DISTRICT IRRIGATION PLAN LOWER SUBANSIRI 2016-2021

NABARD0 | P a g e CONSULTANCY SERVICES PVT. LTD.

District Irrigation Plan 2016-2021 Lower Subansiri Arunachal Pradesh

NABARD CONSULTANCY SERVICES PVT. LTD.

Corporate Office : 24, Rajendra Place, NABARD Building, New – 110125 Reg. Office : Plot No. C24, G Block, 3rd Floor, NABARD Building Bandra Kurla Complex, Bandra East, Mumbai-400051

1 | P a g e

FOREWORD

2 | P a g e

Table of Contents INTRODUCTION ...... 20 Background ...... 20 Vision...... 26 Objective ...... 26 Strategy/approach ...... 27 Programme Components ...... 28 1. Accelerated Irrigation Benefit Programme (AIBP) ...... 28 2. PMKSY (Har Khet ko Pani) ...... 28 3. PMKSY (Per Drop More Crop) ...... 29 4. PMKSY (Watershed Development) ...... 30 Rationale/ Justification ...... 30 Methodology...... 30 Chapter 1 ...... 32 General Information of the District ...... 32 1.1 District Profile ...... 32 Administrative set-up of Lower Subansiri ...... 33 1.2 Demography ...... 35 1.3 Biomass and Livestock ...... 37 1.4 Agro-Ecology, Climate, Hydrology and Topography ...... 40 1.4.1 Climate...... 41 1.4.2 Hydrology ...... 42 1.4.3 Topography ...... 43 1.4.4 Rainfall & Temperature ...... 45 1.5 Soil Profile ...... 46 1.6 Soil Erosion and runoff status ...... 47 1.7 Land Use Pattern ...... 47 Chapter 2 ...... 49 Water Profile ...... 49 2.1 Area wise, Crop wise Irrigation status ...... 49 2.2 Production and Productivity of Major Crops ...... 53 2.3 Irrigation base classification ...... 55 Chapter 3 ...... 56 Water Availability ...... 56 3.1 Status of Water Availability ...... 56 3.2 Status of Ground water availability in the district ...... 58 3.3 Status of Command Area ...... 59

3 | P a g e

3.4 Existing type of irrigation ...... 62 Chapter 4 ...... 65 Water Demand ...... 65 4.1 Domestic Water Demand ...... 65 4.2 Crop Water Requirement ...... 66 4.3 Livestock Water Demand ...... 68 4.4 Industrial Water Demand ...... 69 4.5 Water Demand for Power Generation ...... 69 4.6 Water Demand for Various Sector ...... 69 4.7 Water Budget ...... 72 Chapter 5 ...... 74 Strategic Action Plan for Irrigation in District Lower Subansiri under PMSKY 74 5.1 Block wise total plan of the district ...... 74 5.2 Component Wise Plan ...... 79 5.3 Year Wise Plan...... 82 5.4 Expected Outcome ...... 84 5.5 Suggestions ...... 85 5.5.1 Water User’s Association (Participatory Governance) ...... 86 5.5 Strategic Action Plan for irrigation in respect of District Lower Subansiri, AP under Pradhan Mantri Krishi Sinchayee Yojna (PMKSY)...... 88 Annexure I ...... 120 Annexure II ...... 126 1. WRD Strategic Action Plan under PMKSY ...... 126 A. I ...... 126 B. Ziro II ...... 192 C. Tamen Raga...... 228 2. Agriculture Department ...... 259 3. Horticulture Department ...... 265 4. DRDA ...... 291 Ziro I ...... 291 Ziro II ...... 297 Tamen Raga ...... 298 5. RWD (Soil & Water Conservation Department) ...... 304 6. Forest Department...... 313

4 | P a g e

List of Tables

Table 1.1. 1: General profile of ...... 33 Table 1.2. 1: Demography of Lower Subansiri ...... 35 Table 1.3. 1: Population of Small and Large animals in Lower Subansiri ...... 37 Table 1.3. 2: Population of large animals in the district ...... 39 Table 1.4. 1: Percentage Area under different climatic zones ...... 44 Table 1.4. 2: Area under different types of Terrains ...... 45 Table 1.5. 1: Soil type and percent area covered by different soil type ...... 46 Table 1.5. 2: Land slop of Lower Subansiri District ...... 47 Table 1.7. 1: Land use Pattern of the district ...... 48 Table 2.1. 1: Area under kharif, rabi and horticultural crops ...... 50 Table 2.2. 1: Production of different crops in the district ...... 53 Table 2.2. 2: Production details under rainfed and irrigated condition ...... 54 Table 2.3. 1: Irrigation based classification in the district ...... 55 Table 3.1. 1: Status of water availability in the district ...... 57 Table 3.2. 1: Status of ground water availability in the district ...... 59 Table 3.3. 1: Status of command area in the district ...... 60 Table 3.4. 1: Existing type of irrigation in the district ...... 62 Table 4.1. 1: Domestic water requirement in the district...... 65 Table 4.2. 1: Crop water requirement ...... 67 Table 4.3. 1: Livestock water requirement ...... 68 Table 4.6. 1: Sector wise present water demand in the district ...... 69 Table 4.6. 2: Sector wise projected water demand in the district ...... 70 Table 4.7. 1: Water budget of the district ...... 72 Table 5.1. 1: Block wise total outlay of the district (Amount in Rs. Lakhs) ...... 74 Table 5.2. 1: Component wise total outlay of the district (Amount in Rs. Lakhs) ...... 80 Table 5.3. 1: Year wise share of total outlay in the district (Amount in Rs. Lakhs) ...... 82

5 | P a g e

List of Figures

Figure 1.2. 1: Block-wise population of male, female and children (o-6 years) in district ...... 36 Figure 1.2. 2: Percentage of ST and General/Others population in district ...... 36 Figure 1.3. 1: Percentage of small animals in the district ...... 38 Figure 1.3. 2: Block wise percentage of small animals ...... 38 Figure 1.3. 3: Block wise population of large animals in the district ...... 39 Figure 1.3. 4: Percentage of large animals in the district ...... 40 Figure 1.4. 1: Variation in Temperature in the district ...... 45 Figure 2.1. 1: Block wise percentage area under different crops ...... 50 Figure 2.1. 2: Percentage area under irrigated and rainfed for Kharif season crops ...... 51 Figure 2.1. 3: Block wise percentage area under rabi ...... 51 Figure 2.1. 4: Block wise percentage area under horticultural crops ...... 52 Figure 2.1. 5: Percentage area under irrigated and rainfed in the district ...... 52 Figure 2.2. 1: Block wise percentage of production under rainfed and irrigated condition .... 54 Figure 3.3. 1: Block wise percentage of developed canal command area in the district ...... 61 Figure 3.3. 2: Block wise percentage of un-developed canal command area in the district ... 61 Figure 3.3. 3: Block wise percentage of other services command area in the district ...... 62 Figure 4. 1: Block wise domestic water demand in the district ...... 66 Figure 4. 2: Existing water potential and water potential to be created in the district ...... 67 Figure 4. 3: Block wise percentage of present and projected water requirement of livestock in the district ...... 68 Figure 4. 4: Block wise present water demand of the district from various sector ...... 70 Figure 4. 5: Sector wise water present water demand of the district ...... 70 Figure 4. 6: Block wise percentage of projected water demand in the district...... 71 Figure 4. 7: Sector wise projected water demand in the district ...... 71 Figure 4. 8: Block wise percentage of water gap in the district ...... 73 Figure 5.1. 1: Block wise percentage share of outlay under WRD ...... 75 Figure 5.1. 2: Block wise percentage share of outlay under Agriculture Department ...... 76 Figure 5.1. 3: Block wise percentage share of outlay under Horticulture Department ...... 76 Figure 5.1. 4: Block wise percentage share of outlay under DRDA ...... 77 Figure 5.1. 5: Block wise percentage share of outlay under RWD (Soil & Water Conservation Department) ...... 77 Figure 5.1. 6: Block wise percentage share of outlay under ATMA ...... 78 Figure 5.1. 7: Block wise percentage share of outlay under Forest Department ...... 78 Figure 5.1. 8: Block wise percentage share of outlay ...... 79 Figure 5.2. 1: Component wise percentage allocation of total outlay ...... 81 Figure 5.2. 2: Sub-component wise percentage outlay of the district ...... 81 Figure 5.3. 1: Year wise percentage share of total outlay of the district ...... 83

6 | P a g e

List of Maps

Map 1: Location Map of the district ...... 32 Map 2: Land use map of Pistana circle ...... 316 Map 3: Land use of Yachuli circle ...... 317 Map 4: Land use map of Ziro circle ...... 318 Map 5: Land use map of Dullungmukh circle ...... 319

7 | P a g e

Abbreviations

NDC : National Development Council

GoI : Government of

C-DAP : Comprehensive District Agriculture Plan

ICT : information and communications technology

BCM : Billi Cubic Metres

GDP : Gross Domestic Product

AIBP : Accelerated Irrigation Benefits Programme

CADWM : Command Area Development and Water Management

MI : Micro Irrigation

SWMA : Supplementary Water Management Activities

NITI Aayog : National Institution for Transforming India Aayog

NRM : Natural resource Management

IWMP : Integrated Watershed Management Programme

PRI : Panchayati Raj Institutions

DRDA : District Rural Development Agencies

NRLM : National Rural Livelihoods Mission

C.D. Blocks : Community development block

BPL : Below Poverty Line

SC/ST : Scheduled Caste/ Scheduled Tribe

Nos. : Number

ATMA : Agriculture Technology Management Agency

MSL : Mean Sea Level mm : Millimeter

8 | P a g e ha : Hectare

TGA : Total Geographical Area

GCA : Gross Cropped Area

GIA : Gross Irrigated Area

NSA : Net Sown Area

AIBP : Accelerated Irrigation Benefits Programme

MGNREGA : Mahatma Gandhi National Rural Employment Gurantee Act

CI : Cropping Intensity

Qtl/yr : Quintal per year

GIA : Gross Irrigated Area

MCM : million cubic metres

Bgl : Below ground Level

CCA : Culturable Command Area

LPD : Liter Per Day

CAD : Command Area Development

DIP : District Irrigation Plan

SIP : State Irrigation Plan

DLIC : District Level Implementation Committee

STP : Sewage Treatment Plant

WRD : Water Resource Department

RWD : Rural Work Department

DRDA : Department of Rural Development Agency

ATMA : Agricultural Technology and Management Agency

9 | P a g e

Executive Summary Out of about 141 million ha of net area sown of the country, only 65 million hectare (46%) is focused manner, with end-to-end solution on source creation, distribution, management, and field currently covered under irrigation. Substantial dependence on rainfall makes cultivation in remaining areas a high risk and less productive profession. Empirical evidences suggest that assured/protective irrigation/in-situ moisture conservation encourages farmers to invest more in farming technology and inputs leading to productivity enhancement and increased farm income. Government has conceived the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) with the objective of extending the coverage of irrigation in a application and extension activities.

Further, Pradhan Mantri Krishi Sinchayee Yojana incentivizes states to enhance expenditures on irrigation and water resources management by making the access to PMKSY funds to states conditional i.e., state will have access only if the expenditure in water resource development for agriculture sector in the year under consideration is not less than the baseline expenditure, which is defined as the average of the expenditure in irrigation sector irrespective of the department in the state plan in three years prior to the year under consideration.

PMKSY will be implemented in area development mode only by adopting a ‘decentralized state level planning and projectised execution’ structure that will allow states to draw up their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7 years. A three tier structure at national, state and district level will oversee implementation and coordination of the program. The District Level Implementation Committee will form the third tier of the PMKSY. The DLIC will be chaired by the Deputy Commissioner, Lower Subansiri and comprises of the Department of Agriculture, Horticulture, District Rural Development Agency (DRDA), Irrigation and Public Health Department, Forest Department, Lead bank of the District and any other line Departments in the District. The DLIC will oversee the implementation and inter-departmental coordination at district level.

District Water Profile The population of Lower Subansiri district is predominantly dependent on agriculture and allied activities for their livelihood. The gross cropped area in the district is 10212 ha. About 9587.50 ha of the area under crop is grown under kharif season while 60 ha

10 | P a g e of crop area is under rabi season and 565 ha of area is under horticulture. Cereals are the major agricultural crops grown in the district. Paddy is the major cereal grown in the district and constitutes about more than 60% of the gross cropped area in the district. The 15 percent of the gross cropped area shared among oilseeds and pulses. Whereas, oilseeds constitutes about 7% of the gross cropped area, the remaining 8% is under pulses. The rest of 25% of the gross cropped area in the district is grown under various coarse cereals like maize, barley etc. and various horticultural crops which constitute fruits and vegetable crops. Mash, moong, lentil and gram are major pulses grown in the district. Sesamum and Mustard are the major oilseeds of the district. Under vegetables, potato is grown all the year round along with other vegetables like tomato, capsicum, cabbage and cauliflower. Some exotic varities of vegetables like Capsicum (Red and Green), Asparagus, Broccoli, etc. Considering the topography of Lower Subansiri, where land is a inelastic resource increasing the irrigation potential further is the key to increasing the production and productivity of crops.

