Rebecca M Crew Multi Purpose Vessel Master 2 X Deck Hands

Total Page:16

File Type:pdf, Size:1020Kb

Rebecca M Crew Multi Purpose Vessel Master 2 X Deck Hands HUMBER WORK BOATS LTD Rebecca M Crew Multi Purpose Vessel Master 2 x Deck Hands Communications Robertson Autopilot Type AP45 Furuno FM 8500 VHF Radio Graseby RT 260M 406 EPIRB Graseby RT 400 Search and Rescue Transponder "REBECCA M" JMA 5206 - 4BB Radar WORKING IN GT. YARMOUTH HARBOUR WITH TWO x 360° Furuno GD 3100 Track Plotter MACHINES ON DECK AIR-LIFTING FOR A PIPE TRENCH Comar CSB 200 AIS Transceiver Furuno NX 500 Navtex Receiver Furuno FCV 581 Echosounder HUMBER WORK BOATS LTD Head Office Humber Work Boats Limited North Killingholme Haven, Grimsby North East Lincolnshire DN40 3LX. Telephone: +44 (0)1469 540156 Fax: +44 (0)1469 540303 www.humberworkboats.co.uk [email protected] Marine Contracting · Dredging · Surveying · Work Boats & Crane Barges · Marine Solutions Marine Contracting · Dredging · Surveying · Work Boats & Crane Barges · Marine Solutions Rebecca M Specification Details Dimensions Offical Number 726499 Length Overall 35.78 Metres Beam 10.06 Metres Depth 3.20 Metres HUMBER WORK BOATS LTD Draught Light 1.102 Metres Draught Loaded 2.368 Metres Gross Registered Tonnes 322 Nett Registered Tonnes 96 Classification MCA Class VIII A Coastal Capacities (approximately) Oil Fuel 184.0 Tonnes (can transfer 15 Cu Mtrs per hour) Fresh Water 200.0 Tonnes Deck Cargo 450.0 Tonnes Total Deadweight (Sheltered Waters) 483.8 Tonnes Total Deadweight (At Sea) 400.0 Tonnes Main Deck Space available:- 9.4 m x 8m plus 8.05m x 7.15m or 19.2m x 6.3m (Piles, or similar, up to 30m can be accommodated) 2 Spud Legs capable of operating in up to 15 metres of water. Deck suitable for:- Portacabin Workshop Portacabin Accommodation Module Compressor Long Reach Excavator Welding Plant Crawler Crane Deck Cargo 450.0 Tonnes Deck Machinery Main Winch for Anchor Handling 40.0 Tonnes Bow Roller Four Point Mooring System - 1 Tonne Delta Flipper Anchors 30 Tonne/Metre Deck Crane Electrics 12 KVA of 240 volt single phase 24 volt for domestic purposes Main Machinery 2 x "Cummins" NTA 855M main engines giving a total power of 720 b.h.p. 1 x "Cummins" NT 855 - 360 b.h.p. driving hydraulics 40 KVA "Cummins" Generator Set Speed 7 knots (approximately) Bow Thruster 1.5 Tonnes Thrust on the Bow Thruster 762mm Bollard Pull 5 Tonne (approximately) Marine Contracting · Dredging · Surveying · Work Boats & Crane Barges · Marine Solutions Marine Contracting · Dredging · Surveying · Work Boats & Crane Barges · Marine Solutions Rebecca M Specification Details Dimensions Offical Number 726499 Length Overall 35.78 Metres Beam 10.06 Metres Depth 3.20 Metres HUMBER WORK BOATS LTD Draught Light 1.102 Metres Draught Loaded 2.368 Metres Gross Registered Tonnes 322 Nett Registered Tonnes 96 Classification MCA Class VIII A Coastal Capacities (approximately) Oil Fuel 184.0 Tonnes (can transfer 15 Cu Mtrs per hour) Fresh Water 200.0 Tonnes Deck Cargo 450.0 Tonnes Total Deadweight (Sheltered Waters) 483.8 Tonnes Total Deadweight (At Sea) 400.0 Tonnes Main Deck Space available:- 9.4 m x 8m plus 8.05m x 7.15m or 19.2m x 6.3m (Piles, or similar, up to 30m can be accommodated) 2 Spud Legs capable of operating in up to 15 