List of Metro Projects

Total Page:16

File Type:pdf, Size:1020Kb

List of Metro Projects List Of Metro Projects Year Name of Project Client Geo-Technical-3: Detailed Geotechnical Investigation Work for Tughlakabad – Terminal Delhi Metro Rail Corporation 2017 1, IGI Airport corridor & Lajpat Nagar-Saket G Block corridor of Phase - IV of Delhi Ltd. MRTS Project Geotechnical Investigation for Mumbai Metro Line 3 (Colaba-Bandra_SEEPZ) 2017 Larsen & Toubro Ltd. – SUCG Project - UG Package-1 (MM2-CBS-UGC-01) Geotechnical Investigation for Tunnel by Shield TBM & ITO, Delhi Gate & Jama Masjid 2015 Stations between Mandi House & Jama Masjid under Delhi MRTS Project, Phase-III Metro Tunnelling Delhi (DMRC) Geotechnical Investigation for Construction of Viaduct and Elevated Stations at Sector- 2015 34, 52, 61, 59, 62 and Electronic City in Noida (CC-94), Line III Extension of Phase-III YFC Projects Private Limited Delhi MRTS Project Confirmatory Geotechnical Investigation for Proposed Noida Metro Project at Noida, CEC International Corporation 2015 Uttar Pradesh India Pvt. Ltd. Geotechnical Investigation for C/o In-situ balance Cantilever over Railway Delhi Metro Rail Corporation 2014 Crossing near Ernakulam South Railway Station Limited (Kochi Metro Rail Project) Geotechnical Investigation for DMRC Phase-III Project between Mandi House to Jama Delhi Metro Rail Corporation 2014 Masjid (CC-05 Contract) Limited Confirmatory borehole work at Ashram Chowk and Sarai Kale Khan to Nizamuddin 2014 J. Kumar Infraprojects Ltd. Station for DMRC Project CC-24 Geotechnical Investigation for Near Khooni Darwaza Monument and Delhi Gate Metro Tunnelling Delhi 2014 Monument along the Tunnel Alignment of DMRC Project (CC-05) (L&T SUCG JV) Geotechnical Investigation for DMRC Corridor Project at Nehru Place Station (UG)- 2014 Pratibha Industries Limited CC23 Geotechnical Investigation for DMRC Corridor Project Between Kalkaji and Hauz Khas 2013 Pratibha Industries Limited Stations(UG)-CC-23 Geotechnical Investigation for Airport Metro Express Line (Tunnel) in T-3 Approach Delhi Metro Rail Corporation 2013 Road, Delhi Airport (DMRC) Geotechnical Investigation for DMRC Corridor Project Between Shankar Vihar and Larsen & Toubro Ltd., 2013 Munirka Stations (UG) CC-27 SUCG-JV-CC27 Geotechnical Investigation for Proposed Metro Stations at ITO, Delhi Gate & Jama 2012 Larsen & Toubro Limited Masjid Pressuremeter Tests along Tunnel from Mandi House to ITO, Delhi Gate & Jama 2012 Larsen & Toubro Limited Masjid (UG-CC-05) 2012 Geotechnical Investigation for DMRC project at Badarpur-Faridabad Route Lanco Infratech Limited Geotechnical Investigation for Proposed Elevated DMRC Corridor Project from Moti 2012 Larsen & Toubro Limited Bagh to Delhi Cantt Via Dhaula Kuan(CC-17) Geotechnical Investigation for DMRC Corridor Project Between Moti Bagh and Lajpat 2012 FEMC-Pratibha JV Nagar Stations(UG)-CC18 Page 1 of 2 Year Name of Project Client 2012 Geotechnical Investigation for New Faridabad Station for DMRC Project Lanco Infratech Limited Geotechnical Investigation for Jama Masjid & Kashmere Gate for UG Works under 2012 Era Infra Engineering Limited Delhi MRTS Project of Ph-III 2012 Geotechnical Investigation for Proposed Sarai Metro Station for DMRC Proejct - CC-16 MBL Infrastructures Limited 2012 Geotechnical Investigation for DMRC Projct-CC-27 (UG-2) Phase-III Larsen & Toubro Limited 2012 DMRC Projct-CC-27 (UG-2) Phase-III L&T - SCUG JV CC27 DELHI Geotechnical Investigations for Chennai Metro Rail Project Phase-I (Underground 2011 Metro Tunneling Chennai Package Uaa-04) Design and Construction of Under-Ground Stations at Shenoy Nagar Anna Nagar Transtonnelstroy - Afcons 2011 East, Anna Nagar Tower Thirumangalam and Associated