Crop Diversification In Lower Subansiri there are four major objectives of agricultural diversification. First to increase the income of the small households, second to attain the fuller employment in the farm household, third to stabilize the farm income over the seasons, and fourth conservation and enhancement of natural resources specially irrigation sources. Irrigation plays a decisive role in cropping pattern, cropping intensity, crop combinations, the extent of yield and to a certain extent the season of sowing. This process ensures that farmer receive decent income while the existing food grain production takes care of the food security needs of the households. In Lower Subansiri district, about 96.38 percent of the area lies under rainfed cultivation while only 3.62 percent of the total gross cropped area has irrigation facilities. The majority of the farmers in the district are engaged in traditional cultivation of food grains (75 percent of the area under agricultural crops is grown under cereals and millets), not being able to divert to more profitable commodities such as vegetables and fruits. In order to boost the agricultural development and enhance the farm income in the rural areas, it is therefore important to increase the productivity of the existing cultivated area, through shifting from self-subsistence crop cultivation to diversified agriculture, by adopting cash crops such as vegetables cultivation suitable in hilly and highland areas and the same can be achieved by providing assured irrigation sources all the year round to different parts of the district.

11 | P a g e

Yield per Hectare of Major Crops

The yield levels of major crops in the district are higher in irrigated conditions than under rainfed conditions. The average yield of the agricultural crops in rainfed condition was found to be 2165.97 kg/ha. while under irrigated condition it was found to be 2650 kg/ha. Further, the absolute levels of yields reported in the district are slightly lesser than the state average yields or potential yields as per the package of practices recommended by the state agricultural university. By enhancing the water resources availability for irrigation purpose through rainwater harvesting, soil & water conservation measures, the productivity of crops can be enhanced further and the more areas can be brought under assured irrigation, thus enhancing the overall farm production and hence the farm income for various crops.

Availability of water sources The district has rich source of surface water which can be observed in the form streams, rivulets, ponds and perennial sources of water. Rain water harvesting structures forms the major source of surface irrigation in the district and constitutes about 37.59% of the total water under surface irrigation followed by lift irrigation sources which constitutes about 27.09% and perennial sources of water which constitutes about 26.24% of the total surface irrigation sources in the district. The minor irrigation tanks in the district which constitutes about 9.08% of the total surface irrigation sources in the district.

The district lacks any ground water structure and hence the water availability under the ground water sources was not available.

Most of the district is occupied by hard and compact metamorphic rocks of pre- Cambrian to upper Paleozoic epochs. The unconsolidated alluvium sediments occupy the valleys located within the consolidated rocks. Hydro-geologically the district broadly divided into the following hydro geological units as under:

Consolidated Formation

It comprises the gneissic rocks of Sela and Bombdila groups Quartzites groups of Buxa and Miri Formation. The unit occupies more than 90% of the total area of the district area. The ground water recharge is replenished annually by amount of precipitation. Their ground water emerges out in the form of springs along the fracture at lower

12 | P a g e points the movement and storage of ground water is restricted by limited areas, with the result, the springs dry up during the lean period. However, perennial spring flow through out the year but their yield s decreases during dry season (March - April).

Unconsolidated Formation

It comprises alluvial sediments of intermundane valleys. In general, the alluvial cover in these valleys surrounded by consolidated rocks is vary thin. Even small thickness of these sediments has good prospect for ground water development by shallow ground water structure.

Some of the intermontane valleys along with their ground water prospects are detailed as follows:

1. Ziro Valley The valley is located in Ziro-Hapoli area, covering about 15 Sq Km. It is underlain by weathered quartzites and gneissic metamorphic rocks of Page. The Kele river draining the valley runs longitudinally along north south direction. A number of stream and nalas from east to west join it. The valley filled comprises the sediments of silt, clay, weathered and broken pieces of gniessis and quartzite’s. The western part of the valley has numerous springs and seepage. The water table rests within 3 m bgl around Ziro. 2. Yazali Valley The valley is formed along the bank of Ranga river and occupies about 3 sq km area. The southern part is undulatory and boulder while the northern part is an alluvial plain. The main valley fills lies on north and north east along the Kele river is used for irrigation by Agricultural department at Yazali Ground water occurs under water table condition. The depth of water table rests within 5 m bgl. Dug wells of 10 meter depth are expected to be feasible throughout the valley. In Yazali valley geophysical survey and trial boring needs to be done to know the depth and extension of aquifer.

At present there is negligible ground water structure for any use and therefore total draft may be considered as negligible. Therefore stage of ground water development is 0%. Based on the net ground water availability, annual allocation of ground water supply for both domestic and industrial water supply for the foot hill and valley area

13 | P a g e is 0.58 mcm and ground water availability for future irrigation use is 2.72 mcm. As there is no other ground water structures available throughout the district, ground water development of the district may be considered as negligible or nil and hence considered under safe category.

Existing Type of Irrigation

Under existing type of irrigation in the district, various sources of irrigation has been identified which includes both government and private based. The total number of government based canal structure in the district is about 221 while there is also some private based canal structure which accounts for 890 in number in the district. There was no information regarding community based canal during the field survey in the district.

There are two government based reservoir in the district one each in Ziro II and Tamen Raga block. Among the blocks, Ziro II has the maximum number of surface irrigation sources and constitutes about 38.66% of the total surface irrigation sources in the district followed by Ziro I and Tamen Raga with 36.49% and 24.85% respectively. The largest number of private canals was also found in Ziro II block which constitutes about 41.57% of the total number of private canals in the district.

There are 98 private ponds in the district and Tamen Raga has the maximum number of these ponds in the district constituting about 44.63% of the total number of community ponds in the district.

Demand for water sources

The present water demand of the district has been assessed to be 14.47 MCM annually. Out of the total water demand, 8.66 MCM (59.84 per cent) is the required for crop production. Nearly 3.53 MCM is required for domestic and drinking purposes (24.40 per cent) and another 2.28 MCM (15.76 per cent) is required for livestock water requirement purpose. Among the blocks, Ziro II has highest water requirement with 6.32 MCM (43.71 per cent), followed by Ziro I with 5.79 MCM (40.01 per cent).

Water budget in the district The water budget shows wide gaps between water availability and water demand in the district. While the availability at present is 11.28 MCM, the present water demand is 14.47 MCM, thus exceeding the given water availability in the district. It is also

14 | P a g e projected that with growth in urbanisation and subsequent growth in food grain requirement the water demand is likely to increase to 16.42 MCM by the year 2021 leaving an unmet demand of 5.14 MCM which needs to be further addressed. The water budget analysis suggest that urgent efforts are required to meet the water requirements of the district as the gap is likely to increase in future. Utilizing the surface & ground water potential in the district, activities that promote ground water re-charge and soil moisture and water conservation etc. are proposed in the Strategic Action plan, 2016-21 that will address the challenge. The scope to tap ground water in the district is feasible as the district falls in safe category.

Component wise planned coverage of area

The strategic action plan envisages providing assured irrigation in a command area of 69325.90 ha. It is assumed that the irrigation infrastructure will benefit a command area of at least 34663 ha (60 per cent). The watershed component is projected to achieve a culturable command area of 9637 ha under DRDA with treatment area proposed under the plan to be 5247 ha and RWD (Soil & Water Conservation Department) to develop a command area of 4390 ha. Under the component Per Drop More Crop, efficient water conveyance and precision water application by drip irrigation system for wide spaced and narrow spaced crops for developing an area of 14426 ha has been proposed. While Sprinklers has been proposed to develop an area of 8396 ha. A training programme will also be scheduled under PMKSY to enhance the better knowledge of efficient use of water through drip and other micro irrigation structures. Department wise planned coverage of area Under department wise development of command area or irrigation potential, the Water Resource Departments will cover an area of about 13525 ha for which irrigation potential will be developed through various activities as proposed under PMKSY. Agriculture Department and Horticulture Department under Per Drop More Crop will develop an area of 36486 ha and 9508 ha respectively, through various drip and sprinkler irrigation system and secondary storage structures. The watershed component under DRDA will develop an irrigation potential of 5247 ha through its various activities proposed such as Land Development, Soil and Moisture Conservation, developing new water harvesting structure and renovating existing one,

15 | P a g e

etc. The Soil and Water Conservation Department under RWD will develop an area of 4390 ha.

Block wise planned financial outlay The total outlay of the district is about Rs.89969.25 lakhs from all the departments under PMKSY. Among the blocks, Ziro I block has the maximum share of total outlay and constitutes about 61.35% followed by Ziro II block with 22.22% and Tamen Raga block with 16.43%. (Amount in Rs. Lakhs) RWD (Soil Fores Agricul Horticult and Water t ture ure Conservat Block WRD DRDA Depa ATMA Total Depart Departme ion rtme ment nt Departme nt nt) Ziro I 32426.60 9193.40 5823.22 4204.42 3328.25 118.00 106.55 55200.44 Ziro II 4871.50 2575.00 3969.88 4267.04 4181.17 18.00 107.00 19989.59 Tamen 4632.75 2664.20 2592.58 1047.00 3577.69 158.00 107.00 14779.22 Raga Grand 41930.85 14432.6 12385.68 9518.46 11087.11 294 320.55 89969.25 Total

Component wise planned financial outlay The component wise total outlay of the district constitutes about Rs.89969.25 lakhs. AIBP and Hark Khet Ko Pani components are to be executed mainly by Water Resource Department. Per drop more crop component will be executed by Agriculture and Horticulture Department. Water shed component will be taken care of by Rural Development Department and Extension & Training component will be executed by ATMA under Agriculture department. However, all the stakeholders need to have coordination among them to have the maximum irrigation efficiency and to avoid duplicity. WRD being the major irrigation department in the district, has the onus to execute schemes or projects included under Har Khet Ko Pani in the district. Further, the watershed component is to be executed under two different departments which include DRDA with an outlay of Rs.9518.46 lakhs as the major department for executing watershed activities along with Soil & Water Conservation Department under RWD which has a total outlay of Rs.11087.11 lakhs under the PMKSY.

16 | P a g e

(Amount in Rs. Lakhs)

Component 2016-17 2017-18 2018-19 2019-20 2020-21 Total Accelerated 0.00 0.00 0.00 0.00 0.00 0.00 Irrigation Benefitted Programme (AIBP) PMKSY-Har 8386.17 12579.26 10482.71 6289.63 4193.09 41930.85 Khet Ko Pani (HKKP) PMKSY- Per 5486.57 8229.85 6858.21 4114.92 2743.28 27432.83 Drop More Crop (PDMC) i) Micro- 2209.62 3314.43 2762.03 1657.22 1104.81 11048.10 irrigation ii) 3212.84 4819.25 4016.04 2409.63 1606.42 16064.18 Supplementary Water Management activities iii) Extension 64.11 96.17 80.14 48.08 32.06 320.55 And Training Under ATMA PMKSY – 4121.11 6181.67 5151.39 3090.84 2060.56 20605.57 Watershed Total 17993.85 26990.77 22492.31 13495.39 8996.92 89969.25

Year wise planned financial outlay The strategic action plan proposed under different departments has been further divided based on year wise allocation of the total outlay. The projects proposed under Strategic Action Plan have been divided into five phases starting from project initiation and planning. Under this stage resource allocation will be done by each department for different projects running under their purview. An allocation of 20% of the total outlay under each department has been assumed under this stage. The second phase is the implementation stage when the projects will be executed at the ground level and an assumption of 30% of the total outlay under each department has been assumed at this stage. It is assumed that the implementation would be continued in the third stage and hence an allocation of 25% is to be kept under this stage. The fourth stage being monitoring and evaluation, where an assumption of 15% has been proposed to determine if the proposed activities are meeting the objectives of PMKSY and also to complete the ongoing projects. The final stage is of review, under which each project

17 | P a g e executed under different departments will be scrutinised for any lacunae and the same will be completed under this stage. 10% of the total outlay is to be distributed under this stage.

(Amount in Rs. Lakhs)

Department 2016-17 2017-18 2018-19 2019-20 2020-21 Total WRD 8386.17 12579.26 10482.71 6289.63 4193.09 41930.85 Agriculture 2886.52 4329.78 3608.15 2164.89 1443.26 14432.60 Department Horticulture 2477.14 3715.70 3096.42 1857.85 1238.57 12385.68 Department DRDA 1903.69 2855.54 2379.62 1427.77 951.85 9518.46 RWD (Soil and Water 2217.42 3326.13 2771.78 1663.07 1108.71 11087.11 Conservation Department) Forest 58.80 88.20 73.50 44.10 29.40 294.00 Department ATMA 64.11 96.17 80.14 48.08 32.06 320.55 22492.3 Grand Total 17993.85 26990.77 13495.39 8996.92 89969.25 1

The total outlay for the district is Rs.89969.25 lakhs. The Water Resource Department of the district constitutes maximum allocation of about 46.61% of the total outlay followed by Agriculture Department with an outlay of 16.04% of the total outlay in the district.

Implementation Time Period The planned activities and outlay will be spent between 2016-17 and 2020-21 period. Some of the activities may require 5 to 7 years and some other activities relating to extension, small irrigation works etc., are recurring and hence will have a period of implementation less than a year.

Monitoring and evaluation The Strategic Action Plan of PMKSY will be monitored by the respective departments through the regular reporting system and component wise progress will be monitored by the District Level Irrigation Committee. Further, the activities, outputs and

18 | P a g e outcomes will be reported in web based MIS of PMKSY for review at state and national level.

Expected Outcome In terms of economic benefit, the assured water supply to the farm land will result in enhancement of production and productivity of the crops. This is likely to generate an additional income of Rs.16638.22 lakhs to the farmers of the district. This is based on the assumption of at least 60% of potential utilised and Rs.40,000 per ha per annum of incremental income from rainfed to irrigated farming will be generated. This is also likely to create 76.90 lakhs of mandays of non-recurring employment and 34663 jobs will be created annually on recurring basis.

This intervention may result into increased acreage under crops thereby contributing to both agricultural and horticultural production. At the same time, it will create livelihood opportunities for the local population and contribute in generating direct and indirect employment.

