North Lincolnshire

Total Page:16

File Type:pdf, Size:1020Kb

North Lincolnshire Archaeological Investigations Project 2003 Post-Determination & Non-Planning Related Projects Yorkshire & Humberside NORTH LINCOLNSHIRE North Lincolnshire 3/1661 (E.68.M002) SE 78700380 DN9 1JJ 46 LOCKWOOD BANK Time Team Big Dig Site Report Bid Dig Site 1845909. 46 Lockwood Bank, Epworth, Doncaster, DN9 1JJ Wilkinson, J Doncaster : Julie Wilkinson, 2003, 13pp, colour pls, figs Work undertaken by: Julie Wilkonson A test pit produced post-medieval pottery and clay pipe stems and a sherd of Anglo-Saxon pottery. [AIP] SMR primary record number:SLS 2725 Archaeological periods represented: EM, PM 3/1662 (E.68.M012) SE 92732234 DN15 9NS 66 WEST END, WINTERINGHAM Report on an Archaeological Watching Brieff Carried out at Plot 3, 66 West End, Winteringham, North Lincolnshire Atkins, C Scunthorpe : Caroline Atkins, 2003, 8pp, figs Work undertaken by: Caroline Atkins Very few finds were made during the period of archaeological supervision, other than fragments of assorted modern building materials, and only one item, a sherd from a bread puncheon, might have suggested activity on the investigated part of the site prior to the twentieth century. [Au(abr)] SMR primary record number:LS 2413 Archaeological periods represented: MO, PM 3/1663 (E.68.M008) SE 88921082 DN15 7AE CHURCH LANE, SCUNTHORPE An Archaeological Watching Brief at Church Lane, Scunthorpe Adamson, N & Atkinson, D Kingston upon Hull : Humber Field Archaeology, 2003, 6pp, colour pls, figs, refs Work undertaken by: Humber Field Archaeology Monitoring of the site strip and excavation of the foundation trench systems revealed the location of a former garden pond. No archaeological features and no residual archaeological material was identified within the upper ground layers. The sequence of deposits revealed consisted of topsoil overlying sandy clay over bedrock. [Au(abr)] SMR primary record number:2372 Archaeological periods represented: PM Archaeological Investigations Project 2003 Post-Determination & Non-Planning Related Projects Yorkshire & Humberside 3/1664 (E.68.M017) SE 90041444 DN15 0BE CONESBY QUARRY An Archaeological Watching Brief at Conesby Quarry, North Lincolnshire Humber Field Archaeology Kingston upon Hull : Humber Field Archaeology, 2003, 16pp, colour pls, figs, tabs, refs Work undertaken by: Humber Field Archaeology Monitoring of the site strip and excavation of the sand and clay revealed an organic layer within the wind deposited sands, possibly representing ancient land surfaces. [Au(abr)] SMR primary record number:2414 3/1665 (E.68.M004) SE 86221417 DN15 8SN FLIXBOROUGH STATHER Flixborough Stather Trial Pit Survey. Archaeological Watching Brief Report Gardner, R Lincoln : Pre-Construct Archaeology (Lincoln), 2003, 18pp, colour pls, figs, refs Work undertaken by: Pre-Construct Archaeology (Lincoln) The watching brief exposed no archaeologically significant deposits or artefacts. [Au(abr)] SMR primary record number:LS 2440 3/1666 (E.68.M018) SE 78600400 DN9 1SN HOLLINGSWORTH LANE, EPWORTH Archaeological Watching Brief at Hollingsworth Lane, Epworth, North Lincolnshire Mellor, V Sleaford : Archaeological Project Services, 2004, 20pp, colour pls, figs, tabs, refs Work undertaken by: Archaeological Project Services The investigations revealed a post-medieval boundary ditch and a possible medieval hollow way, infilled with dumped building material dating to the late post-medieval period. Post-medieval and later artefacts were recovered. [Au(abr)] SMR primary record number:LS 2568 Archaeological periods represented: MO, PM 3/1667 (E.68.M003) TA 09371091 DN39 6YH HUMBERSIDE INTERNATIONAL AIRPORT An Archaeological Watching Brief at Humberside International Airport, Kirmington Humber Field Archaeology Kingston upon Hull : Humber