metres of water. Deck suitable for:- Portacabin Workshop Portacabin Accommodation Module Compressor Long Reach Excavator Welding Plant Crawler Crane Deck Cargo 450.0 Tonnes Deck Machinery Main Winch for Anchor Handling 40.0 Tonnes Bow Roller Four Point Mooring System - 1 Tonne Delta Flipper Anchors 30 Tonne/Metre Deck Crane Electrics 12 KVA of 240 volt single phase 24 volt for domestic purposes Main Machinery 2 x "Cummins" NTA 855M main engines giving a total power of 720 b.h.p. 1 x "Cummins" NT 855 - 360 b.h.p. driving hydraulics 40 KVA "Cummins" Generator Set Speed 7 knots (approximately) Bow Thruster 1.5 Tonnes Thrust on the Bow Thruster 762mm Bollard Pull 5 Tonne (approximately) Marine Contracting · Dredging · Surveying · Work Boats & Crane Barges · Marine Solutions Marine Contracting · Dredging · Surveying · Work Boats & Crane Barges · Marine Solutions HUMBER WORK BOATS LTD Rebecca M Crew Multi Purpose Vessel Master 2 x Deck Hands Communications Robertson Autopilot Type AP45 Furuno FM 8500 VHF Radio Graseby RT 260M 406 EPIRB Graseby RT 400 Search and Rescue Transponder "REBECCA M" JMA 5206 - 4BB Radar WORKING IN GT. YARMOUTH HARBOUR WITH TWO x 360° Furuno GD 3100 Track Plotter MACHINES ON DECK AIR-LIFTING FOR A PIPE TRENCH Comar CSB 200 AIS Transceiver Furuno NX 500 Navtex Receiver Furuno FCV 581 Echosounder HUMBER WORK BOATS LTD Head Office Humber Work Boats Limited North Killingholme Haven, Grimsby North East Lincolnshire DN40 3LX. Telephone: +44 (0)1469 540156 Fax: +44 (0)1469 540303 www.humberworkboats.co.uk [email protected] Marine Contracting · Dredging · Surveying · Work Boats & Crane Barges · Marine Solutions Marine Contracting · Dredging · Surveying · Work Boats & Crane Barges · Marine Solutions.
Recommended publications
  • East Halton Gymkhana
    RULES OF THE DAY 1. Age taken from 1st January, 2013. THE EAST HALTON 2. Hard hats to be worn and securely fastened whilst on horseback, complying to British Standards, correct riding gear must be worn when competing. We strongly advise the use of body protectors in all jumping classes. 3. Objections to be given to the secretary with a £10.00 deposit within 15 minutes of the result of the class, money to be forfeited GYMKHANA & GALA if sustained. Sponsored by 4. The judges decision is final. 5. The organisers, owners and occupiers of the land take no responsibility for any loss, damage, theft, accident or injury incurred WILD BIRD DIRECT ANIMAL SUPERSTORE in connection with this event to any person, animal, vehicle or equipment, whether caused by their negligence, breach of contract or in any way whatsoever. 6. Whips and spurs are not permitted in mounted games. Sunday 11th August, 2013 at 9.30a.m. prompt. 7. The committee reserves the right to refuse entry Baysgarth Farm, East Halton 8. Trophies to be held for 1 year. Recipients are responsible for returning them by 1st July 2014. Trophies must be signed for before leaving the show ground. Immingham, North Lincolnshire DN40 3NU 9. The organisers reserve the right to alter or omit a class. Prize money may be reduced if there are insufficient entries to a class. 10. All dogs must be kept on leads at all times except when competing. By Kind Permission of Mr. & Mrs. G. W. Turner 11. Please do not muck out on the field.