Suggestions

Land productivity and agricultural production can be improved significantly by launching measures such as:

1. Formulating district and block specific land water use policy in the district. 2. Improving and expanding agricultural extension service network significantly to demonstrate and transfer technology. There should be region specific technology to be developed in the district so that it should not only match with the agro-ecological zones of the district but also should be easily imbibed among the farmers or the ultimate beneficiaries. 3. Promoting SHGs, FPOs and community action towards making small farm holding economically viable and profitable. 4. The public investment and institutional credit should enhance to enable farmers to access technology and achieve expected growth 5. Promoting integrated agriculture model in the district to enhance the productivity and farm income.

19 | P a g e

INTRODUCTION

Background Preparation of decentralized area specific district planning process visualized in various plans took concrete shape through the years and initiatives like specific guidelines on methodologies and processes for preparation of district plans; framework for preparation of perspective plan, medium term and annual plans by then planning commission in 1969 and the 73rd and 74th constitutional amendments conferring constitutional status to Panchayats at district and sub district level; local self-government in urban areas; constitution of district planning committee to consolidate the plans prepared at Panchayats and municipalities and prepare a draft development plan for the whole district.

The decentralized planning process was further strengthened through emphasis by planning commission on preparation of district level plans and making it an integral part of the process of preparation of the states 11th five year plan. The Planning commission issued guidelines in August 2006 for preparation of the district plans. The guidelines define the District Planning as ‘the process of preparing an integrated plan for the local government sector in a district taking into account the resources (natural, human and financial) available and covering the sectoral activities and schemes assigned to the district level and below and those implemented through local governments in a state. The document that embodies this statement of resources and their allocation for various purposes is known as the District Plan”.

Government of India through a resolution in National Development Council on 29th May 2007 conceived a special Additional Central Assistance Scheme (ACAS) to address the slow growth of agriculture and allied sectors by incentivizing states to draw up plans for their agriculture sectors more comprehensively. The NDC resolution states "GoI introduced a new Additional Central Assistance Scheme to incentivize states to draw up plans for their agriculture sector more comprehensively, taking agro- climatic conditions, natural resource issues and technology into account, and integrating livestock, poultry and fisheries, etc. This involved a new scheme for Additional Central Assistance (ACA) to State Plans, administered by the Union Ministry of Agriculture over and above its existing Centrally Sponsored Schemes, to supplement the State-specific strategies including special schemes for beneficiaries of

20 | P a g e land reforms. The newly created National Rainfed Area Authority on request, was to assist States in planning for rainfed areas".

The NDC in its resolution advised the states to prepare a comprehensive district agriculture plans (C-DAP) that will fully utilize available resources and include allied agriculture sectors. Further, GOI issued a manual on preparation of comprehensive district agriculture plans to help the states prepare C-DAP. As per these guidelines, the objective of district planning is ‘to design an integrated and participatory action plan for the development of local area in general and agriculture and allied sectors in particular’. The objectives of Comprehensive District Agriculture Plan (C-DAP) were:

 To prepare a Comprehensive District Agriculture Plan (C-DAP) through participatory process involving various organisations and stakeholders.  To enable optimum utilisation of scarce natural, physical & financial resources.  To assess and plan for the infrastructure required to support the agriculture development.  To establish linkages with the required institutional support services, like credit, technology transfer, ICT, research etc.  To evolve an action plan for achieving sustainable agricultural growth with food security and cropping system that will improve farmers’ income. The guidelines required the state/district authorities to (i) ensure that the agricultural plans are prepared for the district and then integrated into the agricultural plans of the State based on the agro-climatic conditions, availability of technology, trained manpower and natural resources; (ii) local needs / crops / feed and fodder / animal husbandry / dairying / fisheries / priorities are reflected in the plan; (iii) productivity gaps for important crops and livestock and fisheries are reduced; and (iv) the returns to the farmers from these are maximized.

The latest move in the process of strengthening of decentralized planning process was the guidelines issued in 2015 in the form of a template for the preparation of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as part of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) program and made the preparation of DIP and SIP mandatory for the states to receive funds from the program. The present report is a product of these long drawn efforts of Government of

21 | P a g e

India to strengthen the decentralized planning process in the country focusing on the vital resource i.e., water.

Water is of vital importance for human & animal life, maintenance of ecological balance and promotion of developmental activities. Considering its vital importance and ever increasing demand for water, in the face of population growth, urbanization & industrialization and considerations of climatic change, making water, an increasingly a scarce resource, available to multiple uses, planning and management of this vital resources, utilization of water economically, optimally and equitably assumes greater importance.

According to the 12th Five year Plan the water budget estimates of India by Ministry of Water Resources suggests an availability of 1123 billion cubic meters (BCM) against a current estimated demand of 710 BCM. The Standing Committee of the Ministry of Water Resources estimates that this water demand will rise to 1093 BCM by 2025. Though the existing water availability in the immediate future seems to be adequate, with the near constant supply of water resources in the face of increasing demand on account of population growth, urbanisation and industrialization will strain the water supply-demand balance.

The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced to 1820 cubic meters in 2001 while the international prescribed limit is 1800 cubic meters. The projected per capita availability of water is 1341 cubic meters in 2025 and 1140 cubic meters in 2050 suggesting shortage of water in the medium term1. Further, the all India water balance estimates does not reflect the variations in water balance across time and space- certain areas having a positive water balance and the others facing acute shortage. The problem is further accentuated by water quality related issues.

With the abundant surface and ground water supply in the first five decades since independence, more than 80 percent of the total available water resources were allocated for irrigation purposes and the rest meeting the domestic and industrial demands. In a recent study2on the demand for water from agriculture, domestic and

1Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India, New Delhi. 2Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025-

22 | P a g e industrial uses in 2000, 2025 and 2050 seems to suggest that domestic demand (34 BCM in 2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial demand (42 BCM in 2000, 92 BCM in 2025 and 161 BCM in 2050) for water will utilize the total balance water available while agriculture demand for water will be (605 BCM in 2000, 675 BCM in 2025 and 637 BCM in 2050). This change is partly because of the changing sectoral contributions of India’s GDP and also partly because of dynamics of irrigation development in the country where the initial expansion in area under irrigation is propelled by the availability of abundant water resources and availability of good quality land. This is no longer the case in many of the states where the availability of land and water are serious constraints for further expansion of irrigation. Further, as per the erstwhile planning commission up to March 2012 out of 141 million hectares of net sown area in the country 114 (or 81%) million hectares is Irrigation Potential Created (IPC) and 88 (or 62%) million hectares is Irrigation Potential Utilised (IPU) leaving almost 20% of irrigated potential unutilized. This leaves 40 percent of the net sown area in the country dependent on rainfall which makes farming a high risk and less productive.

The competing demands for water resources and the emerging issues and concerns were to be addressed through certain basic principles and commonality in approaches in dealing with planning, development and management of water resources3 under an Integrated Water Resource Management framework. The main objectives of water resource management as delineated in National Water Policy 2012 are:

a) Planning, development and management of water resources need to be governed by common integrated perspective considering local, regional, State and national context, having an environmentally sound basis, keeping in view the human, social and economic needs. b) Principle of equity and social justice must inform use and allocation of water. c) Good governance through transparent informed decision making is crucial to the objectives of equity, social justice and sustainability. Meaningful intensive participation, transparency and accountability should guide decision making and regulation of water resources.

2050:Business-as-usual scenario and deviations. Research Report 123, International Water Management Institute, Colombo. 3Ministry of Water Resources, National Water Policy, 2012, Government of India, New Delhi.

23 | P a g e

d) Water needs to be managed as a common pool community resource held, by the state, under public trust doctrine to achieve food security, support livelihood, and ensure equitable and sustainable development for all. e) Water is essential for sustenance of eco-system, and therefore, minimum ecological needs should be given due consideration. f) Safe Water for drinking and sanitation should be considered as pre-emptive needs, followed by high priority allocation for other basic domestic needs (including needs of animals), achieving food security, supporting sustenance agriculture and minimum eco-system needs. Available water, after meeting the above needs, should be allocated in a manner to promote its conservation and efficient use. g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation, runoff, river, lakes, soil moisture, and ground water, sea, etc., are interdependent and the basic hydrological unit is the river basin, which should be considered as the basic hydrological unit for planning. h) Given the limits on enhancing the availability of utilizable water resources and increased variability in supplies due to climate change, meeting the future needs will depend more on demand management, and hence, this needs to be given priority, especially through (a) evolving an agricultural system which economizes on water use and maximizes value from water, and (b) bringing in maximum efficiency in use of water and avoiding wastages. i) Water quality and quantity are interlinked and need to be managed in an integrated manner, consistent with broader environmental management approaches inter-alia including the use of economic incentives and penalties to reduce pollution and wastage. j) The impact of climate change on water resources availability must be factored into water management related decisions. Water using activities need to be regulated keeping in mind the local geo climatic and hydrological situation.

Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to address the constraints in providing assured irrigation as well as increasing efficiency and productivity of current water use to bring more prosperity to the rural areas. Priorities of Government of India were reflected in the Hon’ble President’s address to the joint Session of the Parliament of 16th Lok Sabha where he indicated that “Each

24 | P a g e drop of water is precious. Government is committed to giving high priority to water security. It will complete the long pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously considering all options including linking of rivers, where feasible; for ensuring optimal use of our water resources to prevent the recurrence of floods and drought. By harnessing rain water through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground water recharge. Micro irrigation will be popularised to ensure ‘Per drop-More crop”.

PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five years from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP, CADWM, MI, SWMA, Watershed & Convergence with MGNREGA were brought together under the umbrella program of PMKSY. Further the scheme seeks convergence with scheme likeMahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES), Rashtriya Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification programmes (JLNNSM&REP), Rural Infrastructure Development Fund (RIDF), Members of Parliament Local Area Development Scheme (MPLAD), Members of Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF), Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be implemented in an area development mode only by adopting a decentralized state level planning and projectised execution structure that will allow the state to draw up their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7 years. The program will be implemented as part of Rashtriya Krishi Vikas Yojana (RKVY) with state agriculture department acting as the State Nodal Agency. However, the implementing departments for the four components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop) and PMKSY (watershed development) will be decided by the respective program ministry/department.

The funds under this program would be provided to the states as per the pattern of assistance of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance

25 | P a g e and NITI Aayog. During 2015-16 the existing pattern of assistance of ongoing scheme was continued. An outlay of Rs. 50,000 crore has been approved for 2015-20. The financial assistance provided to the state governments from this centrally sponsored scheme is subject to fulfillment of certain conditions. Firstly, a state will become eligible to access PMKSY fund only if it has prepared the District Irrigation Plans (DIP) and State Irrigation Plan (SIP), excepting for the initial year, and the expenditure in water resource development for agriculture sector in the year under consideration is not less than the baseline expenditure, which is defined as the average of the expenditure in irrigation sector irrespective of the department in the state plan in three years prior to the year under consideration. Secondly, States will be given additional weightage for levying charges on water and electricity for irrigation purposes, so as to ensure sustainability of the programme. Thirdly, interstate allocation of PMKSY fund will be decided based on

 Share of percentage of unirrigated area in the state vis-à-vis national average including prominence of areas classified under Desert Development Programme (DDP) and Drought Prone Area Development Programme (DPAP)  Increase in percentage share of expenditure on water resource development for agriculture sector in State Plan expenditure in the previous year over three years prior to it and  Improvement in irrigation efficiency in the state. Vision The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to ensure access to some means of protective irrigation to all agricultural farms in the country, to produce ‘per drop more crop’, thus bringing much desired rural prosperity.

Objective The objectives of the PMKSY are to:

a) Achieve convergence of investments in irrigation at the field level (preparation of district level and, if required, sub district level water use plans). b) Enhance the physical access of water on the farm and expand cultivable area under assured irrigation (Har Khet Ko Pani), c) Integration of water source, distribution and its efficient use, to make best use of water through appropriate technologies and practices.

26 | P a g e

d) Improve on-farm water use efficiency to reduce wastage and increase availability both in duration and extent, e) Enhance the adoption of precision-irrigation and other water saving technologies (More crop per drop). f) Enhance recharge of aquifers and introduce sustainable water conservation practices g) Ensure the integrated development of rainfed areas using the watershed approach towards soil and water conservation, regeneration of ground water, arresting runoff, providing livelihood options and other NRM activities. h) Promote extension activities relating to water harvesting, water management and crop alignment for farmers and grass root level field functionaries. i) Explore the feasibility of reusing treated municipal waste water for peri-urban agriculture, and j) Attract greater private investments in irrigation.

Strategy/approach To achieve these objectives PMKSY adopted strategies that include

a) Creation of new water sources; repair, restoration and renovation of defunct water sources; construction of water harvesting structures, secondary & micro storage, groundwater development, enhancing potentials of traditional water bodies at village level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis (T.N.); Dongs (); Katas, Bandhas ( and M.P.) etc. b) Developing/augmenting distribution network where irrigation sources (both assured and protective) are available or created; c) Promotion of scientific moisture conservation and run off control measures to improve ground water recharge so as to create opportunities for farmers to access recharged water through shallow tube/dug wells; d) Promoting efficient water conveyance and field application devices within the farm viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and other application devices etc.; e) Encouraging community irrigation through registered user groups/farmer producers’ organisations/ NGOs; and

27 | P a g e

f) Farmer oriented activities like capacity building, training and exposure visits, demonstrations, farm schools, skill development in efficient water and crop management practices (crop alignment) including large scale awareness on more crop per drop of water through mass media campaign, exhibitions, field days, and extension activities through short animation films etc. Programme Components PMKSY has following four components:

1. Accelerated Irrigation Benefit Programme (AIBP) To focus on faster completion of ongoing Major and Medium Irrigation including National Projects.

