  ƒˆ ›     € „ˆ ‚ ‰   POSTPONED ƒ‰   › ƒ     1 1  1 2  ƒ‹ ˆ/‚   €‚  ‰   1 2  „‘  ƒ ’   †€    €   1 1 1  €21 ‰ „   ‡   š ƒ  ‰    2 1 1 2 ‰ „  € ™ ˆœ‡ € ž Ž‚   ‰ Š ŠŽ  1 1 2 ‰‰ „ƒ   ™ ˆœ‡ € ž Ž‚  ‰    1  1 1  1 2  „„ ”  2   ‚ ‚„      1 1   1 €21  „†  „  ž€„   ‰  ’ 1  Ž€  1 € ‰ „‡ / ’   €    Š  1 1 2 ‰ „ˆ ˆ ƒ  ‹ €   ‰ 212  1 1 €21 ‰ „‰  ƒ€   ƒ€   ‰ 1 1€ 1    2  „‹ ƒ ’ ƒ    ‚ ‚„ ‰   €/Ž 1 1   1 €21  †‘  ‡    €‚  ‰    1 1 2  † ‘ “          1 1 €21  † 1„2    ’     1 1  1  1  2  †ƒ ‹  2   š 2     1  1 1 2  †„ ƒˆ       1 ‰ ‰  Š 1 12€  1 €21  ††   Ž    ‘ ’ˆ ‰    1 €/  1  €  †‡ šˆ —†   ž Ž‚  ‰‰ ‰ 1 1 1   1 €21  †ˆ  Ž ‚    ‹ ‰   21 1  1 1 €  †‰ ›ƒ 2       ‰  Š 1 11 2  †‹ ” ƒ      ” ƒ  ‰‰  NO BIDDERS ‡‘  ’ˆ‚   ž€„     ’ 12   1  €  ‡ / ˆƒ‚   ž Ž‚ ‰     1 11 €21  ‡     Ž      1 1 2 ‰ ‡ƒ  €   š 2     1 1 1   2 ‰       M  O       M 107O                 

      2          1 1 ­21  ‚     ­€‚ ƒ       2 ƒ1 „     1 2 ƒ  „ ‚  † ‡2 ˆ€  ƒ   ƒ   2 ƒ1 ­/   2 ƒ †  ‚  ‰ ‚ ­          ƒ1 „1  1  ­21  ‡ ‹ Œ€­ ‚            ƒ1 11   1 2  ˆ Ž  € Œ   €‡ ƒ       Š 12   1 ­21  †‹ ˆ ‘Œ€  ‰­         Š/ 12Œ 11  ­21  † ’ ­   ‘‡€­ ƒ ƒ ƒ      1 ƒ1  1 1 ­  †Ž †Œ  ­‰  €€‘          ƒ1 1 2  †‘ ­ “ ­‰  €€‘         ƒ1  1  2  † “ ‚  ­‰  ‹ 2ˆ­ ƒ    ƒ    ƒ1 1 1 2  †‚ ’ ‡€  ­‰  €€‘ ƒ         1 1  1  2 ƒ †  ‚  ­‰  ‘ ­         ƒ1  ­/  1 2 ƒ ††  ˆ€  ­‰  „• ­   ƒ     ­ ƒ1 1 ­11 ­  †‡ “ €‰‡ ­   ‘‡€­   ƒ      1 ƒ1  1 1 ­  †ˆ 2/ ˆŒŒ   €­—­ ƒ        ƒ1 11 ­21  ‡‹ “€˜­€  ­‰  “€‚•   ƒ        ƒ1 1 2  ‡ ‹ ‰   ­‰   ­        2    2 122  ‡Ž  ‘    ‚ ƒ  ƒ     ­1Œ’ 1Š 1 ­   ­  1  ­ ƒ ‡‘ Œ ‘ ˜ “ ­‰  „­— Œ€  ƒ      Œ 1­ 1 1 2“  ‡ ’€€­ Œ€  ­‰  Ž  ƒƒ      ­„  1 11  1 2  ‡‚ Ž€/‰  ­‰  ‹€ ­ ƒ ƒ      ”  1 ƒ1 1 ­21  ‡ š€  “ ­‰  1 ­         „­  ƒ1 11 1 2  ‡† Ž‘Œ•ˆ   Œ‘‚ ƒ ƒ      11 ƒ1 1   1  ­21  ‡‡ Ž•­Œ  /Œ   ƒ     POSTPONED ‡ˆ 2 ­    Œ‘‚  ƒ      1 ­11 12 1  ­  ˆ‹ ‰ Œ   Œ‘‚        11 ƒ1 1  1  ­  ˆ €Œ€œ žŸŸ   €­        ” ƒ1 11 2  ˆŽ    ­‰  ‹€ ­ ƒ        ƒ1  1 1 2  ˆ‘ ‚‰ ­Œ  ‘ ­ ƒ         1 1   ­ ƒ ˆ ‘€ŒŒ  ­‰   ­   ƒ     ” 211 ƒ1   1 ­  ˆ‚ „ ŒŒ€ ‚  ­‰  ¡­         ƒ1  1 1 ­  ˆ  ‚  ­‰   €­ ƒ  ƒ     2    2 122  ˆ† „ ‘­  ­‰  ‰        1 ­11 12 1  ­  ˆ‡ /‘Œ  ­‰   2        ”’ ƒ1  1 1 2 ƒ ˆˆ Ž‚    ­‰           1­1­ ƒ1  1 1  1 ­  Ž‹‹ ‰ Œ  ­‰    ƒ       Š ƒ1 1 2  Ž‹ Œ ­  ¡­     ƒ    ƒ1 1 ­21  Ž‹Ž ’€  ­‰  ‰        11 ƒ1 1  1 ­  Ž‹‘ ‚ ‘ ˜   €­        Œ   1 1 2  Ž‹ ­•Œ  ­‰  „• ­        ”  1 1 1    ­21  Ž‹‚ „2Œ ‚  ­‰  ‘‡€­ ƒ       „ 12 ­ •  1 ­21  Ž‹ “ Œ—  ­‰   2 ˆ€ ƒ       ­12”­  1 1   ­21 ƒ Ž‹† Œ‘ ˜   ‡  ‘‡€­ ƒ        ƒ1 1  1 2 ƒ       M  O

      M 108O                 

                ­1  1 ƒ  1 „   2­       €‚    „ ­1 2  ‡ ƒ    „ †‚­  ‡ƒ„  ˆ   ­1   1 2 ˆ ‡‡ ‰‚ ‚      €„  ˆ ˆ 1ˆ   1 ­1 1  1 „21  ‡ ƒƒ     ƒ    2    2 12 2  ‡Š /‚ ƒ‚     ‹ ‚      2 ­1   1  „21  ‡‹ ‹€       ‹ ‚    „  1 1 „21  ‡Œ €ƒ      ˆ  ˆ 1„ ­1 1  1  „21  ‡Ž ƒŒ ‰    ‰„ Ž ˆ ˆ     1 1 1   „21  ‡‘ ‹€  „      ‡Œ  ˆ    ­1 1  1 2  ‡  2ƒ     ‡       1 1   „21  ‡ ‡   ˆ    ­1   1 „21  ˆ  † „  ’‚ ƒ   ˆ ƒ 1„ 1 1 2 “ˆ” ‡ •ƒ  ‰    ’‚ ƒ   ˆ   1 1 2    €     –— 2  ˆ ˆ    12  1  „21 ˆ Š ‡ƒ       €‚   ˆ  ­1 11 1  „ 21  ‹ —„       ‡Œ  ˆ ˆ   1 1 2  Œ ƒ       ˆˆ ˆ „1  „11 ­1 1 „21  Ž ‰ƒ˜1šŽ  ‰„ Ž   ˆ 1 ­1  1 1 „  ‘ ƒ‡­     †ƒ‚   ˆ   ­1  12  1  „21   –†Œ ƒ      €‚  ˆ ˆ „  ­1  „  1 2   ƒ ƒ ›˜››˜››      ‡Œ   ˆˆ    ­ „21  Š †„ƒ  –€‡ † ‚ ˆ  ˆ  ƒ ­1     1  2  Š‡ ƒŽƒ      ‡ƒ„   ˆ „1 ­1 1 2   Š  „„     ’‚ ƒ    „  1 1 „21 “” ŠŠ –  „     ‹€  „    ƒ„ ­1 1  1ƒ 12  1 „  Š‹ €‡ ƒ        1   1 1   1  „21  ŠŒ –‡    –   ˆ   1 ­1  „   1 2  ŠŽ –ƒƒ     Œ€    „12 „  1 1   „21  Š‘ – ‡2     Œ€     1„ 1 1 „21  Š ž Œ     ’† ‡      ­1     12  1 2  Š    ‡  ‰ ƒ  ˆ  ’1   1 1 2 ˆˆ ‹ †Ž ƒ  —‚/ƒ ˆ   NO BIDDERS ‹‡       ‡„    „ ­1 1  1  „  ‹   ˜›      ‡ƒ„   ˆ 1    1 1 „21  ‹Š    –† „ ˆ   POSTPONED ‹‹ — €  ‹ ‚      1 11 „21  ‹Œ       – ƒ    ­1  1 1 12 1 „  ‹Ž †   ‹€  „  ˆ    ­1 1  1  „  ‹‘ ‚       ’ Ž† ˆ     1  „/ƒ  1 „  ‹ /ƒ„     ‹ ‚ ˆ   „2  ƒ„  1 „21  ‹ ‹ ‡          ’1   1 1 2 

      M  O       M 109O                 

          1 1 ­1 212  1   ƒ  ­  € ‚ƒ „     1„ ­1 1   1   21   / 2     ˆ‰ Š  „     12   1     ‹ƒ      ˆ‰ Š  „    ­ ­1 „  1 2  Œ †  ˆ Ž‘   ˆ  „ Œ  ˆ„ ­1 1  1      ‹ ­       /   Œ POSTPONED ‰ ’Ž‘      ƒŠ ˆ  „   ­1  1 1 2  Š ­  Ž‘     ’ ”      1 ­1     „ ‹ ’ ­     •–2—    Œ 2 ­1  1  21 „ Ž Š        ‚ ƒ    „ 1 1  1 1  1  2  ‰ƒ       ˆ  Œ „Œ   1  1 ­1 11  1 2  ‰  –  ˆ‰ Š    „‘  1 1      ‰ 0 ˆ ˆ     ˆ‚ ˆŠ       ­1 „12  1  21  ‰† € 2 ‚   1   „ „   ­1   1 2  ‰ ­Š­      ‚‰ˆ „   Œ   ­1  „   2  ‰‰ 1ˆ ˆ     ’ ”   „Œ  ­1   1 2  ‰Š ›” Š­ƒ­     ˆ   Œ Œ   1 1 2  ‰‹ /­     ˆ   Œ   Œ   1 12‘  1    ‰Ž ’ ƒ‚­     € 2  „Œ Œ „‘ ­1 1 2 Œ Š  ”      ‚–  Œ Œ ’ ­1  1 1   1    Šƒ ’ 2 ‚   ˆ‰ Š „  Œ ­1 ‘ ­1  1 1 2  Š /        Œ POSTPONED Š ›” ƒ­ ­   ’­  ˆ  „ Œ /1   1     Š† ›       „    „Œ ‘„ ­1  1 1  1   21  Š € ƒ ƒ      ­ ­–   Œ    ­1  1  / ˆ1  Œ Š‰    € Šˆ  „ ŒŒ ‘’„ ‘ 121 „„  1  2  ŠŠ › ƒ—   ­ ­–  Œ  ­1 1 2  Š‹  ˆ      Š‚ – ­   Œ  1   1 ­1  1   21  ŠŽ       € Šˆ Œ „ Œ   1 1  1    Œ ‹ œ ‚ ƒ     ž  Œ Œ   12 1      „ ‹ƒ    ƒ  € Šˆ   Œ NO BIDDERS ‹ › ƒ     •ˆ Š­ Œ Œ Œ  ­1 1  21  ‹ ‹ ˆ  –   ž    „Œ ˆ  ­1 1  1    ‹†       › ­– „„ Œ Œ  ­1  1 1    ‹ •       ­ ­– Œ„ „ ŒŒ     1      „ ‹‰       Š „  Œ Œ   ­1    1     ‹Š  ƒ     Šˆ2 —ˆ „ Œ Œ NO BIDDERS ‹‹ •     œ ­ „Œ  Œ  ­1   1    ‹Ž  –ˆ       / Œ Œ   Œ ‘ ­1   1     Ž œŠ–       › ­–  „  Œ NO BIDDERS Žƒ ‹ ­       /    Œ  ” „ ­1 1  12 2  Ž  ƒ     ˆ    Œ   ­1 1 ˆ 2  Ž  Š      ’ ”  „   Œ    1 1 1 „ 1  1   Ž† € ‰ˆ     ’ ”    Œ  ­1   1    21        M  O       M 110O                 

             1 1 €21  ƒ         ­      1€    1  € 21  „       € ‚ƒ  „ „ 1 1 12  1  €   ƒ/        † „†  /‡ 1 €  1 €          € ‚ƒ ‡† †„  € 1 1  1  1  €  ˆ‰‰ €  ­   ˆ  2  ‡  Š2     ‹ €  1  €  ˆ‰Œ  Šƒ     € ‚ƒ „ „„  1 1 1Ž  € 2 1  € 21  ˆ‰ ‹ Š      € ‚ƒ    ‘2 1  1   2  ˆ‰ˆ Œ          „ ‘  1  1 € 21 „ ˆ‰’ 2          † † „ ‘ 1  1 1 €  ˆ‰ ‘ /      ˆ  2 ‡   Ž/Š ‡‘  1   € 21  ˆ‰ƒ  ’       ˆ  2    EXPECTED ˆ‰„ ­     “  ‡ †      1  2  ˆ‰ ” •­ –––     € ‚ƒ ‡   Š‡   12   1  € 21  ˆ‰       € ‚ƒ „  †  Ž     1  €  ˆŒ‰ •­•      ƒ’  ‡ † 11 1€     1  €  ˆŒŒ ˆ “’     ˆ•/    NO BIDDERS ˆŒ  “     Œ —•       Š  12  1  € 21  ˆŒˆ  ƒ/•      ƒ’    POSTPONED ˆŒ’ ­ Š  –˜––  ­   ™  † ‡  ‹  1   1  €  ˆŒ  ’       ˆ  2     ‡   1  12 €  ˆŒƒ     ­  ‡   €1    1    €  ˆŒ„ —“ –˜––       „  „ ‹ 1 1   1  2  ˆŒ ‘       ‚     „ ‡ ‡   1  2  ˆŒ ’‚ 2     € ‚ƒ †  ‡ Ž 1   1  € 21 ‡ ˆ‰       € ‚ƒ ‡ „ ‡ Ž      1  €  ˆŒ       Œ —•  †        1  2  ˆ ˆ     Œ —•    ‡       1  €  ˆˆ Š      ˆ—      1  1  1  2 „ ˆ’         POSTPONED ˆ Œ      Œ —• ‡ †„  ‡ 1‹ 1 1  2  ˆƒ ƒ    ••­       1  12  1  € †† ˆ„ ­ 2  Œƒ•’   †   1 1 Š    1 € „ ˆ ˆ•“•     —“ ­ƒ• „‡‡    1    2 † ˆ —•     ˆ  “ „ ‡  ”1     ‹ €  1  €  ˆˆ‰ ˆ   ˆ  “ ‡ †    1 1 € 21  ˆˆŒ œ      ”•   „  1    2  ˆˆ Œ   ƒ’  ‡ „ 1  11 1 2  ˆˆˆ ž     Ÿƒ •    ‡  Ž   2  ˆˆ’ •“     ˆ—    ‡   1   €/  2  ˆˆ ’     ƒ’ ‡  † Ž1   1   2 „ ˆˆƒ       ˆ  “   † NO BIDDERS ˆˆ„   “  ‡  „  1   1 1 1  € 21  ˆˆ ­  –        ‡  „ 1 1 1 Š1  1  €21        M  O       M 111O                 

               1 ­21  ‚ƒ   2   ­ €        1   1 „1   1  ­  ‚ ‚   €„         ­11 2 „1  1 ­  ‚†    €„         „1    1  ­  ‚ †‡   €„        ‡21ˆ1    ­ 21  ‚‚ 2ˆ ˆ    ‰Š­         „1    1   2  ‚‰             POSTPONED ‚Š  ‹ ­ˆ  Š        ­‹ „1     1  Œ ‚Œ Ž  Š‹        ­     „   1  ­ 21  ‚Ž ‘    ’ Œ       ‹1 „1  ­/­ 21  ‚ ‹€   € ’‚         12   1  ­  ‰ƒ  ‹   €„        POSTPONED ‰   ˆ‹    €„        ­1 „1 12    ­  ‰† ­ ” ˆ   ‘ ˆ €‚        NO BIDDERS ‰ /‹    ‰Š­     Œ   1 „1 12  1  ­ 21  ‰‚ –‹   €„     Œ    „1  12  1  ­  ‰‰  ˆ     ˆ    Œ     1   1 „1  ­  ‰Š       ”ˆ        “ “1‹ /  1  ­ 21  ‰Œ ˜­ˆ   ‰Š­        1­„1     2  ‰Ž     ‰Š­   Œ     NO BIDDERS ‰ ™„ š    € ‹­          „  1  2 Œ Šƒ ™„ šš    € ‹­          „  1  2 Œ Š –  ­Š € Œ        “   1  12 ­  Š† – ˆ€  „          „1  1   2  Š ™ ‡          “  1  ­/2  Š‚ ˆ           1” „ ‡12  1  ­   Š‰ ˆ € 2  Š     Œ   ‡ “ „    1  ­  ŠŠ  ˆ    € ˆ‚   Œ    Œ   “  1 „1 ­/‹1  ­  ŠŒ †”    ‹2’         ­1 2 „1 1  1  ­  ŠŽ  ‚ ‰ 2 œ ‚ ” ž  „ €„        ‡2 „1  1  2  Š Š2ˆ   Š        ­1‹ “ „1 ­ 21  Œƒ ­/  €„         12   1   2  Œ Ÿ    Š‹         „1  2   1  ­ 21  Œ† ˆ  Š  Œ         „1   ­/‹1  2  Œ     €        1 „1    ­ 21  Œ‚ ™   ­¡        1   1   2  Œ‰  ‚ˆ š¢šš  ­ˆ        2     2  122  ŒŠ  Š ˆ”    Š‹ Œ Œ      ‹ 1 „1  ­ 21  ŒŒ – ˆ€   Š ”        ­ˆ ­/“ „1 1 ­  1  ­ Œ ŒŽ   ˆ¢   ˜          „1  1  ­ 21  Œ ‘   ­ˆ        2     2 122  Žƒ 0 ” ‚     ‹        NO BIDDERS Ž   ‹  ‘ ˆ €‚     Œ     „1 1  2  Ž†    †  Œ    Œ    ‡  „1 1  1  ­        M  O       M 112O                 

   2            1 1 ­  2  ‚     €‚ƒ     1 1  1  ƒ 21  „ / 2   ƒ€     1    1    ƒ   †/‡  ˆ   ‰ ƒ    † ‡ˆ† ‡11/1 1 1 2  Š ƒ € ˆ   €€ Š  ‹‹ 11 1 1 1‡  ƒ 2 1   2 Š   Œ    Ž€ ƒ‰ ‹  ‹‹  ‹ 1  1 1  1  ƒ  Œ 1ˆ€ € ˆ     € Š  ‹ 1 † 1  1  1  1   ŒŽ  €  ’  ‡†   ‹ ˆ2 1  2  Œ‹ ƒˆ€     ‚€   ‹ ‡1   1   2 Š Œ‘  € €  ’  ‡† ‹  ‹ ˆ2 1  2  Œ  ˆ ˆ    ‚€ Š‹  ‹  1    1   2 Š Œ‚ / ˆ    ‚€  Š Š‹ 1† 1 ’ 1 12  1  2 ‹ Œ„ ‰ ˆ   0    ‹ 1† 1 ’ 1 12  1  2  Œ † ‰ ‰    • ‰     1 12 1   2  ŒŠ  ˆ ƒ  –    Š       12  1  2  Œ  ƒ‰     ‚€ Š     1  ƒ 21  ŒŒ   €‡         ƒ 21  ‚ŽŽ     ‚€ ‹   ‡ /† ’ 12   1   2 ‹Š ‚Ž‹ €    ‚€ Š    1  1 1  2  ‚Ž‘  ‰     ‰   ‹ 1 1  2   1  ƒ  ‚Ž      ’  ‡† ‹  ‹ 1 1 12   1  ƒ ‹ ‚Ž‚   †    Žˆ2Œ Š     1  1  1    ƒ Š ‚Ž„ •      ‚€  Š  †  1 1 ƒ 21  ‚Ž ˆ ƒ‰     2 Š    2  1    1   2  ‚ŽŠ Œ  Ž€ ƒ‰     1   1  ƒ 21  ‚Ž  ‰    ˜    ­ 1 / ƒƒ 2 1  2  ‚ŽŒ  ™  Ž€ ƒ‰     1     1   2  ‚‹Ž € †Œ€ š  ƒ ˆ†‰   Š  ‹ 1 ’  121  2  ‚‹‹ € †Œ€ š  ƒ ˆ†‰   Š  ‹ 1 ’  121  2  ‚‹‘ †      ‚€     1  1 1 2  ‚‹ Ž     Žˆ2Œ ‹   ‡1   1   2  ‚‹‚ 2 ‰/    €‡      1 ’ ­1211   ‚‹„ ›Œ‰    €‡ ‹   ƒ1 2 1 1  1  ƒ Š ‚‹  œ ˆ    ˆ  ‹   1 † 1 1  2 Š ‚‹Š       Žˆ2Œ    ˆ 1 1 ­ 1  ƒ  ‚‹ Ž /    ‡™   Š   1 1 ƒ 21  ‚‹Œ žŒ €‚    ‰2 Š  Š 2 1  1  ƒ 21  ‚‘Ž € €        /­ 1  1   1  ƒ  ‚‘‹ /     ˜  Š  ƒ2 ˆ    1     2  ‚‘‘ ž†     ˜   ‹ ƒ2 ˆ    1     2  ‚‘ ‡ œ  € €ƒ   ‹ ƒ1 1   1   2 Š ‚‘‚ €™  Ÿ  €      1  1   2  ‚‘„ €™  ŸŸ  €      1  1   2  ‚‘ €™  ŸŸŸ  €   Š   1  1   2        M  O       M 113O                 

          12 €1 1 ƒ  „ 0           €1    ƒ 21              †1   1   2  ‡ˆ ­ €‚ 2  „ /    ‰ €1 11  2  ‡Š ‡ ˆ ‰          ‰ €1   2  ‡ ­ € Š  ‹    NO BIDDERS ‡‡  Ž     ‚     €1     ƒ/   1   2 ‘ ‡  Ž  ’     † €1      1  ƒ  ‡Ž  ˆ€  €€    NO BIDDERS ‡‘ “     ”      † €1      1  ƒ  ‡ ‚      ’  ‘‘     1 1  2  ‡„ ‹2•  ”    ‘  12  1  ƒ  / ‚     ‡ ‰„2   ‘ 1 €1 ƒ ‰’ 12  1   2  –˜ ™ ˆ €‹“šš  €Ž        1 1 2  Š   ­ˆŠ‹     2 ƒ/ ’ €   1  ƒ   ŠŽ      Š  ‚   ‘ 1  €1  ’ 1  1 ƒ 21  ‡ › € š“šš“šš     ­ˆŠ‹ ‘  ‘ ƒ €1  ’ 1  1 ƒ 21   €€     1  € ‘ ‘  1 €1   ƒ21  Ž /            12 1 1  2  ‘ ›/Ž           €1  1 1 2    € 2     Š  ‚    11 €1    1  ƒ  „ 2Ž      Š  ‚ ‘   1“‰ €1 ƒ 21   ­2 ˆ   Š    †  1   1   2   12 €1  ‰’ ’ƒ ƒ   Žˆ /     ‹  ‘   ƒ 2 1  ƒ ŽŠ ’   Ž ‡‹ •    ‘     1 1  2  Ž  ˆ 2 ‚    €€      €1  1   2  Ž‡ Ÿ          ‰ ‰ € 1  1  ƒ  Ž ‡ ‹‚  Žˆ      ‰‰ €1 1  1  2  ŽŽ „2        /1  1 €1  ƒ  Ž‘ 2       ƒ/   ’  €1 1’ ƒ 21  Ž ‹/ €          /1  1 €1  ƒ  Ž„ ›      ­ˆŠ‹     €1   2  Ž ‰  Ž     ”    NO BIDDERS ‘ˆ Ž2       Ž      1  1   ƒ  ‘Š 2      Š  ‚    †  €1  ƒ 21  ‘ 1    Š  ‚    11  1   2  ‘‡ ­   Ž  Ž ‡‹ • ’ ‘    €1    ƒ 21  ‘ ‰Ž        ƒ €1  ƒ 21  ‘Ž 1  €    1  €  ‘ ‘ ‰ € 12€ ƒ€ ƒ 1  ƒ  ‘‘ ‹/     ­ˆŠ‹      11 €1  ’ 1  1 ƒ 21  ‘  /  ‡   ‘ ‘ 1ƒ1’ €1  ƒ 21  ‘„   € šš  Š  ‚     †1  12    €1  ƒ/1   

      M  O       M 114O                 

             /   1  €  ‚ƒ        ­   †1 € 12   1  2  ‚ˆ € ‚    ƒ„/  ­  ­ ‰Š Š †1  12  1  € † ‚‹ €ˆ    ‹Œ„ˆ Ž ˆ †   €€ †1  1 1  2 † ‚Œ Œ„     ‚ ‘ † †  1     1   112   † ‚ €‘  € ‘     †1   2  ‚Ž ƒ    ‹  „    ‘ †1    1  €  ‚ ’ ‘ Ž“ŽŽ        Š  1  €/    1  €  ‚‚   „ “    ”„„•  †  ‰21 1  1 1 €  ‚’ €    – „ †  †   †1 1“  € 2 1  € 21  ‚ 1      ˜  ‘    † ‘€ †1    € 21  ’ƒ ‘ „    ˜  ‘     €2 ‘   1 2  ’ˆ ˜• ‚     ­   “ /Š ‰ 12   1   2  ’‹ €          2 †1   1  €  ’Œ ‹   ˜  ‘   ­  2 Š †1 ‰   €  ’    ”  †  ‘      1  2  ’Ž ƒ ˆ    ™ ”Œ     €11 2 € 21  ’ ‘   ‹Œ„ˆ     † ŠŠ †1 ‰    12  1   2 † ’‚ €ˆ   / ­ ­ †  †1   1  €  ’’    ‹Œ„ˆ  ­­  † Š ‰Š †1 €    1  €  ’  ”        †  ‰  †1    €/  1  €  ƒ 0•   ‹Œ„ˆ   †­ ­ † 1€ €      1  € ­ ˆ › ‘     ­ † † “ /Š ‰ 12   1   2  ‹ €‘       ­† 1  1  € 21  Œ    ™ ”Œ  ­ ­†  †1   2   ‹” ŽŽ    •   † ‘  12   1   2  Ž ‹” Ž    • ­  †  †1  2 †  ˜• ‘  ”„„•   †    †1   €/ 1  2  ‚ 0•    •   † ‰ †1 12 † €   1  €  ’ ’  ŽŽ  € ­  †  12   1  € 21   € Œ    € ‘  ­ †  †1 1 11 1  2  Žƒƒ ‹  Ž“Ž    ™ ”Œ   †† € †1  12 €/  1  €  Žƒˆ ’     ™ ”Œ  ­ ††    1   2  Žƒ‹ ‹‘ˆ    ‹  „   † NO BIDDERS ŽƒŒ     €   †  1 †1  €/  12 1  € 21  Žƒ €         † ŠŠ †1  1 1  2  ŽƒŽ € „ ˜•   ‘‘   †  †1  2  Žƒ •”      ” ­   2 €‰    1  1   2  Žƒ‚ €„     ‹  „  ­  ‰  †1      1  €  Žƒ’ €„”     ‹•2ž    ­ 11  12  1  € 21  Žƒ Ž2 ‘     ­  ­ ‰21  †1   1  € ­ Žˆƒ ‹     ‹  „ †   ŠŠ †1   1   2  Žˆˆ Ÿ 2    ‹  „     †1     2  Žˆ‹ 0 ˆ  ˜•   ”„„•     †1 ‰   1  €        M  O       M 115O                 

          1  1  €  ‚   ­    NO BIDDERS    €€ ‚ ­  ƒ  „  ƒƒ 1     1   2   † ‚ ­  ƒ‡  „     1 1  1  €  †    /      ‡1 1   1  2  ˆ Š €€  ƒ ‹ „ „   1   1  € 21  ‰ ŒŽ  ’  “   ” ‹Œ ƒ 1 1  2  Ž‘  ­ •’ ­  –Š „ ” ” Œ ƒ 1 €     1  €  Ž Œ‹Š ‚ ­  ‚   ” 1 1 1  1    1   2  ŽŽ  ‡ ‚ ­  ƒ‡  „ ” 1€ 1€ 1     1  € ” Ž     Š   ”” ƒŒ  1 1 2 ” Ž‚ –‚ ‚ ­  ’2†   ””    1 1 1Œ Œ 11   Ž Œ­ ‚ ­  ˜ –    ” 2 ‡1 1   1  €  Ž /  ‚ ­   „  ” ’ 1  € 21  Ž† 1† ‚ ­  –Š   ”   1 1  2  Žˆ š  ‚ ­  ˜ –  „  ” ƒƒ 1  1 1  2  Ž‰ ›–† ‚ ­  Œ   ”   1 12 ƒ  1  € 21  ‘ •‡ ‹  Œ 2   ”  1  2   •  ­   ” 1 1 12 1‡  € 2 1   2  Ž ‹ ƒ  œ ‚ ­  „ ”  1   11 1  € 21 ”   ƒ2    „   1 1 € 21 „ ‚ Œ‹  ˜ ƒ    1ƒ 1  ‹ 1  1 € 21   ŒƒŽ  ƒ ‹     1 1 € 21 „  Œ‹­   ’  ”  ƒ 1  ‹ 1  1 € ” † Œ–‹ €“ ‚ ­  ’2†    NO BIDDERS ˆ    ‚ ­  –’    POSTPONED ‰ Œ‡  Œ          ƒ ƒ 121  1 € ” ‚‘ ‹   ­†  „  Œ€   1  €  ‚  ƒ2  –’    2 Œ  1  € 21 „ ‚Ž  ‹      Œ’Œ € ‹ 1   1  €  ‚ – €€€  ƒ’   ” ‹ 1   1  €  ‚‚ ‹   ­†  „ ”   1 Œ  1   2  ‚ Ž– ‚ ­  ’‹     1    1  € „ ‚ Œ  ­/ Ÿ ‚ ­    ”   ‹1 1 1 12  1 €  ‚† / ­ ‚ ­      11 1 1  1  €  ‚ˆ –­ ‚ ­  ˜ –   ”  Œ’Œ € ‹ 1   1  €  ‚‰ ŒŽ  ‚ ­        1  1   2  ‘ •’ Ž ‚ ­  ˜ –     Œ€1  1 1 1 2   –¢¢ ‚ ­  ’2†     ‹ 1    1  €  Ž •’ ‚ ­  Œƒ’  „    1   1   2    Š ‚ ­  ƒ‡        1    1   2 „ ‚ –‚‡ ‚ ­  ƒ‡    Œ 1 12   1  €   ˜Ž ‚ ­  –’  ” ” POSTPONED  1† ‚­  ƒ    ” POSTPONED       M  O       M 116O                 

  /         POSTPONED  ­ €‚ƒ     „      POSTPONED  ­ €    ‡ ˆ‰     POSTPONED  ­    ƒ   ­  „ „  POSTPONED  € ƒ    ‰        1    1   2   Š  ƒ   ‹ „     †‡ ˆ1 1  2   ‰ ‚ ƒ    Ž‰    „   ˆ1   1  Š 21   ‹ Ž       ‡ ˆ‰   „ Œ 12  12 ˆ1 Š 1  Š 21      ‘„    ’     ††  † 2 12    ‡Ž      ‘    ’     ††  † 2 12    ‡Ž     ­     €2•    ‘1Š ˆ1    12   1  Š    –ƒ    ‰    ‡/‡ Š    1  2       ƒ   ­  „ „    1 1 Š 21  ­ ­ €    ‡ ˆ‰     † ˆ1  1   2  € Ž €     ’     C A N C E L E D  ‡      ‰ €   „   1  12 1 1  Š 21  ‰ —   ‰    —      † ˆ1 12   1  Š 21  ‹ ­ ˜ ‚    ‡ ˆ‰    †Š1  ˆ1 1 1 2   ‡’    €2•      ˆ1   1  Š 21    €2 ‚    ‰  „    ˆ1  ‡Ž / 12    1    ‹ ‘    ‰    ‘ ˆ    1  2   ­  ƒ ——    ‹€ƒ    POSTPONED  ­ ‘™ •  ƒ    •‘ ’  „„  POSTPONED ­ ƒ2     ’  „     1  Š    1  Š  € ­ /    0‰€       ˆ1 11 Š 21   ­˜ƒ‚    0‰€  „  11  1 1  2  ‰  ’‰    ›  „    Š11 12 1 1 1  Š  ­ ‚ /‘ ‚‚   ‹ ‚‚  „ „„   Š/  1  Š/  1  Š     •    ­€   „  1  †   1  Š 21   ­’ ‚             ˆ1  1   1  Š    ‚ /     ’     Ž ˆ1   1  Š 21   ƒ‚ˆƒ     ’     Ž  ˆ1  Š 21   ˜          Š2 ‘    1     2  ­ ‡ /ˆ    1 ‚    ‡ † ˆ1  Ž Š/  1  Š  €        „   ”1   1   2   Ž/          1 † 11Š 21 1  ‰ Ÿ      ’     ‡  ˆ1 1 Š 21  /‡ ˆ1   Š/   12   ‹  •            „   1  †Š/Š‡   12  Š/ Ž  ­       ’      1  Š 21  –    › „ „     ˆ1 1 2   ¢ £ ’¤     ’   „  ŒŒ

      M  O       M 117O                 

             1 1 ­ 21             ­ ‚  ­ 1     1  ­  ƒ„„         €­ ­  †1  1 1 ­   ƒ„‡ ‚ ƒ„ ‚†   ‡ ‚ˆ   † ƒ ‰Š   ­ 21 ‚ †1 ˆˆ 2 € ƒ„‰ 1 †  Š  ‰  € ­ ‚  †1  ­     1  ­  ƒ„Š ‡ ˆ‚ /‚     ‰   ­­   †1 1 2 € ƒ„‹ ‚Ž      ‰ ­ €€ ­­  †1   1  2  ƒ„ ‘  Ž ”       ­  †1  1 ­   1  2 ­ ƒ„ƒ  Ž      ‰Š ­  ­ 11  12  1  ­ 21  ƒ„Œ • 2‚  ‰  ­   ˆ †1   1  ­ 21  ƒ„ Ž   ‘ ”     NO BIDDERS ƒ„ 0Ž  Š    1ˆ †1     1  ­  ƒ‡„  2       ‰Š      12     ­  ƒ‡‡ ˜ ”      ‰    € NO BIDDERS ƒ‡‰   ”  ”   € ­1 2 †1 1  1  ­  ƒ‡Š ‡   ”‚ ‚Ž    Ž1­ †1    12   1  ­  ƒ‡‹ ‡ ”     › ‚ ­   ‚‚ˆ  1 1 ­ 21 ­ ƒ‡       œ 2  €  ˆˆ †1 1  1  ­ 21  ƒ‡ƒ     €   ­   ‚2 †1   ­  1  ­  ƒ‡Œ ”     ”     ‚Ž‚ ­ †1   1  ­  ƒ‡       œ‚/ ­   ‚ˆ ˆ †1  12  1  ­  ƒ‡  /     ‡Ž2†     ˆ2   ‚    1  ­ 21  ƒ‰„ /  ‰   ”‚ ‚Ž      11  1 1 2 € ƒ‰‡ Ž       ”‚ ‚Ž        1 1 2  ƒ‰‰ ‘‚   ”‚ ‚Ž € €     1 1 2   Ž †Ž‚‰‚ žƒžž    ƒ‰Š    ­  1 †1  1 1 ­   ƒ‰‹  /‚  ” ‰  /   ­€ 11    2  ƒ‰ /      Š ­  ­€ ˆˆ‘‚   12  1    ­  ƒ‰ƒ ‡  Š  ‰‚2   ”     € ‚ˆ  †1      1  ­  ƒ‰Œ •   Ž   1   € € €  ˆ †1    1  2  ƒ‰ ”    €  € ˆˆ †1  12 ­ 21 €€ ƒ‰ /      Š ­  ­€ ˆˆ‘‚   12  1    ­  ƒŠ„ Ÿ Ž‚‚  Ž   œ   €€ ­­   1 1 12 ˆ 1  ­  ƒŠ‡    Ž    ‰       1 ˆ †1 1 ­ 21 € ƒŠ‰ ¡ ‰      ‰Š    NO BIDDERS ƒŠŠ ž      1   € €  121  12  ­   1  ­  ƒŠ‹  ˆ   Ž   œ  € €       12 ­  1  ­  ƒŠ ˜   Ž   œ‚/      ‚ †1 ‚     1  ­  ƒŠƒ  /   Ž    ‰Š ­   ­  1 1 2  ƒŠŒ 2     Š €     †1    12  2 €­ ƒŠ     Š  ‡ ‚   ­    †   1  2 

      M  O       M 118O                  

The Prime Ministry’s Mass housing Administration-Emlak Konut Gayri Menkul Yatırım Ortaklı/ı has awarded various contracts for 16 projects in 2013 after tender invitations. DETAY has followed up these tenders and reported their results in various issues before:

                                    2   2   0                     ­  12121  2  ‚ƒ‚ƒ ‚‚„ €   ‡       2112    1 ƒ‚ ˆ ‰ „         21  12  ‚ƒ‚ƒ Š‚‹‚ŠŒ„Š 0        ­ € 1    2 1   0   2 2‰  ‡ ƒ‚ ˆ 12 1  2  ‚‚ƒ ‹ƒ‚‚„ ’Œ„ ‚‚„ ‘  ‰  ‘ ­   121    2  0   2‰     ˆ    12 1    Š‚“‚ƒ ‚Œ‚„ 0        ­ €  2  0   2‰ ” ˆ ‚  11/   12  ‹‚Š‚ƒ ““‚“‚„ ’ƒŠ„ ‚ƒ‚„ Š‚ˆ ‘  ‰  ‘ ­    2 12    2 0  •‚– ­ 2   ‚ ˆ 212  1  2  ‹‚Š‚ƒ ƒ“‚‚„ ’ƒ„ “‚Š‚„ ‘  ‰  ‘ ­   0  2      ‚ ˆ ‚        0       121  2  Œ‚Š‚ƒ ‹‚“‚„    ­ € 0  2      ‚ ˆ ‚        0      12121  2  ‚Š‚ƒ “‚“‚„    ­ € 0  2      ‚ ˆ ƒ‚  ™    „  ‰ „ ­   121     ‚Š‚ƒ ‹‚“‚„ ‰  „  ˆ  ‚  š „ 21  0        ­ € 0  ‘    ­   ‘  ‰   12  1   ƒ‚‹‚ƒ “ƒ‚‚„ ’Œ„ Œ‚‚„ ‘ ­   21  0    2      ‚ ˆ ‚        0     121    2  ‚‹‚ƒ ‹ƒ‚“‚„    ­ €      ‚     21    0   ‰   ‘  ‰   12 1    ‚Œ‚ƒ ƒ‚ŠŒ‚„ ’ƒ“„ “‚ŠŒ‚‹„ ‘ ­    1   1  2      1  21  0    2      ‚ ˆ 12     ‚     ­ 0     ‚Œ‚ƒ ‹‚“‚„ 1 1 1    2     ­ € 0    2      ‚ ˆ  12  1   ƒ‚  ‰ „  ‰     ‚‚ƒ Œƒ‚“‚“„ 21  0        ­ € 0    2      ‚ ˆ     1  2  ‚     ­ 0     ‚‚ƒ Œ‚Š‚„  12   1  21     ­ € 0   2 2‰   2 ‚ ˆ 121  2    ‚‚ƒ Œ‚‚„ ’Œ„ “‚“‚„ ‘  ‰  ‘ ­   12    1  21 

        M  O    M 119O 2S        

                 1  0        ­  € €   ‚ƒ„ †      12 11 21 1 ‹ Œ Ž ‘’ 0   † † ‡ ˆ‰Š 212  1  “     Š  †   ‡ ”‰ † 0   † † ‡ ˆ‰Š   Ž ‘’ 2 1 0  • ŠŠ  †  – Š   ‘Š† / ˜‰™  “‹  €‰ €‰‡ „‰šŽ Š †›  Ž €‰ Ž ‡‰ € Ž ™   Ž   ­ €‚     ‰ ‰ † ‡‰ ‰ ‰ ‰    ™ 0   †     † ‡ ˆ‰Š  Š œ 0  –‰   ƒ Š  ‡‰™ Œ  €‰ † ‰    ‰™ › €‰‡ „‰šŽ Š †›  Ž €‰ Ž ‡‰ € Ž ™   ­ €‚       Ž ‰ ‰ † ‡‰ ‰ ‰ ‰    ™     0   † † ‡ ˆ‰ŠŽ  Š  • ŠŠ  ˜‰™  ‹Ž  €‰ † ‰    ‰™ › €‰‡ „‰šŽ Š †›  Ž €‰ Ž ‡‰ € Ž ™   ­ €‚ Œ      Ž ‰ ‰ † ‡‰ ‰ ‰ ‰    ™ ”     0   † † ‡ ˆ‰ŠŽ  Ž œŽ œ  Ž – € ­ ­  2Ž „/ Ž  ‰™ ˜‰™  ƒ12     † ““      Ž ‘’ ‰› †‡‰ †   ›  1 2 1  œ  0  ‘ ™    † ƒ  €‰‡    † ‡12 1 1        ‹ Ž ‘’ † ‡ ˆ‰Š 1 2 1 1  0  Ÿ 2€  ““ Ž €‰ † ‰    112  †  ‰™ › €‰‡ „‰šŽ Š †›  Ž €‰ Ž ‡‰ € Ž ™ ‹Œ     1 2 1  “‹ Ž ‘’   Ž ‰ ‰ † ‡‰ ‰ ‰ ‰    ™ ” ‰‡12  0   † † ‡ ˆ‰ŠŽ ƒ ‰‡ 0    Š   † ˆ ƒ  €‰‡ ‰  †  2   ‹ Œ     Ž ‘’ 0   † † ‡ ˆ‰Š 1  2 † 0  –‰œ   †   ‡ ”‰ ‰  † 0   /  1112  “Œ Œ    ŒŒ Ž ‘’ † † ‡ ˆ‰Š  1 2 † 0  ƒ  ­   †   ‡ ”‰ Ž ƒ‰    /  1112  “‹Œ ‹    “ Ž ‘’ ‰  † 0   † † ‡ ˆ‰Š  1 2  „(£  ‰ ‰ ˆ‰Š ­ › † †‰™ † €  112 1†1 1  “Œ    ‹ ŒŽ ‘’ ‡ ‰   1 2 1 12 1 Œ    „ 0   ­   † ƒ  €‰‡ ¤‰ ‰ ˆ‰Š Œ  Ž ‘’   1 2 1 ‡12 1 1  ‰ ‹‹    ”    ‡ ‰  ‡ ƒ †­ ¤‰ ‰ ˆ‰Š ‹  Ž ‘’ ƒ12  2 1 ƒ ­ 0  ‘­   † ”‰‡ ‰  † 0   † /  1112  “      Ž ‘’ † ‡ ˆ‰Š  1 2  Š  0  •Š   †  ­  œ   ™  ‰/ ¤ ­‡ ‡121 1   1 “       ‰ ‰ † Ž €   † › ‡‰      ‹ Œ Ž ‘’  2 1 0   † † ‡ ˆ‰Š 1  0  „Šœ  „ 2Š  ›  ƒ ›  ”‰Ž       12 1‡ 2 12 ‹‹ ‹ Ž ‘’ ­‰š Ž    0   † † ‡ ˆ‰Š   1 1  0  „Šœ  „ 2Š ›‰  ƒ › “ ”‰ †   1 †/12 1     “ ‹ Ž ‘’  ‰  † 0   † † ‡ ˆ‰Š  ‰ †2 12  1 2 1 –‰  0  2€   † ƒ  €‰‡ ‰  † ‹    € ‹  €    † † ‡ ˆ‰Š – € 0  ­  “ † ƒ  €‰‡ ‰  † 0    12   1  Œ‹“      Ž ‘’ † † ‡ ˆ‰Š 2 1  12  12‰†      –‰   0  §œ   † ƒ  €‰‡ ¤‰ ‰ ˆ‰Š “ Œ Ž ‘’ 12  1   –‰  0    Š   † ƒ  €‰‡ Ž 0   † 112           ‹ Ž ‘’ † ‡ ˆ‰Š 1  2 1

      M  O       M 120O                   0 0       ­  € € 0€‚ ƒ ƒ     1 12   2 1 †‡ ˆ ‰ Š‹ 2S         €  € ­ „   €  0   /     ‡      € € 0€‚ ƒ ƒ     1  1 2 1  †‡ ‰ Š‹ €  € ­ „     € ƒ   ‘ ’  €‰ ƒƒ     ­  “ 211212 ˆ ‡     € ”•– € —  “ € € 0€‚ ƒ ƒ € 1 2 112   †  ‰ Š‹       € ­ „    1 2 1            0 •    ’ “ •  †    ­  212 1  1       ‡ ‡     ‰ Š‹ 1  0        ­  € €   ‚ƒ„ † ˜ €ƒ  € „   12      12 11 21 1 ‹ Œ Ž ‘’ “ 0 € €   1  •  †‡  ƒ‰    12   0   † † ‡ ˆ‰Š  †    † ‰ Š‹ 212  1  • šƒ‰ ƒ‚‚‰ 00€‚ ƒ ƒ €  € ­ „   12 “     Š  †   ‡ ”‰ † 0   † † ‡ ˆ‰Š   Ž ‘’ €“ 0 ›     €„   ­  € € 2 1  †    1 112  ˆ ‰ Š‹ 0  • ŠŠ  †  – Š   ‘Š† / ˜‰™  “‹  €‰ 0€‚ ƒ ƒ €  € ­ „   €‰‡ „‰šŽ Š †›  Ž €‰ Ž ‡‰ € Ž ™   Ž   ­ €‚ 0 €ƒ 0 Šƒ       ­  € € 0€‚ ƒ ƒ     ˆ †   12   1 2 1 ‡  ‰ Š‹ ‰ ‰ † ‡‰ ‰ ‰ ‰    ™ 0   †     €  € ­ „   † ‡ ˆ‰Š  ƒ€ 0 œ ­   †    ­   ƒ€ €    †‡    12   1  2 1  ˆ ‰ Š‹  Š œ 0  –‰   ƒ Š  ‡‰™ Œ  €‰ † ‰ € € € 0€‚ ƒ ƒ €  € ­ „      ‰™ › €‰‡ „‰šŽ Š †›  Ž €‰ Ž ‡‰ € Ž ™   ­ €‚ 112       ƒƒ 0 ƒ   †    ­  0 0€‚ ƒ ƒ €   Ž ‰ ‰ † ‡‰ ‰ ‰ ‰    ™     ‡    1 2 1 12    ‡ ‰ Š‹  € ­ „   ˜ €ƒ  € „   0   † † ‡ ˆ‰ŠŽ   1 2 1  Š  • ŠŠ  ˜‰™  ‹Ž  €‰ † ‰ €¡‰   /‰ € €‰ “  ‰ •  “ ‰ •ƒ2‰ Šƒ€  — ‘€  †ˆ    ‰™ › €‰‡ „‰šŽ Š †›  Ž €‰ Ž ‡‰ € Ž ™   ­ €‚  ‰  ƒ €    ‚  ‘€¡ ­  • šƒ‰ Œ    ˆ     ­€‚ƒ„‚ † ­„ ‡ˆ    Ž ‰ ‰ † ‡‰ ‰ ‰ ‰    ™ ”     €¡ €‰ ‰ ­  ‰ ‘  ‚ ‰ €ƒ  € € ­  0   † † ‡ ˆ‰ŠŽ €ƒ  € €ƒ € “ ‘  0€‚ ƒ ƒ €  € ­ „    Ž œŽ œ  Ž – € ­ ­  2Ž „/ Ž  ‰™ ˜‰™  ƒ12     †  € ‰  “  €‰   €‰ £  €­‰  ‘ 1 € ƒ‚ — ‘€  † ““      Ž ‘’ ‰› †‡‰ †   ›  1 2 1  ‰ ƒ €    ‚  ‘€¡ ­  • šƒ‰ €¡ €‰ ˆ     ­€‚ƒ„‚ † ­„ ‡ˆ   œ  0  ‘ ™    † ƒ  €‰‡    † ‡12 1 1   ‰ ­  ‰ ‘  ‚ ‰ €ƒ  € € ­  €ƒ  €      ‹ Ž ‘’ † ‡ ˆ‰Š 1 2 1 €ƒ € “ ‘  0€‚ ƒ ƒ €  € ­ „   1  0  Ÿ 2€  ““ Ž €‰ † ‰    œ € 0 • / •/ ‘  ƒ€¡‰ € € 0€‚ ƒ ƒ 12   112  †  ˆ    ‡ ˆ† ‰ Š‹ ‰™ › €‰‡ „‰šŽ Š †›  Ž €‰ Ž ‡‰ € Ž ™ €  € ­ „     12  ‹Œ     1 2 1  “‹ Ž ‘’   Ž ‰ ‰ † ‡‰ ‰ ‰ ‰    ™ ” 112  ‰‡12       €  “     ­  ˜ €ƒ  € „    ˆ ‰ Š‹ 0   † † ‡ ˆ‰ŠŽ   1  ƒ ‰‡ 0    Š   † ˆ ƒ  €‰‡ ‰  †  2   € “ 0 ­       ­  € € 0€‚ ƒ ƒ 2 1   ‹ Œ     Ž ‘’ †    ‡ † ‰ Š‹ 0   † † ‡ ˆ‰Š 1  2 €  € ­ „   12  1  12 † 0  –‰œ   †   ‡ ”‰ ‰  † 0   /  1112  1 € ƒ‚ 0 œ €2    ““­€  ‰ •(  “Œ Œ    ŒŒ Ž ‘’ †ˆ    1 1 ˆ †‰ Š‹ † † ‡ ˆ‰Š  1 2 €  ¡  ¡  ¡  €  ƒ‘“ ­  ­­   € † 0  ƒ  ­   †   ‡ ”‰ Ž ƒ‰    /  1112   ¡  0   €‘ Š ­   • ‚  ¦ €  € € “‹Œ ‹    “ Ž ‘’     12   1 2 1 †‡ ‡ ‰ Š‹ ‰  † 0   † † ‡ ˆ‰Š  1 2 0€‚ ƒ ƒ €  € ­ „    „(£  ‰ ‰ ˆ‰Š ­ › † †‰™ † €  112 1†1 1    12  1  “Œ    ‹ ŒŽ ‘’     §ƒ 0         ­  ˜ €ƒ  € „   † ‡† †‡‰ Š‹ ‡ ‰   1 2 1  1 122 12 1   12  1 Œ    „ 0   ­   † ƒ  €‰‡ ¤‰ ‰ ˆ‰Š Œ  Ž ‘’ €  0 •        ­  € € 0€‚ ƒ ƒ   1 2 1 ‡     2 1 1  † ‡ ‡‡‰ Š‹ €  € ­ „   ‡12 1 1  ‰ 12 12 ‹‹    ”    ‡ ‰  ‡ ƒ †­ ¤‰ ‰ ˆ‰Š ‹  Ž ‘’ ƒ12  2 1  “  €‰ “  ‰   /‰ ƒƒ‰ •ƒ2‰ ‘  — ‘€    Š1Š1 ˆ‡ †     ‰ Š‹ ƒ ­ 0  ‘­   † ”‰‡ ‰  † 0   † /  1112   ¡  ­  € ƒ€¡ € „    1 2 1 “      Ž ‘’ † ‡ ˆ‰Š  1 2  € ‰ ‚“ €‰ €‰   €ƒ‰  ƒ€‰ Š  / — ‘€      12   1  ˆ‡ †   ˆ ˆ† ‰ Š‹  Š  0  •Š   †  ­  œ   ™  ‰/ ¤ ­‡  ¡  ­  € ƒ€¡ € „   2 1 ‡121 1   1 “       ‰ ‰ † Ž €   † › ‡‰      ‹ Œ Ž ‘’   € 0 ’  € “‚   € 2  €       121112   2 1 †    †  ‰ Š‹ 0   † † ‡ ˆ‰Š § / § ƒƒ € € 0€‚ ƒ ƒ €  € ­ „   1 2 1 1  0  „Šœ  „ 2Š  ›  ƒ ›  ”‰Ž   € ­ 0 ƒ / €   †    ­  € € 0€‚ ƒ ƒ  2      12 1‡ 2 12 ‹‹ ‹ Ž ‘’ ‡†     ˆˆ ‰ Š‹ ­‰š Ž    0   † † ‡ ˆ‰Š €  € ­ „   1  2   1 €“ 0 ¡        ­  € € 0€‚ ƒ ƒ 1  0  „Šœ  „ 2Š ›‰  ƒ › “ ”‰ †   1 †/12 1 †    ‚ ‹ ƒ ­‚   ‰ Š‹     “ ‹ Ž ‘’ €  € ­ „    ‰  † 0   † † ‡ ˆ‰Š  ‰ †2  “  ƒ †  ’  € 0 0€‚ ƒ ƒ €  € ­ „   ‡‡     12 2  † ‰ Š‹ 12  1 2 1 ˜ ­ ˜ €ƒ  € „   –‰  0  2€   † ƒ  €‰‡ ‰  † ‹    € ‹  € €  £ 2 0€    ¡ ††   ƒ €    ‚     † † ‡ ˆ‰Š ‘€¡ ­  • šƒ‰ €¡ €‰ ‰ ­  ‰ ‘  – € 0  ­  “ † ƒ  €‰‡ ‰  † 0    12   1  ‡    ‚ ‹ ƒ ­‚ ˆ † ‰ Š‹ Œ‹“      Ž ‘’ ‚ ‰ €ƒ  € € ­  €ƒ  € €ƒ € “ ‘  † † ‡ ˆ‰Š 2 1 0€‚ ƒ ƒ €  € ­ „    12  12‰†  •€ 0 £€        ­  0 0€‚ ƒ ƒ €     –‰   0  §œ   † ƒ  €‰‡ ¤‰ ‰ ˆ‰Š “ Œ Ž ‘’     ‚ ‹ ƒ ­‚ ˆ ˆ ‰ Š‹ 12  1    € ­ „   –‰  0    Š   † ƒ  €‰‡ Ž 0   † 112      “ € ­ƒƒ   €¡  ’ ­  € € 0€‚ ƒ ƒ €      ‹ Ž ‘’ ˆ    1 12  †  ‰ Š‹ † ‡ ˆ‰Š 1  2 1  € ­ „  

