<<

Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Transportation for Livable Communitites (TLC) Bay Area Program - Priority Development Area (PDA) 21011 Region/Multi- $ 100 $ - $ 100 N YY Y Y Planning Grants: provide planning funds to County support transit-oriented development in PDAs Bay Area 21012 Region/Multi- Bridge Seismic Retrofit $ 700 $ 700 $ - YYY Y Y County Bay Area State-Owned Toll Bridge 21013 Region/Multi- $ 1,620 $ 1,620 $ - YYY Y Y Rehabilitation/Replacement/Retrofit County Small transit operators in , Contra Costa, Marin, Napa, Solano and Sonoma counties - Bay Area transit operating and capital improvement 21017 Region/Multi- program (including replacement, rehabilitation $ 8,470 $ 7,534 $ 935 N YY Y Y County and minor enhancements for rolling stock, equipment, fixed facilities and other capital assets; does not include system expansion)

Golden Gate Bridge Moveable Median Barrier: Bay Area installation of a moveable median barrier on the 21320 Region/Multi- $ 25 $ 25 $ - YYY Y Y to provide a physical County separation between opposing directions of traffic Bay Area Implement Transbay Transit Center/Caltrain 21342 Region/Multi- Downtown Extension (Phase 1 - Transbay Transit $ 1,589 $ 1,589 $ - YYY Y Y County Center) Caltrain Service Frequency Improvements (6- Bay Area Train Service during Peak Hours), Electrification 21627 Region/Multi- ( to Tamien), and Communications- 1718 $ 1,046 $ 672 N YY Y Y County Based Overlay Signal System (CBOSS) and Positive Train Control System (PTC)

Bay Area Implement Sonoma-Marin Area Rail Transit 22001 Region/Multi- District (SMART) Commuter Rail and Multi-Use $ 360 $ 360 $ - YYY Y Y County Pathway Project (Initial Operating Segment) Bay Area Improve ferry facilities/equipment including the 22006 Region/Multi- Downtown Ferry Terminal and procuring $ 193 $ 193 $ - YYY Y Y County additional spare ferry vessels Fund Regional Measure 2 studies (Water Bay Area Emergency Transportation Authority 22241 Region/Multi- $ 7 $ 7 $ - YYY Y Y environmental studies, I-680/Pleasant Hill BART County Connector Study) Bay Area Fund Regional Measure 2 Express Bus North 22243 Region/Multi- improvements (includes park-and-ride lots and $ 20 $ 20 $ - YYY Y Y County rolling stock) Bay Area 22244 Region/Multi- Fund City CarShare $ 5 $ 5 $ - YYY Y Y County Bay Area 22245 Region/Multi- Fund Safe Routes to Transit $ 30 $ 30 $ - YYY Y Y County Bay Area Lifeline Transportation Program: fund programs 22423 Region/Multi- and services that address transportation gaps 809 $ - $ 809 N YY Y Y County specific to low-income communities Planning funds for the Metropolitan Bay Area Transportation Commission, Association of Bay 22425 Region/Multi- Area Governments, Bay Conservation and $ 100 $ - $ 100 N YY Y Y County Development Commission, and nine county congestion management agencies Caltrain - transit operating and capital improvement program (including replacement, Bay Area rehabilitation and minor enhancements for 22481 Region/Multi- $ 7,667 $ 4,255 $ 1,120 N YY Y Y rolling stock, equipment, fixed facilities and other County capital assets); station improvements (e.g., platforrms) are included Bay Area Provide ferry service between Berkeley/Albany 22511 Region/Multi- $ 312 $ 312 $ - YYY Y Y and San Francisco County Bay Area Implement BART earthquake 22636 Region/Multi- $ 593 $ 593 $ - YYY Y Y safety improvements (Phase 1) County Bay Area 94089 Region/Multi- Implement Presidio Parkway Project $ 2,053 $ 2,053 $ - YYY Y Y County

C‐1 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Bay Area Widen Route 12 (Jameson Canyon) from 2 lanes 94152 Region/Multi- to 4 lanes from I-80 in Solano County to Route 29 $ 140 $ 140 $ - YYY Y Y County in Napa County (Phase 1) BART - transit operating and capital improvement Bay Area program (including replacement, rehabilitation 94525 Region/Multi- $ 43,516 $ 33,513 $ 4,457 N YY Y Y and minor enhancements, equipment, fixed County facilities and other caital assets) AC Transit - transit operating and capital improvement program (including replacement, Bay Area rehabilitation and minor enhancements for 94526 Region/Multi- $ 15,926 $ 14,000 $ 172 N YY Y Y rolling stock, equipment, fixed facilities and other County capital assets; does not include system eqpansion) Livermore Amador Valley Transit Authority (LAVTA) - transit operating and capital Bay Area improvement program (including replacement, 94527 Region/Multi- rehabilitation and minor enhancements for $ 885 $ 685 $ 161 N YY Y Y County rolling stock, equipment, fixed facilities and other capital assets; does not include system expansion) Central Contra Costa Transit Authority (CCCTA) - transit operating and capital improvement Bay Area program (including replacement, rehabilitation 94558 Region/Multi- $ 1,444 $ 1,401 $ - YYY Y Y and minor enhancements for rolling stock, County equipment, fixed facilities and other capital assets; does not include system expansion) Golden Gate Transit - transit operating and capital improvement program (including Bay Area replacement, rehabilitation and minor 94572 Region/Multi- $ 4,240 $ 3,116 $ 681 N YY Y Y enhancements for rolling stock, equipment, fixed County facilities and other capital assets; does not include system expansion) Valley Transportation Authority (VTA) - transit operating and capital improvement program Bay Area (including replacement, rehabilitation and minor 94610 Region/Multi- $ 20,669 $ 20,669 $ - YYY Y Y enhancements for rolling stock, equipment, fixed County facilities and other capital assets; does not include system expansion) San Francisco Municipal Transportation Agency (SFMTA) - transit operating and capital Bay Area improvement program (including replacement, 94636 Region/Multi- rehabilitation and minor enhancements for $ 48,997 $ 42,139 $ 2,190 N YY Y Y County rolling stock, equipment, fixed facilities and other capital assets; does not include system expansion) SamTrans - transit operating and capital improvement program (including replacement, Bay Area rehabilitation and minor enhancements for 94666 Region/Multi- $ 7,535 $ 6,125 $ 744 N YY Y Y rolling stock, equipment, fixed facilities and other County capital assets; does not include system expansion) SolTrans - transit operating and capital improvement program (including replacement, Bay Area rehabilitation and minor enhancements for 94683 Region/Multi- $ 594 $ 594 $ - YYY Y Y rolling stock, equipment, fixed facilities and other County capital assets; does not include system expansion) Bay Area Implement I-80 Integrated Corridor Mobility 230221 Region/Multi- $ 70 $ 70 $ - YYY Y Y (ICM) project operations and management County Bay Area Implement San Pablo Avenue SMART Corridors 230222 Region/Multi- $ 11 $ 11 $ - YYY Y Y operations and management County Bay Area Implement Transbay Transit Center/Caltrain 230290 Region/Multi- Downtown Extension (Phase 2 - Caltrain $ 2,596 $ 639 $ 1,957 N YY Y Y County Downtown Extension) Bay Area Implement recommendations from MTC's Transit 230336 Region/Multi- $ 10 $ 10 $ - YYY Y Y Connectivity Plan County

C‐2 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Freeway Performance Initiative (FPI): maximize performance and reliability using technology and limited expansions at essential locations on Bay Area freeways and major arterials; includes Traffic 230419 Region/Multi- $ 2,792 $ - $ 2,792 N YY Y Y Operations System (TOS) infrastructure, TOS County maintenance and replacement, arterial coordination and management, and performance monitoring Bay Area Climate Policy Initiatives: fund initiatives that 230550 Region/Multi- reduce greenhouse has emissions from cars and $ 700 $ - $ 700 N YY Y Y County light duty trucks San Francisco Ferry Berthing Improvements Bay Area Program (Phase 1): improvements to existing 230581 Region/Multi- $ 33 $ 33 $ - YYY Y Y ferry terminals and construction of new terminals County to accommodate increases in ferry ridership Bay Area Conduct environmental and design studies 230612 Region/Multi- related to implementing new ferry services in $ 2 $ 2 $ - YYY Y Y County Antioch and Martinez Implement upgrades to Route 12 (Jameson Bay Area Canyon) between Napa and Solano Counties 230627 Region/Multi- $ 13 $ 13 $ - YYY Y Y (includes grade realignment and full safety County barrier) Bay Area Golden Gate Bridge Suicide Barrier - project 230712 Region/Multi- $ 8 $ 8 $ - YYY Y Y development County Bay Area Implement senior and disabled transportation 230716 Region/Multi- $ 358 $ 219 $ 139 N YY Y Y projects, programs and services County Implement station improvements along the Bay Area Caltrain corridor associated with planned transit- 240019 Region/Multi- oriented development (includes parking, bus, $ 220 $ 220 $ - YYY Y Y County shuttle and bicycle and pedestrian access improvements) Implement system-wide access improvements at Bay Area Caltrain stations associated with increased 240031 Region/Multi- $ 30 $ 30 $ - YYY Y Y service (includes parking, bus, shuttle and bicycle County and pedestrian access improvements) Bay Area Caltrain South Terminal Track Capacity 240048 Region/Multi- $ 16 $ 16 $ - YYY Y Y Expansion, Phase II and III - project development County Bay Area Implement Caltrain at-grade crossing 240140 Region/Multi- $ 6 $ 6 $ - YYY Y Y improvements County Bay Area Priority Conservation Area (PCA) Program: 240731 Region/Multi- provides funding to preserve open space and $ 100 $ - $ 100 N YY Y Y County conservation areas Bay Area Transit Performance Initiative: fund supportive 240735 Region/Multi- infrastructure to achieve performance $ 500 $ - $ 500 N YY Y Y County improvements in major transit corridors Expand and enhance the SMART commuter rail system (Phase II) by constructing a one-station extension from San Rafael to Larkspur, Bay Area constructing a one-station extension from North 240736 Region/Multi- Santa Rosa to Windsor, implementing capacity $ 209 $ - $ 209 N YY Y Y County improvements along the Initial Operating Segment (Sonoma County only), and completing the multi-use pathway from Larkspur to Cloverdale. Bay Area/Multi- Implement transportation improvements serving 240727 $ 225 $ 225 $ - YYY Y Y Region the Golden Gate National Recreation Area Extend High Occupancy Vehicle (HOV) lane on Bay Area northbound I-880 from existing terminus at Bay 22002 Region/Multi- Bridge approach to the Maritime on-ramp to $ 29 $ 29 $ - YYY Y Y County provide HOV access from Maritime to Bay Bridge toll plaza Bay Area Widen I‐680 northbound for express lanes from 22042 Region/Multi‐ Route 237 to Route 84 (includes ramp metering $ 210 $ 150 $ 60 N YY Y N County and auxiliary lanes) Bay Area Extend I‐880 northbound express lanes from north 230088 Region/Multi‐ $ 221 $ 201 $ 20 N YY Y N of Hacienda Avenue to Hegenberger Road County Bay Area Convert I‐80 HOV lanes to express lanes from 230656 Region/Multi‐ Route 4 to Bay Bridge bypass lane in each $ 53 $ 53 $ ‐ N YY Y N County direction

C‐3 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Bay Area Convert I‐80 HOV lanes to express lanes from 230657 Region/Multi‐ $ 9 $ 9 $ ‐ N YY Y N to Route 4 in each direction County Bay Area Widen I‐80 in each direction for express lanes 230658 Region/Multi‐ $ 184 $ 184 $ ‐ N YY Y N from Route 37 to Carquinez Bridge County Bay Area Widen I‐80 in each direction for express lanes 230659 Region/Multi‐ $ 160 $ 160 $ ‐ N YY Y N from Red Top Road to Route 37 County Bay Area Convert I‐80 HOV lanes to express lanes from Red 230660 Region/Multi‐ $ 21 $ 21 $ ‐ N YY Y N Top Road to Air Base Parkway in each direction County Bay Area Widen I‐580 for eastbound and westbound 230666 Region/Multi‐ express lanes from Greenville Road to San Joaquin $ 391 $ 391 $ ‐ N Y N Y N County County line Bay Area Convert I‐880 HOV lanes to express lanes between 230668 Region/Multi‐ Hengenberger Road and Route 237 southbound, $ 58 $ 58 $ ‐ N YY Y N County and Hacienda Drive to 237 northbound Bay Area Convert Route 92 westbound HOV lanes to 230672 Region/Multi‐ express lanes from Hesperian Boulevard to San $ 4 $ 4 $ ‐ N YY Y N County Mateo‐Hayward Bridge toll plaza Bay Area Convert Route 84 westbound HOV lanes to 230673 Region/Multi‐ express lanes from I‐880 to Dumbarton Bridge toll $ 4 $ 4 $ ‐ N YY Y N County plaza Bay Area Widen I‐580/I‐680 interchange in each direction 230684 Region/Multi‐ $ 310 $ 310 $ ‐ N YY Y N for express lanes County Express Lanes on I‐680: Widen I‐680 northbound Bay Area for express lane from Rudgear to North Main; 230685 Region/Multi‐ Convert HOV lanes to express lanes between $ 24 $ 24 $ ‐ N YY Y N County Benicia Bridge and Alcosta Boulevard in each direction Bay Area Widen I‐680 in each direction for express lanes 230686 Region/Multi‐ $ 335 $ 335 $ ‐ N YY Y N between Martinez Bridge to I‐80 County Bay Area Widen I‐680/I‐80 interchange in each direction for 230687 Region/Multi‐ $ 140 $ 140 $ ‐ N YY Y N express lanes County Bay Area Widen I‐680 northbound for express lane from 240059 Region/Multi‐ $ 161 $ 161 $ ‐ N YY Y N Route 84 to Alcosta Boulevard County Bay Area Widen I‐680 southbound for express lane from 240061 Region/Multi‐ $ 161 $ 161 $ ‐ N YY Y N Alcosta Boulevard to Route 84 County Bay Area Widen I‐80 in each direction for express lanes 240581 Region/Multi‐ $ 139 $ 139 $ ‐ N YY Y N from Air Base Parkway to I‐505 County Bay Area Widen I‐80 in each direction for express lanes 240583 Region/Multi‐ $ 427 $ 427 $ ‐ N Y N Y N from I‐505 to Yolo County Line County Bay Area Widen I‐680 northbound for express lanes from 240587 Region/Multi‐ $ 93 $ 93 $ ‐ N YY Y N Marina Vista Avenue to North Main Street County Bay Area Widen I‐680 southbound for express lanes from 240588 Region/Multi‐ $ 221 $ 221 $ ‐ N YY Y N Marina Vista Avenue to Livorna Road County Bay Area 240732 Region/Multi‐ Regional Express Lane Network Grant Funding $ 600 $ ‐ $ 600 N YY Y N County Bay Area Regional Express Lane Network Reserve: net 240733 Region/Multi‐ $ 945 $ 945 $ ‐ N YY Y N revenue from the Network will be held in reserve County Bay Area Regional Express Lane Network Operations and 240734 Region/Multi‐ $ 1,801 $ 1,801 $ ‐ N YY Y N Maintenance, Rehabilitation, and Financing Cost County Implement Route 92/Clawiter Road/Whitesell 21093 Alameda Street interchange improvements and local $ 28 $ 28 $ - YYY Y Y intersection improvements Modify I‐580/Vasco Road interchange, includes widening I‐580 overcrossing to provide 8 lanes and bike lanes/shoulders, constructing auxiliary lanes 21100 Alameda $ 64 $ 55 $ 9 N YY Y N on I‐580 between Vasco and First Street, widening Vasco Road to 8 lanes between Northfront Road and Las Positas Road