2. PMKSY (Har Khet ko Pani) This component focuses on-

a) Creation of new water sources through Minor Irrigation (both surface and ground water) b) Repair, restoration and renovation of water bodies; strengthening carrying capacity of traditional water sources, construction rain water harvesting structures (Jal Sanchay); c) Command area development, strengthening and creation of distribution network from source to the farm; d) Ground water development in the areas where it is abundant, so that sink is created to store runoff/ flood water during peak rainy season. e) Improvement in water management and distribution system for water bodies to take advantage of the available source which is not tapped to its fullest capacity (deriving benefits from low hanging fruits). At least 10% of the command area to be covered under micro/precision irrigation. f) Diversion of water from source of different location where it is plenty to nearby water scarce areas, lift irrigation from water bodies/rivers at lower elevation to supplement requirements beyond IWMP and MGNREGS irrespective of irrigation command. g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc. at feasible locations.

28 | P a g e

3. PMKSY (Per Drop More Crop) a) Programme management, preparation of State/District Irrigation Plan, approval of annual action plan, Monitoring etc. b) Promoting efficient water conveyance and precision water application devices like drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan); c) Topping up of input cost particularly under civil construction beyond permissible limit (40%), under MGNREGS for activities like lining inlet, outlet, silt traps, distribution system etc. d) Construction of micro irrigation structures to supplement source creation activities including tube wells and dug wells (in areas where ground water is available and not under semi critical/ critical/ over exploited category of development) which are not supported under AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Watershed) and MGNREGS as per block/district irrigation plan. e) Secondary storage structures at tail end of canal system to store water when available in abundance (rainy season) or from perennial sources like streams for use during dry periods through effective on-farm water management; f) Water lifting devices like diesel/ electric/ solar pumpsets including water carriage pipes, underground piping system. g) Extension activities for promotion of scientific moisture conservation and agronomic measures including cropping alignment to maximise use of available water including rainfall and minimise irrigation requirement (Jal Sarankchan); h) Capacity building, training and awareness campaign including low cost publications, use of pico projectors and low cost films for encouraging potential use water source through technological, agronomic and management practices including community irrigation. i) The extension workers will be empowered to disseminate relevant technologies under PMKSY only after requisite training is provided to them especially in the area of promotion of scientific moisture conservation and agronomic measures, improved/ innovative distribution system like pipe and box outlet system, etc. Appropriate Domain Experts will act as Master Trainers. j) Information Communication Technology (ICT) interventions through NeGP-A to be made use in the field of water use efficiency, precision irrigation

29 | P a g e

technologies, on farm water management, crop alignment etc. and also to do intensive monitoring of the Scheme.

4. PMKSY (Watershed Development) a) Effective management of runoff water and improved soil & moisture conservation activities such as ridge area treatment, drainage line treatment, rain water harvesting, in-situ moisture conservation and other allied activities on watershed basis. b) Converging with MGNREGS for creation of water source to full potential in identified backward rainfed blocks including renovation of traditional water bodies Rationale/ Justification In reference to the status and need of irrigation, the water resource management including irrigation related priorities was identified for Lower Subansiri district by the peoples’ representatives of district with support from administration and technical experts. For instance the reports of Strategic Research and Extension Plan (SREP) prepared under ATMA program, Comprehensive District Agriculture Plan (C-DAP) prepared as part of Rashtriya Krishi Vikas Yojana (RKVY), Potential Linked Credit Plans (PLP) of NABARD and the Integrated District Development Plan etc. identified number of irrigation related issues for Lower Subansiri district including (i) promoting water use efficiency through sprinkler and drip irrigation; (iii) promoting protected polyhouse cultivation to minimize risk factors and enhance quality and productivity; (iv) Improvement of on-farm water delivery and efficiency of existing irrigation systems; (v) promotion of soil conservation of arable & non-arable land through engineering measures; (vi) creation of new water harvesting structures, check dams, ponds, tanks, etc (vii) increase the forest cover in the district and (viii) land improvement measures.

Methodology During the course of preparation of District Irrigation Plan (DIP) the team visited Lower Subansiri district to collect data and have interaction with all the stakeholders. Methodology adopted to prepare DIP is outlined in brief as under: a) Collection of primary and secondary data from field from various sources including published documents and websites.

30 | P a g e

b) Various meetings were held to obtain ground level realities and data from key personnel/stakeholders through structured, unstructured interviews, focused group discussions etc. c) Meetings with various State Government departments and related institutions were held d) Meeting through VC was also held with State Level authorities. e) GIS maps of the area’s/clusters were studied to understand the land morphology, topography of the district. f) Focused group discussions and interaction with of agriculture officers, horticulture officers, soil conservation officers, extension officers, rural development department, animal husbandry department, irrigation officers both at blocks and district level for identifying the key issues and focus areas of the region. g) Discussion with NABARD officer of Lower Subansiri district was also held during the visit. h) Team members also participated in the State Level workshop and held active discussions with GoI officers, State Level officers and scientists of various institutions i) In the district at Panchayat level schemes were identified as per the need and potential and resolutions were passed by the Panchayat to include the schemes in PMKSY. The Panchayat resolutions were then consolidated and put up in the Block Development Committee and a block plan was put up in the Zila Parishad along with the programme of other line departments participating in implementation of PMKSY.

On the basis of detailed discussion and analysis of data, the team arrived at the projections of various components of PMKSY and Department wise plan for four years from 2016-17 to 2019-20 as detailed in the plan.

31 | P a g e

Chapter 1

General Information of the District

1.1 District Profile Lower Subansiri district of Arunachal Pradesh is located in between 920 40΄ and 94º 21΄ East Longitude and 26º 55΄ and 28º 21΄ North Latitude. In the North the District is bounded by Kurung-Kumey district and some part of , West and some part of Upper Subansiri District is touching to the Eastern side, and State of Assam to the south and Kurung Kumey and Papum Pare Districts to the Western side.

The Lower Subansiri District covers approximately an area of 3,508 sq. km. The topography of the district is mostly mountainous terrain, where the hill range varies approximately from 1000 to 1600 meters above sea level.

Map 1: Location Map of the district

32 | P a g e

A greater part of its falls within he Higher mountain Zone consisting of tangled peaks and valleys. Nature has gifted the heart land of the District in the form of magnificent plateau at above 1564 meters above sea level, where District Headquarter, Ziro is located.

There are 2 (two) major tribes in lower Subansiri District namely Apatani & Nyishi. Apatani & Nyishi are believed to belong to Tibeto-Mongoloid stock and are fair in complexion.

The river Subansiri, a tributary of Brahmaputra River had provided the name of the district as an undivided huge Subansiri district. The mother river subansiri that flows through Raga Circle of this District. The District was a part of North of Assam till 1914. In 1954, Subansiri Area was named as the “Subansiri Frontier Division” and its Headquarter was later transferred to a small township Ziro. Like other part of NEFA, the District was under the Ministry of External Affairs. On 1st September, 1965, the Ministry of Home Affairs took over the Administrative charge of NEFA from Ministry of External Affairs and Subansiri Frontier Division was named as Subansiri District and Political Officer (administrative in charge) was designated as Deputy Commissioner, Addl. Political Officer as Addl. Deputy Commissioner.

Table 1.1. 1: General profile of Lower Subansiri District

Name of District Code Latitude Longitude the District Lower 255 26˚ 55΄ to 28˚ 21΄ N 92˚ 40΄ 18˝ to 94˚ 21΄ E Subansiri Source: Census of India, 2011 Administrative set-up of Lower Subansiri The Lower Subansiri is bounded on the north by the Upper Subansiri district of Arunachal, on the south by Lower Subansiri District of Arunachal Pradesh and Assam, on the east by West Siang and some part of Upper Subansiri, and on the west by of Arunachal Pradesh. Presenlty district has three sub divisions viz. Ziro I CD block, Zior II CD block and Tame-Raga and eight circles under this three sub divisions. The headquarter of the district is situated at Ziro.

33 | P a g e

Lower Subansiri district covers 538 villages.

Table 1.1 1: Administrative set-up of the district

Name of CD Block No. of Circle No. of Villages Ziro – I CD Block 1. Ziro (Sadar) 138 2. Old Ziro 83 Ziro – II CD Block 1. Yachuli 57 2. Yazali 66 3. Pistana 57 Tamen Raga CD Block 1. Raga 39 2. Dullungmukh 19 3. Kamporijo 79 Source: Census of India, 2011 The Deputy Commissioner being the over-all In-charge of the district maintains law and order with the help of Administrative Officers and police force. He also look after the developmental activities of the district .The villagers have their own customary administrative system in the forms of traditional village councils. The Assam Frontier (Administration of Justice) Regulations, 1945, authorizes the village councils to settle all civil matters and certain criminal matters falling within their jurisdictions. However, for all matters, the Deputy Commissioner and other administrative officers have jurisdiction under the supervision of Assam High Court, who hold the appellate and the Revision Authority.

The Panchayat Raj system has been introduced in the district with the North East Frontier Agency Panchayat Raj Regulation, 1967.(i)The Panchayat Body exist at the village level. (ii) The Anchal Samiti at the Block / Anchal level, (iii) The Zilla Parishad operates at the District level. The regulation provides for the effective participation of the people in the Administrtive of Arunachal Pradesh through the institutions set-up under the Pachayat Raj Scheme.

34 | P a g e

Deputy Commissioner

Additional Deputy Commissioner

AC deputy commissioner

Ziro I CD block Ziro II CD block Tame-Raga

under 221 Villages under 180 Villages under 137 Villages

Figure 1.1. 1: Administrative setup of Lower Subansiri District

1.2 Demography

As per 2011 census, the total population of the district is 83030 out of which there are 41187 female and 41843 are male. The districts of the state with a sex ratio of 984 female per 1000 male as compared to 972 females per 1000 males of state average. The literacy rate of the district for male population is 80.53%, while for female it is 68.08%.

The population density of the district as recorded by 2011 census is 24 people per sq. km. which is 60% increase in density as compared to 16 people per sq. km as per 2001 census. Compared to the population density of the state (17 person per sqkm), the current population density of Lower Subansiri is on higher side. Lower Subansiri district administers 3508 sq.km. of areas.

Table 1.2. 1: Demography of Lower Subansiri

General Population ST Total / Others Blocks Village Male Female CH* (0-6 No. of No. of No. of No. of Covered yrs) Member Member household Member ZIRO I 221 21346 21006 3825 35919 6433 8109 42352

35 | P a g e

ZIRO II 180 12857 12542 3877 22272 3127 4667 25399

Tamen 137 7640 7639 2618 14720 559 2473 15279 Raga Total 538 41843 41187 10320 72911 10119 15249 83030 Source: Census of India, 2011

60.00% 51.01% 51.00% 50.00%

40.00% 37.06% 37.57% 30.73% 30.45% ZIRO I CD 30.00% 25.37% ZIRO II CD 18.55% 20.00% 18.26% Tamen Raga CD Block

10.00%

0.00% M F CH* (0-6 yrs)

Figure 1.2. 1: Block-wise population of male, female and children (o-6 years) in district

120.00%

100.00%

80.00% 63.57%

Percentage of General or 60.00% Others 30.90% Percentage of ST members 40.00%

49.26% 20.00% 5.52% 30.55% 20.19% 0.00% ZIRO I CD ZIRO II CD Tamen Raga CD Block

Figure 1.2. 2: Percentage of ST and General/Others population in district

The total number of household in the district is 15249, out of which 53% are in Ziro I and 31% in Ziro II, 16% Tame-Raga block. Ziro I is the most populated block in the

36 | P a g e district followed by Ziro II. In Ziro I the number of ST population is 49.26% of total population in the district followed by Ziro II with 30.55% and 20.19% in Tame-Raga Block.

1.3 Biomass and Livestock

As per Livestock census 2012, a total of 213383 livestock was recorded in the district. The district has seen an increase of 14% approximately in the total livestock population which was recorded as during Livestock census 2007. Department of Animal Husbandry has stated that the main reason for this reduction is migration of youth from rural to urban areas and dwindling profits that accompany rearing of livestock.

Table 1.3. 1: Population of Small and Large animals in Lower Subansiri

Small Animals Total Block Poultry Ducks Pigs Goats Sheep (No.) (No.) (No.) (Nos.) (Nos.) (Nos.) Ziro I 29985 1227 5859 2533 0 39604 Ziro II 29139 3174 7278 4179 246 44016 Tamen Raga 34694 3556 9389 4900 0 52539 Total 93818 7957 22526 11612 246 136159 Source: Livestock Census 2012

It is clearly shown from above table that more number of people are interested in poultry farming because their basic food pattern adds more no of non-vegetarians due the climatic conditions and the production of vegetables is less in the district because of small land holding and peoples are more interested in doing farming for one season due to lack of irrigation facilities.

37 | P a g e

Small Animals

Goats, 11612, 8%

Pigs, 22526, 17%

Duck, 7957, 6%

Poultry, 93818, 69%

Poultry Duck Pigs Goats Sheep

Figure 1.3. 1: Percentage of small animals in the district

Block wise percentage of small animals

39% 29%

32%

ZIRO I CD ZIRO II CD Tamen Raga CD Block

Figure 1.3. 2: Block wise percentage of small animals

Population of small animal in the district is 136159 and poultry population accounts for 68.90% of the total number of small animals in the district followed by pigs (16.54%) and Goats (8.53%). Among different blocks, the Tamen Raga block has the highest percentage of small animal and contributes 38.59% of the total small animal

38 | P a g e

population in the district, followed by Ziro II which contributes 32.33% and Ziro I contributes 29.09% of total small animal population. The Tamen Raga block has highest percentage of poultry, piggery and goat population in the district with 36.98%, 10.01% and 5.22% of the total animals in the district.