            M  O M  O       M 121O                    0    0     /      ­€‚  ƒ          ‡‡  „       †      ‰    ‰ ˆ  ‹  € Œ       ‡  Ž      ‡  12 1  ˆ  €ˆ”ˆ •‘  ‘’ 0†       “ ‰ 1 2 1  / 0  –    ‡—  Ž    0†      ‚ƒ 11  12 ”  ‚€”‚ •‘   “ ‰ ˜     “ ‰ 1 2 1 • ‰ 0  ™           0†     12  1 2 1† ˆ­‚  ­‚ •‘   “ ‰ ƒ ‡12 1 2 1 Ž š  0  Œ „›   ”ˆ ‡—  Ž      0†    ˆ”‚  ˆ12  1 2 1  •‘    “ ‰ ’ — ‰  š  ‡—  Œ  0†       “ ‰  ‰    ‚ ”€  ˆ •‘ ˜ š ˜     “ ‰ 12  1 2 1 – 0    ’    Œ      •     š œ ‡ 1 12  1    €‚­‚ •‘    0†       “ ‰ 2 1  0  Ž /   ”‚        0†     ­ˆ”       € •‘   “ ‰ ’ — ‰  0  Œ ›    ‡—  Ž      ˆ‚       ˆ •‘ 0†       “ ‰ ‰  ˜  š  •   ’ Ž „ —  ‹  0†    ­ˆ­   / ˆ ­”ˆ •‘    “ ‰ ˜ š ˜     “ ‰  ›  „  ‡           0†     ˆ‹12      €  ˆˆ •‘   “ ‰ 1 2 1 – 0  ƒ 2 š—         €         ƒ  ‡ 2112  ˆ ­ˆ  ””      œ   †† 0†       ‚ˆ •‘ 1 2 1 “ ‰ ¡/  0   ‰ ›            ‡  Ž / ‰ ‘’ 12 ƒ     ­‚ˆˆ  ­ •‘    0†       “ ‰  1 2 1†‚ ƒ  ›‹ ‰ /š   ˆ ‡—  Œ     0†     ­ˆ ­ 1 ‹ 12  1 2 1 ‚ •‘   “ ‰ • —›  ƒ    Ž ‹        •     œ   ‡ˆ12  1 ˆ  ­ ­ ”€ •‘  0†       “ ‰  2 1 ‰  0   š ‰    Ž ‹        ‰ 0†    ­ ­      ­­ˆ •‘    “ ‰ 0 — 0   2 ‰2     ’ — 2 ‚  ‹  Ž ‹ ”ˆ    ­‚ ‚      €€ •‘   š œ 0 0†       “ ‰ ˜     “ ‰ 0 — 0   2 ‰2     ’ — 2 ‚  ‹   Ž ‹ €  ­‚‚ ‚      ­­ •‘    0 0†       “ ‰ ˜     “ ‰  0   2    2 / › † ’       ‡  0   2  12   ƒ ƒ1ƒ €” ‚ „   ‘’       ¢ ‰   ¢ ‰   ƒ1ˆ1  1ˆƒ 1ˆƒ €”­ •‘ 0†       “ ‰   1 2 1   0   /    2 ’ ‰       ‡  0   ˆ12  1  €” ” „   ‘’   ¢ ‰      ¢ ‰   š     ””” •‘ 2 1  0†       “ ‰   0   š    ˆˆ         †† 0†     ­­ ”      ”ˆ •‘   “ ‰ ˜     “ ‰  ’ 0  Œ’‰   ˆ     „    †† ˜           ­€”­ •‘ 0†       “ ‰  › / 0       ˆ ‡—  Ž      0†    ‚       €­ •‘    “ ‰  0 —  ’ — 2  Ž ‹  „       †    ’ Ž     ‘  ‡‡  ‚12 1 2 1 0 —  ’ — 2 ­  ‹  ­       •     € ­ † 12   1  ­ •‘ 0†       “ ‰ ˜     “ ‰ 2 1 š ’ 0  Œ š š›   ˆ ‡—  Ž      ‰2† 2‚‚ ” ­ ­ •‘ 0†       “ ‰ 12   1   ›   ‡    ¤‚ Ž    ¥ Œ   „ Ž  ‚   12 ˆ €­ ­ €‚ •‘ †        0†       “ ‰ 1 2 1   š   / ‰ 2 ¦  —  • † š   „  ƒ§  Ž ‹ ˆ        †     „ ‹    œ  ” ­      ­ˆ •‘ ‰ ‹            „ †                  ’  „  0†       “ ‰  › / 0    ‰    ˆ ‡—  Ž       12 ƒ   2 ˆ­” €­  •‘ 0†       “ ‰ ƒ 1 2 1       M  O       M 122O                                     0    0     /      ­€‚  ƒ           0       ­€ €  /12   1  ‡‡       † ‡ˆ  „       †      0‚     ƒ€„ 1  1 2 1 ‰    ‰ ˆ  ‹  € Œ       ‡  Ž      ‡  12 1  Š 0 ‹/     Ž€ †   ‡     2112   ˆ  €ˆ”ˆ •‘ ‰     ‰ † ‡ˆ  ‘’ 0†       “ ‰ 1 2 1 0‚     ƒ€„ ‘€€ ƒ€„ 1 2 1  / 0  –    ‡—  Ž    0†      ‚ƒ 11  12   0     ’ “ Ž€  0‚   12  1  ”  ‚€”‚ •‘  ‰    ‰ † ‡ˆ   “ ‰ ˜     “ ‰ 1 2 1    ƒ€„ ‘€  ‘€€ ƒ€„ 2 • ‰ 0  ™           0†     12  1 2 1† 112    1 ˆ­‚  ­‚ •‘ ‹„  0 ”2  ‰ ’ “ Ž€  €  0‚   “ ‰ ƒ ‡12 1 2 1  ‰ ‰    2 112     † ‡ˆ Ž š  0  Œ „›   ”ˆ ‡—  Ž      0†        ƒ€„ ˆ”‚  ˆ12  1 2 1  •‘ 1 2 1    “ ‰ ” 2Ž 0 ‹ „ /   ’ “ Ž€  0‚  112    1 ’ — ‰  š  ‡—  Œ  0†       “ ‰  ‰    ‚ ‰ ‰     † ‡ˆ ”€  ˆ •‘    ƒ€„  2 1 ˜ š ˜     “ ‰ 12  1 2 1 —˜2Ž 0 š   “š ‰  Ž€ €  – 0    ’    Œ      •     š œ ‡ 1 12  1        ­   † ‡ˆ   €‚­‚ •‘ 0‚     ƒ€„    0†       “ ‰ 2 1 —˜2Ž 0 š   “š ‰  Ž€ †   €œ    0  Ž /   ”‚        0†         €12 2 ‰  ‰ † ‡ˆ ­ˆ”       € •‘  ‘€  0‚     ƒ€„   “ ‰ 112   2 1 ’ — ‰  0  Œ ›    ‡—  Ž      ˆ‚       ˆ •‘    0’ ­€2   “š ˜ Ž   ‚€ € /  1     † ‡ˆ 0†       “ ‰ 2 1 ‰  ˜  š  •   ’ Ž „ —  ‹  0†    ­ˆ­   / ˆ ­”ˆ •‘ ”Ž  0 ‡˜2  ‰    ­€  “€ ‚ 12  1     “ ‰ ˜ š ˜     “ ‰ ‰    ‰ † ‡ˆ 0 0‚     ƒ€„ ‘€  ‘€€ ƒ€„ 2 1  ›  „  ‡           0†     ˆ‹12      €  ˆˆ •‘  0 ­„ ‚  ­€ ž     š   “ ‰ 1 2 1 ‰      ­  ‰  † ‡ˆ ‘€€ ƒ€„ – 0  ƒ 2 š—         €         ƒ  ‡ 2112  ˆ ­ˆ  ””      œ   †† 0†       ‚ˆ •‘ ­„„ 0 Ÿ„Š  ”  ŸŽ     ‡  ˆ  1 2 1       ­  ‰ † ‡ˆ “ ‰ €  0‚     ƒ€„ ¡/  0   ‰ ›            ‡  Ž / ‰ ‘’ 12 ƒ     ¡ 0  2     “˜ ’ š†  ‰    ­‚ˆˆ  ­ •‘      €12 2   † ‡ˆ    0†       “ ‰  1 2 1†‚ ƒ Ÿ€œ €  0‚     ƒ€„  ›‹ ‰ /š   ˆ ‡—  Œ     0†     ˜ 0 1˜2  „ Ÿ˜„    € ‡ŽR ˆ † ­ˆ ­ 1 ‹ 12  1 2 1 ‚ •‘       ­   † ‡ˆ   “ ‰     ­€ €  0‚     ƒ€„ • —›  ƒ    Ž ‹        •     œ   ‡ˆ12  1 ˆ     0’ ­€2   “š ˜ Ž   ‚€ € ƒ„ †‡ ˆ‰­ˆ„ †  ­ ­ ”€ •‘  0†       “ ‰  2 1 š† Š /† Š†  ’„ † Ÿ † Ÿ2 ˜ ‡ ž€˜ ‰  0   š ‰    Ž ‹        ‰ 0†    ‰  †  Ž€  € ‚ €˜š Ž€  Ÿ€œ† ­ ­      ­­ˆ •‘      ŠŠ­ „ †  ‰     “ ‰ „ š† Ž€†  € Ž† ˜ ‚† €€  € 0 — 0   2 ‰2     ’ — 2 ‚  ‹  Ž ‹ ”ˆ    €€ € ˜ 0‚     ƒ€„ ­‚ ‚      €€ •‘   š œ 0 0†       “ ‰ ˜     “ ‰ š 0  „  Ÿ„Š ŸŽ      € ˆ   12    1  ‰      † ‡ˆ 0 — 0   2 ‰2     ’ — 2 ‚  ‹   Ž ‹ €      ­€ ‘€  0 0‚     ƒ€„ 1 1  2 1 ­‚‚ ‚      ­­ •‘    0 0†       “ ‰ ˜     “ ‰  †  † † ¥Š † ”  1 ‚ ž€˜ ‰  0   2    2 / › † ’       ‡  0   2  12   ƒ ƒ1ƒ † Ž€  € ‚ €˜š Ž€  Ÿ€œ† „ š†      ŠŠ­ „ †  ‰  €” ‚ „   ‘’       ¢ ‰   ¢ ‰   ƒ1ˆ1  1ˆƒ 1ˆƒ €”­ •‘ Ž€†  € Ž† ˜ ‚† €€  € €€ 0†       “ ‰   1 2 1 € ˜ 0‚     ƒ€„   0   /    2 ’ ‰       ‡  0   ˆ12  1  ”€  0 ”   ¦‚ ŸŽ      € €” ” „   ‘’   ¢ ‰      ¢ ‰   š     ””” •‘ 2 1     ‡ŽR ˆ †     ­€  “ € Ž ‘€    ­   † ‡ˆ  0†       “ ‰ 0‚     ƒ€„   0   š    ˆˆ         †† 0†      Ÿ„Š  š€ ‰  Ž€ †   ‡   €œ ­­ ”      ”ˆ •‘      12   1 2 1   † ‡ˆ   “ ‰ ˜     “ ‰ ‘€  0‚     ƒ€„  ’ 0  Œ’‰   ˆ     „    †† ˜    §  0 Ÿ„Š  Ž     ŽŽ ˆ  €  / 12          ­€”­ •‘       ‰ † ‡ˆ 0†       “ ‰  0‚     ƒ€„  1 2 1  › / 0       ˆ ‡—  Ž      0†    ‚       €­ •‘  Ÿ„Š  š€  ‰  Ž€ 0‚     2 112       “ ‰       † ‡ˆ ƒ€„ 1 2 1  0 —  ’ — 2  Ž ‹  „       †    ’ Ž     ‘  ‡‡  Ÿ„Š  š€ ‰  Ž€†     “Ž€€  ‚12 1 2 1 ‰    12   1 2 1   † ‡ˆ 0 —  ’ — 2 ­  ‹  ­       •     0‚     ƒ€„ € ­ † 12   1  ­ •‘ 0†       “ ‰ ˜     “ ‰ ”€  0 ‡2„    Ž€   ‚‚ ‘€  2 1 ‰      ­   † ‡ˆ š ’ 0  Œ š š›   ˆ ‡—  Ž      ‰2† 2‚‚ 0‚     ƒ€„ ” ­ ­ •‘ Ÿ  0 žš  ­ Ÿ˜„    “   ­€  12   € 0†       “ ‰ 12   1         † ‡ˆ  ›   ‡    ¤‚ Ž    ¥ Œ   „ Ž  ‚   12 ˆ €  0‚     ƒ€„  1 2 1 €­ ­ €‚ •‘ ‹12  1 2 1 †        0†       “ ‰ 1 2 1 ¡ 0 2   ’ “ Ž€  ‘€  €  €    ‰     12     † ‡ˆ   š   / ‰ 2 ¦  —  • † š   „  ƒ§  Ž ‹ ’ “ Ž€  €  0‚     ƒ€„ ˆ        †     „ ‹    œ   1 2 1 ” ­      ­ˆ •‘  12  12 ‰ ‹            „ †               š “ Ÿš   R “˜ ‚       ’  „  0†       “ ‰  ‰     1 / €€   † ‡ˆ  0‚     ƒ€„  › / 0    ‰    ˆ ‡—  Ž       12 ƒ   2  1 ˆ­” €­  •‘ 0†       “ ‰ ƒ 1 2 1 Ÿ/ 0 ”˜„    “š   Ž€†   €œ   12    1      ‡   † ‹ ’€      Ž€ 0‚        † ‡ˆ 2 ƒ€„       M  O         M  O    M 123O                      2         ­‚ ƒ„ „       †     ‚‡  ˆ ‰    ˆ   ­ „  ˆ         ’   “” 1 „  „        0Œ  ‚ ‚ ‡  ‡ ˆ Ž ‘ˆ ‘ ‚ „ Ž Œ†  „  0„  ƒ„ „ • „ †  „ –  ‚  ’   112  1 2 1  ’   “”   ‡ 0Œ  ‚ ‚ ‡  ‡ ˆ Ž —  ­ ‡/ š„ ›‚„‡„œ   „  Œ „„ „  ’   „‡œ     ­‚  ‘  ‡ 0Œ  ‚ ‚ ‡  ‡ ˆ   ’ –   “” Ž  † 0„  ƒ„ „ ­22„ š„„    ”†   „ ––          ‡ 0Œ  ‚ ‚ ‡  ‡ ˆ Ž 12  2 1 ’ ’   “” ‘ˆ ‘ ‚ „ Ž † 0„ ‰ ‡„ ƒ„ „    ‚   ‡ 0Œ  ‚ ‚ ‡        ’    “”  ‡ ˆ Ž “ 0„ 2 ‡„† ƒ„ „ ’ ›‡ Ž   ˆ„    ‡  12   1   ’        “” 0Œ  ‚ ‚ ‡  ‡ ˆ Ž 2 1    0„ ‰  †Œ ƒ„ „ †  † ŒŒ„„  ‰‚ 0Œ  ‚ ‚        ’’   “” ‡  ‡ ˆ Ž   0„    ƒ„ „   œ   ‚ ‘  ˆ  ‡       12 2 – – ’   “” 0Œ  ‚ ‚ ‡  ‡ ˆ Ž    ‚  ›‡ ƒš ‰  „ ‚‚    ‡  ˆ  „†  ’’ –       Ÿ¡ ‡ ¢  †   ‡ 0Œ  ‚ ‚ ‡    –––   “”  ‡ ˆ Ž £  0 „„ /„ „ ‡/ š„ ›‚„‡„œ   ‡ 0Œ  ‚ ‚  ’ –     – ’   “” ‡  ‡ ˆ Ž  121    1  ‚Œ 0„ ‰ Œ „ ƒ„ „  ›‡   ˆ„  ‡ 0Œ  ‚ ‚ ‡        1 2 1­      “”  ‡ ˆ Ž 12  „ 0„  ƒ„ „ ƒ š‚ ˆ š„„  ˆˆ  ˆ šœ„ š„  2  11  ’ –     ˆ  œ šœ„ š„ ‡ Œ „„ „ ‡ Œ  ‚ ‚ ‡  ‡ ˆ  –   “” 2 1112 1 2 1 Ž œ 0„ œ‚ ƒ„ „ ’ ›‡   ˆ„    ‡ 0Œ  ‚ ‚ 1    1112  ’    ’    “” ‡  ‡ ˆ Ž   1 2 1 £  0„  ƒ„ „ 1Œ„†  „ ’  ‚ ‡   “ ‡ ­ / 12       – ’   “”     ‡ 0Œ  ‚ ‚ ‡  ‡ ˆ Ž   11      † †‡ /  œ„    ‚   ‡ 0Œ  ‚ ‚ ‡  12   –    –    “”  ‡ ˆ Ž 12 “ › 0„  › ƒ„ „  ‡  ‚„„ˆ „ †  „œ  ‡ /12      ’    – ’   “” ‘ ‚ „ Ž   1 2 1   † †‡ /  œ„ –   ‚         „† –        Ÿ¡ ‡ ¥‚ ‘  ‡ 0 0Œ  ‚ ‚ ‡ ƒ12   12     “”  ‡ ˆ Ž   † †‡ /  œ„ ’  ‚   ¥‚ ‘  ‡ ’     ƒ12   12     “” 0Œ  ‚ ‚ ‡  ‡ ˆ Ž   † †‡ / ’ œ„   ‚ 0Œ  ‚ ‚ ‡  ‡ ˆ  12   –        “” Ž ‘ ‚ „ Ž 12   † †‡ /  œ„ ’  ‚    ”† 0Œ  ‚ ‚  12   –     –   “” ‡  ‡ ˆ Ž 12 12  1 2­ ’––      „ ’ ›‡   ˆ„  ‘ ‚ „ Ž –    “” 12   1 2  12  1  ’ ’   „2 „  ›‡   ˆ„  ‘ ‚ „ Ž  –’   “” 2­12 1  ¦„/‡ 0„  ‚ „  ƒ„ „ ’’  ‚   „  Œ „„ „  12   1  – ’   – –   “” 0Œ  ‚ ‚ ‡  ‡ ˆ Ž  1 2 1   1112  ’’     š„ 0„  š„ ƒ„ „  ›‡   ˆ„  ‘ˆ ‘ ‚ „ Ž  ’   “”   1 2 1 ‡  †  „„ ¢ „    ‡  ˆ  „†     Ÿ¡   1 ƒ1/ N          “” ‡ ¢  † 0Œ  ‚ ‚ ‡  ‡ ˆ Ž 02 12  /12    12­ –       „†  „„œ   š„ ›‚„‡„œ ‘ ‚ „ Ž     “”  1 12    12 0 ›‚ 0„    ƒ„ „ ‰      „       12 2­  –      ‡ 0Œ  ‚ ‚ ‡  ‡ ˆ Ž ‡ ‡„ ‰ š ’    “” 12  12 ƒ„ „ –  ‚  ‡ ‡  „Ž  „ ‘ ‚ „ Ž

      M  O       M 124O                    0     ­ € ‚ 0ƒ„   ƒ  12   1      ˆ ˆ ‰ Š‹ ƒ ‚ †  ‡ ƒ  ƒ †  2 1   0 ƒ Šƒ„ Œ ƒ Ž ‚ ‘’ “†ƒ€‚ Œƒ‰ ˆ    Ž  ƒ‰ ƒ   ƒ † ‰ €  ‚ ’‰ Œ€ ” ƒ ‰  ­  „• ƒ  ƒƒ  ƒ  ƒ‰ €ƒ ƒ Ž —• 0 0ƒ  ƒ  /ƒ•  ”Ž  —  ‰   Œ š   –    12  12   ‰ Š‹ ‰ Š  ƒ ƒ 0ƒ„   ƒ ƒ ‚ †  € ƒ11„12      ƒ ‚  ” —  0ƒ„    Œ‚ ƒ –   ‰ Š‹ ƒ 1 2 1 ƒ 0 ”Œ   ­    €  ‰ ‡ ‚ ƒ       ­†  0ƒ„   ƒ ƒ ‚ †  1‡„12 ƒ ƒ 2 1ˆ1‡„ ––ˆ    ƒ ƒƒ ”ƒ• ƒƒœ „ ‡ ƒ  ƒ †    ‰ Š‹ €1 „ ˆ ƒ    “ ” ”Œ ƒ     ­€    ‹•  ƒ ƒ „ƒ  / 12  ƒ      “ ” žƒ Œ —   ƒƒƒ    ‡ ƒ ƒ   ‰ Š‹  1 2 1 0ƒ„   †   1  ƒ11„12 2 1ˆ –     ƒ   ­ € ‚ ‡ ƒ  ƒ †    ‰ Š‹ €€€1  12 ”ƒ ž  ƒ  2Œ ” ‰ ”ƒ ” ­ • — Œ Ž Š12  ƒ ‡  1 –  ˆ      Œ ž  Œ 0 ”    ƒ ‡ ƒ ƒ 0ƒ„    ‰ Š‹  2 1 ƒ ƒ ‚ †     €  ‰   € ‚‰  Ž   Œ š  ‚  ˆ   ˆ  ‹€ 12 2 ˆ   ‰ Š‹ „ ƒ   ƒ ƒ 0ƒ„   ƒ ƒ ‚ †  ¢/  0  ƒ€       €   ƒ ƒ  ƒ11„  1 ˆ   ˆ  ˆ – ‰ Š‹ 0ƒ„   ƒ ƒ ‚ †   2 1   Œ 0 — ƒ     € ‰ 2    €  ƒ  –  ˆ  †  ––ˆ ‰ Š‹ 0ƒ„   ƒ ƒ ‚ †  ƒ• 0 Œ  ” ž•   ƒ† ­ € ‚ ƒ 2€12  ƒ2 ˆ  ˆ  ˆ  ‰ Š‹ 0ƒ„   ƒ ƒ ‚ †  ‡ Œ‚ ‡ ƒ  ƒ †  1 2 1   0 ƒ /  ˆ  € ‰    „„‰ 0ƒ„   ƒ    ˆ  12  12   ‰ Š‹ ƒ ‚ †  Š ƒ 0 —     ƒ  — ‚ 0ƒ„   ƒ –   ˆ  †   ‰ Š‹ ƒ ‚ †  ‡ Œ‚ ‡ ƒ  ƒ †  0ƒ  0 22€  ž•2    ƒ ˆ —  ‰   –  ˆ  †   ‰ Š‹ ƒ ƒ Œ š ‰ 0ƒ„   ƒ ƒ ‚ † ‰ ž ƒ• 0 —•    €  ƒ    „„ ‡ ƒ ƒ  ˆ ‰    ˆ  † 0ƒ„   ƒ ƒ ‚ †  Š‹ / 0 ‘ƒ   • ”€     ƒ ‚ —   ƒ ‡ ƒ11„12  ˆ  ˆ    ‰ Š‹ ƒ 0ƒ„   ƒ ƒ ‚ †  1‡  2 1   0 ƒ2€  — Ž‰ 0ƒ   žŒ‚2 ”€  12  ƒƒ 1 ˆ  ˆ  –  ‰ Š‹ ‘  ƒƒ ƒ ƒ ƒ ‚ †  ‡ Œ‚   1 2 1 €„ 1‡ €12 1 – ˆ  ˆ  ž    ‚  ‚ ­  Œ ‡ ƒ  ƒ †  2ˆ‡ 212 12 ‡ –  ‰ Š‹ 12 ž 0 „ƒ    — ‚ 0ƒ„   ƒ ƒ ‚ „‡ 12  1 ‡    ˆ    ‰ Š‹ †  ‡ Œ‚ ‡ ƒ  ƒ †  2   Ž    Œ ƒŒ 2ƒ / ­Ž   ƒ ‰ 0   ­Ž­    ˆ   0ƒ„   ƒ ƒ ‚ †  ‡ ƒ  ƒ †   ­  €ƒ ¤   ­ ƒ  — ‚ ƒ ‹ ƒ  ‡ ƒ 1ƒ„1€   € ‡ ––  ˆ  ˆ  ‰ Š‹ ‡ Œ‚ 12 1 2 1 ƒ 0  ƒ  ”€Œ •     €     „„‰ ˆˆ– ˆ ˆ  €„ƒ„1 /    ‰ Š‹ ¤•     €  0ƒ„   ƒ ƒ ‚ †  ‡ ƒ ­Ž 0 ¤Œ    €  ‰   ” š  ƒ  „„ ‡ ƒ „ƒ 12   1  ˆˆ  ˆ ˆ    ‰ Š‹ ƒ 0 0ƒ„   ƒ ƒ ‚ †  2 1 €€12 ƒ  Š ƒ 0  Œ    ”Ž   –  ­€   ƒ ƒ „  1 ˆ‡/ ˆ––ˆ – ˆ   – ‰ Š‹ 0ƒ„   ƒ ƒ ‚ †   12  ƒ „  1 2 1    Œ •  ƒŽ•  —€ ­ƒ ‹  ƒ ƒ „ / 12  ƒ 1 ˆ–ˆ – ˆ   ‰ Š‹ 0ƒ„   ƒ ƒ ‚ †  1   2 1 ˆˆ  ˆ      ­ € ‚ ‡ ƒ  ƒ †  †  ž€• 0 ŠŽ2ƒ  —ƒ Œ 2Œ ”Ž ƒ ” •Œ  ”€ ˆ–  ˆ  2 ƒ 212 2 1 –  ‰ Š‹   –  ­€  ‡ ƒ ƒ 0ƒ„   ƒ ƒ ‚ †        M  O

      M 125O                  0  0         ­€­ ‚ƒ  ­ 12           † ‡ ˆ ƒƒ € ­ ­ „  ƒ   ­ƒ   1 2 1 Š ­ 0 Œ Ž ƒ Ž‘ ”Œ    ƒƒ Œ –—€ —   ‰ ‰ ‰   1112 2 1  † ‡ ˆ ƒ ­ 0„  ƒ   ­ ­ ƒ ˜  Ž‘ 0 ™ ‘ Ž ƒ € ‘ 2 ™ ‘ ­ 0„  ƒ   ­ 12   1  † ‰    † ‡ ˆ ­ ƒ ˜  ›  › ƒ  ˜  2 1  12  1  ‰ ‰   ™  ™ † œ­ –   ž   ›  › ƒ  ˜    ‡ ˆ 2      ž   † ™ ˜ €  ­   œ ­ 211 †‰     ‡ ˆ ƒ   ƒ › ƒ  ˜  2 1112 1 2 1 ™ Œ 0 Ÿ  € Ž ƒ   ™—    – ­ ƒ   ‰ †     ­€ €‚  † ‡ ˆ ƒ ­ 0„  ƒ   ­ ­ ƒ ˜  Ž‘ƒ 0 ™ ‘ Ž ƒ  ­Œ ™ž     ”   –—€ 12     ‰       ‡ ˆ —  ­   0­   › ­ 0„  ƒ   ­ ­ ƒ ˜  1 2 1   0 ™ ‘ Ž ƒ    ž  ‡    œƒ –ƒž‡ ™ ¡ †    —  ­ ƒ  ­ 0„  ƒ   ­ ­ ƒ ˜  › ƒ   ­€ €‚   ‡ ˆ ˜  ‡ ¢ 0 ‘ Ž ƒ † œ­ –   ž   ­ 0„  ƒ   ­ 12   1       † ‡ ˆ ­ ƒ ˜  ›  › ƒ  ˜  2 1 ¤‘  0 1ž   Ž ƒ   ™ž    ž  ƒ  212   1       † ‰ ‡ ˆ ­ 0„  ƒ   ­ ­ ƒ ˜  2 1 1  „‡  ‘  ‡  ‡ —2ž Ÿ —ƒ  ‡‰    ­  /1 12   ‰     ‡ ˆ €€ƒ € ƒžƒ  —Œ      1 2 1 112   ¤‘  0 1ž   Ž ƒ   ™ž    ž  ƒ      1 2 1 ‰ † ‡ ˆ ­ 0„  ƒ   ­ ­ ƒ ˜  „12  ¤‘  0 1ž   Ž ƒ   ™ž  †   ž  ƒ 12   1  †     ‰ ‡ ˆ ­ 0„  ƒ   ­ ­ ƒ ˜  2 1  0     „ ­ Ž— Ÿ ¦ Š˜ ž    ‡  ‚†€ ‡†ˆ­€†‰Šˆ  ‰    — ‡   ­ ‘€ ˜  ‡  ƒž ƒ    ¦ƒ ‡  ž ™­€‡ œœ ­‚€‡†ˆ „  Œ ­ ƒƒ  €   ‡ ƒžƒ   ƒ  —ƒ  Œ 0 ¤‘2 Ž ƒ † œ­ –   ž   ­ 0„  ƒ   ­      2  12 † † ‡ ˆ ­ ƒ ˜  ›  › ƒ  ˜  ™  0  €  Ž ƒ  ™   ™ž    ž     12   1  †     † ‡ ˆ –ƒ „ƒ  › ­ 00„  ƒ   ­ ­ ƒ ˜  2 1  Œ 0 ™—€ Ž ƒ  œ­ –   ž     ƒ ­     212  1 2 1 ‰  ‡ ˆ 0„  ƒ   ­ ­ ƒ ˜  ›  › ƒ  ˜   12         ”‘ €ž –ƒž › ƒ  ˜  1 „‹ 12  ‰ †‡ ˆ    1 2 1        ƒ € ƒ  ˜ – —ƒ ­€‡ › ƒ  ˜   ‚†€ ‡†ˆ­€†‰ œœ /­ 0 ¨  ­ Ž ƒ  – €   ž  ­ 0„  ƒ   ­ 11  1  †    ‡ ˆ ­ ƒ ˜   2 1 / 0 ™ ‘   ™ž   œ­ ƒ ‡ Ž/Œ‘ Ž ƒ  œ­ ƒ ‡ †    Ÿ  Ž ƒ  œ­ ƒ –™ ­ 0„  ƒ   ­ ­ ƒ ˜       †† ‡ ˆ › € ”  — ¢ 2ž    œ­ ƒ  Œ ž ž ƒ  ©–™ª ­ Ÿž ƒŒ ‡ ™2 ™ ƒ     œ­ ƒ  Œ ž ž ƒ  ©–™ª †‰         ‰† ‡ ˆ ­ Ÿž ƒŒ ‡ ­ 0„  ƒ   ­ ­ ƒ ˜  › ƒ  ˜  €‡ ŽŒ  ‡ ‘ /‡  ‘ƒ‡ ™ Œ ­ ƒ 0 †‰ ­ ‡  ž  ­ ƒ „ƒ  ƒ— € ž   ™ ¡‡ ­ € ‡      2 112 ‰ † ‡ ˆ ž ‡  ž‡  —ƒ „ƒ  ‡ ƒ ƒ  ­  ƒ ƒ  ƒ  ƒŒ  —ƒ 0„  ƒ   ­ ­ ƒ ˜  ‡ ­ Œ ‡   ¤‘ ‡ ”ž    2‡ ™ ­ ­ 1  „ Ÿ —ƒ   ž  ­ ƒ „ƒ  ƒ— € ž  ‡ ­      2 112 ‰  ‡ ˆ ƒ  ‡  ¡‡ ˆŒƒ ‡ 0„  ƒ   ­ ­ ƒ ˜  › ­ ƒ ƒ  ƒ  ­ ƒ  ƒŒ  —ƒ / ‡   ‡  ‡ ” ‡ 1  — ¢ Ÿ —ƒ  ‡   ž  ­ ƒ „ƒ  ƒ— € ž   ™ ¡‡ ­ € ‡ 1112        † ‡ ˆ ž ‡  ž‡  —ƒ „ƒ  ‡ ƒ ƒ  ­  ƒ ƒ   2 1 ƒ  ƒŒ  —ƒ 0„  ƒ   ­ ­ ƒ ˜ 

      M  O

      M 126O                                   0  0         ­€­ ‚ƒ  ­ 12           † ‡ ˆ   0            ­ € ƒƒ € ­ ­ „  ƒ   ­ƒ   1 2 1 ‚  ƒ„  €     ‚   ­    12 12          ‡ˆ Š ­ 0 Œ Ž ƒ Ž‘ ”Œ    ƒƒ Œ –—€ —        ‚         ­ 0      2  ‰ ‰ ‰   1112 2 1  † ‡ ˆ ƒ ­ 0„  ƒ   ­ ­ ƒ ˜   ‚ †  Ž‘ 0 ™ ‘ Ž ƒ € ‘ 2 ™ ‘ ­ 0„  ƒ   ­ 12   1  ‰  Š  ‹ Œ Ž‰  Ž ‚ ­ ‡‘Œ ’­   † ‰    † ‡ ˆ ­ ƒ ˜  ›  › ƒ  ˜  2 1        ­ € ‚  ƒ„  €   1112          ‡ˆ  12  1    ‚   ­         ‚      2 1 ‰ ‰   ™  ™ † œ­ –   ž   ›  › ƒ  ˜    ‡ ˆ 2     ­ 0       ‚ †       ž   † ™ ˜ €  ­   œ ­ 211      “‚  ”  ƒ ­ ‹‰   ’­    †‰     ‡ ˆ       ­ € ‚  ƒ„  €   2 1111 ƒ   ƒ › ƒ  ˜  2 1112 1 2 1        ‡ˆ ™ Œ 0 Ÿ  € Ž ƒ   ™—    – ­ ƒ     ‚   ­         ‚     2 ‰ †     ­€ €‚  † ‡ ˆ ƒ ­ 0„  ƒ   ­ ­ ƒ ˜      ­ 0       ‚ †  Ž‘ƒ 0 ™ ‘ Ž ƒ  ­Œ ™ž     ”   –—€ 12    • Œ  2 ”   ƒ/   2 ’­  ™     ‰       ‡ ˆ —  ­   0­   › ­ 0„  ƒ   ­ ­ ƒ ˜  1 2 1      ­ € ‚  ƒ„  €     ‚   2 11   0 ™ ‘ Ž ƒ    ž  ‡    œƒ –ƒž‡ ™ ¡      ­         ‚         11  1     ‡ˆ †    —  ­ ƒ  ­ 0„  ƒ   ­ ­ ƒ ˜  › ƒ   ­€ €‚   ‡ ˆ ­ 0       ‚ †  0       ‚ 2 1 ˜  ‡ †  ¢ 0 ‘ Ž ƒ † œ­ –   ž   ­ 0„  ƒ   ­ 12   1  ”  ” 2 ›­2 Ž­ ‡  ­ Œ€ ’­  ™       † ‡ ˆ         ­ € ‚  ƒ„ ­ ƒ ˜  ›  › ƒ  ˜  2 1 ™      22    ‡ˆ  €     ‚   ­         ‚ ¤‘  0 1ž   Ž ƒ   ™ž    ž  ƒ  212   1       † ‰ ‡ ˆ         ­ 0       ‚ †  ­ 0„  ƒ   ­ ­ ƒ ˜  2 1    œ   ”‘  ” ‰    ž € ’­    1  „‡  ‘  ‡  ‡ —2ž Ÿ —ƒ  ‡‰    ­  /1 12   2 11  ‰     ‡ ˆ        ­ € ‚  ƒ„  €   €€ƒ € ƒžƒ  —Œ      1 2 1     11  1      ‡ˆ   ‚   ­         ‚     112   2 1 ¤‘  0 1ž   Ž ƒ   ™ž    ž  ƒ     ­ 0       ‚ †        1 2 1 ‰ † ‡ ˆ ­ 0„  ƒ   ­ ­ ƒ ˜  Œ€ 0 Ž€ •    Ÿ‘ Ž   ‚       0    „12         ­€‚ƒ„ƒ„ƒƒ ƒ† ŸŸ    ‚ †  ¤‘  0 1ž   Ž ƒ   ™ž  †   ž  ƒ 12   1  †     ‰ ‡ ˆ ‹‰ Š  ƒ/ Ž­ ‘ €    Ž   ­ ­ 0„  ƒ   ­ ­ ƒ ˜  2 1 ™    ” €     Š      ˆ€ € ¡     ƒ­†ƒ„‚€­ƒƒ†    ‡ˆ  0     „ ­ Ž— Ÿ ¦ Š˜ ž    ‡  ‚†€ ‡†ˆ­€†‰Šˆ 0       ‚ †   ‰    œœ — ‡   ­ ‘€ ˜  ‡  ƒž ƒ    ¦ƒ ‡  ž ™­€‡ 112    12‡ ­‚€‡†ˆ  2 0 Š Œ ­ ƒ‰     Ÿ‘ Ž   ‚  „  Œ ­ ƒƒ  €   ‡ ƒžƒ   ƒ  —ƒ        ˆ    ™   ‡ˆ  Œ 0 ¤‘2 Ž ƒ † œ­ –   ž   ­ 0„  ƒ   ­ 0       ‚ †  ¡    †       2  12 † † ‡ ˆ 12 1  ­ ƒ ˜  ›  › ƒ  ˜  ƒ  0 •‰ •   Ÿ‘ Ž   ‚    0      ˆ  12   ™  0  €  Ž ƒ  ™   ™ž    ž     12   1       ™    ‡ˆ †     † ‡ ˆ  ‚ †  ¡‰‚ ¡    †  1 2 1 –ƒ „ƒ  › ­ 00„  ƒ   ­ ­ ƒ ˜  2 1   ƒ ’  € 0 Š  ƒ/ Ž­ ‘ €   12   1   Œ 0 ™—€ Ž ƒ  œ­ –   ž     ƒ ­       ™  ‡ˆ     212  1 2 1 ‰  ‡ ˆ 0       ‚ †  ¡    †  1  12 0„  ƒ   ­ ­ ƒ ˜  ›  › ƒ  ˜  12   1  •Œ  Ÿ‘ ¢‚       0       ‚ †   12    ™   2 1‡12     ™  ‡ˆ ¡‰‚        ”‘ €ž –ƒž › ƒ  ˜  1 „‹ 12  ‰ †‡ ˆ 1  1 2 1    1 2 1  12 2‡1 /    ™   1    ‘   Ÿ‘ Ž   ‚  ¡    †      ‡ˆ        ƒ € ƒ  ˜ – —ƒ ­€‡ › ƒ  ˜   ‚†€ ‡†ˆ­€†‰ œœ ‡ 1 /­ 0 ¨  ­ Ž ƒ  – €   ž  ­ 0„  ƒ   ­ 11  1 ”‘ 0 Ž ‘ •    ¢         †    ‡ ˆ 12 ‡212  ­ ƒ ˜   2 1       ƒ„    0       ‚ †    ƒ  ™   ‡ˆ 2 1 2 1 / 0 ™ ‘   ™ž   œ­ ƒ ‡ Ž/Œ‘ Ž ƒ  œ­ ƒ ‡          ‚ †  †    Ÿ  Ž ƒ  œ­ ƒ –™ ­ 0„  ƒ   ­ ­ ƒ ˜       †† ‡ ˆ 1 121 ›      Œ ‡  €    ‚  Q ¡ ‚ ¡    †  1 2 1‡1 21    ‡ˆ € ”  — ¢ 2ž    œ­ ƒ  Œ ž ž ƒ  ©–™ª ­ 12  1 2 1 Ÿž ƒŒ ‡ ™2 ™ ƒ     œ­ ƒ  Œ ž ž ƒ  ©–™ª †‰         ‰† ‡ ˆ    œ   ”‘  ” ‰    ž € ’­    ­ Ÿž ƒŒ ‡ ­ 0„  ƒ   ­ ­ ƒ ˜  › ƒ         ­ € ‚  ƒ„  €       ƒ‹­Œ†€Ž­†ƒ„ƒ Ž ­ ŸŸ ˜    ‚   ­         ‚     €‡ ŽŒ  ‡ ‘ /‡  ‘ƒ‡ ™ Œ ­ ƒ 0 †‰ ­ ‡      ­ 0       ‚ †   ž  ­ ƒ „ƒ  ƒ— € ž   ™ ¡‡ ­ € ‡      2 112 ‰ † ‡ ˆ ”  ” 2 ›­2 Ž­ ‡  ­ Œ€ ’­  ™  ž ‡  ž‡  —ƒ „ƒ  ‡ ƒ ƒ  ­  ƒ ƒ        ­ € ‚  ƒ„  €   ™    ƒ‹­Œ†€Ž­†ƒ„ƒ Ž ­ ŸŸ ƒ  ƒŒ  —ƒ 0„  ƒ   ­ ­ ƒ ˜  ‡   ‚   ­         ‚     ­ Œ ‡   ¤‘ ‡ ”ž    2‡ ™ ­ ­ 1  „     ­ 0       ‚ †  Ÿ —ƒ   ž  ­ ƒ „ƒ  ƒ— € ž  ‡ ­    0   0  ƒ‰   ‚  ™™ ­       2 112 ‰  ‡ ˆ    ƒ­†ƒ„‚€­ƒƒ† ŸŸ ƒ  ‡  ¡‡ ˆŒƒ ‡ 0„  ƒ   ­ ­ ƒ ˜  › ­        ƒ ƒ  ƒ  ­ ƒ  ƒŒ  —ƒ  ­€„ƒƒ ƒ†‘ „            ƒ    Ž­   ¡    †  ŸŸ / ‡   ‡  ‡ ” ‡ 1  — ¢ Ÿ —ƒ  ‡   „ƒ€ƒƒ ­ ž  ­ ƒ „ƒ  ƒ— € ž   ™ ¡‡ ­ € ‡ 1112        † ‡ ˆ • Œ  2 ”   ƒ/ 2 ’­  ™     ž ‡  ž‡  —ƒ „ƒ  ‡ ƒ ƒ  ­  ƒ ƒ   2 1    ­ € ‚  ƒ„  €     ‚       ƒ‹­Œ†€Ž­†ƒ„ƒ Ž ­ ŸŸ ƒ  ƒŒ  —ƒ 0„  ƒ   ­ ­ ƒ ˜  ­         ‚         ­ 0       ‚ †              M  O M  O       M 127O                              ­ €   ‚ƒ €  „ € € ‚  †ƒ ‡           ŠŠ ‚  ‚  € „ € € ƒ€  € ƒ€ € ƒ € € 0 „ ƒ€ƒ  €  ‰‡ €‡ ‹‡ Ž ƒ  ‚     Š  €  ‘   ­‚  € 0  12 ‚„‚     ““   ”• 0 „ ƒ€ƒ  €  ‰‡ ’ ƒ€ ‰‡   1 2 1   0   Ž€ ’  2  ‚     Š€  ‘ / ‡  1 12  “““–    •€  Šƒ   €  š ’  0 0 „ ƒ€ƒ  “–   ”• „ 1 2 1  €  ‰‡ ‡2‚ 0  ƒ  ‹  Ž€ “  ‚ƒ ­ ‡ €     12  1       – –››   ”• 0 „ ƒ€ƒ  €  ‰‡ ’ ƒ€ ‰‡ 12   œƒ  ƒ ‹ ‘ ƒ ‘  ” ž‹ ­ € ›  ‚ƒ €  „ € € ‚  †ƒ ‡   –        ŠŠ ‚  ‚  € „ € € ƒ€  € ƒ€ € ƒ € € 0 „ ƒ€ƒ  €  ‰‡  ‡  0   ‚ƒ €  „ € € ‚  †ƒ –“    ‡   ‚  ‚  € „ € € ƒ€      ŠŠ € ƒ€ € ƒ € € 0 „ ƒ€ƒ  €  ‰‡   ‡   ‘€ žƒ    ›“          ŠŠ ’  ’ ƒ€ ‰‡ /  š ‡‡    1  ‡  ¡ ­ €   ‚ƒ €  „ € € ‚  †ƒ ‡   ‚  ‚          ŠŠ € „ € € ƒ€  € ƒ€ € ƒ € € 0 „ ƒ€ƒ  €  ‰‡   Ž ž ‡   ‹ / ‹ €    ¡ ”ƒ € 0 “–  ‚ƒ €  „ € € ‚  †ƒ ‡   ‚          ŠŠ ‚  € „ € € ƒ€  € ƒ€ € ƒ € € 0 „ ƒ€ƒ  €  ‰‡     œ ‹   ‚  2     1  ƒ„ ­ €   ‚ƒ €  „ € € ‚  †ƒ         ŠŠ ‡   ‚  ‚  € „ € € ƒ€  € ƒ€ € ƒ € € 0 „ ƒ€ƒ  €  ‰‡  0 / Ž€    ‚    ‚ƒ ‚  €   12  1  “““     „  €ƒ  €  0 „ ƒ€ƒ  €   “   ”• 2 1 ‰‡ 0 žƒ  2 ‡2‚   ž 2      €   ž  ‡‡ 0 š  •€  €   €    ƒ  €   •€ 1 12 ‡ 1  “        ”• ‡      Šƒ   €  š   ‰‡‚ 2 1 ‘ ‚  €  „ ƒ€ƒ  €  ‰‡ €‡ 0 ‹‡ Ž€ ›  ‚ƒ €  „ € € ‚  †ƒ ‡   ‚  ‚  € „ €  / 12    1 “› “   –    ”• € ƒ€  € ƒ€ € ƒ € € 0 „ ƒ€ƒ  2 1‰„ / 12   €  ‰‡  ‡  œ 0 €‡  ‘  ““  ‚ƒ €  „ € € ‚  †ƒ ‡   ‚  ‚  € „ € › “         › “   ”• € ƒ€  € ƒ€ € ƒ € € 0 „ ƒ€ƒ  €  ‰‡ 0 žƒ 0  2 ‡2‚ Ž€   ž 2    › šƒ   ŠŠ   ‹     ŠŠ ”  €  †ƒ 00 „ ƒ€ƒ  €  ‰‡ Š        £ ‡‡   Šž ‘  ‚  ’ ƒ€ ‰‡ ŠŠ      ŠŠ  ‚ ‡ ‰‚‚‡1 £ ‡‡  0 œžƒ Ž€   ‚ƒ   ‚  €   “–    2  1‚„ 11‡ 1 “ ››   ”• €ƒ  ’  0 „ ƒ€ƒ  €  ‰‡  2 1 œ ‹   ‘  ¡ ”    ‡ 0 0 „ ƒ€ƒ ‡12 1  ›–  “   ““   ”•  €  ‰‡ ’  ’ ƒ€ ‰‡ 1 2 1  ƒ ‡‹  ƒ    Š€  ‘€‚  Š€  •€ ““›  “  €   ƒ ‡‹   €     šƒ ’ €        ›   ”•  ’  0 „ ƒ€ƒ  €  ‰‡  ‡  0  / Ž€ ‡ 2  ‘  “  ‚ƒ   ‚ 212  „2 “  “      ”• ’  0 „ ƒ€ƒ  €  ‰‡ 1 2 1 ŠŠ   ‹ › – “  €    Š€  €  ‘ ƒ ’ ƒ€ ‰‡ ŠŠ Š    ‹  0 ‡ /   Ž€  ‘    ‚ƒ €   12  1 2 1‰  – “      ”• 0 „ ƒ€ƒ  €  ‰‡ ‚‡‚12 1        M  O       M 128O                                               ­ €    0  0     ­ €  ‚ ƒ‚„ ‚ †    ‚ƒ €  „ € € ‚  †ƒ ‡   ‡„ ˆ ‰­Š ‹€†„Š „Š ‡ „ Š  ‚ ƒ‚„Š         ŠŠ     1 12  1   Š Ž‘ ‚  ‚  € „ € € ƒ€  € ƒ€ ‚ „­‚„  € ‡ „ ‚ „­‚„  ‚ ­„‚  ‚ 0ƒ„­‚„­ € 2 € ƒ € € 0 „ ƒ€ƒ  €  ‰‡ €‚‡ Œ ‹ Š €‡ ‹‡ Ž ƒ  ‚     Š  €  ‘   ­‚  € 0  12 ‚„‚ 0„’­ “ 2€ •‹ “ ­ €  ‚ ƒ‚„ ‚ † ‡„     ““   ”• 0 „ ƒ€ƒ  €  ‰‡ ’ ƒ€ ‰‡   1 2 1 ˆ ‰­Š ‹€†„Š „Š ‡ „ Š  ‚ ƒ‚„Š ‚ „­‚„   12  1       –   Š Ž‘   0   Ž€ ’  2  ‚     Š€  ‘ / ‡ € ‡ „ ‚ „­‚„  ‚ ­„‚  ‚ 0ƒ„­‚„­ € €‚‡ 2 1  1 12  “““–    •€  Šƒ   €  š ’  0 0 „ ƒ€ƒ  “–   ”• Œ ‹ Š „ 1 2 1  €  ‰‡ —­­• 0 “   ™„‚„   ­ 0ƒ„­‚„­ € €‚‡  ––      ­ – – Š Ž‘ ‡2‚ 0  ƒ  ‹  Ž€ “  ‚ƒ ­ ‡ €     12  1   Œ ‹ š „­‚„  Œ ‹     – –››   ”• 0 „ ƒ€ƒ  €  ‰‡ ’ ƒ€ ‰‡ 12 “„ 0   ™„‚„   ˆ     ›‚ ‚  ‚ „ 1 12        Š Ž‘   œƒ  ƒ ‹ ‘ ƒ ‘  ” ž‹ ­ € › € 0ƒ„­‚„­ € €‚‡ Œ ‹  1 2 1  ‚ƒ €  „ € € ‚  †ƒ ‡   –        ŠŠ  ––     ‹  ›’€ „„ ‡„ š „­‚„  Œ ‹ €€­‚ ƒ‚„ ‚  ›› ‚  ‚  € „ € € ƒ€  € ƒ€ ˆ„ 0 ‹ €/ ™„‚„  ›’€ „„ ‡„ ‚ „ €  1212   1 –       Š Ž‘ € ƒ € € 0 „ ƒ€ƒ  €  ‰‡ 0ƒ„­‚„­ € €‚‡ Œ ‹  2 1  ‡  0   ‚ƒ €  „ € € ‚  †ƒ 1 ­ƒ 0 ˆ‹— ™„‚„ ˆ2­‹     ­ ‚ „ €  12 2†1        Š Ž‘ –“    ‡   ‚  ‚  € „ € € ƒ€      ŠŠ 0ƒ„­‚„­ € €‚‡ Œ ‹ 12  2 1 € ƒ€ € ƒ € € 0 „ ƒ€ƒ  €  ‰‡ ™„   ‚ ™­­• „• 2‹ /  ‚ ’­€†Š   ‡   ‘€ žƒ     –      ­ ›› ›“          ŠŠ 0ƒ„­‚„­ € €‚‡ Œ ‹ š „­‚„  Œ ‹ ’  ’ ƒ€ ‰‡  ‹  Ÿ„  ‹ 02„• ¢2„•  ™„‹• 0€ / 12    1 /  š ‡‡    1  ‡  ¡ ­ €   ‚ƒ –     2‹ / £ Ÿ0¤  ‚ ’­€†Š ‚ „ € 0ƒ„­‚„­ €  – Š Ž‘ €  „ € € ‚  †ƒ ‡   ‚  ‚   2 1         ŠŠ €‚‡ Œ ‹ € „ € € ƒ€  € ƒ€ € ƒ € € Ž’—  0  • ™„‚„ —€ ˆ ‹    ›‚ ‚  ‚ „ € 0 „ ƒ€ƒ  €  ‰‡ ––      ­   Š Ž‘ 0ƒ„­‚„­ € €‚‡ Œ ‹   Ž ž ‡   ‹ / ‹ €    ¡ ”ƒ € 0 “–  ‚ƒ ‹ ˆ ¥† 0€ ¢ ˆ€/  ‚ ’­€†Š € €  „ € € ‚  †ƒ ‡   ‚       €€­‚ ƒ‚„ ‚  ››         ŠŠ 0ƒ„­‚„­ € €‚‡ Œ ‹ ‚  € „ € € ƒ€  € ƒ€ € ƒ € € 0 „ ƒ€ƒ  €  ‰‡ 1 ­ƒ 0 ˆ‹— ™„‚„ ˆ2­‹ † –  ­ Š    ›‚     œ ‹   ‚  2     1  ƒ„     ‚ Š  ›‚ ‘‚ Š • ‰­Š   ­ƒƒ„ 0ƒ„­‚„­ €  12  1 2 1 –  Š Ž‘ ­ €   ‚ƒ €  „ € € ‚  †ƒ €‚‡ Œ ‹         ŠŠ Ÿ€­ 0 ¢‹ ™„‚„ ––  ­ 0ƒ„­‚„­ € €‚‡ ‡   ‚  ‚  € „ € € ƒ€      12  12   Š Ž‘ € ƒ€ € ƒ € € 0 „ ƒ€ƒ  €  ‰‡ Œ ‹ 12 1 †  0 / Ž€    ‚    ‚ƒ ‚  €  †  „† –  ­ €  ‚ ƒ‚„ ‚ † ‡„  12  1  1112   “““     „  €ƒ  €  0 „ ƒ€ƒ  €   “   ”• ˆ ‰­Š ‹€†„Š „Š ‡ „ Š  ‚ ƒ‚„Š ‚ „­‚„  2 1      12   1 † –  Š Ž‘ ‰‡ € ‡ „ ‚ „­‚„  ‚ ­„‚  ‚ 0ƒ„­‚„­ € €‚‡ 112    0 žƒ  2 ‡2‚   ž 2      €   ž  ‡‡ Œ ‹ Š 0 š  •€  €   €    ƒ  €   •€ 1 12 ‡ 1      1  “        ”• 2‹ 0   ™„‚„   ­ Š   ­ƒƒ„ 00ƒ„­‚„­ €  12   1  ‡      Šƒ   €  š   ‰‡‚ 2 1 –    –   Š Ž‘ ‘ ‚  €  „ ƒ€ƒ  €  ‰‡ €‚‡ Œ ‹ 2 1 “‹‹ 0 1•€Š ‹‹  € ¦ 0 2‹ ™„‚„ 1•„„ €‡ 0 ‹‡ Ž€ ›  ‚ƒ €  „ € €        11   Š Ž‘ ‚  †ƒ ‡   ‚  ‚  € „ €  / 12    1 Ž‡ – “ ƒ€ •‡‡† € †„ Œ ‹ “› “   –    ”• € ƒ€  € ƒ€ € ƒ € € 0 „ ƒ€ƒ  2 1‰„ / 12  —­­• 0 2‹ ™„‚„   ­ € 0ƒ„­‚„­ € €‚‡        ­ –   Š Ž‘  €  ‰‡ Œ ‹ š „­‚„  Œ ‹  ‡  œ 0 €‡  ‘  ““  ‚ƒ €  „ € € † ˆ‹— 0 ˆ   „†   ­ Š  ›‚ ‚ Š † 12  –     – Š Ž‘ ‚  †ƒ ‡   ‚  ‚  € „ € Ž• ’­€† 0ƒ„­‚„­ € €‚‡ Œ ‹   1 2 1 › “         › “   ”• € ƒ€  € ƒ€ € ƒ € € 0 „ ƒ€ƒ  ­ 0 ˆ‹— ™„‚„ •‹„ ˆ     ›‚ „€ ‘‚  –    1Š1     Š Ž‘  €  ‰‡ § ƒ‚„ ‚ „ € 0ƒ„­‚„­ € €‚‡ Œ ‹ 0 žƒ 0  2 ‡2‚ Ž€   ž 2    › šƒ   ŠŠ   ‹     ŠŠ Ÿ• ¢ ˆ€/  ‚ ’­€†Š Š    ‚ ƒ‚„ € ”  €  †ƒ 00 „ ƒ€ƒ  €  ‰‡ Š          €†„ Š   ˆƒ  €   ‘ €†† š „ € €€­‚ ƒ‚„ ‚  ››     £ ‡‡   Šž ‘  ‚  ’ ƒ€ ‰‡ ŠŠ      ŠŠ 0ƒ„­‚„­ € €‚‡ Œ ‹  ‚ ‡ ‰‚‚‡1 £ ‡‡  0 œžƒ Ž€   ‚ƒ   ‚  €   / 0 ˆ‹—  „ ˆ  ›€ ‚‡ Š ™ /­’— „ ™„‚„  ›€ ‚‡ Š ¥„  “–    2  1‚„ 11‡ 1 “ ››   ”• €ƒ  ’  0 „ ƒ€ƒ  €  ‰‡     ™„‚„  ›€ ‚‡ ˆ € 0ƒ„­‚„­ € €‚‡ Œ ‹   ­  – Š Ž‘  2 1 š „­‚„  Œ ‹ œ ‹   ‘  ¡ ”    ‡ 0 0 „ ƒ€ƒ ‡12 1  Ÿ• 0 € ™„‚„ š•‡2 ˆ     ›‚ ‚   12 1 ›–  “   ““   ”• –     Š Ž‘  €  ‰‡ ’  ’ ƒ€ ‰‡ 1 2 1 ‚ „ € 0ƒ„­‚„­ € €‚‡ Œ ‹   1 2 1  ƒ ‡‹  ƒ    Š€  ‘€‚  Š€  •€ 2‹ 0 2• ™„‚„   ­ Š   Ž€ ‚„ • ‰­ € –     12  1 2 1   Š Ž‘ ““›  “  €   ƒ ‡‹   €     šƒ ’ €        ›   ”• š „ € 0ƒ„­‚„­ € €‚‡ Œ ‹  ’  0 „ ƒ€ƒ  €  ‰‡ ¨‹‹ 0 — ™„‚„ ˆ •­€ €   ­       ­‹ Œ„Ž  ‡  0  / Ž€ ‡ 2  ‘  “  ‚ƒ   ‚ 212  „2      ›› “  “      ”• ­ƒƒ„ Š ¢‹ €   ­ 0ƒ„­‚„­ € €‚‡ Œ ‹ ­‚ƒƒ­€ƒ‚ ‚€ƒ‚„ ’  0 „ ƒ€ƒ  €  ‰‡ 1 2 1 ¦ 0 ˆ‹— ™„‚„ ©„ Ÿ‹­­ ˆ ‹    ›‚ € ­ ‘‚  1 12  ŠŠ   ‹       – Š Ž‘ › – “  €    Š€  €  ‘ ƒ ’ ƒ€ ‰‡ ŠŠ ‚ „ € 0ƒ„­‚„­ € €‚‡ Œ ‹ 1 121     1  Š    „• 0 ˆ‹— ™„‚„ –  ­ Š    ›‚ ‚ Š ˆ ‰­ ‹  0 ‡ /   Ž€  ‘    ‚ƒ €   12  1 2 1‰       €€­‚ ƒ‚„ ‚  ››  – “      ”•  Ž€ ‚„ 0ƒ„­‚„­ € €‚‡ Œ ‹ 0 „ ƒ€ƒ  €  ‰‡ ‚‡‚12 1              M  O M  O       M 129O                    12    0        ­   €‚  ƒ   1 2 1      ˆ ‰ Š 0„  ‚ ‚  ƒ  ƒ  † ‡ /12     1 2 1 ­ Ž  ’ “ 2€    •ƒ  – € €   —˜™ ƒ  ‹ ‹   š€  – ‰ ˜‚2 ˜ ‡‡     •ƒ  – € €   —˜™  ­­€   ‰ Š ƒ š€  – ‰ 0„  ‚ ‚  ƒ  ƒ  † ‡ › ‚  † ‡   1 1  ‚ „ 0 ˜ ‡    Ž ‡  ƒ ˆ  €‚ ƒ ˆ ‹   1/12 1    ‰ Š 0„  ‚ ‚  ƒ  ƒ  † ‡ › ‚  † ‡  2 1  ‡–    •     ƒ‚    „  /122 12     ˆ ‹ ‰ Š › ‚  † ‡    212  ž’2€ 0  ‡‚–‚ “ ’  0  ƒ    •ƒ   €   ‹ˆ    12   12 ˆ   ‰ Š ƒ 0„  ‚ ‚  ƒ  ƒ  † ‡ › ‚  † ‡ ‹ˆˆ    1  ‚ „ ––‚–  •ƒ   €   › ‚  † ‡ ‚‚€ƒ­„ƒ  ­ƒ† •• 12  1   1  ‹     ‡ –   •     ƒ‚ › ‚  † ‡ ‹    ‰ Š 2 ‡2€ 0 ¡– ƒ ˜ €‚ƒ– 0      •ƒ   €        ­­€   ‰ Š 0 0„  ‚ ‚  ƒ  ƒ  † ‡  ‚ 0 ¢ – ˜ €    €‚ ‰   ˜ ‚‰      112        ‹ ‹ ‰ Š „  0 0„  ‚ ‚  ƒ  ƒ  † ‡ › ‚  † ‡ 1 1 2 1 ¢  ‡‡  –’ ‡  •ƒ   €    ƒ 0„  ‚ ‚  ƒ  2  1 12  ‹ ˆ   ‹  ‰ Š  ƒ  † ‡  1 2 1 0 ‚ –‡ƒ  •ƒ   €    ƒ 0„  ‚ ‚  ƒ ‹ ˆ    12  12   ‰ Š  ƒ  † ‡   ‰ ‚‰ ¢ ‡ ‰ Ž ‡‰ Ž  ‚ ƒ £­‚ƒ ‡ š ’  ‹‹  €‚ ƒ    „  ’ ­ €   ˜¤‚‰ ‡ƒ ­ ‰ ‚‚€ƒ­„ƒ  ­ƒ†ˆ  ˆˆ ‹   •• €‰    € ‰  ’  „ ‰  ‚  ƒ   ‚  ‚ €­„ƒ  ‚  –  ’  0„  ‚ ‚  ƒ  ƒ  † ‡ ‰ Ž – ‰ Ž 2€ ‰ ž’2€ ‰ ’ ‰ ‡  ƒ ­  š ’  ˆ  €‚ ƒ    „  ’ ­ €   ˜¤‚‰ ‡ƒ ­ ‰ ‚‚€ƒ­„ƒ  ­ƒ†ˆ  ˆ ‹   •• €‰    € ‰  ’  „ ‰  ‚  ƒ   ‚  ‚ €­„ƒ  ‚  –  ’  0„  ‚ ‚  ƒ  ƒ  † ‡  – ‰ ¡ ‚‰ ¥ ƒ‚‰ ‰  ‚‰  ’  š ’    €‚ ƒ    „  ’ ­ €   ˜¤‚‰ ‡ƒ ­ ‰ ‚‚€ƒ­„ƒ  ­ƒ†ˆ  ˆ‹ ‹   •• €‰    € ‰  ’  „ ‰  ‚  ƒ   ‚  ‚ €­„ƒ  ‚  –  ’  0„  ‚ ‚  ƒ  ƒ  † ‡ ‰ ‚  0 ˜ ­       €‚ ƒ   ‚„„  ƒ     12        ‰ Š 0„  ‚ ‚  ƒ  ƒ  † ‡ 1 1 1 2 1 ƒ  0  –     •ƒ   €   ƒ 0„  ‚ ‚  ƒ ‹     ­­€  ‰ Š  ƒ  † ‡ › ‚  † ‡  12     ¡    ­   €‚ ‰ ¦   •    €    ‹    1   12  ˆ  ‰ Š „  ƒ 0„  ‚ ‚  ƒ  ƒ  † ‡   ‰2112  1  ‚  0 ¥ ­     / –     „     ˆ Š12     ˆˆ      ‰ Š ‚ƒ ­ ‚ƒ ‡ › ‚  † ‡ 1 2 1 “  ˜ ‡ ‡‡   •ƒ ‰ Ž  ‡  •ƒ ‰ ƒ    ­ ‹ •ƒ   112   ˆ    ‰ ƒ    ­  •ƒ ‰     •ƒ ‰  2 ‹ •ƒ ˜   ‰ Š 1 121   1  0„  ‚ ‚  ƒ  ƒ  † ‡ ƒ –  ‰    ¡   ‰ Ž €   2‰ ˜ ƒ ’ 1  ‚ „ š ’  ‹  €‚ ƒ    „  ’ ­ €   ˜¤‚‰     ‚‚€ƒ­„ƒ  ­ƒ† •• ‡ƒ ­ ‰ €‰    € ‰  ’  „ ‰  ‚  ƒ   ‚  ‚  –  ’  0„  ‚ ‚  ƒ  ƒ  † ‡ ‰ ­‰ –  ‡ ‰   /‰   ‰ ˜  – ƒ ‚  0  ˆ  €‚ ƒ    „  ’ ­ €   ˜¤‚‰ ‡ƒ ­ ‰     ‚‚€ƒ­„ƒ  ­ƒ† •• €‰    € ‰  ’  „ ‰  ‚  ƒ   ‚  ‚  –  ’  0„  ‚ ‚  ƒ  ƒ  † ‡ ‰ ‡2€ ‰ Ž €– ‰ ˜‚/ ’ 2 ‡ š ’    €‚ ƒ    „  ’ ­ €   ˜¤‚‰ ‡ƒ ­ ‰ €‰    ˆ    ‚‚€ƒ­„ƒ  ­ƒ† •• € ‰  ’  „ ‰  ‚  ƒ   ‚  ‚  –  ’  0„  ‚ ‚  ƒ  ƒ  † ‡ ˜‚/ 0 Ž ’ ‡ ƒ     ¢ ––‚ ƒ ˆ  €‚ 0„  ‚ ‚  ‹     ­­€  ˆ ‰ Š ƒ  ƒ  † ‡ › ‚  † ‡

