PT3 SKIFIELD

ARROWTOWN

QT1

QT9 QT4

QT3

QT6 QT8 QT13 QT5 QT4 QT1

QT7 TO / FROM & SKIFIELDS

QT7 QT1

W2

TO / FROM CROMWELL

FF7

LAKE HAYES ESTATE &

FF1

FF4 PT5

W3 FF2

FF5 PT2 FF3 FRANKTON AIRPORT

FF6 FF8

PT4

PT3 SKIFIELD

TO / FROM MILFORD

W1 TO / FROM GLENORCHY

SHORT QUEENSTOWN TERM MEDIUM TERM LONG TERM 2015/16 – 2018/19 – 2024/25 2025/26 – 2044/45 TOWN CENTRE 2017/18 Arterial route improvements to improve the QT1 people moving capacity and trip reliability QT2 Walking & Cycling Audit and improvements WAKATIPU Hallenstein St Traffic flow (parking and signage QT3 changes) SH6A Intersection Improvements (Stanley/ QT4 Ballarat, Stanley/Shotover, Shotover/Camp and SHORT Shotover/Rees intersections SERVICES / INFRASTRUCTURE TERM MEDIUM TERM LONG TERM Services redesign scope QT5 Camp / Ballarat Intersection Improvement FRANKTON FLATS 2015/16 – 2018/19 – 2024/25 2025/26 – 2044/45 REDESIGN AREA WIDE 2017/18 QT6 Duke St two laning/shared space TRANSPORT FF1 Glenda Dr Roundabout & Local Rds Key pt visitor routes • Bus shelters Park St/Thompson St cycling connections (safe, QT7 convenient cycling routes to and through the FF2 Eastern Access Rd town centre) • Bus stop signage & information FF3 Grant Rd to Kawarau Falls Bridge QT8 Inner Links Key external routes • Area wide park ‘n’ ride facilities FF4 Grant Rd/SH6 intersection QT9 Operational parking changes FF5 SH6 – Hawthorne link NOT SHOWN ON THE MAP... PLANS FF6 Kawarau Falls Replacement Bridge QT10 Bike parking facilities in carparks FF7 Ladies Mile Improvements SHORT QT11 Public showers/lockers for cyclists TERM MEDIUM TERM LONG TERM FF8 Frankton Flats Bridge PUBLIC TRANSPORT 2015/16 – 2018/19 – 2024/25 2025/26 – 2044/45 QT12 District plan changes 2017/18 QT13 Camp St bus stop improvements PT1 Urban services re-design Tourist service bus stops (addressing need for SHORT QT14 improved and higher capacity stops for local TERM MEDIUM TERM LONG TERM PT2 Airport to Town Centre route tourist bus services) WAKATIPU 2015/16 – 2018/19 – 2024/25 2025/26 – 2044/45 PT3 Town Centre to skifields route 2017/18 Long term town centre bus terminal (to replace QT15 PT4 Park Street ferry stop use of Camp St) W1 Rees River Bridge (Glenorchy – Paradise Rd) PT5 Frankton Flats Park’n’Ride Transport Improvements fund (creating a revenue W2 Replacement QT16 stream from parking charges for transport NOT SHOWN ON THE MAP... improvements benefitting the town centre) W3 State Highway 6A improvements PT6 Bus stop signage & information On-street wayfinding system for QT17 PT7 Bus shelters pedestrians and other road users PT8 Area wide park’n’ride QT18 Transport communications plan Land protection Business case development Design / Implementation