River Basin Management Plan North West River Basin District
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Draft Local Flood Risk Management Strategy Annex G Water Framework Directive (WFD) Assessment
Cumbria County Council Draft Local Flood Risk Management Strategy Annex G Water Framework Directive (WFD) Assessment October 2014 Cumbria County Council Table of contents Chapter Page(s) Glossary of Acronyms 2 1. Introduction 3 1.1 Overview 3 1.2 Purpose of a Local Flood Risk Management Strategy 4 1.3 Requirement for a Water Framework Directive (WFD) Assessment 5 1.4 Summary of the key WFD Objectives 6 1.5 Other legislation 8 2. Cumbria LFRMS 9 2.1 Overview of the study area 9 2.2 Timescale 10 2.3 Objectives of the Cumbria LFRMS 11 2.4 WFD Preliminary Screening 11 2.5 Water bodies and how they are classified 14 2.6 Water quality data for the River Basin Districts 15 3. WFD Assessment 17 3.1 Introduction 17 3.2 WFD Objectives 17 3.3 Testing the LFRMS against WFD Objectives 18 3.4 Pressures on the water environment 20 4. Conclusion 26 5. References 27 Figures 1 Designated conservation sites in Cumbria 8 2 Cumbria County Council administrative area 9 3 Named water bodies wholly or partially within the Cumbria LFRMS area 12 4 River Basin Districts in Cumbria 16 5 WFD assessment objectives 18 6 High level WFD assessment 19 7 Pressures on the water environment 20 8 Assessment of the Cumbria LFRMS measures and actions 21 Glossary of Acronyms AWB Artificial Water Bodies BAU Business as Usual LDNP Lake District National Park EU European Union LLFA Lead Local Flood Authority FWMA Flood and Water Management Act 2010 LFRMS Local Flood Risk Management Strategy GCS Good Chemical Status RBMP River Basin Management Plan GEP Good Ecological Potential SSSI Site of Special Scientific Interest GES Good Ecological Status SAC Special Area of Conservation HMWB Heavily Modified Water Bodies SPA Special Protection Area WFD Water Framework Directive Serving the people of Cumbria Annex G Water Framework Directive (WFD) Assessment 1. -
Lake District: Wandern
Alle Infos zu dieser Reise finden Sie hier LAKE DISTRICT: WANDERN Ort: Vereinigtes Königreich Reisedauer: 8 Tage Teilnehmerzahl: 5 - 16 Schwierigkeit: Mittel Reiseart: Wander- und Trekkingreisen, Gruppenreise LAKE DISTRICT Auf Ihrer 8-tägigen Standortreise lernen Sie den fabelhaften Lake District mit all seinen Facetten kennen. Die Landschaft scheint wie aus dem Bilderbuch: zerklüftete Berge, grüne Hügel und schimmernde Seen soweit das Auge reicht. Viele Dichter und Schriftsteller fanden an diesem wundervollen Flecken Erde die Inspiration für ihre Werke, und besonders die Romantiker, wie William Wordsworth, verfielen der schönen Natur. Lassen auch Sie sich von dem Zauber der Seen in den Bann ziehen und erleben Sie zu Fuß die Schönheit der Region. Inklusivleistungen kleine Gruppe mit max. 16 Gästen garantierte Durchführung ab 5 Gästen 1 / 7 Linienflug (Economy) mit Lufthansa von Frankfurt/M. (FRA) nach Manchester (MAN) und zurück (inkl. Steuern & Gebühren). Platzangebot begrenzt. Aufpreise möglich. Weitere Abflugorte in Deutschland, Österreich & der Schweiz. Rail&Fly-Ticket der Deutschen Bahn: 71 € (2. Kl.); bitte bei Anmeldung mitbuchen. Transfers & Transporte in klimatisierten Fahrzeugen 7 Nächte im Doppelzimmer (DZ) mit Bad oder Dusche/WC im Hotel „Windermere Hydro“ Mahlzeiten lt. Programm Programm wie beschrieben inkl. Eintrittsgelder ständige, deutschsprachige Reiseleitung Zusatzleistungen Doppelzimmer zur Alleinbenutzung 465€ Rail&Fly-Ticket der Deutschen Bahn; bitte bei 71€ Anmeldung mitbuchen (2. Klasse Reiseverlauf 1. Ihr 3-Sterne-Hotel „Windermere Hydro“ Das viktorianische Hotel aus dem 19. Jh. punktet mit einem Charme, der Tradition und Moderne verbindet. Das Haus liegt in dem schönen Ort Bowness-on- Windermere, mitten im Herzen des Lake Districts. Genießen Sie den atemberaubenden Ausblick auf den größten natürlichen See in ganz England, Lake Windermere. -
Issues and Options Topic Papers