C‐4 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Construct grade separation structure on Central 21103 Alameda $ 19 $ 1 $ 18 N YY Y Y Avenue at Union Pacific Railroad crossing Construct grade separations on Washington Boulevard/Paseo Padre Parkway at the Union 21114 Alameda $ 109 $ 109 $ - YYY Y Y Pacific railroad tracks and proposed BART extension Widen I-580 for HOV and auxiliary lanes eastbound from Hacienda Road to Greenville 21116 Alameda $ 226 $ 226 $ - YYY Y Y Road and westbound from Greenville Road to Foothill Road Improve infrastructure at Union City Intermodal 21123 Alameda $ 27 $ 20 $ 7 N YY Y Y Station Construct Route 84 westbound HOV on‐ramp from 21126 Alameda $ 19 $ ‐ $ 19 N YY Y N Newark Boulevard Build a BART Oakland Airport Connector between 21131 Alameda Coliseum BART station and Oakland International $ 484 $ 484 $ - YYY Y Y Airport 21132 Alameda Extend BART from Fremont to Warm Springs $ 890 $ 890 $ - YYY Y Y Reconfigure I‐80/Gilman interchange, involves 21144 Alameda dual roundabout at interchange and $ 26 $ 1 $ 25 N YY Y N bicycle/pedestrian improvements Construct additional turn- and bus-loading lanes 21451 Alameda $ 7 $ 7 $ - YYY Y Y on Hesperian Boulevard and East 14th Street 21472 Alameda Improve I-680/Bernal Avenue interchange $ 4 $ 4 $ - YYY Y Y Construct a 4-lane arterial connecting Dublin 21473 Alameda $ 12 $ 12 $ - YYY Y Y Boulevard and North Canyons Parkway 21475 Alameda Reconstruct I‐580/First Street interchange $ 44 $ 38 $ 5 N YY Y N

21477 Alameda Reconstruct I‐580/Greenville road interchange $ 54 $ 43 $ 11 N YY Y N Widen Kato Road from Warren Avenue to 21484 Alameda $ 12 $ 0.2 $ 12 N YY Y N Milmont Drive Improve I‐580/San Ramon Road/Foothill Road interchange, includes eliminating eastbound 21489 Alameda diagonal off‐ramp and eastbound loop off‐ramp $ 4 $ 3 $ 1 N YY Y N and constructing new signalized intersection at off‐ ramp Expand Capitol Corridor intercity rail service from 22009 Alameda $ 58 $ 18 $ 40 N YY Y Y Oakland to San Jose - project development Construct I-580 eastbound truck climbing lane at 22013 Alameda $ 66 $ 66 $ - YYY Y Y the Altamont Summit 22062 Alameda Construct Irvington BART Station in Fremont $ 127 $ - $ 127 N YY Y Y Improve Route 238 corridor near Foothill 22063 Alameda Boulevard/I-580 by removing parking during $ 122 $ 122 $ - YYY Y Y peak periods and spot widening Implement Outer Harbor Intermodal Terminals 22082 Alameda project (includes 7th Street grade separation and $ 332 $ 166 $ 166 N YY Y Y roadway improvements) Replace overcrossing structure at I-880/Davis Street interchange and add additional travel 22100 Alameda $ 11 $ 11 $ - YYY Y Y lanes on Davis Street (includes ramp, intersection and signal improvements) Implement AC Transit Bus Rapid Transit 22455 Alameda $ 218 $ 179 $ 39 N YY Y Y (BRT) Provide ferry service between Alameda/Oakland 22509 Alameda and San Francisco, and between harbor Bay and $ 22 $ 22 $ - YYY Y Y San Francisco Convert the I-580 westbound HOV lane to an 22664 Alameda express lane from Greenville Road to San Ramon $ 17 $ 5 $ 12 N YY Y Y Road/Foothill Road Construct HOV lane for southbound I-880 from Hegenberger Road to Marina Boulevard (includes 22670 Alameda $ 117 $ 117 $ - YYY Y Y reconstructing bridges at Davis Street and Marina Boulevard) Construct Outer Harbor Intermodal Terminal (OHIT) on former Oakland Army Base at 7th 22760 Alameda Street/Maritime Street (includes expanded $ 326 $ 257 $ 70 N YY Y Y intermodal terminal for the Port, warehouses, and truck parking lot) Improve northbound I‐880 interchange at 23rd and 29th Avenue, involves improving on‐ and off‐ 22769 Alameda $ 109 $ 105 $ 4 N YY Y N ramp geometrics, modifying local streets, and landscaping/soundwalls

C‐5 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Widen Route 84 from 2 lanes to 4 lanes from north of Pigeon Pass to Stanley Boulevard and 22776 Alameda $ 146 $ 135 $ 11 N YY Y N from 2lanes to 6 lanes from Stanley Boulevard to Jack London Boulevard Improve Route 262/I‐880 interchange (Phase 2), 22779 Alameda which involves grade separation at Warren $ 80 $ ‐ $ 80 N YY Y N Avenue/Union Pacific Rail Road Implement AC Transit Grand-MacArthur Bus 22780 Alameda $ 41 $ - $ 41 N YY Y Y Rapid Transit (BRT) Widen Route 262 from I-880 to Warm Springs Boulevard (includes reconstructing Route 262/I- 22990 Alameda $ 62 $ 62 $ - YYY Y Y 880 and Route 262/Kato Road interchanges) and reconstruct Union Pacific Railroad underpasses

Implement the Union City BART station transit- oriented development project, including construction of pedestrian grade separations 94012 Alameda $ 86 $ 86 $ - YYY Y Y under the BART and Union Pacific Railroad tracks and reconfiguring existing station to provide multimodal loop road (Phase 1) Construct an east‐west connector between I‐880 and Route 238/Mission Boulevard (includes improvements to roadways and intersections 94506 Alameda $ 196 $ 110 $ 86 N YY Y N along Decoto Road, Fremont Boulevard, Paseo Padre Parkway, Alvarado‐Niles Road and Route 238/Mission Boulevard) Construct Bus Rapid Transit facility from Alameda Naval Station to 12th Street BART station, improve freeway weaving at I-880/I-980 interchange, construct new on-ramp at Market Street/6th Street and off-ramp at Martin Luther King Way/5th Street, improve operations at 98207 Alameda Posey and Webster Tubes, construct park and $ 83 $ 8 $ 75 N YY Y Y ride on Mariner Square Drive near Posey Tube entrance, add Intelligent Transportation Systems (ITS) elements on Webster Street, Ralph Appezatto Memorial Parkway, 6th Street, 5th Street, Broadway, Harrison Street, and 7th Street (Phase 1) Construct auxiliary lanes on I-880 near Winton 230052 Alameda $ 23 $ 23 $ - YYY Y Y Avenue in Hayward Construct auxiliary lanes on I-880 between 230054 Alameda $ 10 $ 10 $ - YYY Y Y Whipple Road and Industrial Parkway West Improve I-880/Marina Boulevard interchange (includes on-and off-ramp improvements, 230066 Alameda $ 34 $ 34 $ - YYY Y Y overcrossing modification and street improvements) Tri-Valley Transit Access: acquire right-of-way 230083 Alameda along I-580 from Hacienda Drive to the Greenville $ 182 $ 182 $ - YYY Y Y Road interchange to accommodate rail transit Install traffic monitoring systems, signal priority and coordination, ramp metering, and HOV 230091 Alameda $ 47 $ 47 $ - YYY Y Y bypass lanes in the I-880, I-238 and I-580 corridors Implement Union City Passenger Rail Station and 230101 Alameda Dumbarton Rail Segment G improvement; and $ 231 $ 50 $ 181 N YY Y Y Union City BART Phase 2/Passenger Rail Station Construct grade separation over Decoto Road in 230103 Alameda $ 192 $ - $ 192 N YY Y Y the Decoto neighborhood Improvement Route 262 Mission Boulevard cross connector, includes widen Mission Boulevard to 3 lanes in each direction throughout I‐680 interchange, extend westbound right turn lane 230110 Alameda $ 20 $ ‐ $ 20 N YY Y N from Warm Springs to Mohave, extend westbound left turn lanes at Warm Springs, rebuild northbound and southbound I‐680 on and off ramps Widen Auto Mall Parkway from 4‐lanes to 6‐lanes 230114 Alameda $ 25 $ ‐ $ 25 N YY Y N between I‐680 and I‐880 Improve I‐580/Isabel/Route 84 interchange, includes providing 6‐lanes over I‐580 at 230132 Alameda $ 31 $ 26 $ 5 N YY Y N Isabel/Route 84 interchange and 4‐lanes over I‐ 580 at Portola flyover

C‐6 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Construct a 2-lane gap closure on Las Positas 230157 Alameda $ 4 $ 4 $ - YYY Y Y Road from Arroyo Vista to west of Vasco Road Improve 42nd Avenue and High Street, includes extending and aligning 42nd Avenue with Alameda Avenue to create road parallel to High Street, 230170 Alameda widening High Street between Oakport Street and $ 18 $ 6 $ 12 N YY Y N Coliseum Way, realigning E. 8th Street near Alameda Avenue, and modifying traffic signals and other intersection improvements Improve Route 24/Caldecott Tunnel including 230171 Alameda bicycle and transit access and soundwall $ 16 $ 16 $ - YYY Y Y improvements Construct I-80 bicycle-pedestrian bridge 240003 Alameda $ 23 $ 1 $ 22 N YY Y Y between 65th Street and Frontage Road Construct WETA operations and maintenance 240014 Alameda $ 38 $ 25 $ 13 N YY Y Y facility in Alameda Construct a new interchange at Route 92/Whitesell Street and extend Whitesell Street to Clawiter Road (includes new on-ramp from 240015 Alameda $ 78 $ 78 $ - YYY Y Y southbound Clawiter Road to Route 92 westbound on a bridge over the Route 92 westbound off ramp to Whitesell Street) Implement commuter service between Peninsula and East Bay (includes implementation of Phase 1 service as determined by on-going 240018 Alameda $ 436 $ 314 $ 122 N YY Y Y environmental work, railroad right-of-way acquisition, and environmental only for rail improvements) Implement Oakland Army Base infrastructure 240024 Alameda improvements (includes reconstructing Maritime $ 215 $ 97 $ 118 N YY Y N Street, realigning Burma Road and Wake Avenue) Reconstruct interchange at I-880/Industrial Parkway to provide a northbound off-ramp and a 240025 Alameda southbound HOV bypass lane on the southbound $ 65 $ 65 $ - YYY Y Y loop off-ramp (includes reconstruction of bridge over I-880) Reconstruct I‐880/West Winton Avenue interchange, involves reconfiguring eastbound to 240037 Alameda $ 26 $ ‐ $ 26 N YY Y N southbound on ramp and new connection to Southland Mall Drive Widen Doughery Road from 4‐lanes to 6‐lanes 240038 Alameda $ 19 $ 8 $ 11 N YY Y N between Sierra Lane and North City Limit Reconstruct I‐880/A Street interchange, includes widening of A Street from 5 lanes to 6 lanes 240047 Alameda underneath overpass, adding additional freeway $ 64 $ ‐ $ 64 N YY Y N lane in each direction, modifying intersection and signal Convert I-580 eastbound HOV lane to express 240050 Alameda $ 20 $ 20 $ - YYY Y Y lanes from Hacienda Road to Greenville Road Widen Union City Boulevard from 2‐lanes to 3‐ 240051 Alameda lanes between Whipple Road and Industrial $ 10 $ ‐ $ 10 N YY Y N Parkway Improve I‐880/Whipple Road interchange, includes northbound off‐ramp, surface street 240052 Alameda $ 62 $ ‐ $ 62 N YY Y N improvements and realignment between Union City and Hayward city limits Construct underpass on Tennyson Road between 240055 Alameda $ 14 $ ‐ $ 14 N YY Y N Whitman Avenue and Huntwood Avenue Construct improvements for the Route 84/I‐680 interchange, widen Route 84 from Pigeon Pass to I‐ 240062 Alameda $ 277 $ ‐ $ 277 N YY Y N 680, and construct auxiliary lanes on I‐680 between Andrade and Route 84 Widen Route 92/Industrial Boulevard Interchange 240065 Alameda (includes striping improvements on Industrial $ 9 $ 9 $ - YYY Y Y Boulevard to accommodate the existing lane) Construct auxiliary lanes on I-580 eastbound between Isabel Avenue and North Livermore Avenue, and North Livermore Avenue and First 240076 Alameda Street (includes widening the $ 41 $ 41 $ - YYY Y Y Bridge at two locations and providing additional improvements to accommodate future express lanes)

C‐7 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Implement Rapid Bus Service from Alameda Point 240077 Alameda $ 9 $ - $ 9 N YY Y Y to Fruitvale BART station Implement Crow Canyon Road Safety Improvements Project (includes roadway realignment, shoulder widening, retaining wall 240094 Alameda $ 24 $ 24 $ - YYY Y Y systems, and guardrail modifications along Crow Canyon Road between E. Castro Valley Blvd. and the Alameda / Contra Costa county line)

Replace between Park Street in 240100 Alameda $ 70 $ - $ 70 N YY Y Y Alameda and 29th Avenue in Oakland Replace between Tilden Way in 240101 Alameda Alameda and Fruitvale Avenue in Oakland $ 142 $ - $ 142 N YY Y Y (includes widening for travel lanes) 240139 Alameda Widen the Stoneridge Drive overcrossing at I‐680 $ 5 $ 1 $ 4 N YY Y N Construct second bridge on Bernal Bridge for 240175 Alameda $ 5 $ 1 $ 4 N YY Y Y bicycle and pedestrian access 240179 Alameda Construct Downtown Berkeley Transit Center $ 28 $ - $ 28 N YY Y Y

240180 Alameda Implement BART Metro/Bay Fair connection $ 150 $ - $ 150 N YY Y Y Extend BART from the Dublin/Pleasanton Station 240196 Alameda to Livermore - project development (funds for $ 617 $ 217 $ 400 N YY Y Y study, construction reserve) 240197 Alameda Implement Berkeley Pedestrian Master Plan $ 28 $ 28 $ - YYY Y Y Extend Stoneridge Drive from Trevor Parkway to 240200 Alameda $ 17 $ 17 $ - YYY Y Y El Charro Road and construct six traffic signals