Field Archaeology, 2003, 8pp, colour pls, figs, refs Work undertaken by: Humber Field Archaeology Monitoring of the site strip and excavation of the foundation trench systems revealed no surviving or extant archaeological features within the specified area. No archaeological artefacts were recovered. [Au(abr)] SMR primary record number:LS 2342 Archaeological Investigations Project 2003 Post-Determination & Non-Planning Related Projects Yorkshire & Humberside 3/1668 (E.68.M013) SE 90551409 DN15 0BQ LAND ADJACENT TO HILLCREST, HIGH STREET, DRAGONBY A Report on an Archaeological Watching Brief Carried Out on Land Adjacent to Hillcrest, High Street, Dragonby, North Lincolnshire Atkins, C Scunthorpe : Caroline Atkins, 2003, 8pp, figs Work undertaken by: Caroline Atkins The almost total absence of evidence for human activity on the site prior to the 20th century, and the character of the observed deposits, appeared to suggest that this part of the hillside had been stripped of its topsoil and then recoated with a substantial deposit of clean sand. [Au(adp)] SMR primary record number:LS 2498 Archaeological periods represented: MO 3/1669 (E.68.M010) SE 88272171 DN15 9JW LAND ADJACENT TO HOLME FARM, FRONT STREET, ALKBOROUGH Report on an Archaeological Watching Brief Associated with the Development of Land Adjacent to Holme Farm, Front Street, Alkborough, North Lincolnshire Atkins, C Scunthorpe : Caroline Atkins, 2003, 7pp, figs Work undertaken by: Caroline Atkins The watching brief observed post-medieval building materials related to a cottage previously on the site and undisturbed natural clay. [AIP] SMR primary record number:LS 2411 3/1670 (E.68.M011) TA 07021073 DN38 6DF LAND AT MIDDLEGATE LANE, MELTON ROSS Report on an Archaeological Watching Brief Associated with the Development of Plots 1, 2, and 3 on Land at Middlegate Lane, Melton Ross, North Lincolnshire Atkins, C Scunthorpe : Caroline Atkins, 2003, 9pp, figs Work undertaken by: Caroline Atkins A watching brief recovered post-medieval pottery, the deposition of such was likely related to the site's recent use as an orchard. [Au(adp)] SMR primary record number:LS 2412 Archaeological periods represented: PM 3/1671 (E.68.M006) SE 92402020 DN15 9LX LAND AT NORTHLANDS ROAD, WINTERTON Archaeological Watching Brief on Land at Northlands Road, Winterton, North Lincolnshire Snee, J Sleaford : Archaeological Project Services, 2003, 20pp, colour pls, figs, refs Work undertaken by: Archaeological Project Services No archaeological features or deposits were disturbed by the groundworks of the development. [Au(abr)] SMR primary record number:LS 2499 Archaeological Investigations Project 2003 Post-Determination & Non-Planning Related Projects Yorkshire & Humberside 3/1672 (E.68.M020) SE 87701390 DN15 9GA NORMANBY ENTERPRISE PARK, SCUNTHORPE An Archaeological Watching Brief at Normany Enterprise Park, Scunthorpe Humber Field Archaeology Kingston upon Hull : Humber Field Archaeology, 2003, 14pp, colour pls, figs, refs Work undertaken by: Humber Field Archaeology Observations and recording of the deposits revealed during the excavation of 78 test pits revealed no evidence of any archaeological deposits and no artefacts were recovered. [Au(abr)] SMR primary record number:LS 2398 3/1673 (E.68.M014) TA 14401767 DN40 3JX NORTH KILLINGHOLME MANOR, NORTH KILLINGHOLME (I) Interim Report on an Archaeological Watching Brief Carried out During Clearance of the Ground Floor of the East Wing, North Killingholme Manor, North Killingholme, North Lincolnshire Atkins, C Scunthorpe : Caroline Atkins, 2003, 6pp, figs Work undertaken by: Caroline Atkins The debris removed from the living room to expose the clay floor consisted of the fragmentary remains of the timber floor, numerous pieces of framing and broken panels from the linen-fold panelling, rush, plaster