Tameside Metropolitan Borough Council Local Development Framework Joint Core Strategy and Development Management Policies Development Plan Document Issues and Options Topic Papers February 2012 Strategic Planning Tameside MBC Room 5.16, Council Offices Wellington Road Ashton-under-Lyne OL6 6DL Tel: 0161 342 3346 Email: [email protected] For a summary of this document in Gujurati, Bengali or Urdu please contact 0161 342 8355 It can also be provided in large print or audio formats Local Development Framework – Core Strategy Issues and Options Discussion Paper Topic Paper 1 – Housing 1.00 Background • Planning Policy Statement 3: Housing (PPS3) • Regional Spatial Strategy North West • Planning for Growth, March 2011 • Manchester Independent Economic Review (MIER) • Tameside Strategic Housing Land Availability Assessment (SHLAA) • Tameside Strategic Housing Market Assessment 2008 (SHMA) • Tameside Unitary Development Plan 2004 • Tameside Housing Strategy 2010-2016 • Tameside Sustainable Community Strategy 2009-2019 • Gypsy and Traveller Accommodation Assessment • Tameside Residential Design Supplementary Planning Document (SPD) 1.01 The Tameside Housing Strategy 2010-2016 is underpinned by a range of studies and evidence based reports that have been produced to respond to housing need at a local level as well as reflecting the broader national and regional housing agenda. 2.00 National Policy 2.01 At the national level Planning Policy Statement 3: Housing (PPS3) sets out the planning policy framework for delivering the Government's housing objectives setting out policies, procedures and standards which Local Planning Authorities must adhere to and use to guide local policy and decisions. 2.02 The principle aim of PPS3 is to increase housing delivery through a more responsive approach to local land supply, supporting the Government’s goal to ensure that everyone has the opportunity of living in decent home, which they can afford, in a community where they want to live. -
3 Restocking with Salmon, Trout and Freshwater Fish 80
North West fisheries report 2002 Item Type monograph Publisher Environment Agency North West Download date 07/10/2021 13:25:39 Link to Item http://hdl.handle.net/1834/24896 I www.environment-agency.gov.uk • North West Fisheries Report 2002 Published by: Environment Agency Richard Fairclough House Knutsford Road Warrington WA4 1HG Tel: 01925 653999 Fax: 01925 415961 ISBN: 1844322076 © Environment Agency All rights reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted in any form or by any other means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the Environment Agency. NORTH WEST FISHERIES REPORT 2002 Contents Page Note on organisational changes 2 North West Region Fisheries and Recreation staff 3 Regional Fisheries Ecology, Recreation Advisory Committee 5 Consultative association contacts 6 Introduction 7 North Area Annual Report for 2002 Team report: South-West Cumbria 8 Team report: Eden 12 Team report: West Cumbria 14 Projects 15 Central Area Annual Report for 2002 Team reports 17 Projects 20 Survey reports 28 South Area annual report for 2002 Team reports 34 Survey reports 39 Projects 42 Note on Organisational Changes In the past year the Environment Agency has undergone major organisational changes. The area teams were previously organised in relation to work areas, e.g. we had an Area Fisheries Ecology and Recreation Manager, and a Fisheries team in each of our area offices. Since October 1, 2002 the old 'functional' structure has gone and the work is now split along geographic lines. The three areas now have two or more Environment Managers who are responsible for delivery of all Agency work (e.g. -
Final Recommendations on the Future Electoral Arrangements for Stockport
Final recommendations on the future electoral arrangements for Stockport Report to The Electoral Commission September 2003 © Crown Copyright 2003 Applications for reproduction should be made to: Her Majesty’s Stationery Office Copyright Unit. The mapping in this report is reproduced from OS mapping by The Electoral Commission with the permission of the Controller of Her Majesty’s Stationery Office, © Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Licence Number: GD 03114G. This report is printed on recycled paper. Report no. 355 2 Contents Page What is The Boundary Committee For England? 