Worms Eye Report

Total Page:16

File Type:pdf, Size:1020Kb

Worms Eye Report Electronic Report 52 Bank Parade Burnley BB11 1TS Phone 01282 414649 / 458410 Our Ref: Hollin Way/BB4 8LB/PRA/L.14 Date: 27th May 2014 Hallmark Developments (NW) Ltd Copy to: Nigel Longshaw Hallmark Court AJ Cocker Associates 132 Manchester Road [email protected] Rochdale 01706 764880 OL11 4JQ PROPOSED HOUSE LAND AT HOLLIN WAY, RAWTENSTALL, BB4 8LB PRELIMINARY RISK ASSESSMENT (DESK STUDY) INTRODUCTION It is proposed to build a detached house. The objective is to carry out a desk study, supplemented with a walk over survey, to form a Preliminary Risk Assessment (PRA) to consider contamination, landfill gas and geotechnical issues. SITE DESCRIPTION The site is an almost rectangular plot, about 28 by 15 metres, located at the north end of Hollin Way in Rawtenstall and centred on OS Grid Reference 381230 424040. The site was inspected on 21/5/14. The site is an undeveloped plot of land with a footpath going from south of the site to the northwest. The rest of the site is unkempt grass, weeds and plants. There are no signs of contamination or contaminative uses. The site is generally level but the general slope in the area is down to the west. The site is on the edge of a residential area having houses to the east and west with fields to the north. 2 TREES There are four deciduous trees to the southwest these ranging from 5 to 8 metres high. To the northwest there are 3 deciduous trees about 12 to 15 metres high. Along the north boundary there were four deciduous trees from 9 to 15 metres. This is not an accurate arboricultural survey. PROPOSED DEVELOPMENT It is proposed to build a detached house. There will be a short driveway to the front (south) and surrounding gardens. LEGAL/COPYRIGHT Material may be included in this report from Ordnance Survey (Licence No. AL100031635), Landmark, Environment Agency, Coal Authority and others. It may be copyright and the usual restrictions apply. This report can only be relied upon if the invoice has been paid promptly and in full. This report may be signed by an individual, but only on behalf of Worms Eye Limited. This report is referred to as a “Desk Study” but also involves a site inspection. Alternative names for such reports are “Phase I Report” (Phase II being the intrusive work involving boreholes etc.) or a “Preliminary Risk Assessment” (PRA). DATA SOURCES The following data sources have been viewed in compiling this report. o BGS, Geology Map, 1:50000 scale, Sheet 76, Rochdale, Solid and Drift Edition o BGS, on-shore boreholes scans (no nearby records) o Coal Authority, Interactive Mapping Data o Environment Agency, What's In Your Backyard o Groundwater o Landfill Sites o Pollution o Landmark Envirocheck Report, 9/5/14 o Ordnance Survey, Historical Maps, 1:10000 and 1:2500 scale o Walkover Survey, 21/5/14 3 ENVIRONMENTAL DATA A Landmark Envirocheck report has been obtained for the site and geological maps have been reviewed, the following is a summary of the combined data. The Envirocheck report indicated none of the following within 250 metres: Contaminated land register entries Discharge consents Water abstraction points Source protection zones Radioactive sites Landfill or other waste sites Hazardous substances sites Fuel stations Sensitive land uses Geology of Site The geological map indicates that the underlying solid rocks are sandstone of the Holcombe Brook Grit horizon in the Marsden Formation of the Millstone Grit Group, dipping to the northeast. Surface drift is shown as glacial till (boulder clay) of unspecified thickness and natural subsidence hazards are shown as very low to no hazard. Surface Water (Hydrology) A stream issues 240 metres west, flowing west to Limy Water (GQA Grade B) 270 metres west. The nearest pollution incident was a significant incident 222 metre west of diesel in Limy Water* The nearest area of flooding from rivers is shown to be 241 metres west, i.e. well clear of the site.* The area slopes down to the southwest, the flow of surface water is expected to be in this direction. * not relevant due to distance/severity/significance Groundwater (Hydrogeology) The solid rocks under the site are indicated as a Secondary A aquifer. Superficial (drift) deposits are shown as unproductive strata with a low permeability. Groundwater flow is likely to follow the topography and move to the southwest. 