    [Show full text]
  • Hull), 81 (Patrington), 89 (Brig) and 90 (Grimsby)
    Natural Environment Research Council INSTITUTE OF GEOLOGICAL SCIENCES Geological Survey of England and Wales Geological reports for DOE: Land use planning SOUTH HUMBERSIDE PROJECT Parts of TA ll,12 and 21 . included in 1:50 000 geological sheets 84) (Hull), 81 (Patrington), 89 (Brig) and 90 (Grimsby). I. T. Williamson BibliographicaZ reference Williamson, I. T. 1983. Geological reports for DOE: Land use planning. South Humberside Project. (Leeds Institute of Geological Sciences). Author I. T. Williamson Institute of Geological Sciences Ring Road Halton Leeds LS15 8TQ This report and the accompanying maps were commissioned and financed by the Department of the Environment The views expressed in this report are not necessarily those of the Department of the Environment c Crown copyright 1983 LEEDS INSTITUTE OF GEOLOGICAL SCIENCES 1983 Contents I Page PREFACE Chapter I INTRODUCTION 1 1 e? PhysiographyPopulation Distribution, Communications and Land Use i Chapter 2. GM)LOGY 3 2mlo SuperficialDeposits 3 Introduction 3 Made Ground or Fill 3 Tidal Flat and Saltings 4 Storm Gravel Beach Deposits 4 201 04. Peat 5 2.1.6~ Blown Sand 5 Alluvium 5 2rn1e8rn Marine or Estuarine Alluvium 6 Dry Valley Deposits 7 2.1.100 Head 7 2.1011. Till 8 2oIeI2e Sand and Gravel Deposits 9 Interglacial Deposits 11 2.1.14- The Kirmington Buried Channel 12 2.2. Bedrock ( 'Solid' Geology- 12 Structure 16 Chapter 3. GEOLOGICAL FACTORS AFFECTIXG THE SITISG OF LARGE SCALE DEVELOPMENT 17 3.1 0 ktroduction 17 3.2. Groundwater and Geomorphology 17 3.3. GeotechnicjlConsiderations 18 3.3.L Chalk 18 3.3.2, Sands and Gravels 19 3.3.3.
    [Show full text]
  • Hornsea One and Two Offshore Wind Farms About Ørsted | the Area | Hornsea One | Hornsea Two | Community | Contact Us
    March 2019 Community Newsletter Hornsea One and Two Offshore Wind Farms About Ørsted | The area | Hornsea One | Hornsea Two | Community | Contact us Welcome to the latest community newsletter for Hornsea One and Two Just over a year ago we began offshore construction on Hornsea One, and now, 120 km off the coast, the first of 174 turbines have been installed and are generating clean, renewable electricity. Following a series of local information events held along our onshore cable route, the onshore construction phase for Hornsea Two is now underway. We will continue to work to the highest standards already demonstrated by the teams involved, and together deliver the largest renewable energy projects in the UK. Kingston Upon Hull Duncan Clark Programme Director, Hornsea One and Two We are a renewable energy company with the vision to create a world About that runs entirely on green energy. Climate change is one of the biggest challenges for life on earth; we need to transform the way we power the Ørsted world. We have invested significantly in the UK, where we now develop, construct and operate offshore wind farms and innovative biotechnology which generates energy from household waste without incineration. Over the last decade, we have undergone a truly green transformation, halving our CO2 emissions and focusing our activities on renewable sources of energy. We want to revolutionise the way we provide power to people by developing market leading green energy solutions that benefit the planet and our customers alike. March 2019 | 2 About
    [Show full text]
  • North Lincolnshire
    Archaeological Investigations Project 2003 Post-Determination & Non-Planning Related Projects Yorkshire & Humberside NORTH LINCOLNSHIRE North Lincolnshire 3/1661 (E.68.M002) SE 78700380 DN9 1JJ 46 LOCKWOOD BANK Time Team Big Dig Site Report Bid Dig Site 1845909. 46 Lockwood Bank, Epworth, Doncaster, DN9 1JJ Wilkinson, J Doncaster : Julie Wilkinson, 2003, 13pp, colour pls, figs Work undertaken by: Julie Wilkonson A test pit produced post-medieval pottery and clay pipe stems and a sherd of Anglo-Saxon pottery. [AIP] SMR primary record number:SLS 2725 Archaeological periods represented: EM, PM 3/1662 (E.68.M012) SE 92732234 DN15 9NS 66 WEST END, WINTERINGHAM Report on an Archaeological Watching Brieff Carried out at Plot 3, 66 West End, Winteringham, North Lincolnshire Atkins, C Scunthorpe : Caroline Atkins, 2003, 8pp, figs Work undertaken by: Caroline Atkins Very few finds were made during the period of archaeological supervision, other than fragments of assorted modern building materials, and only one item, a sherd from a bread puncheon, might have suggested activity on the investigated part of the site prior to the twentieth century. [Au(abr)] SMR primary record number:LS 2413 Archaeological periods represented: MO, PM 3/1663 (E.68.M008) SE 88921082 DN15 7AE CHURCH LANE, SCUNTHORPE An Archaeological Watching Brief at Church Lane, Scunthorpe Adamson, N & Atkinson, D Kingston upon Hull : Humber Field Archaeology, 2003, 6pp, colour pls, figs, refs Work undertaken by: Humber Field Archaeology Monitoring of the site strip and excavation of the foundation trench systems revealed the location of a former garden pond. No archaeological features and no residual archaeological material was identified within the upper ground layers.