Improve Route 13/Ashby Avenue corridor with 240202 Alameda $ 8 $ 2 $ 6 N YY Y N traffic, bicycle, and pedestrian safety measures 240206 Alameda Implement Berkeley Bicycle Plan $ 18 $ 18 $ - YYY Y Y Extend Bay Trail by 1.3 miles from West Frontage 240207 Alameda $ 32 $ - $ 32 N YY Y Y Road to Improve highway-rail grade crossings at four 240208 Alameda $ 3 $ - $ 3 N YY Y Y crossings in Fremont Construct access improvements to Berkeley Ferry 240226 Alameda $ 109 $ - $ 109 N YY Y Y Terminal Extend Bay Trail in Oakland, inlcuding bicycle/pedestrian bridge over Lake Merritt 240227 Alameda $ 116 $ 68 $ 48 N YY Y Y Channel and bicycle/pedestrian access around Widen Dublin Boulevard from 4‐lanes to 6‐lanes 240250 Alameda $ 4 $ 1 $ 4 N YY Y N between Sierra Court and Dublin Court Widen Greenville Road from 2‐lanes to 4‐lanes 240254 Alameda $ 10 $ 5 $ 5 N YY Y N between I‐580 and Patterson Pass Road Extend and widen Scarlett Drive from Dougherty 240261 Alameda Road to Dublin Boulevard and relocate Iron Horse $ 13 $ ‐ $ 13 N YY Y N Trail along Scarlett Drive in Dublin Modify Route 84/Peralta Boulevard (includes widening Peralta Boulevard from 1‐lane to 2‐lanes and a bike lane in each direction between Fremont 240263 Alameda Boulevard Mowry Avenue, and widening Mowry $ 45 $ ‐ $ 45 N YY Y N Avenue from 1‐lane to 2‐lanes and a bike lane in each direction between Thane Street and Mission Boulevard) Widen Fremont Boulevard to 6‐lanes and 2‐bike 240264 Alameda $ 5 $ ‐ $ 5 N YY Y N lanes from Grimmer Boulevard to I‐880 Widen Thornton Avenue from 2‐lanes to 4‐lanes 240272 Alameda $ 14 $ 1 $ 13 N YY Y N between Gateway Boulevard and Hickory Street Union Pacific Railroad (UPRR) Capital Access Fee 240274 Alameda to operate Altamont Commuter Express (ACE) $ 3 $ 3 $ - YYY Y Y trains Construct bicycle and pedestrian facilities from 240281 Alameda $ 1 $ 1 $ - YYY Y Y Fremont BART Station to Fremont Midown Install security cameras at the Alameda and San 240295 Alameda $ 3 $ 3 $ - YYY Y Y Joaquin County ACE stations Interoperable Communications Equipment for 240297 Alameda $ 0 $ 0 $ - YYY Y Y ACE Extend platforms at ACE Stations in Alameda 240304 Alameda $ 8 $ - $ 8 N YY Y Y County and San Joaquin County 240307 Alameda Rehabilitate six ACE locomotives $ 16 $ 16 $ - YYY Y Y 240310 Alameda Minor repairs of ACE locomotives and rail cars $ 9 $ 9 $ - YYY Y Y

C‐8 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Preventive Maintenance for ACE locomotives and 240311 Alameda $ 14 $ 14 $ - YYY Y Y rail cars 240318 Alameda Reconstruct the Ashby Avenue interchange on I‐80 $ 54 $ 1 $ 53 N YY Y N Retrofit Miller Sweeney Bridge between Tilden 240324 Alameda Way and Fruitvale Avenue, includes bike lanes, $ 61 $ - $ 61 N YY Y Y median and sidewalks Construct new segments and close existing gaps 240347 Alameda along Iron Horse Trail, East Bay Greenway, and $ 243 $ 3 $ 240 N YY Y Y Bay Trail Implement pedestrian safety improvements on 240350 Alameda $ 4 $ - $ 4 N YY Y Y Marin Avenue Implement College Avenue/Broadway Corridor 240372 Alameda (Route 51) Improvements - Transit Priority $ 35 $ - $ 35 N YY Y Y Measures Implement Alameda County's Bicycle and Pedestrian program (includes pedestrian 240381 Alameda $ 390 $ - $ 390 N YY Y Y infrastructure, support facilities, maintenance, and education/promotion programs) Implement highway and freeway safety 240388 Alameda improvements (includes interchange $ 20 $ ‐ $ 20 N YY Y N improvements, ramp metering, and soundwalls) Implement Alameda County's Bridge 240389 Alameda $ 30 $ ‐ $ 30 N YY Y N Improvements Program Support TODs/PDAs through multi-modal 240391 Alameda $ 270 $ - $ 270 N YY Y Y improvements and CEQA mitigation Implement promotion/outreach/education/planning studies 240392 Alameda about taking transit, biking, walking, and multi- $ 30 $ - $ 30 N YY Y Y modal access (includes Safe Routes to School program) Implements Alameda County's Transportation Demand Management (TDM) and Parking Management program (includes Guaranteed 240393 Alameda $ 270 $ - $ 270 N YY Y Y Ride Home, Safe Routes to School, Safe Routes to Transit, Travel Choice, Travel Training, Walk/Bike Promotions, and parking cash out) Implement Alameda County's Goods Movement Program (includes improvements for goods 240394 Alameda $ 80 $ - $ 80 N YY Y Y movement by truck and coordinated with rail and air) Improve Priority Development Areas (PDAs) with 240395 Alameda non-transportation infrastructure (includes sewer $ 5 $ - $ 5 N YY Y Y and storm water upgrades) Implement Alameda County's Environmental 240396 Alameda $ 10 $ - $ 10 N YY Y Y Mitigation Program Implement Alameda County's Transportation 240397 Alameda $ 80 $ - $ 80 N YY Y Y Technology and Revenue Enhancement Program Upgrade Clawiter Road/Route 92 interchange (includes new ramps and an over-crossing for the 240562 Alameda $ 55 $ 55 $ - YYY Y Y Whitesell Street extension and ramp intersection signalization) Expand Alamo Canal Trail from Dublin to 240683 Alameda $ 3 $ 3 $ - YYY Y Y Pleasanton Construct bicycle and pedestrian bridge on 240716 Alameda Tennyson Road from Nuestro Parquecito to $ 2 $ - $ 2 N YY Y Y South Hayward BART station Rehabilitate Solano Avenue (includes resurfacing 240717 Alameda $ 3 $ 3 N YY Y Y and beautification) Implement streetscape improvements on San 240718 Alameda Pablo Avenue (includes medians and rain $ 3 $ - $ 3 N YY Y Y gardens) Implement project development phases for transportation projects in Alameda County, 240726 Alameda $ 304 $ 39 $ 265 N YY Y Y includes wide-range of highway, arterial, transit, and bicycle/pedestrian improvements Implement Alameda County's Transit 240382, Alameda Enhancements, Expansion, Safety and Operations $ 1,069 $ - $ 1,069 N YY Y Y 240383 and Maintenance Program, including Paratransit 240387, Local streets and roads improvements, Alameda $ 1,550 $ - $ 1,550 N YY Y Y 240386 operations, and maintenance

C‐9 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Construct enhancements of the San Pablo Rapid service, including real-time passenger 21134 Contra Costa $ 19 $ 13 $ 6 N YY Y Y information, queue jump lanes, buses and on- board equipment, and passenger amenities Improve I‐680/Route 4 interchange (includes connecting northbound I‐680 to westbound State 21205 Contra Costa Route 4, connecting eastbound State Route 4 to $ 205 $ 33 $ 172 N YY Y N southbound I‐680, and widening SR4 between Morello and SR242) Implement improvements to Richmond Parkway 21208 Contra Costa $ 50 $ 29 $ 20 N YY Y Y Transit Center Construct Capitol Corridor train station in 21210 Contra Costa $ 19 $ 19 $ - YYY Y Y Hercules Extend BART/East Contra Costa Rail (eBART) 21211 Contra Costa eastward from the Pittsburg/Bay Point BART $ 493 $ 493 $ - YYY Y Y station into eastern Contra Costa County Widen Wilbur Avenue over Burlington Northern 21214 Contra Costa $ 16 $ 16 $ - YYY Y Y Santa Fe Railroad from 2 lanes to 4 lanes Regional and local pedestrian and bicycle 21225 Contra Costa improvements, including overcrossing locations $ 57 $ 57 $ 40 N YY Y Y to be determined Provide ferry service from Richmond to San 22122 Contra Costa $ 53 $ 1 $ 53 N YY Y Y Francisco Improve I‐680/Route 4 interchange Phases 4 and 5 (includes connecting soutbound I‐680 to eastbound State Route 4, connecting westbound 22350 Contra Costa State Route 4 to northbound I‐680, and $ 221 $ ‐ $ 221 N YY Y N constructing HOV flyover ramps from westbound State Route 4 to I‐680 southbound from I‐680 northbound to eastbound State Route 4)

Construct an HOV lane on I-680 nortbound 22351 Contra Costa between North Main Street and Route 242 (See $ 48 $ - $ - YYY Y Y Bay Area Region/Multi-County Project #240587) Construct new HOV‐only on‐ and off‐ramps at I‐ 22352 Contra Costa $ 102 $ 48 $ 54 N YY Y N 680/Norris Canyon Road Construct an HOV lane on I-680 southbound 22353 Contra Costa between North Main Street and Livorna (See Bay $ 102 $ 54 $ 20 N YY Y Y Area Region/Multi-County Project #240588) Modify I‐80/Central Avenue interchange, includes connecting Pierce Street to San Mateo Street and 22355 Contra Costa $ 25 $ 21 $ 4 N YY Y N relocating traffic signal to San Mateo/Central Avenue intersection Reconstruct I‐80/San Pablo Dam Road interchange, includes relocating of westbound El Portal on‐ramp to the full interchange northwards, 22360 Contra Costa providing access to McBryde Avenue through a $ 114 $ 30 $ 84 N YY Y N new connector road from San Pablo Dam Road interchange, and replacing Riverside Avenue pedestrian overcrossing Construct on‐ and off‐ramp for State Route 242 at 22388 Contra Costa $ 35 $ 6 $ 29 N YY Y N Clayton Road Reonstruct State Route 4/Willow Pass Road ramps 22390 Contra Costa $ 35 $ 26 $ 9 N YY Y N in Concord Conduct environmental and design studies to create a new alignment for SR239 and develop 22400 Contra Costa $ 30 $ 14 $ 16 N YY Y Y corridor improvements from Brentwood to Tracy - project development Implement the San Ramon School Bus Program, 22402 Contra Costa $ 261 $ 261 $ - YYY Y Y and continue the Lamorinda School Bus Program Construct auxiliary lane on I‐680 in both directions 22602 Contra Costa between Sycamore Valley Road in Danville to $ 34 $ 15 $ 20 N YY Y N Crow Canyon Road in San Ramon Improve safety and operations of Vasco Road from 22604 Contra Costa Brentwood to Alameda County line ‐ Phase 2 $ 61 $ ‐ $ 61 N YY Y N (includes potential realignment) Widen and extend major streets, and improve 22607 Contra Costa $ 45 $ 45 $ - YYY Y Y interchanges in east Contra Costa County Widen and extend major streets, and improve 22609 Contra Costa $ 39 $ 39 $ - YYY Y Y interchanges in central Contra Costa County Widen and extend major streets, and improve 22610 Contra Costa $ 45 $ 45 $ - YYY Y Y interchanges in west Contra Costa County

C‐10 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Implement a low-income student bus pass 22611 Contra Costa $ 32 $ 32 $ - YYY Y Y program in west Contra Costa County Widen and extend major streets, and improve interchanges in southwest Contra Costa County (includes widening Camino Tassajara to 4 lanes 22613 Contra Costa $ 42 $ 42 $ - YYY Y Y between Danville and Windemere Parkway, and to 6 lanes from Windemere Parkway to Alameda County line) Construct Martinez Intermodal Station (Phase 3), 22614 Contra Costa which includes additional 425 spaces and $ 20 $ 4 $ 16 N YY Y Y auto/pedestrain bridge Construct BART crossover at Pleasant Hill BART 22637 Contra Costa $ 40 $ 40 $ - YYY Y Y station Improve interchanges and parallel arterials to 94046 Contra Costa $ 32 $ 32 $ - YYY Y Y Route 4 Improve interchanges and parallel arterials to I- 94048 Contra Costa $ 23 $ 23 $ - YYY Y Y 80 Implement the Gateway Lamorinda Traffic Program (includes carpool lot in Lafayette, structural and safety improvements on Moraga 94532 Contra Costa $ 5 $ 5 $ - YYY Y Y Road, intersection realignments, turn lanes, pedestrian accommodation and signal coordination) Widen Ygnacio Valley/Kirker Pass Roads from 4 98115 Contra Costa lanes to 6 lanes from Michigan Boulevard to $ 15 $ 15 $ - YYY Y Y Cowell Road Improve interchanges and arterials parallel to I- 98126 Contra Costa $ 32 $ 32 $ - YYY Y Y 680 and Route 24 Widen Pacheco Boulevard from 2 lanes to 4 lanes 98133 Contra Costa $ 58 $ 58 $ - YYY Y Y between Blum Road to Arthur Road Widen Dougherty Road to 6 lanes from Red 98134 Contra Costa $ 72 $ 72 $ - YYY Y Y Willow to Contra Costa County line Extend Commerce Avenue to Waterworld Parkway, including construction of vehicular 98194 Contra Costa bridge over Pine Creek, installation of trails and a $ 8 $ 8 $ - YYY Y Y pedestrian bridge connecting Willow Pass Road to Concord Avenue/Route 242 interchange Construct an eastbound auxiliary lane on Route 24 98196 Contra Costa between Gateway Boulevard and Brookwood $ 7 $ ‐ $ 7 N YY Y N Road/Moraga Way Improve safety and operations on Vasco Road in 98198 Contra Costa $ 45 $ 11 $ 34 N YY Y N Contra Costa and Alameda counties Construct freeway-to-freeway direct connectors 98222 Contra Costa $ 53 $ 53 $ - YYY Y Y between Route 4 Bypass and Route 160

Widen Route 4 from Somersville Road to Route 98999 Contra Costa $ 442 $ 442 $ - YYY Y Y 160 including improvements to interchanges