4 Radon Less than 1% of homes in the area are above the radon action level and radon protection measures are not required. Mining The Coal Authority interactive mapping shows that the site is not in a ‘Development High Risk Area’. Nearby Industry No trade directory entries within 50 metres, the closest entries between 50 to 100 metres being houses with either small cottage industries or the registered addresses of businesses. SITE HISTORY Date On Site Off Site Limy Water 270m west 1849 Undeveloped field 1: 10560 Generally undeveloped – poor mapping Fields to the north Houses 20m southwest and 40m west 1893 Undeveloped field 1: 2500 Grange Works (disused) 240m southwest. Farm 40m northwest 1911 - 1963 No change No change 1: 2500 1993 No change Housing estates built to the east and southwest. 1: 2500 2014 No change No relevant change 1: 10000 DISCUSSION Contamination The site is a previously undeveloped plot. There has been no use of the site from which contamination would be expected. There have been no nearby land uses, industrial or other, which will affect the site and no pollution incidents on or close to the site. The proposed development will be a house with gardens. However, there are no indications that contamination will be present at levels which will pose a risk to householders. A negligible risk is anticipated from contamination. 5 Controlled Waters There is an underlying Secondary A aquifer beneath low permeability clay. The nearest water course is a stream 240 metres west, leading to Limy Water 270 metres west. Although the gardens will allow rainwater to pass through the surface soils, significant contamination is not anticipated. Furthermore, the underlying clay will impede the migration of water and no risks to controlled waters are expected. Ground Gas There are no landfill sites or significant filled features, within 250 metres of the site, and peat is not expected. There are no nearby sources of ground gas and no risk to the development from ground gasses. Radon Radon protection measures are not required. Flooding The Environment Agency maps show that this site is clear of flooding from rivers. Flooding can occur for many reasons other than those dealt with by the EA maps. These include: burst pipes blocked drains, sewers and culverts inadequate drainage cloudbursts/flash flooding overwhelming normally satisfactory drainage systems Statements in this report such as ‘clear of flooding/flood plain’ and ‘flooding – no further action’ are references to the EA river and sea flood maps and are no guarantee that flooding will not occur. Foundations The geological map suggests that the site is underlain by clay. If present this often provides a good bearing strata for strip foundations. If clay is present plasticity tests will be required to establish its shrinkage potential, to ensure foundations are below the possible effects of tree root action. INDUSTRY PROFILE The site has had no industrial use and there have been no nearby industrial sites. 6 CONCEPTUAL MODEL A conceptual model based on the source-pathway-receptor concept is included with this desk study to show the potential pollutant linkages with this site. Likely Source Receptors Pathway Pollutant Linkage Construction workers Inhalation No Asbestos End-users Inhalation No Construction workers Short-term direct contact, inhalation of dust, ingestion No Direct contact, ingestion, from home grown vegetables, Householders No inhalation of dust Inorganic contaminants Service pipes Seeping into drinking water pipes No Groundwater Leaching towards No River/stream Leaching towards No Sulphate Building fabric Concrete directly in contact with soil No Construction workers Short-term direct contact, inhalation of dust, ingestion No Direct contact, ingestion, from home grown vegetables, Householders No inhalation of dust Hydrocarbons Service pipes Seeping into drinking water pipes No Groundwater Migrating towards No River/stream Migrating/leaching towards No Construction workers Short-term inhalation No Hydrocarbon vapours Householders Inhalation of vapours indoors and outdoors No Landfill gas End-users - in buildings Seeping into buildings, explosion, asphyxiation No Radon End-users - in buildings Seeping into buildings No CONCLUSION Contamination Taking into account the history of the site and surrounding area it is considered unlikely that contamination will be present on site and no risks are expected to householders. The development will probably require excavated material to be disposed off-site. The receiving waste site, may require confirmation of contamination levels in the soil. With this in mind the developer may consider a limited investigation, comprising two to three tests (depending on volume of material for disposal), for a general suite of contaminants including heavy metals, sulphate, PAHs, TPHs and asbestos. 7 Controlled Waters Significant levels of contamination are not expected and no risks to controlled waters are anticipated. No further action is required. Ground Gas There are no nearby sources for ground gases and no further action is required. Radon Radon protection measures are not required. Flooding The EA maps indicate that the area is clear of flooding