5 Summary 7 1 Introduction 11 2 Current electoral arrangements 13 3 Draft recommendations 17 4 Responses to consultation 19 5 Analysis and final recommendations 21 6 What happens next? 45 Appendices A Final recommendations for Stockport: Detailed mapping 47 B Guide to interpreting the first draft of the electoral change Order 49 C First draft of the electoral change Order for Stockport 51 3 4 What is The Boundary Committee for England? The Boundary Committee for England is a committee of The Electoral Commission, an independent body set up by Parliament under the Political Parties, Elections and Referendums Act 2000. The functions of the Local Government Commission for England were transferred to The Electoral Commission and its Boundary Committee on 1 April 2002 by the Local Government Commission for England (Transfer of Functions) Order 2001 (SI 2001 No. 3692). The Order also transferred to The Electoral Commission the functions of the Secretary of State in relation to taking decisions on recommendations for changes to local authority electoral arrangements and implementing them. -
Remote Environment Committee Meeting Tuesday 2 February 2021
Shaw & Crompton Parish Council Council Offices, 1 Kershaw Street East, Shaw, Oldham OL2 8AB Tel: 01706 847590 Mob: 07926 186652 e-mail: [email protected] NOTICE OF MEETING There will be a meeting of the ENVIRONMENT COMMITTEE to be held remotely via the Zoom platform on Tuesday 2 February 2021 commencing at 7:00pm when the business set out in the following agenda will be transacted. Meeting quorum is 3 Committee membership Councillors Beeston, Berry, Flores, Gloster, Marbrow (Vice Chair), Moore (Chair), Rowlinson and Sykes. Meeting quorum is 3 The meeting will be open to the public for the whole or part of the proceedings. Tony Hilton Dated: 28 January 2021 Tony Hilton Clerk to the Council Please ensure that your mobile phone is switched to silent or is switched off completely during the meeting AGENDA 1 To receive any apologies for absence. 2 To receive declarations of interest in any contract or matter to be discussed. 3 To approve as a correct record the Minutes of the meeting on the 12 January 2021. 4 Public Participation A period not exceeding 15 minutes set aside to listen to matters raised by members of the public. 5 Developing Health and Wellbeing in Shaw and Crompton: To explore the role of the Environment and the Parish Council. To receive updates in relation to a) growing hub activity at Crompton Cemetery/Fraser Street – the Clerk b) a list of environmental projects to be included in planning application recommendations to housing developers - Councillors Gloster, Hamblett and Moore. 6 Sustainability Standards implementation -
MACF 2014 Report.Pdf
1 Key facts In 2012 Manchester’s population was 511,000 Manchester has 32 electoral wards There are 181 schools in Manchester (170 local authority) There are 16,900 businesses in Manchester Manchester covers an area of 11,564 hectares In 2012 there were 220,150 households in Manchester Manchester’s energy consumption in 2011 was 9,130 GWh 73% of journeys to the city are by public transport or bike Manchester recycled 36% of its household waste in 2012/13 58% of the city’s surface area is green infrastructure 2 Contents MACF Steering Group Chair’s introduction 4-5 Part 1 MACF Steering Group activity in 2013: a year of change 6-7 Part 2 The city’s action on climate change in 2013: progress against MACF plan 8-9 Meeting our objectives 10-18 1 Reducing the city’s CO2 emissions by 41% by 2020 10-12 (from 2005 levels) 2 Culture change - embedding ‘low carbon thinking’ 13-15 in the lifestyles and operations of the city 3 Prepare for and actively adapt to a rapidly changing climate 16 4 Making a rapid transition to a low carbon economy 17-18 Buildings 20-28 Energy 29-33 Transport 34-39 Sustainable consumption and production 40-44 Green and blue infrastructure 45-49 Part 3 Actions for 2014 50-51 3 MACF Steering Group Chair’s introduction Over the past two decades the scientific community has gathered a growing body of irrefutable evidence that climate change is occurring on a global scale, brought about by the increased concentration of greenhouse gases in the atmosphere as a result of human behaviour. -
Rossendale Local Plan Flood Risk Incorporating Sequential Test Topic Paper