and structural timbers from the fallen ceiling; discrete heaps of bricks and an assortment of late 20th century bottles, hard and plastic containers. [Au(adp)] SMR primary record number:2354 Archaeological periods represented: MO, PM 3/1674 (E.68.M015) TA 14401767 DN40 3JX NORTH KILLINGHOLME MANOR, NORTH KILLINGHOLME (II) Interim Report on an Archaeological Watching Brief Carried Out During the Excavation of Four Test Pits at North Killingholme Manor, North Lincolnshire Atkins, C Scunthorpe : Caroline Atkins, 2003, 6pp, figs Work undertaken by: Caroline Atkins None of the pits provided any man-made items of archaeological interest. [Au(adp)] SMR primary record number:LS2396 Archaeological periods represented: PM 3/1675 (E.68.P001) SE 80231609 DN17 4PH PLOT 3B, CROWLE ROAD, EASTOFT Plot 3b, Crowle Road, Eastoft, North Lincolnshire, A Report on an Archaeological Watching Brief Dean, G York : York Archaeological Trust, 2003, 4pp, figs, refs Work undertaken by: York Archaeological Trust A watching brief undertaken primarily of the excavation of foundation trenches, revealed deposits interpreted as a buried soil and a possible pit or depression that produced a few fragments of 19th century pottery. No other features were observed. [Au(adp)] Archaeological periods represented: PM Archaeological Investigations Project 2003 Post-Determination & Non-Planning Related Projects Yorkshire & Humberside 3/1676 (E.68.M019) SE 97350376 DN20 9DT TECHRATE LTD, STATION ROAD, HIBALDSTOW Techrate (UK) Ltd, Station Road, Hibaldstow, N. Lincs. Archaeological Watching Brief Rowlandson, I & Young, D Lincoln : Lindsey Archaeological Services, 2003, 8pp, colour pls, figs, tabs Work undertaken by: Lindsey Archaeological Services Despite the known Roman remains in the Station Road area no archaeological remains were found., [Au(abr)] SMR primary record number:LS 2661 3/1677 (E.68.M001) TA 08741783 DN39 6XH THORNTON HUNT INN, THORNTON CURTIS An Archaeological Watching Brief at Thornton Hunt Inn,
Recommended publications
  • The Humber Metro
    The Humber Metro The Humber Metro is a very futuristic concept, depending, as it does, on the existence of the Humber tunnel between Goxhill and the approach to Paragon station, proposed as part of HS10 in the ‘HS Eastern Routes and Service Plans’ article. As noted there, although the tunnel will be built to GC gauge, it is intended from the outset to be shared with Regional Metro traffic between Cleethorpes and Hull, which will at least initially be of UK loading gauge. The Humber Metro covers the area from Selby and Goole in the west to Cleethorpes and Withernsea in the east, and from Grimsby in the south to Bridlington in the north. The core section, built to GC-gauge, as all new infrastructure should be, runs in tunnel under the centre of Hull between Paragon (LL) and Cannon St. (former H&B) stations, with a connection to the Hornsea / Withernsea lines just before Wilmington, and another to the Beverley line at Cottingham. Other than that (and the Humber tunnel, of course,) it takes over the routes of existing and former, long closed, branches. The proposed metro services fall into two groups, either cross-river or west-east along the north bank. The services of the first group are: 2tph Cleethorpes – New Clee – Grimsby Docks – Grimsby Town – West Marsh – Great Coates – Healing – Stallingborough – Habrough – Ulceby – Thornton Abbey – Goxhill – Hull Paragon (LL) – George St. – Cannon St. – Beverley Rd. – Jack Kaye Walk – Cottingham – Beverley – Arram – Lockington – Hutton Cranswick – Great Driffield – Nafferton – Lowthorpe – Burton Agnes – Carnaby – Bridlington 2tph Cleethorpes – New Clee – Grimsby Docks – Grimsby Town – West Marsh – Great Coates – Healing – Stallingborough – Habrough – Ulceby – Thornton Abbey – Goxhill – Hull Paragon (LL) – George St.