Recommended publications
  • Rossendale Local Plan Flood Risk Incorporating Sequential Test Topic Paper
    ROSSENDALE LOCAL PLAN FLOOD RISK INCORPORATING SEQUENTIAL TEST TOPIC PAPER March 2019 Contents 1 Introduction .................................................................................................................................... 3 2 Background ..................................................................................................................................... 3 2.1 National Context ..................................................................................................................... 3 2.2 Regional / Local context .......................................................................................................... 8 3 Evidence base................................................................................................................................ 10 3.1 Strategic Flood Risk Assessment (SFRA) ............................................................................... 10 3.2 Sustainability Appraisal (SA) ................................................................................................. 12 4 Applying the Sequential Test ........................................................................................................ 12 4.1 Site allocations ...................................................................................................................... 12 Proposed allocations in flood zone 1 ................................................................................................ 13 Proposed allocations in flood zone 2 ...............................................................................................
    [Show full text]
  • Environmental Statement Main Text Volume 1 Proposed Three Wind
    ENVIRONMENTAL STATEMENT MAIN TEXT VOLUME 1 PROPOSED THREE WIND TURBINES ON LAND ADJACENT TO HAMELDON HILL WIND FARM May 2016 1 Environmental Statement This Environmental Statement (ES) is prepared for the submission for planning approval of three wind turbines on land adjacent to the Hameldon Hill Wind Farm. The statement is prepared by AAH Planning Consultants with contributions from: Copies of the ES can be obtained either through downloading from the website www.hameldonhillwindfarm.com or by contacting: AAH Planning Consultants, 2 Bar Lane, York, YO1 6JU Tel: 01904 629258 Email: [email protected] The cost of printing for paper copies will be charged at cost price to cover the cost incurred for printing and postage. DVD versions can also be provided at a cost of £10. Paper copies will also be available for public viewing at Burnley Borough Council’s planning department at Housing and Development Control, Contact Centre, 9 Parker Lane, Burnley, BB11 2BY during the following office hours: 9am to 5pm Monday, Tuesday, Thursday and Friday 10am to 5pm on Wednesdays The Non-Technical Summary of the ES is also available free of charge upon request and again available for download from the above mentioned website. 2 Contents 1.0 Introduction to the Proposal ....................................................................................................... 1 2.0 Approach to Environmental Assessment .................................................................................... 5 3.0 Site Description ........................................................................................................................
    [Show full text]
  • Croal/Irwell Local Environment Agency Plan Environmental Overview October 1998
    Croal/Irwell Local Environment Agency Plan Environmental Overview October 1998 NW - 10/98-250-C-BDBS E n v ir o n m e n t Ag e n c y Croal/lrwell 32 Local Environment Agency Plan Map 1 30 30 E n v ir o n m e n t Ag e n c y Contents Croal/lrwell Local Environment Agency Plan (LEAP) Environmental Overview Contents 1.1 Introduction 1 1.2 Air Quality 2 1.3 Water Quality 7 1.4 Effluent Disposal 12 1.5 Hydrology. 15 1.6 Hydrogeology 17 1.7 Water Abstraction - Surface and Groundwater 18 1.8 Area Drainage 20 1.9 Waste Management 29 1.10 Fisheries 36 1.11 . Ecology 38 1.12 Recreation and Amenity 45 1.13 Landscape and Heritage 48 1.14 Development . 5 0 1.15 Radioactive Substances 56 / 1.16 Agriculture 57 Appendix 1 - Glossary 60 Appendix 2 - Abbreviations ' 66 Appendix 3 - River Quality Objectives (RQOs) 68 Appendix 4 - Environment Agency Leaflets and Reports 71 Croal/lrwell LEAP l Environmental Overview Maps Number Title Adjacent to Page: 1 The Area Cover 2 Integrated Pollution Control (IPC) 3 3 Water Quality: General Quality Assessment Chemical Grading 1996 7 4 Water Quality: General Quality Assessment: Biological Grading 1995 8 5 Water Quality: Compliance with proposed Short Term River Ecosystem RQOs 9 6 Water Quality: Compliance with proposed Long Term River Ecosystem RQOs 10 7 EC Directive Compliance 11 8 Effluent Disposal 12 9 Rainfall 15 10 Hydrometric Network 16 11 Summary Geological Map: Geology at Surface (simplified) 17 12 Licensed Abstractions>0.5 Megalitre per day 18 13 Flood Defence: River Network 21 14 Flood Defence: River Corridor