Construct a railroad grade separation at the 230084 Contra Costa $ 39 $ 39 $ - YYY Y Y Richmond Waterfront on the Marina Bay Parkway Expand exist WestCAT maintenance facility to 230123 Contra Costa $ 6 $ 1 $ 5 N YY Y Y store addiitonal transit vehicles Construct new WestCat satellite 230127 Contra Costa $ 11 $ - $ 11 N YY Y Y maintenance/administration facility Expand WestCAT service, including purchase of 230129 Contra Costa $ 13 $ 13 $ - YYY Y Y vehicles Provide expanded express bus service to Pinole 230131 Contra Costa $ 8 $ - $ 8 N YY Y Y and Hercules Ferry Establish Express Bus Service and eBART support 230185 Contra Costa $ 24 $ - $ 24 N YY Y Y network Transit Preferential Measures (TPM)s to improve bus speed and passenger safety, includes signal 230196 Contra Costa $ 19 $ 13 $ 6 N YY Y Y priority, passenger amenities, improved bus loading areas, and rider information Widen Route 4 Bypass from 2 to 4 Lanes from 230202 Contra Costa $ 20 $ 20 $ - YYY Y Y Laurel Road to Sand Creek Road Construct Route 4 Bypass interchange at Sand 230203 Contra Costa $ 35 $ 35 $ - YYY Y Y Creek Road Widen Route 4 Bypass from 2 to 4 lanes from 230205 Contra Costa $ 22 $ 22 $ - YYY Y Y Sand Creek Road to Balfour Road Construct Route 4 Bypass interchange at Balfour 230206 Contra Costa $ 46 $ 46 $ - YYY Y Y Road (Phase 1)

C‐11 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Improve Clayton Road/Treat Boulevard intersection and increase capacity (includes 230212 Contra Costa $ 3 $ 3 $ - YYY Y Y upgrading traffic signal and geometric improvements) Construct a two‐lane bridge over Walnut Creek 230216 Contra Costa connecting Waterworld Parkway with Meridan $ 14 $ 8 $ 5 N YY Y N Park Boulevard Conduct planning, engineering, environmental studies, and construct transportation 230218 Contra Costa improvements at the El Cerrito Del Norte BART $ 30 $ - $ 30 N YY Y Y station's Transit Oriented Development (TOD) project Improve State Route 4/Phillips Lane interchange to provide diamond configuration connecting 230232 Contra Costa $ 50 $ 30 $ 20 N YY Y N Route 4 to an extension of Phillips Lane from Oakley Road Extend James Donlon Boulevard to Kirker Pass 230233 Contra Costa $ 54 $ 37 $ 17 N YY Y N Road by constructing a new 2‐lane expressway Widen Pittsburg-Antioch Highway from 2 lanes 230236 Contra Costa $ 15 $ 15 $ - YYY Y Y to 4 lanes Extend West Leland Road and construct a new 4‐ lane arterial road with raised median, bike lanes 230237 Contra Costa $ 16 $ 15 $ 2 N YY Y N and sidewalks from San Marco Boulevard to Willow Pass Road Widen Avenue from 2 lanes to 4 lanes 230238 Contra Costa $ 13 $ 13 $ - YYY Y Y with 2 left-turn lanes Widen and improve Buskirk Avenue between Monument Boulevard and Hookston Road to provide 2 through lanes in each direction 230239 Contra Costa $ 11 $ 11 $ - YYY Y Y (includes road realignment, new traffic signals and bicycle/pedestrian streetscape improvements) Improve Contra Costa Boulevard from Boyd Road and 2nd Avenue, includes intersection geometry 230240 Contra Costa $ 13 $ 2 $ 11 N YY Y N modificatins, new traffic signals, bike lane, sidewalks, bus shelters and landscaping Widen Lone Tree Way to 6‐lanes from O'Hara 230247 Contra Costa $ 16 $ 4 $ 12 N YY Y N Avenue to Brentwood Boulevard Construct grade sepration underpass at Lone 230249 Contra Costa $ 19 $ 4 $ 15 N YY Y Y Tree Way and Union Pacifc Railroad Widen Brentwood Boulevard from 2 lanes to 4 230250 Contra Costa $ 17 $ 17 $ - YYY Y Y lanes between marsh Creek and Delta Road Rplace the old 2-lane Fitzuren Road with a new 4- 230253 Contra Costa lane divided arterial (includes shoulders, bicycle $ 11 $ 11 $ - YYY Y Y lanes, a park-and-ride lot and sidewalks) Widen Main Street to 6 lanes from Route 160 to 230274 Contra Costa $ 13 $ 13 $ - YYY Y Y Big Break Road Widen Empire Avenue from 2-lanes to 4-lanes 230288 Contra Costa between Lone Tree Way and Union Pacific $ 2 $ 2 $ - YYY Y Y Railroad right-of-way/Antioch city limits Create Main Street Downtown Bypass by 230289 Contra Costa constructing new roadway between Vintage $ 27 $ 12 $ 15 N YY Y N Parkway and 2nd Street Construct northbound truck climbing lane from Clearbrook Drive in Concord to crest of Kirker Pass 230291 Contra Costa $ 10 $ 6 $ 4 N YY Y N Road, includes 12‐foot dedicated truck climbing lane, bike lane and 8‐foot paved shoulder

Provide transportation improvements on the east 230293 Contra Costa side of the Richmond BART station to $ 11 $ 11 $ - YYY Y Y accommodate redevelopment for a transit village Improve safety on Alhambra Avenue by adding second southbound lane from Walnut Avenue to 230306 Contra Costa $ 3.0 $ 0.5 $ 2.6 N YY Y N south side of State Route 4, includes signal modifications Widen Camino Tassajara Road from 2 lanes to 4 lanes from Windemere Parkway to County line, 230307 Contra Costa $ 15 $ 7 $ 8 N YY Y N includes 8‐foot paved shoulders and bike lanes in both directions Realign and improve safety and operations on 230308 Contra Costa $ 11 $ 7 $ 4 N YY Y N Alhambra Valley Road

C‐12 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Provide rolling stock, infrastructure and 230309 Contra Costa information-technology for bus-rapit transit $ 16 $ - $ 16 N YY Y Y service in select corridors in Contra Costa County

Extend North Richmond truck route from Market 230318 Contra Costa Avenue to Parr Boulevard, involves two lanes, $ 20 $ ‐ $ 20 N YY Y N shoulders on both sides and sidewalk on west side

Construct Hercules Intermodal Station (Phase 2, 3 and 4), includes improvements to railraod tracks, construction of a platform and pedestrian bridge to platform, building station structure and plaza, 230321 Contra Costa $ 56 $ 11 $ 45 N YY Y Y building Ferry Station building, extending John Muir Parkway to 2-lanes in each direction, providing trail connections and adding 226 surface parking spaces Improve infrastructure to support WestCat service area, includes park and ride lots, signal 230397 Contra Costa $ 17 $ - $ 17 N YY Y Y prioritization, queue jump lanes and freeway drop ramps East Side Improvements at the Richmond 230505 Contra Costa $ 19 $ 19 $ - YYY Y Y Intermodal Station Realign Curves along Marsh Creek Road to 230535 Contra Costa $ 9 $ 9 $ - YYY Y Y improve safety and operations 230538 Contra Costa Widen Bailey Road lanes and shoulders $ 6 $ 6 $ - YYY Y Y Close a bicycle/pedestrian gap at San Pablo Avenue bridge in Pinole by upgrading the 230542 Contra Costa $ 1 $ 1 $ - YYY Y Y existing bridge or constructing a new dedicated bicycle/pedestrian bridge Construct a six bay transit hub on Pacheco Boulevard (includes park-and-ride spaces, 230596 Contra Costa $ 4 $ 4 $ - YYY Y Y landscaping, lighting and passenger amenities on Blum Road at the I-680/Route 4 interchange) Implement I-80 Integrated Corridor Mobility Project (includes the installation/upgrade of corridor management elements along the I-80 230597 Contra Costa corridor (Phase 1) and along parallel and $ 28 $ 28 $ - YYY Y Y connecting arterials (Phase 2) to allow sharing of real-time traveler information among public agencies and the public) Provide ferry service between Hercules and San 230613 Contra Costa $ 54 $ 4 $ 49 N YY Y Y Francisco 230693 Contra Costa Maintain local streets and roads countywide $ 644 $ - $ 644 N YY Y Y Improve BART Station capacity, including additional vertical circulation and faregates, 240074 Contra Costa $ 127 $ - $ 127 N YY Y Y platform widening, trainscreens and doors and pad area expansion (initial phase) Widen Brentwood Boulevard from 2 lanes to 4 lanes from Lone Tree Way and the north city limit, 240167 Contra Costa $ 12 $ 11 $ 1 N YY Y N includes bike lanes, median islands, curb gutter, sidewalk, street lights and landscaping Replace CCCTA existing diesel trollery fleet with 240333 Contra Costa $ 0.4 $ - $ 0.4 N YY Y Y electric trolleys and necessary infrastructure Add an eastbound mixed‐flow lane on Route 4 from the lane drop 1,500 feet west of Port Chicago 240355 Contra Costa $ 34 $ ‐ $ 34 N YY Y N Highway to east of Willow Pass Road (west) on‐ ramp 240364 Contra Costa Implement paratransit programs $ 227 $ 227 $ - YYY Y Y Implement Transportation for Livable 240365 Contra Costa $ 146 $ 146 $ - YYY Y Y Communitites/streetscape projects Implement Contra Costa County's Safe Routes to 240367 Contra Costa $ 45 $ 45 $ - YYY Y Y Schools program Construct improvements at the Walnut Creek BART transit-oriented development, inlcudes 240457 Contra Costa $ 34 $ 24 $ 10 N YY Y Y additional parking station access, capacity, safety and operational improvements Construct bicycle/pedestrain overcrossings for 240459 Contra Costa $ 6 $ - $ 6 N YY Y Y Route 4 Bypass Add a westbound mixed‐flow lane from east of 240584 Contra Costa Willow Pass Road (West) to the lane‐add west of $ 27 $ ‐ $ 27 N YY Y N Willow Pass Road (West) Implement I-80 Integrated Corridor Mobility 240624 Contra Costa (ICM) Project Operations and Management - $ 3 $ 3 $ - YYY Y Y Local Portion - Maintenance

C‐13 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Construct eBART station in the Route 4 median at 240625 Contra Costa $ 16 $ 4 $ 12 N YY Y Y Railroad Avenue Widen Bolinger Canyon Road from Alcosta to San 240629 Contra Costa $ 11 $ 8 $ 3 N YY Y N Ramon Valley Boulevard Enhance streetscape on 23rd Street in Richmond 240637 Contra Costa $ 15 $ - $ 15 N YY Y Y to encourage bicycle and pedestrian use Make landside improvements for Richmond ferry 240640 Contra Costa $ 21 $ 2 $ 19 N YY Y Y service, inlcudes expanded parking Construct eastbound HOV lane on I-80 from 240641 Contra Costa Cummings Skyway to Carquinez Bridge (See Bay $ 39 $ - $ 30 N YY Y Y Area Region/Multi-County Project #230657) Add 450 space parking structure to serve 240649 Contra Costa $ 35 $ - $ 35 N YY Y Y Hercules Rail Station and the Ferry Terminal 240656 Contra Costa Widen bridge at Church Lane over $ 1 $ ‐ $ 1 N YY Y N Purchase rolling stock for enhanced AC Transit 240706 Contra Costa $ 5 $ - $ 5 N YY Y Y service Implement Computer Aided Dispatch Upgrades 240707 Contra Costa $ 4 $ - $ 4 N YY Y Y for AC Transit Close gaps and develop three major trails in 240708 Contra Costa Alameda County, includes Iron Horse, Bay Trail, $ 2 $ - $ 2 N YY Y Y and East Bay Greenway Project) 240725 Contra Costa Rehabilitate transit vehicles $ 43 $ - $ 43 N YY Y Y 240738 Contra Costa Martinez Rail Corridor Improvements $ 36 $ 36 $ - YYY Y Y Improve interchange at U.S. 101/Lucas Valley 21306 Marin $ 3 $ - $ 3 N YY Y Y Road - project development Improve U.S. 101 Greenbrae/Twin Cities Corridor (includes modifying access ramps, new bus stops, 21325 Marin $ 155 $ 49 $ 106 N YY Y N improving transit stops and facilities, and adding pedestrian/bicycle facilities) Implement Marin Sonoma Narrows Stage 1 98154 Marin $ 222 $ 222 $ - YYY Y Y (Marin County) Improve U.S. 101/Tiburon Boulevard interchange - 98179 Marin $ 2 $ - $ 2 N YY Y Y project development 230105 Marin Replace Pacific Way Bridge $ 8 $ 1 $ 7 N YY Y Y Improve local transit frequencies and service 230252 Marin $ 5 $ - $ 5 N YY Y Y spans in Marin County Install traffic signal and modify roadway at the 230422 Marin intersection of Anderson Drive/East Sir Francis $ 6 $ ‐ $ 6 N YY Y N Drake Boulevard Local street and roads operations and 230694 Marin $ 204 $ 88 $ 116 N YY Y Y maintenance Implement local air quality and climate 240005 Marin $ 24 $ - $ 24 N YY Y Y protection strategies countywide Construct Golden Gate Multi-modal transfer 240034 Marin $ 4 $ - $ 4 N YY Y Y facility at Larkspur Ferry Terminal Widen Novato Boulevard between Diablo Avenue 240039 Marin $ 20 $ ‐ $ 20 N YY Y N and Grant Avenue 240041 Marin Improve Downtown Novato Transit Facility $ 4 $ - $ 4 N YY Y Y Expand Marin Transit's Automated Vehicle 240043 Marin $ 1 $ - $ 1 N YY Y Y Location (AVL) and real time system Construct multi-modal transit hubs/green 240044 Marin $ 6 $ - $ 6 N YY Y Y mobility hubs Enhance facilities for Muir Woods Shuttle and 240045 Marin $ 1.4 $ 0.1 $ 1.3 N YY Y Y West Marin Stagecoach Implement new technologies to manage transit 240078 Marin $ 2 $ - $ 2 N YY Y Y systems Improve the intersection at Sir Francis Drake 240456 Marin Boulevard/Red Hill Avenue/Center Boulevard $ 1 $ - $ 1 N YY Y Y (known as "The Hub") - project development Construct multi-use pathway connecting Calpark 240552 Marin $ 15 $ 14 $ 2 N YY Y Y tunnel and the Ferry Teriminal in Larkspur Implement senior mobility program countywide (includes free transit passes for seniors, safe 240644 Marin $ 26 $ - $ 26 N YY Y Y routes, subsidized rides and volunteer ride program) Improve local arterials parallel to U.S. 101 and I‐ 240660 Marin $ 67 $ ‐ $ 67 N YY Y N 580 Implementation of Station Area Plans in 240662 Marin $ 29 $ - $ 29 N YY Y Y anticipation of SMART