Table 1.3. 2: Population of large animals in the district

Large animals Block Indigenous Hybrid cow Buffalo Mithuns Total cow Ziro I 7237 471 2194 6540 16442 Ziro II 11112 0 4314 14299 29725 Tamen Raga 11720 0 4138 15199 31057 Total 30069 471 10646 36038 77224 Source: Livestock Census 2012

Large Animal Population

ZIRO I CD, 16442, 21%

Tamen Raga CD Block, 31057, 40%

ZIRO II CD, 29725, 39%

ZIRO I CD ZIRO II CD Tamen Raga CD Block

Figure 1.3. 3: Block wise population of large animals in the district

39 | P a g e

Large Animals

Indegenous cow, 30069, 39%

Mithun, 36038, 47%

Buffalo, 10646, Hybrid cow, 471, 14% 0%

Indegenous cow Hybrid cow Buffalo Mithun

Figure 1.3. 4: Percentage of large animals in the district

Population of large animals in the district is 77224. Indigenous cow’s population accounts for 38.94% of the total number of large animals and mithuns contribute 46.67% and remaining 14% are Buffaloes. Among different blocks, Tamen-Raga has the highest population of large animals and contributes about 40% of total large animal population followed by Ziro II and Ziro I with 38% and 21% of the total large animal population in the district.

1.4 Agro-Ecology, Climate, Hydrology and Topography

Lower Subansiri District is mainly constituted of NE-SW trending structural hills. The district is mainly characterised by two fairly large intermountain valleys, Ziro & Talley Valley in Ziro Circle. Both the valley is glacier originator. The unique feature of district is highly dissected land underline by the ziro gneiss. The district comes under temperate sub alpine (AZ49) Tropical Hill (AZ50) The Maximum and minimum temperature is 24.4 to 9.70C at Ziro is Sub tropical and Temperature while climate of Raga, Yachuki and Palin is Sub tropical. The average annual rain fall in Ziro (HQ) is about 1910mm. In the mountainous district of lower Subansiri, climate is largely influenced by terrain condition and attitude. a year may be divided into four season a) cold weather season-Dec. to Feb. b). Mar. to May – Pre-Monsoon season of thunder storms, c).June to middle Oct.- the south west monsoon and d). Second half of Oct. to

40 | P a g e

Nov.- Post –Monsoon period. In the foot hill or low high belt area of the district, the comparison to high belt area of the district, the climate is moderate in comparison to high belt area, where during winter is very cold and chilled while in summer it is pleasant. Dec. and Jan. is generally they are the coldest month and Jul. and Aug are the warmest months. The Maximum and minimum temperature is 24.4 to 9.70C at Ziro is Sub tropical and Temperature while climate of Raga, Yachuki and Palin is Sub tropical.

1.4.1 Climate

The climatic condition of the district varies from place to place as well as season to season. The climate is largely influenced by the nature of terrain depending upon altitude and location of place. It may broadly be divided into four seasons in a year:

(1) The cold weather season is from December to February,

(2) March to May is the pre-monsoon season of thunders storms follows by,

(3) The South –West monsoon from June to about the middle of October and

(4) The second half of October to November which constitutes the post monsoon or the retreating monsoon period and is a period of transition.

In the foot hills or low high belt area of the district, the climatic condition is moderate in comparison to high belt areas, where during winter is very cold and chill, and in summer is pleasant. December and January are generally the coldest month, and July and August are warmest months.

Annual rainfall in the South is heavier than that in the Northern areas of the district. During the monsoon period more than 70 percent of the rain over the Southern half occurs while in the Northern portions it is about 60 percent. Variability of rain fall for the monsoon and the year, as a whole, are relatively small. Average Annual Rainfall of the district Headquarter, Ziro recorded as 1910 mm. during, 2013.

Relative humidity is always high throughout the year except in the winter months being slightly less humid. In the cold season, the sky is obscured on many mornings due to lifted fog which clears with the advance of the day generally, moderately clouded

41 | P a g e in the period of March to May, heavily clouded to overcast in the monsoon season and clear or slightly clouded during the post monsoon season. Winds are generally light strong katabatic winds down the valleys are experienced as local effect produced by the nature of terrain.

1.4.2 Hydrology

Most of the district is occupied by hard and compact metamorphic rocks of pre- Cambrian to upper Palaeozoic epochs. The unconsolidated alluvium sediments occupy the valleys located within the consolidated rocks. Hydro geologically the district broadly divided into the following hydro geological units as under.

Consolidated Formation: It comprises the gneissic rocks of Sela and Bombdila groups Quartzite’s groups of Buxa and Miri Formation. The unit occupies more than 90% of the total area of thr district area. The rocks of the unit are intensity folded fractured and jointed. Minor fault are evident by cluster of discharging spring. The fractured and joints, along with weathered mantle, act as the zone for ground water storage. The ground water recharge is replenished annually by amount of precipitation. their ground water emerges out in the form of springs along the fracture at lower points the movement and storage of ground water is restricted by limited areas, with the result, the springs dry up during the lean period however perennial spring flow throughout the year but their yield s decrease during dry season (March - April)

Unconsolidated Formation: It comprises alluvial sediments of intermundane valleys. In general, the alluvial cover in these valleys surrounded by consolidated rocks is very thin. Even small thickness of these sediments has good prospect for ground water development by shallow ground water structure. The surrounding hilly terrain recharges these valleys by their runoff and through the fractures, fissures and weak plains beneath their covers. Some of the intermundane valleys along with their ground water prospects are detailed as follows:

1) Ziro Valley

The valley is located in Ziro-Hapoli area, covering about 15 Sq Km. It is underlain by weathered quartzites and gneissic metamorphic rocks of Page. The Kele river draining the valley runs longitudinally along north south direction. A

42 | P a g e

number of stream and nalas from east to west join it. The valley filled comprises the sediments of silt, clay, weathered and broken pieces of gneisses and quartzite’s. The western part of the valley has numerous springs and seepage. The water table rests within 3 m bgl around Ziro Dug wells, 5 to 6 meter depth are feasible throughout the valley. The shallow tube ells of 25 to 30 meter depth in the alluvium around the Ziro and east of Hapoli town are expected to yield more than 20 m /hr. At present only a few dug wells are present in the valley. Geophysical survey should be carried out to demarcate the exact depth of the aquifer.

2) Yazali Valley

It lies half way of -Ziro road. The valley is formed along the bank of Ranga river and occupies about 3 sq km area. The southern part is undulatory and boulder while the northern part is an alluvial plain. The main valley fills lies on north and north east along the Kele river is used for irrigation by Agricultural department at Yazali Ground water occurs under water table condition. The depth of water table rests within 5 m bgl. Dug wells of 10 meter depth are expected to be feasible throughout the valley. In Yazali valley geophysical survey and trial boring needs to be done to know the depth and extension of aquifer. Apart from the valleys as mentioned above, there are small alluvial patches in the form of valleys scattered throughout the district, namely Sher, Joram etc. and cover about 0.5 to 1 sq. km area with thin veneer of alluvium.

1.4.3 Topography

The Lower Subansiri District covers approximately an area of approx. 3,508 Sq.km. The topography of the District is mostly mountainous terrain, where the Hill Ranges varies approximately from 1000 to 1600 metres above sea level. A greater part of it falls within the higher mountain zone consisting of tangled peaks and valleys. Nature has gifted the heart land of the District in the form of magnificent plateau at about 1564 metres above sea level, where District Headquarter, Ziro is located.

The forest of the District are rich in valuable species of trees and different varieties of shrubs, cane and bamboo grow plenty, and the exquisite floral treasures of wilder species may often be found in the shadowy recesses of the Forest. The Forest of the District has got great economic values and various types of wild game. The District is

43 | P a g e also rich in wild fauna such as tigers, panthers, leopard, cats, bear, boars, antelopes and barking deer etc. beautify this nature’s Zoological Garden.

One of the main river of this District is Kamala. The origins of the river is from snow ranges of China (Tibet), which flows towards South-East and meets the Subansiri river at Raga Circle. The Subansiri river, at one time was famous for its gold dust flows through the District and leaving the District at Dollungmukh Circle. It ultimately joins the mightly Brahmaputra in plain of Assam. Khru, Panior, Kime, Panya, Selu, Pugo, Persen, Rein Sipu, Pange, Kiile etc. river are also worth

Table 1.4. 1: Percentage Area under different climatic zones

Block Large animals Area/ Tropical Zone Sub- Temperate Zone Percentage (0 – 900mtr.) Tropical (1801-3500 Zone (901- mtr.) 1800mtr.) Area 0 72.86 160.12 Ziro I Percentage 0 31.27 68.73 Area 191.03 791.16 220.11 Ziro II Percentage 15.89 65.8 18.31 Area 532.39 584.14 271.43 Tamen Raga Percentage 38.36 42.09 19.56 Area 723.42 1448.16 651.66 District Percentage 25.62 51.29 23.08 Source: various sources From the above table the total area fall under three different climatic zones. The total area Under Tropical zone is 723.42 square kilometre, the district have more than 1000 square kilometre area under sub-tropical zone which contribute 51.29% and remaining comes under Temperate zone which is 23.08% of total area. Each climate zone have their each different distinct properties and different crops can be taken under this different climate.

44 | P a g e

Table 1.4. 2: Area under different types of Terrains

Blocks Agro Ecological Zone Type Ziro I Temperate Sub Alpine (AZ49)Tropical Hill (AZ50)

Ziro II Warm to hot, per-humid eco-subregion (C1A10) Tamen Raga North Eastern Hill Region Source: District Agriculture Plan 2014-15

The maximum area of district falls under the category of AES-2 which is medium altitude sandy clay loam.

1.4.4 Rainfall & Temperature

Annual rainfall in the South is heavier than that in the Northern areas of the district. During the monsoon period more than 70 percent of the rain over the Southern half occurs while in the Northern portions it is about 60 percent. Variability of rain fall for the monsoon and the year, as a whole, are relatively small. Average Annual Rainfall of the district Headquarter, Ziro recorded as 1910 mm. during, 2013.

Relative humidity is always high throughout the year except in the winter months being slightly less humid. In the cold season, the sky is obscured on many mornings due to lifted fog which clears with the advance of the day generally, moderately clouded in the period of March to May, heavily clouded to overcast in the monsoon season and clear or slightly clouded during the post monsoon season. Winds are generally light strong katabatic winds down the valleys are experienced as local effect produced by the nature of terrain.

Figure 1.4. 1: Variation in Temperature in the district

45 | P a g e

1.5 Soil Profile

Lower Subansiri district is mainly hilly. Hill ranges trending in North East - South West to North West – South East directions with moderate to steep slopes, alternative with narrow valleys. The elevation of hills generally increases towards the north. Based upon the factors of relief, drainage, lithology etc. the district can be divided into five geomorphic units which are:

a) High Denudo-Structural Hills: Covers mostly the northern part of the district. Elevation of the hills ranges from 900m – 5000m above msl with moderate to steep slopes. Valleys are narrow and ‘V’ shaped.

b) Moderate Denudo- Structural Hills---- This unit by moderate hills with flat tops and moderate to steep slopes. Elevation of the hills varies between 700 to 900m above msl. The unit occupies about 1,355 sq. km. area. Main rock formations are phyllite, quartzite and shale with occasional high grade sctists and gneiss. The rocks are highly, weathered and thickness of weathered mantle varies between 5 – 10 m in Basar area. Valleys are ‘U’ shaped. The soils of the district have been derived from parent rock formation, e.g. phyllite, biotite- schist and gneiss, alluvial and colluvial deposits. The soils of the hill slopes were genetically derived from schists and gneiss that of the valley areas from alluvial and colluvial sediments. These are sandy loam in texture in the valleys and lateritic in hill areas. The soils are high is acid content with PH value ranges in-between 5 to 6. The carbon content is also high with low Potassium and Phosphate is high to low.

Table 1.5. 1: Soil type and percent area covered by different soil type

Sl. No. Texture Area (ha) Percentage

1 Fine 68881 24.4 2 Medium 213426 75.6 Total 282307 100 Source: District Agriculture Plan 2014-15

Gently sloping, moderately sloping and St6eep to steeply sloping are the different land slopes found in the district.

46 | P a g e

Table 1.5. 2: Land slop of Lower Subansiri District

Slope Description (In Land Slope Degrees) or Gradient in 0-3% 3-8% (ha) 8-25% (ha) >25% (ha) Percentage (Ha) Gently sloping (2.28-5.14) NA 4626 NA NA or (4 -9 percentage ) Moderately sloping (5.71- NA NA 77830 NA 8.51) or (10-15 percentage ) Steep to steeply sloping NA NA NA 199850 (9.07-16.70) or (16-30 percentage) Source: District Agriculture Plan 2014-15

1.6 Soil Erosion and runoff status Data not available 1.7 Land Use Pattern

The total geographical area (TGA) of the District is 350799 ha. The area under cultivation includes gross cropped area and net sown area in the district. The gross cropped area of the district is found to be 10212.50 ha while the net sown area of the district is 7280.80 ha. 58.31% of the gross cropped area lies under Ziro II block followed by Ziro I and Tamen Raga with 37.44% and 4.25% respectively. Similarily, the net sown area is maximum in Ziro II block followed by Ziro I and Tamen Raga with a share of 55.36%, 39.96% and 4.67% respectively.