    [Show full text]
  • Detailed Assessment of NO2 at South Killingholme
    Local Authority Dr Matthew Barnes Officer Department Environmental Health (Commercial) Church Square House Scunthorpe Address North Lincolnshire DN15 6XQ Telephone 01724 297336 e-mail [email protected] Date January 2016 Report Status Final Report 1 Executive summary North Lincolnshire Council’s Air Quality Progress Report 2011 identified a possible exceedance of nitrogen dioxide alongside the A160 in South Killingholme. For this reason, in October 2013 North Lincolnshire Council installed an air quality monitoring site to more accurately measure nitrogen dioxide, nitric oxide and nitrogen oxides at this location. Nitric oxide (NO) is mainly derived from road transport emissions and other combustion processes. Nitric oxide is not considered to be harmful to health, however, once emitted to the atmosphere it is rapidly oxidised to nitrogen dioxide (NO2) which can be harmful to health. NO2 can irritate the lungs and lower resistance to respiratory infections. Continued exposure to concentrations above the recommended air quality objectives may cause increased incidence of acute respiratory illness in children. The main source of NO2 is from road traffic emissions. At South Killinghome the principle source is from vehicles using the A160 dual-carriage way, which provides access to the Port of Immingham, local refineries and power stations. It is also the main route to the proposed Able Marine Energy Park, a deep water quay and manufacturing facility for the offshore wind energy industry. To provide better access to the Port of Immingham and surrounding area, the Highways Agency are upgrading both the A160 and A180. It is anticipated that 1 construction will take approximately 16 months and should be completed by Autumn 2016.
    [Show full text]
  • Mrs K Pickering, Hillgarth Farm, Ulceby, North
    2018/19 - 27 A meeting of Ulceby Parish Council was held on Monday 19th November 2018 at 7.00pm in The Village Hall. PRESENT : Cllr Mrs Macefield – Chairman, Cllr Mrs Hulatt, Cllr B Jeffery,Cllr Mrs Smith, Cllr M Birtle, Cllr C Rowland, Cllr M Berney, Cllr A Ogden, Cllr A Reeve, IN ATTENDANCE : Mrs K Pickering – Clerk. Cllr P Clark, 2 members of the public. PUBLIC FORUM • A member of the public advised that The Front Street planning application has been passed with a Section 106 agreement which has been allocated to Baysgarth leisure centre. The member of the public felt that as Ulceby was having the development surely the S106 benefit should come to Ulceby. Cllr Clark advised the meeting that the plocy regarding S106 allocations has been changed and it can now to allocated to where there is a large recreational facility. Ward councillors have raised this policy change with The Leader of the Council. The member of the public also noted that a levy has been placed on the developers of a considerable amount which has to be paid to N.L.C. It was suggested that Ulceby should benefit in some way when development is taking place in the village. • It was noted that the planning permission has expired on the Church lane development land and that when this is reapplied for the S106 allocation should be kept for the benefit of the village. 1 .APOLOGIES : Cllr Mrs Caygill-Ogden, Cllr R Hannigan Cllr D Wells. 2. DECLARATIONS OF INTEREST ON THE AGENDA ITEMS: Cllr D Macefield – Item 6(a).
    [Show full text]
  • Applications and Decisions 6280: Office of the Traffic Commissioner
    OFFICE OF THE TRAFFIC COMMISSIONER (NORTH EAST OF ENGLAND) APPLICATIONS AND DECISIONS PUBLICATION NUMBER: 6280 PUBLICATION DATE: 28/02/2018 OBJECTION DEADLINE DATE: 21/03/2018 Correspondence should be addressed to: Office of the Traffic Commissioner (North East of England) Hillcrest House 386 Harehills Lane Leeds LS9 6NF Telephone: 0300 123 9000 Fax: 0113 248 8521 Website: www.gov.uk/traffic-commissioners The public counter at the above office is open from 9.30am to 4pm Monday to Friday The next edition of Applications and Decisions will be published on: 07/03/2018 Publication Price 60 pence (post free) This publication can be viewed by visiting our