    [Show full text]
  • River Irwell Management Catchment – Evidence and Measures Greater
    River Irwell Management Catchment – Evidence and Measures Greater Manchester Combined Authority Water body output maps LIFE Integrated Project LIFE14IPE/UK/027 The Irwell Management Catchment Water body ID Water body Name GB112069064660 Irwell (Source to Whitewell Brook) GB112069064670 Whitewell Brook GB112069064641 Irwell (Cowpe Bk to Rossendale STW) GB112069064680 Limy Water GB112069064650 Ogden GB112069064620 Irwell (Rossendale STW to Roch) GB112069064610 Kirklees Brook GB112069060840 Irwell (Roch to Croal) GB112069061451 Irwell (Croal to Irk) GB112069064720 Roch (Source to Spodden) GB112069064690 Beal GB112069064730 Spodden GB112069064600 Roch (Spodden to Irwell) GB112069064710 Naden Brook GB112069061250 Whittle Brook (Irwell) GB112069064570 Eagley Brook GB112069064560 Astley Brook (Irwell) GB112069064530 Tonge GB112069064540 Middle Brook GB112069064550 Croal (including Blackshaw Brook) GB112069061161 Irk (Source to Wince Brook) GB112069061120 Wince Brook GB112069061131 Irk (Wince to Irwell) GB112069061452 Irwell / Manchester Ship Canal (Irk to confluence with Upper Mersey) GB112069061151 Medlock (Source to Lumb Brook) GB112069061152 Medlock (Lumb Brook to Irwell) GB112069061430 Folly Brook and Salteye Brook. GB112069064580 Bradshaw Brook Click on a water body to navigate to that map Water body name Issues: Comments provided during the Opportunity theme symbols Workshop on the 10th February • Lists the issues in the water Fisheries – barrier removal body and their causes Physical modifications Opportunities: • Based on the issues what Water quality are the main opportunities for the Partnership. This excludes water company issues and the Mitigation Measures Actions as these are presented as other opportunities below. Map of the waterbody indicating the location of Irwell Catchment Partnership Projects, Mitigation Measures Actions, Environment Agency sampling locations, Mitigation Measure Actions: consented discharges, and priority barriers for eel. • A list of the Mitigation Measures Actions identified in the water body by the Environment Agency.
    [Show full text]
  • Review of Discharge Consents Irwell Catchment
    Review of discharge consents. River Irwell catchment report Item Type monograph Publisher North West Water Authority Download date 25/09/2021 14:27:27 Link to Item http://hdl.handle.net/1834/27235 RSD2/A20 REVIEW OF DISCHARGE CONSENTS IRWELL CATCHMENT REPORT Contents 1. Introduction 2. Physical Description of Catchment 3. River Water - Chemical Classification 4 . Discharges and Consents 4.1 Authority Sewage Treatment Works 4.2 Authority Trade Effluent Discharges 4.3 Private Trade Effluent Discharges 4.4 Private Sewage Treatment Works 4 .5 Storm Sewage Overflows 5. Special Cases MARCH 1979 Introduction The purpose of this Report is to make recommendations for the revision of consents for discharges within the catchment of the River Irwell, downstream to and including the River Medlock in Manchester. This revision has the sole objective of recognising the present effluent and river water quality - proposals for long term river water quality objectives are to be put forward in other Reports. The report identifies the existing situation regarding the legal status of effluent discharges from Authority and non-Authority owned installations within the catchment, details the determinand concentration limits included in existing discharge consents (where appropriate) and proposes the limits to be included in the reviewed consents. The reviewed consents will reflect the quality of efflu­ ent achievable by good operation of the existing plant based on 1977 effluent quality data but taking into account any improvements, extensions etc. that have been or are about to be carried out and any known further industrial and/or housing development in the works drainage area. The proposed limits are intended to be the 95% compliance figures rather than the 80% compliance figures inferred in existing consents and hence the new figures will obviously be higher than the old.