47 | P a g e

Table 1.7. 1: Land use Pattern of the district

Blocks Number Total Area under Agriculture of the Geographical Gross Net Area Cropping villages Area (ha) Cropped Sown sown intensity covered Area (1) Area (2) more (%) than once (1-2) Ziro I 221 47957 3824.00 2909.72 914.28 131% Ziro II 180 129901 5954.40 4030.77 1923.63 148% Tamen 137 172941 434.10 340.31 93.79 128% Raga Total 538 350799 10212.50 7280.80 2931.70 Source: Agriculture Department, Lower Subansiri

The area under non cultivation includes area under forests, wasteland and other uses. The area under forest in the district was found to be 277.94 ha. Tamen Raga has the maximum area under forest and constitutes about 136.01 ha while Ziro I block has 132.43 ha of area under forest. Ziro II block has 9.50 ha of area under forest in the district.

48 | P a g e

Chapter 2

Water Profile

Due to undulating soil and lack of surface water source, ground water has sufficient base for irrigation as well as for drinking purpose in every village. Lack of irrigation source forces the majority of the farmers to migrate to ensure their livelihood or work as a wage labour in another farmer’s field. The major crops in the project area cultivated by the farmers are paddy, maize, millet in kharif season. Some of the farmers take up wheat, potato, vegetables & mustard in rabi if rainfall is good. The land conservation measures such as channel in the villages help them to take up a rabi crop in the residual moisture. But other soil and water conservation structures like farm bunding, nala plug, check dam, gully plug and new pond will also help the farmers to take up other crops like sugarcane, irrigated wheat, vegetables crops etc. Agriculture primarily depends upon water; the district have perennial source of water but the reason for poor agriculture development is because of poor retention of water resources as the area is hilly with mild slopes. All this can change with the integrated land and water management during the watershed project. The planned micro irrigation channels will provide uninterrupted water to the farm land which will enhance agriculture productivity in the area. This will also help the farmers can take more than one season of crops.

2.1 Area wise, Crop wise Irrigation status Irrigation and drinking water supply facility constitutes the basic needs of the rural agricultural economy of Lower Subansiri district. The societies in the district being rural in nature are primarily agriculturalists. They practice both Jhum and settled cultivation in the form of wet rice cultivation and terraced rice cultivation.

The total gross cropped area of the district was found to be 10212.50 ha out of which kharif season crop has the maximum share in the gross cropped area with 93.88% followed by horticultural crops which constitute about 5.53% of the total gross cropped area in the district. Most of the farmers practise one crop cycle due to lack of irrigation facilities and in the light of good rainfall prefer to grow crops under rabi season. The rabi season crops mainly constitutes 0.59% of the gross cropped area and wheat, mustard and some vegetables like potato, capsicum are majorily grown in this season.

49 | P a g e

Table 2.1. 1: Area under kharif, rabi and horticultural crops

Blocks Kharif (Area in ha.) Rabi (Area in ha.) Horticulture & Plantation Grand Crops (Area in ha) Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total (ha)

Ziro I 150.00 3339.00 3489.00 0 30 30 0 305 305 3824 Ziro II 115.00 5659.40 5774.40 0 20 20 0 160 160 5954.4 Tamen 105.00 219.10 324.10 0 10 10 0 100 100 434.1 Raga Total 370.00 9217.50 9587.50 0.00 60 60 0 565 565 10212.5

Source: Department of Science and Technology,

70.00% 60.23% 60.00% 53.98% 50.00% 50.00%

36.39% 40.00% 33.33% Ziro I 28.32% Ziro II 30.00% Tamen Raga CD Block 16.67% 17.70% 20.00%

10.00% 3.38%

0.00% Percentage area Percentage area Percentage area under kharif under rabi under horticulture

Figure 2.1. 1: Block wise percentage area under different crops

Area under Kharif season crops, the maximum area lies under Ziro II block which constitutes about 60.23% of the total Kharif crops followed by Ziro I and Tamen Raga which constitutes about 36.39% and 3.38% respectively to the total area under kharif season crops. About 96.14% of the total area under Kharif is cultivated under rainfed situation while the reaming 3.86% under irrigated conditions. Among the blocks, Ziro I has the maximum area under irrigated condition and constitutes about 40.54% of the total irrigated area while Ziro II has maximum area under rainfed condition and constitutes about 61.40% of the total rainfed area.

50 | P a g e

100.00% 90.00% 80.00% 70.00% 61.40% 60.00% 36.22% Percentage area under rainfed 50.00% in kharif 40.00% Percentage area under irrigated 30.00% 2.38% in kharif 20.00% 40.54% 31.08% 28.38% 10.00% 0.00% Ziro I Ziro II Tamen Raga CD Block

Figure 2.1. 2: Percentage area under irrigated and rainfed for Kharif season crops

Under rabi season no crops is grown under irrigated condition. 50% of the total area under rainfed lies in Ziro I block and it constitutes the maximum area under rainfed condition. The other blocks include Ziro II with 33.33% and Tamen Raga block with 16.67% of the area under rainfed condition.

Percentage area under rainfed in rabi

16.67%

50.00% Ziro I

33.33% Ziro II Tamen Raga CD Block

Figure 2.1. 3: Block wise percentage area under rabi

The horticultural crops includes vegetables and fruits mainly grown as orchard farming in the district. Due to lack of any irrigation facilities and infrastructure in the

51 | P a g e district, all the crops are grown under rainfed conditions. About 53.98% of the total area uner horticulture falls under Ziro I block.

Percentage area under horticulture

17.70%

Ziro I 53.98% 28.32% Ziro II Tamen Raga CD Block

Figure 2.1. 4: Block wise percentage area under horticultural crops

In district, about 96.38% of the total gross cropped area is cultivated under rainfed condition while the remaining 3.62% of the area is grown under irrigated conditions. The block wise representation of percentage area under rainfed and irrigated is given in the figure below.

59.33% 60.00%

50.00% 40.54% 37.33% 40.00% 31.08% Percentage area under irrigated 28.38% 30.00% condition Percentage area under 20.00% rainfedcondition

10.00% 3.34%

0.00% Ziro I Ziro II Tamen Raga CD Block

Figure 2.1. 5: Percentage area under irrigated and rainfed in the district

52 | P a g e

2.2 Production and Productivity of Major Crops Paddy, Maize and Millet are the three major cereals crops in Lower Subansiri district. The other food crops which are grown in the district are horticulture and olericulture crops. Area under cereal production is 430 ha and paddy and wheat are the major crops grown under cereals in the district. Whereas, paddy is mostly grown under irrigated condition, wheat is a rainfed crop in the district. All other crops are grown under rainfed conditions. The total area under coarse cereals crops is 2239.28 ha and includes maize and millets as the major crops. About 676.99 ha of the area is under maize while 1562.29 ha of the area is under millets cultivation. Mustard or Sarso, is the major oilseed grown in the district and constitutes an area of 947.79 ha. Ginger is major spice crop grown in the district with an area of 199.97 ha while pulses covers an area of 407.24 ha in the district. The crops like sugarcane, mushroom, fruits and vegetables and cover an area of 5988.22 ha in the district and the total crop area under rainfed accounts for 9842.50 ha.

Table 2.2. 1: Production of different crops in the district

Crops Production (qt/ha) Total Ziro I Ziro II Tamen Raga Vegetables 24800 12400 9300 46500 Chilli 1400 700 350 2450 Ginger 2259.6 1129.8 847.35 4236.75 Sugarcane 7637.5 4582.5 4582.5 16802.5 Potato 4750 2850 1425 9025 Total 40847 21662 16505 79014 Source: NABARD PLP, 2015-16

The total production under irrigated condition is 9805 qt/annum with an average productivity of 2650 kg/ha. Among blocks, Ziro I has the maximum share in total paddy production in the district and constitutes about 40.54% of the total paddy production.

53 | P a g e

Table 2.2. 2: Production details under rainfed and irrigated condition

Block Gross Rainfed Irrigated Total Cropped Area Production Yield Area Production Yield Production Area (ha) (Qtl/yr.) (Kg/ha) (ha) (Qtl/yr.) (Kg/ha) (Qtl./yr.) Ziro I 3824 3674 40847 1112 150 3975 2650 44822 Ziro II 5954 5839 21662 371 115 3048 2650 24710 Tamen 434 329 16505 5015 105 2783 2650 19287 Raga Total 10212.5 9842.5 79014.25 2165.97 370 9805 2650.00 88819.25 Source: NABARD PLP, 2015-16

The total production under rainfed condition is 79014 qt/annum with an average productivity of 2165.97 kg/ha. Among the blocks, 51.70% of the total production under rainfed is from Ziro I block followed by Ziro II with 27.42% and Tamen raga block with 20.89% of the total production under rainfed.

Irrigated agriculture has been extremely important source of food production in recent decades in the country and the availability of assured source of irrigation in the farm has led to the increase in the production of the crops. Even so, irrigated agriculture contributes less in the total production as compared to the rainfed agriculture in the district but the efficient production per drop of water is more in the irrigated condition as compared to the rainfed condition. It can be observed that the average productivity in case of irrigated agriculture is more than the rainfed agriculture due to the year round availability of water and taking of more than one crop in a year.

60.00% 51.70%

50.00% 40.54% 40.00% 31.08% Percentage of production under 27.42% 28.38% rainfed 30.00% 20.89% Percentage of production under 20.00% irrigated 10.00% 0.00% Ziro I Ziro II Tamen Raga CD Block

Figure 2.2. 1: Block wise percentage of production under rainfed and irrigated condition

54 | P a g e

The lack of irrigation infrastructure in the district and on farm irrigation facility has led to lower agriculture production in the district. There is huge water potential in the district in the forms of streams, river, rivulets, spring, etc. but it has failed to channelise the water from source to sink.

2.3 Irrigation base classification The irrigation based classification of the district explains the need of intervention that is required under rainfed condition to bring the partially rainfed area under complete irrigation while supporting and implementing activities to bring the rainfed areas under assured irrigation or partially irrigation facilities.

As discussed earlier, the district is primarily rainfed. Area under rainfed condition is 9842.50 ha and constitutes about 96.38% of gross cropped area, while the extent of irrigated agriculture is mere 370 ha and constitutes about 3.62% of the total gross cropped area in the district.

Table 2.3. 1: Irrigation based classification in the district

Blocks Irrigated (Area in ha) Rainfed (Area in ha) Gross Irrigated Net Irrigated Un-Irrigated Gross cropped Area Area or Totally area Rainfed Ziro I 150 150 3674 3824 Ziro II 115 115 5839 5954 Tamen 105 105 329 434 Raga Total 370 370 9842.5 10212.5 Source: Agriculture Department, Lower Subansiri

As discussed earlier in the chapter above, the total irrigated area in the district is 370 ha and since the farmers usually take single crop or follow one crop cycle in a year, hence the net irrigated area of the district is also 370 ha. The total rainfed area in the district is 9842 ha.

55 | P a g e

Chapter 3

Water Availability

Physiographically, the district can be broadly divided into three unit’s i.e. lower hills, the plateau and mountain. The topography changes from lower hills in the south to lofty mountain extending northward. The hill ranges varies approx. from 1000 to 1600 m above MSL. One of the main rivers of the district is Kamala which flow towards south east and meets the Subansiri river in Raga Circle, the Raga river drains area west of Yazail running through Kimin and join the river Brahamaputra in south.

In this district agricultural practice is mainly depend on monsoon rainfall. Most peoples who are engaged with agriculture are unaware of doing agriculture or horticulture in the lean period by using ground water. In the valley or foothill areas where construction of ground water structures like large diameter dug wells or tube wells are feasible, farmers should be encouraged to adopt the practice of cultivation by using ground water structures at least in which months there is scarcity of rain or surface water. Moreover, in the hilly part of the district, perennial springs are only utilized for drinking or other household purposes only. For this, only a part of the spring water is utilized and rest part is allowed to pass away. This excess water may be tapped fully by constructing collector chamber and then allowed to pass through horticultural field which not only reduce the soil erosion but also recharge the ground water as well as meet the water requirement of the horticultural field in the lean period also.

3.1 Status of Water Availability The district has rich source of surface water which can be observed in the form streams, rivulets, ponds and perennial sources of water. Rain water harvesting structures forms the major source of surface irrigation in the district and constitutes about 37.59% of the total water under surface irrigation followed by lift irrigation sources which constitutes about 27.09% and perennial sources of water which constitutes about 26.24% of the total surface irrigation sources in the district. The minor irrigation tanks in the district which constitutes about 9.08% of the total surface irrigation sources in the district.

56 | P a g e

Table 3.1. 1: Status of water availability in the district

Sl.No Sources Kharif Rabi Summer Total (MCM) (MCM) (MCM) (MCM) 1 Surface Irrigation i Canal (Major & Nil Nil Nil Nil medium irrigation) ii Minor Irrigation 0.000410 0.000102 0.000512 0.001024 tanks iii Lift Irrigation/ 0.001222 0.000306 0.001528 0.003055 Diversion iv Various water 0.001696 0.000424 0.002120 0.004240 bodies including Rain Water Harvesting v Treated Effluent Nil Nil Nil Nil Received from STP vi Untreated Nil Nil Nil Nil Effluent vii Perennial sources 0.001184 0.000296 0.001480 0.002960 of water 2 Ground Water Nil Nil Nil Nil i Open Well Nil Nil Nil Nil ii Deep Tube Well Nil Nil Nil Nil iii Medium Tube Nil Nil Nil Nil Well iv Shallow Tube Nil Nil Nil Nil Wells Source: WRD, Ziro 2015-16

The district lacks any ground water structure and hence the water availability under the ground water sources was not available.