Tunnels : UAA-05 Joint Venture Geotechnical Investigation for Tunnel Between Central Secretariat and Mandi House for 2011 Pratibha-CRFG JV Underground Works Under Delhi MRTS Project (BC-45) Geotechnical Investigation for Under Ground Tunnel at Delhi (Package CMC1) of Delhi 2009 Larsen & Toubro Limited Mass Rapid Transport System (MRTS) Drilling of boreholes for the Installation of Inclinometer/ Extensometer along monitoring 2008 line ML-11 near Sarvapriya Vihar club at 4 No.locations at Hauz Khas Station and Metro Tunneling Group Malviya Nagar Station Geotechnical Investigation for Delhi Metro Project (Phase-III)-BC 20 Contract : Metro 2007 Tunnel Alignment between green park and saket including stations Hauz Khas and Metro Tunneling Group Malviya Nagar Geotechnical Investigation for Delhi Metro Project (Phase-III)-BC 20 Contract : Metro 2007 Tunnel Alignment to construct viaduct and three elevated Stations at Chhattarpur Simplex Infrastructures Ltd. Ghitorni and Arjungarh on Qutab Minar Gurgaon Corridor Geotechnical Investigation for DMRC Mass Rapid Transport System Airport Metro Line 2007 Larsen & Toubro Limited (AMEL-C5) Project New Delhi Geotechnical Investigation for Qutab Minar-Gurgaon Corridor of Phase-II of Delhi 2006 Simplex Infrastructures Ltd. MRTS Project (Contract BC-20) Geotechnical Investigation for Construction of Railway Bridge Across Yamuna River 2004 Larsen & Toubro Limited Near Shastri Park, Delhi Geotechnical Investigation for DMRC Extension of Line No.3 From Barakhamba Road Consulting Engineering Services 2004 to Indraprastha Estate New Delhi (I) Private Limited Kumagai-Skanska-HCC-Itoch 2002 Soil Investigation and Pumpout tests for DMRC Project under Section MC1A Group Delhi Metro Rail Corporation 1999 Geotechnical Investigation for DMRC - Seelampur Station, New Delhi Ltd. Additional Geotechnical Investigation Along Metro East - West Corridor From ISBT - 1998 RITES Limited Partap Nagar, Delhi Page 2 of 2 Page 3 of 2 .
Recommended publications
  • Metro Rail Projects in India
    MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI REFERENCE NOTE No. 49/RN/Ref/November/2016 For the use of Members of Parliament NOT FOR PUBLICATION1 METRO RAIL PROJECTS IN INDIA Prepared by Smt. Sunanda Das Mohanty, Additional Director (23035036) and Shri S.L. Dogra, Deputy Director of Lok Sabha Secretariat under the supervision of Smt. Kalpana Sharma, Joint Secretary. The reference material is for personal use of the Members in the discharge of their Parliamentary duties, and is not for publication. This Service is not to be quoted as the source of information as it is based on the sources indicated at the end/in the text. This Service does not accept any responsibility for the accuracy or veracity of the information or views contained in the note/collection. METRO RAIL PROJECTS IN INDIA INTRODUCTION Metros are major capital assets of cities. Urban Metro1 Projects have proven to be very useful in decongesting large cities. There are around 148 cities around the world which has a metro system with nearly 540 metro lines, 9,000 stations and 11,000 kilometres of line infrastructure . The world’s metro systems carry 150 million passengers per day. The earliest metro system, the London Underground, first electrified underground line opened in 1890, was the world's first metro system. With more than 500 km of infrastructure, Shanghai has the world’s longest Metro network. London is the longest non Asian Metro network in the ranking, with New York, Moscow, Madrid and Paris. INDIAN SCENARIO Metro systems2 are often given preference as mass transit options for Indian cities due to the belief that road-based bus systems cannot cater to capacity requirements as much as metro systems.