      M  O       M 130O                                   0  0                ­ 2  11    12         † ‡ˆ  0        ­   €‚  ƒ   1 2 1   € 0‚   €  €  ƒ „ 11 1 1       ˆ ‰ Š Š ‹  0 2     Ž     †    ‘ ‚‚  111   0„  ‚ ‚  ƒ  ƒ  † ‡ /12   ‰     “ † ‡ˆ   1 2 1 € 0‚   €  €  ƒ „ ’   „  1  1  • – ‹ 0  —   2‹      ­ Ž “”    ­ Ž  ’ “ 2€    •ƒ  – € €   —˜™ ƒ ” ‰   112  2 1   † ‡ˆ  ‹ ‹   š€  – ‰ ˜‚2 ˜ ‡‡     •ƒ  – € €   —˜™  ­­€   ‰ Š   € 0‚   €  €  ƒ „  0 0Ž   “ €  ƒ ™“” ­ €  ƒ š   € 12 1  1 ƒ š€  – ‰ 0„  ‚ ‚  ƒ  ƒ  † ‡ › ‚  † ‡  ‰    ‰ † ‡ˆ   1 0‚   €  €  ƒ „ ’   „  2 1 1  ‚ „ 0 ˜ ‡    Ž ‡  ƒ ˆ  €‚ ƒ ˆ ‹   1/12 1    ‰ Š    †  —† ­œŠ 0 €/ ­ €Ž†      0„  ‚ ‚  ƒ  ƒ  † ‡ › ‚  † ‡  2 1 ‰‰ ‰   –      ƒƒ  ƒ¡ ‚    ƒ¡ € ƒ 1 “ † ‡ˆ  ‡–    •     ƒ‚    „  /122 12   ƒ € ‹ – Ž     ˆ ‹ ‰ Š  €  — ¢         €   ‚   › ‚  † ‡    212  12 21  Ž  ƒ   ‘† €Ž  †  † ƒ  †  ž’2€ 0  ‡‚–‚ “ ’  0  ƒ    •ƒ   €   ‰ ”    12 1   ““ † ‡ˆ ‹ˆ    12   12 ˆ   ‰ Š ‚   †    € ƒ      ‹  ƒ 0„  ‚ ‚  ƒ  ƒ  † ‡ › ‚  † ‡ 2 1 ‹ˆˆ    1  ‚ „ ––‚–  •ƒ   €   › ‚  † ‡ ‚‚€ƒ­„ƒ  ­ƒ† •• 0‚   €  €  ƒ „ 12  1   1   €   ‚   Ž  ƒ   ‘† €Ž  †  ‹     ‡ –   •     ƒ‚ › ‚  † ‡ ‹    ‰ Š 2  ”    † ƒ  †  ‚   †    € ƒ    12  12   † ‡ˆ ‡2€ 0 ¡– ƒ ˜ €‚ƒ– 0      •ƒ   €     ‹  0‚   €  €  ƒ „      ­­€   ‰ Š  212 0 0„  ‚ ‚  ƒ  ƒ  † ‡ 1  ‚ 0 ¤    “    †   – ‘ € ‡ €    “     1 2 1   † ‡ˆ  ‚ 0 ¢ – ˜ €    €‚ ‰   ˜ ‚‰      112      € 0‚   €  €  ƒ „     ‹ ‹ ‰ Š  1 „  0 0„  ‚ ‚  ƒ  ƒ  † ‡ › ‚  † ‡ 1 1 2 1   €   ‚   Ž  ƒ   ‘† €Ž  † ¢  ‡‡  –’ ‡  •ƒ   €    ƒ 0„  ‚ ‚  ƒ  2  1 12  111    ‹ ˆ   ‹  ‰ Š  “    † ƒ  †  ‚   †    € ƒ     “ † ‡ˆ  ƒ  † ‡  1 2 1  1  1    ‹  0‚   €  €  ƒ „ 0 ‚ –‡ƒ  •ƒ   €    ƒ 0„  ‚ ‚  ƒ ‹ ˆ    12  12   ‰ Š   œ 0  ­ Ž ““    €   ‚   Ž  ƒ  † ‡  ƒ   ‘† €Ž  †  † ƒ  †  ‚   † ‰     ­€‚ƒ„ „ „„†„‡   ‰ ‚‰ ¢ ‡ ‰ Ž ‡‰ Ž  ‚ ƒ £­‚ƒ ‡ š ’  ‹‹    € ƒ      ‹  0‚   €  €‚ ƒ    „  ’ ­ €   ˜¤‚‰ ‡ƒ ­ ‰ ‚‚€ƒ­„ƒ  ­ƒ†ˆ  ˆˆ ‹   ••  €  ƒ „ €‰    € ‰  ’  „ ‰  ‚  ƒ   ‚  ‚ €­„ƒ    / 12  ‚  –  ’  0„  ‚ ‚  ƒ  ƒ  † ‡ ‰ ‰     ‹   ƒ   ƒ ­ƒ   ’   „ ” “ † ‡ˆ  11   Ž – ‰ Ž 2€ ‰ ž’2€ ‰ ’ ‰ ‡  ƒ ­  š ’  ˆ   12   1 €‚ ƒ    „  ’ ­ €   ˜¤‚‰ ‡ƒ ­ ‰ ‚‚€ƒ­„ƒ  ­ƒ†ˆ  ”‰    0   2 ‚‚  ‚   € 0‚   €  €  ƒ „   † ‡ˆ ˆ ‹   •• 2 €‰    € ‰  ’  „ ‰  ‚  ƒ   ‚  ‚ €­„ƒ  ‚  –  ’  0„  ‚ ‚  ƒ  ƒ  † ‡ “    €    ƒ   ƒ ­ €‹– ’   „ 112   12   † ‡ˆ Š  0 ¥ ‹  €  “    € Š  0 0—–    – ‰ ¡ ‚‰ ¥ ƒ‚‰ ‰  ‚‰  ’  š ’    12   1   €‚ ƒ    „  ’ ­ €   ˜¤‚‰ ‡ƒ ­ ‰ ‚‚€ƒ­„ƒ  ­ƒ†ˆ       ‹ ƒ       ‘   € 0‚   €  €  ƒ ” “ † ‡ˆ ˆ‹ ‹   •• 2 1 €‰    € ‰  ’  „ ‰  ‚  ƒ   ‚  ‚ €­„ƒ  „ Š   0  —        ””    € ‚  –  ’  0„  ‚ ‚  ƒ  ƒ  † ‡ ‰ ”        † ‡ˆ 0‚   €  €  ƒ „ ’   „ ‚  0 ˜ ­       €‚ ƒ   ‚„„  ƒ     12        ‰ Š ¦  €–      ƒƒ  ƒ ‡ – ƒ  0„  ‚ ‚  ƒ  ƒ  † ‡ 1 1 1 2 1  12  1  “    –   €  –  „ †     € €  Ž ” “ † ‡ˆ ƒ  0  –     •ƒ   €   ƒ 0„  ‚ ‚  ƒ 2 ‹     ­­€  ‰ Š  €   ƒ  † ‡ › ‚  † ‡   Š  ‹  œ €/  € ­ƒ  † ƒ   12  ‰        † ‡ˆ    ¡    ­   €‚ ‰ ¦   •    €    0‚   €  €  ƒ „ ‹    1   12  ˆ  ‰ Š „  ƒ 0„  ‚ ‚  ƒ  ƒ  † ‡   –   ™•’š  Ž ‚   ­ €Ž†   ‰2112  1  ‰”     12  12   † ‡ˆ ’   „ ‚  0 ¥ ­     / –     „     ˆ Š12     ˆˆ      ‰ Š   ‹ 0  —       €   ‡ €        ‚ƒ ­ ‚ƒ ‡ › ‚  † ‡ 1 2 1 ”‰“     ” † ‡ˆ € 0‚   €  €  ƒ „ ‰112  12 “  ˜ ‡ ‡‡   •ƒ ‰ Ž  ‡  •ƒ ‰ ƒ    ­ ‹ •ƒ   112   ˆ    ‰ ƒ    ­  •ƒ ‰     •ƒ ‰  2 ‹ •ƒ ˜   ‰ Š — 0  —   1   Š‹     Ž R ˆ‹ € 1 121   1      Š1212  12  “ † ‡ˆ 0„  ‚ ‚  ƒ  ƒ  † ‡ €Ž   ’  € 0‚   €  €  ƒ „  ‹ 0†  ‹ 0  †  –   €  ƒ     ƒ –  ‰    ¡   ‰ Ž €   2‰ ˜ ƒ ’ 1  ‚ „    „€‡„ ƒ‚€„„‡  “ † ‡ˆ š ’  ‹  €‚ ƒ    „  ’ ­ €   ˜¤‚‰      ‚ ‹     ‚‚€ƒ­„ƒ  ­ƒ† •• 2  —  ­ Ž   „  ƒ¡  –    ­     ‡ƒ ­ ‰ €‰    € ‰  ’  „ ‰  ‚  ƒ  ‰    „€‡„ ƒ‚€„„‡ “  † ‡ˆ  ‚  ‚  –  ’  0„  ‚ ‚  ƒ  ƒ  † ‡ ‰ ƒ €      € 0‚   €  €  ƒ „ Š‹ 0 ­         Ž R ˆ‹ € €Ž   11     ­‰ –  ‡ ‰   /‰   ‰ ˜  – ƒ ‚  0  ˆ  ”‰      † ‡ˆ €‚ ƒ    „  ’ ­ €   ˜¤‚‰ ‡ƒ ­ ‰ ’  € 0‚   €  €  ƒ „ 12 1 2 1     ‚‚€ƒ­„ƒ  ­ƒ† •• / ­ /  € ¤ ƒ    € 0‚   €  €  ƒ €‰    € ‰  ’  „ ‰  ‚  ƒ   ‚  “    12  12 ” “ † ‡ˆ ‚  –  ’  0„  ‚ ‚  ƒ  ƒ  † ‡ „ ’–ƒ     ƒ    ’  0‚   €  €  ƒ „ ‰ ‡2€ ‰ Ž €– ‰ ˜‚/ ’ 2 ‡ š ’    €‚ ”‰ ‰   12   “ † ‡ˆ ƒ    „  ’ ­ €   ˜¤‚‰ ‡ƒ ­ ‰ €‰    ’–ƒ ’   „ ˆ    ‚‚€ƒ­„ƒ  ­ƒ† •• ‹   0 ¥–   ‡ƒ       œ R ˆ‹ € 12  12 € ‰  ’  „ ‰  ‚  ƒ   ‚  ‚  – ”‰ ‰    “ † ‡ˆ  ’  0„  ‚ ‚  ƒ  ƒ  † ‡ €Ž   ’  € 0‚   €  €  ƒ „  1 2 1 ˜‚/ 0 Ž ’ ‡ ƒ     ¢ ––‚ ƒ ˆ  €‚ 0„  ‚ ‚       € – “ Š2 ™“” ­ €  ƒ š ¤  € ­  ‹     ­­€  ˆ ‰ Š  ”   / 1  12 2   † ‡ˆ ƒ  ƒ  † ‡ › ‚  † ‡ ‚     € 0‚   €  €  ƒ „             M  O M  O       M 131O                           ­€ € ­       ­  / 12   1   † ‡ 0  ƒƒ  ­  ­ „  1   2 1  Š€   ‹ƒ­  „ Œˆ Ž „‘    ’        ­  ‹  / 12   1 ˆ‰   ‡    ­€ € ­ 0  ƒƒ  ­  ­ „   1   2 1 ”„  • — ƒ  ‹ƒ­  „ Œ ’ƒ­  „ ‘  ­  “   1  12  2 1 “†ˆ‰ ‡ ’           ­ 0  ƒƒ  ­  ­ „  Ž  ‡ —Š     ˜ƒƒ  ­   ƒ    ƒƒ  ­ “ˆ     1 2 ‰“ ‡  ­ „    0    0   ˜ ƒ ­ „   ˆˆ ƒ   ­ €‚ƒ„­ƒ ‹‹    ƒ      12   1    Ž „ƒ    € ­ ’        0  ƒƒ  “ˆ  12†1121 112† † ‡ ­  ­ „  1 1   /  0 —ƒ  2 2 •  — 2 €        €  ­ —  0   „      €       0­ƒ        “ˆˆ   €‡ƒˆƒˆ„  † ‡ ­ €  ­     ‹ƒ­  „  ­ œ   „ ’„    02 0  ƒƒ  ­  ­ „  ˜   0  ­ / Ÿ    ’ € ˆ   ƒ ­           €  „   ˜ ¡ƒ ­ €    „        12   1  “ˆˆ  “ ‡        ƒ  ­ „    ƒ   ƒ     2 1 0  ƒƒ  ­  ­ „  • 2          „        €  €ƒ €  € ‰ 1 1 12  “    „    € „       —  „  ““ˆ ‡  2 1† 12  0  ƒƒ  ­  ­ „  Ž  ƒ   ƒ  0 ¢ € Š Ÿ   ƒƒ ˜     ‹  ’  ­ 212  1  “ˆ  £ •  ˜    • Š  ­ • ­ €  Ž  ­ “ ‡ 2 1 00  ƒƒ  ­  ­ „  ¤ €ƒ­ 0 ˜ Š ŠŠ ‡‡•  ­€ € ƒ —     ­ ­ „  1   ˆ  § ¨ € „   ƒ  ­ €     „   ‡ 2   „ „   ©   0 Š  Ÿ   ª  ­    ƒ ­ 0  ƒƒ  ‰†   €‡ƒˆƒˆ„  †“ ‡ ­  ­ „  Ž  ƒ     12  “   2—  ’   —ƒ ­ €  ‡   2 Ÿ Š 0 ©  Ÿ    ’ €    ƒ ­   ƒ Ž  ­ ˆˆ   12  1 2 1 “ ‡ 0 0  ƒƒ  ­  ­ „  ’   ˜ Š “   ƒ    ­ 0  ƒƒ  ­  ­ „    “ˆ  †ˆ ‡  Š1 12  12 † 0 —ƒ ‡ƒŠ „    „    ƒ    ‡€€ˆ‚  ‹‹ ‡  0   •ƒ ƒƒ «2 €  ˜­ / ’   —ƒ ­ € ­  12  2 1† “† † ˆˆ ‡ 0  ƒƒ  ­  ­ „  Š12 2 «2 0  €„ Ÿ   Ÿƒ  ˜    ˆ ‹  € R      / 12   “ˆ ‰ †“† ‡    ­ 0  ƒƒ  ­  ­ „   1 2 1  12   1 1  0  ˜ Š ˜ ­ ®  R /  ’  „ £  ®  R /  Ž  ­ ˆ†   †  12   ‡ 00  ƒƒ  ­  ­ „   1‰ 2 1  ª ƒ 0 ©  ƒ Ÿ   ˆ“   ƒ ­ 0  ƒƒ  ­ ‰   12  ‰‰ ‡  ­ „   ƒ 0 ˜€ Ÿ   § Š  ­  ’ € ‰“   ƒ ­ “   12   2 1  ‡ 0  ƒƒ  ­  ­ „  Ž  ƒ   ‰  £ ƒ        ƒ     „ „ „    11 †  21Š “ ‡ / ˜ Š 0—   ©         ­€ € ­ 1/ 12    †  “““ ‡ 0  ƒƒ  ­  ­ „  Ž „Ž  ƒ    1 2 1 ‡ —Š  0   Ÿ   Š­  ˜   ‰ ‹  ’     ­  €‡ƒˆƒˆ„ ˆƒ­Œ ‰‰ ˆ ‹‹ 0  ƒƒ  ­  ­ „  „„Žƒ€ˆŽƒ 1  0  ˜ Š • Š ƒ ®  R /  0­  ’ƒ ®• •R /    ­ ‰ † 1 12  1 2 1 “ ‡ 00  ƒƒ  ­  ­ „  •ƒŠ  • ª 2 †““   ƒ   ƒ    ­  12 2†  † † “ ‡ 0  ƒƒ  ­  ­ „  Ž  ƒ   12   1 2 1 •ƒŠ  Ž  €  ††   ƒ 0  ƒƒ  ­  ­ „ †† ‰ 12   12 ‰“ ‡  •ƒŠ  Ž  €  ˆˆ   ƒ   ƒ      ­ €  †“ ‰ 12   12 †† ‡ ­ 0  ƒƒ  ­  ­ „ 

      M  O       M 132O                                            ­€ € ­       ­  / 12   1   2112  1   † ‡        ­€    ‚    ƒ 0  ƒƒ  ­  ­ „  1   2 1      2 1 12   ‡ ˆ ‡‚ ‰Š 0   ƒ ƒ   †  0  Š€   ‹ƒ­  „ Œˆ Ž „‘    ’        ­  ‹  / 12   1 1  21  ˆ‰   ‡    ­€ € ­ 0  ƒƒ  ­  ­ „   1   2 1 ‰‹  0 2ƒ ‘      ’   ‚  ‰ƒ    1  1 12  1 ‡     ‡ ‚ ‰Š ”„  • — ƒ  ‹ƒ­  „ Œ ’ƒ­  „ ‘  ­  ƒ 0   ƒ ƒ   †   2 1 “   1  12  2 1 “†ˆ‰ ‡ ’           ­ 0  ƒƒ  ­  ­ „  Ž    “   ­€   ’   ‚    M  ­ ’  ƒ ­        ­€‚ƒ‚ƒ‚‚„‚  –– ‡ —Š     ˜ƒƒ  ­   ƒ    ƒƒ  ­   ƒ 0   ƒ ƒ   †  “ˆ     1 2 ‰“ ‡  ­ „   0‚ —˜ 0  ‚  ‘™ š’ ‚                12 2   ‚ ‰Š   0    0   ˜ ƒ ­ „   ˆˆ ƒ   ™ ’   ­ €‚ƒ„­ƒ ‹‹    ƒ     šƒ š œ š’    ’   ƒ     12   ™€ ’  š ž‚ ƒ€‚ ’ ‚  ’‚ ™  1    Ž „ƒ    € ­ ’        0  ƒƒ  ˆ     ­€‚ƒ‚ƒ‚‚„‚  –– “ˆ  12†1121 112† † ‡   ‚     ƒ        ˜ ™  ­  ­ „  1 1   /  0   ƒ ƒ   †  ‚  †‡‡‡ 11 1 0 —ƒ  2 2 •  — 2 €        €  ­ —  0  š˜ 0 2˜ ‘   š   š’   ƒ €  €  1 1ˆ   „      €       0­ƒ        ‡‡    ™˜   ƒ    ˜  ƒ   ’€ €  €   ‡‚ ‰Š “ˆˆ   €‡ƒˆƒˆ„  † ‡  12     ­ €  ­     ‹ƒ­  „  ­ œ   „ ™˜   ’„    02 0  ƒƒ  ­  ­ „  ˆ  1  ˜  0 Ÿ ‹2 ‘    – ƒ  ¡  ­ƒ  ¢   12  1  ˜   0  ­ / Ÿ    ’ € ˆ   ƒ ­               ‚ ‰Š   €  „   ˜ ¡ƒ ­ €    „        12   1  ƒ ™ ­    £   ƒ 0   ƒ ƒ   †  2 1 “ˆˆ  “ ‡        ƒ  ­ „    ƒ   ƒ     2 1 ƒ 0 ™  ‘    – ƒ  ¡ ­ƒ  ¢   ƒ ˆ112   1     ‡ ‡ ‚ ‰Š 0  ƒƒ  ­  ­ „  ™ ­    £   ƒ 00   ƒ ƒ   †   2 1 • 2          „        €  €ƒ €  € 0 0 “ ‘     ‚   ’€    ƒ  ˆ 11 ‰ 1 1 12  ˆ     ˆ ‚ ‰Š “    „    € „       —  „  ““ˆ ‡ 0   ƒ ƒ   †  £   12 2 1  2 1† 12  0  ƒƒ  ­  ­ „  Ž  ƒ   ‰‹  0 2   ˆ (    ƒ    ‚ ‹ ƒ  0 ¢ € Š Ÿ   ƒƒ ˜     ‹  ’  ­      ™  ƒ    € ‹ ƒ € ƒ  ’    1   ‚ ‰Š 212  1  “ˆ  £ •  ˜    • Š  ­ • ­ €  Ž  ­ “ ‡   ¦   ’      ‚  €   02 2 1 00  ƒƒ  ­  ­ „  “ 0 œ ‘   šƒ š’    ’   ‚ ’ ­ ‡‡    12  1 2 1 ˆ  ‚ ‰Š ¤ €ƒ­ 0 ˜ Š ŠŠ ‡‡•  ­€ € ƒ —     ­ ­ „ š’  ˆ  ’   ƒ 0   ƒ ƒ   †   1   ˆ  § ¨ € „   ƒ  ­ €     „   ‡    0  ‘   ‡  ’   ‚    0 0   ƒ  12  1    2    ‡     ˆ ‡‚ ‰Š „ „   ƒ   †  £     †  2 1 ©   0 Š  Ÿ   ª  ­    ƒ ­ 0  ƒƒ  ‰‹  ˜   –     ­ƒ ƒ ­    ‰†   €‡ƒˆƒˆ„  †“ ‡ ˆˆ     ­€‚ƒ‚ƒ‚‚„‚  –– ­  ­ „  Ž  ƒ   £     †    12  ’˜ 0 “ƒ ‘   ‹˜ š’  ‡  ’   ‚   ‰ƒ 12   12 “   2—  ’   —ƒ ­ €  ‡      ‡ ‚ ‰Š   2  0   ƒ ƒ   †  £     †   1 2 1 Ÿ Š 0 ©  Ÿ    ’ €    ƒ ­   ƒ Ž  ­ — 0  ‘     ’     ƒ 0   ƒ ˆˆ   12  1 2 1 “ ‡ ‡    ‚ ‚ƒ€­ ‚‚   ‡ ‚ ‰Š 0 0  ƒƒ  ­  ­ „  ƒ   †  ’   ˜ Š “   ƒ    ­ 0  ƒƒ  ­  ­ „    / š 0‹’ —  ™     Š ƒ€€   ƒ “ˆ  †ˆ ‡  ˆ    ‚ ‚ƒ€­ ‚‚  ––  Š1 12  12 0   ƒ ƒ   †  £   £     †  † 0 —ƒ ‡ƒŠ „    „    ƒ    ‡€€ˆ‚  ‹‹ 2’ 0 š  ‘    – ƒ  ’ ‚ ­    ƒ  12  1    ‡    ‡  ‚ ‰Š ‡  0   •ƒ ƒƒ «2 €  ˜­ / ’   —ƒ ­ € ­  12  2 1† 0   ƒ ƒ   †  £     †  2 1 “† † ˆˆ ‡ 0  ƒƒ  ­  ­ „  Š12 2   0 0€ ‘    – ƒ  ¡ ­ƒ  ¢ ’  ƒ     ‚ ‚ƒ€­ ‚‚     ‚ ‰Š «2 0  €„ Ÿ   Ÿƒ  ˜    ˆ ‹  € R      / 12   0   ƒ ƒ   †  £     †  “ˆ ‰ †“† ‡    ­ 0  ƒƒ  ­  ­ „   1 2 1  0‚ —˜ 0  ‚  ‘™ š’ ‚         ƒ­­‚­­ ‹ ­ƒ‚    ––  12   1 ™ ’ Œ ‚ƒ‚„Œ  1  0  ˜ Š ˜ ­ ®  R /  ’  „ £  ®  R /  Ž  ­ ˆ†   †  12   ‡ ¨ €ƒ 0   ™ ™ ˜     ƒ ‹   1   1 00  ƒƒ  ­  ­ „  ‡      ‚ ‰Š  1‰ 2 1  †€ ‚    0   ƒ ƒ   †  2 ª ƒ 0 ©  ƒ Ÿ   ˆ“   ƒ ­ 0  ƒƒ  ­ ˜ 0 š ‘   š 2 ƒ˜  ¨˜ š’    – ‰   12  ‰‰ ‡ ‡ ˆ    12   ˆ ‚ ‰Š  ­ „   ­ ’    ƒ 0   ƒ ƒ   †   ƒ 0 ˜€ Ÿ   § Š  ­  ’ € ‰“   ƒ ­  0   ‘      –  ­ ’    ƒ 0   1 1  112 “   12   2 1  ‡ ‡‡     ‡‡ ˆ‡‚ ‰Š 0  ƒƒ  ­  ­ „  Ž  ƒ   ƒ ƒ   †  1  2 1 ‰  £ ƒ        ƒ     „ „ „    11 †  21Š “ ‡  ˜ 0 š  ‘     š’  ‡ˆ  ’   ˆ12 Ž  ‡ˆ    ˆ  ‚ ‰Š / ˜ Š 0—   ©         ­€ € ­ 1/ 12    0   ƒ ƒ   †  £     †   1 †  “““ ‡ 0  ƒƒ  ­  ­ „  Ž „Ž  ƒ    1 2 1   ƒ/  –  € R Š˜  ƒ ƒ€‚  –  ƒ  12   1  ‡ —Š  0   Ÿ   Š­  ˜   ‰ ‹  ’     ­  €‡ƒˆƒˆ„ ˆƒ­Œ ‡ˆ‡‡    Š˜ ‚  –  0  Š˜ ‚  – ƒ   ‚ ­  ’   ˆ ‚ ‰Š ‰‰ ˆ ‹‹  1 2 1 0  ƒƒ  ­  ­ „  „„Žƒ€ˆŽƒ ƒ   ’ £   ƒ 0 0   ƒ ƒ   †  1  0  ˜ Š • Š ƒ ®  R /  0­  ’ƒ ®• •R /    ­  12 1  1  ‰ † 1 12  1 2 1 “ ‡ š˜ š ’ ˜ƒ        ƒ  00  ƒƒ  ­  ­ „  ‡ˆ     2 112 1ˆ    ‚ ‰Š   £     †  •ƒŠ  • ª 2 †““   ƒ   ƒ    ­  12 2†  2 12 † † “ ‡ 0  ƒƒ  ­  ­ „  Ž  ƒ   12   1 2 1 ‘˜‹  šª «ƒ    ‚ € ’  ‚   12   •ƒŠ  Ž  €  ††   ƒ 0  ƒƒ  ­  ­ „ ‡ ‡     †‚ €€ ‚    ‚  ‰  0€ ˜      1 2 1 ‡  ‚ ‰Š †† ‰ 12   12 ‰“ ‡  ’  ‚ ­  ’ £   ƒ 0   ƒ ƒ   †    ˆ1 •ƒŠ  Ž  €  ˆˆ   ƒ   ƒ      ­ €     ™ ˜ €€  ˜ ƒ    ’ ­™  ‹ƒ€‚ †“ ‰ 12   12 †† ‡ ‡     12   1 2 1   ‚ ‰Š ­ 0  ƒƒ  ­  ­ „  £   ƒ 0   ƒ ƒ   † 

            M  O M  O       M 133O                    0      ­ 2 ‚ƒ „  ƒ‡ ˆ  Š  / 12         ‚ƒ ‹ Œ   Ž  ‘’ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ”  —   ˜™ 1 2 1 •‘Š –‘‚ ’ ‘‚ •‘Š 0Œ 0   ‚ƒ    › ‚ ˜ ‚“‘ ‚ƒ ‘” ‹œ ž•‚” 21  —š —   ‚  ’ ‘‚ ’› ‚ ƒ ‚ •‘Š   ’  ”‘œ   Ž   ˜™ /2 Ÿ‘ƒ‚ “ ›  ‚ƒ ‘‚‚’ ‚ ‘  ‘‚ ‚   ‚  Ÿ   0 ŸŠŒ     ‘’    ˜ ƒ ‚  ‘‚  Ž—         ˜™ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š ƒ ” Œ  ‘’’Š      ‘’ Š ŸŠŒ Ž     2112 ­ 1 šŽ     Ž—   ˜™ ‘‘ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š –‘” –‘‚ ’ ‘‚ •‘Š  2 1   ‚ ‚  ‚    ‘‘ “ ’  ‘“   ‚ ‚‚ “ ’  š     12   12     ˜™ ‚ƒ  ’ƒ‚ M”‘‚‚   –‘‚ ’ ‘‚ •‘Š  Š  ˜  Š   ‘’ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š –‘”    2112 ­ 1 —Ž    —   ˜™ –‘‚ ’ ‘‚ •‘Š  2 1 1 ‚ Š ’‚   ”’   ‚‚ ‚ƒ  “   ‚ƒ     ‚ƒ„ ƒ‚ƒ„ƒ† ££ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š 0 ‚›’ 0     ­2  ‚ƒ ˆ  ’ ‚ Ÿ      š   ­ˆ12   12  —   ˜™  ‚ ‚  ’  ’ ’  ‘ ‘‚ ‚ƒ ‘‚ ’ ‘‚  ŸŠŒ Ž  ‘’    £  ‘‘ –  ƒ  ‚ ŸŠŒ ­12 2‰1  Ž— Ž   —— —   ˜™ ’ Œ   ‘¤’ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š  ­12 1  Œ 0 ¥‚’     ‘’ —  ‘”    “ ‚ƒ Ž Ž   Š / ­12   —   ˜™ ‚ƒ  ‚ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š –‘” ‚ ‘’ 0 Ÿ‚ ‚   ˜Š› ŸŠ ‚ ƒ‘’ ž Š  ˜’Œ ™     ‰1  —    š   ˜™  £  Š ‚ ‘‚  ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š  12 ‘’ 0 › ‚ 0ŒŒ    ‚  Ž  ‘’ 0 0‚“  ’ ’ ‚ƒ 1 2 1Š12 š——Ž      —  ˜™  ‚ƒ ” •‘Š –‘‚ ’ ‘‚ •‘Š 12 ˜ ›Œ‘‚ ­  ›   › ‚ ˜ ‚“‘ ‚ƒ ƒ‘”‚ ”œ ž•‚”     ‚  ’ ‘‚ ’› ‚ ƒŒ ‚ •‘Š   ’  ”‘œ   1 —   ˜™ Ÿ‘ƒ‚ “ ›  ‚ƒ ‘‚‚’ ‚ ‘  ‘‚ ‚   ‚ „ ‚Š  0 ŸŠŒ    2 Ÿ   ‘  ¥‚Š ’’’ 0 11 12  Š 1 —Ž        ˜™ Ÿƒ/  ›’ƒ‚ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š  2 1 ‚Œ 0 „   „ Š ŸŠŒ Ÿ     £  ™ ‘‚  Š12  Š 1  Ž     Ž—   ˜™ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š 2 1 ‚Š  0 ¥› 2   ›‘Œ Ÿ   ”  ‚‘  — Ž š Ÿ 1‰ ——š     —  ˜™ ƒ‚   ” ‚‚‚ ‘ ‚  ‘‘   ’ ”‘  ¨ Š11 Ÿ ‚ 0 ¥ƒ   Ž  ‘’   ‘¤’ ‚ƒ ˜ ƒ ‚  Ž    12 2     ˜™ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š –‘” Œ 0 „   š—  ‘’   ˜ ƒ ‚  ‚ƒ ‘¤’ ‚ƒ 12  1 2 1‰ Ž    Ž    ˜™ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š –‘‚ ’ ‘‚ •‘Š Š 12 1 2 1 ’Œ ‚Š  ‚ ¥2   © ‘‚  ‚ƒ 0‚“  ’ ’ ‚ƒ     12   12 Ž    ˜™  ‚ƒ ” •‘Š –‘” ƒ ‚ 0 /   ‘  ¥‚Š ’’’ ŸŠŒ Ÿƒ/ / 12 Š ­ 1     ›’ƒ‚   ’    ‚ƒ  ‚     ‘‚ ”” ‘‚ š Ž  ˜™  2 1 ”‘œ  ‚  ”“ ‘‚  ‚  ‚ƒ ƒ‘ ˆ  0  ‚      Ÿ      £  ‘‘ ‘‚  š      š   ˜™ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š Œ‚ ‚ 0  Š‘’   Žš  ‘’   2  ˜£Ž Ÿ‘¤’ ­/ ­12    1 š—š š    š   ˜™ ‘‚  ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š  2 1   ‚  2 0 ¥Š’‚   ‚   Š ŸŠ  £  — š   1 12  1 2 1  ŽŽ   ˜™ ‚ ƒ‘’ ™ ‘‚  ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š Œ‚ ‚ ˜ ‚ — £›ƒ ˆ  ‚ ™‘ƒ ‚  ‚ƒ ‚ ‘ M  ‚“‘ š š   Š212  1 2 1 —    ˜™ –‘‚  ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š  0 ›   2     ‘‚ ‚ ‚“  ’ ’ ‚ƒ ­­12   1      — Ž —  ˜™ ‘  “   –‘‚ ’ ‘‚ •‘Š 2 1 1 ‚ ’“ ŸŠŒ  Š” Ÿ     M   ” 0  ˆ ” ™ 1­12  1  ‹  ‘‘ ‚ƒ ‘  Š ˆ ƒ Ÿ     £  ‚ ƒ‘’ š—    2 1‰1  1  Ž   ˜™ ™ ‚ƒ ‘  ŸŠŒ   ‚ Ÿ     ‚ ƒ‘’ ™  ”‘   2 1   0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š Œ‚ ‚ 0  £›ƒ   ‘”  ‘‚  ‚ƒ 0‚“  ’ ’ ‚ƒ 1 2 1Š12 š—š     —   ˜™  ‚ƒ ” •‘Š 12 ‚Š  0ª  ‚ƒ /    2” ‚  Ÿ   š  ‘’ Ÿ  Š Š1112 š      ˆ  ‚ Ÿ     ‘¤’ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ”     ˜™ ­  1 2 1 •‘Š –‘‚ ’ ‘‚ •‘Š

      M  O

      M 134O                    0      ­ 2 ‚ƒ „  ƒ‡ ˆ  Š  / 12         ‚ƒ ‹ Œ   Ž  ‘’ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ”  —   ˜™ 1 2 1                •‘Š –‘‚ ’ ‘‚ •‘Š 0Œ 0   ‚ƒ    › ‚ ˜ ‚“‘ ‚ƒ ‘” ‹œ ž•‚” 21  —š —   ‚  ’ ‘‚ ’› ‚ ƒ ‚ •‘Š   ’  ”‘œ   Ž   ˜™ • /2     G Ÿ‘ƒ‚ “ ›  ‚ƒ ‘‚‚’ ‚ ‘  ‘‚ ‚   ‚  Ÿ   0 ŸŠŒ     ‘’    ˜ ƒ ‚  ‘‚  Ž—         ˜™ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š ƒ ” Œ  ‘’’Š      ‘’ Š ŸŠŒ Ž     2112 ­ 1 šŽ     Ž—   ˜™ According to the 2013 Shipping Work Group 427.933 containers, Kocaeli port area with 243.936 ‘‘ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š –‘” –‘‚ ’ ‘‚ •‘Š  2 1   ‚ ‚  ‚    ‘‘ “ ’  ‘“   ‚ ‚‚ “ ’  Report issued by the General Directorate of Maritime containers and 0zmir port area with 234.913 containers š     12   12     ˜™ ‚ƒ  ’ƒ‚ M”‘‚‚   –‘‚ ’ ‘‚ •‘Š Trade Affairs of the ministry of Transport, Maritime and and Gemlik port area with 199.512 containers.  Š  ˜  Š   ‘’ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š –‘”    2112 ­ 1 Communications,, the number of containers of export —Ž    —   ˜™ –‘‚ ’ ‘‚ •‘Š  2 1 goods rose by 9% last year as compared to the ­ €‚  ƒ 1 ‚ Š ’‚   ”’   ‚‚ ‚ƒ  “   ‚ƒ     ‚ƒ„ ƒ‚ƒ„ƒ† ££ previous year.0t is reported that the number of The most container loadings at Turkish ports were 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š 0 ‚›’ 0     ­2  ‚ƒ ˆ  ’ ‚ Ÿ     containers handled in seaway exports rose to 2.088.000 mad e for vessels that were to sail to Egypt with  š   ­ˆ12   12  —   ˜™  ‚ ‚  ’  ’ ’  ‘ ‘‚ ‚ƒ ‘‚ ’ ‘‚ ea.0n 2012 the figure was 1.910.060 ea. Of the 402.450 ea and the volume of containers handled  ŸŠŒ Ž  ‘’    £  ‘‘ –  ƒ  ‚ ŸŠŒ ­12 2‰1  containers, 188.453 ea were carried on Turkish reached 592.000 TEU. Ž— Ž   —— —   ˜™ ’ Œ   ‘¤’ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š  ­12 1  vessels, and 47.696 ea on the vessels of destination This country was followed by Greece with 246.144 Œ 0 ¥‚’     ‘’ —  ‘”    “ ‚ƒ Ž Ž   Š / ­12   —   ˜™ countries and 1.851.882 on the vessels belonging to ea, Italy with 193.045 ea, Spain with 180.210 ea, ‚ƒ  ‚ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š –‘” ‚ ‘’ 0 Ÿ‚ ‚   ˜Š› ŸŠ ‚ ƒ‘’ ž Š  ˜’Œ ™     ‰1 different countries. Belgium with 154.596 ea and China with 141.157 ea.  —    š   ˜™  £  Š ‚ ‘‚  ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š  12 0n the said period, the most handling of containers According to the 2013 Shipping Work Group ‘’ 0 › ‚ 0ŒŒ    ‚  Ž  ‘’ 0 0‚“  ’ ’ ‚ƒ 1 2 1Š12 took place at Ambarlı port with 630.362 ea whereas the š——Ž      —  ˜™ Report, the following analyses have been made as to  ‚ƒ ” •‘Š –‘‚ ’ ‘‚ •‘Š 12 volume of containers loaded reacned 1 million TEU. the 2003-2012 period imports and exports handlings ˜ ›Œ‘‚ ­  ›   › ‚ ˜ ‚“‘ ‚ƒ ƒ‘”‚ ”œ ž•‚” Ambarlı port was followed by Mersin port area with (ton) and Turkish ports and cargo types:     ‚  ’ ‘‚ ’› ‚ ƒŒ ‚ •‘Š   ’  ”‘œ   1 —   ˜™ Ÿ‘ƒ‚ “ ›  ‚ƒ ‘‚‚’ ‚ ‘  ‘‚ ‚   ‚ „ ‚Š  0 ŸŠŒ    2 Ÿ   ‘  ¥‚Š ’’’ 0 11 12  Š 1 —Ž        ˜™   ­    „    Ÿƒ/  ›’ƒ‚ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š  2 1 ‚Œ 0 „   „ Š ŸŠŒ Ÿ     £  ™ ‘‚  Š12  Š 1  Ž     Ž—   ˜™ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š 2 1      ‚Š  0 ¥› 2   ›‘Œ Ÿ   ”  ‚‘  — Ž š Ÿ 1‰ ——š     —  ˜™      ƒ‚   ” ‚‚‚ ‘ ‚  ‘‘   ’ ”‘  ¨ Š11              1     1  1 Ÿ ‚ 0 ¥ƒ   Ž  ‘’   ‘¤’ ‚ƒ ˜ ƒ ‚  Ž    12 2     ˜™      ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š –‘” ­  ­  ­  Œ 0 „   š—  ‘’   ˜ ƒ ‚  ‚ƒ ‘¤’ ‚ƒ 12  1 2 1‰ Ž    Ž    ˜™ €‚‚ƒ                             0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š –‘‚ ’ ‘‚ •‘Š Š 12 1 2 1 ’Œ ‚Š  ‚ ¥2   © ‘‚  ‚ƒ 0‚“  ’ ’ ‚ƒ €‚‚„                             12   12 Ž    ˜™  ‚ƒ ” •‘Š –‘” €‚‚                                ƒ ‚ 0 /   ‘  ¥‚Š ’’’ ŸŠŒ Ÿƒ/ / 12 Š ­ 1     ›’ƒ‚   ’    ‚ƒ  ‚     ‘‚ ”” ‘‚ š Ž  ˜™ €‚‚†                                2 1 ”‘œ  ‚  ”“ ‘‚  ‚  ‚ƒ ƒ‘ ˆ  0  ‚      Ÿ      £  ‘‘ ‘‚  €‚‚‡                                š      š   ˜™ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š €‚‚ˆ                          Œ‚ ‚ 0  Š‘’   Žš  ‘’   2  ˜£Ž Ÿ‘¤’ ­/ ­12    1 š—š š    š   ˜™ ‘‚  ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š  2 1 €‚‚‰                                 ‚  2 0 ¥Š’‚   ‚   Š ŸŠ  £  — š   1 12  1 2 1  ŽŽ   ˜™ €‚Š‚                               ‚ ƒ‘’ ™ ‘‚  ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š Œ‚ ‚ ˜ ‚ — £›ƒ ˆ  ‚ ™‘ƒ ‚  ‚ƒ ‚ ‘ M  ‚“‘ š š   Š212  1 2 1 —    ˜™ €‚ŠŠ                           –‘‚  ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š  0 ›   2     ‘‚ ‚ ‚“  ’ ’ ‚ƒ ­­12   1  €‚Š€                                 — Ž —  ˜™ ‘  “   –‘‚ ’ ‘‚ •‘Š 2 1 1 ‚ ’“ ŸŠŒ  Š” Ÿ     M   ” 0  ˆ ” ™ 1­12  1  ‹  ‘‘ ‚ƒ ‘  Š ˆ ƒ Ÿ     £  ‚ ƒ‘’ „         ­   š—    2 1‰1  1  Ž   ˜™ ™ ‚ƒ ‘  ŸŠŒ   ‚ Ÿ     ‚ ƒ‘’ ™  ”‘   2 1   0‚“  ’ ’ ‚ƒ  ‚ƒ ” •‘Š    Œ‚ ‚ 0  £›ƒ   ‘”  ‘‚  ‚ƒ 0‚“  ’ ’ ‚ƒ 1 2 1Š12 š—š     —   ˜™    1   ‚ƒ ” •‘Š 12             ‚Š  0ª  ‚ƒ /    2” ‚  Ÿ   š  ‘’ Ÿ  Š     1    1 Š1112      š      ˆ  ‚ Ÿ     ‘¤’ ‚ƒ 0‚“  ’ ’ ‚ƒ  ‚ƒ ”     ˜™ ­  ­  ­  ­  1 2 1 •‘Š –‘‚ ’ ‘‚ •‘Š                                                            M  O       M  O       M 135O                                                                                                                                                                                                                                 

                  

MARMARA REGION 2030 FORECAST (aver.) Existing Capacity Capacity Difference

Container (TEU) 13.098.320 5.238.197 -7.860.123 General and Bulk Cargo (Ton) 200.967.589 118.185.000 -82.782.589 Liquid Chemical Cargo (Ton) 63.314.147 49.261.000 -14.053.147 Ro-Ro Foreign Trade (Ea ) 480.194 1.050.000 569.806 Ro-Ro Coasting trade (Ea ) 1.714.316 250.000 -1.464.316 Automobile (Ea ) 5.673.034 1.789.230 -3.883.804 Container (TEU) 4.539.989 1.705.101 -2.834.888 General and Bulk Cargo (Ton) 77.818.977 42.930.810 -34.888.167 Liquid Chemical Cargo (Ton) 46.950.593 36.362.889 -10.587.704 Ro-Ro Foreign Trade (Ea ) 95.908 50.000 -45.908 Automobile (Ea ) 265.176 200.000 -65.176 MEDITERRANEAN REGION Container (TEU) 10.015.515 1.907.000 -8.108.515 General and Bulk Cargo (Ton) 139.670.042 54.574.052 -85.095.990 Liquid Chemical Cargo (Ton) 63.795.770 54.510.000 -9.285.770 Ro-Ro Foreign Trade (Ea ) 230.999 130.000 -100.999 BLACK SEA REGION Container (TEU) 2.170.230 505.000 -1.665.230 General and Bulk Cargo (Ton) 65.729.245 53.725.000 -12.004.245 Liquid Chemical Cargo (Ton) 5.381.525 2.912.000 -2.469.525 Ro-Ro Foreign Trade (Ea ) 274.929 449.800 174.871 TÜRK0YE TOTAL Container (TEU) 29.824.054 9.355.298 -20.468.756 General and Bulk Cargo (Ton) 484.185.854 269.414.862 -214.770.991 Liquid Chemical Cargo (Ton) 179.442.035 143.045.889 -36.396.146 Ro-Ro Foreign Trade (Ea ) 1.082.031 1.679.800 597.769 Ro-Ro Coasting trade (Ea ) 1.714.316 250.000 -1.464.316 Automobile (Ea ) 5.938.210 1.989.230 -3.948.980 (Transport Coastal Structures Master Plan Concluding Report)       M  O

      M 136O                                                                                                                                                                                                                                 

                   2030 FORECAST (aver.) Existing Capacity Capacity Difference       

Container (TEU) 13.098.320 5.238.197 -7.860.123 General and Bulk Cargo (Ton) 200.967.589 118.185.000 -82.782.589 Liquid Chemical Cargo (Ton) 63.314.147 49.261.000 -14.053.147 Ro-Ro Foreign Trade (Ea ) 480.194 1.050.000 569.806 Tax rate has been raised from 2 to 8% in the import DÇÜD General Secretary Dr. Veysel Yayan Ro-Ro Coasting trade (Ea ) 1.714.316 250.000 -1.464.316 of flat rolled products in the stainless steel. pointed out that at the time when the tax rate was 2 % Automobile (Ea ) 5.673.034 1.789.230 -3.883.804 General Secretary of the Turkish Steel Suppliers’ for the import of stainless flat rolled products, Posco Association (DÇÜD) Dr. Veysel Yayan said that they Assan facilities started production and with this, a AEGEAN REGION have found the decision positive. capacity has emerged in Turkey. The tax has been Container (TEU) 4.539.989 1.705.101 -2.834.888 Yayan said, “0n 2011, Turkey realized imports raised to 8% considering this situation.” General and Bulk Cargo (Ton) 77.818.977 42.930.810 -34.888.167 worth 872 million dollars and in 2012, worth 755 million Yayan added that this application is not valid for dollars. We can say that this application will limit the the countries that are bound by the Customs Union or Liquid Chemical Cargo (Ton) 46.950.593 36.362.889 -10.587.704 imports from third countries and contribute to the the free trade agreement. He noted that this approach Ro-Ro Foreign Trade (Ea ) 95.908 50.000 -45.908 closure of the foreign trade deficit.” taken by Economy Ministry is quite positive. Turkey Automobile (Ea ) 265.176 200.000 -65.176 made imports worth 872 million dollars in 2011 and MEDITERRANEAN REGION worth 755 million dollars in 2012. He said that a similar attitude is expected for the other flat products. Container (TEU) 10.015.515 1.907.000 -8.108.515 Yayan said, “Turkey’s flat product capacity is 16.5 General and Bulk Cargo (Ton) 139.670.042 54.574.052 -85.095.990 million tons whereas production is 9 million tons. Fort Liquid Chemical Cargo (Ton) 63.795.770 54.510.000 -9.285.770 his capacity to be utilized at higher rates, the decisions Ro-Ro Foreign Trade (Ea ) 230.999 130.000 -100.999 taken for the stainless steel should be given for the BLACK SEA REGION other products, and we expect a sense of utilizing the country’s own sources to be shown throughout the Container (TEU) 2.170.230 505.000 -1.665.230 economy. 0t is only by this way that foreign trade deficit General and Bulk Cargo (Ton) 65.729.245 53.725.000 -12.004.245 and payments balance deficit can be eliminated. Liquid Chemical Cargo (Ton) 5.381.525 2.912.000 -2.469.525 Otherwhise, it will only be a wish. Ro-Ro Foreign Trade (Ea ) 274.929 449.800 174.871  TÜRK0YE TOTAL Yayan stated that many countries in the world are Container (TEU) 29.824.054 9.355.298 -20.468.756 taking similar measures against their imports . General and Bulk Cargo (Ton) 484.185.854 269.414.862 -214.770.991 He said, “For instance the USA, where free trade is Liquid Chemical Cargo (Ton) 179.442.035 143.045.889 -36.396.146 at high levels, does not hesitate implementing such measures as soon as a boom takes place in imports. Ro-Ro Foreign Trade (Ea ) 1.082.031 1.679.800 597.769 But in our country, it is just the opposite and in spite of Ro-Ro Coasting trade (Ea ) 1.714.316 250.000 -1.464.316 the extraordinary rises in our local capacity, imports Automobile (Ea ) 5.938.210 1.989.230 -3.948.980 show an upwards trend. 0t is necessary to decide on (Transport Coastal Structures Master Plan Concluding Report) The Annex Decision of the 0mport Regime what to do to prevent such figures to appear once Decision was officially gazetted on 30 October 2013. more.”       M  O     M  O       M 137O             J      ­    €‚ ƒ    ‚  „ G

Zafer Ça/layan, who was the then Minister of both countries. “In the same way, the presence of many Economy, indicates that trade volume between Turkey Polish students in Turkey confirms that the future will be and Poland was $585 million in 2002, and it is $5 billion different,” Erdo/an said. at the end of 2012 yet not enough. Ça/layan spoke in The visit to the three European countries is closing session of Polish-Turkish Business Forum considered significant because all three countries Reminding the goal to increase the trade volume support Turkey's EU membership bid and have more between Turkey and Poland to $10 billion in a short recently developed strong bilateral ties with Turkey time, set by Turkish Prime Minister Erdogan and Polish     † ‚   Prime Minister Donald Tusk, Ça/layan said, "Turkey Meanwhile a strategic cooperation agreement and Poland challenge the economical crisis while most worth 250 million euros was signed with Polish firms European countries needs five or ten years to return to during the business visit chaired by Prime Minister pre-crisis conditions." Recep Tayyip Erdogan, regarding the Amasra Ça/layan underlined that the reason for the Hardcoal and Thermal P.Plant Project . The agerement bilateral trade volume's not being at desired level is not was concluded between Hattat Enerji and Poland’s knowing each other and stated, "Let's cooperate now Kopex S.A. and Famur S.A. . and turn mutual disadvantages into advantages by The agreement with Poland covers commercial receiving the support of business people. I trust the issues and the technology transfer for use in the Project Turkish businesspeople who made history for 10 processes from the extraction of the hardcoal by years," assessing Turkey's historical, cultural and means of underground and ground mechanization religious ties with the Caucasus and Middle East. systems, up to its rehabilitation, and conversion into Ça/layan invited Polish businesspeople to revise various coal types. their plans and invest in Turkey by telling that the labor Hattat Holding Board of Directors member 0pek cost is very low in his country and not neglecting a Hattat said that the total investment value is 3,5 bln humor, "Some of you may want to come Turkey Euro of the Project, which will lessen Turkey’s coal immediately when you check the incentive package, imports by 25% (around 5 bln dollars/year) and raise there are still empty seats in my airplane." the hardcoal production 3 fold.Employment will reach After Ça/layan's speech, some mutual 11.000 workers when the Project is fully in action. agreements, regarding the cooperation between Meanwhile, Poland is reported to be interested in Turkish and Polish firms, were signed in the presence collaborating with Turkey in the production and of the delegation. modernization of various weapons systems. Among On the third day of his trip to Europe in November, these are helicopters, the production of corvettes, which Erdo/an visited Poland, which coincided with the 600th are small-scale warships, and the modernization of anniversary of the establishment of diplomatic relations Poland's Perry-class frigates and German-made between Turkey and Poland. Leopard 2A4 tanks. Poland, which will domestically The Prime Minister said that the trade volume produce three corvettes, is interested in learning from between the two countries is not at the expected level, the experience of Turkey's first domestically produced pointing out that a $5 million trade volume was too low corvette with stealth capability, the first of which entered when compared to the two countries' potential. service about two years ago. Turkey has successfully “We were planning to reach $7 billion. But we want modernized its Perry-class frigates which it obtained to raise this to $10 billion. We have the will to do this from the US, and Poland also seeks cooperation with and there is no reason for anything to the contrary,” Turkey in the modernization of its own Perry-class said Erdo/an. frigates. Erdo/an noted that approximately 2,000 Turkish A second modernization project with which Poland students were attending Polish universities, adding that seeks cooperation is the modernization of its Leopard this situation is a significant investment for the future of 2A4 tanks.       M  O       M 138O                      J      ­    €‚ ƒ    ‚  „ G    

Zafer Ça/layan, who was the then Minister of both countries. “In the same way, the presence of many Economy, indicates that trade volume between Turkey Polish students in Turkey confirms that the future will be World crude steel production for the 64 countries Spain’s production was 1.0 Mt, an increase of 10.3% on and Poland was $585 million in 2002, and it is $5 billion different,” Erdo an said. / reporting to the World Steel Association (worldsteel) 2012 August. at the end of 2012 yet not enough. Ça/layan spoke in The visit to the three European countries is Turkey’s crude steel production for August 2013 closing session of Polish-Turkish Business Forum considered significant because all three countries was 130 million tonnes (Mt) in August 2013, an Reminding the goal to increase the trade volume support Turkey's EU membership bid and have more increase of 5.2% compared to August 2012. was 2.6 Mt, down by -15.4% on August 2012. between Turkey and Poland to $10 billion in a short recently developed strong bilateral ties with Turkey China’s crude steel production for August 2013 In August 2013, Russia produced 5.8 Mt of crude time, set by Turkish Prime Minister Erdogan and Polish     † ‚   was 66.3 Mt, up by 12.8% compared to August 2012. steel, a decrease of -1.9% compared to the same Prime Minister Donald Tusk, Ça/layan said, "Turkey Meanwhile a strategic cooperation agreement Elsewhere in Asia, Japan produced 9.1Mt of crude steel month last year. Ukraine’s crude steel production for and Poland challenge the economical crisis while most worth 250 million euros was signed with Polish firms in August 2013, a decrease of -0.6% over August 2012. August 2013 was 2.8 Mt, 4.1% higher than August European countries needs five or ten years to return to during the business visit chaired by Prime Minister South Korea’s crude steel production was 4.9 Mt in 2012. pre-crisis conditions." Recep Tayyip Erdogan, regarding the Amasra August 2013, down by -13.1% on August 2012. The US produced 7.4 Mt of crude steel in August Ça/layan underlined that the reason for the Hardcoal and Thermal P.Plant Project . The agerement in the EU, Germany produced 3.2 Mt of crude steel 2013, down by -2.9% compared to August 2012. bilateral trade volume's not being at desired level is not was concluded between Hattat Enerji and Poland’s The crude steel capacity utilisation ratio for the 64 knowing each other and stated, "Let's cooperate now Kopex S.A. and Famur S.A. . in August 2013, a decrease of -6.3% compared to and turn mutual disadvantages into advantages by The agreement with Poland covers commercial August 2012. France’s crude steel production was 1.2 countries in August 2013 was 75.4% and it is a 1.0 receiving the support of business people. I trust the issues and the technology transfer for use in the Project Mt, up by 21.7% on August 2012. Italy produced 1.1 Mt percentage point higher compared to August 2012. It is Turkish businesspeople who made history for 10 processes from the extraction of the hardcoal by of crude steel, -7.5% less compared to August 2012. 1.4 percentage points lower than July 2013. years," assessing Turkey's historical, cultural and means of underground and ground mechanization religious ties with the Caucasus and Middle East. systems, up to its rehabilitation, and conversion into Ça/layan invited Polish businesspeople to revise various coal types. their plans and invest in Turkey by telling that the labor Hattat Holding Board of Directors member 0pek Top crude steel producing countries (‘000 ton) cost is very low in his country and not neglecting a Hattat said that the total investment value is 3,5 bln 2013 2012 % Change /12 humor, "Some of you may want to come Turkey Euro of the Project, which will lessen Turkey’s coal immediately when you check the incentive package, imports by 25% (around 5 bln dollars/year) and raise 1. China 66.277 58.739 12,8 there are still empty seats in my airplane." the hardcoal production 3 fold.Employment will reach 2. Japan 9.149 9.207 -0,6 After Ça/layan's speech, some mutual 11.000 workers when the Project is fully in action. 3. -2,9 agreements, regarding the cooperation between Meanwhile, Poland is reported to be interested in USA 7.402 7.622 Turkish and Polish firms, were signed in the presence collaborating with Turkey in the production and 4. 0ndia 6.640 6.582 0,9 of the delegation. modernization of various weapons systems. Among 5. Russia 5.795 5.909 -1,9 On the third day of his trip to Europe in November, these are helicopters, the production of corvettes, which 6. S.Korea 4.892 5.632 -13,1 Erdo/an visited Poland, which coincided with the 600th are small-scale warships, and the modernization of anniversary of the establishment of diplomatic relations Poland's Perry-class frigates and German-made 7. Germany 3.158 3.370 -6,3 between Turkey and Poland. Leopard 2A4 tanks. Poland, which will domestically 8. Brazil 3.002 2.871 4,6 The Prime Minister said that the trade volume produce three corvettes, is interested in learning from 9. Ukraine 2.779 2.671 4,1 between the two countries is not at the expected level, the experience of Turkey's first domestically produced pointing out that a $5 million trade volume was too low corvette with stealth capability, the first of which entered 10. Turkey 2.575 3.045 -15,4 when compared to the two countries' potential. service about two years ago. Turkey has successfully 11. Taiwan 1.905 1.730 10,1 “We were planning to reach $7 billion. But we want modernized its Perry-class frigates which it obtained 12. Mexico 1.476 1.511 -2,3 to raise this to $10 billion. We have the will to do this from the US, and Poland also seeks cooperation with 13. Iran 1.292 1.142 13,2 and there is no reason for anything to the contrary,” Turkey in the modernization of its own Perry-class said Erdo/an. frigates. 14. France 1.161 954 21,7 Erdo/an noted that approximately 2,000 Turkish A second modernization project with which Poland 15. 0taly 1.088 1.176 -7,5 students were attending Polish universities, adding that seeks cooperation is the modernization of its Leopard TOTAL 130.352 123.884 5,2 this situation is a significant investment for the future of 2A4 tanks.             M  O M  O       M 139O

During January-August period, the global crude production dropped by 5.4% down to 22.8 million tons steel production tended to go up and with 2.3 % rise, it during the 8-month period and was placed ninth in the reached 1 bln 51 mln tons. Turkey, which was placed world leauge. China, showing 7.8 % rise, reached 522 among the countries with the worst performance in million tons and also raised its share of the world crude August, came third after 0taly and South korea who steel production from 47 to 50%. indicated the worst performances. Turkey’s steel

Top crude steel producing countries during Jan.-August period, 2013 (‘000 ton) 2013 2012 % Change /12 1. China 521.839 484.067 7,8 2. Japan 73.150 72.522 0,9 3. USA 57.944 61.139 -5,2 4. 0ndia 52.926 51.655 2,5 5. Russia 46.217 47.543 -2,8 6. S.korea 43.503 46.422 -6,3 7. Germany 28.127 28.882 -2,6 8. Brazil 22.889 23.214 -1,4 9. Turkey 22.804 24.113 -5,4 10. Ukraine 22.292 22.416 -0,6 11. 0taly 15.854 18.457 -14,1 12. Taiwan 15.034 14.108 6,6 13. Mexico 11.701 11.883 -1,5 14. France 10.530 10.777 -2,3 15. 0ran 9.955 9.654 3,1 TOTAL 1.050.708 1.027.471 2,3

            Turkey’s crude steel production grew by 5.2% to any other country. Production is adversely affected by 35.89 Mt in 2012. Turkey moved up to the 8th position such applications as TRT share on energy costs, in the largest steel producing countries list from the 10th municipal share, energy fund, environmental position in 2011 overtaking Brazil and Ukraine. Despite contrilution share duties on scrap and coal imports, and sharp drop in crude steel production growth from 17 % other applications that make imported products more in 2011 to 5.2 % in 2012, Turkey kept its position as the advantageous than local products. country with the highest production increase in the top With an export value of more than 17 billion dollars 10 steel producers. Although crude steel production in 2012, the sector has difficulties keeping its existing increase slowed down, Turkey’s growth rate was 4.5 level in exports as well as in production. times higher than the world average of 1.2%. Quarterly This adverse situation negatively affects many production figures for 2012 clearly reflects the fields as well from the logistics to construction, slowdown in production growth. Growth rate of the automotive, white endurables, pipes, machinery and Turkey’s crude steel production was 13.7 % yoy in the energy. first quarter. Increase in the production slowed down to Turkey’s steel exports have tended to decline in the 5.2 % in the second quarter, 6.7 % in the third quarter, first half of 2013. 0n June, the steel industry had a growth tendency turned to negative during the last negative Outlook as well. Turkish steel exports quarter and production dropped by -3.6 %. Recent indicated a drop by 20.3% amounting to 1.5 million tons figures show that Turkey increased its production in quantity in June as compared to the same month of compared to the pre-crisis period by 39 % and in this 2012, resulting in a drop of 20.7% in value, down to 1.3 respect was among the 5 countries to carry its billion dollars production to 2007 level. Because of the slowdown trend in steel exports, 0t is necessary to carefully elaborate the reasons the steel industry occupied the 10.7% of Turkey’s 11.8 why Turkish steel production has recently narrowed bln dolar overall exports, which made it third biggest rapidly.With no state subsidy, the Turkish steel sector exporting industry after automotive and confectioneries. has been faced with a lot of burdens that are not met in         M  O    M 140O           The Eastern Black Sea Regional Plan (2010-2013), R‚€ €€S  €†  is based on the evaluation of current status of the The Eastern Black Sea Development Agency region from an objective point of view resulting national (DOKA) will build a “chocolate valley,” worth 5.5 million development plans. euros in the first phase, where 34 enterprises will be In the light of findings, increasing the level of able to manufacture in the northern province of Ordu. competitiveness and development, decreasing the level DOKA aims to produce high-value-added products of disparities in inter-regional development, providing in the currently used areas rather than on new lands, the sustainable development including social and said Çetin Oktay, the secretary-general of DOKA. environmental matters are taken into account during the “Hazelnuts are an important raw material in the region. preparation of regional plan. Seventy percent of the hazelnuts consumed in the From this point of view; aims, objectives, and world are imported from Turkey. The added value of priorities that specified by regional needs and potentials hazelnuts is low. The chocolate valley also aims to economical, social and environmental infrastructure increase the added value of the hazelnut,” Oktay said. fields as main axises of Eastern Black Sea Regional The main goal of the project is to develop new products Plan, are foreseen to be supported. through research and development activities on Prepared by the East Black Sea Development chocolate, hazelnuts and similar products. Agency (DOKA) the Project covers 6 cities and this will “We have a plan in which 34 enterprises can make big investments flow into the region. produce,” said Oktay. He said the project was slated to According to the regional plan, between 2014 and be worth 5.5 million euros in the first phase but the 2023, private and public sectors will achieve 230 bln TL amount could surpass 10 million euros. The majority of investments the project will be financed by the DOKA, he said. According to the data of the "2014-2023 Regional Plan Draft ", DOKA started the initial preparations in ‡€ ˆ€ 2011 for the areas of Artvin, Giresun, Gümü2hane, Eastern Black Sea Regional Plan is based on the Ordu, Rize, Trabzon .0t has completed the 2014-2023 evaluation of current status of the region from an regional plan draft Works objective point of view resulting national development     plans. In the light of findings, increasing the level of DOKA have so far carried out 33 sectoral analyses, competitiveness and development, decreasing the level 199 workshops, 32 focus group meetings and of disparities in inter-regional development, providing interviews with around 300 people and at first stage the sustainable development including social and important sectors have been determined, which has environmental matters are taken into account during the enabled the plan to be shaped preparation of regional plan. According to the draft plan, financing of the From this point of view; aims, objectives, and provinces in the region will consist of public sources, priorities that specified by regional needs and potentials private sector investments, agency sources, EU grants. economical, social and environmental infrastructure Between 2014-2023 , around 30 billion TL public fields as main axises of Eastern Black Sea Regional investments and 200 billion TL private sectör Plan, are foreseen to be supported. investments will be achieved according to the forecasts The 9th Development Plan (2007-2013), Medium