ROSSENDALE LOCAL PLAN FLOOD RISK INCORPORATING SEQUENTIAL TEST TOPIC PAPER March 2019 Contents 1 Introduction .................................................................................................................................... 3 2 Background ..................................................................................................................................... 3 2.1 National Context ..................................................................................................................... 3 2.2 Regional / Local context .......................................................................................................... 8 3 Evidence base................................................................................................................................ 10 3.1 Strategic Flood Risk Assessment (SFRA) ............................................................................... 10 3.2 Sustainability Appraisal (SA) ................................................................................................. 12 4 Applying the Sequential Test ........................................................................................................ 12 4.1 Site allocations ...................................................................................................................... 12 Proposed allocations in flood zone 1 ................................................................................................ 13 Proposed allocations in flood zone 2 ............................................................................................... -
Environmental Statement Main Text Volume 1 Proposed Three Wind
ENVIRONMENTAL STATEMENT MAIN TEXT VOLUME 1 PROPOSED THREE WIND TURBINES ON LAND ADJACENT TO HAMELDON HILL WIND FARM May 2016 1 Environmental Statement This Environmental Statement (ES) is prepared for the submission for planning approval of three wind turbines on land adjacent to the Hameldon Hill Wind Farm. The statement is prepared by AAH Planning Consultants with contributions from: Copies of the ES can be obtained either through downloading from the website www.hameldonhillwindfarm.com or by contacting: AAH Planning Consultants, 2 Bar Lane, York, YO1 6JU Tel: 01904 629258 Email: [email protected] The cost of printing for paper copies will be charged at cost price to cover the cost incurred for printing and postage. DVD versions can also be provided at a cost of £10. Paper copies will also be available for public viewing at Burnley Borough Council’s planning department at Housing and Development Control, Contact Centre, 9 Parker Lane, Burnley, BB11 2BY during the following office hours: 9am to 5pm Monday, Tuesday, Thursday and Friday 10am to 5pm on Wednesdays The Non-Technical Summary of the ES is also available free of charge upon request and again available for download from the above mentioned website. 2 Contents 1.0 Introduction to the Proposal ....................................................................................................... 1 2.0 Approach to Environmental Assessment .................................................................................... 5 3.0 Site Description ........................................................................................................................ -
Natural Flood Management Proposals Crompton Moor, Oldham
Natural Flood Management Proposals Crompton Moor, Oldham Background A survey has been undertaken by the Natural Flood Management Advisor at the Mersey Forest who was able to identify a series of potential Natural Flood Management measures on the moor, see location plan below. The site assessment was also attended by City of Trees and members of the Friends of Crompton Moor. NFM measures are being considered to help slow down and reduce the amount of rainwater entering the Old Brook which flows into the River Beal, that latter being identified by the Environment Agency as source of flood risk to communities in Crompton and Shaw. The survey found 4 potential options for delivering NFM, see context map below. Option Context Map Option 2 Option 3 Option 4 44 Option 1 Option 1 – Plantation Woodland & Adjacent field boundary Drainage Ditch Water drains into the woodland from an external adjacent drainage ditch at the bottom of the moor. After rainfall this forms a shallow stream that runs through the woodland and it drains into the Old Brook via a culvert. It