    [Show full text]
  • Noida Metro Rail Corporation (Nmrc) Limited
    Application for playing Curated Music and Content with Commercials at NMRC Stations and Depot Application For Playing Curated Music and Content with commercials at NMRC Stations and Depot through public address system NOIDA METRO RAIL CORPORATION (NMRC) LIMITED Tender No. NMRC/FM/EoI/142/2021 March - 2021 Issued by: Noida Metro Rail Corporation (NMRC) Limited Block-III, 3rd Floor, Ganga Shopping Complex, Sector-29, Noida -201301, District Gautam Budh Nagar, Uttar Pradesh, India Page 1 of 21 Application for playing Curated Music and Content with Commercials at NMRC Stations and Depot Data Sheet 1 Name of the Application For playing Curated Music and Content with commercials at NMRC Stations and Depot through Public Address system 2 Time-period of contract 24 Months 3 Processing Fee INR 10,000 (including GST) (Rupees Ten Thousand only) through RTGS/NEFT only payable in favour of Noida Metro Rail Corporation Limited (Non-Refundable) 4 Name of the Corporation’s GM (Technical) official for addressing queries Noida Metro Rail Corporation, and clarifications Block-III, 3rd Floor, Ganga Shopping Complex, Sector-29, Noida 201301 Email: [email protected] Website:www.nmrcnoida.com 5 Schedule of Application Process Heads Key Dates Uploading of Application 10/03/2021 Pre-Application Meeting 19/03/2021, 1100 hrs (IST) Last date of receipt of written 19/03/2021 upto 18.00 hrs. Can also be emailed to queries against pre-bid meeting [email protected] NMRC response to pre-bid 26/03/2021 till 18.00 hrs. queries (if any) Last Date of Application 12/04/2021, 1500 hrs (IST) Submission Presentation To be intimated by NMRC 6 Account details For Processing Fee HDFC Bank, Shop No.
    [Show full text]
  • Trams Der Welt / Trams of the World 2021 Daten / Data © 2021 Peter Sohns Seite / Page 1
    www.blickpunktstrab.net – Trams der Welt / Trams of the World 2021 Daten / Data © 2021 Peter Sohns Seite / Page 1 Algeria ... Alger (Algier) ... Metro ... 1435 mm Algeria ... Alger (Algier) ... Tram (Electric) ... 1435 mm Algeria ... Constantine ... Tram (Electric) ... 1435 mm Algeria ... Oran ... Tram (Electric) ... 1435 mm Algeria ... Ouragla ... Tram (Electric) ... 1435 mm Algeria ... Sétif ... Tram (Electric) ... 1435 mm Algeria ... Sidi Bel Abbès ... Tram (Electric) ... 1435 mm Argentina ... Buenos Aires, DF ... Metro ... 1435 mm Argentina ... Buenos Aires, DF - Caballito ... Heritage-Tram (Electric) ... 1435 mm Argentina ... Buenos Aires, DF - Lacroze (General Urquiza) ... Interurban (Electric) ... 1435 mm Argentina ... Buenos Aires, DF - Premetro E ... Tram (Electric) ... 1435 mm Argentina ... Buenos Aires, DF - Tren de la Costa ... Tram (Electric) ... 1435 mm Argentina ... Córdoba, Córdoba ... Trolleybus Argentina ... Mar del Plata, BA ... Heritage-Tram (Electric) ... 900 mm Argentina ... Mendoza, Mendoza ... Tram (Electric) ... 1435 mm Argentina ... Mendoza, Mendoza ... Trolleybus Argentina ... Rosario, Santa Fé ... Heritage-Tram (Electric) ... 1435 mm Argentina ... Rosario, Santa Fé ... Trolleybus Argentina ... Valle Hermoso, Córdoba ... Tram-Museum (Electric) ... 600 mm Armenia ... Yerevan ... Metro ... 1524 mm Armenia ... Yerevan ... Trolleybus Australia ... Adelaide, SA - Glenelg ... Tram (Electric) ... 1435 mm Australia ... Ballarat, VIC ... Heritage-Tram (Electric) ... 1435 mm Australia ... Bendigo, VIC ... Heritage-Tram