    [Show full text]
  • LINCOLNSHIRE. [ Kl:'LLY's
    - 780 FAR LINCOLNSHIRE. [ Kl:'LLY's F ARMER~-continued. Anderson Charles, Epworth, Doncaster Atldn Geo. Common, Crowland, Peterboro' Abraham Everatt, Barnetby-le-Wold R.S.O Anderson G. High st. Long Sutton, Wisbech Atltin Geo. Hy. West Pinchbeck, Spalding Abrabam Henry, Aunsby, Sleaford Anderson John, High st. Barton-on-Humber Atkin John, Mareham-le-Fen, Boston Abrnham Jn. Otby ho. Walesby,:Market Ra.sen Anderson John, Epworth, Doncaster Atkin John, Skidbrook, Great Grimsby Ahraham S. Toft ho. Wainfieet St.Mary R.S.O AndersonJn. j un. Chapel farm, Brtn. -on-Hm br A tkin J n. Wm. The Gipples, Syston, G rantham Abraha.m William, Croxby, Caistor AndersonR. Waddinghm.KirtonLindseyR.S.O Atkin Joseph, Bennington, Boston Abrahams Wm. Park, Westwood side,Bawtry Anderson Samuel, Anderby, Alford Atkin Richard, Withern, Alford Aby Edward, Thornton Curtis, Ulceby Andrew Charles, North Fen, Bourn Atkin Tom, Cowbit, Spalding Aby Mrs. Mary & Joseph, Cadney, Brigg Andrew Edwd. Grubb hi. Fiskerton, Lincoln Atkin Tom, Moulton, Spalding Achurch Hy.Engine bank, Moulton, Spalding Andrew James Cunnington, Fleet, Holbeach Atkin William, Fosdyke, Spalding Achurc;h J.DeepingSt.James,Market Deeping Andrew John, Deeping St. Nicholas, Pode AtkinWm.Glebe frrn. Waddington hth.Lincln Acrill William, Fillingham, Lincoln Hole, Spalding Atkin William, Swineshead, Spalding Adams Mrs. Ann, Craise Lound, Bawtry Andrew John, Gunby, Grantham Atkin William, Whaplode, Spalding Adarns George, Epworth, Doncaster Andrew John, 5 Henrietta. street, Spalding Atkins George, Mill lane, South Somercotes, Adarns Isaac Crowther, Stow park, Lincoln Andrew John, Hunberstone, Great Grimsby Great Grimsby Adams John, Collow grange, Wragby Andrew John, Somerby, Grantham Atkinson Jsph. & Jas. Pointon, Falkingham Adams Luther, Thorpe-le-Yale, Ludford, Andrew J oseph, Butterwick, Boston Atkinson Abraharn,Sea end,Moulton,Spaldng Market Rasen Andrew Willey,South Somercotes,Gt.Grmsby Atkinson Abraham, Skellingthorpe, Lincoln Adcock Charles, Corby, Grantham Andrcw Wm.
    [Show full text]
  • East Halton Gymkhana
    RULES OF THE DAY 1. Age taken from 1st January, 2013. THE EAST HALTON 2. Hard hats to be worn and securely fastened whilst on horseback, complying to British Standards, correct riding gear must be worn when competing. We strongly advise the use of body protectors in all jumping classes. 3. Objections to be given to the secretary with a £10.00 deposit within 15 minutes of the result of the class, money to be forfeited GYMKHANA & GALA if sustained. Sponsored by 4. The judges decision is final. 5. The organisers, owners and occupiers of the land take no responsibility for any loss, damage, theft, accident or injury incurred WILD BIRD DIRECT ANIMAL SUPERSTORE in connection with this event to any person, animal, vehicle or equipment, whether caused by their negligence, breach of contract or in any way whatsoever. 6. Whips and spurs are not permitted in mounted games. Sunday 11th August, 2013 at 9.30a.m. prompt. 7. The committee reserves the right to refuse entry Baysgarth Farm, East Halton 8. Trophies to be held for 1 year. Recipients are responsible for returning them by 1st July 2014. Trophies must be signed for before leaving the show ground. Immingham, North Lincolnshire DN40 3NU 9. The organisers reserve the right to alter or omit a class. Prize money may be reduced if there are insufficient entries to a class. 10. All dogs must be kept on leads at all times except when competing. By Kind Permission of Mr. & Mrs. G. W. Turner 11. Please do not muck out on the field.