website at the above address. It is also available, free of charge, via e-mail. To use this service please send an e-mail with your details to: [email protected] APPLICATIONS AND DECISIONS General Notes Layout and presentation – Entries in each section (other than in section 5) are listed in alphabetical order. Each entry is prefaced by a reference number, which should be quoted in all correspondence or enquiries. Further notes precede each section, where appropriate. Accuracy of publication – Details published of applications reflect information provided by applicants. The Traffic Commissioner cannot be held responsible for applications that contain incorrect information. Our website includes details of all applications listed in this booklet. The website address is: www.gov.uk/traffic-commissioners Copies of Applications and Decisions can be inspected free of charge at the
    [Show full text]
  • Agenda for the 22Nd October 2019
    1 October 2019 Dear Colleague, The next meeting of the North Lincolnshire District Committee will be held as follows: Date: 22nd October 2019 Time: 6.30pm Venue: The Foreman Carter Centre, Haxey The Foreman Carter Centre, Westwoodside Playing Field, Westwoodside, North Lincolnshire, DN9 2DX Meetings of the North Lincolnshire District Committee are normally held on the same evening as the North Lincolnshire Council Parish Liaison meeting. I have been informed by the Council that it is undertaking a review of the liaison meetings and therefore no such meetings will be held during October and November. Following consultation with the District Committee Chairman, the date above was agreed. I have not received any indications from member councils of items they wish to place on the agenda for the 22nd October 2019. All Councillors and Clerks are welcome to attend the district committee meeting on the 22nd although only two representatives per Council are allowed to vote. Please be kind enough to forward the enclosed agenda papers to your Council’s delegates and any other members who may wish to attend. Additional copies of the documentation can be downloaded from the ERNLLCA website. I will not be able to attend the meeting on the 22nd. Yours sincerely Alan Barker Executive Officer Suite 8, Waters Edge Business Centre, Maltkiln Road, Barton upon Humber, North Lincolnshire, DN18 5JR Tel: 01652 66 16 17 Email: [email protected] Website: www.ernllca.info AGENDA 1 Introductions and apologies 2 To consider the minutes of the meeting held on 25 July 2019. 3 Matters arising from the minutes 4 Executive Committee report – attached 5 To note the date of the 2019 Annual Conference 6 7 Open Forum (time permitting and at the Chairman’s discretion) 8 Suggested items for the next agenda.
    [Show full text]
  • LINCOLNSHIRE POST OFFICES Compiled by Ken Smith (Updated 26/1/2020)
    LINCOLNSHIRE POST OFFICES Compiled by Ken Smith (updated 26/1/2020) Aby 1893: rubber: ALFORD. Closed, late 1990. ALFORD by 1770: BOSTON. UDC 3-6-1841. 6-11-1844 M.O.& POST TOWN. No.95 allocated. S.B.9-12-1861. T.O.1870(AF) (relocated 3-6-2015, PO Local). Alkborough 10-1-1846: UDC: BARTON-ON-HUMBER. By 1855 BRIGG. 1-10-1884 DONCASTER. Rubber 1890. MO-SB 1-2-1898. T.O.2-9-1902(AKY). 1-7-1919 SCUNTHORPE. Closed 5-11-2005. Re-open 20-3-2006 (C oronation Club, Mon.2 – 4.30 pm). Allington 6-5-1847: UDC: GRANTHAM. Closed 1867. Re-estd.1885. Rubber 1889. T.O.1-2-1934(AUI). Closed 19-3-2008 >Hosted Outreach 1-4-2008 (V.Hall, Tues 1-5, W/F.9-1). Althorpe 24-11-1845: UDC: BAWTRY. Closed 1865. Re-estd.1873: DONCASTER. Rubber 1888. 1-11-1925 SCUNTHORPE. Closed 2-11-1995. Alvingham 1868: LOUTH. Rubber 1897. Closed 14-1-1998. Amber Hill 1885: BOSTON. Rubber 1899. Closed 28-6-1996. Amcotts 1894: rubber: DONCASTER. T.O.15-1-1907(AMK). 1-11-1925 SCUNTHORPE. Closed by 9/1998. Ancaster 29-9-1846: UDC: GRANTHAM. Rubber 1887. MO-SB 1-4-1890. T.O.15-11-1910(ATE). Anderby 1880: ALFORD. Rubber 1886. 1893 HUTTOFT RSO. 1/1908 ALFORD (&1941). T.O.27-4-1938(AYY) By 1946 SKEGNESS. Closed 24-3-1993. Anwick 1870: SLEAFORD. Rubber 1897. Closed 20-3-2008 (replaced by Mobile). Appleby 10-1-1846: UDC: BRIGG. 1-10-1884 DONCASTER.