 ­ €€   ‚ ƒ Term Program (2011-2013), other national plans, programmes, strategies, and regional plans with their 0n case that all of the collection of DOKA revenues are made possible TR-90 Level 2 region’s economy own conditions and potentials are considered during the comprising 6 provinces will receive a transfer of 750 preparation of the plan. Within this framework Eastern million TL source in total. Meanwhile, through the Black Sea Development Plan, other plan, program, and 2014-2023 Pre Accession Financial Aid Budget , the decisions taken from plan are also taken into account. European Union’s grants and other sources’ transfers In addition to this, opinions and suggestions of will total 1.5 billion TL in the ten year period according workshops and committee meetings executed with all to the calculations made under possible programs. stakeholders in six cities in the region are also reflected       M  O       M 141O

in the plan. The draft version of regional plan composed          of these processes for about 3 weeks is reflected to the plan with the opinions and suggestions of all   1. To increase region's transport and environmental stakeholders. infrastructure Regional problems caused by different factors are             2. To protect natural structure and resources of the discussed, present capacity and potential of the region region are examined by SWOT analysis made in economic,    social, and environmental fields. According to these       analyses main topics in the region attract attention: To increase the current capacity and efficiency of To have human source shortage besides spatial SMEs in the region problems in industry To enable international marketing integration of To have a tea & nut-dependent economy in the SMEs Zafer Ça/layan, who was the then Minister of wishes to become an important brand in aerospace region To develop sectors based on regional potential Economy, said that Turkey will make 250 bln dollar sector. Turkey’s SSM (Defense 0ndustry To have high potential of alternative tourism in the To increase innovation investment on energy, transport and informatics Undersecretariat) and relevant companies and the region To develop sectoral cooperation based on Technologies only, in order to make up the domestic potentials are making Turkey an important To have environmental and infrastructural competitiveness infrastructure of the 2013 targets actor. problems regarding climate and geography To increase the number of high value added new Ex-Minister Ça/layan spoke during the signing Zafer Ça/layan said: "0n the next ten year period, To carry high potential at present and in the future investments and entrepreneurships ceremony for an agreement between General Electric investment worth 130 bln dollars in energy, 110 bln in milk and dairy products, forest and wood To enhance human capital suitable for the regional products, organic agriculture & food, sea fishing & economy (GE) and TUSA1 Motor Sanayi (TEI) for production of dollars in transportation, 10 bln dollars in the fresh-water fishing, tourism and shipbuilding fields To diversify regional tourism blisks, used in CFM International's LEAP engines at informatics Technologies will be made. 0n only these 3 in industries except tea and nut To increase tourism oriented infrastructure TE0’s Eski2ehir facilities sectors, Turkey will invest 250 bln dollars so as to To provide opportunity to the regional culture, local To increase number of tourists and length of stay in Ça/layan recalled that GE last year made a constitute the infrastructure of the targets set for t he products, nature, and climate turn into economic the region commitment to make 900 mln dollar investment in year 2023. This creates an important opportunity for assets To increase production of high value added Turkey during 3 years period and added that in 1.5 those who will invest in Turkey. We wish all the To have social and cultural potential with its products years, this investment should exceed 1 billion dollars, international companies to enter these tenders.” strategic condition as being close to Middle Asia, To increase agriculture based industrial (agro- considering that in 1.5 years, its 515 mln dollar portion Ça/layan said that when these investments are Caucasia, and Middle East. industries) branches has been achieved. achieved, the foreign trade balance will get more Eastern Black Sea Development Agency makes up To produce water products in the region and to “I hope that we will be able to announce the balanced and important steps will be taken in current the principle of minimizing weaknesses and threats provide added value in this sector additional projects next year.” said Ça/layan. deficit issue. 0n energy issue, Turkey has given up the mentioned in SWOT analysis regarding opinions and        former policies. suggestions of all stakeholders, highlighting regional Noting that between 1923-2002, the value of the To increase educational level strengths, reflecting domestic and external sources to overall direct international investment into Turkey was The prioritized subject is the renewable energy To enhance social dialogue and institutional the sustainable development of the region by motivating 14,6 billion dollars, Ça/layan said that a total 127.5 sources. Energy investments by means of the old capacity regional potential. Within this scope vision of Eastern bln dollar direct international investments entered systems may lead Turkey to the arms of the current Black Sea Regional Plan is: The vision of Development To improve struggling against poverty and income Turkey in the last 10.5 years as a result of the reforms deficit again. Turkey will obtain energy from wind, solar distribution Agency is an `Eastern Black Sea region with a strong, achieved by the government as soon as holding power, and aquatic resources, geothermal, biomass, nuclear, To enhance social inclusion innovative and competitive economy, an advanced and continous improvement of the quality of the investment shale gas as much as possible. To improve health services integrated society, a completed infrastructure and have atmosphere, movement with a development model that Ça/layan also pointed out that GE’s investments in To extend health services a high standard of life and sustainable environment”. gives importance to the free market especially, as from energy sector are meaningful and the investments that In paralel with this vision, regional plan foresee the To improve sports infrastructure and sportive 2002. He stated that this investment, of which 75% has have been started now will become the items that will following main aims in 3 principal axes “Powerful and activities come from Europe, has been attracted by Turkey’s allow exports beyond meeting Turkey’s requirements Competitive Economy”, “Social Development and To protect and develop culture tomorrow. Integration”, and “Complete Infrastructure and          political and economic stability, young population and ever rising quality of manpower supply. Sustainable Environment”;   Zafer Ça/layan also noted that GE’s President and To complete and improve infrastructure needs       Q        CEO Jeffrey Immelt had said their best employees were To provide struggling aganist climate change and Meanwhile, The ex- Minister said that Turkish firms Provision of participant social development in Turkey and therefore they were determined to to provide sustainability of environmental need to invest in research and development to be able 1. Provision of an Inclusive Social Integration adaptation increase their investments in Turkey. to produce high-tech high value added products 2. Increasing quality and accessibility of health To raise environmental awareness 250 bln dollar investment to make up infrastructure Speaking at a visit to Turkish manufacturing firm service To develop capacity of local government and local of 2023 objectives Hidromek, Caglayan stressed the importance of 3. Development of Cultural Life and Sports government unions Zafer Ça/layan also said that the agreement international companies to create global brands. Infrastructure To increase quality of space and life between GE and TEI is important and that Turkey       M  O             M  O M 142O

in the plan. The draft version of regional plan composed          of these processes for about 3 weeks is reflected to the plan with the opinions and suggestions of all   1. To increase region's transport and environmental stakeholders. infrastructure Regional problems caused by different factors are             2. To protect natural structure and resources of the discussed, present capacity and potential of the region region are examined by SWOT analysis made in economic,    social, and environmental fields. According to these       analyses main topics in the region attract attention: To increase the current capacity and efficiency of To have human source shortage besides spatial SMEs in the region problems in industry To enable international marketing integration of To have a tea & nut-dependent economy in the SMEs Zafer Ça/layan, who was the then Minister of wishes to become an important brand in aerospace region To develop sectors based on regional potential Economy, said that Turkey will make 250 bln dollar sector. Turkey’s SSM (Defense 0ndustry To have high potential of alternative tourism in the To increase innovation investment on energy, transport and informatics Undersecretariat) and relevant companies and the region To develop sectoral cooperation based on Technologies only, in order to make up the domestic potentials are making Turkey an important To have environmental and infrastructural competitiveness infrastructure of the 2013 targets actor. problems regarding climate and geography To increase the number of high value added new Ex-Minister Ça/layan spoke during the signing Zafer Ça/layan said: "0n the next ten year period, To carry high potential at present and in the future investments and entrepreneurships ceremony for an agreement between General Electric investment worth 130 bln dollars in energy, 110 bln in milk and dairy products, forest and wood To enhance human capital suitable for the regional products, organic agriculture & food, sea fishing & economy (GE) and TUSA1 Motor Sanayi (TEI) for production of dollars in transportation, 10 bln dollars in the fresh-water fishing, tourism and shipbuilding fields To diversify regional tourism blisks, used in CFM International's LEAP engines at informatics Technologies will be made. 0n only these 3 in industries except tea and nut To increase tourism oriented infrastructure TE0’s Eski2ehir facilities sectors, Turkey will invest 250 bln dollars so as to To provide opportunity to the regional culture, local To increase number of tourists and length of stay in Ça/layan recalled that GE last year made a constitute the infrastructure of the targets set for t he products, nature, and climate turn into economic the region commitment to make 900 mln dollar investment in year 2023. This creates an important opportunity for assets To increase production of high value added Turkey during 3 years period and added that in 1.5 those who will invest in Turkey. We wish all the To have social and cultural potential with its products years, this investment should exceed 1 billion dollars, international companies to enter these tenders.” strategic condition as being close to Middle Asia, To increase agriculture based industrial (agro- considering that in 1.5 years, its 515 mln dollar portion Ça/layan said that when these investments are Caucasia, and Middle East. industries) branches has been achieved. achieved, the foreign trade balance will get more Eastern Black Sea Development Agency makes up To produce water products in the region and to “I hope that we will be able to announce the balanced and important steps will be taken in current the principle of minimizing weaknesses and threats provide added value in this sector additional projects next year.” said Ça/layan. deficit issue. 0n energy issue, Turkey has given up the mentioned in SWOT analysis regarding opinions and        former policies. suggestions of all stakeholders, highlighting regional Noting that between 1923-2002, the value of the To increase educational level strengths, reflecting domestic and external sources to overall direct international investment into Turkey was The prioritized subject is the renewable energy To enhance social dialogue and institutional the sustainable development of the region by motivating 14,6 billion dollars, Ça/layan said that a total 127.5 sources. Energy investments by means of the old capacity regional potential. Within this scope vision of Eastern bln dollar direct international investments entered systems may lead Turkey to the arms of the current Black Sea Regional Plan is: The vision of Development To improve struggling against poverty and income Turkey in the last 10.5 years as a result of the reforms deficit again. Turkey will obtain energy from wind, solar distribution Agency is an `Eastern Black Sea region with a strong, achieved by the government as soon as holding power, and aquatic resources, geothermal, biomass, nuclear, To enhance social inclusion innovative and competitive economy, an advanced and continous improvement of the quality of the investment shale gas as much as possible. To improve health services integrated society, a completed infrastructure and have atmosphere, movement with a development model that Ça/layan also pointed out that GE’s investments in To extend health services a high standard of life and sustainable environment”. gives importance to the free market especially, as from energy sector are meaningful and the investments that In paralel with this vision, regional plan foresee the To improve sports infrastructure and sportive 2002. He stated that this investment, of which 75% has have been started now will become the items that will following main aims in 3 principal axes “Powerful and activities come from Europe, has been attracted by Turkey’s allow exports beyond meeting Turkey’s requirements Competitive Economy”, “Social Development and To protect and develop culture tomorrow. Integration”, and “Complete Infrastructure and          political and economic stability, young population and ever rising quality of manpower supply. Sustainable Environment”;   Zafer Ça/layan also noted that GE’s President and To complete and improve infrastructure needs       Q        CEO Jeffrey Immelt had said their best employees were To provide struggling aganist climate change and Meanwhile, The ex- Minister said that Turkish firms Provision of participant social development in Turkey and therefore they were determined to to provide sustainability of environmental need to invest in research and development to be able 1. Provision of an Inclusive Social Integration adaptation increase their investments in Turkey. to produce high-tech high value added products 2. Increasing quality and accessibility of health To raise environmental awareness 250 bln dollar investment to make up infrastructure Speaking at a visit to Turkish manufacturing firm service To develop capacity of local government and local of 2023 objectives Hidromek, Caglayan stressed the importance of 3. Development of Cultural Life and Sports government unions Zafer Ça/layan also said that the agreement international companies to create global brands. Infrastructure To increase quality of space and life between GE and TEI is important and that Turkey       M  O         M  O    M 143O

Caglayan noted that the Netherlands, with less branding"Caglayan reminded company officials that his gross domestic product than Turkey, is more effective ministry helps companies do business abroad. The than Turkey economically. Turkish government set up the first state-funded Caglayan underlined that the Netherlands has branding project for Turkish companies, called scores of international companies and it cares about the "Turquality" in 2003. The project's aim is to make brand and quality, adding, "It's a change of route for Turkey a global actor in international market with its Turkey" Caglayan stated that Turkey has achieved a lot own brands. By the end of 2011, 87 brands of 77 firms in the last 10 years and it will show the same success in making business on consumer durables, industrial the next 10 years and that the private sector plays an machine, garment industry, jewellery, automotive and important role in that success. "Turkey's top 100 textile sectors, recieved support within the scope of companies' total brand value is about 31 billion dollars" Turquality project. said Caglayan, "Turkey needs more progress in              

Turkey’s Minister for Economy, Nihat Zeybekci has will be positive developments," Zeybekci said, referring raised concerns about the effect of third party European to their goal of ensuring that Turkey automatically Union (EU) trade agreements on Turkey. becomes party to FTAs signed between the EU and Zeybekci said, , that whenever the EU signs a free third party countries. trade agreement with third parties, the countries in "If we fail to ensure the signing of a parallel question are automatically entitled to a free circulation agreement whenever the EU signs a free trade of goods, both within the EU and Turkey - whereas agreement with a third party, we want to be able to Turkey is not. prevent that third party from being automatically entitled "This is neither acceptable nor sustainable," he told to free circulation rights within Turkey. We want to reporters after a meeting with EU Trade Commissioner prevent it until a parallel agreement is signed," he said. Karel De Gucht on the Customs Union. Zeybekci said that they also discussed the recently Zeybekci said that negotiations have resumed on resolved transit pass row with Bulgaria, where Turkish the Customs Union agreement with the EU, which has trucks were kept waiting for 12 days in February at been created with an expectation of full membership in Turkey's Kapikule border gate by Bulgarian authorities. the short term. "We see this as a de facto suspension of the The Economy Minister suggested that in the event Customs Trade Agreement," he said, referring to an that the EU signs a free trade agreement with major article within the agreement that states that free economies, such as the U.S., Canada or India, it would circulation of goods within the scope of the Customs have a tremendously negative effect on the economy of Union agreement may not be hindered, restricted or Turkey, and such damage would be impossible to subjected to quotas within the EU member countries. compensate for. "We will keep monitoring the situation, and take "No third country should be able to be a party to legal action if necessary," the minister councluded. such agreement. We think it is unacceptable," he said. The dispute over transit passes for trucks travelling Zeybekci added that the EU Trade Commissioner between Turkey and Bulgaria was solved on Feb 13, and the accompanying delegation agree that the after Bulgaria decided to issue around 100,000 passes. Customs Union needs to be upgraded, modernized, Turkey and Bulgaria closed the border at the and made more acceptable and sustainable. beginning of February, after Sofia approved only 5,000 "We decided to set up a committee and technical of the 125,000 transit permits requested by Turkish team to start working right away. We believe that there trucks at the beginning of the year.

        M  O    M 144O

Caglayan noted that the Netherlands, with less branding"Caglayan reminded company officials that his gross domestic product than Turkey, is more effective ministry helps companies do business abroad. The than Turkey economically. Turkish government set up the first state-funded Caglayan underlined that the Netherlands has branding project for Turkish companies, called scores of international companies and it cares about the "Turquality" in 2003. The project's aim is to make brand and quality, adding, "It's a change of route for Turkey a global actor in international market with its Turkey" Caglayan stated that Turkey has achieved a lot own brands. By the end of 2011, 87 brands of 77 firms in the last 10 years and it will show the same success in making business on consumer durables, industrial            the next 10 years and that the private sector plays an machine, garment industry, jewellery, automotive and important role in that success. "Turkey's top 100 textile sectors, recieved support within the scope of       companies' total brand value is about 31 billion dollars" Turquality project. said Caglayan, "Turkey needs more progress in             ­€‚  ƒ „ ­  † ‡‡  ˆƒ‰ € ­­ˆ­  ­€‚­ ƒ ‚            ‡ˆ ­€  ­ ­   2 ‚  2 3 G     DETAY Economic Magazine reported more than bid price came from GÜLERMAK Group. The Turkey’s Minister for Economy, Nihat Zeybekci has will be positive developments," Zeybekci said, referring 100 projects in various sectors in 2013. Some of these bidding process is stil underway. raised concerns about the effect of third party European to their goal of ensuring that Turkey automatically projects were concluded in the year and some others 0ller Bankası (0LBANK) concluded various tenders Union (EU) trade agreements on Turkey. becomes party to FTAs signed between the EU and suspended into 2014. for infrastructure projects in many provinces and Zeybekci said, , that whenever the EU signs a free third party countries. Last year’s major projects of primary importance districts under scope of K0K MD-21 B based on trade agreement with third parties, the countries in "If we fail to ensure the signing of a parallel that were followed up and finalized were Ankara auctions. question are automatically entitled to a free circulation agreement whenever the EU signs a free trade Subways initiated by the General directorate of This year 0LBANK has a lot of infrastructure of goods, both within the EU and Turkey - whereas agreement with a third party, we want to be able to 0nfrastructure 0nvestments, Ankara Metropolitan projects in various locations. Turkey is not. prevent that third party from being automatically entitled Municipality’s drinking water treatment facilities, 0stanbul Tuzla Municipality awarded a contract to "This is neither acceptable nor sustainable," he told to free circulation rights within Turkey. We want to TCDD’s high speed train railway signaling and BAYRAKTAR KARDE1LER at a cost of 120.750.000 reporters after a meeting with EU Trade Commissioner prevent it until a parallel agreement is signed," he said. electrification projects, DS ’s drinking water treatment 0 TL. for 30- year permission to use a total 370.989,98 Karel De Gucht on the Customs Union. Zeybekci said that they also discussed the recently facilities, TMO’s steel silos and grain storage projects, Zeybekci said that negotiations have resumed on resolved transit pass row with Bulgaria, where Turkish m²’ area including the filling of the sea at a scale of 0LBANK’s drinking water and wastewater treatment 1/1000, and construction of a marina, and its operation the Customs Union agreement with the EU, which has trucks were kept waiting for 12 days in February at facilities. New tender preparations are underway for been created with an expectation of full membership in Turkey's Kapikule border gate by Bulgarian authorities. services. BA1KENTRAY (Sincan-Ankara-Kaya2) lines which the short term. "We see this as a de facto suspension of the Turkish Coal Works (TK ) held a tender for was tendered by TCDD last year but later was 0 The Economy Minister suggested that in the event Customs Trade Agreement," he said, referring to an Kütahya Domaniç mineral areas and Bingöl Karlıova canceled upon oppositions to K0K (Public Bidding that the EU signs a free trade agreement with major article within the agreement that states that free Board). mines in return for royalty. Çelikler and Aska Enerji economies, such as the U.S., Canada or India, it would circulation of goods within the scope of the Customs submitted the best offers. 0n EÜA1’s Kemerköy and Yata/an thermal p. have a tremendously negative effect on the economy of Union agreement may not be hindered, restricted or Plants’ frequency control centre Project and Keban Turkey, and such damage would be impossible to subjected to quotas within the EU member countries. HES 8 units rehabilitations, the selection of eligible Dear Readers; compensate for. "We will keep monitoring the situation, and take firms will be held this year. Also,a rehabilitation tender You will find the list of important projects, with their "No third country should be able to be a party to legal action if necessary," the minister councluded. for Tunçbilek thermal p. plant units 3.4.,5. Electrofilters details, that were monitored in 2013 and those that such agreement. We think it is unacceptable," he said. The dispute over transit passes for trucks travelling was held but canceled as the bids were not valid. A suspended into 2014. Zeybekci added that the EU Trade Commissioner between Turkey and Bulgaria was solved on Feb 13, The latest issue number of DETAY Economic and the accompanying delegation agree that the after Bulgaria decided to issue around 100,000 passes. new notice will be made in the first half fort his. Magazine in which a report took place is also given for Customs Union needs to be upgraded, modernized, Turkey and Bulgaria closed the border at the Among 0stanbul Metropolitan Municipality’s reference. and made more acceptable and sustainable. beginning of February, after Sofia approved only 5,000 subway projects the “Mecidiyeköy-Mahmutbey lines” "We decided to set up a committee and technical of the 125,000 transit permits requested by Turkish Project was tendered on 8 Oct. 2013 and the lowest team to start working right away. We believe that there trucks at the beginning of the year.             M  O M  O       M 145O       

Tenderer :             Project name:    2      Financing : Local source Latest state : 2013/9688 registered tender: Quoting 41.500.000,00 TL, GÜVEN 0N1AAT received the contract.

Tenderer :         2     Project name: 2 2           Financing : Local source Latest state : 2012/91075 registered tender: Quoting 84.310.000,00 TL, YÜKSEL 0N1AAT received the contract.

Project name:             Financing : Local source Latest state : 2012/91087 registered tender: Quoting 2.389.800,00 TL, KUTLULAR MÜH. received the contract.

Tenderer :              Project name:                Financing : World Bank ( DB-0BRD) Latest state : ASAT T2-W2 registered tender Quoting 14.685.066,21 TL, AKER 0N1AAT received the contract.

Tenderer :         Project name:   ­  €     ‚      Financing : Local source Latest state : 2012/193188 registered tender: Quoting 14.736.600,00 TL, ULTRA TEK. A.1. received the contract.

Tenderer :     ƒ     ­ €3‚ Project name:     †    Financing : Local source Latest state : 2012/113038 registered tender: Quoting 3.191.000 Euro, D0MSA YAPI MAK0NE received the contract.

Project name: 2        Financing : Local source Latest state : 2012/183317 registered tender: Quoting 18.855.000,00 TL, VEMAK 0N1AAT received the contract.

Project name:              Financing : Local source Latest state : 2013/31778 registered tender : QUoting 2.997.000,00 $, HAL0L ALTIN received the contract for demounting EMT metering station that meters the crude oil sent to Ceyhan Tank area and PSO pumping station, as well as Block valves, filters, Ultrasonic flow meters, metering lines,, installation of the metering station comprising Small Volume Prover and turbinmeter , renewal of electrohydraulic actuators belonging to the control valve , field instrumentation and AG distribution equipment renewal, control system renewal, etc. procurements, testing, putting into operation.

Project name:                    Financing : Local source Latest state : 2012/26075 registered tender : Quoting 3.389.547,00 Euro, ALCATEL+TELETA1 received the contract.

Tenderer :      ‡   ƒ   Project name:           €2‚                  Financing : Foreign credit Latest state : EuropeAid/130252/D/ WKS/TR) tender: Bids were received on 13 Sep. 2013. 11 firms submitted bids. The lowest bid offer of 15.709.900 Euro was submitted by YILMAZER HAR0TA PROJE + CONSTRUCTION CALAS joint venture. (DETAY-1339)

           M  O M 146O Tenderer :        

       Project name:        Financing : Local source Latest state : 2012/99526 registered tender: Quoting 153.640.000,00 TL, GÜLERMAK+KOL N N AAT received the contract. Tenderer : 0 0 1             Project name:    2      Project name: 232        € 2  ‚ Financing : Local source Financing : Local source Latest state : 2013/9688 registered tender: Quoting 41.500.000,00 TL, GÜVEN N AAT received the contract. 0 1 Latest state : 2011/105948 registered tender : Eski2ehir (Excluded )-Alanyurt-Kütahya-Balıkesir lines electrification facilities. 4.

Section job was awarded at 23.955.221,10 TL and 5. Section job was awarded at 18.613.925,00 TL and 1AH0N Tenderer :         2     YILMAZ+ EMRE RAY received the contract.

Project name: 2 2           Financing : Local source Project name:  2    ƒ  „          ‚ Financing : Local source Latest state : 2012/91075 registered tender: Quoting 84.310.000,00 TL, YÜKSEL 0N1AAT received the contract. Latest state : 2011/207087 registered tender: Kayseri North Crossing Variant (infrastructure, superstruc ture, signalling, telecommunications -electrification) completion contract was awarded at 53.877.418,35 TL and KOL0N 0N1AAT Project name:             received the contract. Financing : Local source Latest state : 2012/91087 registered tender: Quoting 2.389.800,00 TL, KUTLULAR MÜH. received the contract. Project name:  2    „2€ 2 €    ‚ Financing : Local source Tenderer :              Latest state : 2012/90330 registered tender : Kaya2-Kayseri line section fiber optic cabling and energy cable laying and GSM-R, Project name:                transmission and telephone systems contract was awarded to KEMAL ÇA.LAR YURTSEVER quoting 22.987.326,45 TL Financing : World Bank ( DB-0BRD)

Latest state : ASAT T2-W2 registered tender Quoting 14.685.066,21 TL, AKER 0N1AAT received the contract. Project name:   „   ‚ Financing : Local source Tenderer :         Latest state : 2013/15235 registered tender: Quoting 28.728.510,00 Euro, ECETUR+EL0T PROJE+TEMA PROJE joint venture Project name:   ­  €     ‚      received the contract for 35 fueloil, mineral oil, soft water supply stations, 20 patinage sand plants for depots and Financing : Local source workshops on railways. Latest state : 2012/193188 registered tender: Quoting 14.736.600,00 TL, ULTRA TEK. A.1. received the contract. Project name:  2       „†  €    ‚ Financing : Local source Tenderer :     ƒ     ­ €3‚ Latest state : 2012/85316 registered tender: Quoting 21.445.390 TL, 01-KAYA 0N1AAT received the contract. Project name:     †    Financing : Local source Project name: 2   3  €3  ‚ Latest state : 2012/113038 registered tender: Quoting 3.191.000 Euro, D0MSA YAPI MAK0NE received the contract. Financing : Local source Latest state : 2012/8833 registered tender : Bids were first received on 25 Apr. 2012. After the evaluation, the contract was Project name: 2        awarded to GÜLERMAK+KOL0N 0N1AAT quoting 186.235.935,Euro. Because of the other bidders’ petition of Financing : Local source opposition to K0K, the tender was then canceled. Latest state : 2012/183317 registered tender: Quoting 18.855.000,00 TL, VEMAK 0N1AAT received the contract. The bidders that submitted petitions of opposition to K0K are: PORR BAU GMBH ÖZ ARAS GRUP N . A. . + NTEKAR YAPI. LTD. T .+ UYUM YAPI N . A. . Project name:              0 1 1 0 1 0 0 1 1 COMSA SA / AÇILIM 0N1AAT LTD.1T0. + SEZA 0N1. SAN. VE T0C. LTD. 1T0. Financing : Local source AZER 0N1AAT SERV0S LTD. 1T0. + ÖZGÜN YAPI SANAY0 VE T0C. A.1 Latest state : 2013/31778 registered tender : QUoting 2.997.000,00 $, HAL0L ALTIN received the contract for demounting EMT RHOMBERG BAU AG + ÇEL0KLER TAAHHÜT 0N1AAT VE SANAY0 A.1. metering station that meters the crude oil sent to Ceyhan Tank area and PSO pumping station, as well as Block MAKYOL 0N1AAT SAN. TUR. VE T0C. A.1. + CENG0Z 0N1AAT SAN. VE T0C. A.1. valves, filters, Ultrasonic flow meters, metering lines,, installation of the metering station comprising Small Volume GÜLERMAK A.IR SANAY0 0N1. VE TAAH. A.1. + KOL0N 0N1. TURZ. SAN. VE T0C. A.1. Prover and turbinmeter , renewal of electrohydraulic actuators belonging to the control valve , field instrumentation and AG distribution equipment renewal, control system renewal, etc. procurements, testing, putting into operation. Project name:   ƒ       23 2 ˆ ‚ Financing : Local source Project name:                    Latest state : 2013/46197 registered tender: Quoting 20.217.745,00 € , CAF S0GNALL0NG S.L. + EMRE RAY ENERJ0 joint Financing : Local source venture received the contract. Latest state : 2012/26075 registered tender : Quoting 3.389.547,00 Euro, ALCATEL+TELETA1 received the contract.

Project name:           ‰      ‰      Tenderer :      ‡   ƒ    ‚ Project name:           €2‚              Financing : Local source Latest state : 1 Aug. 2013 tender attracted 2 bids. The lowest bid was 12.169.560 TL submitted by YAPI MERKEZ0. (DETAY-     1333) Financing : Foreign credit

Latest state : EuropeAid/130252/D/ WKS/TR) tender: Bids were received on 13 Sep. 2013. 11 firms submitted bids. The lowest Project name: bid offer of 15.709.900 Euro was submitted by YILMAZER HAR0TA PROJE + CONSTRUCTION CALAS joint  2€    „     ‚ venture. (DETAY-1339) Financing : Local source Latest state : 2013/108136 registered tender: Bids were received on 19 Sep. 2013 and.8 firms submitted bids. The lowest bid 38.937.000,00 TL was submitted by E+M ELEKTR0K S0S. H0Z. LTD. 1T0.                M  O    M 147 OO Project name:        Financing : Local source Latest state : 2013/46197 registered tender: Quoting 20.217.745,00 Euro CAF S0GNALL0NG S.L. + EMRE RAY ENERJ0 joint venture received the contract.

Project name:   2 0   3 2 €         ‚    Financing : Local source Latest state : 2011/191173 registered tender: 1. Section Works: Quoting 24.731.000 TL, ULTRA TEKNOLOJ0 received the contract . Contract was signed with 1AH0N YILMAZ + EMRE RAY ENERJ0 at 20.912.954 TL for 2nd part, 28.127.019 TL for 3rd part, 32.149.983 TL for t he 5th part of the project.

Project name:   2 2     ‚2   2    ƒ       € „ 2           Financing : Local source Latest state : 2012/196695 registered tender: Quoting.899.000 TL bedelle TEKNOTEK ENERJ0 received the contract .

Project name:   2   †    P 3    ˆ  ‰  Š ‹  Œ 2 €    Financing : Local source Latest state : 2013/567 registered tender: Quoting 289.833.710 TL, DO.U1 0N1AAT received the contract.

Tenderer :          ˆ€Ž2‰ €  Project name: €2      2     Financing : Local source Latest state : 2012/125986 registered tender: Quoting 195.400.000,00 TL, YDA+KUZU KONUT received the contract.

Project name: 2    †    Financing : Local source Latest state : 2012/164290 registered tender: Quoting 21.318.485,82 TL, TEKBUDAK+YEK GRUP received the contract.

Tenderer :   Ž €  † ˆ€2‰ Project name:   2    € 2    †  †          Financing : Local source Latest state : 2012/171863 registered tender: Quoting 15.443.000,00 TL, ÖZBEN+M0TA1 received the contract.

Project name:  2   €†           Financing : Local source Latest state : 2012/196990 registered tender: Quoting 38.250.000,00 TL, DO.U1 0N1AAT received the contract.

Project name: 3 ‚ €†                Financing : Local source Latest state : 2012/79056 registered tender: Quoting 22.339.000,00 TL, B0NA1 0N1AAT received the contract.

Project name:     2   Financing : Local source Latest state : 2012/115650 registered tender: Quoting 58.700.000,00 TL, 0NCEKAYA 0N1AAT received the contract for the water outpouring lines, depots, pumping station and Tayip regulator

Project name:    ‚ €†           Financing : Local source Latest state : 2012/198813 registered tender: Quoting 24.720.000,00 TL, LOTUS MÜHEND0SL0K received the contract

Project name:  2€ 0   Ž   €      †  †          Financing : Local source Latest state : 2013/13784 registered tender: Quoting 19.450.095,52 TL, TÜRKERLER+LOTUS MÜH. joint venture received the contract.

Project name:   2‘  Ž2  €       †  †          Financing : Local source Latest state : 2012/194522 registered tender: Quoting 21.220.000,00 TL, TÜRKERLER+LOTUS MÜH. joint venture received the contract.

        M  O    M 148O Project name:        Project name:   3  32 2        Financing : Local source Financing : Local source Latest state : 2013/46197 registered tender: Quoting 20.217.745,00 Euro CAF S0GNALL0NG S.L. + EMRE RAY ENERJ0 joint Latest state : 2013/42136 registered tender: Bids were received in May. The lowest bid was 44.490.000,00 TL submitted by venture received the contract. KAMER 0N1AAT LTD.

Project name:   2 0   3 2 €         ‚    Project name:   2­ €   ‚            Financing : Local source Financing : Local source Latest state : 2011/191173 registered tender: 1. Section Works: Quoting 24.731.000 TL, ULTRA TEKNOLOJ received the 0 Latest state : 2012/176114 registered tender: Quoting 13.494.000,00 TL, AKER 0N1AAT received the contract. contract . Contract was signed with 1AH0N YILMAZ + EMRE RAY ENERJ0 at 20.912.954 TL for 2nd part, 28.127.019 TL for 3rd part, 32.149.983 TL for t he 5th part of the project. Project name: ƒ ­            Financing : Local source Project name:   2 2     ‚2   2    ƒ       € „ 2   Latest state : 2013/63948 registered tender: Bids were received on 21 June 2013 and. The lowest bid was 11.980.000,00 TL         submitted by NEMA K0MYA. Financing : Local source Latest state : 2012/196695 registered tender: Quoting.899.000 TL bedelle TEKNOTEK ENERJ received the contract . 0 Project name: ­             Financing : Local source Project name:   2   †    P 3    ˆ  ‰  Š ‹  Œ 2 € Latest state : 2013/79295 registered tender: Bids were received on 17 July 2013 and 9 firms submitted bids. The lowest bid    was 6.790.000,00 TL submitted by B0R0K0M GRUP+ASMET YAPI. Financing : Local source Latest state : 2013/567 registered tender: Quoting 289.833.710 TL, DO.U1 0N1AAT received the contract. Project name: 2„  2           

Financing : Local source Tenderer :          ˆ€Ž2‰ €  Latest state : 2013/99198 registered tender: Bids were received on 21 Aug. 2013 and 8 firms submitted bids. The lowest bid was 7.848.000,00 submitted by B R K M GRUP+MET N AAT. Project name: 0 0 0 0 1 €2      2     Financing : Local source Latest state : 2012/125986 registered tender: Quoting 195.400.000,00 TL, YDA+KUZU KONUT received the contract. Project name: 3  22         Financing : Local source Project name: 2    †    Latest state : 2013/104882 registered tender: Bids were received on 9 Sep. 2013 and 3 firms submitted bids. The estimated Financing : Local source cost is 17.708.346,85 lira and The lowest bid was 11.250.000 TL submitted by MD YAPI+ÇALI1 MAD. Latest state : 2012/164290 registered tender: Quoting 21.318.485,82 TL, TEKBUDAK+YEK GRUP received the contract. Project name: 2  3          Financing : Local source Tenderer :   Ž €  † ˆ€2‰ Latest state : 2013/84836 registered tender: Bids were received on 26 Sep. 2013 and 6 firms submitted bids. The estimated Project name:   2    € 2    †  †          cost is 490.000,00 TL. The lowest bid was 12.241.000,00 TL submitted by TÜRKERLER 0N1AAT+LOTUS MÜH. Financing : Local source Latest state : 2012/171863 registered tender: Quoting 15.443.000,00 TL, ÖZBEN+M0TA1 received the contract. Project name: 20           Financing : Local source Project name:  2   €†           Latest state : 2013/120644 registered tender: Bids were received on 3 Oct. 2013 and 10 firms submitted bids. The estimated Financing : Local source cost is 11.669.795,70 TL. The lowest bid was 9.430.000,00 TL submitted by KONYAALTI 0N1AAT. Latest state : 2012/196990 registered tender: Quoting 38.250.000,00 TL, DO.U1 0N1AAT received the contract. Tenderer : „    €3‚ Project name: 3 ‚ €†                Project name: Financing : Local source  2           Financing : Local source Latest state : 2012/79056 registered tender: Quoting 22.339.000,00 TL, B0NA1 0N1AAT received the contract. Latest state : 2012/162101 registered tender: Quoting 24.885.500,00 TL, S0STEM ELEKT. VE T0C. A.1. received the contract.

Project name:     2   Project name: Financing : Local source  „   „0  ˆ­ „        Financing : Local source Latest state : 2012/115650 registered tender: Quoting 58.700.000,00 TL, 0NCEKAYA 0N1AAT received the contract for the Latest state : Bids were received on 7 October for units primary frequency control unit and boiler turbine control systems water outpouring lines, depots, pumping station and Tayip regulator conversion to digital system. 4 bids were received and The lowest bid offer of 11.060.000 Euro submitted by HONEYWELL OTOMASYON. Project name:    ‚ €†           Financing : Local source Project name:  S Š ­    Latest state : 2012/198813 registered tender: Quoting 24.720.000,00 TL, LOTUS MÜHEND0SL0K received the contract Financing : Local source-credit Latest state : as reported in DETAY-1333rd issue, proposals were received on 30 July 2013 for the tender under file no Project name:  2€ 0   Ž   €      †  †          2013/63654: covering Keban Hydropower Plant‘s (1330 MW install.cap.) 8 units rehabilitation services but the Financing : Local source tender was canceled. 3 firms submitted bids. The lowest bid was 72.499.000 Euro submitted by ALSTOM GES Latest state : 2013/13784 registered tender: Quoting 19.450.095,52 TL, TÜRKERLER+LOTUS MÜH. joint venture received the (DETAY-1333). contract.

Project name: ­ 2  ­Œ  Ž ‘ ’  2   Project name:   2‘  Ž2  €       †  †          Financing : Local source Financing : Local source Latest state : 2013/12468 registered tender: 10 firms submitted bids. But the tender was later canceled as the bids were not Latest state : 2012/194522 registered tender: Quoting 21.220.000,00 TL, TÜRKERLER+LOTUS MÜH. joint venture received the found valid. contract.             M  O       M 149 OO Tenderer : 2   23  2 Project name:             Financing : Local source Latest state : 2013/60948 registered tender: Quoting 15.964.000,00 TL, ULUOVA 0N1AAT received the contract.

Project name:              Financing : Local source Latest state : 2013/160787 registered tender: Bids were received on 12 Dec. 2013. The estimated cost is 19.853.050,00 TL and 4 firms submitted bids. Lowest bid 18.869.128 TL submitted by ÇALI1KAN KARDE1.

Tenderer :       ­2 3€ Project name:          Financing : World Bank Latest state : REf.DB. ATT.18 ECSEE APL-6 PROJECT covering 380 kV Kartal Gas isolated substation (GIS) tender was awarded at 22.521.623,42 Euro and S0EMENS+BALIKES0R ELEKT. Received the contract.

Project name:    ‚        ƒ     Financing : Local source Latest state : 2012/121288 registered tender: TKABÇY 3 Ref. 380 kV, 2000mm2, 8 km XLPE isolated Maltepe GIS TM-Kartal GIS TM underground cable connection project was awarded at 26.922.009,17 TL, and DEM0RER CABLES received the contract.

Project name:  „ ‚323 2 2      ƒ     Financing : Local source Latest state : 2012/145639 registered tender: Quoting 10.904.698,46 TL (214.000,00 TL as repair cost) ZDR MÜHEND0SL0K received the contract.

Project name: 2 † ‡   ˆ‰         Financing : Local source Latest state : 2012/145647 registered tender: 0TM.86, 3 ea 380 Kv and 154 Kv substations Works awarded to AVN0 ULUTA1.

Project name: † ‡   ‚         Financing : Local source Latest state : 2013/22029 registered tender: Quoting 11.624.000,00 TL, KAR-PA ELEKTR0K received the contract.

Project name: Š‰ ‡    ƒ  N ‚3        Financing : Local source Latest state : 2013/29388 registered tender: Quoting 16.393.770,00 TL, MDC 274 ENERJ0 received the contract.

Project name:  ‰Ž ‡ ˆ‰  2 ƒ       Financing : Local source Latest state : 2013/37419 registered tender: Quoting 8.100.000,00 TL, VAM MÜHEND0SL0K received the contract.

Project name: 2 Ž ‘ Ž ‡    ƒ     Financing : Local source Latest state : 2013/27964 registered tender: Quoting 29.714.000,00 TL, ANADOLU ELEKTR0K received the contract.

Project name: 2 Ž ‡ ­  3   €    ƒ     Financing : Local source Latest state : 2013/27964 registered tender: Quoting 27.961.000,00 TL, ANADOLU ELEKTR0K received the contract.

Project name: Š ‡ 2  ‚2 3 2        Financing : Local source Latest state : 2013/10663 registered tender: Quoting 18.937.000,00 TL, UFUK ATAÇ received the contract.

Project name: Š† ‡     2 ‚22 2        Financing : Local source Latest state : 2013/48644 registered tender: Quoting 59.337.000,00, 1A-RA ENERJ0 received the contract.

        M   O  M 150O Project name:         2 2     Tenderer : 2   23  2 Financing : Local source Project name:             Latest state : 2013/66427 registered tender: Quoting 10.972.222,00 TL, SEYHUN ER0M received the contract. Financing : Local source Latest state : 2013/60948 registered tender: Quoting 15.964.000,00 TL, ULUOVA 0N1AAT received the contract. Project name:    3 € 2    Financing : Local source Project name:              Latest state : 2013/65186 registered tender: Quoting 63.633.000,00 TL, MDC 2 ENERJ0+TELEN joint venture received the Financing : Local source contract. Latest state : 2013/160787 registered tender: Bids were received on 12 Dec. 2013. The estimated cost is 19.853.050,00 TL and 4 firms submitted bids. Lowest bid 18.869.128 TL submitted by ÇALI1KAN KARDE1. Project name:    3 €  ‚€ ƒ„     Financing : Local source Latest state : 2013/61182 registered tender: Quoting 46.218.784,00 TL, MDC 2 ENERJ0 received the contract. Tenderer :       ­2 3€ Project name:          Project name:    ‚ 2     †ƒ ƒ„    Financing : World Bank Financing : Local source Latest state : REf.DB. ATT.18 ECSEE APL-6 PROJECT covering 380 kV Kartal Gas isolated substation (GIS) tender was Latest state : 2013/98690 registered tender: Quoting 7.479.136,31 TL, BES ELEKTR0K received the contract. awarded at 22.521.623,42 Euro and S0EMENS+BALIKES0R ELEKT. Received the contract. Project name:     ‚ 2     †ƒ ƒ„    Project name:    ‚        ƒ     Financing : Local source Financing : Local source Latest state : 2013/98690 registered tender: Quoting 7.479.136,31 TL, BES ELEKTR0K received the contract. Latest state : 2012/121288 registered tender: TKABÇY 3 Ref. 380 kV, 2000mm2, 8 km XLPE isolated Maltepe GIS TM-Kartal GIS TM underground cable connection project was awarded at 26.922.009,17 TL, and DEM RER CABLES 0 Project name:     ‚ 2     †ƒ ƒ„    received the contract. Financing : Local source

Latest state : 2013/98690 registered tender: Quoting 7.479.136,31 TL, BES ELEKTR0K received the contract. Project name:  „ ‚323 2 2      ƒ     Financing : Local source Project name:     2 ƒ„ ‡ƒ‡2 €ƒ2  ‚€ ƒ„    Latest state : 2012/145639 registered tender: Quoting 10.904.698,46 TL (214.000,00 TL as repair cost) ZDR MÜHEND SL K 0 0 Financing : Local source received the contract. Latest state : 2013/91036 registered tender: 9.938.826,00 TL , ENMON+DATEL received the contract .

Project name: 2 † ‡   ˆ‰         Project name: 2 ˆ     3 ‡„    Financing : Local source Financing : Local source Latest state : 2012/145647 registered tender: TM.86, 3 ea 380 Kv and 154 Kv substations Works awarded to AVN ULUTA . 0 0 1 Latest state : 2013/92619 registered tender: Quoting 32.432.000,00 TL, UFUK ATAÇ+ELTEM MÜH. received the contract.

Project name: † ‡   ‚         Project name:  ‰     2 2 Š 2€ Œ    „   Financing : Local source Financing : Local source Latest state : 2013/22029 registered tender: Quoting 11.624.000,00 TL, KAR-PA ELEKTR K received the contract. 0 Latest state : 2013/88629 registered tender: For TBB-1, 600 MVA Back-To-Back Birecik (Turkey) (Birecik-1anlıurfa) converter

station constr. Project, SIEMENS, 1ARA+CHINA ELECTR0C ve ABB A.1.’ submitted bids in November. Project name: Š‰ ‡    ƒ  N ‚3        Financing : Local source Tenderer : Latest state : 2013/29388 registered tender: Quoting 16.393.770,00 TL, MDC 274 ENERJ0 received the contract.  „„€ Š€‚Œ 2 ‡‡ „     Project name: ‡ ‚2 ‡ „ ‡ ‡‡ „ƒ„„     Project name:  ‰Ž ‡ ˆ‰  2 ƒ       Financing : Local source Financing : Local source Latest state : 2013/79423 registered tender: For “Ordu-Giresun aırport Superstruc ture facılıtıes project ” bids were received on 09 Dec. 2013. The estimated cost is 99.500.000 TL and 15 firms submitted bids, The lowest bid 71.420.000 TL Latest state : 2013/37419 registered tender: Quoting 8.100.000,00 TL, VAM MÜHEND0SL0K received the contract. submitted by 0NTES+FEMA+STY.

Project name: 2 Ž ‘ Ž ‡    ƒ     Financing : Local source Tenderer :  ‚„  ŠŒ Latest state : 2013/27964 registered tender: Quoting 29.714.000,00 TL, ANADOLU ELEKTR0K received the contract. Project name:  ƒ „ƒ  „ƒ„„ Financing : Local source Project name: 2 Ž ‡ ­  3   €    ƒ     Latest state : 2013/26248 registered tender: For colombian type silos in 8 locations, KIZILER 0N1AAT received the contract at Financing : Local source 6.925.000,00 TL.

Latest state : 2013/27964 registered tender: Quoting 27.961.000,00 TL, ANADOLU ELEKTR0K received the contract. Project name:   „€ ‚„      Project name: Š ‡ 2  ‚2 3 2        Financing : Local source Latest state : 2013/120641 registered tender: bids were received on 10 Oct. The estimated cost is 54.817.977,91 TL and the Financing : Local source lowest bid was 45.900.000,00 TL submitted by AT LLA DO AN+AS N AAT joint venture. Latest state : 2013/10663 registered tender: Quoting 18.937.000,00 TL, UFUK ATAÇ received the contract. 0 . 0 1

Project name: Š† ‡     2 ‚22 2        Tenderer :  Ž „„ ‘ ‡„„ „„€ Financing : Local source Project name: ‚ 2 ‡‡  „    Latest state : 2013/48644 registered tender: Quoting 59.337.000,00, 1A-RA ENERJ0 received the contract. Financing : Local source Latest state : 2012/152034 registered tender: Quoting 312.770.000,00 TL, TURKCELL received the contract.             M  O   M  O    M 151O Tenderer : 2     22    Project name: 2 22 N             Financing : Local source Latest state : 2012/134253 registered tender: Silivri-Çanta WASTEWATER TREATMENT plant constr. (0nvest.Prj. no: K-8288) was awarded at 18.166.130,67 TL and TÜRKERLER 0N1AAT +OTV received the contract.

Project name: 2 22 N 2 3            Financing : Local source Latest state : 2013/90028 registered tender: Bids were received on 11 Dec. 2013 from 8 firms and over an estimated cost of 23.821.325.66 Euro, The lowest bid was 19.118.000,00 Euro submitted by EREN 0N1AAT+BETON ROHHBÜAU.

Tenderer : 2     Project name: 2   22 ‚         Financing : Local source Latest state : 2013/87848 registered tender: For Mecidiyeköy-Mahmutbey (1i2li–Ka/ıthane–Eyüp–Gaziosmanpa2a – Esenler- Ba/cılar) subway lines , Depot – mnaintenance area and depot connection lines, bids were received on 8 Oct. 2013. Estimated cost 1.301.139.308,91 TL and The lowest bid was 849.440.000 TL submitted by GÜLERMAK+KOL0N+KALYON.

Tenderer : 2ƒ 2     Project name:  „    †     Financing : Local source Latest state : 2013/41362 registered tender: Quoting 54.927.634,00 TL, R0T 0N1AAT+ERKA 0N1AAT joint venture received the contract.

Project name:     ‡          Financing : Local source Latest state : 2013/58174 registered tender: Bids were received on 1 July 2013 from 8 firms. The lowest bid offer of 47.330.000 TL submitted by VA TECH WABAG.

Tenderer : 2    2   3† Project name:   2 2 2†          Financing : Local source-Auction Latest state : 2013/93134 registered tender: Quoting 4.911.080,00 TL, SÜREKL0 0N1AAT received the contract.

Project name: ƒƒ 2 †          Financing : Local source-Auction Latest state : 2013/93142 registered tender: Quoting 5.930.000,00 TL, HNC 0N1AAT received the contract.

Project name:  2 †          Financing : Local source-Auction Latest state : 2013/101068 registered tender: Quoting 8.100.336,28 TL, RAMAKI 0N1AAT received the contract.

Project name: 22 2  †          Financing : Local source-Auction Latest state : 2013/100224 registered tender: Quoting 6.829.520,00 TL, ÖZDO.AN+ÇAPA 0N1. received the contract.

Project name: 32 ‡ 3‚ †          Financing : Local source-Auction Latest state : 2013/114524 registered tender: Quoting 4.520.114,75 TL, GÜRDO.U 0N1AAT received the contract.

Project name: 0  2            Financing : Local source-Auction Latest state : 2013/116450 registered tender: Quoting 9.490.677,00 TL, ÖZSU 0N1AAT received the contract.

Project name: 2 2            Financing : Local source-Auction Latest state : 2013/116443 registered tender: Quoting 8.170.000,00 TL, T0SAN+M0RHAN 0N1. received the contract.

Project name: 2 2 †        ‡   Financing : Local source-Auction Latest state : 2013/116437 registered tender: Quoting 8.050.000,00 TL, GÜRDO.U 0N1AAT received the contract.         M  O    M 152O Project name: Tenderer : 23 2       2     22    Financing : Local source-Auction Project name: 2 22 N             Latest state : 2013/116445 registered tender: Quoting 32.690.515,70 TL, EFOR YAPI Received the contract. Financing : Local source Latest state : 2012/134253 registered tender: Silivri-Çanta WASTEWATER TREATMENT plant constr. ( nvest.Prj. no: K-8288) 0 Project name: 2 3 ­      was awarded at 18.166.130,67 TL and TÜRKERLER 0N1AAT +OTV received the contract. Financing : Local source-Auction Latest state : 2013/116440 registered tender: Quoting 6.455.000,00 TL, METHA MÜH. Received the contract. Project name: 1 2 22 N 2 3            Financing : Local source Latest state : 2013/90028 registered tender: Bids were received on 11 Dec. 2013 from 8 firms and over an estimated cost of Project name: €2‚2 ƒ2„2­      23.821.325.66 Euro, The lowest bid was 19.118.000,00 Euro submitted by EREN 0N1AAT+BETON ROHHBÜAU. Financing : Local source-Auction Latest state : 2013/116448 registered tender: Quoting 4.864.841,00 TL, VESTAN MÜHEND0SL0K Received the contract.

Tenderer : 2     Project name: 23 ‚­      Project name: 2   22 ‚         Financing : Local source-Auction Financing : Local source Latest state : 2013/116447 registered tender: Quoting 30.850.407,05 TL, ECAY N AAT Received the contract. Latest state : 2013/87848 registered tender: For Mecidiyeköy-Mahmutbey ( i li–Ka ıthane–Eyüp–Gaziosmanpa a – Esenler- 0 1 1 2 / 2 Ba/cılar) subway lines , Depot – mnaintenance area and depot connection lines, bids were received on 8 Oct. 2013. Estimated cost 1.301.139.308,91 TL and The lowest bid was 849.440.000 TL submitted by Project name: „   3­      GÜLERMAK+KOL0N+KALYON. Financing : Local source-Auction Latest state : 2013/116438 registered tender: Quoting 11.696.000,00 TL, M1C 0N1AAT Received the contract.

Tenderer : 2ƒ 2     Project name:  ­      Project name:  „    †     Financing : Local source-Auction Financing : Local source Latest state : 2013/123360 registered tender: Quoting 7.074.175,00 TL, ESEN 0N1AAT Received the contract. Latest state : 2013/41362 registered tender: Quoting 54.927.634,00 TL, R T N AAT+ERKA N AAT joint venture received the 0 0 1 0 1 contract. Project name:        Financing : Local source-Auction Project name:     ‡          Latest state : 2013/116449 registered tender: Quoting 5.653.263,56 TL, SÜREKL N AAT Received the contract . Financing : Local source 0 0 1

Latest state : 2013/58174 registered tender: Bids were received on 1 July 2013 from 8 firms. The lowest bid offer of 47.330.000 TL submitted by VA TECH WABAG. Project name:   3      Financing : Local source-Auction Latest state : 2013/162312 registered tender: Quoting 11.603.089,20 TL, ÖZSU N AAT Received the contract. Tenderer : 0 1 2    2   3† Project name:   2 2 2†          Financing : Local source-Auction Tenderer :   22  2 2202 Latest state : 2013/93134 registered tender: Quoting 4.911.080,00 TL, SÜREKL0 0N1AAT received the contract. Project name:  ˆ ‰     

Financing : Transfer of operating rights Project name: ƒƒ 2 †          Latest state : BAYHA ATIK YÖNET0M0 VE TA1IMACILIK A.1. + ASTEM 0N1. TUR. TA1. T0C. LTD. 1T0. + HARMAN 0N1. T0C. Financing : Local source-Auction VE SAN. A.1. received the contract for Kütahya solid waste landfill facilities construction and 29-year operational Latest state : 2013/93142 registered tender: Quoting 5.930.000,00 TL, HNC 0N1AAT received the contract. rights EKAY annex facılıtıes.

Project name:  2 †          Financing : Local source-Auction Tenderer : 2       Latest state : 2013/101068 registered tender: Quoting 8.100.336,28 TL, RAMAKI 0N1AAT received the contract. Project name:  ƒ  ƒ‰   ƒ 2    Financing : World Bank Project name: 22 2  †          Latest state : (KAY-W1) project: QUoting 30.106.847,00 TL, STRABAG (Austria) is the best bidder. Financing : Local source-Auction Latest state : 2013/100224 registered tender: Quoting 6.829.520,00 TL, ÖZDO.AN+ÇAPA 0N1. received the contract. Tenderer :        Project name: 32 ‡ 3‚ †          Project name: ƒ2      Financing : Local source-Auction Financing : Local source Latest state : 2013/114524 registered tender: Quoting 4.520.114,75 TL, GÜRDO.U 0N1AAT received the contract. Latest state : 2013/60280 registered tender: For Adliye tramway lınes and existing campus tramway lınes rehabilitation constr.,

YAPI MERKEZ0+YAPIRAY joint venture received the contract quoting 53.817.217,12 TL. Project name: 0  2            Financing : Local source-Auction Latest state : 2013/116450 registered tender: Quoting 9.490.677,00 TL, ÖZSU 0N1AAT received the contract. Tenderer : „     2 ­ Project name: 2  Project name: 2 2            Financing : Transfer of operating right Financing : Local source-Auction Latest state : BAYRAKTAR KARDE1LER received the contract as per State Bidding Law no 2886 article 51/g at a cost Latest state : 2013/116443 registered tender: Quoting 8.170.000,00 TL, T0SAN+M0RHAN 0N1. received the contract. of120.750.000 TL. for Tuzla coastal filling area usage permission for 30 year period as per Municipality Law no

5393 article 18/e for a total area of 370.989,98 m² (including 182559,53 m² area transferred and 188430,45 m² Project name: 2 2 †        ‡   sea surface). Financing : Local source-Auction Latest state : 2013/116437 registered tender: Quoting 8.050.000,00 TL, GÜRDO.U 0N1AAT received the contract.             M  O   M  O    M 153O Tenderer :     2      Project name:     2  Financing : Turnover in return for royalty Latest state : ÇEL0KLER 0N1AAT received the contract for operations in return for royalty on condition of building a thermal Management :              p.plant, for 5,03 kr2. ((kr2/kWh), (KÜTAHYA Area: Domaniç Certif. No: 0R.4364 Project : ESENBO.A AIRPORT RAIL SYSTEM PROJECT Latest State: 2012/21266 registered tender has been contracted for 3.380.000 TL and winner is ITALFERR GRUPPO has received Project name: 2   ­  the contract. Financing : Turnover in return for royalty Latest state : AKSA ENERJ0 received the contract for operations in return for royalty on condition of building a thermal p.plant. Management :         3 for 53,2 kr2. (kr2/kWh) (Certif. no: S.12561/S. 62715) Project : 1IRNAK NATURALGAS PIPELINES FIELD SURVEY MAPPING AND EXPROPRIATIONAL SERVICES Tenderer :  €  €    €  Latest State: 2013/83661 registered tender has been awarded for 1.749.000 TL. GÜNKA HAR0TA has received the contract. Project name:     2  Financing : Local source Management :             Latest state : 2013/124369 registered tender: Bids were received on 26 November 2013 and The lowest bid was 15.965.000 TL Project : BALIKES0R SOLIDWASTE MANAGEMENT PROJECT submitted by VEMAK N AAT for De/irmenköy expansion and peripheral n.gas areas storage terminal Project 0 1 Latest State: EPEM S.A. + ENV0RONMENTAL PLANN0NG, ENG0NEER0NG AND MANAGEMENT (YUNAN0STAN) + SLR (Phase II) surface facilities. The estimated cost 28.074.660,00 TL. CONSULT0NG LTD (0NG0LTERE) + TÜMA1 (TÜRK0YE) received the contract for technical assistance and control services of Balıkesir solidwaste management project financed with foreign loans (Ref: EuropeAid/129944/D/SER/TR) Tenderer : Contract value was 1.461.525 Euro.           Project name: ‚  ƒ   ƒ 32     ‚   €€ €   Management : Financing : Local source      N        Latest state : 2013/111286 registered tender: Bids were received on 17 Sep. 2013 from 8 firms.. The estimated cost is Project : ERC01 SOLIDWASTE MANAGEMENT PROJECT 23.264.021,46 TL and The lowest bid was 16.177.077,70 TL submitted by FORA MEKATRON0K. Latest State: 2013/77088 registered tender has been awarded to BNR KENTSEL DÖNÜ1ÜM quoting 1.445.000 TL. The contract covers existing state analyses, field strategies and transformation model, proprietorship right determination, real estate assessment, consensus period, action plan, urban design services in Erci2, Van. Tenderer :  ‚2 €  €    €  Project name:     †    † €   Management :  €  ‚ ƒ  Financing : Local source Project : AFYONKARAH0SAR ÇAY AND BOLVAD0N DRINKINGWATER TREATMENT PLANT Latest state : 2012/180823 registered tender: For 3rd stage 0brahimli region rail system construction and electrification Works. PROJECT COMSA SA received the contract quoting 45.791.383,12 TL. Latest State: 2012/183660 registered tender has been awarded to TAHA MÜHEND0SL0K quoting184.000 TL.

Tenderer :   ‡ ­  ˆ   ‡‡  N  ­  €† Project : HATAY-AM0K-AFR0N IRRIGATION FACILITIES PROJECT Latest State: 2012/130380 registered tender has been awarded at a cost of 5.190.000 TL and winner is BAR-SU+B0RL0K MÜH. Project name:  23   €€   €   Financing : IPA (Pre Accession Aid ) Project : MERS0N TARSUS ENGINEERING SERVICES Latest state : Europe Aid / 130 137/D/WKS/TR refer. “Erci2 drinkingwater supply system”: bids were received on 7 May 2013 Latest State: 2012/112213 registered tender has been awarded at a cost of 900.000 TL and SU01 PROJE. has received the and best offer is 21.739.025,00 Euro submitted by MPE MÜHEND SL K. 0 0 contract.