    [Show full text]
  • Hull), 81 (Patrington), 89 (Brig) and 90 (Grimsby)
    Natural Environment Research Council INSTITUTE OF GEOLOGICAL SCIENCES Geological Survey of England and Wales Geological reports for DOE: Land use planning SOUTH HUMBERSIDE PROJECT Parts of TA ll,12 and 21 . included in 1:50 000 geological sheets 84) (Hull), 81 (Patrington), 89 (Brig) and 90 (Grimsby). I. T. Williamson BibliographicaZ reference Williamson, I. T. 1983. Geological reports for DOE: Land use planning. South Humberside Project. (Leeds Institute of Geological Sciences). Author I. T. Williamson Institute of Geological Sciences Ring Road Halton Leeds LS15 8TQ This report and the accompanying maps were commissioned and financed by the Department of the Environment The views expressed in this report are not necessarily those of the Department of the Environment c Crown copyright 1983 LEEDS INSTITUTE OF GEOLOGICAL SCIENCES 1983 Contents I Page PREFACE Chapter I INTRODUCTION 1 1 e? PhysiographyPopulation Distribution, Communications and Land Use i Chapter 2. GM)LOGY 3 2mlo SuperficialDeposits 3 Introduction 3 Made Ground or Fill 3 Tidal Flat and Saltings 4 Storm Gravel Beach Deposits 4 201 04. Peat 5 2.1.6~ Blown Sand 5 Alluvium 5 2rn1e8rn Marine or Estuarine Alluvium 6 Dry Valley Deposits 7 2.1.100 Head 7 2.1011. Till 8 2oIeI2e Sand and Gravel Deposits 9 Interglacial Deposits 11 2.1.14- The Kirmington Buried Channel 12 2.2. Bedrock ( 'Solid' Geology- 12 Structure 16 Chapter 3. GEOLOGICAL FACTORS AFFECTIXG THE SITISG OF LARGE SCALE DEVELOPMENT 17 3.1 0 ktroduction 17 3.2. Groundwater and Geomorphology 17 3.3. GeotechnicjlConsiderations 18 3.3.L Chalk 18 3.3.2, Sands and Gravels 19 3.3.3.
    [Show full text]
  • Hornsea One and Two Offshore Wind Farms About Ørsted | the Area | Hornsea One | Hornsea Two | Community | Contact Us
    March 2019 Community Newsletter Hornsea One and Two Offshore Wind Farms About Ørsted | The area | Hornsea One | Hornsea Two | Community | Contact us Welcome to the latest community newsletter for Hornsea One and Two Just over a year ago we began offshore construction on Hornsea One, and now, 120 km off the coast, the first of 174 turbines have been installed and are generating clean, renewable electricity. Following a series of local information events held along our onshore cable route, the onshore construction phase for Hornsea Two is now underway. We will continue to work to the highest standards already demonstrated by the teams involved, and together deliver the largest renewable energy projects in the UK. Kingston Upon Hull Duncan Clark Programme Director, Hornsea One and Two We are a renewable energy company with the vision to create a world About that runs entirely on green energy. Climate change is one of the biggest challenges for life on earth; we need to transform the way we power the Ørsted world. We have invested significantly in the UK, where we now develop, construct and operate offshore wind farms and innovative biotechnology which generates energy from household waste without incineration. Over the last decade, we have undergone a truly green transformation, halving our CO2 emissions and focusing our activities on renewable sources of energy. We want to revolutionise the way we provide power to people by developing market leading green energy solutions that benefit the planet and our customers alike. March 2019 | 2 About
    [Show full text]
  • C TIG Deeds and Historical Papers Relating to 1807-1935 Various Families and Properties in Hull