C‐14 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Implement bicycle and pedestrian improvements 240678 Marin countywide including Safe Routes to School $ 123 $ 15 $ 108 N YY Y Y elements Marin Sonoma Narrows HOV Lane and corridor 240691 Marin $ 119 $ ‐ $ 119 N YY Y N improvements 240712 Marin Implement regional planning policies $ 22 $ - $ 22 N YY Y Y Evaluate multi-modal options including trolley, 240713 Marin $ 1 $ - $ 1 N YY Y Y Ross Valley to San Rafael 240714 Marin Improve Major Roads and related Infrastructure $ 59 $ ‐ $ 59 N YY Y N Implement One Bay Area Grant Pilot Priority 240715 Marin $ 1 $ - $ 1 N YY Y Y Conservation Area improvements 240723 Marin Transit operations and maintenance $ 242 $ - $ 242 N YY Y Y

240724 Marin Transit Capital $ 25 $ - $ 25 N YY Y Y

240729 Marin U.S. 101 Gap Closure ‐ San Rafael $ 31 $ 31 N YY Y N Implement Napa County's Safe Routes to School 22417 Napa $ 6 $ - $ 6 N YY Y Y program 22744 Napa Improve traffic signalization countywide $ 3 $ ‐ $ 3 N YY Y N Construct round‐a‐bouts between California Blvd 22746 Napa $ 15 $ ‐ $ 15 N YY Y N and Freeway Drive on First Street Construct new southbound Route 221 to 94073 Napa southbound Route 29 flyover, including auxiliary $ 5 $ ‐ $ 5 N YY Y N lane to Route 12/Route 29 Construct interchange at intersection of Route 94075 Napa $ 6 $ 2 $ 4 N YY Y N 12/Route 29/Airport Road Construct curb cuts and accessiblity 230378 Napa $ 2 $ - $ 2 N YY Y Y improvements in St. Helena Improve signalization along Main Street from 230381 Napa $ 1 $ ‐ $ 1 N YY Y N Sulpher Springs to Mills Lane in St. Helena Extend Devlin Road from Airport Boulevard to 230392 Napa $ 12 $ ‐ $ 12 N YY Y N Green Island Road 230508 Napa Construct corridor improvements in Yountville $ 1 $ ‐ $ 1 N YY Y N Construct Madison Ave. bypass to Route 29 in 230510 Napa $ 1 $ ‐ $ 1 N YY Y N Yountville Improve intersection at Petrified Forest 230518 Napa $ 3 $ ‐ $ 3 N YY Y N Road/Route 128 230695 Napa Rehabilitate local streets and roads countywide $ 110 $ - $ 110 N YY Y Y Reconfigure northbound Route 29 off‐ramp at 240082 Napa $ 3 $ ‐ $ 3 N YY Y N Lincoln Avenue Construct a bicycle and pedestrian undercrossing 240083 Napa $ 1 $ - $ 1 N YY Y Y along Napa Creek Construct intersection improvements at Silverado 240085 Napa $ 5 $ ‐ $ 5 N YY Y N Trail/Third Street/Coombsville Road/East Avenue

240123 Napa Rehabilitate Green Island Road $ 5 $ - $ 5 N YY Y Y Widen intersection at Napa Junction Road/Route 240136 Napa $ 3 $ ‐ $ 3 N YY Y N 29 Implement lighted crosswalks at five 240152 Napa $ 0.2 $ - $ 0.2 N YY Y Y intersections in St. Helena Create new road and transit configuration on Route 29 through American Canyon with 240617 Napa $ 12 $ ‐ $ 12 N YY Y N connectivity to the Vallejo Ferry, including BRT, potential HOV, and other roadway innovations 240057, 240120, Napa Construct corridor improvements along Route 29 $ 26 $ ‐ $ 26 N YY Y N 240122, 240138 240612, Napa Build out countywide primary bicycle network $ 20 $ - $ 20 N YY Y Y 230527 Extend the Third Street light Rail line from north of King Street to Clay Street in Chinatown via a 21510 San Francisco $ 1,578 $ 1,578 $ - YYY Y Y new Central Subway, including the purchase of light-rail vehicles 21549 San Francisco Implement Bayview Transportation Improvements $ 37 $ 12 $ 26 N YY Y N

Extend historic streetcar service from Fort Mason 22415 San Francisco $ 69 $ 4 $ 64 N YY Y Y along Fisherman's Wharf to Caltrain Station

C‐15 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Provide capital improvements to support ferry 22512 San Francisco $ 58 $ 58 $ - YYY Y Y service between Treasure Island to San Francisco Implement Sfgo Integrated Transportation 98593 San Francisco $ 102 $ 92 $ 10 N YY Y Y Management System Implement Bus Rapid Transit (BRT) on Van Ness 230161 San Francisco $ 144 $ 22 $ 122 N YY Y Y Avenue from Mission Street to Lombard Street

Implement Bus Rapid Transit (BRT) on Geary 230164 San Francisco $ 184 $ 38 $ 146 N YY Y Y Boulevard from Van Ness Avenue to 33rd Avenue

230490 San Francisco Re‐build and widen Harney Way to 8‐lanes $ 24 $ 22 $ 2 N YY Y N Reconstruct ramps on the east side of the San 230555 San Francisco Francisco-Oakland Bay Bridge's Yerba Buena $ 103 $ 103 $ - YYY Y Y Island tunnel Implement Southeast Waterfront Transportation 240147 San Francisco $ 464 $ 449 $ 15 N YY Y Y Improvements - Phase 1 Implement Better Market Street - Transportation 240155 San Francisco Elements $ 206 $ 2 $ 205 N YY Y Y

Implement EN TRIPS Circulation & Streetscape Improvement Projects - Phase 1 Transportation 240158 San Francisco $ 70 $ - $ 70 N YY Y Y Improvements without Transit Effectiveness Project Recommended Implement Hunters Point Shipyard and Candlestick 240163 San Francisco $ 722 $ 698 $ 24 N YY Y N Point Local Roads Phase 1 Implement San Francisco's Transit Effectiveness 240171 San Francisco $ 172 $ 18 $ 154 N YY Y Y Project (TEP) 240182 San Francisco Implement BART Metro Program in San Francisco $ 10 $ - $ 10 N YY Y Y

240259 San Francisco Construct Mission Bay Loop $ 8 $ 0.4 $ 7 N YY Y Y

240309 San Francisco Expand SFMTA transit fleet $ 101 $ 1 $ 100 N YY Y Y Implement Geneva Transit Preferential Streets (TPS) improvements on Geneva Avenue from 240328 San Francisco Ocean Avenue to Prague (includes BRT on $ 81 $ 7 $ 74 N YY Y Y Geneva Avenue from Prague to U.S. 101 interchange) Construct Southern Intermodal Terminal and 240334 San Francisco extend MUNI T-Line from Bayshore/Sunnydale to $ 50 $ 21 $ 29 N YY Y Y Caltrain Bayshore Station

240344 San Francisco Expand Sfpark $ 53 $ 24 $ 29 N YY Y Y

240349 San Francisco Widen I‐280/Mariposa off‐ramp $ 7 $ 5 $ 2 N YY Y N

240358 San Francisco Implement Mission Bay New Roadway Network $ 125 $ 94 $ 31 N YY Y N

240370 San Francisco Implement HOPE SF Street Grid Phase 1 $ 10 $ ‐ $ 10 N YY Y N Implement Parkmerced Street Network (includes a new street network, traffic calming, pedestrian 240399 San Francisco improvements, biking improvements, $ 48 $ 48 $ - YYY Y Y streetscape improvements, and transit/shuttle stops) Implement Treasure Island/ Street Network (includes a new street network, 240400 San Francisco traffic calming, pedestrian improvements, biking $ 48 $ 48 $ - YYY Y Y improvements, streetscape improvements, and transit/shuttle stops) Establish new ferry terminal at Mission Bay 16th 240415 San Francisco $ 18 $ - $ 18 N YY Y Y Street Implement transit enhancements (including ADA compliance, directional signage, real-time arrival 240471 San Francisco information, mobility and access improvements, $ 133 $ 88 $ 45 N YY Y Y passenger shelters, bus bulbs, informational kiosks, and other passenger amenities Implement San Francisco's Local Air Quality and 240474 San Francisco $ 18 $ 13 $ 5 N YY Y Y Climate Protection strategies Plan for and expand parking management measures (includes demand based/variable 240476 San Francisco $ 6 $ 3 $ 3 N YY Y Y pricing system for auto parking and parking cash out)

C‐16 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Enhance highways in San Francisco (includes signs 240483 San Francisco $ 1 $ ‐ $ 1 N YY Y N and landscaping) 240486 San Francisco Expand bicycle and pedestrian facilities $ 128 $ 113 $ 15 N YY Y Y

240487 San Francisco Rehabilitate Fort Mason and Presidio Ferry Piers $ 15 $ 15 $ - YYY Y Y

240488 San Francisco Enhance bicycle and pedestrian facilities $ 171 $ 156 $ 15 N YY Y Y

Rehabilitate local roads (includes installation of 240490 San Francisco signs, signals, transit lane markings, parking $ 201 $ 75 $ 126 N YY Y Y meters, resurfacing, and skid treatments)

240493 San Francisco Implement safety improvements on local roads $ 410 $ 380 $ 30 N YY Y N Implement HOV Lanes on U.S. 101 in San 240523 San Francisco Francisco - Planning, Preliminary Engineering, $ 2 $ - $ 2 N YY Y Y and Envrionmental Construct HOV Ramp on I-280 and 6th Street - 240525 San Francisco Planning, Preliminary Engineering, and $ 2 $ - $ 2 N YY Y Y Envrionmental Transit Performance Initiative: Implement 240526 San Francisco improvements to improve transit efficiency and $ 100 $ - $ 100 N YY Y Y performance at key intersections or choke points

240533 San Francisco Rehabilitate bicycle and pedestrian facilities $ 58 $ 53 $ 5 N YY Y Y

240534 San Francisco Rehabilitate local bridges $ 15 $ - $ 15 N YY Y Y 240535 San Francisco Maintain local streets and roads $ 129 $ 129 $ - YYY Y Y Implement Transit Management Systems in San 240536 San Francisco Francisco (includes fare management, transit GPS $ 28 $ 13 $ 15 N YY Y Y tracking systems) 240537 San Francisco Install transit safety and security improvements $ 32 $ 27 $ 5 N YY Y Y

240541 San Francisco Maintain transit operations $ 110 $ 12 $ 98 N YY Y Y

Manage freeways and expressways in San 240542 San Francisco Francisco (includes non-ITS elements, $ 3 $ - $ 3 N YY Y Y performance monitoring, and corridor studies)

Modify local road intersections (includes safety 240543 San Francisco $ 101 $ 70 $ 30 N YY Y N upgrades, signalization, and realignment) Implement San Francisco's Lifeline 240544 San Francisco $ 19 $ 4 $ 15 N YY Y Y Transportation program Extend light rail corridor into Parkmerced development project, add three new light rail 240545 San Francisco $ 81 $ 81 $ - YYY Y Y stations and facilities, and add tail track and operator support facilities 240546 San Francisco Construct Treasure Island Bus Terminal Facility $ 3 $ 3 $ - YYY Y Y Implement Road Diets for Bike Plan (includes 240551 San Francisco conversion of traffic lanes for bicycle network $ 2 $ - $ 2 N YY Y Y improvements) Oakdale Caltrain Station - Planning, Preliminary 240557 San Francisco $ 13 $ 5 $ 8 N YY Y Y Engineering, and Envrionmental 240666 San Francisco Conduct local planning studies and outreach $ 14 $ 13 $ 2 N YY Y Y Implement Transportation Demand 240681 San Francisco $ 30 $ 25 $ 5 N YY Y Y Management (TDM) measures Implement San Francisco congestion pricing 240728 San Francisco programs (includes Treasure Island Congestion $ 147 $ 17 $ 130 N YY Y Y Pricing and cordon pricing) San Francisco Pricing Program: Mobility 240730 San Francisco Improvements (includes transit-capital and $ 2,500 $ 2,500 $ - YYY Y Y maintenance improvements) 21602 San Mateo Reconstruct U.S. 101/Broadway interchange $ 80 $ 47 $ 33 N YY Y N

21603 San Mateo Improve U.S. 101/Woodside Road interchange $ 73 $ 36 $ 36 N YY Y N Add northbound and southbound modified 21604 San Mateo auxiliary lanes on U.S. 101 from Oyster Point to $ 77 $ 34 $ 43 N YY Y N San Francisco County line 21606 San Mateo Reconstruct U.S. 101/Willow Road interchange $ 61 $ 34 $ 27 N YY Y N

C‐17 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Modify University Avenue overcrossing of U.S. 101 to improve operational efficiency and safety 21607 San Mateo (includes widening of overcrossing, constructing $ 3 $ 3 $ - YYY Y Y new southbound off-ramp and auziliary lane, and adding bicycle lanes) Construct auxiliary lanes (one in each direction) 21608 San Mateo on U.S. 101 from Marsh Road to Embarcadero $ 132 $ 132 $ - YYY Y Y Road Improve local access at I‐280/I‐380 from Sneath 21609 San Mateo $ 5 $ 2 $ 2 N YY Y N Lane and San Bruno Avenue to I‐380 Improve access to and from the west side of Dumbarton Bridge on Route 84 connecting to U.S. 21612 San Mateo 101, includes flyovers, interchange improvements, $ 64 $ 54 $ 10 N YY Y N and conversion of Willow Road between Route 84 and U.S. 101 to expressway Widen Route 92 between San Mateo‐Hayward 21613 San Mateo Bridge to I‐280, includes uphill passing lane from $ 35 $ 19 $ 16 N YY Y N U.S. 101 to I‐280 Modify and reconstruct I‐280/Route 1 interchange 21615 San Mateo in northbound and southbound directions, $ 20 $ 10 $ 10 N YY Y N including braided ramps Implement incentive program to support transit- 21624 San Mateo $ 75 $ - $ 75 N YY Y Y oriented development Widen Woodside Road from 4‐lanes to 6‐lanes 21892 San Mateo from El Camino to Broadway, includes adding $ 3 $ 2 $ 1 N YY Y N shoulders Widen Route 92 between Half Moon Bay city 21893 San Mateo limits and Pilarcitos Creek alignment, includes $ 5 $ 3 $ 3 N YY Y N widening of travel lanes and shoulders Provide ferry service from Redwood City to San 22120 San Mateo $ 61 $ 16 $ 45 N YY Y Y Francisco Create intermodal transit center at the Caltrain Bayshore Station, includes cross platform 22226 San Mateo transfers with 3rd Street light-rail at Caltrain $ 2 $ - $ 2 N YY Y Y Bayshore station and bus rapid transit and bus connections Construct a 6‐lane arterial from Geneva 22227 San Mateo Avenue/Bayshore Boulevard intersection to U.S. $ 96 $ 76 $ 19 N YY Y N 101/Candlestick Point interchange Reconstruct U.S. 101/Sierra Point Parkway 22229 San Mateo interchange (includes extension of Lagoon Way $ 16 $ 16 $ - YYY Y Y to U.S. 101) Add auxiliary lane in each direction on I‐280 22230 San Mateo $ 14 $ 7 $ 7 N YY Y N between Westborough and Hickey Boulevard Construct streetscape improvements on Mission 22232 San Mateo Street (Route 82) from John Daly Boulevard to $ 8 $ 8 $ - YYY Y Y San Pedro Road 22261 San Mateo Replace San Pedro Creek Bridge on Route 1 $ 10 $ 7 $ 3 N YY Y Y Provide connecting shuttle service between 22268 San Mateo $ 146 $ 68 $ 78 N YY Y Y Caltrain stations and major activity centers Widen Skyline Boulevard (Route 35) to 4‐lane 22271 San Mateo $ 4 $ 2 $ 2 N YY Y N roadway from I‐280 to Sneath Lane Install an Intelligent Transportation System (ITS) 22274 San Mateo $ 111 $ 66 $ 45 N YY Y Y and a Traffic Operation System countywide Constrruct new itnerchange at U.S. 101/Produce 22279 San Mateo $ 162 $ 86 $ 75 N YY Y N Avenue 22282 San Mateo Improve operations at U.S. 101 near Route 92 $ 221 $ 30 $ 192 N YY Y N Implement ferry service between South San 22726 San Mateo $ 225 $ 225 $ - YYY Y Y Francisco and Alameda/Oakland Improve safety on Route 1, including adding protected left and right turn lanes at Route 1, 22751 San Mateo adding through lanes on Route 1 at signalized $ 17 $ 9 $ 8 N YY Y N intersections, and constructing new pedestrian/bicycle path Reconstruct U.S. 101/Candlestick Point 22756 San Mateo $ 209 $ 169 $ 40 N YY Y N interchange to full all‐directional interchange Construct a westbound slow vehicle lane on Route 94644 San Mateo $ 21 $ 10 $ 10 N YY Y N 92 between Route 35 and I‐280 Construct Route 1 (Calera Parkway) northbound 98204 San Mateo and southbound lanes from Fassler Avenue to $ 53 $ 27 $ 27 N YY Y N Westport Drive in Pacifica