Project name:      €€   €   Project : AYDIN-SÖKE-SARIÇAY DAM CONSTR. PROJECT Financing : IPA (Pre Accession Aid ) Latest State: 2011/207589 registered tender has been awarded at a cost of 950.000,00 TL and PETEK PROJE has received the Latest state : Akçaabat supply system project (EuropeAid/132572/D/WKS/TR): bids were received on 09 July 2013 and 5 firms contract. submitted bids. The best offer is 13.520.754 Euro submitted by MEDOS+MET PROJE. Project : AND HEPP PROJECT Project name: 2­ƒ    2             €   Latest State: 2011/176178 registered tender has been awarded at a cost of 3.514.000,00 TL and SU-YAPI MÜH. has received the Financing : IPA (Pre Accession Aid ) contract. Latest state : For Siverek Esmerçay river wastewater and rain water collectors bids were received on 09 July 2013 and 4 firms submitted bids. The best offer is 16.449.818,74 Euro submitted by 0NTEKO TEK.+CEM-SEL. Project : MERS0N-DE.0RMENÇAY DAM CONSTR. PROJECT Latest State: 2011/190951registered tender has been awarded at a cost of 1.290.000,00 TL and ES PROJE has received the contract. Tenderer :    €    €  ƒ 2 Project name:      † €   Project : SAMSUN-SALIPAZARI DAM CONSTR. PROJECT Financing : Local source Latest State: 2012/77616 registered tender has been awarded at a cost of 1.500.000,00 TL and SETAN MÜH. has received the Latest state : 22 firms submitted bids Akçay Dam tender for a water source as an alternative to Lake Sapanca under file no contract. 2013/37379: The tender was held on 30 April 2013. But it was later canceled. Project : ADIYAMAN-GÖMÜKAN DAM CONSTR. PROJECT Latest State: 2011/207562 registered tender has been awarded at a cost of 1.704.000,00 TL and ESER PROJE has received the contract.

            M  O   M 154O    M  O Tenderer :     2      Project name:     2  Financing : Turnover in return for royalty Latest state : ÇEL0KLER 0N1AAT received the contract for operations in return for royalty on condition of building a thermal Management :              p.plant, for 5,03 kr2. ((kr2/kWh), (KÜTAHYA Area: Domaniç Certif. No: 0R.4364 Project : ESENBO.A AIRPORT RAIL SYSTEM PROJECT Latest State: 2012/21266 registered tender has been contracted for 3.380.000 TL and winner is ITALFERR GRUPPO has received Project name: 2   ­  the contract. Financing : Turnover in return for royalty Latest state : AKSA ENERJ0 received the contract for operations in return for royalty on condition of building a thermal p.plant. Management :         3 for 53,2 kr2. (kr2/kWh) (Certif. no: S.12561/S. 62715) Project : 1IRNAK NATURALGAS PIPELINES FIELD SURVEY MAPPING AND EXPROPRIATIONAL SERVICES Tenderer :  €  €    €  Latest State: 2013/83661 registered tender has been awarded for 1.749.000 TL. GÜNKA HAR0TA has received the contract. Project name:     2  Financing : Local source Management :             Latest state : 2013/124369 registered tender: Bids were received on 26 November 2013 and The lowest bid was 15.965.000 TL Project : BALIKES0R SOLIDWASTE MANAGEMENT PROJECT submitted by VEMAK N AAT for De/irmenköy expansion and peripheral n.gas areas storage terminal Project 0 1 Latest State: EPEM S.A. + ENV0RONMENTAL PLANN0NG, ENG0NEER0NG AND MANAGEMENT (YUNAN0STAN) + SLR (Phase II) surface facilities. The estimated cost 28.074.660,00 TL. CONSULT0NG LTD (0NG0LTERE) + TÜMA1 (TÜRK0YE) received the contract for technical assistance and control services of Balıkesir solidwaste management project financed with foreign loans (Ref: EuropeAid/129944/D/SER/TR) Tenderer : Contract value was 1.461.525 Euro.           Project name: ‚  ƒ   ƒ 32     ‚   €€ €   Management : Financing : Local source      N        Latest state : 2013/111286 registered tender: Bids were received on 17 Sep. 2013 from 8 firms.. The estimated cost is Project : ERC01 SOLIDWASTE MANAGEMENT PROJECT 23.264.021,46 TL and The lowest bid was 16.177.077,70 TL submitted by FORA MEKATRON0K. Latest State: 2013/77088 registered tender has been awarded to BNR KENTSEL DÖNÜ1ÜM quoting 1.445.000 TL. The contract covers existing state analyses, field strategies and transformation model, proprietorship right determination, real estate assessment, consensus period, action plan, urban design services in Erci2, Van. Tenderer :  ‚2 €  €    €  Project name:     †    † €   Management :  €  ‚ ƒ  Financing : Local source Project : AFYONKARAH0SAR ÇAY AND BOLVAD0N DRINKINGWATER TREATMENT PLANT Latest state : 2012/180823 registered tender: For 3rd stage 0brahimli region rail system construction and electrification Works. PROJECT COMSA SA received the contract quoting 45.791.383,12 TL. Latest State: 2012/183660 registered tender has been awarded to TAHA MÜHEND0SL0K quoting184.000 TL.

Tenderer :   ‡ ­  ˆ   ‡‡  N  ­  €† Project : HATAY-AM0K-AFR0N IRRIGATION FACILITIES PROJECT Latest State: 2012/130380 registered tender has been awarded at a cost of 5.190.000 TL and winner is BAR-SU+B0RL0K MÜH. Project name:  23   €€   €   Financing : IPA (Pre Accession Aid ) Project : MERS0N TARSUS BERDAN RIVER ENGINEERING SERVICES Latest state : Europe Aid / 130 137/D/WKS/TR refer. “Erci2 drinkingwater supply system”: bids were received on 7 May 2013 Latest State: 2012/112213 registered tender has been awarded at a cost of 900.000 TL and SU01 PROJE. has received the and best offer is 21.739.025,00 Euro submitted by MPE MÜHEND SL K. 0 0 contract.

Project name:      €€   €   Project : AYDIN-SÖKE-SARIÇAY DAM CONSTR. PROJECT Financing : IPA (Pre Accession Aid ) Latest State: 2011/207589 registered tender has been awarded at a cost of 950.000,00 TL and PETEK PROJE has received the Latest state : Akçaabat supply system project (EuropeAid/132572/D/WKS/TR): bids were received on 09 July 2013 and 5 firms contract. submitted bids. The best offer is 13.520.754 Euro submitted by MEDOS+MET PROJE. Project : KAYRAKTEPE DAM AND HEPP PROJECT Project name: 2­ƒ    2             €   Latest State: 2011/176178 registered tender has been awarded at a cost of 3.514.000,00 TL and SU-YAPI MÜH. has received the Financing : IPA (Pre Accession Aid ) contract. Latest state : For Siverek Esmerçay river wastewater and rain water collectors bids were received on 09 July 2013 and 4 firms submitted bids. The best offer is 16.449.818,74 Euro submitted by 0NTEKO TEK.+CEM-SEL. Project : MERS0N-DE.0RMENÇAY DAM CONSTR. PROJECT Latest State: 2011/190951registered tender has been awarded at a cost of 1.290.000,00 TL and ES PROJE has received the contract. Tenderer :    €    €  ƒ 2 Project name:      † €   Project : SAMSUN-SALIPAZARI DAM CONSTR. PROJECT Financing : Local source Latest State: 2012/77616 registered tender has been awarded at a cost of 1.500.000,00 TL and SETAN MÜH. has received the Latest state : 22 firms submitted bids Akçay Dam tender for a water source as an alternative to Lake Sapanca under file no contract. 2013/37379: The tender was held on 30 April 2013. But it was later canceled. Project : ADIYAMAN-GÖMÜKAN DAM CONSTR. PROJECT Latest State: 2011/207562 registered tender has been awarded at a cost of 1.704.000,00 TL and ESER PROJE has received the contract.

        M  O          M 155O M  O Project : BURSA-KARACABEY GÖLEC0K DAM CONSTR. PROJECT Project : BOLU-ÇELE DAM IRRIGATION CONSTR. PROJECT Latest State: 2011/199514 registered tender has been awarded at a cost of 1.425.000,00 TL and ESER PROJE has received the Latest State: 2012/174952 registered tender has been awarded at a cost of 1.100.000,00 TL and winner is BAGET contract. MÜHEND0SL0K

Project : 1IRNAK-C0ZRE DRINKINGWATER TREATMENT PLANT CONSTR. PROJECT Project : KOCAEL0-KARAMÜRSEL AVCIDERE AND 0HSAN0YE DAM CONSTR. PROJECT Latest State: 2012/183568 registered tender has been awarded at a cost of 223.000 TL and ART ÇEVRE has received the Latest State: 2012/191660 registered tender has been awarded at a cost of 2.590.000 TL and YOL SU MÜHEND0SL0K has contract. received the contract.

Project : HATAY-AM K-AFR N IRRIGATION FACILITIES PROJECT (2ND UNIT) 0 0 Project : KARS D0GOR-VARLI DAM CONSTR. PROJECT Latest State: 2012/130380 registered tender has been awarded at a cost of 5.190.000,00 TL and BAR-SU+B0RL0K MÜH. has Latest State: 2012/90505 registered tender has been awarded at a cost of 1.160.000 TL and H0DRO D0ZAYN MÜHEND0SL0K received the contract. has received the contract.

Project : 0ZM0R GEY0KL0 DAM CONSTR. PROJECT Project : SAMSAT PUMPING IRRIGATION 2. STAGE PLANNING REVISION SERVICES Latest State: 2012/115996 registered tender has been awarded at a cost of 920.000 TL and EN-SU MÜH. has received the Latest State: 2012/193656 registered tender has been awarded at a cost of 1.150.000,00 TL and KOLTEK MÜ1AV0RL0K has contract. received the contract.

Project : KARS ÇAYI BASIN PROJECT Project : KARS-SEL M DAM IRRIGATION PROJECT Latest State: 2012/139792 registered tender has been awarded at a cost of 2. 900.000 TL and KOLTEK MÜH. has received the 0 Latest State: 2013/108317 registered tender: Applications were received on 2 sep. 2013 for evaluation. contract.

Project : BIG MENDERES AND WEST MEDITERRANEAN RESERVOIRS POND PROJECT Project : AFYONKARAH0SAR-AKDE.0RMEN DAM TREATMENT PLANT PROJECT Latest State: 2012/191432 registered tender has been awarded at a cost of 1.906.770,00 TL and MERKEZ PROJE has received Latest State: 2012/188360 registered tender has been awarded at a cost of 115.000,00 TL and VAD0 PROJE has received the contract. the contract.

Project : KARS ÇAYI BASIN KARS DAM CONSTR. PROJECT Project : Mu/la YATA.AN AND ULA ENVIRONS DRINKINGWATER SUPPLY PROJECT Latest State: 2012/139792 registered tender has been awarded at a cost of 2.900.000,00 TL and winner is KOLTEK MÜH. has Latest State: 2012/67946 registered tender has been awarded at a cost of 1.971.500,00 TL and DOLSAR MÜHEND0SL0K has received the contract. received the contract.

Project : GAZ0ANTEP P2 POMPAJ IRRIGATION 2. STAGE CONSTR. PROJECT Management :         22 Latest State: 2012/135191 registered tender has been awarded at a cost of 1.160.000,00 TL and DOLSAR MÜH. has received Project : ZM R-KAPIKAYA DAM CONSTR. PROJECT the contract. 0 0 Latest State: 2012/86598 registered tender has been contracted for 1.220.000 TL and TABAR MÜH. has received the contract .

Project : DÜZCE DRINKINGWATER FACILITIES APPLICATION PROJECT Latest State: 2012/92554 registered tender has been awarded at a cost of 1.710.000,00 TL and SU-YAPI MÜH. has received the Project : 0ZM0R 2. BÖLGE GÖL-SU PROJECT (1. STAGE ) contract. Latest State: 2011/194208 registered tender has been contracted for 980.000,00 TL and winner is YOL SU MÜHEND0SL0K has received the contract. Project : I.DIR DRINKINGWATER AND TREATMENT PLANT PROJECT Latest State: 2012/90952 registered tender has been awarded at a cost of 1.950.000,00 TL and KOLTEK MÜH. has received the Management :        23 2 contract. Project : ESK EH R-BEYAZALTIN M HALIÇÇIK, ALPU, DEREKÖY, SARICAKAYA, LAÇ N PONDS 01 0 0 0 PROJECT SERVICES Project : KA -KASABA PROJECT KIBRIS DAM KGM ROAD RELOCATION SERVICES 1 Latest State: 2012/108905 registered tender has been contracted for 1.470.000 TL and AKAR-SU MÜH. has received the Latest State: 2012/193927 registered tender has been awarded at a cost of 620.000,00 TL and JEMAS MÜH. has received the contract. contract.

Project : ADAPAZARI-BALLIKAYA DAM DRINKINGWATER OUTPOUR0NG L0NES APPLICATION Management :        23 2 PROJECT Project : GÜNDÜZLER DAM CONSTR. PROJECT Latest State: 2013/13913 registered tender has been awarded at a cost of 624.350,00 TL and ÇÖZÜM ALTYAPI. has received Latest State: 2012/195679 registered tender has been contracted for 920.000,00TL and BAGET MÜH. has received the contract . the contract.

Management :     ­     Project : ERZURUM HINIS BA1KÖY DAM IRRIGATION PROJECT Project : GÖLET IRRIGATION PROJECT Latest State: 2012/195298 registered tender has been awarded at a cost of 1.800.000,00 TL and KOLTEK MÜ1. A.1. has received the contract. Latest State: 2012/90089 registered tender has been contracted for 613.000 TL and winner is YOLSU MÜH. has received the contract for Ni/de pond and irrigations planning report and project services (3. Stage )

Project : 0ZM0R-MUSACALI DAM CONSTR. PROJECT Latest State: 2012/90092 registered tender has been contracted at a cost of 623.000,00 TL and winner is YOLSU MÜH. has Latest State: 2012/189815 registered tender has been awarded at a cost of 1.173.000,00 TL and SETAN MÜHEND0SL0K has received the contract for Karaman pond and irrigations planning report and project services (2. Stage ) received the contract. Latest State: 2012/90085 registered tender has been contracted for Konya Pond and irrigations planning report and project Project : ERZURUM-ÇATALÖREN DAM IRRIGATION CONSTR. PROJECT services (3. Stage ) and quoting 1.211.000 TL, YOLSU MÜH. has received the contract. Latest State: 2012/174953 registered tender has been awarded at a cost of 960.000,00 TL and YOL SU MÜHEND0SL0K has received the contract. Latest State: 2012/166978 registered tender has been contracted for Sarayönü Be2gözler Project planning revision consultany and quoting 1.162.500 TL, NFB MÜHEND0SL0K has received the contract. Project : ANTALYA-OBAÇAYI DAM IRRIGATION CONSTR. PROJECT Latest State: 2012/191661 registered tender has been awarded at a cost of 1.190.000,00 TL and TEMELSU MÜHEND0SL0K has Latest State: 2012/173149 registered tender has been contracted for Konya 0li pond and irrigations planning report and project received the contract. services 4. stage consultancy. Quoting 867.000 TL MERKEZ PROJE LTD has received the contract.             M  O M  O       M 156O Project : BURSA-KARACABEY GÖLEC0K DAM CONSTR. PROJECT Project : BOLU-ÇELE DAM IRRIGATION CONSTR. PROJECT Latest State: 2011/199514 registered tender has been awarded at a cost of 1.425.000,00 TL and ESER PROJE has received the Latest State: 2012/174952 registered tender has been awarded at a cost of 1.100.000,00 TL and winner is BAGET contract. MÜHEND0SL0K

Project : 1IRNAK-C0ZRE DRINKINGWATER TREATMENT PLANT CONSTR. PROJECT Project : KOCAEL0-KARAMÜRSEL AVCIDERE AND 0HSAN0YE DAM CONSTR. PROJECT Latest State: 2012/183568 registered tender has been awarded at a cost of 223.000 TL and ART ÇEVRE has received the Latest State: 2012/191660 registered tender has been awarded at a cost of 2.590.000 TL and YOL SU MÜHEND0SL0K has contract. received the contract.

Project : HATAY-AM K-AFR N IRRIGATION FACILITIES PROJECT (2ND UNIT) 0 0 Project : KARS D0GOR-VARLI DAM CONSTR. PROJECT Latest State: 2012/130380 registered tender has been awarded at a cost of 5.190.000,00 TL and BAR-SU+B0RL0K MÜH. has Latest State: 2012/90505 registered tender has been awarded at a cost of 1.160.000 TL and H0DRO D0ZAYN MÜHEND0SL0K received the contract. has received the contract.

Project : 0ZM0R GEY0KL0 DAM CONSTR. PROJECT Project : SAMSAT PUMPING IRRIGATION 2. STAGE PLANNING REVISION SERVICES Latest State: 2012/115996 registered tender has been awarded at a cost of 920.000 TL and EN-SU MÜH. has received the Latest State: 2012/193656 registered tender has been awarded at a cost of 1.150.000,00 TL and KOLTEK MÜ1AV0RL0K has contract. received the contract.

Project : KARS ÇAYI BASIN PROJECT Project : KARS-SEL M DAM IRRIGATION PROJECT Latest State: 2012/139792 registered tender has been awarded at a cost of 2. 900.000 TL and KOLTEK MÜH. has received the 0 Latest State: 2013/108317 registered tender: Applications were received on 2 sep. 2013 for evaluation. contract.

Project : BIG MENDERES AND WEST MEDITERRANEAN RESERVOIRS POND PROJECT Project : AFYONKARAH0SAR-AKDE.0RMEN DAM TREATMENT PLANT PROJECT Latest State: 2012/191432 registered tender has been awarded at a cost of 1.906.770,00 TL and MERKEZ PROJE has received Latest State: 2012/188360 registered tender has been awarded at a cost of 115.000,00 TL and VAD0 PROJE has received the contract. the contract.

Project : KARS ÇAYI BASIN KARS DAM CONSTR. PROJECT Project : Mu/la YATA.AN AND ULA ENVIRONS DRINKINGWATER SUPPLY PROJECT Latest State: 2012/139792 registered tender has been awarded at a cost of 2.900.000,00 TL and winner is KOLTEK MÜH. has Latest State: 2012/67946 registered tender has been awarded at a cost of 1.971.500,00 TL and DOLSAR MÜHEND0SL0K has received the contract. received the contract.

Project : GAZ0ANTEP P2 POMPAJ IRRIGATION 2. STAGE CONSTR. PROJECT Management :         22 Latest State: 2012/135191 registered tender has been awarded at a cost of 1.160.000,00 TL and DOLSAR MÜH. has received Project : ZM R-KAPIKAYA DAM CONSTR. PROJECT the contract. 0 0 Latest State: 2012/86598 registered tender has been contracted for 1.220.000 TL and TABAR MÜH. has received the contract .

Project : DÜZCE DRINKINGWATER FACILITIES APPLICATION PROJECT Latest State: 2012/92554 registered tender has been awarded at a cost of 1.710.000,00 TL and SU-YAPI MÜH. has received the Project : 0ZM0R 2. BÖLGE GÖL-SU PROJECT (1. STAGE ) contract. Latest State: 2011/194208 registered tender has been contracted for 980.000,00 TL and winner is YOL SU MÜHEND0SL0K has received the contract. Project : I.DIR DRINKINGWATER AND TREATMENT PLANT PROJECT Latest State: 2012/90952 registered tender has been awarded at a cost of 1.950.000,00 TL and KOLTEK MÜH. has received the Management :        23 2 contract. Project : ESK EH R-BEYAZALTIN M HALIÇÇIK, ALPU, DEREKÖY, SARICAKAYA, LAÇ N PONDS 01 0 0 0 PROJECT SERVICES Project : KA -KASABA PROJECT KIBRIS DAM KGM ROAD RELOCATION SERVICES 1 Latest State: 2012/108905 registered tender has been contracted for 1.470.000 TL and AKAR-SU MÜH. has received the Latest State: 2012/193927 registered tender has been awarded at a cost of 620.000,00 TL and JEMAS MÜH. has received the contract. contract.

Project : ADAPAZARI-BALLIKAYA DAM DRINKINGWATER OUTPOUR0NG L0NES APPLICATION Management :        23 2 PROJECT Project : GÜNDÜZLER DAM CONSTR. PROJECT Latest State: 2013/13913 registered tender has been awarded at a cost of 624.350,00 TL and ÇÖZÜM ALTYAPI. has received Latest State: 2012/195679 registered tender has been contracted for 920.000,00TL and BAGET MÜH. has received the contract . the contract.

Management :     ­     Project : ERZURUM HINIS BA1KÖY DAM IRRIGATION PROJECT Project : GÖLET IRRIGATION PROJECT Latest State: 2012/195298 registered tender has been awarded at a cost of 1.800.000,00 TL and KOLTEK MÜ1. A.1. has received the contract. Latest State: 2012/90089 registered tender has been contracted for 613.000 TL and winner is YOLSU MÜH. has received the contract for Ni/de pond and irrigations planning report and project services (3. Stage )

Project : 0ZM0R-MUSACALI DAM CONSTR. PROJECT Latest State: 2012/90092 registered tender has been contracted at a cost of 623.000,00 TL and winner is YOLSU MÜH. has Latest State: 2012/189815 registered tender has been awarded at a cost of 1.173.000,00 TL and SETAN MÜHEND0SL0K has received the contract for Karaman pond and irrigations planning report and project services (2. Stage ) received the contract. Latest State: 2012/90085 registered tender has been contracted for Konya Pond and irrigations planning report and project Project : ERZURUM-ÇATALÖREN DAM IRRIGATION CONSTR. PROJECT services (3. Stage ) and quoting 1.211.000 TL, YOLSU MÜH. has received the contract. Latest State: 2012/174953 registered tender has been awarded at a cost of 960.000,00 TL and YOL SU MÜHEND0SL0K has received the contract. Latest State: 2012/166978 registered tender has been contracted for Sarayönü Be2gözler Project planning revision consultany and quoting 1.162.500 TL, NFB MÜHEND0SL0K has received the contract. Project : ANTALYA-OBAÇAYI DAM IRRIGATION CONSTR. PROJECT Latest State: 2012/191661 registered tender has been awarded at a cost of 1.190.000,00 TL and TEMELSU MÜHEND0SL0K has Latest State: 2012/173149 registered tender has been contracted for Konya 0li pond and irrigations planning report and project received the contract. services 4. stage consultancy. Quoting 867.000 TL MERKEZ PROJE LTD has received the contract.             M  O M  O       M 157O

Latest State: 2012/174187 registered tender has been contracted for Konya 0li pond and irrigations planning report and project services 5. stage consultancy. Quoting 1.121.000 TL SUPEK A.1. has received the contract.

Management :         Project : ÇANKIRI DEVREZ KIZLARROAD DAM CONSTR. PROJECT Latest State: 2013/25909 registered tender : applications wer e received on 22 March 2013 . Eligible firms will be determined.

Management :           Project : TOKAT-ALPU DAM IRRIGATION PROJECT Latest State: 2012/132660 registered tender has been awarded at a cost of 425.000,00 TL and KOLTEK MÜH. has received the contract.

Project : TOKAT-GÜZELCE DAM IRRIGATION PROJECT Latest State: 2012/152619 registered tender has been awarded at a cost of 450.000,00 TL and KOLTEK MÜH. has received the contract.

Project : ORDU 1. GROUP DRINKINGWATER AND IRRIGATION PROJECT Latest State: 2012/86040 registered tender has been awarded at a cost of 1.821.340,00 TL and winner is ES PROJE has received the contract.

Project : S0NOP POND PROJECTS Latest State: 2012/134166 registered tender has been awarded at a cost of 999.500,00 TL and H0DROMARK MÜH. has received the contract.

Project : ORDU PERIPHERAL ROAD (ORDU-ULUBEY)-TOPÇAM-MESUD0YE ROAD Latest State: 2012/6142 registered tender has been awarded at a cost of 14.542.896,00 TL and YÜKSEL PROJE has received the contract.

Management :     ­   €   Project : GÖLET IRRIGATION PROJECT Latest State: 2012/115804 registered tender has been awarded at a cost of 1.710.000,00 TL and H0DROMARK MÜHEND0SL0K for Erzurum pond and irrigation planning report (2 stage ) (Tortum-Ba/ba2ı, Büyükbahçe, Pehlivanlı Çiftlik, Uzundere pond and irrigation facilities)

Management :         2 Project : GÖLET IRRIGATION PROJECT Latest State: 2012/103259 registered tender has been awarded at a cost of 377.000 TL and SU-PEK A.1. has received the contract for Yozgat-Bo/azlıyan O/ulcuk Dam irrigation facilities project

Management :        3 „ Project : BOZOVA YAYLAK PUMPING IRRIGATION PROJECT Latest State: 2011/168680 registered tender has been awarded at a cost of 828.000,00 TL and H0DRO D0ZAYN MÜHEND0SL0K has received the contract.

Management :         2† Project : YILDIZEL0 PONDS PROJECT Latest State: 2012/172658 registered tender has been awarded at a cost of 497.000 TL and YOLSU MÜH. has received the contract.

Project : ULA1-KANGA PONDS PROJECT Latest State: 2012/162641 registered tender has been awarded at a cost of 450.000 TL and PETEK PROJE. has received the contract.

Management :         3 Project : MERKEZ-BA1DERV01-PAZARCIK-SAKARKAYA PONDS PROJECT Latest State: 2012/134485registered tender has been awarded at a cost of 627.000 TL and YOLSU MÜH. has received the contract.       M  O       M 158O

Latest State: 2012/174187 registered tender has been contracted for Konya 0li pond and irrigations planning report and project Project : GÖKSUN-BOZHÜYÜK AND ANDIRIN-GEBEN-KALEBOYNU PONDS PROJECT services 5. stage consultancy. Quoting 1.121.000 TL SUPEK A.1. has received the contract. Latest State: 2012/132702 registered tender has been awarded at a cost of 780.000,00 TL and ENSU MÜH. has received the contract.

Management :         Project : KARAKUZ DAM PROJECT Project : ÇANKIRI DEVREZ KIZLARROAD DAM CONSTR. PROJECT Latest State: 2012/109203 registered tender has been awarded at a cost of 1.872.650,00 TL and DOLSAR MÜH. has received Latest State: 2013/25909 registered tender : applications wer e received on 22 March 2013 . Eligible firms will be determined. the contract.

Management :           Management :          Project : TOKAT-ALPU DAM IRRIGATION PROJECT Project : AYDIN-Ç0NE IRRIGATION PROJECT Latest State: 2012/132660 registered tender has been awarded at a cost of 425.000,00 TL and KOLTEK MÜH. has received the Latest State: 2012/138847 registered tender has been awarded at a cost of 846.000 TL and M0MPA1 MÜH. has received the contract. contract.

Project : TOKAT-GÜZELCE DAM IRRIGATION PROJECT Project : AYDIN-SEK0 DAM IRRIGATION PROJECT Latest State: 2012/152619 registered tender has been awarded at a cost of 450.000,00 TL and KOLTEK MÜH. has received the Latest State: 2013/67494 registered tender has been awarded at a cost of 323.900,00 TL and SUFEN PROJE LTD. has received contract. the contract.

Project : ORDU 1. GROUP DRINKINGWATER AND IRRIGATION PROJECT Latest State: 2012/86040 registered tender has been awarded at a cost of 1.821.340,00 TL and winner is ES PROJE has received Management :         the contract. Project : G0RESUN POND IRRIGATION PROJECT

Project : S0NOP POND PROJECTS Latest State: 2012/92977 registered tender has been awarded MET PROJE quoting 2.000.000 TL for Giresun pond and Latest State: 2012/134166 registered tender has been awarded at a cost of 999.500,00 TL and H0DROMARK MÜH. has irrigation planning report (2. Stage ). received the contract. Latest State: 2012/116364 registered tender has been awarded for Gümü2hane pond and irrigation planning report 2.Stage Project : ORDU PERIPHERAL ROAD (ORDU-ULUBEY)-TOPÇAM-MESUD0YE ROAD surveys and quoting 2.580.000,00 TL, SU-YAPI MÜH. has received the contract. Latest State: 2012/6142 registered tender has been awarded at a cost of 14.542.896,00 TL and YÜKSEL PROJE has received the contract. Project : GÜMÜ1HANE-BAHÇEC0K DAM DRINKINGWATER TREATMENT PLANT PROJECT Latest State: 2012/194042 registered tender has been awarded at a cost of 720.000 TL and SEPA MÜH. has received the Management : contract.     ­   €   Project : GÖLET IRRIGATION PROJECT Latest State: 2012/115804 registered tender has been awarded at a cost of 1.710.000,00 TL and H0DROMARK MÜHEND0SL0K Management :         for Erzurum pond and irrigation planning report (2 stage ) (Tortum-Ba/ba2ı, Büyükbahçe, Pehlivanlı Çiftlik, Uzundere Project : KARS RIVER BASIN II. STAGE PROJECT pond and irrigation facilities) Latest State: 2012/144793 registered tender has been awarded at a cost of 1.200.000 TL and SEPA MÜH. has received the contract. Management :         2 Project : GÖLET IRRIGATION PROJECT Management : 2 ­  23 ­ 2  ­  0 Latest State: 2012/103259 registered tender has been awarded at a cost of 377.000 TL and SU-PEK A.1. has received the Project : KIRKA NEW WASTE POND PLANNING PROJECT contract for Yozgat-Bo/azlıyan O/ulcuk Dam irrigation facilities project Latest State: 2012/96063 registered tender has been contracted for 365.000,00 TL and ERGES PROJE has received the contract

Management :        3 „ Project : H0SARCIK-ESPAY WASTE DAM CONSTR. PROJECT Project : BOZOVA YAYLAK PUMPING IRRIGATION PROJECT Latest State: 2013/17807 registered tender has been contracted for 300.027 TL and TÜMA1 MÜH. has received the contract.

Latest State: 2011/168680 registered tender has been awarded at a cost of 828.000,00 TL and H0DRO D0ZAYN MÜHEND0SL0K has received the contract. Management :  ­­ „ 

Project : 5 EA TRASH SCREENS AND 3 EA RIVER CROSSING BRIDGES PROJECT Management :         2† Latest State: 2012/190460 registered tender has been contracted for 61.500,00 TL and LAVA MÜH. has received the contract. Project : YILDIZEL0 PONDS PROJECT Latest State: 2012/172658 registered tender has been awarded at a cost of 497.000 TL and YOLSU MÜH. has received the Project : SAMSUN ROAD KAYA1-MAV0GÖL ENTRY BRIDGED JUNCTION PROJECT contract. Latest State: 2012/193677 registered tender has been contracted for 71.000,00 TLand 0MPRO MÜH. has received the contract.

Project : ULA1-KANGA PONDS PROJECT Management : Latest State: 2012/162641 registered tender has been awarded at a cost of 450.000 TL and PETEK PROJE. has received the ­    ­ 2 contract. Project : PRE- AND POST- CONSTRUCTION PERIODS CONSULTANCY SERVICES Latest State: 2012/102230 registered tender covering Rize, Trabzon, Gümü2hane, Giresun, Ordu and Sivas Provinces 1460 ea houses 200 -bed hospital , 25 -bed hospital , trade centre , buffet and mosque , 16 -class lycee, 32 -class 0.Ö.O., 200 - Management :         3 student cap. hostel , 25000 -spectator cap. Stadium and service facilities construction consultancy services. Quoting Project : MERKEZ-BA1DERV01-PAZARCIK-SAKARKAYA PONDS PROJECT 4.950.000,00 TL, ÜÇER MÜ1AV0R MÜH. A.1. has received the contract . Latest State: 2012/134485registered tender has been awarded at a cost of 627.000 TL and YOLSU MÜH. has received the contract. Latest State: 2013/43231 registered tender covering Bingöl, Diyarbakır, Elazı/, Erzincan, Malatya and Tunceli 0l. 4159 ea houses and landscape Works Consultancy services. Quoting 9.500.000 TL KOLTEK MÜH. has received the contract.       M  O       M M 159 OO Latest State: 2013/43234 registered tender covering A/rı, Bitlis, Hakkari, Kars, 1ırnak and Van 112 ea personnel lodgings hospital, FSM, social facilities, consultancy services . Quoting 6.850.000 TL MEGA MÜHEND0SL0K has received the contract.

Latest State: 2013/40499 registered tender covering Bolu, Çankırı, Karabük, Kastamonu ve Zonguldak Provinces 1606 ea houses, social facilities consultancy services . Quoting 7.350.000 TL, METRO PLAN MÜ1. has received the contract.

Latest State: 2013/42933 registered tender covering Denizli, Eski2ehir, Kütahya, Mu/la and U2ak 1083 Ea houses. hospital., social facilities consultancy services . Quoting 3.770.000 TL METRO PLAN MÜH. has received the contract.

Latest State: 2013/40495 registered tender covering Ankara 2334 ea houses , hospital ,FSM , trade centre , social facilities consultancy services 9.250.000 TL BCT M0MARLIK has received the contract .

Latest State: 2013/40496 registered tender covering Amasya, Giresun, Ordu, Rize, Samsun, Sinop, Trabzon Provinces 1714 ea houses, hospital, Trade centre , social facilities consultancy services. Quoting 7.420.000 TL MEGA MÜHEND0SL0K has received the contract.

Latest State: 2013/43236 registered tender covering Adana, Antalya, Isparta, Konya, Mersin Osmaniye Provinces 421 Ea houses hospital, rehabilitation works. Quoting 9.000.000 TL and winner is MEGA MÜHEND0SL0K has received the contract.

Latest State: 2013/114932 registered tender covering Adana, Adıyaman, Batman, Gaziantep, Kilis, 1anlıurfa Provinces 4512 ea houses, social facilities consultancy services. Quoting 6.970.000 TL MEGA MÜH. has received the contract.

Latest State: 2013/114934 registered tender covering Bingöl, Elazı/, Erzincan, Diyarbakır, Malatya, Mu2, Tunceli Provinces 3592 ea houses, hospital,social facilities consultancy services. Quoting 6.580.000 TL MEGA MÜH. has received the contract.

Management :            Project : PALANDÖKEN LOGISTICS CENTRE CONSTR. CONSULTANCY PROJECT Latest State: Quoting 219.600 TL MEHMET ERGÜR has received the contract.

Project : TATVAN AND VAN BERTHS RENEWAL PROJECT Latest State: 2012/46041 registered tender covering renewal projects held on 3 May 2013. But later it was canceled.

Project : NUSAYB0N-C0ZRE-S0LOP0-HABUR RAILWAY PROJECT Latest State: 2011/207277 registered tender covering survey Works. Quoting 3.144.212 TL SWS ENGINEERING has received the contract.

Project : U1AK-SAL0HL0 RAILWAY PROJECT Latest State: 2012/31673 registered tender covering survey Works. Quoting 2.790.985 TL SWS ENGINEERING has received the contract.

PROJECT : SAL0HL0 MAN0SA RAILWAY PROJECT Latest State: 2012/38367 registered tender covering etüt survey Works. Quoting 2.362.903 TL PROTEK+MEGA MÜHEND0SL0K has received the contract.

PROJECT : PALANDÖKEN LOGISTICS CENTRE PROJECT Latest State: 2013/30689 registered tender covering survey Works. Quoting 658.761,00 TL METROPLAN MÜH. has received the contract.

PROJECT : ANKARA-S0VAS RAILWAY PROJECT Latest State: 2012/108360 registered tender covering the Kaya2-Kırıkkale route section I (V7-V9-V10-V15 viaducts excluded) ınfrastructure constr. Control and consultancy (Km:12+263-74+100) : Technical bids received on 28 March 2013. Evaluation is still underway. Below are the bidders; BOTEK + MEGA MÜH. EMAY MÜHEND0SL0K TEMAT + GÖZLEM MÜH. UBM A.1. YÜKSEL PROJE

           M  O M 160O Latest State: 2013/43234 registered tender covering A/rı, Bitlis, Hakkari, Kars, 1ırnak and Van 112 ea personnel lodgings PROJECT : KAYA1-KIRIKKALE ROUTE RAILWAY PROJECT hospital, FSM, social facilities, consultancy services . Quoting 6.850.000 TL MEGA MÜHEND0SL0K has received Latest State: 2013/23128 registered tender covering Ankara-Sivas Railway project -Kaya2-Kırıkkale route (Section I) V7-V9-V10- the contract. V15 viaducts constr. Control and consultancy services. Applications received on 29 March 2013. Evaluation is still underway. Below are the applicants; Latest State: 2013/40499 registered tender covering Bolu, Çankırı, Karabük, Kastamonu ve Zonguldak Provinces 1606 ea houses, ARKAD0S NDLANT + TÜMA1 TÜRK MÜH. social facilities consultancy services . Quoting 7.350.000 TL, METRO PLAN MÜ1. has received the contract. EMAY ULUSLARROUTE MÜHEND0SL0K GET0NSAN MÜHEND0SL0K GÖZLEM MÜHEND0SL0K Latest State: 2013/42933 registered tender covering Denizli, Eski2ehir, Kütahya, Mu/la and U2ak 1083 Ea houses. hospital., 0NECO ENY ESEY social facilities consultancy services . Quoting 3.770.000 TL METRO PLAN MÜH. has received the contract. KA0SER MÜHEND0SL0K MEGA MÜHEND0SL0K Latest State: 2013/40495 registered tender covering Ankara 2334 ea houses , hospital ,FSM , trade centre , social facilities S0STRA ESEY + PRO YAPI consultancy services 9.250.000 TL BCT M0MARLIK has received the contract . TEMELSU MÜHEND0SL0K UBM ULUSLARROUTE MÜHEND0SL0K Latest State: 2013/40496 registered tender covering Amasya, Giresun, Ordu, Rize, Samsun, Sinop, Trabzon Provinces 1714 ea YÜKSEL PROJE houses, hospital, Trade centre , social facilities consultancy services. Quoting 7.420.000 TL MEGA Project : PALU-GENÇ-MU ROUTE RAILWAY PROJECT MÜHEND0SL0K has received the contract. 1 Latest State: 2012/ 199177 registered tender covering 114 km railway deplacement constr. control and consultancy services:

Applications received but the tender was canceled because of few participants. Below are the applicants: Latest State: 2013/43236 registered tender covering Adana, Antalya, Isparta, Konya, Mersin Osmaniye Provinces 421 Ea houses GET0NSA MÜHEND0SL0K hospital, rehabilitation works. Quoting 9.000.000 TL and winner is MEGA MÜHEND0SL0K has received the contract. EMAY MÜHEHD0SL0K KA0SER+MESC0O.LU Latest State: 2013/114932 registered tender covering Adana, Adıyaman, Batman, Gaziantep, Kilis, 1anlıurfa Provinces 4512 ea SYSTRA SOCIETE ANOYME A DIRECTORIE houses, social facilities consultancy services. Quoting 6.970.000 TL MEGA MÜH. has received the contract. EPT0SA SERV0C0OS S.L.

Project : Latest State: 2013/114934 registered tender covering Bingöl, Elazı/, Erzincan, Diyarbakır, Malatya, Mu2, Tunceli Provinces 3592 KÖSEKÖY-VEZ0RHAN, VEZ0RHAN-0NÖNÜ RAILWAY PROJECT ea houses, hospital,social facilities consultancy services. Quoting 6.580.000 TL MEGA MÜH. has received the Latest State: 2013/11079 registered tender covering Ankara-0stanbul high speed train project Köseköy-Vezirhan (Section I) and Vezirhan-0nönü (Section II) lines security evaluation and report consultancy : Applicants were SYSTRA S.A and contract. TÜV SÜD RAIL. The tender was canceled.

Management :            Project : ANKARA-S0VAS DEM0RROAD PROJECT Latest State: 2012/83647 registered tender covering Kırıkkale-Yerköy route (Km:74+100 and Km:153+316 ) ınfrastructure constr. Project : PALANDÖKEN LOGISTICS CENTRE CONSTR. CONSULTANCY PROJECT Control and consultancy services Quoting 8.947.928 TL, UBM MÜHEND0SL0K has received the contract. Latest State: Quoting 219.600 TL MEHMET ERGÜR has received the contract. Project : YERKÖY-YOZGAT-S0VAS ROUTE INFRASTRUCTURE PROJECT Project : TATVAN AND VAN BERTHS RENEWAL PROJECT Latest State: 2012/89981 registered tender covering Control and consultancy services (Section I Km:282+600- 332+300): quoting 11.740.548 TL UBM A. . has received the contract. Latest State: 2012/46041 registered tender covering renewal projects held on 3 May 2013. But later it was canceled. 1

Project : YERKÖY-YOZGAT-S0VAS ROUTE INFRASTRUCTURE PROJECT Project : NUSAYB0N-C0ZRE-S0LOP0-HABUR RAILWAY PROJECT Latest State: 2012/89981 registered tender covering Control and consultancy services (Section II Km:332+300-363+527,727): Latest State: 2011/207277 registered tender covering survey Works. Quoting 3.144.212 TL SWS ENGINEERING has received the Quoting 5.754.400,00 TL, BOGAZ0Ç0 MÜH.+MEGA MÜH.LTD has received the contract. contract. Project : YERKÖY-YOZGAT-S0VAS ROUTE INFRASTRUCTURE PROJECT Project : U1AK-SAL0HL0 RAILWAY PROJECT Latest State: 2012/89981 registered tender covering Control and consultancy services (Section II Km:332+300-363+527,727): Latest State: 2012/31673 registered tender covering survey Works. Quoting 2.790.985 TL SWS ENGINEERING has received the Quoting 5.754.400,00 TL, BOGAZ0Ç0 MÜH.+MEGA MÜH.LTD has received the contract. contract. Project : KÖSEKÖY-VEZ RHAN AND VEZ RHAN NÖNÜ LINES SECURITY REPORT 0 0 0 PREPARATION PROJECT : SAL HL MAN SA RAILWAY PROJECT 0 0 0 Latest State: 2013/96000 registered tender covering Ankara-0stanbul High speed train project Köseköy-Vezirhan (Section I) and Latest State: 2012/38367 registered tender covering etüt survey Works. Quoting 2.362.903 TL PROTEK+MEGA MÜHEND0SL0K Vezirhan-0nönü (Section II) lines security assessment and report preparation: Bids received on 31 July 2013. Quoting has received the contract. 1.197.680 TL, ITALCERT0FER S.P.A has received the contract.

PROJECT : PALANDÖKEN LOGISTICS CENTRE PROJECT Project : KONYA-KARAMAN ROUTE CONVERSION INTO DOUBLE WAY LINES Latest State: 2013/30689 registered tender covering survey Works. Quoting 658.761,00 TL METROPLAN MÜH. has received the Latest State: 2013/92516 registered tender covering Konya-Karaman stations route conversion into double way lines Control and consultancy services: applications received and technical and price envelopes will be invited from eligible firms. contract.

Project : ANKARA-S0VAS HIGH SPEED TRAIN PROJECT PROJECT : ANKARA-S0VAS RAILWAY PROJECT Latest State: 2012/91132 registered tender covering Yerköy–Yozgat–Sivas route ınfrastructure completion constr. Control and Latest State: 2012/108360 registered tender covering the Kaya2-Kırıkkale route section I (V7-V9-V10-V15 viaducts excluded) consultancy services (Section II Km:332+300- 363+527,727)” was awarded to BOTEK+MEGA MÜH. quoting ınfrastructure constr. Control and consultancy (Km:12+263-74+100) : Technical bids received on 28 March 2013. 5.754.400 TL Evaluation is still underway. Below are the bidders; BOTEK + MEGA MÜH. Management :                 EMAY MÜHEND0SL0K Project : ÇORLU-MARTA1 PORT RAILWAY PROJECT TEMAT + GÖZLEM MÜH. Latest State: 2012/140170 registered tender covering Çorlu-Marta2 Port railway lines and Kaptan Demir Çelik A.1. lyines survey UBM A.1. and consultancy engineering services was awarded to ENYE 0N1 SAN. T0C. A.1. quoting 980.340,00 TL. YÜKSEL PROJE       M  O             M  O M 161O Management :          Project : HIGHWAY INITIAL PROJECT PREPARATION Latest State: 2012/77284 registered tender covering Merzifon-Gürbulak highway (Merzifon-Koyulhisar route) initial Project and engineering services consultancy services was awarded to TEKFEN MÜHEND0SL0K A.1. quoting 3.496.000,00 TL

Project : MANAVGAT-ALANYA JUNCTION-AKSEK0 3. REGIONAL ROAD PROJECT Latest State: 2012/41447 registered tender covering (Manavgat-Alanya) Junction - Akseki - 3. Bl. Hd. Road survey and Project consultancy: Applications received but tender was canceled

Project : BATMAN HASANKEYF-GERCÜ1-M0DYAT ROAD PROJECT Latest State: 2012/105775 registered tender has been awarded at a cost of 690.000 TL and INFRASTRUCTURE MÜHEND0SL0K has received the contract.

Project : ZARA-BEYPINAR ROAD PROJECT Latest State: 2012/107478registered tender has been awarded at a cost of 1.150.000 TL and UBM+SOM MÜHEND0SL0K has received the contract.

Project : 0SK0L0P TOSYA ROAD PROJECT Latest State: 2012/137557 registered tender has been awarded at a cost of 1.100.000 TL and UBM+SOM MÜHEND0SL0K has received the contract.

Project : (HOPA-BORÇKA) STATE ROAD -CANKURTARAN ROAD PROJECT Latest State: 2012/142476 registered tender has been awarded at a cost of 1.238.000 TL and YILDIZ+ZTM MÜHEND0SL0K has received the contract.

Project : ARDAHAN-1AV1AT ROAD PROJECT Latest State: 2012/142501 registered tender has been awarded at a cost of 2.344.000 TL and PROTEK+MEGA MÜH. has received the contract.

Project : DEM0RÖZÜ-OTLUKBEL0 ROAD PROJECT Latest State: 2012/137545 registered tender has been awarded at a cost of 1.379.000 TL and ERKA AS+KOBA MÜH. has received the contract.

Project : KEÇ0BORLU-SANDIKLI JUNCTION -ULUBORLU YALVAÇ ROAD PROJECT Latest State: 2012/144327 registered tender has been awarded at a cost of 1.698.000 TL and OPT0M+FKM MÜH. has received the contract.

Project : MENDERES GÜMÜLDÜR (SEFER0H0SAR-KU1ADASI) ROAD PROJECT Latest State: 2012/144349 registered tender has been awarded at a cost of 825.000TL and ALTER+ERYOL MÜH. has received the contract.

Project : HINIS VARTO JUNCTION KARAÇOBAN-AKTUZLA ROAD PROJECT Latest State: 2012/142447 registered tender has been awarded at a cost of 661.000TL and SAGBA1+MEKAN MÜH. has received the contract.

Project : ÖDEM01-KÖ1K ROAD PROJECT Latest State: 2012/131146 registered tender has been awarded at a cost of 989.000 TL and PROTEK+MEGA MÜH. has received the contract.

Project : ÜNYE-FATSA JUNCTION AKKU1 N0KSAR ROAD PROJECT Latest State: 2012/131619 registered tender has been awarded at a cost of 998.000, TL and PROTEK+MEGA MÜH. has received the contract.

Project : MERZ0FON-GÜRBULAK HIGHWAY (KOYULH0SAR-PÜLÜMÜR ROUTE) ROAD PROJECT Latest State: 2012/77307 registered tender has been awarded at a cost of 3.440.000 TL ile TEMELSU MÜH. has received the contract.

Project : MERZ0FON-GÜRBULAK HIGHWAY (PÜLÜMÜR-HORASAN ROUTE ) ROAD PROJECT Latest State: 2012/75609 registered tender has been awarded at a cost of 3.670.000TL and TEMELSU MÜH. has received the contract.

        M  O    M 162O Project : TURHAL-Z0LE 6.BÖL. HD. ROAD PROJECT Latest State: 2012/109284 registered tender has been awarded at a cost of 1.089.000TL and PROTEK+MEGA MÜH. has received the contract.

Project : DEM0RC0 AYR. (U1AK-KÜTAHYA) ROAD PROJECT Latest State: 2012/142518 registered tender has been awarded at a cost of 1.070.000 TL and OPT0M OBERMEYER+FKM MÜH. Has received the contract.

Project : MAN0SA-0ZM0R STATE ROAD SABUNCUBEL0 TUNNEL CONSTR. PROJECT WITH BOT MODEL Latest State: Final decision awaited for 0zmir-Manisa State road Sabuncubeli tunnel constr. Consultancy services for which bids were received on 11 Dec. 2012 (DETAY-1300). The contesting firms are TEMELSU, UBM and YÜKSEL PROJE

Project : ÖDEM01-KÖ1K ROAD PROJECT Latest State: 2012/131346 registered tender has been awarded at a cost of 989.000 TL AND PROTEK+MEGA MÜH. Has received the contract.

Project : ÇORUM-MERZ0FON JUNC. MEC0TÖZÜ (AMASYA-TURHAL) JUNC.. PROJECT Latest State: 2012/137496 registered tender has been awarded at a cost of 1.075.000 TL and MESC0O.LU MÜH. Has received the contract.

Project : ÇORUM-GÜRBULAK HIGHWAY (HORASAN-GÜRBULAK ROUTE ) PROJECT Latest State: 2012/77209 registered tender has been awarded at a cost of 3.295.000,00 TL and PROTEK+MEGA MÜHEND0SL0K has received the contract.

Project : KEBAN JUNC. ARAPK0R 16.BÖL. ROAD PROJECT Latest State: 2012/14477 registered tender has been awarded at a cost of 1.159.000,00 TL and EMAY+ERB0L MÜHEND0SL0K has received the contract.

Project : HOPA-BORÇKA DY. CANKURTARAN TUNNEL OUTLET BORÇKA ROUTE ROAD PROJECT Latest State: 2012/142476 registered tender has been awarded at a cost of 1.238.000,00 TL and YILDIZ HAR0TA+ZTM MÜHEND0SL0K has received the contract.

Project : 0MRANLI -REFAH0YE-SU1EHR0 JUNC. (KIZILDA. CROSSING) ROAD PROJECT Latest State: 2013/144418registered tender has been awarded at a cost of 1.898.000,00 TL and ERKA AS+KOBA MÜH. has received the contract.

Project : ENEZ-KE1AN ROAD PROJECT Latest State: 2012/142529 registered tender has been awarded at a cost of 860.000 TL and MESC0O.LU MÜH. has received the contract.

Project : YALOVA-0ZM0T HIGHWAY (CONNECTING ROADS INCLUDED) PROJECT Latest State: 2012/166053 registered tender has been awarded at a cost of 2.469.000 TL and EMAY MÜHEND0SL0K has received the contract.

Project : 0ZM0T KÖRFEZ CROSSING AND CONNECTING ROADS PROJECT Latest State: YÜKSEL PROJE+EMAY+COHADI has received the contract quoting 158.829.560 TL 100 % score) for “Gebze- Orhangazi-0zmir highway consultancy services (0zmit Körfez crossing and connecting roads included) with build- operate-transfer model.

Project : YUSUFEL0 DAM ROADS PROJECT Latest State: 2012/169797 registered tender has been awarded at a cost of 5.338.000,00 TL and winner is BOTEK MÜHEND0SL0K has received the contract.

Management :               Project : ONGOING ROADS AND BIG REPAIR CONSULTANCY SERVICES AND SURVEY WORKS Latest State: 2012/190648 registered tender has been awarded at a cost of 16.776.000,00 TL and BOTEK+MEGA MÜH. has received the contract.

        M  O    M 163O Management :              Project : ONGOING ROADS AND BIG REPAIR CONSULTANCY SERVICES AND SURVEY WORKS Latest State: 2012/141224 registered tender has been awarded at a cost of 16.947.403,20 TL and EMAY MÜHEND0SL0K has received the contract.

Management : 2        Project : DUDULLU-BOSTANCI AND ÜMRAN0YE-ATA1EH0R-GÖZTEPE RAIL SYSTEM PROJECT Latest State: 2012/168698 registered tender covering the project and consultancy services prequalification was held on 9 Jan. 2013. Then the tender was canceled.

Project : 0STANBUL SQUARE ARRANGEMENT PROJECT Latest State: 2012/115792 registered tender has been contracted for 403.200,00 TL and winner is INFRASTRUCTURE PROJE

Project : 0STANBUL GROUP 2 SQUARE ARRANGEMENT PROJECT Latest State: 2012/104115 registered tender has been contracted for 6.496.400,00 TL and winner is B0MTA1 PROJE

Project : 0STANBUL GROUP 4 SQUARE ARRANGEMENT PROJECT Latest State: 2012/104460 registered tender has been contracted for 7.002.900,00 TL and winner is YÜKSEL PROJE has received the contract.

Project : URBAN TRANSFORMATION PROJECT Latest State: 2012/104460 registered tender covering Bayrampa2a 0smetpa2a Mahallesi plot no F21c24a parcel no 22372 application Project services for architecture and static and installation consultancy services: Quoting 6.607.233,33 TL PROGER S.P.A. firması has received the contract.

Project : HAL0Ç METRO CROSSING BRIDGE CONSTRUCTION CONTROL SERVICES Latest State: 2012/146023 registered tender has been contracted for 4.093.260 TL and winner is EMAY MÜHEND0SL0K

Project : 0STANBUL CITY RAIL SYSTEM LINES PROJECT Latest State: 2012/ 122167 registered tender has been contracted for 4.620.000 TL and winner is B0MTA1 MÜHEND0SL0K

Project : 0STANBUL KARTAL-KAYNARCA SUBWAY LINE EXTENSION PROJECT Latest State: 2012/128712 registered tender covering Kartal–Kaynarca subway Works civil engineering and electromechanical Works control and consultancy engineering under the Kadıköy-Kartal subway lines 4.5 km extension: Quoting 9.933.760 TL OPT0M+PROKON MÜH. has received the contract.

Project : WASTE INCINERATION AND ENERGY GENERATION PLANT PROJECT Latest State: 2012/94579 registered tender has been contracted for 10.078.020,00 TL. YÜKSEL PROJE has received the contract.

Management : 2 ­ 2­ 3 Project : ANTAKYA CENTRAL DRINKINGWATER PROJECT Latest State: 2012/81228 registered tender has been contracted for 133.000,00 TL and winner is SEDES MÜH.

Project : ZONGULDAK-F0LYOS DEEP SEA OUTFALL PROJECT Latest State: 2012/54019 registered tender has been contracted for 174.000,00 TL and winner is NTF MÜH. Has received the contract.

Project : GÜMÜ1HANE-KELK0T WASTEWATER TREATMENT PLANT PROJECT Latest State: 2012/69661 registered tender has been contracted for 135.000,00 TL and winner is NTF MÜH.

Project : TEK0RDA.-YEN0Ç0FTL0K SEWERAGE PROJECT Latest State: 2012/67557 registered tender has been contracted for 168.850,00 TL and BA1AR MÜH. Has received the contract.