    Hull History Centre: Deeds and historical papers relating to various families and properties in Hull C TIG Deeds and historical papers relating to 1807-1935 various families and properties in Hull Accession number: 06/25 Historical Background: Scott Street, laid out in the late 18th century, was named after the designer, Christopher Scott, a builder, merchant and twice Mayor of Hull, in 1763 and 1776. Custodial history: Records passed by Allen Ticehurt, solicitors of East Grinstead, West Sussex in April 2006 to Hull City Council's Information Governance team, which had been established in 2004. Transferred to the History Centre in May 2006. Description: Deeds, legal and family papers Arrangement : C TIG/1 Deeds, legal and family papers relating to properties on Scott Street 1807-1935 Extent: ½ box Related material: The deeds can also be found at the East Riding Registry of Deeds, which is located at the East Riding of Yorkshire Archives Service at the Treasure House, in Beverley Access conditions: Access will be granted to any accredited reader C TIG/1 Deeds, legal and family papers relating to 1807-1935 properties on Scott Street, Hull 19 items and I bundle C TIG/1/1 Deeds relating to properties on Scott Street, Hull 1807-1935 8 items C TIG/1/1/1 Feoffment of ground in Scott Street, in the Parish of 6 Jul 1807 Sculcoates, County of York i) John Carr, of Dunstan Hill, in the County Palatine of Durham, esquire; Christopher Machell of Beverley in the County of York, esquire and John Alderson of Sculcoates, County of York, doctor of physic
    [Show full text]
  • Detailed Assessment of NO2 at South Killingholme
    Local Authority Dr Matthew Barnes Officer Department Environmental Health (Commercial) Church Square House Scunthorpe Address North Lincolnshire DN15 6XQ Telephone 01724 297336 e-mail [email protected] Date January 2016 Report Status Final Report 1 Executive summary North Lincolnshire Council’s Air Quality Progress Report 2011 identified a possible exceedance of nitrogen dioxide alongside the A160 in South Killingholme. For this reason, in October 2013 North Lincolnshire Council installed an air quality monitoring site to more accurately measure nitrogen dioxide, nitric oxide and nitrogen oxides at this location. Nitric oxide (NO) is mainly derived from road transport emissions and other combustion processes. Nitric oxide is not considered to be harmful to health, however, once emitted to the atmosphere it is rapidly oxidised to nitrogen dioxide (NO2) which can be harmful to health. NO2 can irritate the lungs and lower resistance to respiratory infections. Continued exposure to concentrations above the recommended air quality objectives may cause increased incidence of acute respiratory illness in children. The main source of NO2 is from road traffic emissions. At South Killinghome the principle source is from vehicles using the A160 dual-carriage way, which provides access to the Port of Immingham, local refineries and power stations. It is also the main route to the proposed Able Marine Energy Park, a deep water quay and manufacturing facility for the offshore wind energy industry. To provide better access to the Port of Immingham and surrounding area, the Highways Agency are upgrading both the A160 and A180. It is anticipated that 1 construction will take approximately 16 months and should be completed by Autumn 2016.
    [Show full text]
  • Developing Appropriate Strategies for Reducing Inequality in Brighton and Hove
    Developing Appropriate Strategies for Reducing Inequality in Brighton and Hove Phase 1 Identifying the challenge: Inequality in Brighton and Hove Phase 1 Final Report December 2007 Oxford Consultants for Social Inclusion Ltd (OCSI) EDuce Ltd Oxford Consultants for Social Inclusion (OCSI) 15-17 Middle St Brighton BN1 1AL Tel: 01273 201 345 Email: [email protected] Web: www.ocsi.co.uk EDuce ltd St John’s Innovation Centre Cowley Road Cambridge CB4 0WS Tel: 01223 421 685 Email: [email protected] Web: www.educe.co.uk Developing Appropriate Strategies for Reducing Inequality in Brighton and Hove. Phase 1 Identifying the challenge 2 Oxford Consultants for