    [Show full text]
  • Appendix I SHLAA Sites Summary Proformas
    Burnley SHLAA: Site Information Form Site Information Density and Yield SHLAA Ref: HEL/009 Site Area (Ha): 11.1 Category: Housing Standard Density: 25 dph - Housing Site Name: Site off Mount Lane, Overtown Initial Source IO Omission site (rural) of Supply: Street: Mount Lane, Overtown Theoretic Yield at Standard 280 Density Location: Overtown Sub Sources Anticpated Yield (m2 or 0 Ward: Cliviger with Worsthorne Ward Extant Planning Permission? No number of dwellings): Parish: Cliviger CP Allocation in Saved Local Plan: Rural Areas Suitability Achievability Attractive Site Location: Open Countryside adjoining named settlement Likely marketability of site: Current Land Use: Agricultural Local Housing/Commercial market/demand: Strong Green Belt: No Established Residential/ Greenfield/Brownfield: Greenfield Commercial Area?: Yes BMV Agricultural Land N/A Likely viability of site: Viable - subject to caveat (boundary Landscape/ Undulating farm land Availability Topography Ownership: Private Visual Visually prominent in long distance views Ownership notes/ Promoted for inclusion in the Local Prominence: evidence of Plan by local resident during Issues landowner and Options consultation Contaminated Land Register: No intentions: Estimated number of Landowners 1 Contamination Adjacent Sites of Potential Concern (mining; textile and Comments: dye works) Tenancies or restrictive covenants: Flood Zone: 1 Comments: Flood Risk Issues: Site considered unsuitable due to scale and location. Flood Map for Surface Water- Predominantly very low annual probability. Small areas of low annual probability. Flood depth less than Uncertainty over site availability. Not listed in GSS 2015 but 300mm. was identified as site for potential new allotments (Burnley Allotment Review 2011). Heritage Asset Comment: South of site within 100m of Grade II Listed LCC highways: Access preferred off Burnley Road due to Building.
    [Show full text]
  • River Basin Management Plan North West River Basin District
    River Basin Management Plan North West River Basin District Annex C: Actions to deliver objectives Contents C.1 Introduction 3 C.2 Actions we can all take 9 C.3 All sectors 11 C.4 Agriculture and rural land management 14 C.5 Angling and conservation 32 C.6 Central government 45 C.7 Environment Agency 52 C.8 Industry, manufacturing and other business 67 C.9 Local and regional government 78 C.10 Mining and quarrying 87 C.11 Navigation 92 C.12 Urban and transport 96 C.13 Water industry 102 Environment Agency River Basin Management Plan, North West River Basin District 2 Annex C: Actions to deliver objectives December 2009 C.1 Introduction This annex sets out tables of the actions (the programmes of measures) that are proposed for each sector. Actions are the on the ground activities that will implemented to manage the pressures on the water environment and achieve the objectives of this plan. Further information relating to these actions and how they have been developed is given in: • Annex B: Objectives for waters in the North West River Basin District This gives information on the current status and environmental objectives that have been set and when it is planned to achieve these. • Annex D: Protected area objectives (including programmes for Natura 2000) This gives details of the location of protected areas, the monitoring networks for these, the environmental objectives and additional information on programmes of work for Natura 2000 sites. • Annex E: Actions appraisal This gives information about how we have set the water body objectives for this plan and how we have selected the actions.