57 | P a g e

3.2 Status of Ground water availability in the district

Most of the district is occupied by hard and compact metamorphic rocks of pre- Cambrian to upper Paleozoic epochs. The unconsolidated alluvium sediments occupy the valleys located within the consolidated rocks. Hydro-geologically the district broadly divided into the following hydro geological units as under:

Consolidated Formation

It comprises the gneissic rocks of Sela and Bombdila groups Quartzites groups of Buxa and Miri Formation. The unit occupies more than 90% of the total area of the district area. The ground water recharge is replenished annually by amount of precipitation. Their ground water emerges out in the form of springs along the fracture at lower points the movement and storage of ground water is restricted by limited areas, with the result, the springs dry up during the lean period. However, perennial spring flow through out the year but their yield s decreases during dry season (March - April).

Unconsolidated Formation

It comprises alluvial sediments of intermundane valleys. In general, the alluvial cover in these valleys surrounded by consolidated rocks is vary thin. Even small thickness of these sediments has good prospect for ground water development by shallow ground water structure.

Some of the intermontane valleys along with their ground water prospects are detailed as follows:

3. Ziro Valley The valley is located in Ziro-Hapoli area, covering about 15 Sq Km. It is underlain by weathered quartzites and gneissic metamorphic rocks of Page. The Kele river draining the valley runs longitudinally along north south direction. A number of stream and nalas from east to west join it. The valley filled comprises the sediments of silt, clay, weathered and broken pieces of gniessis and quartzite’s. The western part of the valley has numerous springs and seepage. The water table rests within 3 m bgl around Ziro. 4. Yazali Valley

58 | P a g e

The valley is formed along the bank of Ranga river and occupies about 3 sq km area. The southern part is undulatory and boulder while the northern part is an alluvial plain. The main valley fills lies on north and north east along the Kele river is used for irrigation by Agricultural department at Yazali Ground water occurs under water table condition. The depth of water table rests within 5 m bgl. Dug wells of 10 meter depth are expected to be feasible throughout the valley. In Yazali valley geophysical survey and trial boring needs to be done to know the depth and extension of aquifer.

Table 3.2. 1: Status of ground water availability in the district

Block Status of Block as per Central Ground Water (MCM) Ground Water Board Notification Critical Semi- Safe Draft Recharge Gap Critical MCM MCM MCM Ziro I NA NA NA NA NA NA Ziro II NA NA NA NA NA NA Tamen NA NA NA NA NA NA Raga Source: Central ground water Board report, 2014-15

At present there is negligible ground water structure for any use and therefore total draft may be considered as negligible. Therefore stage of ground water development is 0%. Based on the net ground water availability, annual allocation of ground water supply for both domestic and industrial water supply for the foot hill and valley area is 0.58 mcm and ground water availability for future irrigation use is 2.72 mcm. As there is no other ground water structures available throughout the district, ground water development of the district may be considered as negligible or nil and hence considered under safe category.

3.3 Status of Command Area

The district has a total of 10263 ha under canal command area out of which 6855 ha of the area has been developed through various major and medium irrigation structures while 3408 ha of the area still lies under undeveloped area. The other

59 | P a g e

services command includes command area under other sources of irrigation in the district like lift irrigation, perennial sources or ground water sources, etc. About 5991 ha of area lies under the other services command, no further irrigation structures has been developed for these areas. The total developed command area in the district is 6855 ha while 9399 ha is undeveloped command area and requires to be brought under the ambit of irrigation sources.

Table 3.3. 1: Status of command area in the district

Block Information of canal Information on the other Total Area command services command Total Develop Undeve Total Devel Undevelo Develope Undeveloped Area ed Area loped Area oped ped Area d Command (ha) (ha) Area (ha.) Area (ha.) Comman (ha.) (ha) (ha.) d (ha.) 1 3 4 5 6 7 8 4+7 5+8 Ziro I 6874.00 6074.00 800.00 5841.0 Nil 5841.00 6074.00 6641.00 0 Ziro II 1892.00 600.00 1292.00 75.00 Nil 75.00 600.00 1367.00 Tamen 1497 181 1316 75 Nil 75 181 1391 Raga Total 10263 6855 3408 5991 0 5991 6855 9399 Source: WRD, Ziro 2015-16

60 | P a g e

Developed canal command area

2.64% 8.75%

Ziro I Ziro II Tamen Raga CD Block 88.61%

Figure 3.3. 1: Block wise percentage of developed canal command area in the district

Un-developed canal command area

23.47% 38.62%

Ziro I Ziro II

37.91% Tamen Raga CD Block

Figure 3.3. 2: Block wise percentage of un-developed canal command area in the district

61 | P a g e

Percentage of other services command area 1.25% 1.25%

Ziro I Ziro II Tamen Raga CD Block

97.50%

Figure 3.3. 3: Block wise percentage of other services command area in the district

3.4 Existing type of irrigation

Under existing type of irrigation in the district, various sources of irrigation has been identified which includes both government and private based. The total number of government based canal structure in the district is about 221 while there is also some private based canal structure which accounts for 890 in number in the district. There was no information regarding community based canal during the field survey in the district.

Table 3.4. 1: Existing type of irrigation in the district

Surface Irrigation (No.) Canal Based Tanks/ Ponds/ Reservoirs Total Block Community Govt. Govt Community Individual (No.) ponds Reservoir/ Canal /Pvt. Canal Pvt. Ponds including small Dam Ziro I 136 280 40 30 NA 486 Ziro II 77 370 30 37 1 515 Tamen Raga 8 240 28 54 1 331 Total 221 890 98 121 2 1332 Source: WRD, Ziro 2015-16

62 | P a g e

There are two government based reservoir in the district one each in Ziro II and Tamen Raga block. Among the blocks, Ziro II has the maximum number of surface irrigation sources and constitutes about 38.66% of the total surface irrigation sources in the district followed by Ziro I and Tamen Raga with 36.49% and 24.85% respectively. The largest number of private canals was also found in Ziro II block which constitutes about 41.57% of the total number of private canals in the district.

Percentage of surface irrigation sources in the district

24.85% 36.49%

Ziro I Ziro II Tamen Raga CD Block 38.66%

Figure 3.4. 1: Block wise percentage of surface irrigation sources in the district

Percentage of private canals

26.97% 31.46%

Ziro I Ziro II Tamen Raga CD Block 41.57%

Figure 3.4. 2: Percentage of private canals in the district

63 | P a g e

Percentage of individual private ponds

24.79%

44.63%

Ziro I Ziro II 30.58% Tamen Raga CD Block

Figure 3.4. 3: Block wise percentage of private ponds in the district

There are 98 private ponds in the district and Tamen Raga has the maximum number of these ponds in the district constituting about 44.63% of the total number of community ponds in the district.

Percentage of government canal

3.62%

34.84% Ziro I 61.54% Ziro II Tamen Raga CD Block

Figure 3.4. 4: Block wise percentage of government canals in the district

The government based canals is located maximum in Ziro I block which constitutes about 61.54% of the total number of government canals in the district.

64 | P a g e

Chapter 4

Water Demand

The earlier chapters deal with the general profile, water profile and water availability of Lower Subansiri district. The present chapter will deal with the current (2016) and projected (2021) demand of water for various sectors. The demand for water has been assessed on the basis of data obtained from different departments.

4.1 Domestic Water Demand Data of Census 2011 and 2001 has been considered to arrive at the growth rate of population of the district. As per Census 2011, the district has shown an decadal growth rate of 49%. Current population (in 2016) has been calculated by assuming a growth of 4.90% per annum over a period of five years (from 2011-2016). Projected population has been calculated in similar way by assuming a growth of 4.90% over the period of five years (from 2016-2021).

It has been assumed that per capita daily water requirement of people residing in urban areas of the district is 150 litre and for population in rural areas, the daily per capita daily water requirement is 70 litre. Using the same norms domestic water supply demand has been worked out.

Table 4.1. 1: Domestic water requirement in the district

Blocks 2011 2016 Gross Projected Gross water Population water demand 2021 demand in MCM in MCM (2016) (2021) Ziro I 42352 53796 2.00 68333 2.54 Ziro II 25399 32262 0.95 40980 1.21 Tamen Raga 15279 19408 0.58 24652 0.74 Total 83030 105466 3.53 133965 4.48

The total population of the district in 2016 has been estimated to be 105466 and the projected population for the year 2021 is 133965. The present water demand of the

65 | P a g e district has been estimated to be 3.53 MCM while it is expected to rise to 4.48 MCM by the year 2021.

Domestic water demand 3.00 2.54 2.50 2.00 2.00

1.50 1.21 0.95 1.00 0.74 0.58 0.50

0.00 Ziro I Ziro II Tamen Raga

Present water demand Projected water demand

Figure 4. 1: Block wise domestic water demand in the district

The growing population in the district and the decadal growth of the district which was reported to be 49% in 2011 census, shows that the domestic water demand is going to rise and it will be 27.02% as compared to present water demand.

4.2 Crop Water Requirement As discussed in Chapter 2, cereals are cultivated on major part of the gross cropped area in the district. Hence, the crop water requirement for major cereals viz. Maize, Paddy, as assumed by State Agricultural University has been taken. The assumptions are as under:

 For paddy: 0.6 m per ha,  for Maize: 0.06 m per ha,  Vegetables: 0.18 m per ha and  for Horticulture crops: 0.06 m per ha  The small portion of area under other crops has been taken in category of vegetables and same assumption has been made.

66 | P a g e

Table 4.2. 1: Crop water requirement

Water Crop Water Existing Area Irrigated Potential Water Potential Water Block sown area to be Demand Required Potential (Ha) (ha) created in MCM in MCM MCM MCM Ziro I 3824 150 3.30 3.30 0.90 2.40 Ziro II 5954.4 115 4.50 4.50 0.69 3.81 Tamen 434.1 105 0.85 0.85 0.63 0.85 Raga Total 10213 370 8.66 8.66 2.22 7.07

Crop water demand in the district 60.00% 52.04% 50.00% 40.54% 40.00% 38.17% 31.08% 28.38% 30.00%

20.00%

9.79% 10.00%

0.00% Ziro I Ziro II Tamen Raga

Water Potential to be created Existing Water Potential

Figure 4. 2: Existing water potential and water potential to be created in the district

Water potential required has been derived from water required by crops cultivated under rainfed conditions. Therefore, the existing water potential represents the water requirement of crops cultivated in irrigated areas. The existing water potential available in the district is 2.22 MCM. The projected water demand for crop irrigation

67 | P a g e is 8.66MCM. It can be concluded from the table that a total water potential of 6.44 MCM is to be created in the district to fulfil the requirement of crops.

4.3 Livestock Water Demand

The requirement of water by livestock in the district has been derived from two livestock census (2008 & 20012), as discussed in second chapter. The table below represents the animal wise water requirement as well as total water requirement of the district for livestock.

Table 4.3. 1: Livestock water requirement

Block Livestock Present Water Demand Water (No.) water In 2020 in MCM Potential Demand in to be MCM created in MCM Ziro I 113077 0.48 0.69 0.30 Ziro II 21259 0.87 1.26 0.56 Tamen Raga 39514 0.93 1.33 0.58 Total 173850 2.28 3.28 1.44

Livestock water requirement

45.00% 40.64% 40.47% 38.36% 40.00% 38.10% 35.00% 30.00% 25.00% 21.27% 21.17% 20.00% 15.00% 10.00% 5.00% 0.00% Ziro I Ziro II Tamen Raga

Present water demand in percentage Projected water demand in percentage

Figure 4. 3: Block wise percentage of present and projected water requirement of livestock in the district

68 | P a g e

4.4 Industrial Water Demand *Industrial water requirement is not applicable for the district. There is no such water consuming industries identified in the district.

4.5 Water Demand for Power Generation *Power is not generated in the district and hence, water requirement has been indicated to be zero. The power requirement of district is met through common grid system of the state.

4.6 Water Demand for Various Sector

This sections presents the total water demand of the district and has been calculated by summing up all major sectors consuming water. The current water demand has been indicated in Table 4.6.1 and the projected water demand has been depicted in Table 4.6.2. Table 4.6. 1: Sector wise present water demand in the district Sr. Block Sector-wise water demand (2015) Total No. Domestic Crop Livestock Industrie Power (MCM) (MCM) (MCM (MCM) s (MCM) Generation ) 1 Ziro I 2.00 3.30 0.48 NA NA 5.79 2 Ziro II 0.95 4.50 0.87 NA NA 6.32 3 Tamen 0.58 0.85 0.93 NA NA 2.36 Raga Total 3.53 8.66 2.28 0.00 0.00 14.47

Present water demand

16.28%

40.01%

43.71%

Ziro I Ziro II Tamen Raga

69 | P a g e

Figure 4. 4: Block wise present water demand of the district from various sector

Among the blocks, the maximum water requirement is observed in Ziro II with 43.71% of the total present water demand followed by Ziro I with 40.01% while Tamen Raga has the water demand from various sector of about 16.28% of the total present water demand in the district.

Water demand

15.76% 24.40%

59.84%

Domestic Crop Livestock

Figure 4. 5: Sector wise water present water demand of the district

The present water demand of the district has been assessed to be 14.47 MCM from various sectors. The agriculture sector constitutes maximum percentage of water demand in the district with 59.84% while the domestic water requirement for drinking and other purposes is 24.40%. The water requirement for the livestock has been estimated to be 15.76% of the total present water demand in the district.

Table 4.6. 2: Sector wise projected water demand in the district

Sr. Block Sector-wise water demand (2021) Total (MCM) No. Domestic Crop Livestock Industrie Power (MCM) (MCM) (MCM) s (MCM) Generation 1 Ziro I 2.54 3.30 0.69 NA NA 6.54 2 Ziro II 1.21 4.50 1.26 NA NA 6.97

70 | P a g e

3 Tame 0.74 0.85 1.33 NA NA 2.91 n Raga Total 4.48 8.66 3.28 0.00 0.00 16.42

The projected water demand in the district has been assessed to 16.42 MCM with Ziro II block showing the maximum water requirement by 2021 and it constitutes about 42.44% of the total projected water demand in the district followed by Ziro I with 39.81% and Tamen Raga with 17.74%.