Social Inclusion (OCSI) and EDuce Ltd Contents Section 1 Executive summary 4 Section 2 Introduction and context 9 Section 3 Key issues coming out of our analysis 14 Appendix A The Brighton and Hove context 54 Appendix B LAA theme: Developing a prosperous and sustainable economy 74 Appendix C LAA theme: Ensuring all our children and young people have the best possible start in life 98 Appendix D LAA theme: A healthy city that cares for vulnerable people and tackles deprivation and injustice 117 Appendix E LAA theme: A safe city that values our unique environment 138 Appendix F Key indicator maps 154 Appendix G Bibliography of sources 155 Appendix H Geography of Brighton and Hove 163 Appendix I Small cities comparator areas 168 Appendix J Acknowledgements 177 Developing Appropriate Strategies for Reducing Inequality in Brighton and Hove. Phase 1 Identifying the challenge 3 Oxford Consultants for
    [Show full text]
  • Appendix 6 Performance Indicator and CIPFA Data Comparisons BVPI Comparisons
    Appendix 6 Performance Indicator and CIPFA Data Comparisons BVPI Comparisons Southend-on-Sea vs CPA Environment High Scorers / Nearest Neighbours / Unitaries BV 106: Percentage of new homes built on previously developed land 2001/02 2002/03 2003/04 Southend-on-Sea 100 100 100 CPA 2002 Environment score 3 or 4 in unitary authorities, by indicator 2001/02 2002/03 2003/04 Blackpool 56.8 63 n/a Bournemouth 94 99 n/a Derby 51 63 n/a East Riding of Yorkshire 24.08 16.64 n/a Halton 27.48 49 n/a Hartlepool 40.8 56 n/a Isle of Wight 84 86 n/a Kingston-upon-Hull 40 36 n/a Luton 99 99.01 n/a Middlesbrough 74.3 61 n/a Nottingham 97 99 n/a Peterborough 79.24 93.66 n/a Plymouth 81.3 94.4 n/a South Gloucestershire 41 44.6 n/a Stockton-on-Tees 33 29.34 n/a Stoke-on-Trent 58.4 61 n/a Telford & Wrekin 54 55.35 n/a Torbay 39 58.57 n/a CIPFA 'Nearest Neighbour' Benchmark Group 2001/02 2002/03 2003/04 Blackpool 56.8 63 n/a Bournemouth 94 99 n/a Brighton & Hove 99.7 100 n/a Isle of Wight 84 86 n/a Portsmouth 98.6 100 n/a Torbay 39 58.57 n/a Unitaries 2001/02 2002/03 2003/04 Unitary 75th percentile 94 93.7 n/a Unitary Median 70 65 n/a Unitary 25th percentile 41 52.3 n/a Average 66.3 68.7 n/a Source: ODPM website BV 107: Planning cost per head of population.
    [Show full text]
  • Mrs K Pickering, Hillgarth Farm, Ulceby, North
    2018/19 - 27 A meeting of Ulceby Parish Council was held on Monday 19th November 2018 at 7.00pm in The Village Hall. PRESENT : Cllr Mrs Macefield – Chairman, Cllr Mrs Hulatt, Cllr B Jeffery,Cllr Mrs Smith, Cllr M Birtle, Cllr C Rowland, Cllr M Berney, Cllr A Ogden, Cllr A Reeve, IN ATTENDANCE : Mrs K Pickering – Clerk. Cllr P Clark, 2 members of the public. PUBLIC FORUM • A member of the public advised that The Front Street planning application has been passed with a Section 106 agreement which has been allocated to Baysgarth leisure centre. The member of the public felt that as Ulceby was having the development surely the S106 benefit should come to Ulceby. Cllr Clark advised the meeting that the plocy regarding S106 allocations has been changed and it can now to allocated to where there is a large recreational facility. Ward councillors have raised this policy change with The Leader of the Council. The member of the public also noted that a levy has been placed on the developers of a considerable amount which has to be paid to N.L.C. It was suggested that Ulceby should benefit in some way when development is taking place in the village. • It was noted that the planning permission has expired on the Church lane development land and that when this is reapplied for the S106 allocation should be kept for the benefit of the village. 1 .APOLOGIES : Cllr Mrs Caygill-Ogden, Cllr R Hannigan Cllr D Wells. 2. DECLARATIONS OF INTEREST ON THE AGENDA ITEMS: Cllr D Macefield – Item 6(a).