    [Show full text]
  • 07514520059.501 Burnley Wildlife and Habitat Survey Version A.0
    December 2007 - i - 07514520059.501 Burnley Wildlife and Habitat Survey Version A.0 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION......................................................................................... 1 1.1 Objectives................................................................................................1 1.2 Limitations ...............................................................................................1 2.0 LEGISLATIVE BACKGROUND AND POLICY FRAMEWORK.................. 3 2.1 Planning Policy........................................................................................3 2.2 The Natural Environment and Rural Communities Act 2006...................4 2.3 Biodiversity Action Planning ....................................................................4 2.4 National Government Performance Indicators ........................................5 3.0 METHODOLOGY........................................................................................ 6 3.1 Desk Study ..............................................................................................6 3.2 Field Survey.............................................................................................6 3.3 Arrangement of Access ...........................................................................7 3.4 Database and GIS ...................................................................................7 4.0 RESULTS.................................................................................................... 9 4.1 Desk Study
    [Show full text]
  • Flood Risk Report
    Consulng Civil, Structural & Geo‐Environmental Engineers Flood Risk Assessment Report Site Address: Burley Road Rawtenstall Paul Waite Associates Ltd Summit House Riparian Way Project Ref: 11201/I/01B The Crossing Cross Hills February 2014 BD20 7BW [email protected] www.pwaite.co.uk Report No.13161/I/01 REVISION B Project Details. FRA – Site off Burnley Road, Rawtenstall, Lancashire Date. February 14 Flood Risk Assessment Paul Waite Associates have been appointed by the RTB Partnership, to undertake a Flood Risk Assessment in support of a planning application for residential development at a site off Burnley Road in Rawtenstall, Lancashire. Clients Details RTB Partnership The Business Centre Futures Park Bacup Lancashire OL13 0BB Documents Revision Status ISSUE: DATE COMMENTS ‐ November 4, 2013 FINAL A February 10, 2014 FINAL ‐ Revised following updated development plans February 25, 2014 FINAL – Revised following response from the Environment B Agency Report No.13161/I/01 REVISION B Project Details. FRA – Site off Burnley Road, Rawtenstall, Lancashire Date. February 14 Contents Executive Summary 1 1.0 Introduction 3 2.0 Approach to the Flood Risk Assessment 4 2.1 Approach 4 2.2 Application of the Sequential and Exceptions Test 4 3.0 Site Details 6 3.1 Location 6 3.2 Former/Current Use 6 3.3 Proposals 6 3.4 Boundaries 7 3.5 Topography 7 3.6 Existing Drainage 8 3.7 History of Flooding 9 3.7.1 British Hydrological Society – Hydrological Events 9 3.7.2 Internet Search for Historical Flooding 9 3.7.3 Lancashire Area PFRA Document (2011) 9 3.7.4 Rossendale Borough Council SFRA (May 2009) 11 3.7.5 Environment Agency Data – Historic Flooding 11 4.0 Flooding Mechanisms 12 4.1 Fluvial: Limy Water 12 4.1.1 General 12 4.1.2 Modeled Flood Level Data 13 4.1.3 Overtopping 14 4.1.4 Climate Change 15 4.1.5 Infrastructure Failure: Blockage 16 4.1.6 Conclusion 17 Report No.13161/I/01 REVISION B Project Details.
    [Show full text]
  • Lancashire: a Chronology of Flash Flooding
    LANCASHIRE: A CHRONOLOGY OF FLASH FLOODING Introduction The past focus on the history of flooding has been mainly with respect to flooding from the overflow of rivers and with respect to the peak level that these floods have achieved. The Chronology of British Hydrological Events provides a reasonably comprehensive record of such events throughout Great Britain. Over the last 60 years the river gauging network provides a detailed record of the occurrence of river flows and peak levels and flows are summaried in HiflowsUK. However there has been recent recognition that much flooding of property occurs from surface water flooding, often far from rivers. Locally intense rainfall causes severe flooding of property and land as water concentrates and finds pathways along roads and depressions in the landscape. In addition, intense rainfall can also cause rapid rise in level and discharge in rivers causing a danger to the public even though the associated peak level is not critical. In extreme cases rapid rise in river level may be manifested as a ‘wall of water’ with near instantaneous rise in level of a metre or more. Such events are usually convective and may be accompanied by destructive hail or cause severe erosion of hillsides and agricultural land. There have been no previous compilations of historical records of such ‘flash floods’or even of more recent occurrences. It is therefore difficult to judge whether a recent event is unusual or even unique in terms of the level reached at a particular location or more broadly of regional severity. This chronology of flash floods is provided in order to enable comparisons to be made between recent and historical floods, to judge rarity and from a practical point of view to assess the adequacy of urban drainage networks.