Management : 2 2  22 2 ­ Project : OKMEYDANI RESEARCH HOSPITAL PROJECT Latest State: YÜKSEL PROJE ULUSLARROUTE A.1. has received the contract for consultancy and control services of the reconstruction of Okmeydanı research hospital under 0stanbul seismic Risk Mitigation and Emergency Preparedness Project (Ref. ISDB-CB1). The winner’s quotation is 10.661.350 TL

        M  O    M 164O          

• ANTALYA-ALTYAPI YÖNET0M DANI1MANLIK Winner : TOROS TARIM A.1 ELEKTR0K ENERJ0S0 ÜRET0M H0ZMETLER0 0N1AAT Approx. cost : 34.331.079,67 TL TAAHHÜT SANAY0 VE T0CARET A.1 (ALDA1): ASAT2- Offer : 6.275.426,00 TL G8 bitumenous hot asphalt procurement Contract date : 15.08.2013 Winner : GÜNFALT 0N1. ASFALT Approx.cost of contracted items : 7.530.240,00 TL Offer : 1.335.000,00 TL STANBUL ASFALT T C. also contested. 0 0 Winner : TOROS TARIM A.1

Approx. cost : 34.331.079,67 TL • TARIM LETMELER GENEL MÜDÜRLÜ Ü (T GEM): 01 0 . 0 Offer : 8.241.152,00 TL 9 types of fertilizer procurement Contract date : 15.08.2013 Tarım 02letmeleri Genel Müdürlü/ü opened the tender for 2013 2.Period requirements 9 types of fertilizer Approx.cost of contracted items : 9.790.300,00 TL procurement (Tender regis.no: 2013/72286 Bid deadline • 08.07.2013) and the evaluation was completed and STATE HIGHWAYS ADMIN. 14.BÖLGE MÜDÜRLÜ.Ü contracts awarded. (BURSA): for snow and ice control, salt procurement and Sources said that deliveries started to relevant regıons transport. and they will be completed soon. Winner : ÖZ DEM0RELLER HARF. NAK. Tender scope; T0C.VE SAN. LTD.1T0. Approx. cost : 655.500,00 TL No Subject qty Offer : 410.205,00 TL 1 DAP (%18-46) 7.071,25 Ton 2 TSP (%42) 21,15 Ton Deliveries will be made to ; • 3 Potassium Nitrate(%44) 105 Ton 141. 1ube 1efli/i (Balıkesir) Borders (1ube Merkezi ) 1200 4 Compost (20.20.0) 8.136,5 Ton Ton • 142. ube efli i(Çanakkale) Borders (Çanakkale ube 5 Urea (%46) 7.844 Ton 1 1 / 1 Plent Sahası) 300 Ton 6 Ammonıum Nitrate(%33) 13.260 Ton • 143. 1ube 1efli/i(Bursa) Borders (Sülüklü Plent Sahası) 7 Ammonıum Sulphate (%21) 1.149 Ton 1000 Ton 8 Potassium Sulphate (%50) 45,2 Ton • 144. 1ube 1efli/i (Bilecik) Borders (Bozüyük Bakımevi) 9 MAP (%12-61) 60 Ton 1500 Ton

• 145. 1ube 1efli/i(Kütahya) Borders (Kütahya Asfalt Plent Order awards and contract costs are as follows; Sahası) 900 Ton Winner : GÜBRE FAB. A. 1 • 146. 1ube 1efli/i(Bandırma) Borders (1ube Merkezi ) 500 Approx. cost : 34.331.079,67 TL Ton Offer : 240.325,36 TL • Contract date : 23.08.2013 147. 1ube 1efli/i (0znik) Borders (Cankurtaran Bakımevi) Approx.cost of contracted items : 269.653,00 TL 1000 Ton • 148. 1ube 1efli/i (Emet) Borders (1ube Merkezi) 500 Ton Winner : 0SKENDERUN GÜBRE A.1 Approx. cost : 34.331.079,67 TL • MAK0NE VE K0MYA ENDÜSTR0S0 KURUMU (MKEK) Offer : 735.934,50 TL GENEL MÜDÜRLÜ.Ü: 750 kg Karabarut (Class 7) Contract date : 02.09.2013 material procurement. Approx.cost of contracted items : 671.207,50 TL Winner : POLY EXPLOSIVE GROUP CO, LTD. Offer : USD. 25.425,00 Winner : TOROS TARIM A.1 Approx. cost : 34.331.079,67 TL • STATE HIGHWAYS ADMIN. 2. BÖLGE MÜDÜRLÜ.Ü Offer : 7.650.289,00 TL (0ZM0R): 2013-2014 snow and ice control services salt Contract date : 15.08.2013 procurement and transport. Approx.cost of contracted items : 8.520.856,25 TL Winner : MUTLUCAN TUZ. A. . 1 Tender regist.no : 2013/85922 Winner : TOROS TARIM A.1 Approx. cost : 171.062,50 TL Approx. cost : 34.331.079,67 TL Offer : 207.526,00 TL Offer : 139.737,50 TL Contract date : 15.08.2013 Approx.cost of contracted items : 259.875,00 TL • ERZ0NCAN 0L ÖZEL 0DARES0 DESTEK H0ZMETLER0 MÜDÜRLÜ.Ü: Varıous explosives procurement. Winner : TOROS TARIM A.1 Winner : MAXAM ANADOLU PATLAYICI Approx. cost : 34.331.079,67 TL MAD. Offer : 6.075.938,00 TL Tender regist.no : 2013/99793 Contract date : 15.08.201 Offer : 39.380,00 TL Approx.cost of contracted items : 7.288.947,92 TL       M  O       M 165O Deliveries will be made to Gümü2tarla Mevki depot Approx. cost : 588.371,00 TL facilities . Offer : 350.813,00 TL Tender scope; YAVA1ÇALAR A.1. also submitted a bid for t he tender. • Dynamite (50x450) 3.000 Kg • • Anpho (25 Kg) 7.000 Kg MACHINERY AND CHEMICALS INDUSTRIES CO. • Detonating fuse (10gr) 2.000 Mt (MKEK): 500 ton pryl Ammonıum Nitrate procurement. Winner : YILDIZ ENTEGRE A AÇ SAN. VE • Excell capsules(Ms)(10 Mt) 2.000 Ea . T0C. A.1. Tender regist.no : 2013/28717 • KÜTAHYA MUNICIPALITY- FEN 01LER0 MÜDÜRLÜ.Ü: Approx. cost : 450.000,00 TL Varıous explosives procurement. Offer : USD.232.500,00 (416.523,75 TL) Winner : FER0DE KIRLIO.LU PATLAYICI MADDE T C. 0 • STATE RAILWAYS ADMIN. (TCDD): 3 items wooden Tender regist.no : 2013/67371 sleepers procurement . Offer : 91.990,00 TL Winner : SALKIM ORMAN ÜRÜNLER N TROTEK LTD. T also sent in bids. ordered 0 0 1 0 SAN. T C. LTD. T . explosive materials are as follows 0 1 0 Tender regist.no : 2012/161442 • Dynamite 60 mm 2.000 kg Approx. cost : 8.843.127,52 TL • Nonel capsules ms 07,00mt 0500 ms veya Offer : 6.968.270,40 TL Dual-Delay capsules 8.00 mt 25 500 ms 500 ea The other bidders were ; • Nonel capsules ms 10,00mt 0500 ms veya • KO1AR ENERJ0 Dual Delay capsules 10.00mt 25 500 Ms 500 ea • DEM0RC0 ORMAN ÜRÜNLER0 • Nonel capsules Sd 4,00 mt 0025 ms 750 ea • LEVEL WOOB PROD. EX0M. • Nonel capsules ms 15,00 mt 0500 ms veya Dual Delay Deliveries will be made to : Çankırı Makas Fab. 0f capsules 16,00 mt 25 500 ms 500 ea procured domestically . And on the basis of CIF/CIP • Nonel capsules Sd 4,00 mt 0042 ms 750 ea 0ZM0R Port/TÜRK0YE if procured from abroad • 30 Ms delayed actıon capsules Al 1,50 mt 02 nolu 50 ea • 30 Ms delayed actıon capsules Al 1,50 mt 01 nolu 50 ea • BELKO ANKARA KÖMÜR ASFALT ENERJ0 0N1AAT • Anpho 30.000 kg SANAY0 VE T0CARET L0M0TED 10RKET0: 18-70 mm. • emulsıon explosives 6000 75 mm 5.000 kg 100.000 ton bagged imported coal procurement for stoves, • 0gnition cables (2x0,50) 10.000 metre in 25 kg. bags. • Transport (including all exit, duty etc.costs) 15 ea Winner : ATAKA1 T0CARET VE NAKL YAT ANON M RKET • 0gnition cost 15 ea 0 0 10 0 Tender regist.no : 2013/43124

Approx. cost : 42.970.470,00 TL • 0STANBUL METROPOLITAN MUNICIPALITY : 2 groups Offer : 19.900.000,00 USD of total 100.000 ton raw salt procurement . Below are the winners: • MARD0N 0L ÖZEL 0DARES0 YOL VE ULA1IM • 60.000 ton raw salt procurement (European side) H ZMETLER MÜDÜRLÜ Ü: 34.000 kg Anpho, 1.800 kg Bid method : Open 0 0 . J. Dynamite, 1.500 ea 12 m. Nonel capsules, 75 ea Tender regist.no : 2013/42639 electric Capsules procurement. Bid deadline : 14.05.2013 Winner : M0DYAT EXPLOS0VES Winner : MUTLUCAN TUZ A.1 MADDELER Approx. cost : 4.953.000,00 TL Tender regist.no : 2013/53978 Offer : 3.915.000,00 TL Approx. cost : 108.422,19 TL Contract date : 17.06.2013 Offer : 103.015,00 TL • 40.000 ton raw salt procurement (Anatolian side) Bid method : Open • STATE GRAIN BOARD (TMO) - T 0CARET DA0RES0 Tender regist.no : 2013/43877 BA1KANLI.I: 240.000 ton (+-5%) red milling wheat Bid deadline : 14.05.2013 sales for export purposes . Winner : ARMAKSA ARAÇ 1T0. Approx. cost : 3.233.200,00 TL Winners and order awards are as follows: Offer : 2.520.000,00 TL Contract date : 17.06.2013     1       • T.K.0. KURUMU E.L.0. MÜESSESES0 ÇAN L 0NY0TLER0     01LETMES0 MÜDÜRLÜ.Ü: Anpho, feed sensitive   0          Explosives (heavy Anpho), capsule sensitive emulsıon     explosives (emulsıon Dynamite ) and non electric  0      capsules procurement.    Winner : ORICA-N0TRO PATLAYICI 00            MADDELER0 SAN. VE T0C. A.1. 0    Tender regist.no : 2013/35344       M  O       M 166O                ­€ƒ„ ­             ­€ƒ„ ­              0          ­€ƒ„­               ­€ƒ„ ­          0 .           ­€‚ƒ„              0 .        ­€ƒ„ ­              0Œ‹ƒ€              0          ­†ƒ€‡ˆ/                 ­€‚ƒ„        0 .           ­€‚ƒ„              0        ­€ƒ„ ­                 ˆ„‡ €‹ˆ         0          0Œ‹ƒ€     Ž  0 0               ­†ƒ€‡ˆ/        0      ­†ƒ€‡ˆ/       

1st and 2nd proposals . Loading period: 31 May / 19    ˆ„‡ €‹ˆ        June 2013     ­€ƒ„ ­            ­€‚ƒ„              0‚†­„‡­€‘„                        ­€‚ƒ„              ­€‚ƒ„        ­€‚ƒ„              ­€‚ƒ„        ­€ƒ„ ­    ­€‚ƒ„           ­†ƒ€‡ˆ/           ­€‚ƒ„            ­€ƒ„ ­           ­€‚ƒ„           ­€ƒ„ ­           ­€‚ƒ„           ­€‚ƒ„           ­†ƒ€‡ˆ/           ­€‚ƒ„           ­†ƒ€‡ˆ/           ­†ƒ€‡ˆ/            ­†ƒ€‡ˆ/           ­€ƒ„ ­           ­†ƒ€‡ˆ/           ­€ƒ„ ­           ­†ƒ€‡ˆ/              ­€ƒ„ ­          ­†ƒ€‡ˆ/            ­€ƒ„ ­           ­€ƒ„ ­           ­€ƒ„ ­           ˆ„‡ €‹ˆ           ˆ„‡ €‹ˆ           ˆ„‡ €‹ˆ           0‚†­„‡­€‘„           ­€‚ƒ„           ­€‚ƒ„           ­€‚ƒ„           0Œ‹ƒ€           ­€‚ƒ„           ­€‚ƒ„           ­€‚ƒ„           0Œ‹ƒ€           ­€‚ƒ„           0Œ‹ƒ€           ­€‚ƒ„           ­€ƒ„ ­           ­€‚ƒ„           0‚†­„‡­€‘„           ­€ƒ„ ­           ˆ„‡ €‹ˆ       

        M  O    M 167O • TURKISH SUGAR MILLS - ELB0STAN 1EKER • 0STANBUL M. MUNICIPALITY- SATINALMA FABR0KASI MÜDÜRLÜ.Ü: 3 types of 45.000 ton lignite MÜDÜRLÜ.Ü: 40.000 ton raw salt (Anatolian side) coal procurement. procurement. Tender regist.no : 2013/56020 Winner : ARMAKSA ARAÇ VE MAK0NA SAN. T0C.LTD.1T0. 1. 0tem : 17.000 Ton, 1200-1500 Kcal 0,5-18 mm lignite Tender regist.no : 2013/43877 coal Approx. cost : 3.233.200,00 TL Winner : ÖZCESUR KARDE LER NAKL YA 1 0 Offer : 2.520.000,00 TL TN1AAT GIDA HAYVANCILIK PETROL TARIM

ÜRÜNLER0 DO.ALGAZ MADENC0L0K Approx. cost : 1.317.330,00 TL • ÇAY 01LETMELER0 GENEL MÜDÜRLÜ.Ü: 2 types of Offer : 1.878.500,00 TL 23.800 ton nut or hazelnut size procurement. Tender regist.no : 2013/21196 2. 0tem : 13.500 Ton, 4100-4400 Kcal 10-18 mm Lignite 1. 0tem : 21.200 Ton, Hazelnut size coal coal Winner : DETAY KATI YAKIT SATI1 VE T0C. LTD. Winner : AKSARAY TIR NAK SAN. T0C. LTD. Approx. cost : 9.540.000,00 TL Approx. cost : 3.293.325,00 TL Offer : 7.441.200,00 TL Offer : 3.280.500,00 TL 2. 0tem : 2.600 Ton, Nut size coal 3. 0tem : 14.500 Ton, 5100-5400 Kcal 10-18 Winner : YILKARBON YAKIT PAZ.SAN.T0C. A.1. mm Lignite coal Approx. cost : 1.170.000,00 TL Winner : ARAFA MADENC0L0K SAN. VE T 0C. Offer : 900.900,00 TL LTD. 1T0. Approx. cost : 4.369.575,00 TL • TURKISH COAL WORKS (TK0)- GARP L0NY0TLER0 Offer : 3.973.000,00 TL 01LETMES0 MÜESSESES0 MÜDÜRLÜ.Ü: 8 items 724 kg. 21.950 ea explosives and equipment procurement. • MACHINERY AND CHEMICALS INDUSTRIES CO. Tender regist.no : 2013/16459 (MKEK): 1.000 ton technical Ammonıum Nitrateprocurement. Order awards, ordered items and contract costs are as Winner : YILDIZ ENTEGRE A.AÇ SAN. VE follows: T0C. A.1. Tender regist.no : 2013/26861 • YAVA1ÇALAR A.1. Approx. cost : 820.000,00 TL Dynamite capsule sensitive Offer : 844.905,00 TL Qty : 24.000 Kg

Offer : 2,79 TL/kg+KDV • T.K. . KURUMU E.L. . MÜESSESES -ÇAN L NY TLER 0 0 0 0 0 0 01LETMES0 MÜDÜRLÜ.Ü: Anpho, feed sensitive • OR CA-N TROK MYA LTD. Explosives (heavy Anpho), capsule- sensitive emulsıon 0 0 0 Non electric capsules (450 m/sn. 10-m.) explosives (emulsıon Dynamite) and non electric capsules Qty 7.500 ea procurement. Offer : 4,00 TL/ea +KDV Winner : ORICA-N0TRO EXPLOS0VES

MADDELER0 SAN. VE T0C. A.1. Tender regist.no : 2013/26861 Non electric capsules (475m/sn. 18-m.) Approx. cost : 588.371,00 TL Qty 2.300 ea Offer : 350.813,00 TL Offer : 6,15 TL/ea +KDV

Surface connection parts (17 m/sn,10- m) • ANKARA M. MUNICIPALITY -FEN 01LER0 DA0RES0 Qty 2.700 ea BA1KANLI.I: 11 items varıous explosives and ignition systems procurement. Offer : 4,10 TL/ea +KDV

Winner : N0TKOK0MYA K0MYA SANAY0 MÜHEND0SL0K ÜRET0M PAZARLAMA 0N1AAT VE Surface connection parts (25 m/sn,10 -m) T0CARET ANON0M 10RKET0 Qty 2.600 ea Tender regist.no : 2013/30819 Offer : 4,10 TL/ea +KDV Approx. cost : 587.642,50 TL Offer : 390.087,50 TL Surface connection parts (65 m/sn,10- m) Qty 1.850 ea • 0STANBUL M. MUNICIPALITY - SATINALMA Offer : 4,10 TL/ea +KDV MÜDÜRLÜ.Ü: 60.000 ton raw salt (for European side) procurement. • MAD-SER EXPLOS0VES MAD. SAN. T0C.LTD Winner : MUTLUCAN TUZ MAD.0N1 TUR. Non electric capsules (475 m/sn. 21-mt.) OTO. PET.NAK. SAN. VE T0C.A.1. Qty 5.000 ea Tender regist.no : 2013/42639 Offer : 6,99 TL/ea +KDV Approx. cost : 4.953.000,00 TL Offer : 3.915.000,00 TL         M  O    M 168O • MAXAM ANADOLU EXPLOS0VES MAD. PAZ. A.1. Winner : GÜRAL NAKL0YE LTD. emulsıon explosive Approx. cost : 608.619,96 TL Qty 700.000 kg Offer : 402.000,00 TL Offer : 1,65 TL/kg+KDV Contract date : 21.11.2013

The other bidder was KIRLIO.LU. 0t did not receive any • SARAYÖNÜ 0LÇE M0LL0 E.0T0M MÜDÜRLÜ.Ü order. (KONYA); Bagged coal for heating systems (50-150 mm and 18-22 mm ) • ET0 MADEN 01LETMELER0 - SATINALMA DA0RES0 Bid method : Open BA1KANLI.I: Various explosives procurement required Tender regist.no : 2013/145113 for Kırka Bor 02letme Müdürlü/ü Sarıkaya open mines. Bid deadline : 25.10.2013 Winner : YAVA1ÇALAR AV SPOR Winner : MAZLUMO.LU NAKL0YE LTD. MALZEMELER0 SANAY0 VE T0CARET A.1. Approx. cost : 113.491,25 TL Tender regist.no : 2012/9765 Offer : 103.525,00 TL Approx. cost : 942.068,75 TL Contract date : 13.11.2013 Offer : 702.845,00 TL The other bidders: MAXAM ANADOLU PAT. MAD. A. 1. • GÜMÜ1HANE ÜN0VERS0TES0; coal procurement for and N0TROK0MYA. heating purposes Bid method : Open • R0ZE 0L ÖZEL 0DARES0: 15.000 kg dynamite (27x225 Tender regist.no : 2013/119316 mm.), 15.000 ea land capsules (8 nolu demolition Bid deadline : 17.09.2013 capsules), 13.500 ea electric capsules (delay action 2,5 Winner : SAF 0 KATI YAKIT A.1 mt.) procurement . Approx. cost : 113.231,25 TL Winner : HANTALO.LU AV MALZ. LTD. Offer : 71.665,00 TL Tender regist.no : 2013/763 Contract date : 22.11.2013 Approx. cost : 171.600,00 TL Delivery: 175 Ton hazelnut size coal to hostels in Kelkit Offer : 170.745,00 TL (stacking in hostel depot), 40 Ton melon type coal to Kürtün Özkürtün are ahostels (stacking in hostel depot), • TURKISH COAL WORKS (TK0): 2.500 ton anpho, 250 ton emulsıon explosives required for E.L.0. Müessesesi • URFA S0VEREK ÖZEL 0DARES0; During 2013-2014 Müdürlü/ü Soma, Deni2 and Eynez open mine panels and period, coal procurement for Siverek 0lçe Milli E/itim material preparations, transport and filling into holes, Müdürlü/ü’ compression and ignition service procurement. Bid method : Open Winner : MAXAM ANADOLU EXPLOS VES 0 Tender regist.no : 2013/147433 MADDELER A. . 1 Bid deadline : 14.11.2013 Tender regist.no : 2012/180224 Winner : KARAKAYALI 0N1AAT Approx. cost : 4.326.000,00 TL Approx. cost : 183.716,70 TL Offer : 4.649.250,00 TL Offer : 183.376,00 TL The other bidders: N TROMAK K MYA and 0 0 Contract date : 25.11.2013 YAVA ÇALAR A. . 1 1

• MAN SA L ÖZEL DARES GENEL SEKRETERL : • STATE GRAIN BOARD (TMO) : 30.000 ton (+-5 % option) 0 0 0 0 0.0 Coal procurement For Manisa Merkez and relevant bagged milling wheat flour procurement . schools during 2013-2014 period Orders awarded as follows: 12.000 tons to ULUSOY UN Bid method : Open SAN. VE T0C. A.1., 6.000 tons to 0PEK UN SAN. GIDA Tender regist.no : 2013/127187 TAR.VE T0C. LTD. 1T0., 6.000 tons to TOSUNLAR UN Bid deadline : 10.10.2013 0MALAT PET. 0N1. TAAH. TAR. NAK. 0TH. 0HR. SAN. VE Winner : MAV0M YILDIZ 0N1. MAK. LTD T0C. LTD. 1T0. and 6.000 tons to YEN0 UN Approx. cost : 213.098,00 TL DE.0RMENC0L0K VE T0C. A.1. Offer : 116.800,00 TL Contract date : 25.11.2013 • TRABZON 0L ÖZEL 0DARES0 YOL VE ULA1IM H ZMETLER MÜDÜRLÜ Ü: E2.000 kg 27x255 dynamite, 0 0 . • 22.960 kg 50x450 dynamite , 15.000 ea normal electric MEB ALTINÖZÜ 0LÇE M0LL0 E.0T0M MÜDÜRLÜ.Ü: capsules (2,50 mt.), 35 ea delay action electric capsules 7000 Kcal/Kg coal procurement for stoves (2,50 mt.), 8.100 mt ring wires (0,60 mm.), 500 mt cables Bid method : Open (0,75 mm) procurement . Tender regist.no : 2013/139119 Bid deadline : 21.10.2013 Winner : ATAMANLAR EXPLOS0VES MADDE LTD. Winner : DOLGUNLAR ULUSL.NAK. LTD. Tender regist.no : 2013/220 Approx. cost : 151.285,71 TL Approx. cost : 194.912,15 TL Offer : 150.000,00 TL Offer : 164.574,00 TL • MKEK GENEL MÜDÜRLÜ.Ü: 700 kg 1-4 Diamino 2-3 • AYDIN MUNICIPALITY; 2.010 ton bagged coal for Dihydro Antrakinon procurement delivery to poor families in province of Aydın Bid method : Open Bid method : Open Tender regist.no : 2013/90049 Tender regist.no : 2013/127965 Winner : WALRUS ENTERPRISES LLC/ABD Bid deadline : 08.10.2013 Offer : USD 19.320,00       M  O       M 169O        

• Eti Maden 02letmeleri Genel Müdürlü/ü -Enerji ve • AKYÜZ NAKL0YAT Otomasyon Dairesi Ba2kanlı/ı: TM-6 and pond pump • ÖZDUY NAKL0YAT station transportation. • EKSPRES NAKL0YAT Tender reg.no : 2013/44609 • ARKAS ULA1TIRMA Winner : EM0T ELEKTRON0K • ERDAL 0LHAN NAKL0YAT Offer : 995.000,00 TL Approx. cost : 1.191.000 TL • Eti Maden 02letmeleri Genel Müdürlü/ü- Satınalma The other Bidding firms were ARTEK MÜHEND0SL0K, Dairesi Ba2kanlı/ı: 20.835 ton products transports by YEN0 BA1KENT, GEL010M ENERJ0 containers and 7.000 ton bagged/palletted packed Delivery ; Kırka Bor 02letme Müdürlü/ü. products from Kırka Bor 02letme Müdürlü/ü storage areas This tender also covers assembly of the subject equipment to ports. and putting into operation, performance tests. Tender reg.no : 2012/166559 Winner : 10R0N NAKL0YAT • Eti Maden 02letmeleri Genel Müdürlü/ü -Satınalma Offer : 28.476.400,00 TL Dairesi Ba2kanlı/ı: From open mines 4.000.000 ton Approx. cost : 40.556.108,00 TL tuvenane ore excavated debris transports to factories and The other Bidding firms were ; feeding works Tender reg.no : 2013/10649 • AKYÜZ ULUSL. NAK. Winner : ÇALI KAN KARDE LER 1 1 • ET0S LOJ0ST0K A.1. Offer : 3.388.000,00 TL • TEMPO LOJ0ST0K Approx. cost : 4.659.476,88 TL • M0RAP ULUSL. NAK. The other Bidding firms were PAKSOY MADENC0L0K, • YILMAZLAR MAD. LTD 1T0 HABUR TA1IMACILIK ve ERKAN BUCU.A • HABUR TA1IMACILIK

• ARKAS TA1IMACILIK • Eti Maden 02letmeleri Genel Müdürlü/ü -Satınalma • HO1CAN LOJ0ST0K Dairesi Ba2kanlı/ı: 0n 10.636 ea containers a total 7.500 • ÇALI KAN KARDE LER ton bagged/palletted packed products from Bigadiç Bor 1 1

02letme Müdürlü/ü storage areas to ports. • Eti Maden letmeleri Genel Müdürlü ü- Satınalma Tender reg.no : 2012/163467 02 / Dairesi Ba2kanlı/ı: Products at Bandırma Lojistik Winner : S.S. B0GAD0Ç MOT. TA1. KOOP Müdürlü ü’nün letme warehouses to be transported to Offer : 10.778.000.24 TL / 02 vessels and wagons at Bandırma Port (45.000 ton), and Approx. cost : 10.891.801,28 TL loading of products on wagons (2.000 ton). The other Bidding firms were ALTRAK NAKL0YAT and Tender reg.no : 2012/171785 ARKAS TA1IMACILIK. Winner : ET S LOJ ST K 0 0 0 Offer : 242.050,00 TL • Eti Maden 02letmeleri Genel Müdürlü/ü- Satınalma Approx. cost : 283.387,11 TL Dairesi Ba2kanlı/ı: 0n 3.250 ea containers, products The other Bidding firms were EKSPRES NAKL0YAT and transports from Bandırma Bor ve Asit Fabrikaları 02letme ALTUNLAR NAKL0YAT. Müdürlü/ü and Bandırma Lojistik Müdürlü/ü’ closed

storage areas to 0zmir, 0stanbul, 0zmit, Gemlik , Bandırma • Eti Maden 02letmeleri Genel Müdürlü/ü Satınalma ports and a total of 7.000 ton bagged products to 0stanbul Dairesi Ba2kanlı/ı: 52.300 ton bagged and bulk products Lojistik Müdürlü/ü and 0zmir Lojistik Müdürlü/ü depots. from Bigadiç Bor letme Müdürlü ü Kestelek Bor Tender reg.no : 2012/170201 02 / Ba2mühendisli/i (Kemalpa2a-Bursa) storage areas to Winner : ALTINLAR NAKL0YAT Bigadiç Bor letme Müdürlü ü, zmir Alsancak Port, Offer : 3.828.500,00 02 / 0 Bandırma Port storage area and Bandırma Bor letme 02 Müdürlü ü central storage area. Below are the other bidders; / Tender reg.no : 2012/189369

Winner : H0LAL PETROL+YALÇINKAYA NAK. F0RMALAR Offer : 1.239.500,00 TL • ALTUNLAR ULS. NAKL0YAT The other Bidding firms were M0RAP ULUSLAR ARASI • ALTRAK ULS. TA1IMACILIK NAKL. and ALTUNLAR ULUSLARARASI NAK.+YEN0 • ET0S LOJ0ST0K GAP.       M  O       M 170O • Eti Maden 02letmeleri Genel Müdürlü/ü -Satınalma • Turkish Red Crescent Society (KIZILAY): Road Dairesi Ba2kanlı/ı: Between Kırka Bor 02letme Müdürlü/ü transports to Gaziantep Karkamı2, Hatay Cilvegözü, Hatay and Bandırma Bor ve Asit Fabrikaları 02letme Müdürlü/ü Bükülmez, 1anlıurfa Akçakale, Kilis Öncüpınar unloading 300.000 ton tincal ore ton transports. points. Tender reg.no : 2012/140366 Winner : AKYÜZ NAKL0YAT Winner : M0RAP ULUSLARARASI Offer : 2.016.000,00 TL NAKL0YAT TUR0ZM A.1. During the auctions, ÖZDUY NAKL0YAT submitted Offer : 8.484.000,00 TL 2.017.000,00 TL, KEMALETT0N ATAK 2.019.600,00 TL Approx. cost : 12.778.476,30.-TL but the contract was awarded to AKYÜZ ULUSLARARASI Below are the other bidders;; NAKL0YAT quoting 2.016.000,00 TL F0RMALAR • ET0S LOJ0ST0K A.1. The other Bidding firms were; • PAKSOY MÜH LTD 1T0 • KEMALETT0N ATAK • ÇALI1KAN KARDE1LER • ÖZDUY NAKL0YAT • S.S. TAV1ANLI KOOP • ALP ÖZLER NAKLIYAT • AKYÜZ ULUSL. NAK 0N1AAT • H0LAL NAKL0YAT • YILMAZLAR MAD. LTD 1T0 • ÇELEB0O.ULLARI NAKL0YAT • HABUR TA1IMACILIK • TOPSAKALLAR NAKL0YAT • CEYNAK • Eti Maden 02letmeleri Genel Müdürlü/ü Satınalma • YEN0 GAP NAKL0YAT Dairesi Ba2kanlı/ı: Required for Bandırma Lojistik • HOROZ NAKL0YAT Müdürlü/ü in 2013, discharge and tranrsport of • ET0S LOJ0ST0K colemanite, uleccide ore and ET0BOR-48 products and • DEN0Z NAKL0YAT bagged products loading and transports. • B0LG0N NAKL0YAT Tender reg.no : 2012/148392 • BÜLBÜLLER TARIM NAK. Winner : ER1EN NAKL0YAT VE T0C. LTD. Offer : 1.158.780,00 TL • Hatay-Reyhanlı Municipality’s 0dari ve Mali Hizmetler Approx. cost : 1.265.820,00 TL Müdürlü/ü: Household wastes collection from the solid The other Bidding firms were ASYA LOJ0ST0K and DATA waste transfer station and transport to Antakya MADENC0L0K. Municipality Narlıca household waste landfill centre until 31.12.2013. • MKE Kurumu Pazarlama ve 0hracat Daire Ba2kanlı/ı: Tender reg.no : 2012/178786 Seaway and road transports to Portugal of 50.000 ea 20 Winner : FERHANO.ULLARI NAKL0YAT mmx102 TP M55 A2 training cartridges . Offer : 360.000,00 TL Winner : BORA TA1IMACILIK Approx. cost : 456.000,00 TL Offer : 44.700,00 Euro • Turkish Red Crescent Society (KIZILAY): Seaway • MKE Kurumu Pazarlama ve 0hracat Daire Ba2kanlı/ı: transport to West Africa (Senegal, Niger and Mauritania). Seaway and road transports to Jordan of 10.000 ea 20 Winner : SKYTECH mmx102 HEI-T M56 A3 cartridges (traced HEI) (M14A2 Offer : 4.150.000,00 TL Mayonlu) (fuse type M505A3), 3.360 ea 2,75” rocket The other Bidding firms were; combat heads and 3.360 ea 2,75” MK40 MOD 3 Rocket • ET0S LOJ0ST0K Motor • HOROZ TA1IMACILIK Winner : 0LYA TA1IMACILIK Offer : 128.000,00 $

        M  O    M 171O • ADIYAMAN MUNICIPALITY 1 ea bus • BURSA BUSK0 ADMINISTRATION 4 ea combined          Tender reg.no : 2013/37500 channel cleaning vehicles Winner : ÖZ D0CLE GIDA SAN. Tender reg.no : 2012/139767 Proposal : 158.500,00 TL Winner : ESMAN MAK. SAN. A.1. • ANKARA METROPOLITAN MUNICIPALITY; 5 ea • ANKARA-ASK0 ADMINISTRATION; 1 ea mini excavator Approx. cost : 162.333,33 TL Approx. cost : 2.386.007,33 TL hydraulic compress. garbage vehicle procurement Tender reg.no : 2013/79660 Proposal : 2.295.600,00 TL Tender reg.no : 2013/97243 Winner : S0F 01 MAK. A.1 • MALATYA MUNICIPALITY 10 ea trambus (electric Bid closing date : 22.08.2013 Approx. cost : 116.874,89 TL metrobüs/ trolleybus) vehicle and relevant power • BURSA-KESTEL MUNICIPALITY -MAL0 H0ZMETLER Approx. cost : 554.583,33 TL Proposal : 109.000,00 TL procurement , cataner, control signalling, communications MÜDÜRLÜ.Ü: 4x2 chassis trucks procurement as EFE ENDÜSTR0, EGEM 0TFA0YE, KARBA OTOMOT0V equipment (with assemly) procurement . garbage truck. participated but the tender was canceled. • ANKARA EGO ADMINISTRATION: Walking stairs and Tender reg.no : 2013/34601 Tender reg.no : 2012/177276 elevators in Ankara subways and Ankaray stations. Winner : BOZANKAYA OTOMOT0V Winner : OTOKOÇ OTOMOT0V • ANKARA METROPOLITAN MUNICIPALITY: 50 ea Tender reg.no : 2013/3369 Proposal : 19.784.930,13 Euro+KDV Proposal : 95.750,00 TL Approx. cost : 49.193.900,76 TL+KDV unimog, 25 ea “kırkayak” dump trucks and 7 ea mini Winner : BUGA OT S ASANSÖR Approx. cost : 96.442,33 TL 0 cleaning vehicle for pevements. Proposal : 23.399.000,00 TL • D YARBAKIR MUNICIPALITY MAL H ZMETLER Tender reg.no : 2012/107895 Approx. cost : 23.493.281,96 TL 0 0 0 • N.DEFENSE MINISTRY- K. Arç. ve 02 Mk. T. Fb.: 4 ea MÜDÜRLÜ Ü: 1 ea double cab. fire fighting vehicle and Winner : KOLUMAN A.1. . fire fighting bodybuilding equipment on Mercedes Atego 1 ea rescuer guide fire fighting vehicle procurement. Proposal : 24.697.000,00 TL • ANKARA- EGO ADMINISTRATION; For public buses 479 1518c vehicle Approx. cost : 24.915.692,46 TL Tender reg.no : 2012/154407 Tender reg.no : 2012/142311 ea vehicle type air conditioning systems procurement Winner : VOLKAN YANGIN T0C. A1. Winner : H DAYET ÇINAR Tender reg.no : 2013/20185 0 • ANKARA METROPOLITAN MUNICIPALITY 1 ea mini Proposal : 517.000 TL+KDV Proposal : 318.000,00 TL Approx. cost : 10.705.650,00 TL loader procurement. Approx. cost : 654.000,00 TL Approx. cost : 388.000,00 TL Contract cost : 8.764.742,00 TL Tender reg.no : 2012/187835 Winner : SAFKAR EGE A. . • KONYA METROPOLITAN MUNICIPALITY: 40 ea Winner : GAMA T CARET 1 • ZONGULDAK-KOZLU MUNICIPALITY: 1 ea combined 0 articulated type and 60 ea solo totalling 100 ea n.gas Proposal : 89.900,00 TL channel opening cleaning vehicle procurement. • fueled buses 0ZM0R ESHOT ADMINISTRATION- MAL ALIM Tender reg.no : 2012/155368 Approx. cost : 139.416,67 TL Tender reg.no : 2013/63053 0HALELER0 1UBE MÜDÜRLÜ.Ü: 100 ea solo type buses Winner : KARBA OTOMOT V 40 ea articulated bus 0 • procurement. Proposal : 341.500,00 TL ANKARA METROPOLITAN MUNICIPALITY - 0TFA0YE Winner : KARSAN A. . Tender reg.no : 2012/143000 1 Approx. cost : 350.687,50 TL DA0RES0: 6 items total 14 ea fire fighting and rescuing Proposal : 318.450 Euro/ea +KDV Winner : TEMSA GLOBAL vehicles 60 ea solo bus; Proposal : 25.373.600,00 TL+ KDV • DEN ZL MUNICIPALITY -WATER AND SEWERAGE Tender reg.no : 2013/34398 Winner : BOZANKAYA OTOMOT V-TCV 0 0 Approx. cost : 35.718.781,00 TL 0 ADMIN. 1 ea komple channel görüntüleme vehicle Winner : ANKARA ÇEL0K T0C. A.1. Proposal : 462.300 TL/ea +KDV Tender reg.no : 2012/131071 Proposal : 14.255.000,00 TL Approx. cost : 17.648.500,00 TL • 0ZM0R ESHOT ADMINISTRATION: 100 ea articulated bus Winner : ENERMAK ENERJ0 MAK0NE • KOCAEL0 METROPOLITAN MUNICIPALITY- ULA1IM procuremen. Proposal : 432.142,60 TL DA0RES0 20 ea 12 m. long (+-2% tolerance) low bed, 3 • ANKARA METROPOLITAN MUNICIPALITY - FEN Tender reg.no : 2012/143020 door, air conditioned, yapısına sahip, passenger cap. min • MALATYA-DARENDE MUNICIPALITY- FEN LER LER DA RES ; 12 ea trucks, 40 ea constr. machine Winner : SOLAR0S 01 0 01 0 0 0 80 diesel solo type buses procurement MÜDÜRLÜ Ü: 1 ea combined channel opening cleaning procurement. Approx. cost : 60.264.643,00 TL+KDV . Tender reg.no : 2013/69503 vehicle procurement. Tender reg.no : 2013/50274 Contract cost : 225.000 Euro/Ea +KDV Winner : OTOKAR A.1. Tender reg.no : 2012/175433 Winner : A.C. OTOMOT V 0 Approx. cost : 10.692.500 TL Winner : MUHAMMET SAL H BER Proposal : 21.200.000,00 TL+KDV • 0 01 KONYA KARAPINAR MUNICIPALITY -FEN 01LER0 Proposal : 2.864.000 Euro Proposal : 84.000,00 TL Approx. cost : 22.838.237,50 TL+KDV MÜDÜRLÜ.Ü: Municipal service vehicle (2 Ea 26+1 ea Approx. cost : 140.250,00 TL+KDV • seat cap. Municipal type buses procurement, 1 ea 4x2 1ANLIURFA MUNICIPALITY; 25 ea 12 mt. bus • ANKARA ASK ADMINISTRATION; 0n various diameters, dump dorse trailer, 2 ea 6x2 dump trucks) procurement 0 • AFYONKARAH0SAR 0L ÖZEL: 1 ea multi purpose Trucks 307.248 M. ductile pipes, 100.000 kg ductile pipes fittings Tender reg.no : 2012/114607 Tender reg.no : 2013/100532 Tender reg.no : 2012/182638 and valves, clamps, armatures fire taps procurement. Winner : BAYRAKTAR MERKON A.1. Bid closing date : 27.08.2013 Winner : KOLUMAN SAN. A.1. Tender reg.no : 2012/99219 Approx. cost : 1.460.000,00 TL 1st bidder 0NDEKS A.1. was disqualified and 2nd bidder Proposal : 547.600,00 TL + KDV Winner : SAMSUN MAK0NA A.1. Proposal : 1.326.150,00 TL TCV-BOZANKAYA A.1. (quoting 126.260 Euro/ea) was Approx. cost : 571.410,00 TL+ KDV Proposal : 1.619.585,00 USD invited to contract signing. Legal period is to expire soon. Approx. cost : 4.009.706,42 TL • GÜMÜ HANE MUNICIPALITY LETME MÜDÜRLÜ Ü: • ZM R METROPOLITAN MUNICIPALITY; 20 ea 3,5 ton 1 01 . • 0 0 2 ea low bed, disabled ramped public buses procurement. ADANA KOZAN MUNICIPALITY- FEN 01LER0 fire fighting vehicle procurement. • ANKARA ASK0 ADMINISTRATION; 1 ea diesel stacking Tender reg.no : 2012/190158 MÜDÜRLÜ.Ü: Various vehicles procurement Tender reg.no : 2012/136500 (forklift) vehicle procurement. Tender reg.no : 2012/177237 Winner : 0LKEL OTOMOT0V (OTOKAR) Winner : KATMERC0LER A.1. Winner : OTOKOÇ A. . Tender reg.no : 2012/15554 Proposal : 267.000 TL+KDV/ea 1 Proposal : 2.967.980,00 EUR+KDV Approx. cost : 133.042,00 TL Winner : A.C. OTOMOT0V Approx. cost : 7.330.000,00 TL Proposal : 114.000,00 TL Proposal : 137.664,50 TL • ANTALYA-GAZ PA A MUNICIPALITY: 1 ea 22 Approx. cost : 114.666,66 TL 0 1 • N. DEFENSE MINISTRY -Ankara Tedarik Bölge passenger cap. bus, 1 ea 48 passenger cap. bus • KONYA METROPOLITAN MUNICIPALITY; 9 ea various Ba2kanlı/ı (MSB): 4 ea cesspool emptiers procurement. procurement. • ANKARA ASK ADMINISTRATION; 4 ea crane cleaning vehicle (Partial order ) Tender reg.no : 2012/53815 0 Tender reg.no : 2012/197806 maintenance-repair vehicle procurement. Tender reg.no : 2012/127556 Winner : TAN OTO. LTD. 1T0. Tender reg.no : 2012/190529 Winner : M0THAT YILDIRIM Winner : U.UREL 0N1. TAAH. Proposal : 569.000,00 TL Proposal : 2.967.980,00 EUR+KDV Winner : AC OTOMOT0V Proposal : 239.000,00 TL Approx. cost : 574.000,00 TL Proposal : 1.200.000,00 TL+KDV Approx. cost : 7.330.000,00 TL Approx. cost : 222.500,00 TL • EÜA1-ERMENEK H0DROELEKTR0K SANTRAL0 • GÜMÜ HANE MUNICIPALITY: 2 ea low bed disabled • • ANKARA ASK0 ADMINISTRATION; 1 ea funeral (hearse) 1 KONYA METROPOLITAN MUNICIPALITY: 9 ea various 01LETME MÜDÜRLÜ.Ü: 1 ea fire fighting vehicle vehicle procurement. ramped public buses procurement. cleaning vehicle procurement. (Partial order ) procurement. Tender reg.no : 2013/28330 Tender reg.no : 2012/190158 Tender reg.no : 2012/127556 Tender reg.no : 2012/110832 Winner : A.C. OTOMOT0V Winner : 0LK-EL KOLLEKT0F Winner : ESMAN ÇEGA SAN. Winner : H0DAYET ÇINAR Proposal : 90.000,00 TL Proposal : 534.000,00 TL Proposal : 782.000,00 TL Proposal : 172.400,00 TL Approx. cost : 101.000,00 TL Approx. cost : 540.000,00 TL Approx. cost : 724.000,00 TL Approx. cost : 235.416,70 TL             M  O M  O       M 172O • ADIYAMAN MUNICIPALITY 1 ea bus • BURSA BUSK0 ADMINISTRATION 4 ea combined Tender reg.no : 2013/37500 channel cleaning vehicles Winner : ÖZ D0CLE GIDA SAN. Tender reg.no : 2012/139767 Proposal : 158.500,00 TL Winner : ESMAN MAK. SAN. A.1. Approx. cost : 162.333,33 TL Approx. cost : 2.386.007,33 TL Proposal : 2.295.600,00 TL • MALATYA MUNICIPALITY 10 ea trambus (electric metrobüs/ trolleybus) vehicle and relevant power • BURSA-KESTEL MUNICIPALITY -MAL0 H0ZMETLER procurement , cataner, control signalling, communications MÜDÜRLÜ.Ü: 4x2 chassis trucks procurement as equipment (with assemly) procurement . garbage truck. Tender reg.no : 2013/34601 Tender reg.no : 2012/177276 Winner : BOZANKAYA OTOMOT0V Winner : OTOKOÇ OTOMOT0V Proposal : 19.784.930,13 Euro+KDV Proposal : 95.750,00 TL Approx. cost : 49.193.900,76 TL+KDV Approx. cost : 96.442,33 TL

• D0YARBAKIR MUNICIPALITY MAL0 H0ZMETLER • N.DEFENSE MINISTRY- K. Arç. ve 02 Mk. T. Fb.: 4 ea MÜDÜRLÜ.Ü: 1 ea double cab. fire fighting vehicle and fire fighting bodybuilding equipment on Mercedes Atego 1 ea rescuer guide fire fighting vehicle procurement. 1518c vehicle Tender reg.no : 2012/154407 Tender reg.no : 2012/142311 Winner : VOLKAN YANGIN T0C. A1. Winner : H0DAYET ÇINAR Proposal : 517.000 TL+KDV Proposal : 318.000,00 TL Approx. cost : 654.000,00 TL Approx. cost : 388.000,00 TL

• KONYA METROPOLITAN MUNICIPALITY: 40 ea • ZONGULDAK-KOZLU MUNICIPALITY: 1 ea combined articulated type and 60 ea solo totalling 100 ea n.gas channel opening cleaning vehicle procurement. fueled buses Tender reg.no : 2012/155368 Tender reg.no : 2013/63053 Winner : KARBA OTOMOT V 40 ea articulated bus 0 Proposal : 341.500,00 TL Winner : KARSAN A. . 1 Approx. cost : 350.687,50 TL Proposal : 318.450 Euro/ea +KDV

60 ea solo bus; • Winner : BOZANKAYA OTOMOT V-TCV DEN0ZL0 MUNICIPALITY -WATER AND SEWERAGE 0 ADMIN. 1 ea komple channel görüntüleme vehicle Proposal : 462.300 TL/ea +KDV Tender reg.no : 2012/131071

Winner : ENERMAK ENERJ MAK NE • KOCAEL METROPOLITAN MUNICIPALITY- ULA IM 0 0 0 1 Proposal : 432.142,60 TL DA0RES0 20 ea 12 m. long (+-2% tolerance) low bed, 3 door, air conditioned, yapısına sahip, passenger cap. min • MALATYA-DARENDE MUNICIPALITY- FEN 01LER0 80 diesel solo type buses procurement MÜDÜRLÜ.Ü: 1 ea combined channel opening cleaning Tender reg.no : 2013/69503 vehicle procurement. Winner : OTOKAR A.1. Tender reg.no : 2012/175433 Approx. cost : 10.692.500 TL Winner : MUHAMMET SAL0H BER01 Proposal : 2.864.000 Euro Proposal : 84.000,00 TL Approx. cost : 140.250,00 TL+KDV • 1ANLIURFA MUNICIPALITY; 25 ea 12 mt. bus procurement • AFYONKARAH0SAR 0L ÖZEL: 1 ea multi purpose Trucks Tender reg.no : 2013/100532 Tender reg.no : 2012/182638 Bid closing date : 27.08.2013 Winner : KOLUMAN SAN. A.1. 1st bidder 0NDEKS A.1. was disqualified and 2nd bidder Proposal : 547.600,00 TL + KDV TCV-BOZANKAYA A.1. (quoting 126.260 Euro/ea) was Approx. cost : 571.410,00 TL+ KDV invited to contract signing. Legal period is to expire soon. • ZM R METROPOLITAN MUNICIPALITY; 20 ea 3,5 ton • 0 0 ADANA KOZAN MUNICIPALITY- FEN 01LER0 fire fighting vehicle procurement. MÜDÜRLÜ.Ü: Various vehicles procurement Tender reg.no : 2012/136500 Tender reg.no : 2012/177237 Winner : KATMERC0LER A.1. Winner : OTOKOÇ A.1. Proposal : 2.967.980,00 EUR+KDV Approx. cost : 133.042,00 TL Approx. cost : 7.330.000,00 TL Proposal : 137.664,50 TL • N. DEFENSE MINISTRY -Ankara Tedarik Bölge • KONYA METROPOLITAN MUNICIPALITY; 9 ea various Ba2kanlı/ı (MSB): 4 ea cesspool emptiers procurement. cleaning vehicle (Partial order ) Tender reg.no : 2012/53815 Tender reg.no : 2012/127556 Winner : TAN OTO. LTD. 1T0. Winner : U.UREL 0N1. TAAH. Proposal : 569.000,00 TL Proposal : 239.000,00 TL Approx. cost : 574.000,00 TL Approx. cost : 222.500,00 TL • EÜA1-ERMENEK H0DROELEKTR0K SANTRAL0 • KONYA METROPOLITAN MUNICIPALITY: 9 ea various 01LETME MÜDÜRLÜ.Ü: 1 ea fire fighting vehicle cleaning vehicle procurement. (Partial order ) procurement. Tender reg.no : 2012/127556 Tender reg.no : 2012/110832 Winner : ESMAN ÇEGA SAN. Winner : H0DAYET ÇINAR Proposal : 782.000,00 TL Proposal : 172.400,00 TL Approx. cost : 724.000,00 TL Approx. cost : 235.416,70 TL       M  O       M 173O • • BURSA METROPOLITAN MUNICIPALITY: 10 ea fire MALATYA MUNICIPALITY: 300 spiral welded steel pipes • D0YARBAKIR ÖZEL 0DARES0: 2 ea offroad vehicle • ESK01EH0R E.S.K.0. ADMINISTRATION: For Electronic extinguishing truck vehicle, 3 ea fire fighting water and 200 spiral welded steel pipes procurement. card counters 18 items plastic plastik components sprinkler ü su ikmal vehicle, 4 ea fire fighting rescuers, 1 Tender reg.no : 2012/188249 Tender reg.no : 2012/157350 procurement. ea 42 mt. Full autom. hydraulic ladder fire fighting vehicle Winner : HATBORU ÇEL0K BORU Winner : KARDELEN OTOMOT0V Tender reg.no : 2012/195754 procurement. Proposal : 193.292,00 TL Proposal : 106.800,00 TL Winner : MANAS ENERJ0 SAN. Tender reg.no : 2012/155912 Approx. cost : 218.110,00 TL Approx. cost : 113.873,33 TL Proposal : 385.538,00 TL 4 ea fire fighting rescuer Approx. cost : 488.306,67 TL Winner : KAT BODYBU0LD0NG EK0PMAN • BOLU L SA LIK MÜDÜRLÜ Ü 4*2 case type • KAHRAMANMARA1 MUNICIPALITY: 1 ea mobile 0 . . • ESK EH R E.S.K. . ADMINISTRATION: For Electronic Contract cost : 855.595,20 TL+KDV ambulance for obese /disabled patient. kitchen vehicle procurement. 01 0 0 10 ea first operation fire extinguishing truck, 3 ea fire Tender reg.no : 2012/159977 card counters Secure Memory type smart cards Tender reg.no : 2012/139124 procurement. fighting water sprinkler /supply vehicle Winner : EMS AMBULANS Winner : AYSU END. SAN. T0C. LTD. Winner : KAT BODYBU LD NG EK PMAN Proposal : 164.900,00 TL Tender reg.no : 2012/195636 0 0 0 Proposal : 206.000,00 TL Winner : MANAS ENERJ SAN. Contract cost : 3.760.647,80 TL+KDV Approx. cost : 287.500,00 TL 0 Approx. cost : 220.608,50 TL Proposal : 85.000,00 TL 1 ea 42 mt. Full autom. hydraulic ladder fire fighting 3 • SAMSUN-HAVZA MUNICIPALITY: 11+1 M ’ gardbage Approx. cost : 446.250,00 TL vehicle • 0ZM0R-0ZSU ADMINISTRATION: Various hydraulic cap. hydraulic compress. trucks Winner : VOLKAN 0TFA0YE • KARAMAN MUNICIPALITY: 1 ea 44 (+/-2) m. elevator bodybuilding equipment and assembly after procurement. Tender reg.no : 2013/12019 Contract cost : 1.130.274,60 TL+KDV type , full autom. hydraulic ladder vehicle procurement. Tender reg.no : 2012/134333 Winner : KARBA OTOMOT V 0 Tender reg.no : 2012/188802 Winner : PARAGON SAN. Proposal : 120.000,00 TL • EÜA -ERMENEK H DROELEKTR K SANTRAL Winner : VOLKAN TFA YE 1 0 0 0 Proposal : 3.097.000,00 TL Approx. cost : 118.336,67 TL 0 0 LETME MÜDÜRLÜ Ü: 1 ea ambulans procurement. Proposal : 1.400.000,00 TL 01 . Approx. cost : 3.508.730,00 TL Tender reg.no : 2012/110139 Approx. cost : 1.604.390,00 TL • STATE RAILWAYS ADMIN. (TCDD): 5 items equipment Winner : AMBULANS A. . 1 • MSB STANBUL TEDAR K BÖLGE BA KANLI I: 5 ea procurement (for YHT sets) procurement. Proposal : 102.900,00 TL 0 0 1 . • AFYON-BOLVAD0N MUNICIPALITY: 1 ea 28 m. rescuers, 1 ea 27 passenger cap. Prisoner carrier, 30 ea Tender reg.no : 2012/133851 hydraulic ladder fire fighting vehicle procurement. Approx. cost : 116.644,00 TL Winner :CONSTRUCCIONES Y AUXILLIAR security reaction police team vehicle, 3 ea refrigerated Tender reg.no : 2013/2499 vehicles, 1 ea refrigerated araç procurement. DE FERROCARRILES S.A. (CAF) • YOZGAT-SARIKAYA MUNICIPALITY: 1 ea fire fighting Winner : VOLKAN 0TFA0YE Tender reg.no : 2012/156575 Proposal : 1.888.720,00 Euro Proposal : 197.000,00 TL vehicle and 2 ea 13.000 lt. 3000nh pumped fire fighting Approx. cost : 6.188.381,14 TL Winner : OTOKAR OTOMOT V Approx. cost : 295.000,00 TL supply tankers 0 Proposal : 176.500,00 TL Tender reg.no : 2012/151389 • STATE RAILWAYS ADMINISTRATION (TCDD): • Approx. cost : 185.000,00 TL DS0 MAK0NE 0MALAT VE DONATIM DA0RES0 Winner : KARBA OTOMOT0V 3.000.000 ea concrete sleeper equipment procurement. BA KANLI I: 8 ea vehicles and boom cranes 1 . Proposal : 620.000,00 TL Tender reg.no : 2012/135251 Tender reg.no : 2012/155750 • TÜRK YE PETROLLER ANON M ORTAKLI I (TPAO) Approx. cost : 648.416,66 TL 0 0 0 . Winner : GÜRYAPI 0N1AAT Winner : BA1ER OTO 0N1. ADMINISTRATION: High dorse treyler procurement. Proposal : 2.964.000,00 TL Proposal : 1.665.208,00 TL • SAMSUN METROPOLITAN MUNICIPALITY: 1 ea Tender reg.no : 2012/131936 Approx. cost : 4.050.000,00 TL Approx. cost : 1.749.333,00 TL chassis truck Winner : CEYLAN TREYLER • Tender reg.no : 2013/1679 Proposal : 113.660,00 TL • 1ANLIURFA MUNICIPALITY: 1 ea channel opening KAHRAMANMARA1 MUNICIPALITY: 1 ea telescopic platform vehicle procurement. Winner : 0LK-EL KOLLEKT0F Approx. cost : 200.000,00 TL vehicle procurement. Proposal : 94.920.00 TL Tender reg.no : 2012/188872 Tender reg.no : 2012/196211 Winner : BUMER MAK. SAN. Approx. cost : 97.500,00 TL • YOZGAT-YERKÖY MUNICIPALITY FEN 01LER0 Winner : NURMAK ARAÇ SAN. Proposal : 121.250,00 TL MÜDÜRLÜ.Ü: 1 ea combined channel opening cleaning Proposal : 132.000,00 TL Approx. cost : 173.166,67 TL Approx. cost : 171.000,00 TL • BURSA BUSK -ADMINISTRATION; 6 items various vehicle procurement. 0 Contract date : 15.02.2013 diameter steel pipes procurement. Tender reg.no : 2012/193525 • 3 OSMAN0YE-TÜYSÜZ MUNICIPALITY 1 ea 13+1,5 M Tender reg.no : 2012/148189 Winner : KATMERC0LER A.1. • ÇANAKKALE MUNICIPALITY: 1 ea 32 m. full autom. compress. Garbage truck procurement. Winner : EMEK BORU MAK NA Proposal : 300.000,00 TL 0 hydraulic ladder fire fighting vehicle procurement. Tender reg.no : 2013/22643 Approx. cost : 319.166,67 TL Proposal : 3.559.250,00 USD Tender reg.no : 2012/190349 Winner : EFE ENDÜSTR0 T0C. Approx. cost : 8.056.625,00 TL Winner : VOLKAN TFA YE Proposal : 131.000,00 TL • 0 0 0STANBUL-ADALAR MUNICIPALITY FEN 01LER0 Proposal : 595.000,00 TL Approx. cost : 138.000,00 TL • ÇANAKKALE MUNICIPALITY - 0TFA0YE MÜDÜRLÜ.Ü: MÜDÜRLÜ.Ü: 2 ea dump electric high pressure washing Approx. cost : 893.333,33 TL • ANTALYA-OVA MUNICIPALITY: 1 ea 4x2 turbo-diesel 1 ea 32 m. fire fighting vehicle procurement. type garbage vehicle and 4 ea dump electric non washing panelvan type emergency ambulance procurement. Tender reg.no : 2012/190349 garbage vehicle procurement. • ESK01EH0R E.S.K.0. ADMINISTRATION: For Electronic Tender reg.no : 2012/40344 Winner : VOLKAN TFA YE Tender reg.no : 2012/168750 0 0 card counters 4 items electronic equipment procurement. Winner : AMBULANS A. . Proposal : 595.000,00 TL+KDV 1 Winner : U.UREL 0N1AAT Tender reg.no : 2012/195708 Proposal : 115.500,00 TL Proposal : 382.000,00 TL Winner : MANAS ENERJ0 SAN. Approx. cost : 115.500,00 TL • ERZURUM METROPOLITAN MUNICIPALITY: 18 m. fire Approx. cost : 407.000,00 TL Proposal : 1.675.000,00 TL fighting bodybuilding platform procurement Approx. cost : 2.434.750,00 TL • TRABZON-ES RO LU MUNICIPALITY: 1 ea diesel motor 0 . Tender reg.no : 2012/198151 • B0TL0S MUNICIPALITY: 1 ea 2013 model fire fighting grader procurement. • ESK01EH0R E.S.K.0. ADMINISTRATION: For Electronic Winner : KARBA OTOMOT0V guide vehicle procurement. Tender reg.no : 2011/186096 Proposal : 60.000,00 TL card counters, global closure mechanism procurement. Tender reg.no : 2013/190256 Tender reg.no : 2012/195624 Winner : TEMSA GLOBAL SAN. Approx. cost : 69.000,00 TL Winner : KATMERC LER. A. . Proposal : 470.000,00 TL 0 1 Winner : MANAS ENERJ0 SAN. Proposal : 110.000,00 TL Approx. cost : 485.000,00 TL • Proposal : 462.500,00 TL MINERAL RESEARCH & EXPLOR, ADMINIST. 1.item; Approx. cost : 120.000,00 TL Approx. cost : 609.166,67 TL 2.000 ea pipes (outer diam. 114,30 mm-inner diam. • 0STANBUL-SARIYER MUNICIPALITY: 1 ea wheeled 101,60 mm), 2. Kalem; 2.000 ea boru (outer diam 88,90 • ADANA-YUMURTALIK MUNICIPALITY: 24 Mt. Hydraulic • ESK01EH0R E.S.K.0. ADMINISTRATION: For Electronic excavator- loader constr. machine and hydraulic crusher mm-inner diam. 76,20 mm) procurement. (partial quot.) fire fighting vehicle with ladder. card counters 2 items batteries procurement. procurement. Tender reg.no : 2012/176287 Tender reg.no : 2013/128742 Tender reg.no : 2012/195682 Tender reg.no : 2012/187403 Winner : BORUSAN MANNESMAN Winner : MANAS ENERJ SAN. Winner : SANKO MAK0NA Winner :DETAY BODYBU0LD0NG EK0PMAN 0 Proposal : 255.000,00 TL Proposal : 113.750,00 TL Proposal : 398.860,00 USD Proposal : 126.399,00 TL Approx. cost : 495.375,00 TL Approx. cost : 135.267,80 TL Approx. cost : 1.408.198,00 TL Approx. Cost : 143.750,00 TL             M  O   M  O    M 174O • • BURSA METROPOLITAN MUNICIPALITY: 10 ea fire MALATYA MUNICIPALITY: 300 spiral welded steel pipes • D0YARBAKIR ÖZEL 0DARES0: 2 ea offroad vehicle • ESK01EH0R E.S.K.0. ADMINISTRATION: For Electronic extinguishing truck vehicle, 3 ea fire fighting water and 200 spiral welded steel pipes procurement. card counters 18 items plastic plastik components sprinkler ü su ikmal vehicle, 4 ea fire fighting rescuers, 1 Tender reg.no : 2012/188249 Tender reg.no : 2012/157350 procurement. ea 42 mt. Full autom. hydraulic ladder fire fighting vehicle Winner : HATBORU ÇEL0K BORU Winner : KARDELEN OTOMOT0V Tender reg.no : 2012/195754 procurement. Proposal : 193.292,00 TL Proposal : 106.800,00 TL Winner : MANAS ENERJ0 SAN. Tender reg.no : 2012/155912 Approx. cost : 218.110,00 TL Approx. cost : 113.873,33 TL Proposal : 385.538,00 TL 4 ea fire fighting rescuer Approx. cost : 488.306,67 TL Winner : KAT BODYBU0LD0NG EK0PMAN • BOLU L SA LIK MÜDÜRLÜ Ü 4*2 case type • KAHRAMANMARA1 MUNICIPALITY: 1 ea mobile 0 . . • ESK EH R E.S.K. . ADMINISTRATION: For Electronic Contract cost : 855.595,20 TL+KDV ambulance for obese /disabled patient. kitchen vehicle procurement. 01 0 0 10 ea first operation fire extinguishing truck, 3 ea fire Tender reg.no : 2012/159977 card counters Secure Memory type smart cards Tender reg.no : 2012/139124 procurement. fighting water sprinkler /supply vehicle Winner : EMS AMBULANS Winner : AYSU END. SAN. T0C. LTD. Winner : KAT BODYBU LD NG EK PMAN Proposal : 164.900,00 TL Tender reg.no : 2012/195636 0 0 0 Proposal : 206.000,00 TL Winner : MANAS ENERJ SAN. Contract cost : 3.760.647,80 TL+KDV Approx. cost : 287.500,00 TL 0 Approx. cost : 220.608,50 TL Proposal : 85.000,00 TL 1 ea 42 mt. Full autom. hydraulic ladder fire fighting 3 • SAMSUN-HAVZA MUNICIPALITY: 11+1 M ’ gardbage Approx. cost : 446.250,00 TL vehicle • 0ZM0R-0ZSU ADMINISTRATION: Various hydraulic cap. hydraulic compress. trucks Winner : VOLKAN 0TFA0YE • KARAMAN MUNICIPALITY: 1 ea 44 (+/-2) m. elevator bodybuilding equipment and assembly after procurement. Tender reg.no : 2013/12019 Contract cost : 1.130.274,60 TL+KDV type , full autom. hydraulic ladder vehicle procurement. Tender reg.no : 2012/134333 Winner : KARBA OTOMOT V 0 Tender reg.no : 2012/188802 Winner : PARAGON SAN. Proposal : 120.000,00 TL • EÜA -ERMENEK H DROELEKTR K SANTRAL Winner : VOLKAN TFA YE 1 0 0 0 Proposal : 3.097.000,00 TL Approx. cost : 118.336,67 TL 0 0 LETME MÜDÜRLÜ Ü: 1 ea ambulans procurement. Proposal : 1.400.000,00 TL 01 . Approx. cost : 3.508.730,00 TL Tender reg.no : 2012/110139 Approx. cost : 1.604.390,00 TL • STATE RAILWAYS ADMIN. (TCDD): 5 items equipment Winner : AMBULANS A. . 1 • MSB STANBUL TEDAR K BÖLGE BA KANLI I: 5 ea procurement (for YHT sets) procurement. Proposal : 102.900,00 TL 0 0 1 . • AFYON-BOLVAD0N MUNICIPALITY: 1 ea 28 m. rescuers, 1 ea 27 passenger cap. Prisoner carrier, 30 ea Tender reg.no : 2012/133851 hydraulic ladder fire fighting vehicle procurement. Approx. cost : 116.644,00 TL Winner :CONSTRUCCIONES Y AUXILLIAR security reaction police team vehicle, 3 ea refrigerated Tender reg.no : 2013/2499 vehicles, 1 ea refrigerated araç procurement. DE FERROCARRILES S.A. (CAF) • YOZGAT-SARIKAYA MUNICIPALITY: 1 ea fire fighting Winner : VOLKAN 0TFA0YE Tender reg.no : 2012/156575 Proposal : 1.888.720,00 Euro Proposal : 197.000,00 TL vehicle and 2 ea 13.000 lt. 3000nh pumped fire fighting Winner : OTOKAR OTOMOT V Approx. cost : 6.188.381,14 TL Approx. cost : 295.000,00 TL supply tankers 0 Proposal : 176.500,00 TL Tender reg.no : 2012/151389 • STATE RAILWAYS ADMINISTRATION (TCDD): • Approx. cost : 185.000,00 TL DS0 MAK0NE 0MALAT VE DONATIM DA0RES0 Winner : KARBA OTOMOT0V 3.000.000 ea concrete sleeper equipment procurement. BA KANLI I: 8 ea vehicles and boom cranes 1 . Proposal : 620.000,00 TL Tender reg.no : 2012/135251 Tender reg.no : 2012/155750 • TÜRK YE PETROLLER ANON M ORTAKLI I (TPAO) Approx. cost : 648.416,66 TL 0 0 0 . Winner : GÜRYAPI 0N1AAT Winner : BA1ER OTO 0N1. ADMINISTRATION: High dorse treyler procurement. Proposal : 2.964.000,00 TL Proposal : 1.665.208,00 TL • SAMSUN METROPOLITAN MUNICIPALITY: 1 ea Tender reg.no : 2012/131936 Approx. cost : 4.050.000,00 TL Approx. cost : 1.749.333,00 TL chassis truck Winner : CEYLAN TREYLER • Tender reg.no : 2013/1679 Proposal : 113.660,00 TL • 1ANLIURFA MUNICIPALITY: 1 ea channel opening KAHRAMANMARA1 MUNICIPALITY: 1 ea telescopic platform vehicle procurement. Winner : 0LK-EL KOLLEKT0F Approx. cost : 200.000,00 TL vehicle procurement. Proposal : 94.920.00 TL Tender reg.no : 2012/188872 Tender reg.no : 2012/196211 Winner : BUMER MAK. SAN. Approx. cost : 97.500,00 TL • YOZGAT-YERKÖY MUNICIPALITY FEN 01LER0 Winner : NURMAK ARAÇ SAN. Proposal : 121.250,00 TL MÜDÜRLÜ.Ü: 1 ea combined channel opening cleaning Proposal : 132.000,00 TL Approx. cost : 173.166,67 TL Approx. cost : 171.000,00 TL • BURSA BUSK -ADMINISTRATION; 6 items various vehicle procurement. 0 Contract date : 15.02.2013 diameter steel pipes procurement. Tender reg.no : 2012/193525 • 3 OSMAN0YE-TÜYSÜZ MUNICIPALITY 1 ea 13+1,5 M Tender reg.no : 2012/148189 Winner : KATMERC0LER A.1. • ÇANAKKALE MUNICIPALITY: 1 ea 32 m. full autom. compress. Garbage truck procurement. Winner : EMEK BORU MAK NA Proposal : 300.000,00 TL 0 hydraulic ladder fire fighting vehicle procurement. Tender reg.no : 2013/22643 Approx. cost : 319.166,67 TL Proposal : 3.559.250,00 USD Tender reg.no : 2012/190349 Winner : EFE ENDÜSTR0 T0C. Approx. cost : 8.056.625,00 TL Winner : VOLKAN TFA YE Proposal : 131.000,00 TL • 0 0 0STANBUL-ADALAR MUNICIPALITY FEN 01LER0 Proposal : 595.000,00 TL Approx. cost : 138.000,00 TL • ÇANAKKALE MUNICIPALITY - 0TFA0YE MÜDÜRLÜ.Ü: MÜDÜRLÜ.Ü: 2 ea dump electric high pressure washing Approx. cost : 893.333,33 TL • ANTALYA-OVA MUNICIPALITY: 1 ea 4x2 turbo-diesel 1 ea 32 m. fire fighting vehicle procurement. type garbage vehicle and 4 ea dump electric non washing panelvan type emergency ambulance procurement. Tender reg.no : 2012/190349 garbage vehicle procurement. • ESK01EH0R E.S.K.0. ADMINISTRATION: For Electronic Tender reg.no : 2012/40344 Winner : VOLKAN TFA YE Tender reg.no : 2012/168750 0 0 card counters 4 items electronic equipment procurement. Winner : AMBULANS A. . Proposal : 595.000,00 TL+KDV 1 Winner : U.UREL 0N1AAT Tender reg.no : 2012/195708 Proposal : 115.500,00 TL Proposal : 382.000,00 TL Winner : MANAS ENERJ0 SAN. Approx. cost : 115.500,00 TL • ERZURUM METROPOLITAN MUNICIPALITY: 18 m. fire Approx. cost : 407.000,00 TL Proposal : 1.675.000,00 TL fighting bodybuilding platform procurement Approx. cost : 2.434.750,00 TL • TRABZON-ES RO LU MUNICIPALITY: 1 ea diesel motor 0 . Tender reg.no : 2012/198151 • B0TL0S MUNICIPALITY: 1 ea 2013 model fire fighting grader procurement. • ESK01EH0R E.S.K.0. ADMINISTRATION: For Electronic Winner : KARBA OTOMOT0V guide vehicle procurement. Tender reg.no : 2011/186096 Proposal : 60.000,00 TL card counters, global closure mechanism procurement. Tender reg.no : 2013/190256 Tender reg.no : 2012/195624 Winner : TEMSA GLOBAL SAN. Approx. cost : 69.000,00 TL Winner : KATMERC LER. A. . Proposal : 470.000,00 TL 0 1 Winner : MANAS ENERJ0 SAN. Proposal : 110.000,00 TL Approx. cost : 485.000,00 TL • Proposal : 462.500,00 TL MINERAL RESEARCH & EXPLOR, ADMINIST. 1.item; Approx. cost : 120.000,00 TL Approx. cost : 609.166,67 TL 2.000 ea pipes (outer diam. 114,30 mm-inner diam. • 0STANBUL-SARIYER MUNICIPALITY: 1 ea wheeled 101,60 mm), 2. Kalem; 2.000 ea boru (outer diam 88,90 • ADANA-YUMURTALIK MUNICIPALITY: 24 Mt. Hydraulic • ESK01EH0R E.S.K.0. ADMINISTRATION: For Electronic excavator- loader constr. machine and hydraulic crusher mm-inner diam. 76,20 mm) procurement. (partial quot.) fire fighting vehicle with ladder. card counters 2 items batteries procurement. procurement. Tender reg.no : 2012/176287 Tender reg.no : 2013/128742 Tender reg.no : 2012/195682 Tender reg.no : 2012/187403 Winner : BORUSAN MANNESMAN Winner : MANAS ENERJ SAN. Winner : SANKO MAK0NA Winner :DETAY BODYBU0LD0NG EK0PMAN 0 Proposal : 255.000,00 TL Proposal : 113.750,00 TL Proposal : 398.860,00 USD Proposal : 126.399,00 TL Approx. cost : 495.375,00 TL Approx. cost : 135.267,80 TL Approx. cost : 1.408.198,00 TL Approx. Cost : 143.750,00 TL             M  O M  O       M 175O • 0STANBUL-AVCILAR MUNICIPALITY: 3 ea hydraulic • TÜRK0YE LOKOMOT0F VE MOTOR SANAY0 A.1. compress. (mechanical+electr. commanded) garbage (TÜLOMSA1) 1910 ea diam. 920 mm Wheel sets komple cases procurement. 600 ea diam. 1016 mm monoblock Wheel bodies Tender reg.no : 2013/5184 procurement. Winner : H0DRO-MAK DAMPER Tender reg.no : 2012/169817 Proposal : 103.000,00 TL Winner : JINXI COMPANY LTD. Approx. cost : 121.017,00 TL Proposal : 3.734.050,00 USD Approx. cost : 9.456.668,00 TL • ERZURUM METROPOLITAN MUNICIPALITY: 1 ea 54 mt ladder fire fighting vehicle, 1 ea full equipped fire fighting • BURSA METROPOLITAN MUNICIPALITY: 12+1 rescuer vehicle, 1 ea trailer with electric generator and passenger cap. and 16+1 passenger cap. 2 ea light head light. commercial vehicles Tender reg.no : 2012/153253 Tender reg.no : 2012/178985 Winner : UMTA1 ULS. MAK. Winner : OTOKOÇ OTOMOT0V Proposal : 1.064.000,00 Euro Proposal : 173.000,00 TL Approx. cost : 2.919.828,00 TL Approx. cost : 182.166,67 TL