C‐18 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Modify U.S. 101/Holly Street interchange (includes widening eastbound to northbound 230417 San Mateo $ 19 $ 19 $ - YYY Y Y loop to 2 lanes and eliminating northbound to westbound loop) Extend Blomquist Street over Redwood Creek to 230428 San Mateo $ 18 $ 18 $ - YYY Y Y East Bayshore and Road Implement bicycle/pedestrian enhancements in 230430 San Mateo $ 121 $ 8 $ 113 N YY Y Y San Mateo County Implement local circulation improvements and 230434 San Mateo $ 30 $ - $ 30 N YY Y Y traffic management programs countywide Improve streetscape and traffic calming along Bay Road, and construct new northern access 230592 San Mateo $ 12 $ 12 $ - YYY Y Y connection between Demeter Street and University Avenue San Mateo Maintain local streets and roads countywide $ 531 $ - $ 531 N YY Y Y 230697 Make Route 92 operational improvements to 230704 San Mateo $ 2 $ 2 $ - YYY Y Y Chess Drive on- and off-ramps Add new rolling stock and infrastructure to 240026 San Mateo support SamTrans bus rapid transit along El $ 160 $ 3 $ 157 N YY Y Y Camino Real from Palo Alto to Daly City Implement supporting infrastructure and Automated Transit Signal Priority to support 240027 San Mateo $ 1 $ 1 $ - YYY Y Y SamTrans express rapid bus service along El Camino Real from Palo Alto to Daly City Make incremental increase in SamTrans 240028 San Mateo $ 17 $ 3 $ 13 N YY Y Y paratransit service Modify existing lanes on U.S. 101 from Whipple to 240060 San Mateo $ 117 $ 12 $ 105 N YY Y N County line to accommodate HOV/T lane Implement grade separations at select locations 240064 San Mateo $ 355 $ 310 $ 45 N YY Y Y in San Mateo County Widen overcrossing at Manor Drive over Route 1 to improve safety (includes installing traffic 240067 San Mateo signals at both end of the overcrossing and new $ 19 $ 19 $ - YYY Y Y on-ramp for northbound Route 1 at Milagra Drive) Implement San Mateo County's Safe Routes to 240084 San Mateo $ 25 $ 8 $ 18 N YY Y Y Schools Program Implement San Mateo County's Transportation 240086 San Mateo $ 75 $ 15 $ 60 N YY Y Y for Livable Communities Program Implement non‐capacity Increasing local road 240087 San Mateo Intersection modifications and channelization $ 15 $ ‐ $ 15 N YY Y N countywide Implement operational and safety improvements on Route 1 between Half Moon Bay and Pacifica 240114 San Mateo $ 21 $ 21 $ - YYY Y Y (includes acceleration lanes, deceleration lanes, turn lanes, bike lanes and enhanced crossings)

Extend California Drive north to the intersection 240115 San Mateo $ 2 $ 2 $ - YYY Y Y of Victoria Avenue and El Camino Real in Millbrae

Widen Millbrae Avenue between Rollins Road 240133 San Mateo and U.S. 101 soutbound on-ramp and resurface $ 1 $ 1 $ - YYY Y Y intersection of Millbrae Avenue and Rollins Road Implement intersection and signalization improvements at the Callan 240142 San Mateo Boulevard/Serramonte Boulevard and Lake $ 1 $ 1 $ - YYY Y Y Merced Boulevard/Southgate Avenue intersections Construct new multi-purpose pedestrian/bicycle overcrossing across U.S. 101, north of and 240143 San Mateo $ 3 $ 3 $ - YYY Y Y adjacent to existing Millbrae Avenue Bridge across U.S. 101 Construct southbound on‐ and off‐ramps to U.S. 240160 San Mateo 101 at Peninsula Avenue to add on and off ramps $ 6 $ 3 $ 3 N YY Y N from southbound U.S. 101 240161 San Mateo Provide overcrossing at I‐280/John Daly Boulevard $ 1 $ 1 $ 1 N YY Y N Implement adaptive signal system between I-280 240169 San Mateo $ 2 $ 2 $ - YYY Y Y and Santa Cruz Avenue Implement signal interconnect between signals 240174 San Mateo on Willow Road from Middlefield Avenue to Bay $ 2 $ 2 $ - YYY Y Y Road

C‐19 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Widen Triton Drive between Foster City 240176 San Mateo $ 2 $ 2 $ - YYY Y Y Boulevard and Pilgrim Drive 240346 San Mateo Implement Redwood City Street Car $ 1 $ - $ 1 N YY Y Y Implement Transportation Environmental 240511 San Mateo $ 38 $ - $ 38 N YY Y Y Enhancements countywide Implement a complete streets design for Mission 240590 San Mateo Street/El Camino Real as part of Grand Boulevard $ 75 $ 8 $ 68 N YY Y Y Initiative Improve interchange at U.S. 101/Buena Vista 21702 Santa Clara $ 32 $ ‐ $ 32 N YY Y N Avenue Improve I‐280 downtown access between 3rd 21704 Santa Clara $ 31 $ ‐ $ 31 N YY Y N Street and 7th Street Widen U.S. 101 from Monterey Street to Route 21714 Santa Clara $ 7 $ - $ 7 N YY Y Y 129 - project development Improve interchange at U.S. 101 southbound 21722 Santa Clara Trimble Road/De la Cruz Boulevard/Central $ 43 $ 19 $ 24 N YY Y N Expressway Implement Valley Transportation Authority (VTA) 21754 Santa Clara $ 22 $ - $ 22 N YY Y Y soundwall program Double-track segments of the Caltrain line 21760 Santa Clara $ 31 $ - $ 31 N YY Y Y between San Jose and Gilroy 21785 Santa Clara Widen interchange at U.S. 101/Blossom Hill Road $ 24 $ 10 $ 15 N YY Y N

21786 Santa Clara Widen interchange at U.S. 101/Hellyer Avenue $ 18 $ ‐ $ 18 N YY Y N Expand the Palo Alto Caltrain Station and Bus 21787 Santa Clara $ 75 $ 75 $ - YYY Y Y Transit Center Provide Transportation Authority's (VTA) share of funds for additional 21790 Santa Clara train sets, passenger facilities and service $ 41 $ 41 $ - YYY Y Y upgrades for the ACE service from San Joaquin and Alameda counties Implement Mineta San Jose International Airport 21922 Santa Clara $ 753 $ 100 $ 653 N YY Y Y APM connector Construct second exit lane on I‐280 to Foothill 22010 Santa Clara $ 2 $ ‐ $ 2 N YY Y N Expressway Exten Hill Road from East Main Avenue to Peet 22118 Santa Clara $ 9 $ ‐ $ 9 N YY Y N Avenue Construct a lane on southbound U.S. 101 using the existing median from south of Story Road to 22134 Santa Clara $ 97 $ 97 $ - YYY Y Y Yerba Buena Road; modify the U.S. 101/Tully road interchange to a partial cloverleaf Improve connector ramp at Route 85 northbound to Route 237 eastbound (includes widening off‐ ramp from Route 85 to Route 237 eastbound, constructing auxiliary lane on Route 237 22156 Santa Clara $ 31 $ ‐ $ 31 N YY Y N eastbound between Route 85 on‐ramp to Middlefield Road; constructing off‐ramp on Route 237 eastbound between Route 85 and Dana Street) Construct Route 237 westbound on‐ramp from 22164 Santa Clara $ 13 $ ‐ $ 13 N YY Y N Middlefield Road to Route 237 westbound Widen Almaden Expressway from Coleman 22175 Santa Clara $ 13 $ ‐ $ 13 N YY Y N Avenue to Blossom Hill Road Widen Central Expressway from 4‐lanes to 6‐lanes 22179 Santa Clara between Lawrence Expressway and San Tomas $ 16 $ ‐ $ 16 N YY Y N Expressway Construct auxiliary lanes on Central Expressway 22180 Santa Clara $ 20 $ ‐ $ 20 N YY Y N between Lawrence Expressway and Mary Avenue Widen San Tomas Expressway to 8‐lanes between 22186 Santa Clara $ 56 $ 50 $ 6 N YY Y N Route 82 to Williams Road Implement bicycle and pedestrian improvements 22246 Santa Clara $ 3 $ 3 $ - YYY Y Y on Blossom Hill Road Realign intersection at DeWitt Avenue/Sunnyside 22809 Santa Clara $ 8 $ ‐ $ 8 N YY Y N Avenue Improve railroad crossing at Church 22811 Santa Clara Avenue/Monterey Highway (includes adjusting $ 1 $ - $ 1 N YY Y Y grade) 22814 Santa Clara Extend deceleration lane on Foothill Expressway $ 1 $ ‐ $ 1 N YY Y N Implement expressway traffic information and advisory systems (includes installation of 22822 Santa Clara electronic information changeable message $ 6 $ - $ 6 N YY Y Y signs, advisory radio, cable TV feeds and web page to provide real time traffic information)

C‐20 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Improve intersection at Fitzgerald Avenue 22829 Santa Clara (includes construction of a left‐turn lane to $ 1 $ ‐ $ 1 N YY Y N Fitzerald Avenue and bike lanes and sidewalks) Convert the HOV lane on Central Expressway 22839 Santa Clara between Sam Tomas and De La Cruz to a general $ 0 $ 0 $ - YYY Y Y purpose lane Widen Lawrence Expressway from Moorpark 22843 Santa Clara $ 6 $ ‐ $ 6 N YY Y N Avenue/Bollinger Road to south of Calvert Drive Construct auxiliary lane on southbound U.S. 101 22845 Santa Clara $ 4 $ ‐ $ 4 N YY Y N from Ellis Street to eastbound Route 237 22854 Santa Clara Improve interchange at Oregon‐Page Mill/I‐280 $ 8 $ ‐ $ 8 N YY Y N Improve circulation on Foothill Expressway and 22873 Santa Clara $ 8 $ ‐ $ 8 N YY Y N widen Loyola Bridge Realign Wildwood Avenue to connect with Lawrence Expressway (includes new traffic signal 22878 Santa Clara $ 6 $ 1 $ 5 N YY Y N at Lawrence Expressway/Wildwood Avenue intersection) Close median and right‐in‐and‐out access on Lawrence Expressway at De Soto Avenue, Golden 22883 Santa Clara State Drive, Granada Avenue, Lillick Drive, Buckley $ 2 $ ‐ $ 2 N YY Y N Street, and St. Lawrence/Lawrence Station on‐ ramp Implement operational interchange improvements 22895 Santa Clara $ 3 $ ‐ $ 3 N YY Y N at San Tomas Expressway/Route 17 Implement Intelligent Transportation System (ITS) facilities on the Santa Teresa Boulevard-Hale 22910 Santa Clara $ 6 $ - $ 6 N YY Y Y Avenue corridor between Day Road and Castro Valley Road 22932 Santa Clara Add turn lane on Watsonville Road Center $ 8 $ ‐ $ 8 N YY Y N

Widen I-880 for HOV lanes in both directions 22944 Santa Clara $ 101 $ 101 $ - YYY Y Y from Route 237 in Milpitas to U.S. 101 in San Jose Extend Capitol Expressway light rail to 22956 Santa Clara $ 294 $ - $ 294 N YY Y Y Transit Center - Phase II Improve interchange at U.S. 101/Mabury 22965 Santa Clara $ 63 $ 27 $ 35 N YY Y N Road/Taylor Street Improve interchange at U.S. 101/Zanker 22979 Santa Clara $ 113 $ 49 $ 64 N YY Y N Road/Skyport Drive/Fourth Street Extend ligh-rail transit from Winchester Station to 98119 Santa Clara $ 179 $ 179 $ - YYY Y Y Route 85 (Vasona Junction) Extend Autumn Parkway from Julian Street to San 230200 Santa Clara Carlos Street and implement improvements from $ 40 $ 10 $ 29 N YY Y N St. John Street to Park Avenue Widen Coleman Avenue from 4‐lanes to 6‐lanes 230201 Santa Clara $ 15 $ 3 $ 12 N YY Y N between I‐880 and Taylor Street 230210 Santa Clara Rehabilitate San Tomas Expressway Box Culvert $ 16 $ - $ 16 N YY Y Y

230234 Santa Clara Realign Marcella Avenue $ 7 $ ‐ $ 7 N YY Y N

Extend Center Avenue to Marcella Avenue 230235 Santa Clara $ 3 $ ‐ $ 3 N YY Y N (includes constructing a bridge over Llagas Creek) Implement Capitol Expressway Traffic Operations 230242 Santa Clara $ 6 $ - $ 6 N YY Y Y System (TOS) Improve intersection at Lawrence Expressway/Prospect Road (includes providing a 230246 Santa Clara second left turn lane from Prospect Road $ 3 $ ‐ $ 3 N YY Y N eastbound to Lawrence Expressway northbound and modify existing traffic signals) Implement Expressway TOS infrastructure 230251 Santa Clara $ 12 $ - $ 12 N YY Y Y improvements Implement signal improvements on Santa Teresa 230255 Santa Clara $ 1 $ ‐ $ 1 N YY Y N Boulevard and San Martin Avenue Improve interchange at Montague 230262 Santa Clara $ 18 $ ‐ $ 18 N YY Y N Expressway/U.S. 101 Improve grade intersection at Montague 230265 Santa Clara $ 6 $ ‐ $ 6 N YY Y N Expressway/Mission College Boulevard Implement traffic signal improvements on Santa 230266 Santa Clara $ 1 $ ‐ $ 1 N YY Y N Teresa Boulevard and Tilton Avenue