    [Show full text]
  • Entry/Exit Points to the Metro Stations for Hassle Free Access to Divyangjan
    Page 1 of 7 ENTRY/EXIT POINTS TO THE METRO STATIONS FOR HASSLE FREE ACCESS TO DIVYANGJAN Entry / Exit Gate No. or Lift No.for Availability of Lift inside Entry / Exit Gates of the metro station S/N Station Name Location of the Divyangjan Friendly Entry / Exit Gate or Lift for accessing the metro station accessing metro station for reaching AFC gates (wherever required) RED LINE (RITHALA TO SHAHEED STHAL NEW BUS ADDA) 1 Rithala Lift No.3 - Near Gate No.3 of the Station; near Delhi Jal Board Office 2 Rohini West Lift No.3 - Near Gate No.3 of the Station; near Unity Mall 3 Rohini East Lift No.3 - Near Gate No.3 of the Station; near Fire Safety Management Office 4 Pitampura Lift No.3 - Near Gate No.2 of the Station 5 Kohat Enclave Lift No.3 - Near Gate No.1 of the Station; near Sulabh Toilet Complex, Metro Apartments 6 Netaji Subhash Place (L-1) Gate No.3 Lift No.3 Via Gate No.3 of the Station Gate No.1 Not Required In front of Punjab Kesari Building 7 Netaji Subhash Place (L-7) Gate No.2 Not Required In front of D Mall, Ring Road 8 Keshav Puram Lift No.3 - Near Gate No.3&4 of the Station; near Sulabh Toilet Complex 9 Kanhaiya Nagar Lift No.3 - Near Gate No.3&4 of the Station; near Sulabh Toilet Complex 10 Inder Lok (L-1) Lift No.3 - Near Gate No.1 of the Station; towards Big Bazar 11 Inder Lok (L-5) Lift No.2A - Near Gate No.5 of the Station; Near Sulabh Toilet Complex 12 Shastri Nagar Lift No.3 - Near Gate No.2 of Station; near Parking Lot, Main Market Side 13 Pratap Nagar Lift No.3 - Near Gate No.2 of the Station; Sabzi Mandi Railway Station
    [Show full text]
  • Stop Code List of Delhi
    STOP CODE LIST OF DELHI BOARDING AREA STOP NAME ZONE STOP CODE ROUTE CODE SR.NO 1 KINGSUEY CAMP METRO STATION DL-2 D-001 D-01 2 MODEL TOWN METRO STATION GATE NO.-1 DL-2 D-002 D-01 3 AZADPUR METRO STATION DL-2 D-003 D-01 4 AZADPUR DTC BUS STOP UNDER FLYOVER DL-2 D-004 D-01 5 ASHOK VIHAR OPP. DEEP CINEMA DL-2 D-005 D-01 6 SHALIMAR BAGH RICHI RICH RESTAURANT DL-2 D-006 D-01 7 WAZIRPUR DEPOT OPP. MAIN BUS DEPOT DL-2 D-007 D-01 BRITANNIA / LAWRANCE DTC BUS STOP BETWEEN TWO 8 DL-2 D-008 ROAD FLYOVERS D-01 ON RING ROAD AFTER FLYOVER 9 PUNJABI BAGH DL-2 OPPOSITE SHAMSHAAN GHAAT D-009 D-01 UNDER FLYOVER (DUSSEHRA 10 PUNJABI BAGH DL-2 GROUND) SPG0036 D-01 11 BASAI DARAPUR ESI HOSPITAL BUS STOP DL-2 D-011 D-01 12 MOTI BAGH OPP GURUDWARA DL-1 D-179 D-01 13 UTTAM NAGAR - EAST PANKHA ROAD (DTC BUS STOP) DL-2 SPG0030 D-02 14 JANAKPURI C-1 DTC BUS STOP DL-2 D-013 D-02 15 DABRI MORE DTC BUS STOP DL-2 D-014 D-02 16 JANAKPURI JANAK CINEMA BUS STOP DL-2 D-015 D-02 17 SAGARPUR AGGARWAL SWEETS, DTC BUS STOP DL-2 D-016 D-02 18 DELHI CANTT GOPINATH DL-2 D-018 D-02 19 PALAM AIRPORT (Near Underpass) DL-2 SPG0028 D-02 20 CHHATARPUR CDR CHOWK DL-1 D-146 D-02 21 CHHATARPUR MORE 100 FEET ROAD DL-1 D-147 D-02 22 SAFDARJUNG ENCLV.