is proposed that a log jam is constructed across the course of this stream to allow water to back up into a depression to create an area of ‘wet woodland’ following rainfall events. The log jam would be constructed using felled timber from the immediate vicinity. This will also allow more light into the woodland and help to facilitate colonisation by wet loving understorey species. Drainage ditch containing pipe Culvert daylighted here Log Jam Example of log jam installed in a woodland Culvert Discharging into the Plantation Water Flowing Through the Plantation from the Culvert Option 2 – Dam Old Brook to utilise storage space of abandoned reservoir Inspection of the upper course of the Old Brook revealed a large adjacent depression which appeared to be the location of an abandoned reservoir, probably associated with historical mining activity. -
LFRMS Consultation Report Appendices
Appendix A DRAFT LOCAL FLOOD RISK MANAGEMENT STRATEGY DOCUMENT LOCAL FLOOD RISK MANAGEMENT STRATEGY FOR STOCKPORT February 2016 Foreword by Executive Member It is with great pleasure that we can present to the public the progress we have made and the improvements that we plan to undertake to re-establish Stockport Council as the Lead Local Flood Authority for the Stockport area. We have made great progress in a short period of time and this Strategy endorses that. I certainly accept the new duties and responsibilities the Council has to help our community and look forward to developing a closer relationship with residents and other multi-disciplined agencies with an interest in water and its impact on the built environment and natural environment. I welcome and applaud the support the Council has from its partners in risk management. The beauty, amenity and critical resource of water should certainly be appreciated but also acknowledged that the power of nature can deliver adverse effects that can have a huge impact on us all and for many years. The reality of major flood events in Stockport is relatively small in comparison to other areas, but some risk will remain in areas with large urbanisation and buried waterways. Flood risk management requires the support of all key stakeholders including local residents, organisations and businesses as we all have responsibilities. If we work together then the potential impacts of floods in Stockport can be minimised. 2 Table of contents Chapter Pages Executive Summary 4 1. Introduction 7 1.1. Background 7 1.2. Aims of the Strategy Error! Bookmark not defined. -
Using the Upm Methodology
USING THE UPM METHODOLOGY Graham Squibbs - North West Water Mark Bottomley and Richard Norreys - Montgomery Watson Introduction The Urban Pollution Management (UPM) studies undertaken by Montgomery Watson with North West Water (NWW)' formed the part of .North West Water's UPM programme within the Mersey Basin. These considered the impact of wastewater treatment work and CSO discharges from the sewer network on the receiving watercourses. These studies covered four areas surrounding and including parts of the City of Manchester being Oldham, to the north east of Manchester, part of Bolton to the north west, Salford to the west and the River Medlock catchment including part of Manchester, Droylesden and Failsworth . The catchments have a population in excess of 600 000 people and contain over 76 UCSOs, four wastewater treatment works requiring upgrading works as part of the National Environmental Programme and in excess of 20 different water courses. Tables 1 to 4 detail the studies. The studies were carried out by Montgomery Watson in conjunction with NWW input to a combined team. The UPM data collection programme covering flow and quality surveys was maintained as a single programme under NWW control. The project involved considerable modelling work. In the course of the studies : 14 HYDROWORKS sewer network quality models were built along with two Mike 11 river impact models and three STOAT wastewater treatment work models. In addition existing drainage area study network hydraulic models were upgraded to HYDROWORKS and reverified. UPM Methodology Urban Pollution Management' (UPM) concerns the management of wastewater discharges from urban sewerage and sewage treatment facilities under wet weather conditions .