    [Show full text]
  • Local Environment Agency Plan
    local environment agency plan CROAL/IRWELL CONSULTATION DRAFT OCTOBER 1998 En v i r o n m e n t A g e n c y NATIONAL LIBRARY & INFORMATION SERVICE HEAD OFFICE Rio House, Waterside Drive. Aztec West, Almondsbury, Croal/lrwell 32 Local Environment Agency Plan Map 1 30 30 E n v ir o n m e n t A g e n c y H ^ . BURNLEY BC BUSINESS REPLY SERVICE Licence No NW W 359A Environment Agency Appleton House 430 Birchwood Boulevard Birchwood WARRINGTON Cheshire WA3 7AA Foreword Welcome to our latest Local Environment Agency Plan (LEAP) Consultation Report for the Croal/lrwell area. Our aim is to produce a local agenda of action for.environmental improvement which addresses issues which we are unable to solve through our day to day work. We have attempted to draw together the issues which we believe need tackling to improve your local environment. As the LEAP provides the focus for actions by the Agency, it is important that the issues we have raised relate to our key responsibilities for the regulation of waste, releases to air from some industrial processes and protecting and improving the water environment. However, where issues are raised which do not relate directly to our responsibilities, we hope to influence others to plan and act in ways that support our Environmental Strategy for the Millennium and Beyond. In order for the LEAP to be effective we need to know your views. We would like to know what you think of the issues raised, whether you would like other environmental issues to be added, and whether you can work together with us to achieve environmental improvements.
    [Show full text]
  • JBA Consulting Report Template 2015
    Rossendale Hybrid Level 1 and Level 2 Strategic Flood Risk Assessment Final Report November 2016 Rossendale Borough Council Business Centre Futures Park Bacup Lancashire OL13 0BB JBA Project Manager Mike Williamson JBA Consulting Bank Quay House Sankey Street Warrington WA1 1NN Revision History Revision Ref / Date Issued Amendments Issued to V1.0 / 26 September 2016 - Adrian Smith (RBC) V2.0 / 15 November 2016 RBC & EA comments Adrian Smith (RBC) Contract This report describes work commissioned by Adrian Smith, on behalf of Rossendale Borough Council, by a letter dated 31 May 2016. Rossendale Borough Council's representative for the contract was Adrian Smith. Mike Williamson of JBA Consulting carried out this work. Prepared by .................................................. Mike Williamson BSc MSc EADA FRGS CGeog Chartered Senior Analyst Reviewed by ................................................. Howard Keeble MPhil BEng BSc CertBusStud CEng CEnv CSci MICE MCIWEM C.WEM Technical Director Purpose This document has been prepared as a Final Report for Rossendale Borough Council. JBA Consulting accepts no responsibility or liability for any use that is made of this document other than by Rossendale Borough Council for the purposes for which it was originally commissioned and prepared. JBA Consulting has no liability regarding the use of this report except to Rossendale Borough Council. 2016s4505 RBC Level 1 & 2 Hybrid SFRA Final Report v2.0.docx i Acknowledgements JBA would like to thank all Rossendale Borough Council, Environment Agency and United Utilities staff for their time and commitment to providing data and discussing the issues identified during the course of this study. Copyright © Jeremy Benn Associates Limited 2016 Carbon Footprint A printed copy of the main text in this document will result in a carbon footprint of 544g if 100% post- consumer recycled paper is used and 693g if primary-source paper is used.
    [Show full text]