    [Show full text]
  • Maha Metro Connect Year 03 Volume 03 March-April 2021
    Year 03 | Volume 03 | March-April 2021 Dear Colleagues, Best ever performance when conditions are the toughest and most challenging, is the hardest thing to achieve. But that is what has been precisely achieved by Maha Metro in Nagpur & Pune Metro Projects, in the month - March'21 and the year 2020-21 in terms of our physical & financial progress, despite the gravest challenges posed by COVID19 pandemic through the year. The following are the figures: PROGRESS PREVIOUS BEST Month March ‘21 Rs. 685 Crores Month March ’19 Rs. 669 Crores Year 2020-21 Rs. 3303 Crores Year 2018-19 Rs. 2894 Crores The credit goes to dedication, discipline and delivery of each and every • MD’s Message member of Team Maha Metro and the superb Team Work. No words • Four New Stations operational in can truly capture the exemplary bravery and sacrifice of all of you and Nagpur your families in the trying circumstances in delivering the above • Maha Metro using Pandemic performance. Period to its advantage • Balanced Cantilever Bridge over I compliment and congratulate all of you and your families not only for this outstanding performance but coming out victorious in the fight Railway tracks with this pandemic. • Maintenance Depot on viaduct • Pune Metro Multi-modal A total of 819 of our team members were unfortunately affected by Integration updates the pandemic, 418 of them have already overcame the challenge. • Tunneling under Mutha river However, 4 (Maha Metro-1, GC-1, Contractors-2) lost the battle • New Joinees & Project updates despite best efforts. Our heartfelt condolences to their families.
    [Show full text]
  • Presents Largest Airport
    HARE KRISHNA CONSTRUCTIONS TOWNSHIP NEAR WORLD'S 4TH PRESENTS LARGEST AIRPORT HARE KRISHNA ENCLAVE RESIDENTIAL PLOTS ABOUT HARE KRISHNA CONSTRUCTIONS Hare Krishna Construc�ons is a established premier real estate developer company which has developed Hare Krishna Enclave which is located on Yamuna Expressway near to Noida Interna�onal Airport. Since 2019, Hare Krishna Construc�ons have had the privilege of providing families with an opportunity to process into the next stage of their lives, desirable plots. Hare Krishna Enclave plots give a chance to be a part of developing Township with an exis�ng client base from various domains of society consis�ng of government sector /public sector , serving and re�red workers of Central and state government , teachers, doctors , engineers etc. JEWAR AIRPORT Jewar Interna�onal Airport is a proposed airport to be constructed in Jewar(56 kilometers from Noida) in Gautain Budh Nagar district of U�ar Pradesh. The Yamuna Expressway Industrial Development Authority(YEIDA) will be the implemen�ng agency on behalf of the U�ar Pradesh State Government. The airport is to be developed on a Public Private Partnership model(PPP). The proposed plan is to be build a two runway airport by 2022-23 and then, at a future date, to extend it to a 7200-acre-runway airport. According to the proposed plan. the airport will handle 5 million passengers per annum (MPA) ini�ally and up to 60 MPAa�er expansion over 30 years. The project site is 72 kilometers from Indira Gandhi Interna�onal Airport: 40 km from Bulandshahar. 60 km from Noida & 70 km from Faridabad & Ghaziabad, about 30 km from Greater Noida ,65 km from Gurugrarn and 130 km from Agra.
    [Show full text]
  • Contract Ns-01 Summary Sheet For
    Contract NS-01: Design, Manufacture, Supply, Installation, Testing and Commissioning of Train Control, Signalling and Telecommunication Systems, Supply of Spares and Training of Operation & Maintenance personnel for Noida – Greater Noida Metro Project. CONTRACT NS-01 SUMMARY SHEET FOR ADDENDUM NO.-3 Tender Page Addendum / S. No Clause No. / Item No. Remarks Document No. Corrigendum Sale Period, Last date of issuing Page 4RR is addendum, Date of 1. 1 NIT (Vol. 1) 4RR Clause 1.1.1 – Key Details replaced with Page submission and 4RRR opening are revised Contract NS-01: Design, Manufacture, Supply, Installation, Testing and Commissioning of Train Control, Signalling and Telecommunication Systems, Supply of Spares and Training of Operation & Maintenance personnel for Noida – Greater Noida Metro Project. 1.1.1 Key Details: Approximate cost of Work INR 312.0 crore Tender Security amount INR 3.12 crore Tender Security (in original) as per clause C18 of ITT shall be accepted only up to 1500 hrs on 30.06.2015 17.08.2015 01.09.2015 10.09.2015 in the office of Executive Director/Contracts at following address. Revenue Operation Date (ROD) and Revenue Operation Date (ROD): 31.12.2017. Completion period of the Work The Works shall be completed 2 weeks before ROD from date of Notice to Proceed (NTP) as stipulated in Letter of Acceptance (LOA). (Approximate duration for issuing LOA from the date of submission of tender is expected to be 4 to 6 months) Tender documents on sale From 18.05.2015 to 30.06.2015 17.08.2015 01.09.2015 10.09.2015 (up to 1100 hrs) on e- tendering website www.tenderwizard.com/DMRC Tender document can only be obtained online after registration of tenderer on the website www.tenderwizard.com/DMRC.