3 • NEV EH R-UÇH SAR MUNICIPALITY: 1 ea 12 m. • KAHRAMANMARA1 MUNICIPALITY: 13 ea 9+1 m cap. 1 0 0 3 hydraulic ladder fire fighting vehicle procurement . hydraulic compress. garbage vehicle, 12 ea 13+1,5 m Tender reg.no : 2013/2704 hydraulic compress. garbage vehicle, 7 ea single cab. Winner : KARBA OTOMOT0V small trucks, 1 ea single cab tented small truck, 1 ea dump Proposal : 180.000,00 TL kamyon, 1 ea crane compress. hydraulic compress. Approx. cost : 192.000,00 TL garbage vehicle, 4 ea 4x2 double cab small trucks, 1 ea 4x4 double cab small trucks, 2 ea compact sweeper • MSB K. ARÇ. VE 01. MK. T. FB.: Ammunition case on vehicle procurement. 2 ea Mercedes Atego 1518c vehicle. Tender reg.no : 2012/176444 Tender reg.no : 2012/151777 Winner : EFE ENDÜSTR0 Winner : ECO FR0GO TRUCKS Proposal : 3.945.830,00 TL Proposal : 132.400,00 TL Approx. cost : 4.005.292,54 TL Approx. cost : 140.000,00 TL • STATE RAILWAYS ADMINISTRATION: 6 ea çok high • ORDU-ÜNYE MUNICIPALITY: 2 ea compress. Garbage speed train set s and 1 ea Simulator procurement, 7 – trucks year maintenance-repair, cleaning services. Tender reg.no : 2012/167664 Winner : SEIMENS Proposal : 244.907.795,00 Euro Winner : EFE ENDÜSTR0 T0C. Proposal : 275.000,00 TL • Approx. cost : 282.450,00 TL AYDIN 0L ÖZEL 0DARES0: Various diameter and Atü HDPE 100 pipes and PVC drinking water pipes procurement. • TÜRK0YE ELEKTROMEKAN0K SANAY0 (TEMSAN): Yuvacık-HES turbine adjustment wings procurement. Winner : ESEN PLAST0K SAN. Tender reg.no : 2013/10987 Proposal : 1.128.833,76 TL Approx. cost : 1.338.816,02 TL Winner : H0DROPOL MÜHEND0SL0K Proposal : 25.800,00 Euro • Approx. cost : 102.400,00 TL MAN0SA-MUNICIPALITY 0TFA0YE MÜDÜRLÜ.Ü: 3 ea rescuer fire fighting vehicle and fire fighting vehicle and equipment • HATAY-MUSTAFA KEMAL UN0VERS0TY: 1 ea 24 Mt. Winner : VOLKAN TFA YE Hydraulic ladder rational joystick commanded fire 0 0 Proposal : 755.750,00 TL extinguishing truck and rescuer vehicle procurement. Approx. cost : 1.003.866,67 TL Tender reg.no : 2012/175318

Winner : BAKSAN. T0C. A.1. • Proposal : 329.900,00 TL MAN0SA-SAL0HL0 SOL SAH0L SULAMA B0RL0.0: 1 ea Approx. cost : 367.500,00 TL backhoe grader procurement. Winner : ÖZMAK MAK NA 0 Proposal : 187.000,00 TL • GAZ ANTEP GASK ADMINISTRATION: Various ductile 0 0 Approx. cost : 196.766,66 TL pipes and fittings.

Tender reg.no : 2012/197316 • KONYA METROPOLITAN MUNICIPALITY: 1 ea small Winner : SAMSUN MAK NA 0 trucks ( rescuer vehicle monte assembled on) Proposal : 7.454.965,00 TL Tender reg.no : 2013/21227 Approx. cost : 7.511.913,00 TL Winner : VOLKAN YANGIN

Proposal : 110.000,00 TL • TÜRK YE LOKOMOT F VE MOTOR SANAY A. . 0 0 0 1 Approx. cost : 135.000,00 TL (TÜLOMSA ): 1910 ea diam. 920 mm Wheel sets 1 complete 600 ea diam. 1016 mm monoblock Wheel • TOKAT MUNICIPALITY: 1 ea 13 ton asphalt distributor bodies vehicle procurement. Tender reg.no : 2012/169817 Tender reg.no : 2012/196309 Winner : RM TECH CO. LTD. Winner : KATMERC LER. A. . Proposal : 437.400,00 Euro 0 1 Proposal : 199.000,00 TL Approx. cost : 1.249.410,00 TL Approx. cost : 87.200,00 TL       M  O       M 176O • 0STANBUL ULA1IM SANAY0 VE T0CARET A.1.: Various • T.C.D.D. ADMINISTRATION 7.Bölge Malzeme vehicles procurement Müdürlü/ü: 3.280 ton 60 E1 (60,21 Kg/M’) rail Tender reg.no : 2012/198450 procurement. Winner : ÇETA1 T0CAR0 VASITA Tender reg.no : 2013/22173 Proposal : 284.188,00 TL Winner : KARDEM0R A.1. Approx. cost : 315.815,36 TL Proposal : 2.296.000,00 Euro Approx. cost : 5.436.240,00 TL • GAZ0ANTEP METROPOLITAN MUNICIPALITY: 3 ea multi purpose fire fighting vehicle, 2 ea multi purpose • STATE RAILWAYS (TCDD) 7. BÖLGE MÜDÜRLÜ.Ü: street type fire fighting vehicle procurement. 3.280 ton 60 E1 (60,21 kg/m’) Rail procurement. Tender reg.no : 2013/2825 Winner : KARDEM0R A.1. Proposal : 2.296.000 Euro Winner : KATMERC0LER A.1. Proposal : 1.734.000,00 TL + KDV Approx. cost : 5.436.240 TL Approx. cost : 1.938.001,00 TL + KDV • STATE RAILWAYS ADMINISTRATION (TCDD):115.000 • DEVLET HAVA MEYDANLARI LETMES ea B70 concrete sleepers procurement for E1’ rails. 01 0 Tender reg.no : 2012/191073 ADMINISTRATION (DHM ): 11 ea teleskopic or joint or 0 Winner : YAPIRAY A. . telescopic & jointed self propelling in- terminal 1 Proposal : 7.969.500,00 TL platform procurement. Approx. cost : 9.434.600,00 TL Tender reg.no : 2012/164895

Winner : PAKTA PLATFORM 1 • ADANA ASK ADMINISTRATION: Channel cleaning Proposal : 956.940,00 TL 0 hoses procurement. Approx. cost : 1.010.890,50 TL Tender reg.no : 2013/2273 Winner : GÜNER MAK NA SAN. • 0 0 KOCAEL0-BA10SKELE MUNICIPALITY - DESTEK Proposal : 108.520,00 TL H0ZMETLER0 MÜDÜRLÜ.Ü: 1 ea riper grader, 1 ea Approx. cost : 131.495,20 TL grader, 1 ea crawler excavator procurement. Tender reg.no : 2013/28054 • KONYA-KOSK0 ADMINISTRATION: 9 ea channel anhd Winner : BORUSAN MAK0NE valve default repair vehicle cases and 7 ea water crew Proposal : 1.400.000 TL+KDV vehicle cases procurement Tender reg.no : 2013/21632 • 0STANBUL-BA.CILAR MUNICIPALITY : 1 ea patient Winner : ALPSAN 0TFA0YE H0Z. transport vehicle procurement. Proposal : 663.180,00 TL Tender reg.no : 2013/17539 Approx. cost : 795.250,00 TL Winner : AMBULANS A.1 Proposal : 103.000,00 TL • S0NOP 0L ÖZEL 0DARES0: 1 ea Hydraulic crushers. Approx. cost : 104.141,53 TL Tender reg.no : 2013/7697 Winner : H0DROMEK A.1. • S0VAS MUNICIPALITY Fen 02leri Müdürlü/ü; 1 ea Proposal : 87.000,00 TL Batch type asphalt plant procurement (240 T/H prod. cap. Approx. cost : 87.173,40 TL batch type) Tender reg.no : 2013/6726 • BOLU-TA1KEST0 MUNICIPALITY: 1 ea loader constr. Winner : E-MAK A.1. machine with telescopic boom, çrusher, air condition.sys. Approx. cost : 2.775.800,00 TL joystick, forklift attached procurement. Proposal : 1.656.000,00 TL Tender reg.no : 2013/21751 Contract date : 12.04.2013 Winner : H0DROMEK A.1. Proposal : 142.000,00 TL Approx. cost : 147.500,00 TL • S0VAS MUNICIPALITY ; 1 ea fire fighting bodybuilding equipment with water tank and pump. • Tender reg.no : 2013/16590 ADANA ASK0 ADMINISTRATION: 1 ea mobile crane Bid closing date : 12.03.2013 (mounted on vehicle) Winner : KARBA OTOMOT V LTD. Tender reg.no : 2013/13498 0 Winner : PARAGON SAV. SAN. Approx. cost : 226.833,00 TL Proposal : 135.000,00 TL Proposal : 214.170,00 TL Approx. cost : 141.150,00 TL

• KASTAMONU L ÖZEL DARES : 1 ea bodybuilding 0 0 0 • BATMAN-SASON MUNICIPALITY: 1 ea combined asphalt distributor. channel opening 1 ea fire fighting, 1 ea roadr sweeper Tender reg.no : 2013/31323 vehicle and 1 ea 27+1 bus procurement. Winner : EMRE EL0BOL Tender reg.no : 2013/22451 Proposal : 74.000,00 TL Winner : KARBA OTOMOT0V Approx. cost : 83.333,33 TL Proposal : 837.500,00 TL Approx. cost : 843.666,00 TL • G0RESUN MUNICIPALITY: Multi purpose fire fighting and rescuer vehicle bodybuilding procurement. • A.RI-TAH0R MUNICIPALITY ; 1 ea wheeled loader Tender reg.no : 2013/21229 Tender reg.no : 2013/68103 Winner : VOLKAN 0TFA0YE Winner : JCB S0F OTOMOT0V Proposal : 169.250,00 TL Approx. cost : 8.960.000 Euro Approx. cost : 278.250,00 TL Proposal : 7.700.000 Euro       M  O       M 177O • • KASTAMONU MUNICIPALITY: 1 ea compress. garbage BATMAN-SASON MUNICIPALITY Mali Hizmetler • STATE HYDRAULIC WORKS-DS0 ADMINISTRATION; • TRABZON MUNICIPALITY: 1 ea channel vehicle body truck procurement. Müdürlü/ü: 1 ea combined channel opening and 70 ea trailers building equipment procurement Tender reg.no : 2013/29728 cleaning, 1 ea fire fighting, 1 ea road sweeper vehicle, 1 Tender reg.no : 2013/21968 Tender reg.no : 2013/41882 Winner : KARBA OTOMOT V 0 ea 27+1 bus procurement. Winner : MAN A.1. Winner : KARBA OTOMOT0V LTD Proposal : 102.799,00 TL Tender reg.no : 2013/22451 Approx. cost : 360.000 TL/ea Approx. cost : 235.666,67 TL Approx. cost : 113.000,00 TL Winner : KARBA OTOMOT0V Contract cost : 149.344 Euro/ea Proposal : 230.000,00 TL Proposal : 837.500,00 TL • TÜRK YE PETROLLER ANON M ORTAKLI I 0 0 0 . Approx. cost : 843.666,00 TL • DS ADMINISTRATION; 135 ea crawler type Hydraulic • AMASYA MUNICIPALITY - FEN 01LER0 MÜDÜRLÜ.Ü; ADMINISTRATION (TPAO): 1 ea civilian defense vehicle 0 excavator (BACK-HOE) procurement Crawler mini compactor vehicle procurement procurement. • 0STANBUL-0SK0 ADMINISTRATION; Various kelebek Tender reg.no : 2013/22742 Tender reg.no : 2013/59686 Tender reg.no : 2012/176677 vana procurement Approx. cost : 54.252.045 TL Winner : WACKER NEUSON MAK0NA Winner : Z MAG ARAÇ MAK NA 0 0 Tender reg.no : 2012/145476 Winner : H DROMEK A. . Approx. cost : 132.233.33 TL Proposal : 168.000,00 TL 0 1 Winner : SET ENDÜSTR0 MAL. LTD Proposal : 24.151.500 $ Proposal : 120.000.00 TL Approx. cost : 150.000,00 TL Approx. cost : 3.526.862,73 TL Model : HMK300 DC

Contract cost : 2.718.000,00 TL • BEYPAZARI MUNICIPALITY- FEN LER • ET MADEN LETMELER ADMINISTRATION 140.000 01 0 0 01 0 • MÜDÜRLÜ Ü; 1 ea Dump Trucks mal. ea wooden pallets procurement. DS0 ADMINISTRATION; 3 groups total 130 ea crawler . • 0STANBUL GAZ DA.ITIM A.1. (0GDA1): naturalgas Tender reg.no : 2013/40808 Tender reg.no : 2013/28840 tractors (Dozer)-(50 ea ripered) meters procurement. Winner : KARBA OTOMOT V Winner : AYAZLAR NAKL YE Tender reg.no : 2013/35454 0 0 Tender reg.no : 2013/5941 Approx. cost : 135.867.00 TL Proposal : 2.770.600,00 TL Approx. cost unit : 1.116.923 TL Orders were awarded as follows; Proposal : 135.000.00 TL Approx. cost : 3.305.900,00 TL Approx. Cost total : 145.990.990,00 TL Winner : NATEK ENERJ0 A.1. Winner : LIEBHERR Contracted item :10.000 ea G4 sayaç Unit price : 374.940 Euro • FATSA MUNICIPALITY (ORDU); 1 ea 42 mt ladder fire • 0GDA1 0STANBUL GAZ DA.ITIM SANAY0 VE T0CARET 3 Approx. cost : 485.659,44 TL fighting vehicle and 1 ea single cab fire fighting vehicle A.1.: 400 m /H regulator procurement. Total price : 48.744.800 Euro Contract cost : 157.000 Euro procurement Tender reg.no : 2013/31475 Winner : ELSEL A. . Winner : KALE KALIP MAK NA 1 • ANKARA-ALTINDA. MUNICIPALITY:5 ea 15+1,5 m3 Tender reg.no : 2013/34228 0 450 ea G25 naturalgas meters Proposal : 273.900,00 Euro hydraulic compress. garbage trucks and 1 ea open case Winner : ANKARA ÇEL0K A.1. 100 ea G40 Rotary metersDN50 Ansi 150 Approx. cost : 1.002.908,53 TL double cab small trucks procurement. Approx. cost : 2.171.000,00 TL 140 ea G65 Rotary metersDN50 Ansi 150 Tender reg.no : 2013/39722 Proposal : 1.986.000,00 TL 125 ea G100 Rotary metersDN80 Ansi 150 • ORMAN ADMINISTRATION: 9 ea 4x4 fire extinguishing Winner : BA1ER OTOMOT0V 40 ea G160 Rotary metersDN80 Ansi 150 • truck vehicle (water sprinkler) Contract cost : 785.500 TL+KDV TÜLOMSA1 SATIN ALMA 0KMAL DA0RES0 25 ea G250 Rotary metersDN100 Ansi 150 Tender reg.no : 2013/21007 BA1KANLI.I; 2 items hydraulic platform sets Approx. cost : 1.701.118,10 Winner : VOLKAN TFA YE SAN A. . • ANTALYA DÖ1EMEALTI MUNICIPALITY; 4 Ea 6 X 2 Tender reg.no : 2013/46820 0 0 1 Contract cost : 430.910 Euro Proposal : 2.110.500,00 TL+KDV Chassis Dump Trucks procurement Winner : ÖZ0SMAK 0ST0F MAK0NA 1T0. Winner : MANAS ENERJ A. . Approx. cost : 2.592.000,00 TL+KDV 0 1 Tender reg.no : 2013/42405 Approx. cost : 250.000.00 TL 200 ea G10 Naturalgas meters Winner : MEÇ0KO.ULLARI OTO LTD. Proposal : 181.500.00 TL 475 ea G16 Naturalgas meters • BURSA BUSK0 ADMINISTRATION: 50 .000 m. steel Approx. cost : 574.944,67 TL 2 ea G400 Türbine m. meters DN150 Ansi 150 • pipes procurement. Proposal : 542.372,88 TL 0STANBUL METROPOLITAN MUNICIPALITY; 50 ea Tender reg.no : 2013/25896 Approx. cost : 456.797,10 TL water supply fire fighting vehicle Contract cost : 280.632,83 TL Winner : ERC0YAS ÇEL0K BORU SAN. • STANBUL FAT H MUNICIPALITY: 1 ea combined Tender reg.no : 2012/112085 Winner : KALE KALIP MAK. 0 0 Proposal : 4.092.950 TL channel cleaning vehicle procurement Winner : UMTA1 A.1, HASES OTO. A.1, 140.000 ea G4 naturalgas meters Approx. cost : 8.499.960 TL Tender reg.no : 2013/26986 Z0MAG A.1, ARMAKSA 1T0. Approx. cost : 7.663.834,40 Winner : GÜNER MAK NE A. . Approx. cost : 17.321.183,88 TL Contract cost : 6.540.718,80 0 0 1 • GAZ0ANTEP GASK0 ADMINISTRATION 1 ea water Approx. cost : 487.220,00 TL Proposal : 6.997.500,00 Euro Winner : METR KS GAZ T C. LTD supply vehicle procurement 0 0 Proposal : 405.600,00 Contracted item : 1.650 ea G6 naturalgas meters • Tender reg.no : 2013/29963 0ZM0R METROPOLITAN MUNICIPALITY; Various Approx. cost : 313.625,81 TL Winner : BAKSAN A.1. • KARABÜK L ÖZEL DARES Rescuer equipment Mercedes Benz Actros trailers procurement Contract cost : 204.154,50 TL 0 0 0 Approx. cost : 443.333,33 TL procurement Tender reg.no : 2013/78733

Contract cost : 412.500,00 TL Tender reg.no : 2013/32366 Winner : DMO ADMINISTRATION • BURSA- MUSTAFAKEMALPA A MUNICIPALITY; 1.000 1 Winner : Z MAK LTD. Approx. cost : 3.796.452.00 TL • ea pre payment electr.card water meters and subscriber 0 KIRKA.AÇ MUNICIPALITY : 2 ea 4x2 chassis 11+1m3 Approx. cost : 122.012,50 TL Proposal : 3.796.452.00 TL management sys. procurement cap. hydraulic compress. garbage trucks (HSÇK) Proposal : 99.500,00 TL Tender reg.no : 2013/36757 • Tender reg.no : 2013/31276 0ZM0R METROPOLITAN MUNICIPALITY; Various Winner : EFE ENDÜSTR A. . Winner : METLAB METROLOJ0 LTD. Mercedes brand garbage trucks, crane trucks fuloil 0 1 • TÜRK0YE DEM0RYOLU MAK0NALARI SANAY00 Approx. cost : 247.462,67 TL Approx. cost : 187.000,00 TL tankers, gantry boom procurement (TÜDEMSA1); Wheel sets and Wheel bodies Contract cost : 247.360,00 TL Contract cost : 125.000,00 TL Tender reg.no : 2013/78737 procurement Winner : DMO ADMINISTRATION Tender reg.no : 2013/18673 • TÜLOMSA TÜRK YE LOKOMOT F VE MOTOR • NATIONAL DEFENSE MINISTRY (MSB) -ANKARA Approx. cost : 1.620.590,00 TL 1 0 0 Winner : TAIYUAN HEAVY INDUSTRY/ SANAY : Railway switcher procurement TEDAR K BÖLGE BA KANLI I: 18 ea 5 ton Building Proposal : 1.620.590,00 TL 0 0 1 . EPILSON A. . Tender reg.no : 2013/31363 type fire extinguishing truck vehicle procurement 1 Approx. cost : 4.414.079.25 TL Winner : MAK- N MAK. A. . Tender reg.no : 2012/173820 • ZM R METROPOLITAN MUNICIPALITY -DESTEK 0 1 Proposal : 1.214.100.00 USD 0 0 Approx. cost : 540.000,00 TL Winner : KATMERC LER A. . H ZMETLER DA RE; Mercedes Axor Brand 13.000 liter 0 1 0 0 0 Contract cost : 477.000,00 TL Contract cost : 9.234.000 TL+KDV cap. water tankers , Mercedes Axor Brand 8.000 Liter cap. • TPAO GENEL MÜDÜRLMÜ Ü MAK NE KMAL VE . 0 0 su tankers, Mercedes Axor brand cap. Water sprinkler, N AAT DA RE BA KANLI I; Various fire fighting • KARAMAN MUNICIPALITY 160 ton/hr cap. Batch type • STATE HYDRAULIC WORKS-DS ADMINISTRATION; 0 1 0 1 . Mercedes Atego brand closed case mobile maintenance 0 vehicle procurement asphalt plant 215 ea trucks (rock type dump trucks, 6X4) procurement. truck procurement Tender reg.no : 2012/134126 Tender reg.no : 2013/23417 Tender reg.no : 2013/23594 Tender reg.no : 2013/79858 Winner : Z MAG ARAÇ VE MAK NA A. Approx. cost : 1.833.333,33 Winner : OTOKOÇ A. . 0 0 1 Winner : DMO GENEL MÜD. 1 Approx. cost : 550.000,00 TL Contract cost : 1.177.500,00 Approx. cost : 45.569.895,00 TL Approx. cost : 1.252.036,00 TL Proposal : 406.000,00 TL Winner : AYDIN 0N1. MAK. LTD Contract cost : 50.482.000,00 TL Proposal :1.252.036,00 TL               M  O    M  O M 178O • STATE HYDRAULIC WORKS-DS0 ADMINISTRATION; • TRABZON MUNICIPALITY: 1 ea channel vehicle body 70 ea trailers building equipment procurement Tender reg.no : 2013/21968 Tender reg.no : 2013/41882 Winner : MAN A.1. Winner : KARBA OTOMOT0V LTD Approx. cost : 360.000 TL/ea Approx. cost : 235.666,67 TL Contract cost : 149.344 Euro/ea Proposal : 230.000,00 TL

• DS0 ADMINISTRATION; 135 ea crawler type Hydraulic • AMASYA MUNICIPALITY - FEN 01LER0 MÜDÜRLÜ.Ü; excavator (BACK-HOE) procurement Crawler mini compactor vehicle procurement Tender reg.no : 2013/22742 Tender reg.no : 2013/59686 Approx. cost : 54.252.045 TL Winner : WACKER NEUSON MAK0NA Winner : H0DROMEK A.1. Approx. cost : 132.233.33 TL Proposal : 24.151.500 $ Proposal : 120.000.00 TL Model : HMK300 DC • BEYPAZARI MUNICIPALITY- FEN 01LER0 • DS0 ADMINISTRATION; 3 groups total 130 ea crawler MÜDÜRLÜ.Ü; 1 ea Dump Trucks mal. tractors (Dozer)-(50 ea ripered) Tender reg.no : 2013/40808 Tender reg.no : 2013/35454 Winner : KARBA OTOMOT0V Approx. cost unit : 1.116.923 TL Approx. cost : 135.867.00 TL Approx. Cost total : 145.990.990,00 TL Proposal : 135.000.00 TL Winner : LIEBHERR Unit price : 374.940 Euro • FATSA MUNICIPALITY (ORDU); 1 ea 42 mt ladder fire Total price : 48.744.800 Euro fighting vehicle and 1 ea single cab fire fighting vehicle procurement • ANKARA-ALTINDA. MUNICIPALITY:5 ea 15+1,5 m3 Tender reg.no : 2013/34228 hydraulic compress. garbage trucks and 1 ea open case Winner : ANKARA ÇEL0K A.1. double cab small trucks procurement. Approx. cost : 2.171.000,00 TL Tender reg.no : 2013/39722 Proposal : 1.986.000,00 TL Winner : BA1ER OTOMOT0V Contract cost : 785.500 TL+KDV • TÜLOMSA1 SATIN ALMA 0KMAL DA0RES0 BA1KANLI.I; 2 items hydraulic platform sets • ANTALYA DÖ1EMEALTI MUNICIPALITY; 4 Ea 6 X 2 Tender reg.no : 2013/46820 Chassis Dump Trucks procurement Winner : ÖZ0SMAK 0ST0F MAK0NA 1T0. Tender reg.no : 2013/42405 Approx. cost : 250.000.00 TL Winner : MEÇ0KO.ULLARI OTO LTD. Proposal : 181.500.00 TL Approx. cost : 574.944,67 TL • Proposal : 542.372,88 TL 0STANBUL METROPOLITAN MUNICIPALITY; 50 ea water supply fire fighting vehicle Tender reg.no : 2012/112085 • 0STANBUL FAT0H MUNICIPALITY: 1 ea combined channel cleaning vehicle procurement Winner : UMTA1 A.1, HASES OTO. A.1, Tender reg.no : 2013/26986 Z0MAG A.1, ARMAKSA 1T0. Approx. cost : 17.321.183,88 TL Winner : GÜNER0 MAK0NE A.1. Approx. cost : 487.220,00 TL Proposal : 6.997.500,00 Euro Proposal : 405.600,00 • 0ZM0R METROPOLITAN MUNICIPALITY; Various Mercedes Benz Actros trailers procurement • KARABÜK 0L ÖZEL 0DARES0 Rescuer equipment procurement Tender reg.no : 2013/78733 Tender reg.no : 2013/32366 Winner : DMO ADMINISTRATION Approx. cost : 3.796.452.00 TL Winner : Z0MAK LTD. Approx. cost : 122.012,50 TL Proposal : 3.796.452.00 TL Proposal : 99.500,00 TL • 0ZM0R METROPOLITAN MUNICIPALITY; Various Mercedes brand garbage trucks, crane trucks fuloil • TÜRK0YE DEM0RYOLU MAK0NALARI SANAY00 tankers, gantry boom procurement (TÜDEMSA1); Wheel sets and Wheel bodies Tender reg.no : 2013/78737 procurement Winner : DMO ADMINISTRATION Tender reg.no : 2013/18673 Approx. cost : 1.620.590,00 TL Winner : TAIYUAN HEAVY INDUSTRY/ Proposal : 1.620.590,00 TL EPILSON A. . 1 Approx. cost : 4.414.079.25 TL • ZM R METROPOLITAN MUNICIPALITY -DESTEK Proposal : 1.214.100.00 USD 0 0 H ZMETLER DA RE; Mercedes Axor Brand 13.000 liter 0 0 0 cap. water tankers , Mercedes Axor Brand 8.000 Liter cap. • TPAO GENEL MÜDÜRLMÜ Ü MAK NE KMAL VE . 0 0 su tankers, Mercedes Axor brand cap. Water sprinkler, N AAT DA RE BA KANLI I; Various fire fighting 0 1 0 1 . Mercedes Atego brand closed case mobile maintenance vehicle procurement truck procurement Tender reg.no : 2012/134126 Tender reg.no : 2013/79858 Winner : Z MAG ARAÇ VE MAK NA A. 0 0 1 Winner : DMO GENEL MÜD. Approx. cost : 550.000,00 TL Approx. cost : 1.252.036,00 TL Proposal : 406.000,00 TL Proposal :1.252.036,00 TL         M  O    M 179O • • • 0ZM0R METROPOLITAN MUNICIPALITY; Various • AMASRA MUNICIPALITY - DESTEK H0ZMETLER0 MAK0NA VE K0MYA ENDÜSTR0S0 KURUMU SAKARYA-SASK0 ADMINISTRATION: Valves vehicles. MÜDÜRLÜ.Ü; 1 ea fire fighting vehicle procurement ADMINISTRATION; Dnamite filling machine procurement procurement Tender reg.no : 2013/78730 Tender reg.no : 2013/54715 Tender reg.no : 2012/85575 Tender reg.no : 2013/52867 Winner : DMO ADMINISTRATION Winner : ANKARA ÇEL0K A.1. Winner : B0AZZ0 SA Winner : SET END. 1T0. Approx. cost : 4.485.283,00 TL Approx. cost : 425.250,00 TL Proposal : 388.100,00 Chf Proposal : 877.500,00 TL Proposal : 4.485.283,00 TL Proposal : 415.000,00 TL Approx. cost : 551.600,00 TL Approx. cost : 1.129.531,67TL

• • • ANTALYA WATER AND SEWERAGE • T.C.D.D 2.BÖLGE MALZEME MÜDÜRLÜ.Ü; 50.000 ea KAMAN MUNICIPALITY (KIR1EH0R) Wheeled constr. SAKARYA SASK0 ADMINISTRATION ;: Butterfly valves ADMINISTRATION (ASAT); Asat 2G3-trucks telescopic w-14 type Elastic binded pre tensile -drawn B-70 concrete machines, Hydraulic crusher attachments needle valves procurement boom multi purpose constr. machine procurement sleepers Procurement for 60 E1(width 13674-1(2003) Tender reg.no : 2012/40933 Tender reg.no : 2013/52867 Tender reg.no : 2013/26827 rails Winner : ÇUKUROVA Z0RAAT A.1 Winner : SEMSAN POMPA 1T0. Winner : LAP0S MAK0NE 1T0 Tender reg.no : 2013/25777 Approx. cost : 328.085,00 TL Proposal : 108.900,00 TL Approx. cost : 1.400.178,00 TL Winner : 0NKO A.1+S0VAS TRAVERS Proposal : 269.100,00 TL Approx. cost : 129.125,00 TL Proposal : 532.000,00 USD Approx. cost : 4.250.000,00 TL Proposal : 3.790.000,00 TL • MTA ADMINISTRATION; Various casings (filtered, • ÇANAKKALE MUNICIPALITY - WATER AND • KOCAEL0 METROPOLITAN MUNICIPALITY – 0SU closed) SEWERAGE ADMIN. Combined channel opening ADMINISTRATION ; long reach crawler excavators • HAVAALANI 01LETME VE HAVACILIK ENDÜSTR0LER0 Tender reg.no : 2013/29629 cleaning vehicle Tender reg.no : 2013/42876 A. (HEA ); Trailer type combined snow control vehicle Winner : SHANDONG KERU0 PETROLEUM Tender reg.no : 2013/59297 Winner : H DROMEK-H DROL K A. 1 1 0 0 0 1 Tender reg.no : 2013/43571 EQU0PMENT CO. LTD Winner : ESMAN MAK. A.1 Approx. cost : 410.169,67 TL Winner : OVERAASEN AS Proposal : 590.850,00 USD Proposal : 640.000,00 TL Proposal : 131.750,00 EURO Approx. cost :1.142.354.00 TL Approx. cost : 4.222.000,00 TL Approx. cost : 667.500,00 TL

Proposal : 460.000,00 Euro • TRABZON MUNICIPALITY; Various crushers and sievers • MTA ADMINISTRATION; Various casings (filtered, • 0ZM0T MUNICIPALITY ; 1 ea road sweeper vehicle systems • HAVAALANI LETME VE HAVACILIK ENDÜSTR LER closed) Tender reg.no : 2013/70246 Tender reg.no : 2013/36290 01 0 0 A. (HEA ); 2 ea ompact shovelling – and De- cing Tender reg.no : 2013/29629 Winner : U.UREL 0N1. LTD. Winner : P MAK NA LTD. 1 1 0 0 0 Vehicle Winner : SHANDONG KERU0 PETROLEUM Approx. cost : 523.333,33 TL Approx. cost : 415.000,00 TL Tender reg.no : 2013/43603 EQU0PMENT CO. LTD Proposal : 465.000,00 TL Proposal : 367.000,00 TL Winner : MAX HOLDER GMBH Proposal : 493.200,00 USD

Approx. cost : 695.850,00 TL Approx. cost : 4.222.000,00 TL • VAN MUNICIPALITY - WATER AND SEWERAGE • T.C.D.D 2.BÖLGE MALZEME MÜDÜRLÜ Ü; 4.000 ton . Proposal : 278.000,00 EURO ADMIN.; Drinking water Fittings 60 E 1 rails procurement • MTA ADMINISTRATION; Various casings (filtered, Tender reg.no : 2013/62311 Tender reg.no : 2013/29048 • YAYLABA.I MUNICIPALITY (AFYONKARAH0SAR); 1 closed) Winner : ÖZBAL 0N1. 1T0. Winner : KARDEM0R ÇEL0K A.1 ea full equipped 18 mt ladder fire fighting vehicle and Tender reg.no : 2013/29629 Approx. cost : 619.918,30 TL Approx. cost : 6.440.000,00 TL Winner : SHANDONG KERU0 PETROLEUM Proposal : 477.196,00 TL Proposal : 6.594.000,00 TL equipment EQU0PMENT CO. LTD Tender reg.no : 2013/42314 Winner : VOLKAN YANGIN A. Proposal : 500.340,00 USD • SAKARYA 0L SA.LIK MÜDÜRLÜ.Ü: 4 ea 4x2 turbo • STATE RAILWAYS ADMINISTRATION; 1 ea high speed 1 Approx. cost : 275.333,33 TL Approx. cost : 4.222.000,00 TL diesel panelvan ambulance train set with 5% spares Proposal : 238.400,00 TL Bid method : Open Tender reg.no : 2012/132159 • BA10SKELE MUNICIPALITY (KOCAEL0): Riperli R0per Tender reg.no : 2013/48304 Winner : SIEMENS A.G. • S00RT MUNICIPALITY; Mercedes Benz 3340 Axor chassis graders, Crawler Excavator procurement Bid closing date : 14.05.2013 Approx. cost : 69.899.760,00 TL Tender reg.no : 2013/28054 Winner : EMS AMBULANS LTD. Proposal : 39.999.996,00 Euro Trucks 14 m3 of tub type Winner : BORUSAN MAK. A.1 Approx. cost : 555.899,72 TL Tender reg.no : 2013/68073 Winner : KARBA OTOMOT V Proposal : 1.388.790,00 TL Proposal : 530.000,00 TL • GAZ0ANTEP METROPOLITAN MUNICIPALITY; 28 ea 0 Approx. cost : 114.666,66 TL Approx. cost : 1.417.433,33 TL Contract date : 07.06.2013 tramway procurement Tender reg.no : 2013/54081 Proposal : 106.000,00 TL • BATMAN-HASANKEYF MUNICIPALITY YAZI LER • BURSA METROPOLITAN MUNICIPALITY; 1 ea minibus Winner : GAZ BEL H ZMET MÜ . A. . 01 0 0 0 1 1 • MÜDÜRLÜ Ü 1 ea fire fighting vehicle and 1 ea (13+1 passenger cap. ) and 4 ea light commercial vehicle Approx. cost : 8.960.000 Euro KONYA METROPOLITAN MUNICIPALITY; Vacuum road . combined channel cleaning vehicle procurement (closed case small trucks)(total 5 ea ) procurement Proposal : 7.700.000 Euro sweeper Tender reg.no : 2013/45869 Tender reg.no : 2013/30594 Tender reg.no : 2013/54988 Winner : KARBA OTOMOT0V LTD Winner : OTOKOÇ OTOMOT0V A.1 • TÜRK0YE KÖMÜR 01LETMELER0 KURUMU (TK0) - Winner : U.UREL 0N1. 1T0. Proposal : 497.000,00 TL Approx. cost : 175.783,33 TL SATINALMA DA0RE BA1KANLI.I: Various constr. Approx. cost : 327.180,00TL Machine tires. Proposal : 290.000,00 TL Approx. cost : 542.333,00 TL Proposal : 175.000,00 TL Approx. cost : 10.192.884,95 TL • • Winner : BR0SA T0C.A. 1. • 0STANBUL ASPHALT FABR0KALARI SANAY0 VE SAL0HL0 MUNICIPALITY (MAN0SA): For Cleaning BURSA METROPOLITAN MUNICIPALITY; 2 ea patient Contract cost : 5.950.132,00 USD T0CARET A.1; Aydınlı Asphalt Factory rewuires 4.500 ton purposes, 2 ea 4x2 chassis 8+1 M3 hydraulic compress. transport ambulance procurement Pen Asphalt (50/70) materials excluding transport garbage vehicle procurement Tender reg.no : 2013/30027 Approx. cost : 133.147,50 TL Tender reg.no : 2013/76162 Tender reg.no : 2013/58678 Winner : AMBULANS 0LK YARDIM A.1 Winner : YA AR OTO LAST K A. . 1 0 1 Winner : TPAO A.1. Winner : EGEM 0TFA0YE ARAÇ A.1 Approx. cost : 230.000,00 TL Contract cost : 110.400,00 TL Approx. cost : 4.972.500,00 TL Proposal : 210.000,00 TL Proposal : 186.000,00 TL Approx. cost : 260.480,00 TL Approx. cost : 201.647,08 TL Proposal : 5.125.500,00 TL • TPAO MAK NE KMAL VE DA RE BA KANLI I; 1211 Winner : MGM DI T C. LTD 0 0 0 1 . 1 0 • • BURSA-GÜRSU MUNICIPALITY: 6 m3 cap. Mech. son 33719/1 Seamless Steel Range -3 Casıng (seamless Contract cost : 84.000 Euro 0STANBUL METROPOLITAN MUNICIPALITY Propelled vacuum double side absorption type road non welded, tensile steel drill casings) procurement SATINALMA MÜDÜRLÜ.Ü: 50 ea winter snow control sweeper equipment procurement Tender reg.no : 2011/103803 • ANTALYA L ÖZEL DARES 3 ea ambulances vehicle 0 0 0 Tender reg.no : 2013/67179 Winner :TIANJIN P PE NT. ECONOMIC Tender reg.no : 2012/122564 Tender reg.no : 2013/55985 0 0 Winner : ÇEKSAN PAZ. T TRADING CORPORATION (CH NA) Winner : KURTARAN AMBULANS LTD. Winner : MENGERLER A.1. 1 0 0 Proposal : 108.500,00 TL Approx. cost : 414.022,00 TL Proposal : 5.199.480 Euro Approx. cost : 8.343.650,00 TL Proposal : 410.000,00 TL Approx. cost : 5.326.000 Euro Approx. cost : 111.666,66 TL Proposal : 5.805.264,00 USD               M  O    M  O M 180O • MAK0NA VE K0MYA ENDÜSTR0S0 KURUMU • SAKARYA-SASK0 ADMINISTRATION: Valves ADMINISTRATION; Dnamite filling machine procurement procurement Tender reg.no : 2012/85575 Tender reg.no : 2013/52867 Winner : B0AZZ0 SA Winner : SET END. 1T0. Proposal : 388.100,00 Chf Proposal : 877.500,00 TL Approx. cost : 551.600,00 TL Approx. cost : 1.129.531,67TL

• KAMAN MUNICIPALITY (KIR1EH0R) Wheeled constr. • SAKARYA SASK0 ADMINISTRATION ;: Butterfly valves machines, Hydraulic crusher attachments needle valves procurement Tender reg.no : 2012/40933 Tender reg.no : 2013/52867 Winner : ÇUKUROVA Z0RAAT A.1 Winner : SEMSAN POMPA 1T0. Approx. cost : 328.085,00 TL Proposal : 108.900,00 TL Proposal : 269.100,00 TL Approx. cost : 129.125,00 TL

• MTA ADMINISTRATION; Various casings (filtered, • ÇANAKKALE MUNICIPALITY - WATER AND closed) SEWERAGE ADMIN. Combined channel opening Tender reg.no : 2013/29629 cleaning vehicle Winner : SHANDONG KERU0 PETROLEUM Tender reg.no : 2013/59297 EQU0PMENT CO. LTD Winner : ESMAN MAK. A.1 Proposal : 590.850,00 USD Proposal : 640.000,00 TL Approx. cost : 4.222.000,00 TL Approx. cost : 667.500,00 TL

• MTA ADMINISTRATION; Various casings (filtered, • 0ZM0T MUNICIPALITY ; 1 ea road sweeper vehicle closed) Tender reg.no : 2013/70246 Tender reg.no : 2013/29629 Winner : U.UREL 0N1. LTD. Winner : SHANDONG KERU0 PETROLEUM Approx. cost : 523.333,33 TL EQU0PMENT CO. LTD Proposal : 465.000,00 TL Proposal : 493.200,00 USD Approx. cost : 4.222.000,00 TL • VAN MUNICIPALITY - WATER AND SEWERAGE ADMIN.; Drinking water Fittings • MTA ADMINISTRATION; Various casings (filtered, Tender reg.no : 2013/62311 closed) Winner : ÖZBAL 0N1. 1T0. Tender reg.no : 2013/29629 Approx. cost : 619.918,30 TL Winner : SHANDONG KERU0 PETROLEUM Proposal : 477.196,00 TL EQU0PMENT CO. LTD Proposal : 500.340,00 USD • SAKARYA 0L SA.LIK MÜDÜRLÜ.Ü: 4 ea 4x2 turbo Approx. cost : 4.222.000,00 TL diesel panelvan ambulance Bid method : Open • BA10SKELE MUNICIPALITY (KOCAEL0): Riperli R0per Tender reg.no : 2013/48304 graders, Crawler Excavator procurement Bid closing date : 14.05.2013 Tender reg.no : 2013/28054 Winner : EMS AMBULANS LTD. Winner : BORUSAN MAK. A.1 Approx. cost : 555.899,72 TL Proposal : 1.388.790,00 TL Proposal : 530.000,00 TL Approx. cost : 1.417.433,33 TL Contract date : 07.06.2013

• BATMAN-HASANKEYF MUNICIPALITY YAZI 01LER0 • BURSA METROPOLITAN MUNICIPALITY; 1 ea minibus MÜDÜRLÜ.Ü 1 ea fire fighting vehicle and 1 ea (13+1 passenger cap. ) and 4 ea light commercial vehicle combined channel cleaning vehicle procurement (closed case small trucks)(total 5 ea ) procurement Tender reg.no : 2013/45869 Tender reg.no : 2013/30594 Winner : KARBA OTOMOT0V LTD Winner : OTOKOÇ OTOMOT0V A.1 Proposal : 497.000,00 TL Approx. cost : 175.783,33 TL Approx. cost : 542.333,00 TL Proposal : 175.000,00 TL

• SAL0HL0 MUNICIPALITY (MAN0SA): For Cleaning • BURSA METROPOLITAN MUNICIPALITY; 2 ea patient purposes, 2 ea 4x2 chassis 8+1 M3 hydraulic compress. transport ambulance procurement garbage vehicle procurement Tender reg.no : 2013/30027 Tender reg.no : 2013/58678 Winner : AMBULANS 0LK YARDIM A.1 Winner : EGEM 0TFA0YE ARAÇ A.1 Approx. cost : 230.000,00 TL Proposal : 210.000,00 TL Proposal : 186.000,00 TL Approx. cost : 260.480,00 TL • TPAO MAK0NE 0KMAL VE DA0RE BA1KANLI.I; 1211 • BURSA-GÜRSU MUNICIPALITY: 6 m3 cap. Mech. son 33719/1 Seamless Steel Range -3 Casıng (seamless Propelled vacuum double side absorption type road non welded, tensile steel drill casings) procurement sweeper equipment procurement Tender reg.no : 2011/103803 Tender reg.no : 2013/67179 Winner :TIANJIN P0PE 0NT. ECONOMIC Winner : ÇEKSAN PAZ. 1T0 TRADING CORPORATION (CH0NA) Proposal : 108.500,00 TL Approx. cost : 8.343.650,00 TL Approx. cost : 111.666,66 TL Proposal : 5.805.264,00 USD

        M  O    M 181O • TPAO ADMINISTRATION; 85-13son-48244 12 1/4 ‘’Rock • AYDINCIK MUNICIPALITY (YOZGAT); 1 ea fire fighting Bıt procurement vehicle Tender reg.no : 2013/87984 Tender reg.no : 2013/64203 Winner :DOWELL SCHLUMBERGER Winner : KATMERC0LER EK0PMAN A.1 MIDDLE EAST ANKARA TÜRK0YE 1B. Approx. cost : 207.170,00 TL Approx. cost : 130.000,00 TL Proposal : 190.000,00 TL Proposal : 132.868,06 TL • ED0RNE MUNICIPALITY; 1 ea excavator-loader backhoe • GAZ0ANTEP-GASK0 ADMINISTRATION; 1 ea channel loader bucket imaging vehicle Tender reg.no : 2013/76176 Tender reg.no : 2013/59302 Winner : SANKO MAK. A.1 Approx. cost : 145.948,13 TL Winner : ENERMAK ENERJ0 LTD. Approx. cost : 320.483,75 TL Proposal : 125.900,00 TL Proposal : 286.000,00 TL • ANKARA 0L ÖZEL 0DARES0; Alcohol testing devices • ZM R ZSU ADMINISTRATION: 6 ea maıntenance procurement 0 0 0 Tender reg.no : 2013/18417 vehicle procurement Winner : ARMAS ELEKTRON K LTD. Tender reg.no : 2013/18430 0 Approx. cost : 1.236.146,86 TL Winner : VOLKAN TFA YE 0 0 Proposal : 989.960,00 TL Approx. cost : 1.339.999,98 TL

Proposal : 1.108.800,00 TL • EYÜP MUNICIPALITY- ULA1IM H0ZMETLER0 MÜDÜRLÜ Ü; 1 ea combined channel cleaning vehicle • . TPAO MAK0NE 0KMAL VE DA0RE BA1KANLI.I; 1211 Tender reg.no : 2013/76318 son 33719/1 Seamless Steel Range-3 Casıng(Seamless Winner : GÜNER0 MAK. A.1 no welded, tensile steel drill casings) Approx. cost : 537.011,67 TL Tender reg.no : 2011/103803 Proposal : 467.948,00 TL Winner : MERTEX UK LTD-0NG0LTERE Approx. cost : 23.504.500,00 TL • BALIKES0R MUNICIPALITY ; 1 ea bus . Proposal : 13.818.338,10 USD Tender reg.no : 2013/91290 Winner : KARAHALLILAR (TEMSA) • TPAO MAK0NE 0KMAL VE DA0RE BA1KANLI.I; 1211 Approx. cost : 277.978,28 TL son 33719/1 Seamless Steel Range-3 Casıng(Seamless Proposal : 237.500,00 TL no welded , tensile steel drill casings) Tender reg.no : 2011/103803 • ÜNYE MUNICIPALITY; 1 ea hydraulic compress. Winner : WUXI SEAMLESS OIL P0PE CO. garbage truck procurement LTD. (Ç0N) Tender reg.no : 2013/68583 Approx. cost : 16.851.850,00 TL Winner : EFE ENDÜSTR0 A.1 Proposal : 9.814.700,00 USD Approx. cost : 386.190,00 TL Proposal : 383.400,00 TL • 0STANBUL METROPOLITAN MUNICIPALITY; 12 ea 30 m. conventional hydraulic ladder fire fighting vehicle • TÜRK0YE DEM0RYOLU MAK0NALARI SANAY00 A.1 procurement (TÜDEMSA1); Stainless steel spherical valves 2P Tender reg.no : 2013/26880 procurement Winner : ANKARA ÇEL0K A.1 Tender reg.no : 2013/59924 Approx. cost : 19.681.146,00 TL Winner : SERDARO.LU ENERJ0 1T0. Proposal: 7.986.000,00 EUR Approx. cost : 740.700,00 TL Proposal : 489.000,00 TL • STANBUL METROPOLITAN MUNICIPALITY; 2 ea 60 m. 0 • ladder fire fighting vehicle procurement ÜNYE MUNICIPALITY;1 ea hydraulic compress. garbage Tender reg.no : 2013/25591 truck (min. 11 +1 M3) procurement Tender reg.no : 2013/79879 Winner : ANKARA ÇEL0K A.1 Winner : EFE ENDÜSTR A. Approx. cost : 4.525.227,00 TL 0 1 Approx. cost : 128.730,00 TL Proposal : 1.906.800,00 EUR Proposal : 127.800,00 TL

• STANBUL METROPOLITAN MUNICIPALITY; tunnel 0 • EÜA -YEN KÖY TERM K SANTRAL LETME ventilation fire brigade Vehicle procurement 1 0 0 0 01 MÜDÜRLÜ Ü; Fire fighting equipment procurement (fire Tender reg.no : 2013/28353 . fighting vehicle bodybuilding modification) Winner : UMTA1 ULUSL. MAK. A.1 Tender reg.no : 2013/45107 Approx. cost : 1.357.568,10 TL Winner : VOLKAN 0TFA0YE LTD. Proposal : 579.000,00 EUR Approx. cost : 106.000,00 TL Proposal : 71.700,00 TL • G0RESUN ÖZEL 0DARES0 DESTEK H0ZMETLER0 MÜDÜRLÜ.Ü; Explosives (dynamite, e. capsules,) mal • SAMSUN 0L SA.LIK MÜDÜRLÜ.Ü; 1 ea 4x2 turbo dizel procurement panel van tipi ambulans procurement Tender reg.no : 2013/31016 Tender reg.no : 2013/72595 Winner : AKBA. AV MALZ. 1T0. Winner : EMS AMBULANS LTD. Approx. cost : 45.356,25 TL Approx. cost : 135.000,00 TL Proposal : 43.300,00 TL Proposal : 111.000,00 TL         M  O    M 182O • YÜNTA1 AKARYAKIT GIDA 0ÇECEK TUR0ZM MERMER • BURSA METROPOLITAN MUNICIPALITY - DESTEK ELEKTR0K NAKL0YAT A.1; 1 ea repair finisher H0ZMETLER0 BA1KANLI.I; 1 ea grader procurement Tender reg.no : 2013/98887 Tender reg.no : 2013/50438 Winner : WIRTGEN ANKARA MAK. Winner : BORUSAN MAK. A.1 Approx. cost : 266.666,67 TL Approx. cost : 658.420,00 TL Proposal : 250.000,00 TL Proposal : 593.000,00 TL

• • INTERIOR MINISTRY;12 ea emergency jet boats FAT0H MUNICIPALITY; Patient transport vehicle Tender reg.no : 2013/70612 procurement Tender reg.no : 2013/52822 Winner : BURLA MAK0NA A.1 Approx. cost : 538.526,64 TL Winner : AMBULANS 0LK YARDIM A.1 Approx. cost : 122.066,67 TL Proposal : 228.000,00 USD Proposal : 107.000,00 TL

• ZM R WATER AND SEWERAGE ADMIN. ( ZSU); 1 ea 0 0 0 • KONYA-KOSK ADMINISTRATION; Boom mobile crane garbage truck procurement 0 Tender reg.no : 2013/54296 Tender reg.no : 2013/63345 Winner : H0DROYAVUZ MEKATRON0K Bid closing date : 19.06.2013 Approx. cost : 387.288,14 TL Winner : KATMERC0LER A.1 Proposal : 346.400,00 TL Approx. cost :162.408,78 TL Proposal : 147.740,00 TL • ED0RNE 0L ÖZEL 0DARES0 DESTEK H0ZMETLER0 MÜDÜRLÜ.Ü; Road opening machine • LAPSEK0 MUNICIPALITY; 1 ea 2013 model chassis Tender reg.no : 2013/77966 trucks, refrigerated meat transport vehicle. Winner : GAMA T0CARET A.1 Tender reg.no : 2013/107831 Approx. cost : 597.080,00 TL Winner : EFEMMAK LTD. Proposal : 644.000,00 TL Approx. cost : 129.000,00 TL Proposal : 122.150,00 TL • GAZ0ANTEP METROPOLITAN MUNICIPALITY; 1 ea multi purpose fire fighting rescuer vehicle. • KONYA SELÇUKLU MUNICIPALITY; 6X2 chassis trucks Tender reg.no : 2013/85999 procurement, bodybuilding equipment demounting, Winner : BAKSAN A.1. assembly, Approx. cost : 806.333,33 TL Tender reg.no : 2013/49726 Proposal : 788.800,00 TL Winner : EFE END. A.1 Approx. cost : 220.000,00 TL • BURSA METROPOLITAN MUNICIPALITY; 2 ea constr. Proposal : 195.230,00 TL machine procurement Tender reg.no : 2013/50455 • KÜTAHYA MUNICIPALITY; Ford Cargo 1832 cesspool Winner : BORUSAN A.1 emptier and high pressure water channel cleaning Approx. cost : 233.582,32 TL equipment Proposal : 250.000,00 TL