C‐21 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Widen Montague Expressway to 8-lanes for HOV lanes between Lick Mill and Trade Zone 230267 Santa Clara $ 14 $ 14 $ - YYY Y Y boulevards and on Guadalupe River Bridge and Penitencia Creek Road Construct a new interchange at Trimble Road 230269 Santa Clara $ 37 $ 37 $ - YYY Y Y and Montague Expressway Widen Montague Expressway between Trade 230273 Santa Clara $ 16 $ 4 $ 11 N YY Y N Zone and I‐680 Montague Expressway & McCarthy/O'Toole 230284 Santa Clara $ 41 $ 41 $ - YYY Y Y Interchange Improvements Implement bicycle and pedestrian improvements 230286 Santa Clara $ 1 $ - $ 1 N YY Y Y on Lawrence Expressway/Doyle Road Implement Expressway and Cross Street signal 230292 Santa Clara $ 6 $ ‐ $ 6 N YY Y N coordiation Conduct environmental and design studies to 230294 Santa Clara widen and create new alignment for Route 152 $ 917 $ 917 $ - YYY Y Y (from Route 156 to U.S. 101) 230332 Santa Clara Construct grade separation at Rengstroff Avenue $ 73 $ - $ 73 N YY Y Y Construct interchange at Lawrence Expressway 230356 Santa Clara $ 52 $ 52 $ - YYY Y Y and Arques Avenue Construct interchange at I-880 and Montague 230363 Santa Clara Expressway (includes improvements to $ 14 $ 14 $ - YYY Y Y Montague Expressway) Improve interchange at I‐680/Montague 230370 Santa Clara $ 27 $ ‐ $ 27 N YY Y N Expressway 230385 Santa Clara Implement Palo Alto Street Smarts program $ 5 $ - $ 5 N YY Y Y Widen off‐ramp at southbound Route 230407 Santa Clara $ 1 $ ‐ $ 1 N YY Y N 17/Hamilton Avenue Construct auxiliary lane on southbound U.S. 101 230410 Santa Clara from Great America Parkway to Lawrence $ 3 $ ‐ $ 3 N YY Y N Expressway Construct auxiliary lane on eastbound Route 237 230411 Santa Clara $ 7 $ ‐ $ 7 N YY Y N from Mathilda Avenue to Fair Oaks Avenue Improve interchange at Route 87/Capitol 230425 Santa Clara $ 13 $ 5 $ 8 N YY Y N Expressway/Narvaez Avenue Implement capacity increasing improvements at 230445 Santa Clara the intersection of Great America $ 8 $ ‐ $ 8 N YY Y N Parkway/Mission College Boulevard Extend Charcot Avenue over I-880 as a new 2- lane roadway with bicycle and pedestrian 230449 Santa Clara $ 31 $ 31 $ - YYY Y Y improvements to connect to North San Jose employment center Implement couplet converstion projects in downtown San Jose (includes converting one‐way 230452 Santa Clara couplets to two‐way, reducing lanes, and adding $ 28 $ 12 $ 16 N YY Y N bike lanes along 10th Street/11th Street, Almaden Avenue/Vine Street, and 2nd Street/3rd Street) 230456 Santa Clara Widen Zanker Road from 4-lanes to 6-lanes $ 61 $ 61 $ - YYY Y Y Widen Oakland Road from 4‐lanes to 6‐lanes 230457 Santa Clara $ 13 $ 5 $ 7 N YY Y N between U.S. 101 and Montague Expressway Construct Caltrain grade separation at Branham 230466 Santa Clara $ 36 $ - $ 36 N YY Y Y Lane Widen intersections and improve sidewalks 230471 Santa Clara $ 17 $ 17 $ - YYY Y Y throughout the city of Sunnyvale Improve interchange at U.S. 101/Old Oakland 230492 Santa Clara $ 24 $ 10 $ 14 N YY Y N Road Construct auxiliary lanes on U.S. 101 in Mountain 230531 Santa Clara View and Palo Alto, from Route 85 to $ 106 $ 106 $ - YYY Y Y Embarcadero Road Improve interchange at Route 237/North 1st 230532 Santa Clara $ 2 $ 2 $ - YYY Y Y Street Implement Sunnyvale Downtown Specific Plan Transportation Improvements (includes 230539 Santa Clara intersection and streetscape enhancements, $ 15 $ ‐ $ 15 N YY Y N bikeways, signal improvements, and roadway reconfiguration) 230574 Santa Clara Improve the Route 85/Cottle Road interchange $ 6 $ 6 $ - YYY Y Y Improve interchange at Route 237/El Camino 230580 Santa Clara $ 5 $ ‐ $ 5 N YY Y N Real/Grant Road 230637 Santa Clara Rehabilitate San Carlos Street Bridge $ 11 $ - $ 11 N YY Y Y

C‐22 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities 230638 Santa Clara Construct Caltrain grade separation at Skyway $ 36 $ - $ 36 N YY Y Y Implement bicycle and pedestrian improvements 230641 Santa Clara $ 36 $ 36 $ - YYY Y Y in North San Jose Implement improvements on Bird Avenue 230642 Santa Clara $ 4 $ - $ 4 N YY Y Y pedestrian corridor Implement improvements on Neiman Pedestrian 230643 Santa Clara $ 10 $ - $ 10 N YY Y Y Overcrossing Implement miscellaneous intersection 230644 Santa Clara $ 33 $ 33 $ - YYY Y Y improvements in North San Jose Implement improvements to the North First 230645 Santa Clara $ 71 $ 71 $ - YYY Y Y Street Core Area grid Improve Caltrain terminal at San Jose Diridon 240063 Santa Clara $ 206 $ 52 $ 155 N YY Y Y Station Implement Rapid Transit improvements in the Santa Clara/Alum Rock route (includes dedicated 240117 Santa Clara guideways, signal prioritization, ticket vending $ 147 $ 147 $ - YYY Y Y machines, premium stations, real-time information, and specialized vehicles)

240118 Santa Clara Implement Stevens Creek Rapid Transit Project $ 166 $ - $ 166 N YY Y Y

240119 Santa Clara Implement El Camino Rapid Transit Project $ 234 $ 234 N YY Y Y 240159 Santa Clara Implement King Road Rapid Transit Project $ 62 $ 62 $ - YYY Y Y Extend BART to Berryessa (includes 240374 Santa Clara environmental, preliminary engineering, $ 3,489 $ 3,489 $ - YYY Y Y property acquisition and construction phases) Extend BART from Berryessa to San Jose/Santa 240375 Santa Clara $ 3,962 $ 1,355 $ 2,607 N YY Y Y Clara (Phase 2) Implement improvements on Hacienda Avenue 240376 Santa Clara between Winchester Boulevard and San Tomas $ 4 $ ‐ $ 4 N YY Y N Aquino Road Widen McCllelan Road for bike lanes between 240377 Santa Clara $ 3 $ ‐ $ 3 N YY Y N Foothill Boulevard and Byrne Avenue Extend Buena Vista Avenue from Santa Teresa 240379 Santa Clara $ 10 $ ‐ $ 10 N YY Y N Boulevard to Monterey Road Construct 4‐lane bridge across Uvas Creek to allow 240385 Santa Clara the extension of Tenth Street to Santa Teresa $ 16 $ ‐ $ 16 N YY Y N Boulevard (Glen Loma Development). Widen Los Gatos Boulevard from Camino Del 240398 Santa Clara $ 7 $ ‐ $ 7 N YY Y N Cerro to Samaritan Drive Widen Dixon Landing Road from 4‐lanes to 6‐lanes 240403 Santa Clara $ 7 $ ‐ $ 7 N YY Y N between North Milpitas Boulevard and I‐880 Widen Calaveras Boulevard overpass from 4‐lanes 240404 Santa Clara $ 84 $ ‐ $ 84 N YY Y N to 6‐lanes Improve intersection at Dixon Landing 240405 Santa Clara $ 4 $ ‐ $ 4 N YY Y N Road/Milpitas Boulevard Extend Butterfield Boulevard North (includes 4‐ 240408 Santa Clara lane arterial, bike lanes, sidewalks, lighting and $ 1 $ ‐ $ 1 N YY Y N signal modification) Implement improvements on Santa Teresa 240411 Santa Clara Boulevard between Main Avenue and DeWitt $ 12 $ ‐ $ 12 N YY Y N Avenue Extend Butterfield Boulevard South between Tennant Avenue and Watsonville Road (includes 240412 Santa Clara UPRR overpass structure, drainage channel, traffic $ 22 $ ‐ $ 22 N YY Y N signal upgrades, striping, median and landscaping, street lights, bike lanes and sidewalks) Improve intersection at Miramonte Avenue/Park 240414 Santa Clara $ 1 $ ‐ $ 1 N YY Y N Drive 240419 Santa Clara Upgrade Saratoga Signal System $ 1 $ ‐ $ 1 N YY Y N Widen intersection at El Camino Real/Lafayette 240425 Santa Clara $ 1 $ ‐ $ 1 N YY Y N Street Implement pedestrian safety improvements on 240427 Santa Clara $ 2 $ - $ 2 N YY Y Y Route 9 Implement Saratoga Signal Upgrade Project Phase II (includes providing traffic management system 240428 Santa Clara $ 1 $ ‐ $ 1 N YY Y N at Saratoga City Hall and communication equipment to all upgraded signals) Implement streetscale improvements on 240430 Santa Clara Prospect Road between Saratoga Avenue and $ 2 $ - $ 2 N YY Y Y Saratoga-Sunnyvale Road

C‐23 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Implement sidewalk and pedestrian 240434 Santa Clara $ 0.4 $ - $ 0.4 N YY Y Y enhancements on Saratoga Avenue Improve southbound U.S. 101 between San 240436 Santa Clara Antonio Road to Carleston Road/Rengstorff $ 51 $ ‐ $ 51 N YY Y N Avenue Convert Route 85 HOV lanes to express lanes 240439 Santa Clara $ 187 $ 187 $ - YYY Y Y between Route 87 and I-280 Improve interchange at U.S. 101/Oregon 240441 Santa Clara $ 128 $ ‐ $ 128 N YY Y N Expressway/Embarcadero Road Extend Mary Avenue north across Route 237 (includes reconfiguring the Mathilda Avenue/U.S. 240443 Santa Clara 101 interchange, re‐routing Moffett Park Drive $ 69 $ 32 $ 38 N YY Y N and modifying the Route 237 eastbound/Mathilda Avenue northbound flyover) Convert Route 237 HOV lanes to express lanes 240463 Santa Clara $ 17 $ 17 $ - YYY Y Y between North First Street and I-880 Convert Route 87 HOV lanes to express lanes 240464 Santa Clara $ 36 $ 36 $ - YYY Y Y between Route 85 and U.S. 101 Convert U.S. 101 HOV lanes to express lanes 240466 Santa Clara $ 480 $ 480 $ - YYY Y Y between Whipple Avenue and Cochrane Road Improve connector ramp at Route 237 westbound to Route 85 southbound (includes auxiliary lanes 240468 Santa Clara $ 94 $ ‐ $ 94 N YY Y N on Route 85 between El Camino Real and Route 87) Implement express lanes on Route 17 between I- 240469 Santa Clara $ 30 $ 30 $ - YYY Y Y 280 and Route 85 Install pedestrian countdown signals in 240470 Santa Clara $ 0.2 $ - $ 0.2 N YY Y Y Sunnyvale Improve braided ramps on northbound I‐280 240473 Santa Clara $ 103 $ ‐ $ 103 N YY Y N between Foothill Expressway and Route 85 Implement express lanes on Route 237 between 240477 Santa Clara $ 84 $ 84 $ - YYY Y Y Mathilda Avenue to Route 85 Convert Route 237 HOV lanes to express lanes 240481 Santa Clara $ 21 $ 21 $ - YYY Y Y between North First Street to Mathilda Avenue

Implement express lanes on I-680 from Calaveras 240482 Santa Clara $ 20 $ 20 $ - YYY Y Y Boulevard to Montague Expressway Implement express lanes on I-880 between the 240484 Santa Clara $ 23 $ 23 $ - YYY Y Y Alameda County Line and U.S. 101 Implement express lanes on U.S. 101 between 240485 Santa Clara $ 110 $ 110 $ - YYY Y Y Cochrane Road and Masten Avenue Implement express lanes on U.S. 101 between 240491 Santa Clara $ 70 $ 70 $ - YYY Y Y Masten Avenue and 10th Street Implement express lanes on U.S. 101 between 240492 Santa Clara $ 52 $ 52 $ - YYY Y Y 10th Street and Route 25 Implement System Operations and Management 240494 Santa Clara $ 425 $ - $ 425 N YY Y Y Program for Santa Clara County Implement San Jose Midtown bicycle and 240497 Santa Clara $ 2 $ 1 $ 2 N YY Y Y pedestrian enhancements 240498 Santa Clara Widen Brokaw Bridge over Coyote Creek $ 24 $ ‐ $ 24 N YY Y N Implement El Camino Real Regional Corridor 240506 Santa Clara improvements from Palo Alto Medical Foundation $ 5 $ ‐ $ 5 N YY Y N to Churchill Avenue Improve Middlefield Road‐Midtown Corridor (includes sidewalk enhancements, transit stop 240507 Santa Clara $ 2 $ ‐ $ 2 N YY Y N improvements, lighting improvements, and traffic signal improvements) Implement the Community Design and Transportation (CDT) Program in Santa Clara County (includes streetscape improvements, 240508 Santa Clara $ 566 $ - $ 566 N YY Y Y bicycle and pedestrian access improvements, place-making improvements, and roadway and transit facility improvements) Develop projects and programs contained within VTA's Countywide Bicycle Plan, VTA's Bicycle 240509 Santa Clara $ 362 $ - $ 362 N YY Y Y Expenditure Program, and Local Bike Plans and programs. Implement Guadelupe Express light rail 240512 Santa Clara $ 30 $ 30 $ - YYY Y Y improvements Implement express lanes on I-280 between 240513 Santa Clara $ 60 $ 60 $ - YYY Y Y Leland Avenue and Magdalena Avenue Implement express lanes on I-280 between US 240514 Santa Clara $ 25 $ 25 $ - YYY Y Y 101 and Leland Avenue