    [Show full text]
  • Kochi Water Metro Project
    Kochi Water Metro Project Kochi Metro Rail Limited (KMRL) in line with the directives of the Ministry of Urban Development, Government of India has spearheaded the task of setting up an integrated transportation system for Kochi city. The proposed project recommends sixteen (16) identified routes connecting thirty eight (38) jetties across ten (10) island communities across a 76 km route network. The identified routes and jetties are represented in the figure. There are existing jetties where boat services from Kerala State Water Transport Corporation and private agencies are currently being operated. Eighteen (18) jetties proposed to be developed as major jetties or main boat hubs while the remaining twenty (20) jetties shall be developed as minor jetties for water transit services. The entire Inland Water Transport project is proposed to be realised over a period of four years between 2017 and 2020. The project shall be implemented to cater to daily ridership, which is estimated to increase to 40,000 by 2019; 54,000 by 2025 and 86,000 by 2035. The project involves the renovation of jetties, boatyard and access roads around, providing parking facilities, maintenance dredging activities etc. Kochi Water Metro Project is an integral link in the perceived Urban Metropolitan Transportation Model for Kochi, wherein the Metro rail, land feeder services, earmarked pavements for cycle and pedestrian movement and water metro would be integrated to ease the traffic congestion and reduce the pollution in the city. Implementation of the Kochi Water Metro Project would provide the following advantages: Facilitate better connectivity of the islands around Kochi with mainland.
    [Show full text]
  • Dla 317M0007
    DELHI METRO RAIL CORPORATION LIMITED Draft License Agreement for Exclusive Co-Branding At Selected Metro Stations in of DMRC Network (Including Phase-III) (DLA-317M0007) Delhi Metro Rail Corporation Ltd. Metro Bhawan Fire Brigade Lane, Barakhamba Road New Delhi-110001 India Draft License Agreement for Co-Branding of the selected metro station (DLA-317M0007) Contents Chapter No Item of Chapter Page No 1 Details of License Agreement 3 2 Definitions 6 3 Scope of Exclusive Co-Branding at Selected Metro 8 Stations 4 Disclaimer 10 5 Tenure of License 11 6 License Fee 13 7 Interest Free Security Deposit & Performance 17 Guarantee 8 Taxes and Other Statutory Dues 19 9 Innovations, Creativity and Procedure of Approval of 20 Advertisement Spaces 10 Factors Governing Selection of Permissible 21 Advertisements 11 Minimum Material Specifications for Advertisement 22 12 Electrical Specifications and Procedure for Release of 23 Electric Power Supply 13 Maintenance of Advertisement Spaces 24 14 Force Majeure 26 15 Licensee Events of Default and Termination of License 27 16 Dispute Resolution 31 17 Miscellaneous 32 Annexure-1 Format of Bank Guarantee 37 Annexure-2 Rules and Guidelines for Release of Electric Power (A to H) 41 Annexure-3 NEFT/RTGS procedure order 62 Annexure-4 Handing Over/Taking Over Note 65 Page 2 of 65 Draft License Agreement for Co-Branding of the selected metro station (DLA-317M0007) Chapter: I License Agreement No ______of Year _______ THIS AGREEMENT entered into at Delhi on this _____ day of ___________ 2017 between Delhi Metro Rail Corporation Ltd. a company incorporated under the provisions of the Companies Act-1956 having its registered office at Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi-110001, India, hereinafter referred to as the “DMRC” (which expression shall unless repugnant to the context mean and include it’s successors and assigns) of the First Party.