Tender reg.no : 2013/72385 • BAYBURT MUNICIPALITY; 1 ea 28 mt Hydraulic Ladder Winner : GÜNER MAK NA A. 0 0 1 fire brigade vehicle,1 ea double cab. multi purpose fire Approx. cost : 107.833,33 TL fighting vehicle Proposal : 99.975,00 TL Tender reg.no : 2013/83237 Contract date : 29.07.2013 Winner : KATMERC0LER A.1. Approx. cost : 710.933 TL • KONYA M.MUNICIP.- DESTEK H0ZMETLER Proposal : 592.000 TL MÜDÜRLÜ.Ü; 1 ea compact hydraulic street channel opening constr. machine • B0DAG0Ç MUNICIPALITY 0TFA0YE MÜDÜRLÜ.Ü Tender reg.no : 2013/76481 (BALIKES0R); 1 ea portable ladder type fire fighting Winner : GÜNKAR LTD. vehicle Approx. cost : 210.000,00 TL Tender reg.no : 2013/79559 Proposal : 201.000,00 TL Winner : KATMERC0LER A.1 Approx. cost : 208.333,33 TL • ANKARA-BELKO LTD. 1T0.; Mass transport service on Proposal : 163.200,00 TL Ankara Esenbo/a Airport-A1T0-Kızılay lines until 04.04.2023 • B0DAG0Ç MUNICIPALITY 0TFA0YE MÜDÜRLÜ.Ü Winner : ANKARA 1OF. OTOMOT0V A.1. (BALIKES0R); 1 ea portable ladder type fire fighting Proposal: Per vehicle, 13.100,00 TL/month (KDV excl.), vehicle and equipment (8+1) 9 ea vehicles 117.900,00 TL/Ay+KDV and 115 Tender reg.no : 2013/79559 months total 13.558.500,00 TL+KDV Winner : KATMERC0LER A.1 Approx. cost : 208.333,33 TL • BOYABAT MUNICIPALITY - S0V0L SAVUNMA Proposal : 163.200,00 TL MÜDÜRLÜ Ü (S NOP); 1 ea street fire fighting vehicle . 0 • procurement D0D0M MUNICIPALITY (AYDIN); 1 ea 2 m3 cap. Road Tender reg.no : 2013/52645 sweeper vehicle procurement Tender reg.no : 2013/99001 Winner : VOLKAN 0TFA0YE 1T0. Approx. cost : 177.666,67 TL Winner : ESMAN ÇEGA LTD. Proposal : 134.250,00 TL Approx. cost : 268.304,94 TL Proposal : 261.000,00TL       M  O       M 183O • • 0ZM0T ATIK VE ARTIKLARI ARITMA YAKMA VE 0ZM0R METROPOLITAN MUNICIPALITY: Road marking • HEALTH MINISTRY- AC0L SA.LIK H0ZMETLER0 • BURSA ULA1IM TOPLU TA1IMA 01LETME SANAY0 VE DE.ERLEND0RME A.1. (0ZAYDA1); 1 ea 8x2 and 1 ea machine on 0suzu brand chassis truck ADMINISTRATION; 73 ea 4 x 4 diesel panelvan T0CARET A.1. (BURULA1); 6 ea low bed tramway 6x2 wheeled chassis trucks procurement. Tender reg.no : 2013/97985 ambulance vehicle Tender reg.no : 2013/101514 Winner : YOL MAK0NA YAPI LTD. Tender reg.no : 2013/74948 Tender reg.no : 2013/16285 Winner : ÇETA1 A.1. Approx. cost : 178.500,00 TL Winner : OTOKOÇ A.1. Winner : DURMAZLAR MAK0NE Approx. cost : 375.724,67 TL Proposal : 148.960,00 TL Birim Approx. cost : 146.166 TL Proposal : 10.329.000 Euro Proposal : 350.000,00 TL Top. Approx. cost : 10.670.118,00 TL • STATE RAILWAYS ADMINISTRATION (TCDD); 13.000 Unit price 56.150 Euro • SA LIK BAKANLI I; 16 Ea 4x2 autom. gear panelvan • . . ÇE1ME MUNICIPALITY; 1.8 m3 volume hydrostatic type ton 60 E1 and 1.000 ton 49 E1 900 rails procurement Total price 4.098.950 Euro type ambulance vacuum road sweeper vehicle procurement Tender reg.no : 2013/30286 Brand: Ford Tender reg.no : 2013/52925 Tender reg.no : 2013/82699 Winner : KARDEM0R A.1. Winner : EMS AMBULANS A. . Winner : U UREL N . • 1 . 0 1 Approx. cost : 23.847.600 TL HEALTH MINISTRY -AC0L SA.LIK H0ZMETLER0 Approx. cost : 2.908.400,00 TL Approx. cost : 239.000,00 TL Proposal : 9.366.000 Euro ADMINISTRATION; 9 Ea 4x2 diesel 4 patients transp. Proposal : 2.779.200,00 TL Proposal : 232.000,00 TL Ambulance • SARAYDÜZÜ MUNICIPALITY (S NOP); 1 ea hydraulic Tender reg.no : 2013/73739 0 • TUNCEL ÖZEL DARES ; 1 ea rotatory snow spraying • STATE HIGHWAYS ADMIN.; 3 ea asphalt plants-2. and compress. garbage vehicle and 1 ea combined channel Winner : EMS AC L MOB L S STEMLER 0 0 0 0 0 0 vehicle (self propell.) 3. items opening vehicle Approx. cost : 3.033.914,00 TL Tender reg.no : 2013/105015 Tender reg.no : 2013/77178 Tender reg.no : 2013/103337 Unit price : 132.000 Euro Winner : KOLUMAN MOT. ARAÇ A. . Winner : 1ENSARI KOLLEKT0F Winner : NURMAK ARAÇ LTD. Total price : 1.118.000 Euro 1 Approx. cost : 3.200.000,00 TL Approx. cost : 320.000,00 TL Brand: Mercedes -Benz Approx. cost : 708.809,05 TL Proposal : 1.894.000,00 TL Proposal : 294.000,00 TL Proposal : 254.500,00 EUR • HEALTH MINISTRY- AC L SA LIK H ZMETLER 0 . 0 0 • • STATE HIGHWAYS ADMIN.; 3 ea asphalt plant -1. items • ULALAR MUNICIPALITY (ERZ0NCAN); Various 4 ea ADMINISTRATION; 26 Ea 4x2 diesel intensive care ÜMRAN0YE MUNICIPALITY (0STANBUL); Funeral Tender reg.no : 2013/77178 trucks procurement (Obese) Ambulance procurement (hearse) vehicle and garbage truck procurement Winner : ÇESAN A.1 Tender reg.no : 2013/105563 Tender reg.no : 2013/74952 Tender reg.no : 2013/73786 Approx. cost : 3.200.000,00 TL Winner : KARBA OTO. LTD. Winner : EMS AC0L MOB0L S0STEMLER Winner : KATMERC0LER SAN. Proposal : 1.284.800,00 TL Approx. cost : 806.000,00 TL Unit price : 95.000 Euro/ ea Approx. cost : 331.727,33 TL Proposal : 778.000,00 TL Brand : Wolksvagen Proposal : 244.085,00 TL • KIRKLAEL0 MUNICIPALITY; Fire brigade vehicle • • procurement KOCAEL0 ÖZEL 0DARES0; Rescuer minibüs and small • HEALTH MINISTRY- AC0L SA.LIK H0ZMETLER0 0STANBUL ASPHALT FABR0KALARI SANAY0 A.1; Tender reg.no : 2013/83865 trucks ADMINISTRATION; 134 Ea 4 X 2 autom. gear diesel Wheeled loader Winner : KATMERC0LER A.1 Tender reg.no : 2013/65086 panelvan type ambulance Tender reg.no : 2013/112517 Approx. cost : 547.666,67 TL Winner : EGEM 0TFA0YE LTD. Tender reg.no : 2013/74959 Winner : BORUSAN MAK. A.1 Proposal : 373.373,00 TL Approx. cost : 397.333,33 TL Approx. cost : 185.263,71 TL/ea Approx. cost : 6.004.616,40 TL Proposal : 332.282,00 TL Winner : EMS AC0L MOB0L S0STEMLER Proposal : 1.932.000,00 EUR • HATAY 0L ÖZEL 0DARES0; 1 ea 7 +1 M3 cap. hydraulic Unit price : 63.500 Euro/ea compress. garbage vehicle procurement • B0TL0S MUNICIPALITY; Various vehicles Brand : Mercedes Benz-Sprinter • AKINCILAR MUNICIPALITY (ADIYAMAN); 1ea Tender reg.no : 2013/13265 Tender reg.no : 2013/88328 combined channel opening vehicle Winner : KARBA OTOMOT0V LTD. Winner : KARBA OTO. LTD. • HEALTH MINISTRY- AC0L SA.LIK H0ZMETLER0 Tender reg.no : 2013/102212 Approx. cost : 92.161,02 TL Approx. cost : 877.666,66 TL ADMINISTRATION: 8 Ea 4x4 Pick-Up type umke vehicle Winner : ÖZ D0CLE SAN. A.1 Proposal : 91.000,00 TL Proposal : 816.800,00 TL Tender reg.no : 2013/73757 Approx. cost : 189.300,00 TL

Approx. cost : 1.170.605,87 TL Proposal : 155.000,00 TL • • DEN0ZL0 MUNICIPALITY; Hydraulic propell. repair tamir MALATYA MUNICIPALITY; Mini loader and mini Winner : NESA TA1IT LTD. vehicles and bodybuilding equipment procurement excavator procurement Contract cost : 899.600,00 TL+KDV • TARIM LETMELER ADMINISTRATION (T GEM); 2 ea Tender reg.no : 2013/86887 Tender reg.no : 2013/95920 01 0 0 Brand : Mıtsubishi Temsa 4x4 Fire brigade vehicle procurement Winner : PARAGON SAN. A.1 Winner : WACKER NEUSON MAK. Tender reg.no : 2013/107458 Approx. cost : 642.075,00 TL Approx. cost : 140.000,00 TL • HEALTH MINISTRY- AC L SA LIK H ZMETLER 0 . 0 0 Winner : VOLKAN 0TFA0YE LTD. Proposal : 632.160,00 TL Proposal : 133.000,00 TL ADMINISTRATION; 338 Ea 4x2 diesel panelvan type Approx. cost : 400.000,00 TL ambulance Proposal : 375.400,00 TL • KARATAY MUNICIPALITY (KONYA); Telescopic • SARAYDÜZÜ MUNICIPALITY (S0NOP); 1 ea hydraulic Tender reg.no : 2013/74929

platform vehicles procurement compress. garbage vehicle and 1 ea combined channel Winner : OTOKOÇ A. . 1 • H ZAN MUNICIPALITY (B TL S); 1 ea water supply Tender reg.no : 2013/98889 opening vehicle Approx. cost : 152.718,20 TL 0 0 0 Winner : BUMER MAK. LTD. Tender reg.no : 2013/103337 Unit price : 50.600 Euro/Ea vehicle procurement Approx. cost : 236.583,33 TL Winner : NURMAK ARAÇ LTD. Total price : 17.109.560 Euro Tender reg.no : 2013/117802 Proposal : 210.000,00 TL Approx. cost : 320.000,00 TL Winner : BAKSAN MERD0VEN A.1 Approx. cost : 200.000,00 TL Proposal : 294.000,00 TL • HEALTH MINISTRY- AC0L SA.LIK H0ZMETLER0 • HAVAALANI 01LETME VE HAVACILIK EDÜSTR0LER0 ADMINISTRATION; 19 ea 4x4 diesel offroad snow Proposal : 155.500,00 TL A.1 (HEA1); 1 ea vacuum runway sweeper vehicle • ULALAR MUNICIPALITY (ERZ0NCAN); Various 4 ea crawler ambulance procurement trucks procurement Tender reg.no : 2013/74937 • ALANYA MUNICIPALITY; 1 ea road sweeper vehicle. Tender reg.no : 2013/87025 Tender reg.no : 2013/105563 Approx. cost : 245.220 TL/ea Tender reg.no : 2013/116534 Winner : TEKMAR TEKN0K MARKET Winner : KARBA OTO. LTD. The only bidder was ARMAKSA. Tender was canceled. Winner : U.UREL 0N1. LTD. Approx. cost : 938.066,75 TL Approx. cost : 806.000,00 TL Approx. cost : 323.300,00 TL Proposal : 159.000,00 EUR Proposal : 778.000,00 TL • KOCAEL0 METROPOLITAN MUNICIPALITY; 20 ea Proposal : 320.000,00 TL diesel solo buses with 12 m. (+-2% tolerance) low bed, 3 • • ORDU 0L ÖZEL 0DARES0; 1 ea 4x4 diesel panelvan type INTERIOR MINISTRY -SECURITY ADMINISTRATION door, air conditioned and body resistant to corrosion, and • KAHRAMANMARA1 MUNICIPALITY; 7 ea water ambulance procurement, (EGM); 35 ea sociel events operational vehicle (TOMA) min. 80 passenger cap. sprinkler procurement Tender reg.no : 2013/98599 procurement Tender reg.no : 2013/69503 Tender reg.no : 2013/76502 Winner : EMS AMBULANS LTD Winner : KATMERC0LER A.1. Winner : OTOKAR OTO A.1 Winner : VOLKAN 0TFA0YE LTD. Approx. cost : 142.348,00 TL Proposal : 360.000,00 TL+KDV Approx. cost : 10.692.500,00 TL Approx. cost : 1.965.000,00 TL Proposal : 147.500,00 TL Unit price : 12.600.000,00TL+KDV Total price. Proposal : 2.864.000,00 EUR Proposal : 1.858.000,00 TL

            M  O       M  O M 184O • HEALTH MINISTRY- AC0L SA.LIK H0ZMETLER0 • BURSA ULA1IM TOPLU TA1IMA 01LETME SANAY0 VE ADMINISTRATION; 73 ea 4 x 4 diesel panelvan T0CARET A.1. (BURULA1); 6 ea low bed tramway ambulance vehicle Tender reg.no : 2013/74948 Tender reg.no : 2013/16285 Winner : OTOKOÇ A.1. Winner : DURMAZLAR MAK0NE Birim Approx. cost : 146.166 TL Proposal : 10.329.000 Euro Top. Approx. cost : 10.670.118,00 TL Unit price 56.150 Euro • SA.LIK BAKANLI.I; 16 Ea 4x2 autom. gear panelvan Total price 4.098.950 Euro type ambulance Brand: Ford Tender reg.no : 2013/52925 Winner : EMS AMBULANS A. . • 1 HEALTH MINISTRY -AC0L SA.LIK H0ZMETLER0 Approx. cost : 2.908.400,00 TL ADMINISTRATION; 9 Ea 4x2 diesel 4 patients transp. Proposal : 2.779.200,00 TL Ambulance Tender reg.no : 2013/73739 • TUNCEL ÖZEL DARES ; 1 ea rotatory snow spraying Winner : EMS AC L MOB L S STEMLER 0 0 0 0 0 0 vehicle (self propell.) Approx. cost : 3.033.914,00 TL Tender reg.no : 2013/105015 Unit price : 132.000 Euro Winner : KOLUMAN MOT. ARAÇ A. . Total price : 1.118.000 Euro 1 Brand: Mercedes -Benz Approx. cost : 708.809,05 TL Proposal : 254.500,00 EUR • HEALTH MINISTRY- AC L SA LIK H ZMETLER 0 . 0 0 • ADMINISTRATION; 26 Ea 4x2 diesel intensive care ÜMRAN0YE MUNICIPALITY (0STANBUL); Funeral (Obese) Ambulance procurement (hearse) vehicle and garbage truck procurement Tender reg.no : 2013/74952 Tender reg.no : 2013/73786 Winner : EMS AC0L MOB0L S0STEMLER Winner : KATMERC0LER SAN. Unit price : 95.000 Euro/ ea Approx. cost : 331.727,33 TL Brand : Wolksvagen Proposal : 244.085,00 TL

• • HEALTH MINISTRY- AC0L SA.LIK H0ZMETLER0 0STANBUL ASPHALT FABR0KALARI SANAY0 A.1; ADMINISTRATION; 134 Ea 4 X 2 autom. gear diesel Wheeled loader panelvan type ambulance Tender reg.no : 2013/112517 Tender reg.no : 2013/74959 Winner : BORUSAN MAK. A.1 Approx. cost : 185.263,71 TL/ea Approx. cost : 6.004.616,40 TL Winner : EMS AC0L MOB0L S0STEMLER Proposal : 1.932.000,00 EUR Unit price : 63.500 Euro/ea Brand : Mercedes Benz-Sprinter • AKINCILAR MUNICIPALITY (ADIYAMAN); 1ea combined channel opening vehicle • HEALTH MINISTRY- AC0L SA.LIK H0ZMETLER0 Tender reg.no : 2013/102212 ADMINISTRATION: 8 Ea 4x4 Pick-Up type umke vehicle Winner : ÖZ D0CLE SAN. A.1 Tender reg.no : 2013/73757 Approx. cost : 189.300,00 TL Approx. cost : 1.170.605,87 TL Proposal : 155.000,00 TL Winner : NESA TA1IT LTD. Contract cost : 899.600,00 TL+KDV • TARIM 01LETMELER0 ADMINISTRATION (T0GEM); 2 ea Brand : Mıtsubishi Temsa 4x4 Fire brigade vehicle procurement Tender reg.no : 2013/107458 • HEALTH MINISTRY- AC L SA LIK H ZMETLER 0 . 0 0 Winner : VOLKAN 0TFA0YE LTD. ADMINISTRATION; 338 Ea 4x2 diesel panelvan type Approx. cost : 400.000,00 TL ambulance Proposal : 375.400,00 TL Tender reg.no : 2013/74929

Winner : OTOKOÇ A. . 1 • H ZAN MUNICIPALITY (B TL S); 1 ea water supply Approx. cost : 152.718,20 TL 0 0 0 Unit price : 50.600 Euro/Ea vehicle procurement Total price : 17.109.560 Euro Tender reg.no : 2013/117802 Winner : BAKSAN MERD0VEN A.1 Approx. cost : 200.000,00 TL • HEALTH MINISTRY- AC0L SA.LIK H0ZMETLER0 ADMINISTRATION; 19 ea 4x4 diesel offroad snow Proposal : 155.500,00 TL crawler ambulance • Tender reg.no : 2013/74937 ALANYA MUNICIPALITY; 1 ea road sweeper vehicle. Approx. cost : 245.220 TL/ea Tender reg.no : 2013/116534 The only bidder was ARMAKSA. Tender was canceled. Winner : U.UREL 0N1. LTD. Approx. cost : 323.300,00 TL • KOCAEL0 METROPOLITAN MUNICIPALITY; 20 ea Proposal : 320.000,00 TL diesel solo buses with 12 m. (+-2% tolerance) low bed, 3 door, air conditioned and body resistant to corrosion, and • KAHRAMANMARA1 MUNICIPALITY; 7 ea water min. 80 passenger cap. sprinkler procurement Tender reg.no : 2013/69503 Tender reg.no : 2013/76502 Winner : OTOKAR OTO A.1 Winner : VOLKAN 0TFA0YE LTD. Approx. cost : 10.692.500,00 TL Approx. cost : 1.965.000,00 TL Proposal : 2.864.000,00 EUR Proposal : 1.858.000,00 TL

        M  O    M 185O • TÜRK0YE ELEKTR0K 0LET0M A.1.; 20.000 ea 10 ton • STATE HIGHWAYS ADMIN.; 2 ea wheeled loader 154 kV fog type composite silicon isolator, 5.000 ea 16 procurement ton 380 kV fog type composite silicon isolator, 600 ea 21 Tender reg.no : 2013/106495 ton 380 kV fog type composite isolator totalling 25.600 Bid closing date : 10.09.2013 ea procurement Approx. cost : 996.000 TL +KDV Tender reg.no : 2013/23784 Bidders were SANKO, HMF MAK0NE, BORUSAN EB REBESS O ELEKTR K MAK. SAN. LTD. 0 0 MAK NE and ASC TÜRK. Lowest price offer was Contract cost : 749.000 Euro 0 752.000 TL submitted by SANKO MAK0NE . Final decision UGUR TÜRKYURT A.1. Contract cost : 614.880 Euro awaited.

• • MERS0N METROPOLITAN MUNICIPALITY; 3 ea rock STATE HIGHWAYS ADMIN.; 1.item: 15 ea general and dumper heavy service graders, 2. item: 2 ea maintenance graders Tender reg.no : 2013/121208 procurement Winner : KARTALLAR DAMPER LTD. Tender reg.no : 2013/102222 Approx. cost : 88.500,00 TL Bid closing date : 03.09.2013 Proposal : 79.500,00 TL Tender was canceled due to financial problems.

• DEN ZL MUNICIPALITY; 2 groups total 10 ea fire fighting • 0STANBUL ASFALT FABR0KALARI A.1; 300 ton /hr 0 0 cap. aggregate (crushing- sieving, storing) plant vehicle procurement procurement Tender reg.no : 2013/102843 Tender reg.no : 2013/141336 Bid closing date : 23.09.2013 1.item vehicles Winner : E-MAK A.1 Approx. cost : 2.037.898,20 TL Winner : Z0MAG MAK0NE Proposal : 1.821.730,00 TL Approx. cost : 2.638.635,00 TL Proposal : 2.365.000,00 TL 2. item vehicles • YÜNTA1 AKARYAKIT A.1; 1 ea 36000 lt net cap. Adr’ fueloil tankers procurement Winner : PAKTA1 MAK0NE Tender reg.no : 2013/148870 Approx. cost : 1.047.499,00 TL Proposal : 995.760,00 TL Winner : HASMER OTO. A.1 Approx. cost : 151.483,33 TL • Proposal : 137.450,00 TL BORU HATLARI 0LE PETROL TA1IMA A.1 (BOTA1) 0KMAL DA0RE BA1KANLI.I; 121.451 m. steel pipes procurement • MERS0N METROPOLITAN MUNICIPALITY; 1 ea double decker bus procurement Tender reg.no : 2013/114648 Tender reg.no : 2013/137182 Winner : ÜMRAN ÇEL0K BORU A.1. Approx. cost : 5.012.279,91 $ Winner : I1ILHAN OTO. LTD. Approx. cost : 140.000,00 TL Proposal : 4.240.604,26 $

Proposal : 137.000,00 TL • HEALTH MINISTRY; 55 ea 4X2 diesel panelvan

ambulans procurement • TCDD ADMINISTRATION; 500 ton contrail procurement Tender reg.no : 2013/112434 Tender reg.no : 2013/109179 Winner : OTOKOÇ Winner : ÖZKAN DEM R ÇEL K A. 0 0 1 Approx. cost : 7.126.460,77 TL Approx. cost : 1.783.650,00 TL Proposal : 7.570.246,31 TL Proposal : 674.500,00 EURO

• STATE RAILWAYS ADMINISTRATION (TCDD); 1 ea 20 • 0STANBUL ASFALT FABR0KALARI SANAY0 A.1; ton gantry crane portal procurement Wheeled loader Tender reg.no : 2011/195634 Tender reg.no : 2013/112517 Winner : AL0 RIZA TOPRAK Winner : BORUSAN MAK. A.1 Approx. cost : 193.160,00 TL Approx. cost : 6.004.616,40 TL Proposal : 152.000,00 TL Proposal : 1.932.000,00 Euro (partial order )

• KARAPINAR MUNICIPALITY (KONYA); 1 ea (4x2) • ÇAMLIHEM10N MUNICIPALITY (R0ZE); 1 ea fire fighting 13+1,5 M3 hydraulic compress. garbage vehicle procurement procurement Tender reg.no : 2013/127077 Tender reg.no : 2013/128575 Winner : OKAN BARUT MAK. Winner : 1ENSAN OTO. LTD. Approx. cost : 135.333,33 TL Approx. cost : 109.625,00 TL Proposal : 130.000,00 TL Proposal : 105.933,00 TL

• BURSA METROPOLITAN MUNICIPALITY; Various traffic • OVAKI1LA MUNICIPALITY (B0TL0S); 18 mt hydraulic notice boards and road marking vehicles ladder fire fighting vehicle Tender reg.no : 2013/128005 Tender reg.no : 2013/133241 Winner : ÖZGÖZDE OTO. LTD. Winner : BAKSAN SAN A.1 Approx. cost : 68.200,00 TL Approx. cost : 253.750,00 TL Proposal : 70.000,00 TL Proposal : 238.000,00 TL       M  O       M 186O • BOLU ÖZEL 0DARES0; Vehicle procurement • URFA 0L ÖZEL 0DARES0; Balıklıgöl Basin feeding, Tender reg.no : 2013/95963 Organized industrial site and rural areas drinking water Winner : ÇETA1 A.1. project 2. 0tem steel pipes Approx. cost : 176.250,00 TL Tender reg.no : 2013/117126 Proposal : 167.875,00 TL Winner : ESEN PLAST0K A.1 Approx. cost : 299.715,00 TL • YEN0CE MUNICIPALITY (ÇANAKKALE); Road sweeper Proposal : 284.779,60 TL procurement Tender reg.no : 2013/98864 • 0STANBUL METROPOLITAN MUNICIPALITY; 2 ea Winner : KARYER T0CARET LTD. crane trucks procurement Approx. cost : 61.266,67 TL Tender reg.no : 2013/118661 Proposal : 42.750,00 TL Winner : KOLUMAN ARAÇ A.1 Approx. cost : 960.000,00 TL • PTT MALZEME DA0RES0 BA1KANLI.I; 400 ea Proposal : 899.000,00 TL electronic toll machines procurement Tender reg.no : 2013/51890 • BAYBURT MUNICIPALITY; Fire brigade vehicle Winner : SYSTEC MAK. A.1 procurement Approx. cost : 2.851.896,35 TL Tender reg.no : 2013/83237 Proposal : 810.750,00 EUR (partial quot.) Winner : KATMERC0LER A.1 Approx. cost : 710.963,33 TL • GAZ0ANTEP METROPOLITAN MUNICIPALITY; Karata2 Proposal : 592.000,00 TL rail system depot signalling and switching procurement Tender reg.no : 2013/146080 • 0ZM0R WATER AND SEWERAGE ADMINISTRATION Winner : COMSA SA (UNIPRSONAL) (0ZSU); Ductil font pipes and fittings Approx. cost : 5.080.361,80 TL Tender reg.no : 2013/104921 Proposal : 4.540.475,02 TL Winner : SAMSUN MAK. A.1 Approx. cost : 4.967.219,95 TL • 0STANBUL METROPOLITAN MUNICIPALITY; 126 ea Proposal : 1.500.000,00 USD metro vehicle procurement Tender reg.no : 2013/55310 • SULAKYURT MUNICIPALITY (KIRIKKALE); 1 ea fire Approx. cost : 169.857.133,74 Euro fighting vehicle with 12 mt ladder 3500 lt water tank The evaluation is underway. Bidding firms are; Tender reg.no : 2013/139267 • M0TSUB0SH0 (JAPAN) Winner : KARBA OTO. LTD. Vehicle offer: 119.028.000 Euro Approx. cost : 180.833,00 TL • CSR (Ç0N) Proposal : 170.000,00 TL Vehicle offer: 125.710.200 Euro • • HYUNDA0 ROTEM (S.KOREA) BOLU MUNICIPALITY; 1 ea Combined channel cleaning Vehicle offer: 138.348.000 Euro vehicle procurement • S0EMENS(GERMANY) Tender reg.no : 2013/113033 Vehicle offer: 168.811.335 Euro Winner : KARBA OTO. LTD. • ALSTOM (FRANCE) Approx. cost : 368.333,00 TL Vehicle offer: 172.515.000 Euro Proposal : 286.800,00 TL

• • STATE HIGHWAYS ADMIN.–PROGRAM VE 0ZLEME GÜNGÖREN MUNICIPALITY (0STANBUL); Combined DA0RES0 BA1KANLI.I; 4 ea rotatory snow spraying channel cleaning vehicle vehicle (self propell.) procurement Tender reg.no : 2013/82727 Tender reg.no : 2013/82939 Winner : GÜNER0 MAK. A.1 Winner : ZAUGG AG /KOLUMAN A.1. Approx. cost : 491.161,33 TL Proposal : 896.000,00 Euro Proposal : 432.203,20 TL

• AYDINTEPE MUNICIPALITY (BAYBURT); Vacuum • DS0 18-11 1UBE MÜDÜRLÜ.Ü (AFYONKARAH0SAR); road sweeper on truck 106 ea immersible pumps and equipment Tender reg.no : 2013/130885 Tender reg.no : 2013/126686 Winner : EK0P-ARAÇ ÜSTÜ LTD. Winner : VANSAN MAK. A.1 Approx. cost : 147.533,00 TL Approx. cost : 779.966,67 TL Proposal : 147.000,00 TL Proposal : 599.939,00 TL

• • URFA 0L ÖZEL 0DARES0; Balıklıgöl Basin feeding, KAVAKLIDERE MUNICIPALITY- 0MAR VE FEN 01LER0 Organized industrial site and rural areas drinking water MÜDÜRLÜ.Ü: Garbage truck and 7+1 m3. cap. hydraulic project 2. 0tem steel pipes compress. Autom. garbage cased vehicle procurement Tender reg.no : 2013/104116 Tender reg.no : 2013/103901 Winner : UFUK BORU SAN. A.1 Winner : KARBA OTOMOT0V Approx. cost : 5.030.805,00 TL Approx. cost : 127.168,60 TL Proposal : 4.960.195,00 TL Proposal : 96.500,00 TL

      M  O       M 187O • 0ZM0R WATER AND SEWERAGE ADMINISTRATION • TCDD -1. BÖLGE MALZEME MÜDÜRLÜ.Ü (0stanbul); (0ZSU); 0ron III chloride procurement 60 ton R350 Ht quality 60 E1 rails procurement Tender reg.no : 2013/105173 Tender reg.no : 2013/162473 Winner : KORUMA-KLOR A.1 Winner : YAPIRAY 0N1. A.1 Approx. cost : 280.170,00 TL Approx. cost : 199.574,55 TL Proposal : 207.900,00 TL Proposal: 123.000,00 TL

• • 0ZM0R WATER AND SEWERAGE ADMINISTRATION TCDD- 1. BÖLGE MALZEME MÜDÜRLÜ.Ü (0stanbul); (0ZSU): 1 ea amphibious constr. machine procurement 600 tksystem 300-1, 50 tkdff 300 and 250 Tkks 24 type Tender reg.no : 2013/93459 rails binders or equivalent equip.,700 ea standart Lvt,150 Winner : ERKE DI1 T0CARET LTD. 1T0. Ad Lvt Ha ,150 ea system 300-1 binding system Lvt blocks Approx. cost : 2.935.062,00 TL or equivalent equip procurement Proposal : 820.720,00 Euro Tender reg.no : 2013/156296 Winner : VOSSLOH RA0L LTD. Approx. cost : 435.589,35 TL • SAL0HL0 MUNICIPALITY (MAN0SA); 1 ea 4x2 chassis 5.000 liter cap. Cesspool emptier procurement Proposal : 116.000,00 TL Tender reg.no : 2013/97333 • Winner : EGEM 0TFA0YE LTD. TCDD 7.BÖLGE MALEME MÜDÜRLÜ.Ü (AFYON); B70 Approx. cost : 135.800,00 TL concrete sleepers for 60 E1 (En 13674 -1(2003) rails Proposal : 131.125,00 TL Tender reg.no : 2013/20919 Winner : ÇEL0KLER 0N1AAT A.1 Approx. cost : 3.727.665,00 TL • AC0L SA.LIK 0ZMETLER0; Ambulances modification according to TSE en 1789+A1 standards Proposal : 2.911.500,00 TL Tender reg.no : 2013/113828 • Winner : EMS AMBULANS LTD. ÇANKAYA MUNICIPALITY; Dump electric. garbage Approx. cost : 1.420.156,71 TL vehicle procurement Proposal : 611.800,00 TL Tender reg.no : 2013/101757 Winner : U.UREL 0N1. LTD. • BATMAN MUNICIPALITY 13 + 1,5 M3 cap. hydraulic Approx. cost : 497.333,33 TL compress. garbage equip. procurement Proposal : 48.000,00 TL Bid method : Open • Tender reg.no : 2013/185874 ESK01EH0R METROPOLITAN MUNICIPALITY; Various Bid closing date : 08.01.2014 dump trucks procurement Winner : EFE ENDÜSTR0 A.1. Tender reg.no : 2013/148801 Approx. cost : 347.000,00 TL Winner : MERCEDES-BENZ TÜRK A.1 Proposal : 290.000,00 TL Approx. cost : 1.866.364,00 TL Proposal : 1.699.270,00 TL • STATE RAILWAYS ADMIN. (TCDD); 1800x25 30 ea • 310r22,5 or 300r 22,5 size 48 ea tires KONYA METROPOLITAN MUNICIPALITY; Various elec. Tender reg.no : 2013/111171 vehicle, elec. dump cleaning vehicle Winner : TATKO 01 MAK. A.1 Tender reg.no : 2013/114844 Approx. cost : 313.560,00 TL Winner : AKPA AKARYAKIT A.1 Proposal : 213.000,00 TL Approx. cost : 793.436,15 TL Proposal : 189.899,00 TL Approx. cost of the contracted items : 265.624,73 TL • STATE RAILWAYS ADMIN. (TCDD); 1800x25 size 30 ea 310r22,5 or 300r 22,5 ebadında 48 ea tires • Tender reg.no : 2013/111171 TÜRK0YE PETROLLER0 ANON0M ORTAKLI.I (TPAO); Winner : AYSALLAR LTD. 24’’ Seamless Pıpes (1013tdep 46322/1) Approx. cost : 313.560,00 TL Tender reg.no : 2013/80517 Proposal : 213.000,00 TL Winner : AYDIN BORU A.1 Approx. cost : 422.154,00 TL Proposal : 134.400,00 EUR • TCDD -1. BÖLGE MALZEME MÜDÜRLÜ.Ü (0stanbul):

600 tkysystem 300-1,50tkdff 300 and 250 Tkks 24 type rail • binding or equivalent, 700 ea standard Lvt, 150Ad Lvt KONYA METROPOLITAN MUNICIPALITY - 0TFA0YE Ha,150 ea system 300-1 binding sys. Lvt blocks 1UBE MÜDÜRLÜ.Ü; 1 ea 42 m full autom. hydraulic procurement ladder fire fighting vehicle Tender reg.no : 2013/156296 Tender reg.no : 2013/138638 Winner : ANKARA ÇEL K A. Winner : YAPIRAY 0N1. A.1 0 1 Approx. cost : 435.589,35 TL Approx. cost : 1.918.020,80 TL Proposal : 350.000,00 TL Proposal : 1.850.000,00 TL

        M  O    M 188O • 0ZM0R WATER AND SEWERAGE ADMINISTRATION • TCDD -1. BÖLGE MALZEME MÜDÜRLÜ.Ü (0stanbul); (0ZSU); 0ron III chloride procurement 60 ton R350 Ht quality 60 E1 rails procurement          Tender reg.no : 2013/105173 Tender reg.no : 2013/162473 Winner : KORUMA-KLOR A.1 Winner : YAPIRAY 0N1. A.1 • • Approx. cost : 280.170,00 TL Approx. cost : 199.574,55 TL TCK Program ve 0zleme Dairesi Ba2kanlı/ı: Malatya- 0stanbul Project Coordination Unit: REf. IDB-WB4- Proposal : 207.900,00 TL Proposal: 123.000,00 TL Hekimhan 16. Bl. Hd. road (1.Stage) (Km:0+000-53+570) YAPIM-03 3 ea vocational educational facility Tender reg.no : 2012/24772 reconstruction.

Winner : Z0VER 0N1AAT Financing : World Bank • • TCDD- 1. BÖLGE MALZEME MÜDÜRLÜ Ü ( stanbul); 0ZM0R WATER AND SEWERAGE ADMINISTRATION . 0 Offer : 84.000.000,00 TL Winner : AKYAPI 0N1 +AKYAPI LTD. (0ZSU): 1 ea amphibious constr. machine procurement 600 tksystem 300-1, 50 tkdff 300 and 250 Tkks 24 type Approx. cost : 138.362.665,04 TL Contract cost : 29,870,000.00 TL Tender reg.no : 2013/93459 rails binders or equivalent equip.,700 ea standart Lvt,150 • • Winner : ERKE DI1 T0CARET LTD. 1T0. Ad Lvt Ha ,150 ea system 300-1 binding system Lvt blocks Turkish Electricity Transmis. Co. (TE0A1) Ticaret DS0 12.Regional directorate / Kayseri; Yozgat- Approx. cost : 2.935.062,00 TL or equivalent equip procurement Dairesi Ba2kanlı/ı: 0tm. 84,154 Kv Kadıköy gas Bo/azlıyan O/ulcuk Pond construction isolated substation. Proposal : 820.720,00 Euro Tender reg.no : 2013/156296 Tender reg.no : 2012/182826 Tender reg.no : 2012/121237 Winner : VOSSLOH RA0L LTD. Winner : MEHMET ALPTEK0N Winner : ALSTOM GR0D ENERJ0 Offer : 15.649.999,91 TL • Approx. cost : 435.589,35 TL SAL0HL0 MUNICIPALITY (MAN0SA); 1 ea 4x2 chassis Offer : 18.421.690,76 TL Approx. cost : 25.000.000,00 TL Proposal : 116.000,00 TL 5.000 liter cap. Cesspool emptier procurement Approx. cost : 15.422.266,93 TL

Tender reg.no : 2013/97333 • 0nfrastructure 0nvestments Gen.Direct. of Ministry of • • Konya Metropolitan .Municipality; Sports and congress Winner : EGEM TFA YE LTD. TCDD 7.BÖLGE MALEME MÜDÜRLÜ.Ü (AFYON); B70 Transport and MAaritime: ırnak Airport additional 0 0 centre constr. 1 concrete sleepers for 60 E1 (En 13674 -1(2003) rails apron, taxiroute and various civil works. Approx. cost : 135.800,00 TL Tender reg.no : 2012/171663 Tender reg.no : 2013/20919 Tender reg.no : 2012/146588 Proposal : 131.125,00 TL Winner : DEMARS N AAT 0 1 Winner : DO USAN DO U DEM R SAN. N . Winner : ÇEL0KLER 0N1AAT A.1 Offer : 52.370.000,00 . . 0 0 1 Offer : 30.277.589,00 TL • AC L SA LIK ZMETLER ; Ambulances modification Approx. cost : 3.727.665,00 TL Approx. cost : 54.240.874,23 TL 0 . 0 0 Approx. cost : 34.999.994,43 TL according to TSE en 1789+A1 standards Proposal : 2.911.500,00 TL • 0stanbul Project Coordination Unit (0PKB) 0stanbul Tender reg.no : 2013/113828 • nfrastructure nvestments Gen.Direct. of Ministry of • ÇANKAYA MUNICIPALITY; Dump electric. garbage Hasdal Command Control Centre audio visual system. 0 0 Winner : EMS AMBULANS LTD. Tender reg.no : GA2.7 PAKET 1. Transport and MAaritime: Elazı/ Airport various civil vehicle procurement Approx. cost : 1.420.156,71 TL Winner : ATEMPA PROJE TAAH.LTD Works, manufacturings for disabled people. Proposal : 611.800,00 TL Tender reg.no : 2013/101757 Offer : 1.884.000,00 Euro Tender reg.no : 2012/153515 Winner : U.UREL 0N1. LTD. Contract date : 13.12.2012 Winner : ELRON 0N1AAT • BATMAN MUNICIPALITY 13 + 1,5 M3 cap. hydraulic Approx. cost : 497.333,33 TL Financing : World Bank (IBRD) Offer : 11.536.557,00 TL compress. garbage equip. procurement Proposal : 48.000,00 TL Approx. cost : 12.999.729,27 TL • 0stanbul Project Coordination Unit (0PKB) 0stanbul Bid method : Open Hasdal Command Control Centre audio visual system. • State Highways Admin.6.Regional directorate / • ESK01EH0R METROPOLITAN MUNICIPALITY; Various Tender reg.no : 2013/185874 Tender reg.no : GA2.7 PAKET 2. Kayseri: Sarıkaya–(Sorgun–Saraykent) junc. road Km: dump trucks procurement Bid closing date : 08.01.2014 Winner : TELEMOB0L 0LET010M A.1. 95+760–110+760 route soil livelling artifacts, Tender reg.no : 2013/148801 Winner : EFE ENDÜSTR0 A.1. Offer : 327.000,00 Euro superstructure and various other works Approx. cost : 347.000,00 TL Winner : MERCEDES-BENZ TÜRK A.1 Contract date : 25.11.2012 Tender reg.no : 2012/179569 Proposal : 290.000,00 TL Approx. cost : 1.866.364,00 TL Financing : World Bank (IBRD) Winner : MUSTAFA ALTAN Proposal : 1.699.270,00 TL Offer : 4.678.500,00 • stanbul Project Coordination Unit ( PKB) 0stanbul • STATE RAILWAYS ADMIN. (TCDD); 1800x25 30 ea 0 0 Approx. cost : 8.561.133,25 TL • Hasdal Command Control Centre audio visual system 310r22,5 or 300r 22,5 size 48 ea tires KONYA METROPOLITAN MUNICIPALITY; Various elec. Tender reg.no : GA2.7 PAKET 2. • State Highways Admin -6.Regional directorate / Tender reg.no : 2013/111171 vehicle, elec. dump cleaning vehicle Winner : TELEMOB0L 0LET010M A.1. Kayseri: (Pınarba2ı–Gürün)Junc. –Kaynar–16.Region Winner : Tender reg.no : 2013/114844 TATKO 01 MAK. A.1 Offer : 327.000,00 Euro border roads Km: 40+000 – 47+950 route soil livelling Winner : AKPA AKARYAKIT A.1 Approx. cost : 313.560,00 TL Contract date : 25.11.2012 artifacts, superstructure and various other works Approx. cost : 793.436,15 TL Proposal : 213.000,00 TL Financing : World Bank (0BRD) Tender reg.no : 2012/179279 Proposal : 189.899,00 TL Winner : DO.U1 0N1AAT Approx. cost of the contracted items : 265.624,73 TL • stanbul Project Coordination Unit ( PKB) stanbul 1 ea • STATE RAILWAYS ADMIN. (TCDD); 1800x25 size 30 ea 0 0 0 Offer : 6.961.610,00 TL educational facility reconstruction and 1 ea public building Approx. cost : 11.125.635,34 TL 310r22,5 or 300r 22,5 ebadında 48 ea tires demolition. • TÜRK YE PETROLLER ANON M ORTAKLI I (TPAO); Tender reg.no : 2013/111171 0 0 0 . Tender reg.no : CEB-WB4-YAPIM-35 • State Highways Admin.1.Regional directorate / Winner : AYSALLAR LTD. 24’’ Seamless Pıpes (1013tdep 46322/1) Winner : AKYAPI N AAT 0 1 stanbul: O-4 hihgway Gebze junction and zmit west Approx. cost : 313.560,00 TL Tender reg.no : 2013/80517 Offer : 3.440.000,00 TL 0 0 junction route traffic management system installation. Winner : AYDIN BORU A.1 Contract date : 10.01.2013 Proposal : 213.000,00 TL Tender reg.no : 2012/179063 Approx. cost : 422.154,00 TL Winner : ASELSAN ELEKTRON K Proposal : 134.400,00 EUR • 0stanbul Project Coordination Unit (0PKB) 0stanbul 5 0 • TCDD -1. BÖLGE MALZEME MÜDÜRLÜ.Ü (0stanbul): Offer : 18.745.789,00 TL ea educational facility reconstruction. 600 tkysystem 300-1,50tkdff 300 and 250 Tkks 24 type rail Tender reg.no : CEB-WB4-YAPIM-34 Approx. cost : 25.000.000,00 TL • KONYA METROPOLITAN MUNICIPALITY - TFA YE binding or equivalent, 700 ea standard Lvt, 150Ad Lvt 0 0 Winner : MUSTAFA EK N . 10 0 1 • Ha,150 ea system 300-1 binding sys. Lvt blocks 1UBE MÜDÜRLÜ.Ü; 1 ea 42 m full autom. hydraulic Offer : 32.227.460,00 TL TCK 5. Regional directorate Mersin: Kadirli-Andırın- procurement ladder fire fighting vehicle Contract date : 18.01.2013 Göksun Yolunun (Km: 2+00041+183) route soil livelling artifacts, superstructure and various other works Tender reg.no : 2013/156296 Tender reg.no : 2013/138638 Winner : ANKARA ÇEL K A. • stanbul Project Coordination Unit: REf. IDB-WB4- (foundation surface coating, traffic security, road marking Winner : YAPIRAY 0N1. A.1 0 1 0 Approx. cost : 1.918.020,80 TL YAPIM-02 vocational educational facility reconstruction and guardrails ). Approx. cost : 435.589,35 TL Tender reg.no : 2012/121341 Proposal : 1.850.000,00 TL works. Proposal : 350.000,00 TL Winner : Y.T.Y. ASFALT N . Financing : World Bank 0 1 Winner : ZEKSAN+BEGÜM N AAT Offer : 23.483.771,75 TL 0 1 Contract cost : 22.700.000,00 TL Approx. cost : 42.216.263,10 TL

            M  O   M  O    M 189O • 0stanbul Metropolitan Municipality- Fen 02leri Daire • DS0 7.Bölge Müdürlü/ü: A2a/ı Çekerek 1.Merhale Ba2kanlı/ı Yapı 02leri Müdürlü/ü: Ba2ak2ehir stadium Project Geldingen plain irrigation 2.Stage works construction work Tender reg.no : 2012/191091 Tender reg.no : 2012/92068 Bid deadline : 07.02.2013 Winner : KALYON 0N1AAT Winner : KARACA 0N1AAT Offer : 134.949.900,00 TL Offer : 30.535.262,07 TL Approx. cost : 154.927.101,15 TL Approx. cost : 53.843.869,00 TL

• stanbul l Özel daresi; Sancaktepe research and • State railways Administration- (TCDD) Kütahya – 0 0 0 educational hospital construction work Balıkesir Railways lines road renewal project: Tender reg.no : 2013/10667 Gökçeda/-Nusrat stations around 110 km railways Winner : 1AH0NLER YAPI road renewal Offer : 77.560.000,00 TL Tender reg.no : 2010/104279 Approx. cost : 87.155.061,21 TL Winner : GCF + KOL0N 0N1AAT Offer : 40.760.310,91 TL • DS0 6. Regional directorate : Adana 0mamo/lu irrigation S1 trunk main network • State Airports management (DHM0) Malzeme Dairesi Tender reg.no : 2012/193076 Ba2kanlı/ı: Erzincan Airport fire simulation and training Winner : YILMAZER 0N1AAT facilities . Offer : 37.439.396,00 TL Tender reg.no : 2012/21109 Approx. cost : 78.434.022,05 TL

Winner : ER YAPI 0N1AAT • Offer : 7.296.127,00 TL 0stanbul Water and Sewerage Adm.0SK0 General Directorate -Üsküdar ube Müdürlü ü: damaged and Approx. cost : 9.975.765,50 TL 1 / out of work wastewater and, drinking water lines renewal

• and rehabilitations (3) . Urfa 0l Özel 0daresi Su ve Kanal Hizmetler Müdürlü/ü: Tender reg.no : 2012/195766 anlıurfa-Hilvan Group drinking water facilities 1 Winner : HAKAN 0N1+FTK 0N1. Tender reg.no : 2012/134157 Offer : 13.117.970,00 Winner : HAMZAO.LU 0N1AAT Approx. cost : 15.601.320,00 TL Offer : 5.364.477,97 TL Approx. cost : 8.245.565,00 TL • 0ller Bankası A.1.-Ankara; Develi, Ye2ilhisar, Sindelhöyük, Gazi, Zile Municipalities and Öksüt, • DS0 5. Regional directorate Ankara: Düzce-Akçakoca Karacaören, Sarıca and Tombakköyleri (Kayseri) Dam construction. içmesuyu Tender reg.no : 2012/163275 Tender reg.no : 2013/1032 Winner : ULUOVA 0N1AAT Winner : 0NCEKAYA 0N1AAT Offer : 13.213.000,00 TL Offer : 15.950.000,00 TL Approx. cost : 26.144.056,52 TL Approx. cost : 22.900.562,27 TL

• National Defense Ministry- Emlak ve NATO Güvenlik • State Highways Admin.14. Regional directorate – Yatırımları Dairesi Ba kanlı ı: Öz. K. K.lı ı O ulbey BURSA: regional roads maintenance, winter snow control 2 / / / facilities physical power anhd water training facilities works completion Tender reg.no : 2012/142753 Tender reg.no : 2012/105235 Winner : ÖMÜRLÜ 0N1 + HMC 0N1 Winner : ARGÜP + TANKYAPI + ESEN YAPI Offer : 38.823.000,00 TL Offer : 36.949.000,00 TL Approx. cost : 66.526.800,88 TL Approx. cost : 40.454.755,41 TL

• DS0- State Hydraulic Works 5. Regional directorate – • DS0- 22.Bölge Müdürlü/ü-TRABZON: Trabzon-Of ANKARA: Ankara-Keçiören Çubuk river rehabilitation Solaklı plain flood control facilities rehabilitation and Tender reg.no : 2012/192351 landscape works. Winner : MUZAFFER KAYGIN+TUNA 0N1. Tender reg.no : 2012/184611 Offer : 17.800.000,40 TL Winner : EREN 0N1AAT Approx. cost : 38.678.685,35 TL Offer : 40.913.492,00 TL Approx. cost : 64.819.487,00 TL • 0stanbul Water and Sewerage Adm. (0SK0) Genel Müdürlü/ü: 0stanbul-European region 20. Stage various • State Railways Administration - Demiryolları Yapım drinking water construction work. Dairesi Ba2kanlı/ı (TCDD): Ankara-0stanbul high speed Tender reg.no : 2012/69720 train project (Km: 249+050’de UK-14) overpass bridge Winner : HMC YAPI SAN. T0C. constr. Offer : 11.241.166,93 TL Tender reg.no : 2013/4154 Approx. cost : 22.641.242,74 TL Winner : GENÇ MED0KAL MALZ. Offer : 2.632.010,95 • KGM 11.Regional directorate Van: Hakkari-Yüksekova Approx. cost : 4.283.458,81 TL Junc. State road (Km:58+500-62+000) route soil levelling artifacts and superstructure • Justice ministry -Müste2arlık Teknik 02ler Dairesi Tender reg.no : 2012/36626 Ba2kanlı/ı: Salihli Penal execution facilities constr. Winner : 0MA MÜH. + HEDEF YAPI T0C. LTD. Tender reg.no : 2012/108636 Offer : 5.272.975,00 TL Winner : AKSU 0N1AAT A.1. Approx. cost : 10.851.287,17 TL Offer : 18.940.000,00 TL Approx. cost : 28.494.253,00 TL       M  O       M 190O • State Highways Admin.9. Bölge Müdürlü/ü- • Justice ministry- Teknik 02ler Dairesi Ba2kanlı/ı- D0YARBAKIR; Batman 0li (D.Bakır-Mardin) Junc. -Bismil- ANKARA: Söke Penal execution facilities Binası constr. Batman (GAP) and Batman-(Silvan-Kozluk) Junc. roads; Tender reg.no : 2013/16547 State hospital, 1evket Ba2ak, Gültepe bridged junctions Winner : EPS0LON 0N1AAT and Batman DDY overpass bridge Offer : 13.925.000,00 TL Tender reg.no : 2013/5721 Winner : MUSTAFA TURAN+BEK0RO.LU • ET0 Maden 02letmeleri Genel Müdürlü/ü; Bigadiç Bor Offer : 26.316.564,00 TL 02letme Müdürlü/ü Tülü open mines10.000.000 ton Approx. cost : 51.924.142,66 TL excavations constr. Tender reg.no : 2012/188508 • EGO General Directorate -Raylı Sistemler Dairesi Winner : ERA HAR0TA+MG GRUP MÜH Ba2kanlı/ı: Ankara subway trains 3rd rail power Contract cost : 19.800.000,00 TL collectors fuse constr. Tender reg.no : 2012/172207 • Türkiye Kömür 02letmeleri Kurumu Genel Müdürlü/ü; Winner : SAYKAN RAYLI S0ST. Müessesesi Müdürlü/ü YL0 Müdürlü/ü 0kizköy A-3 Offer : 52.125,00 TL Panosu 3.500.000 m3 cover excavations 2.250.000 ton Approx. cost : 74.185,50 TL coal digging and loading , transport Tender reg.no : 2012/163245 • Justice ministry- Teknik 02ler Dairesi Ba2kanlı/ı – Winner : ZAFER 0N1AAT ANKARA; Elazı/ Penal execution facilities in2. Offer : 10.425.000,00 TL Tender reg.no : 2013/7373 Approx. cost : 15.410.000,00 TL Winner : BAHADIR MÜH.+ARAS 0N1. Offer : 103.750.000,00 TL • DS0, 0çmesuyu Dairesi Ba2kanlı/ı; 1ırnak Silopi Approx. cost : 147.581.251,96 TL drinking water outpouring lines Tender reg.no : 2012/149485 • Justice ministry- Teknik ler Dairesi Ba kanlı ı – 02 2 / Winner : CEM-SEL 0N1.+M.G.G. 0N1. ANKARA; Aksaray Penal execution facilities constr.: Bids Offer : 22.990.000,00 TL received. Approx. cost : 30.362.679, 36 TL Tender reg.no : 2013/6914 Winner : R T N AAT+HALUK ERDEM 0 0 1 • stanbul-Beyo lu Municipality- Fen leri Müdürlü ü: Offer : 29.884.000,00 TL 0 / 02 / Beyo/lu areas no 2013-114-004 investment prj. 1.Stage Approx. cost : 41.174.724,05 TL streets roads foundation improvement. Tender reg.no : 2013/10718 • stanbul Metropolitan Municipality- Makine kmal 0 0 Winner : ÖZYURT MADENC0L0K Müdürlü/ü; 2013 asphalting Works (0stanbul general Offer : 8.646.357,13 TL routes) Approx. cost : 10.877.384,20 TL Tender reg.no : 2013/14293 Winner : METGÜN+EZE 0N1. • DS0 25. Regional directorate Balıkesir: Çanakkale-Biga Offer : 461.876.980,00 TL Ta2oluk irrigation facilities. Approx. cost : 524.991.016,64 TL Tender reg.no : 2012/184827 Winner : KOÇO LU N AAT • . 0 1 State Railways Administration; Konya-Karaman Offer : 53.648.000,00 TL stations existing rails conversion to double way constr. Approx. cost : 116.988.602,82 TL Tender reg.no : 2012/188280 Bid deadline : 11.03.2013 • KGM Program ve zleme Dairesi Ba kanlı ı: (Sivas- Approx. cost : 187.855.318,44 TL 0 2 / 1arkı2la) Junc. -Kangal (2. Stage) road (Km: 56+841.89- Lowest offer from 198.920.966,23 TL. YSE YAPI + 70+724.15) and Kangal-Alacahan 8. Bl. Hd. road ÇEL KLER N AAT under evaluation. 0 0 1 (Km:70+724.15-106+544.66) sections Tender reg.no : 2012/173153 • ller Bankası A. . Altyapı Uygulama Dairesi 0 1 Winner : TA1YAPI 0N1AAT Ba2kanlı/ı: Mersin-Ta2ucu drinking water works. Offer : 87.387.471,60 TL Tender reg.no : 2012/176153 Approx. cost : 182.437.872,96 TL Winner : MAS 0N1AAT Offer : 5.364.786,00 TL • KGM 6. Regional directorate Kayseri: Sarıkaya-

• (Sorgun-Saraykent) Junc. road (Km:95+760-110+760) State Highways Admin.General Directorate -Program route soil levelling artifacts superstructure, ve 0zleme Dairesi Ba2kanlı/ı-ANKARA; Tender reg.no : 2012/179569 Kahramanmara -Göksun-6. Bl. Hd. road Km: 13+900- 2 Winner : ÖNGÜN 0N1AAT 60+577.99 section construction work Offer : 4.939.850,00 TL Tender reg.no : 2012/179900 Approx. cost : 8.561.133,25 TL Winner :KOL0N+L0MAK 0N1. Offer : 392.674.121,74 TL • State Railways Administration- Demiryolları Yapım Approx. cost : 460.730.564,12 TL Dairesi Ba kanlı ı: Ankara- stanbul High speed train 2 / 0 Projesi, Do ançay ripaj 1st Stage Ali Fuat Pa a- • DS , çmesuyu Dairesi Ba kanlı ı; ( arköy/TEK RDA ) / 2 0 0 2 / 1 0 . Do ançay arası (Km: 132+560-143+661-geri) section Çokal Dam drinking water 2.Stage ( arköy) outpouring / 1 infrastructure construction work. lines constr. Tender reg.no : 2012/182441 Tender reg.no : 2013/20894 Winner : ENBAY+ÖZGÜNYAPI ORT Winner : KAMER N AAT 1 0 1 Offer : 238.000.000,00 TL Offer : 16.990.000,00 TL Approx. cost : 499.405.304,84 TL Approx. cost : 25.840.589,12 TL         M  O    M 191O • State Railways Administration: Ankara-0stanbul high • State Highways Admin. 10.Bölge Müdürlü/ü- speed train project Köseköy-Sapanca Line 01 (Km: TRABZON 0yidere Ayrım-0kizdere road Km: 0+000- 100+000-105+110,75), Line 02 (Km: 105+691,82- 17+000 route completion Km: 17+000-36+283,56 route 111+714,78) conventional lines deplacements soil levelling artifacts superstructure, engineering infrastructure construction work. secondary works. Tender reg.no : 2012/196494 Tender reg.no : 2012/190742 Winner : CENG0ZLER 0N1AAT Winner : B.ERGÜNLER+0REM 0N1. Offer : 37.910.721,00 TL Offer : 85.580.859,60 TL Approx. cost : 62.181.339,06 TL Approx. cost : 196.836.362,96 TL

• • State Railways General Directorate -Demiryolları Altyapı Yatırımları Genel Müdürlü/ü: Türkiye-Gürcistan Yapım Dairesi Ba2kanlı/ı: Eski2ehir Gar crossing (Kars-Tiflis) railways alt-superstr-infrastr. completion superstructure and electrification construction work. Bid method : open Tender reg.no : 2012/194712 Tender reg.no : 2012/194712 Winner : 1ENBAY MAD.+ERM0T MÜH. Winner : GÜLERMAK A.1. Offer : 549.266.529 TL Offer : 43.185.709,00 TL • nfrastructure nvestments Gen.Direct. of Ministry of 0 0 Transport and communications: Necatibey station • Harran University-Yapı leri ve Teknik Daire 02 completion. Ba kanlı ı- ANLIURFA: 600 –bed research hospital 2 / 1 Tender reg.no : 2013/9688 construction. Winner : GÜVEN N AAT Tender reg.no : 2012/159629 0 1 Offer : 39.800.000,00 TL Approx. cost : 103.941.374,39 TL Approx. cost : 41.858.330,03 TL Winner : ILGIN N AAT 0 1 Offer : 99.878.000,00 TL • 0stanbul Özel 0daresi 0mar Yatırım ve 0n2aat Daire Ba kanlı ı Yapı Kontrol Müdürlü ü: stanbul-Ata ehir • 0ller Bankası A.1. Altyapı Uygulama Dairesi 2 / / 0 2 Kayı2da/ı Mahallesi plot no 1252 parcel 10 school. Ba2kanlı/ı-ANKARA: Yıldızlı-Derecik-Akçaköy 2 (Trabzon) Gr sewerage Works Found.;1,5 Kg/Cm found. rehabilt., naturalgas system). Tender reg.no : 2012/197340 Tender reg.no : 2012/197216 Winner : ATAK N AAT Winner : 0SA BORA 0 1 Offer : 10.995.000,00 TL Offer : 4.758.000,00 TL Approx. cost : 21.079.370,00 TL Approx. cost : 6.105.534,00 TL

• DS 18. Regional directorate Isparta: Afyonkarahisar- • State railways Administration: Bozkurt-Dinar stations 0 Sinanpa a Çayhisar 27 A ustos pond and irrigation . 75 km.lines section renewal. 2 / Tender reg.no : 2012/175518 Tender reg.no : 2012/170726 Winner : ULUOVA N AAT Winner : YAPI MERKEZ +YAP I R AY N . 0 1 0 0 1 Offer : 11.743.606,65 TL Offer : 57.677.520,58 TL Approx. cost : 21.273.874,27 TL Approx. cost : 121.200.000,00 TL

• KGM General Directorate -Program ve 0zleme Dairesi • DS - 5.Bölge Müdürlü ü-ANKARA Kırıkkale Balı eyh 0 / 2 Ba2kanlı/ı: Trabzon city crossing Kanuni Bulvarı and Akçakavak pond constr. Akyazı and Sahil connecting roads. Tender reg.no : 2012/195462 Tender reg.no : 2012/131652 Winner : ÇEL KLER GRUP+B LKOM N . 0 0 0 1 Winner : MAPA 0N1AAT Offer : 3.262.899, 46 TL Offer : 445.899.630,00 TL Approx. cost : 7.634.619,96 TL Approx. cost : 512.979.409,95 TL

• 1anlıurfa-Harran University -Yapı 02leri ve Teknik • KGM General Directorate -10. Regional directorate Daire Ba kanlı ı: HRÜ Rectorship 600 -bed cap. 2 / Trabzon: Hopa-Kemalpa2a-Sarp (Hopa Geçi2i Dahil) Research hospital completion. State road (Km:17+500-18+500) route soil levelling Tender reg.no : 2012/159629 artifacts superstructure,. Winner : ILGIN 0N1AAT Tender reg.no : 2012/197087 Offer : 99.878.000,00 TL Winner : AKM YAPI TAAHHÜT Approx. cost : 103.941.374,39 TL Offer : 12.494.926,00 TL

• Approx. cost : 20.718.837,23 TL Emlak Konut Gayrimenkul Yatırım Ortaklı/ı A.1. 0stanbul-Ata2ehir public building infrastructure landscape • KGM General Directorate -12. Regional directorate construction work. Erzurum: Tekman (Köprüköy-Hınıs Junc.) Hacıömer 0l Tender reg.no : 2013/26979 road (Km:0+000-11+400) route. Winner : TUR YAPI 0N1AAT Tender reg.no : 2012/187646 Offer : 44.890.000,00 Winner : CENG0ZLER YOL YAPI Approx. cost : 54.734.161,19 TL Offer : 5.861.040,55 TL Approx. cost : 12.699.811,69 TL • 0stanbul Metropolitan Municipality- 0SK0 Genel Müdürlü/ü; European 2.region 2011 1.Stage • DS0 General Directorate -19. Regional directorate wastewater rainwater channels. Sivas: Sivas-Yıldızeli Nevruz Dam. Tender reg.no : 2012/124652 Tender reg.no : 2012/158992 Winner : AKM YAPI Winner : S0STEM ELEKT. A.1. Contract cost : 25.985.805,90 TL Offer : 28.955.300,00 TL Approx. cost : 45.489.991,58 TL Approx. cost : 42.578.670,88 TL       M  O       M 192O