    [Show full text]
  • 57.82 the London Gazette, 31 August, 1928
    57.82 THE LONDON GAZETTE, 31 AUGUST, 1928. Trade.,any objection to the draft Order may it is proposed that electric lines shall be laid do. so • by registered letter addressed to fhe 'down within a specified time are:— Director . of ' Gas Administration, Board of. Trade; Great George Street, London, S.W. 1, Parts, of Kesteven.—In the Urban and--despatched on-or before the first day of District of Bourne: Abbey Road, East Gate, October, 1928. - - . -^ -•» North Street .from, the ..Market Place to , Any such • objection must. state (a) the Stanley Street, Soutii Street from the specific1 grounds of objection, and (b) ibhe - Market Place to South Lodge, West Street omissions, additions or modifications asked for. from ihe Market Place to the Manor House, Un-named street leading from the Wath A copy. of. the objection must; be forwarded 1 to the"' Council or to the undersigned .Clerk or Bridge to .Railway Crossing. In the Rural Parliamentary Agents at the same time as it is District of Bourne:—Parish of Aslackby: Un-named street leading from the Smithy to sent to the Board of Trade. : A copy of the draft Order and an Ordnance the Chapel. Parish of B as ton: Un-named map showing the existing limits of supply, the street. leading from Five Bells Inn to the added limits .and the situation of the existing Church. Parish of Deeping St. James: gas' works of the Council have .been deposited Church Street. Parish of Dowsby: Un- for public inspection with the Clerk of the named street leading from the Rectory to Peace for the County of Stafford at his office the Smithy.
    [Show full text]
  • North Killingholme Parish Council |
    2018/19 - 32 North Killingholme Parish Council Minutes of the Parish Council Meeting held in the Village Hall at 7.00 pm on Monday 14th January 2019 at 7.00pm. Present. Cllr L Broddley (In the Chair,), Cllr K Boyington, ,Cllr K Robinson, Cllr B Shelley, Cllr D Chapman, In Attendance Cllr's R Hannigan and D Wells, Clerk: Mrs K Pickering. 8 members of the public. PUBLIC FORUM Members of the public asked that N.L.C be asked to undertake a litter pick on East Halton Road – in particular clearing the hedges of bags of human waste. It was suggested that the general litter pick be extended down Church lane also. Tanker vehicles are still running along East Halton Road to LOR – Shell, Hoyer and XPO along with unidentified red tankers with 3 letters as the possible identification. Brian Plant tipper trucks are also using East Halton Road rather than the designated route. 19/105 Apologies : Cllr M Russell, R Brimble(LOR), Cllr P Clark. 19/106 Declaration of Interest – No matters to declare. 19/107 To approve the minutes of the Parish Council Meeting held on 10th December 2018 IT WAS RESOLVED to adopt the minutes of the parish council meeting held on 10th December 2018 and authorise the Chairman to sign the minutes. 19/108 Clerks/Chairman's report : Delays have occurred on work on the Eastfield Road bridge – it is now approximately 3 weeks behind schedule. A meeting will take place this week to try and get the work back on track and an update will be available at the next parish council meeting.
    [Show full text]
  • The Planning Act 2008 North Killingholme Power Project Examining Authority's Report of Findings and Conclusions and Recommenda
    The Planning Act 2008 North Killingholme Power Project Examining Authority’s Report of Findings and Conclusions and Recommendation to the Secretary of State for Energy and Climate Change _______________________________________ Examining Authority Lead Member Member Member Kelvin MacDonald Martin Broderick Alan Novitzky Report to the Secretary of State 1 North Killingholme Power Project This page intentionally left blank Report to the Secretary of State 1 North Killingholme Power Project ExA’s findings and conclusions and recommendation in respect of an application for a Development Consent Order for a new thermal generating station that would operate either as a Combined Cycle Gas Turbine (CCGT) plant or as an Integrated Gasification Combined Cycle (IGCC) plant, with a total electrical output of up to 470MWe at North Killingholme, Lincolnshire. File Ref EN010038 . The application, dated 25 March 2013, was made under Section 37 of the Planning Act 2008 and was received in full by The Planning Inspectorate on 25 March 2013. The applicant is C.GEN Killingholme Limited. The application was accepted for examination on 19 April 2013. The examination of the application began on 12 September 2013 and was completed on 11 March 2014. The development proposed comprises a new thermal generating station that would operate either as a Combined Cycle Gas Turbine (CCGT) plant or as an Integrated Gasification Combined Cycle (IGCC) plant, with a total electrical output of up to 470MWe at North Killingholme, North Lincolnshire, together with associated development. Summary of Recommendation: The Examining Authority recommends that the Secretary of State should make the Order in the form attached. The Examining Authority recommends that the Secretary of State should withhold consent for the request for powers for compulsory acquisition in respect of certain statutory undertakers and plots.
    [Show full text]