    [Show full text]
  • Global Report Global Metro Projects 2020.Qxp
    Table of Contents 1.1 Global Metrorail industry 2.2.2 Brazil 2.3.4.2 Changchun Urban Rail Transit 1.1.1 Overview 2.2.2.1 Belo Horizonte Metro 2.3.4.3 Chengdu Metro 1.1.2 Network and Station 2.2.2.2 Brasília Metro 2.3.4.4 Guangzhou Metro Development 2.2.2.3 Cariri Metro 2.3.4.5 Hefei Metro 1.1.3 Ridership 2.2.2.4 Fortaleza Rapid Transit Project 2.3.4.6 Hong Kong Mass Railway Transit 1.1.3 Rolling stock 2.2.2.5 Porto Alegre Metro 2.3.4.7 Jinan Metro 1.1.4 Signalling 2.2.2.6 Recife Metro 2.3.4.8 Nanchang Metro 1.1.5 Power and Tracks 2.2.2.7 Rio de Janeiro Metro 2.3.4.9 Nanjing Metro 1.1.6 Fare systems 2.2.2.8 Salvador Metro 2.3.4.10 Ningbo Rail Transit 1.1.7 Funding and financing 2.2.2.9 São Paulo Metro 2.3.4.11 Shanghai Metro 1.1.8 Project delivery models 2.3.4.12 Shenzhen Metro 1.1.9 Key trends and developments 2.2.3 Chile 2.3.4.13 Suzhou Metro 2.2.3.1 Santiago Metro 2.3.4.14 Ürümqi Metro 1.2 Opportunities and Outlook 2.2.3.2 Valparaiso Metro 2.3.4.15 Wuhan Metro 1.2.1 Growth drivers 1.2.2 Network expansion by 2025 2.2.4 Colombia 2.3.5 India 1.2.3 Network expansion by 2030 2.2.4.1 Barranquilla Metro 2.3.5.1 Agra Metro 1.2.4 Network expansion beyond 2.2.4.2 Bogotá Metro 2.3.5.2 Ahmedabad-Gandhinagar Metro 2030 2.2.4.3 Medellín Metro 2.3.5.3 Bengaluru Metro 1.2.5 Rolling stock procurement and 2.3.5.4 Bhopal Metro refurbishment 2.2.5 Dominican Republic 2.3.5.5 Chennai Metro 1.2.6 Fare system upgrades and 2.2.5.1 Santo Domingo Metro 2.3.5.6 Hyderabad Metro Rail innovation 2.3.5.7 Jaipur Metro Rail 1.2.7 Signalling technology 2.2.6 Ecuador
    [Show full text]
  • Contract NC-02: Part Design and Construction of Elevated Viaduct and 7 Elevated Stations Viz
    Contract NC-02: Part Design and Construction of elevated viaduct and 7 elevated stations viz. Sector 142, Sector 143, Sector 144, Sector 147, Sector 153,Sector 146 and Sector 149 including Architectural Finishing works of stations from Chainage 9038 m 9129.8 m– 19318 m 19322.9 m of Noida-Greater Noida Metro Project. NOTICE INVITING TENDER (NIT) 1.1 GENERAL 1.1.1 Name of Work: Delhi Metro Rail Corporation (DMRC) Ltd. invites Open Tenders from eligible applicants, who fulfil qualification criteria as stipulated in Clause 1.1.3 of NIT, for the work, “Contract NC- 02: Part Design and Construction of elevated viaduct and 7 elevated stations viz. Sector 142, Sector 143, Sector 144, Sector 147, Sector 153, Sector 146 and Sector 149 including Architectural Finishing works of stations from Chainage 9038 m 9129.8 m – 19318 m 19322.9 m of Noida-Greater Noida Metro Project. NOTE:- The name of Work otherwise mention elsewhere in the tender documents shall be deemed to be amended as above The brief scope of the work and site information is provided in ITT Clause A1 (Volume-1) & Employer’s Requirements (Volume–3) 1.1.2 Key details : Approximate cost of work INR 570.00 crores Tender Security amount INR 5.70 crores Completion period of the Work 24 months Tender documents on sale From 11.12.2014 to 20.01.2015 06.02.2015 20.02.2015 16.03.2015 (between 09:00 Hrs to 17:30 Hrs) on working days and on 21.01.2015 09.02.2015 23.02.2015 17.03.2015 up to 1100 hrs Cost of Tender documents 21000/- (inclusive of 5% VAT) Non-Refundable (Demand Draft in favour of “Delhi Metro Rail Corporation Ltd” payable at New Delhi.) Pre-bid Meeting 30.12.2014 @ 1100 Hrs Last date of Seeking Clarification 31.12.2014 Last date of issuing addendum 07.01.2015 19.01.2015 13.02.2015 27.02.2015 Date & time of Submission of Tender 21.01.2015 09.02.2015 23.02.2015 17.03.2015 upto 15:00 Hrs.
    [Show full text]