C‐24 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Implement express lanes on I-280 between 240515 Santa Clara southbound El Monte Road and Magdelena $ 14 $ 14 $ - YYY Y Y Avenue Implement express lanes on I-680 between 240516 Santa Clara $ 36 $ 36 $ - YYY Y Y Montague Expressway and US 101 Implement express lanes on I-880 between U.S. 240517 Santa Clara $ 192 $ 192 $ - YYY Y Y 101 and I-280 Implement Tasman Express Long T (includes double-tracking of a single-tracked light rail 240518 Santa Clara $ 68 $ 68 $ - YYY Y Y segment on the Mountain View line to facilitate the extra line of service) Implement North First Street light rail speed 240519 Santa Clara $ 12 $ 12 $ - YYY Y Y Improvements Improve interchanges on Route 152 at Frazier Lake 240532 Santa Clara Road, Bloomfield Road, Watsonville Road, and $ 10 $ ‐ $ 10 N YY Y N Ferguson Road Improve interchanges at Route 237/Mathilda 240554 Santa Clara $ 18 $ ‐ $ 18 N YY Y N Avenue and U.S. 101/Mathilda Avenue 240570 Santa Clara Widen offramp at Trimble Road on Route 87 $ 1 $ ‐ $ 1 N YY Y N

Implement Capitol Expressway Light Rail Extension - Phase I (includes sidewalk, landscape 240591 Santa Clara $ 53 $ 53 $ - YYY Y Y and street lights on both sides of the expressway from Capitol Avenue to Tully Road)

240603 Santa Clara Implement North San Jose Transit Improvements $ 61 $ 61 $ - YYY Y Y

240611 Santa Clara Improve interchange at Route 85/El Camino Real $ 24 $ ‐ $ 24 N YY Y N Construct 2‐lane or 4‐lane connection between Almaden Expressway and Winfield Boulevard 240636 Santa Clara (Chynoweth Ave. or Thornwood bridge will include $ 17 $ ‐ $ 17 N YY Y N construction of a new connector, bike lanes and sidewalks) 240671 Santa Clara Improve interchange at I‐280/Senter Road $ 52 $ ‐ $ 52 N YY Y N Implement Lawrence Expressway/I‐280 240710 Santa Clara $ 3 $ ‐ $ 3 N YY Y N interchange project Construct new Fairfield/Vacaville multimodal 21341 Solano train station for Capitol Corridor intercity rail $ 49 $ 49 $ - YYY Y Y service (Phases 1, 2 and 3) Construct new Vallejo Baylink Ferry Terminal (includes additional parking, upgrade of bus 22629 Solano $ 76 $ 76 $ - YYY Y Y transfer facilities and pedestrian access improvements) 22632 Solano Widen American Canyon Road overpass at I-80 $ 12 $ 12 $ - YYY Y Y Construct an adjacent 200-space, at-grade 22634 Solano parking lot at the Vacaville Intermodal Station $ 13 $ 13 $ - YYY Y Y (Phase 1) Improve Curtola Transit Center, includes 420 space parking structure and transit plaza on 22794 Solano $ 18 $ 12 $ 6 N YY Y Y existing park and ride lot, auto/carpool pick-up and circulation improvements Improve Fairfield Transportation Center, includes 22795 Solano $ 34 $ 12 $ 22 N YY Y Y 1,000 additional parking spaces Implement transit hub in the Benicia Industrial 22985 Solano $ 1 $ 1 $ - YYY Y Y Park Construct 4‐lane Jepson Parkway from Route 12 to 94151 Solano $ 191 $ 144 $ 47 N YY Y N Leisure Town Road at I‐80 98212 Solano Expand bicycle and pedestrian facilities $ 5 $ 5 N YY Y Y $ - Improve interchanges and widen roadways serving 230313 Solano Solano County Fairgrounds, including Redwood $ 96 $ 93 $ 3 N YY Y N Parkway Rebuild and relocate eastbound Cordelia Truck Scales Facility (inclues a new 4-lane bridge across 230322 Solano $ 104 $ 104 $ - YYY Y Y Suisun Creek and new ramps at eastbound Route 12 and eastbound I-80) Improve I‐80/I‐680/Route 12 Interchange (Phase 230326 Solano 1), includes widen I‐80 and I‐680 and improve $ 578 $ 347 $ 231 N YY Y N direct freeway to freeway connections

C‐25 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Provide auxiliary lanes on I‐80 in eastbound and westbound directions from I‐680 to Airbase 230468 Solano Parkway, add eastbound mixed‐flow lane from $ 52 $ ‐ $ 52 N YY Y N Route 12 East to Airbase Parkway, and remove I‐ 80/auto Mall hook ramps and C‐D slip ramp

230558 Solano Provide Lifeline transit service countywide $ 50 $ 50 N YY Y Y $ - Widen Railroad Avenue on to 4-lanes 230590 Solano $ 5 $ 5 $ - YYY Y Y from G Street to Route 37 Improve Vacaville Intermodal Station (Phase 2), 230635 Solano $ 11 $ 2 $ 9 N YY Y Y inlcudes parking garage Implement I-505/Vaca Valley Parkway interchange improvements (includes widening southbound off-ramp at Vaca Valley Parkway, 240210 Solano $ 2 $ 2 $ - YYY Y Y widening Vaca Valley Parkway to provide protected left turn pockets, and signalization of the southbound ramp intersection)

Implement I-80/Lagoon Valley Road interchange improvements (includes widening existing overcrossing from 2 to 4 lanes, widening the 240213 Solano westbound ramp and intersection, widening and $ 10 $ 10 $ - YYY Y Y realigning the eastbound ramps, and signalization of both eastbound and westbound ramp intersections)

Benicia Intermodal Facilities Project: Construct 240313 Solano transit intermodal stations at Mliitary West and $ 3 $ 3 $ - YYY Y Y West 14th, and Military West and First Street

240556 Solano Enhance bicycle and pedestrian facilities $ 1 $ 1 N YY Y Y $ - 240558 Solano Rehabilitate bicycle and pedestrian facilities $ 1 $ 1 N YY Y Y $ - Improve ADA access at existing intercity transit 240559 Solano $ 1 $ 1 N YY Y Y centers $ - Enhance transit information services (includes adding GPS devices and tracking hardware and 240572 Solano $ 1 $ 1 N YY Y Y software to all buses, and display media to bus stations) $ - Install security cameras and monitoring 240573 Solano $ 1 $ 1 N YY Y Y equipment at Solano transit stations $ - Rehabilitate major transit centers in Solano 240575 Solano $ 2 $ 2 N YY Y Y County $ - 240576 Solano Replace existing transit fleet $ 10 $ 10 N YY Y Y $ - 240578 Solano Transit maintenance $ 50 $ 50 N YY Y Y $ - Implement safety improvements to state 240593 Solano $ 1 $ 1 N YY Y N highways in Solano County $ ‐ Implement enhancements on highways in Solano County (includes landscaping, 240594 Solano $ - $ - YYY Y Y soundwalls, gateways, multi-modal enhancements, and hardscaping) $ - Modify interchanges to improve operations, 240595 Solano safety, multi‐modal access, and improve signal $ 1 $ 1 N YY Y N timing $ ‐ Conduct corridor studies of Solano highways and 240596 Solano freeways and install non‐ITS performance $ 3 $ 3 N YY Y N measures $ ‐ 240599 Solano Rehabilitate local bridges $ 1 $ 1 N YY Y Y $ - 240600 Solano Maintain local streets and roads $ 3 $ 3 N YY Y Y $ - Implement Solano County's local air quality and 240601 Solano $ 3 $ 3 N YY Y Y climate protection strategies $ - Implement ridesharing measures (includes 240602 Solano ridematching, vanpool services, and commute $ 14 $ 14 N YY Y Y trip planning/consulting) $ - 240604 Solano Implement local parking management programs $ 1 $ 1 N YY Y Y $ - Implement Solano County's Safe Routes to 240605 Solano $ 28 $ 28 N YY Y Y School program $ - Implement Solano County's Safe Routes to 240606 Solano $ 7 $ 7 N YY Y Y Transit program $ -

C‐26 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Provide transit service to seniors and individuals 240608 Solano $ 28 $ 28 N YY Y Y with disabilities (separate from Lifeline) $ - Rehabilitate transit guideways (includes docking 240609 Solano facilities and channel maintenance for WETA $ 1 $ 1 N YY Y Y ferries) $ - Local transportation planning and public 240610 Solano $ - $ - YYY Y Y outreach efforts $ - 240680 Solano Local streets and roads maintenance $ 50 $ 50 N YY Y Y $ - 240719 Solano Transit operations support $ 1 $ 1 N YY Y Y $ - 240720 Solano Local Road Safety $ 3 $ 3 N YY Y N $ ‐ 240721 Solano Maintain state highways in Solano County $ 5 $ 5 N YY Y Y $ - Implement Solano County's regional air quality 240722 Solano $ 5 $ - $ 5 N YY Y Y and climate protection strategies 240739 Solano Dredge Channel to Port of Stockton $ 18 $ 18 $ - YYY Y Y Realign Route 116 (Stage Gulch Road) along Champlin Creek to improve safety, adding 21070 Sonoma $ 12 $ 12 $ - YYY Y Y shoulders to accommodate pedestrians and bicyclists Widen U.S. 101 for HOV lanes from Pepper Road 21902 Sonoma $ 109 $ 109 $ - YYY Y Y to Rohnert Park Expressway (Central Phase A)

Improve channelization and traffic signalization at 22190 Sonoma Route 116/Route 121 intersection (includes Arnold $ 15 $ 5 $ 10 N YY Y N Drive improvements) US 101 North Project - Phase B- Airport Boulevard 22191 Sonoma interchange improvements and Airport $ 43 $ 43 $ - YYY Y Y Boulevard Improve U.S. 101/Old Redwood Highway interchange (includes modifying/replacing 22195 Sonoma $ 43 $ 43 $ - YYY Y Y existing 2-lane interchange to at least a 5-lane interchange and improving ramps) Improve local circulation at various locations in Town of Penngrove (includes improvements to 22197 Sonoma $ 40 $ 20 $ 20 N YY Y N Main Street, Petaluma Hill Road, Adobe Road, Old Redwood Highway and U.S. 101/Railroad Avenue) Widen Fulton Road from 2‐lanes to 4‐lanes from 22204 Sonoma $ 4 $ 1 $ 2 N YY Y N Guerneville Road and Piner Road Extend Farmers Lane from Bellevue Avenue to 22207 Sonoma Bennett Valley Road as a 3‐lane or 4‐lane arterial $ 58 $ 29 $ 29 N YY Y N (includes a bicycle lane and sidewalk) Improve Bodega Highway west of Sebastopol 22438 Sonoma (includes straightening curves near Occidental and $ 2 $ 1 $ 1 N YY Y N adding turn pockets) Convert bridges in Sonoma County from 1‐lane to 22490 Sonoma $ 19 $ 1 $ 18 N YY Y N 2‐lane Widen U.S. 101 for HOV lanes (one in each direction) from Rohnert Park Expressway to Santa 22655 Sonoma $ 69 $ 69 $ - YYY Y Y Rosa Avenue (includes interchange improvements and ramp metering) Improve U.S. 101/East Washington Street 22656 Sonoma interchange (includes new northbound on-ramp $ 22 $ 22 $ - YYY Y Y and improvements to southbound on-ramp) Install traffic signal system on Route 121 and 94691 Sonoma $ 3 $ 0 $ 3 N YY Y N improve channelization at 8th Street Widen U.S. 101 in each direction with 1 HOV lane 98147 Sonoma from Old Redwood Highway to the Marin/Sonoma $ 220 $ 14 $ 206 N YY Y N County line Improve channelization and traffic signalization 230341 Sonoma $ 5 $ 5 $ - YYY Y Y on Mirabel Road and Route 116 Construct Suburban Center intersection 230368 Sonoma improvements at Route 12 (Farmers Lane) and 4th $ 7 $ ‐ $ 7 N YY Y N Street 230700 Sonoma Rehabilitate local roads countywide $ 104 $ - $ 104 N YY Y Y Widen Rohnert Park Expressway from 2-lanes to 4- lanes between Snyder Lane and Petaluma Hill Road (includes new bike lanes in both directions, 240359 Sonoma $ 9 $ 9 $ - YYY Y Y curb and gutter, sidewalk, landscaped median, and traffic signal devices/improvements at Petaluma Hill Road)

C‐27 Appendix C

Plan Bay Area Final List of Transporation Projects/Programs by County (As of July 27, 2012) Alt 4: Alt 2: Jobs- Alt 3: Transit Total Project Committed Discretionary Alt 1: No Enhanced RTP ID County Public Title Housing Priority Alt 5: EEJ Cost Funds Funds Project Network of Connection Focus Communities Widen Snyder Lane from 2‐lanes to 4‐lanes 240360 Sonoma between southside of "G" section and Southwest $ 5 $ 4 $ 1 N YY Y N Boulevard Widen of Golf Course Drive West (formerly Wilfred Avenue) from 2-lanes to 4-lanes between the 1999 City Limits west of Redwood Drive to 240366 Sonoma the Urban Growth Boundary (includes four travel $ 5 $ 5 $ - YYY Y Y lanes, a bike lane on both sides, sidewalks, landscaping, and traffic signals at Redwood Drive, Labath Avenue, and Dowdell Avenue) Construct an interchange with bicycle and 240524 Sonoma pedestrian enhancements at Route 12/Fulton $ 70 $ 27 $ 43 N YY Y N Road 240529 Sonoma Improve interchange at Hearn Avenue/U.S. 101 $ 46 $ 4 $ 42 N YY Y N Construct bicycle and pedestrian crossing at U.S. 240547 Sonoma $ 6 $ - $ 6 N YY Y Y 101 and Copeland Creek Implement Sonoma County's Safe Routes to 240561 Sonoma $ 20 $ - $ 20 N YY Y Y School program Enhance bus service frequencies in Sonoma 240650 Sonoma $ 104 $ - $ 104 N YY Y Y County Implement bicycle and pedestrian improvements 240651 Sonoma $ 118 $ 14 $ 104 N YY Y Y countywide Implement Windsor River Road/Windsor Road/NWPRR Intersection improvements. Re‐ 240667 Sonoma $ 9 $ 9 N YY Y N configure intersection and improve railroad, vehicle, pedestrian interface. Widen Airport Boulevard from 2‐lanes to 5‐lanes 240668 Sonoma $ 36 $ 13 $ 23 N YY Y N between Ordiance Road and Aviation Boulevard Implement Marin Sonoma Narrows Stage 1 240672 Sonoma $ 123 $ 123 $ - YYY Y Y (Sonoma County) Implement Sonoma County's Climate Initiatives 240709 Sonoma $ 21 $ - $ 21 N YY Y Y program Conduct environmental studies and preliminary 240737 Sonoma design for the proposed SMART commuter rail $ 15 $ - $ 15 N YY Y Y extension from Windsor to Cloverdale (Phase III)

C‐28