    [Show full text]
  • For Further Information About Road Works
    TEMPORARY ROAD CLOSURES Start Date Time End Date Description Location of Closure Parish Emergency contact Current 24-Apr-17 20:00-06:00 29-Apr-17 Road Closure Moor Road, Yaddlethorpe Bottesford 01924 225646 Next 2 Weeks 29-Apr-17 23:00-09:30 30-Apr-17 Road Closure Caistor Road, Melton Ross (New Barnetby Level Crossing) Melton Ross 01132 775360 6-May-17 23:00-06:00 7-May-17 Road Closure Station Road, Haxey (Haxey Level Crossing) Haxey 01132 775360 6-May-17 23:00-09:00 7-May-17 Road Closure Soff Lane, Goxhill (Butterswood Level Crossing) Goxhill 01132 775360 6-May-17 23:00-09:30 7-May-17 Road Closure Caistor Road, Melton Ross (New Barnetby Level Crossing) Melton Ross 01132 775360 7-May-17 07:30-12:30 7-May-17 Road Closure Multiple roads in North Lincolnshire - see route map on roadworks.org North Lincolnshire 07428 582014 8-May-17 08:00-17:30 12-May-17 Road Closure Access Road T57, Scunthorpe (Rear of Gervase Street) Scunthorpe 0800 137631 9-May-17 08:00-12:00 9-May-17 Road Closure Access Road T121, Scunthorpe (between Gilliatt Street and Frances Street) Scunthorpe 01785 624162 Future 13-May-17 23:30-10:00 14-May-17 Road Closure Station Road, Ulceby (Level Crossing) Ulceby 01132 775360 28-May-17 08:00-15:00 28-May-17 Road Closure Cleatham Road, Kirton in Lindsey Kirton in Lindsey 01132 775360 30-May-17 24 hour 2-Jun-17 Road Closure Outgate, Ealand Ealand 01953 688211 3-Jun-17 23:30-09:15 4-Jun-17 Road Closure Caistor Road, Melton Ross (New Barnetby Level Crossing) Melton Ross 01132 775360 3-Jun-17 23:30-09:30 4-Jun-17 Road Closure Barton
    [Show full text]
  • The Old Vicarage’ Main Street, Thornton Curtis, Dn39 6Xw
    ‘THE OLD VICARAGE’ MAIN STREET, THORNTON CURTIS, DN39 6XW PRICE £350,000 ‘THE OLD VICARAGE’ MAIN STREET, THORNTON CURTIS, DN39 6XW The ‘Old Vicarage’ is a charming attractive period residence offering many original features yet merged beautifully, creating comfortable family modern day living. Sitting within mature and private gardens extending to 0.58 acres, enjoying views to the rear across open countryside, ample parking and a range of original Outbuildings, ideal for conversion or extension (subject to the necessary planning consents). The superbly presented and well-proportioned accommodation comprises; Entrance Hall, Living Room, Snug, large Dining Kitchen, Garden Room, Shower Room, Utility Room. 4 Bedrooms with Master En-suite and family Bathroom. Fully double glazed, efficient Biomass heating system. Picturesque village location. Viewing is strongly advised. NO UPWARD CHAIN. www.paul-fox.com The full accommodation notes are as follows; GROUND FLOOR ENTRANCE HALL Leading to: INNER HALL AREA SITTING ROOM Measures Approx. 4.35m x 4.16m (14ft 3 x 13ft 8) a dual aspect reception room with two double glazed windows, fireplace recess with open grate, original floorboards and beams. SNUG Measures approx. 4.15m x 3.36m (13ft7 x 11’0) with double glazed window, beams and fireplace recess with multi fuel burning stove. SHOWER ROOM Having a vanity wash hand basin, WC, shower cubicle, chrome heated towel rail and tiled floor. UTILITY ROOM Measures approx. 2.58m x 2.17m (8ft 6 x 7ft 1) Having a tiled floor, base cupboards, wall cupboards, worktop and plumbing for a washing machine. KITCHEN/BREAKFAST ROOM Measures approx. 4.67m x 4.53m (15ft4 x 14ft10) fitted with a range of cream base and wall units incorporating a sliding larder unit, with worktops and inset sink unit with waste disposal.
    [Show full text]