Projected water demand

17.74%

39.81%

42.44%

Ziro I Ziro II Tamen Raga

Figure 4. 6: Block wise percentage of projected water demand in the district

Water demand

19.98% 27.30%

52.71%

Domestic Crop Livestock

Figure 4. 7: Sector wise projected water demand in the district

71 | P a g e

The maximum water requirement was assessed from the agriculture sector which constitutes about 52.71% of the total projected water demand in the district followed by domestic sector which constitutes about 27.30% and livestock sector which constitutes about 19.98% of the total projected water demand in the district. 4.7 Water Budget From the above estimation of water requirement and the present water demand, a water budget is prepared. A water budget reflects the relationship between input and output of water through a region. Thus we have a direct comparison of supply of water and the natural demand for water. The following data provides current water gap and projected water gap for the year 2016 and 2021 respectively. The water budget has been estimated based on the assumption and figures arrived from the tables listed above in various components. Table 4.7. 1: Water budget of the district

Block Existing water Total Water Demand Water availability (MCM) (MCM) Gap (MCM) (MCM) Surface Ground Present Projected Water Water (2016) (2021) Ziro I 4.51 NA 4.51 5.79 6.54 2.02 Ziro II 4.93 NA 4.93 6.32 6.97 2.04 Tamen Raga 1.84 NA 1.84 2.36 2.91 1.08 Total 11.28 NA 11.28 14.47 16.42 5.14

The total water availability or the water supply in the district is about 11.28 MCM while the current water demand in the district stands at 14.47 MCM. There exists a water gap of 3.19 MCM which will rise to 5.14 MCM by the end of 2021. Among the blocks, the largest water gap exists in Ziro II block with 43.71% followed by Ziro I block with a gap of 40.01% of the total water gap in the district. Tamen Raga block has a water gap of 16.28% in the district.

72 | P a g e

Percentage water gap

20.95%

39.38%

39.67%

Ziro I Ziro II Tamen Raga

Figure 4. 8: Block wise percentage of water gap in the district

73 | P a g e

Chapter 5

Strategic Action Plan for Irrigation in District Lower Subansiri under PMSKY The water supplied in the district is mainly by tapping surface water sources. The poor ground water development in this district is mainly due to lack of agricultural practices using modern techniques and also due to excessive dependence on surface water for drinking water supply or locally by tapping springs. Moreover, construction of ground water structure like tube wells in this hilly terrain is difficult and in most of the places of the district it is impossible due to approachability problem till date. There is immense scope for the same in the valley and foothill areas, which will boost agriculture and ultimately the state economy.

The District’s Strategic Plan is a guide or roadmap for how the District will respond to current and future challenges. The plan provides the District with overall direction on how to achieve future success. It does not, however, describe all of the specific actions we will need to take in order to achieve our objectives. These actions are spelled out in a series of master plans, business plans, and a rehabilitation and betterment plan; each plan outlining the tasks, milestones, and key dates for the various objectives contained in the Strategic Plan. 5.1 Block wise total plan of the district The total outlay of the district is about Rs.89969.25 lakhs from all the departments under PMKSY. Among the blocks, Ziro I block has the maximum share of total outlay and constitutes about 61.35% followed by Ziro II block with 22.22% and Tamen Raga block with 16.43%. Table 5.1. 1: Block wise total outlay of the district (Amount in Rs. Lakhs) RWD (Soil Agricult Horticultur and Forest ure e Water ATM Block WRD DRDA Depart Total Depart Departmen Conserv A ment ment t ation Depart ment) Ziro I 32426.60 9193.40 5823.22 4204.42 3328.25 118.00 106.55 55200.44 Ziro II 107.0 4871.50 2575.00 3969.88 4267.04 4181.17 18.00 19989.59 0 Tamen 107.0 4632.75 2664.20 2592.58 1047.00 3577.69 158.00 14779.22 Raga 0

74 | P a g e

RWD (Soil Agricult Horticultur and Forest ure e Water ATM Block WRD DRDA Depart Total Depart Departmen Conserv A ment ment t ation Depart ment) Grand 320.5 41930.85 14432.6 12385.68 9518.46 11087.11 294 89969.25 Total 5

The percentage share of each department under different blocks has been shown in the figure below:

WRD

11.05%

11.62%

77.33%

Ziro I Ziro II Tamen Raga

Figure 5.1. 1: Block wise percentage share of outlay under WRD

75 | P a g e

Agriculture Department

18.46%

17.84%

63.70%

Ziro I Ziro II Tamen Raga

Figure 5.1. 2: Block wise percentage share of outlay under Agriculture Department

Horticulture Department

20.93%

47.02%

32.05%

Ziro I Ziro II Tamen Raga

Figure 5.1. 3: Block wise percentage share of outlay under Horticulture Department

76 | P a g e

DRDA

11.00%

44.17%

44.83%

Ziro I Ziro II Tamen Raga

Figure 5.1. 4: Block wise percentage share of outlay under DRDA

RWD (Soil and Water Conservation Department)

32.27% 30.02%

37.71%

Ziro I Ziro II Tamen Raga

Figure 5.1. 5: Block wise percentage share of outlay under RWD (Soil & Water Conservation Department)

77 | P a g e

ATMA

33.38% 33.24%

33.38%

Ziro I Ziro II Tamen Raga

Figure 5.1. 6: Block wise percentage share of outlay under ATMA

Forest Department

40.14%

53.74%

6.12%

Ziro I Ziro II Tamen Raga

Figure 5.1. 7: Block wise percentage share of outlay under Forest Department

78 | P a g e

Percentage share of blocks

16.43%

22.22% 61.35%

Ziro I Ziro II Tamen Raga

Figure 5.1. 8: Block wise percentage share of outlay

5.2 Component Wise Plan The component wise total outlay of the district constitutes about Rs.89969.25 lakhs. AIBP and Hark Khet Ko Pani components are to be executed mainly by Water Resource Department. Per drop more crop component will be executed by Agriculture and Horticulture Department. Water shed component will be taken care of by Rural Development Department and Extension & Training component will be executed by ATMA under Agriculture department. However, all the stakeholders need to have coordination among them to have the maximum irrigation efficiency and to avoid duplicity. WRD being the major irrigation department in the district, has the onus to execute schemes or projects included under Har Khet Ko Pani in the district. Further, the watershed component is to be executed under two different departments which include DRDA with an outlay of Rs.9518.46 lakhs as the major department for executing watershed activities along with Soil & Water Conservation Department under RWD which has a total outlay of Rs.11087.11 lakhs under the PMKSY.

79 | P a g e

Table 5.2. 1: Component wise total outlay of the district (Amount in Rs. Lakhs)

Component 2016-17 2017-18 2018-19 2019-20 2020-21 Total Accelerated 0.00 0.00 0.00 0.00 0.00 0.00 Irrigation Benefitted Programme (AIBP) PMKSY-Har 8386.17 12579.26 10482.71 6289.63 4193.09 41930.85 Khet Ko Pani (HKKP) PMKSY- Per 5486.57 8229.85 6858.21 4114.92 2743.28 27432.83 Drop More Crop (PDMC) i) Micro- 2209.62 3314.43 2762.03 1657.22 1104.81 11048.10 irrigation ii) 3212.84 4819.25 4016.04 2409.63 1606.42 16064.18 Supplementary Water Management activities iii) Extension 64.11 96.17 80.14 48.08 32.06 320.55 And Training Under ATMA PMKSY – 4121.11 6181.67 5151.39 3090.84 2060.56 20605.57 Watershed Total 17993.85 26990.77 22492.31 13495.39 8996.92 89969.25

Percentage share of total outlay

22.90%

46.61%

30.49%

PMKSY Har Khet Ko Pani PMKSY Per Drop More Crop PMKSY Watershed

80 | P a g e

Figure 5.2. 1: Component wise percentage allocation of total outlay

It can be observed that maximum share of 46.61% is for Har Khet Ko Pani component followed by Per Drop More Crop which has a share of about 30.49% to the total outlay. PMKSY Watershed component has a share of 22.90% to the total outlay of the total outlay in the district. There were no major or medium irrigation projects under AIBP running in the district. Whereas, Har Khet Ko Pani is entitled to connect source of water to the farm land by constructing or renovating various water harvesting structures. It also focuses on the rejuvenation of traditional water sources in the district. Per Drop More Crop focuses on the efficient application of water in the farm land so that the yield and hence the production of the farm land increases. Transfer of technology from lab to farm through various extension activities under ATMA should be taken up along with amalgamation of scientific technologies, eco-friendly techniques of conservation and traditional practices which can help in accomplishing a systematic approach to resource management with economic viability in the district.

Further the Per Drop More Crop has been divided into three sub component on the basis of activities performed. It consists of

(a.) Micro-Irrigation (40.27%) (b.) Supplementary Water Management Activities (58.56%) (c.) Extension and Training Component (1.17%)

Percentage share of Per Drop More Crop

1.17%

40.27%

58.56%

Micro Irrigation Supplementary Water Management Activities Extension and Training

Figure 5.2. 2: Sub-component wise percentage outlay of the district

81 | P a g e

5.3 Year Wise Plan The strategic action plan proposed under different departments has been further divided based on year wise allocation of the total outlay. The projects proposed under Strategic Action Plan have been divided into five phases starting from project initiation and planning. Under this stage resource allocation will be done by each department for different projects running under their purview. An allocation of 20% of the total outlay under each department has been assumed under this stage. The second phase is the implementation stage when the projects will be executed at the ground level and an assumption of 30% of the total outlay under each department has been assumed at this stage. It is assumed that the implementation would be continued in the third stage and hence an allocation of 25% is to be kept under this stage. The fourth stage being monitoring and evaluation, where an assumption of 15% has been proposed to determine if the proposed activities are meeting the objectives of PMKSY and also to complete the ongoing projects. The final stage is of review, under which each project executed under different departments will be scrutinised for any lacunae and the same will be completed under this stage. 10% of the total outlay is to be distributed under this stage.

Table 5.3. 1: Year wise share of total outlay in the district (Amount in Rs. Lakhs)

Department 2016-17 2017-18 2018-19 2019-20 2020-21 Total WRD 8386.17 12579.26 10482.71 6289.63 4193.09 41930.85 Agriculture 2886.52 4329.78 3608.15 2164.89 1443.26 14432.60 Department Horticulture 2477.14 3715.70 3096.42 1857.85 1238.57 12385.68 Department DRDA 1903.69 2855.54 2379.62 1427.77 951.85 9518.46 RWD (Soil and Water 2217.42 3326.13 2771.78 1663.07 1108.71 11087.11 Conservation Department) Forest 58.80 88.20 73.50 44.10 29.40 294.00 Department ATMA 64.11 96.17 80.14 48.08 32.06 320.55 22492.3 Grand Total 17993.85 26990.77 13495.39 8996.92 89969.25 1

82 | P a g e

The total outlay for the district is Rs.89969.25 lakhs. The Water Resource Department of the district constitutes maximum allocation of about 46.61% of the total outlay followed by Agriculture Department with an outlay of 16.04% of the total outlay in the district.

Percentage share of total outlay

WRD 0.33% 0.36% 12.32% Agriculture Department 10.58% Horticulture Department 46.61%

DRDA

RWD (Soil and Water 13.77% Conservation Department) Forest Department

ATMA 16.04%

Figure 5.3. 1: Year wise percentage share of total outlay of the district

The Horticulture Department constitutes about 13.77% of the total outlay followed by RWD and DRDA with a share of 12.32% and 10.58% of the total outlay in the district.

Year-wise percentage share of total outlay 10.00% 20.00% 15.00% 2016-17 2017-18 25.00% 30.00% 2018-19 2019-20 2020-21

Figure 5.3. 2: Year-wise percentage allocation of the total outlay in district

83 | P a g e

5.4 Expected Outcome The strategic action plan envisages providing assured irrigation in a command area of 69325.90 ha. It is assumed that the irrigation infrastructure will benefit a command area of at least 34663 ha (60 per cent). The watershed component is projected to achieve a culturable command area of 9637 ha under DRDA with treatment area proposed under the plan to be 5247 ha and RWD (Soil & Water Conservation Department) to develop a command area of 4390 ha. Under the component Per Drop More Crop, efficient water conveyance and precision water application by drip irrigation system for wide spaced and narrow spaced crops for developing an area of 14426 ha has been proposed. While Sprinklers has been proposed to develop an area of 8396 ha. A training programme will also be scheduled under PMKSY to enhance the better knowledge of efficient use of water through drip and other micro irrigation structures.

Under department wise development of command area or irrigation potential, the Water Resource Departments will cover an area of about 13525 ha for which irrigation potential will be developed through various activities as proposed under PMKSY. Agriculture Department and Horticulture Department under Per Drop More Crop will develop an area of 36486 ha and 9508 ha respectively, through various drip and sprinkler irrigation system and secondary storage structures. The watershed component under DRDA will develop an irrigation potential of 5247 ha through its various activities proposed such as Land Development, Soil and Moisture Conservation, developing new water harvesting structure and renovating existing one, etc. The Soil and Water Conservation Department under RWD will develop an area of 4390 ha.

In terms of economic benefit, the assured water supply to the farm land will result in enhancement of production and productivity of the crops. This is likely to generate an additional income of Rs.16638.22 lakhs to the farmers of the district. This is based on the assumption of at least 60% of potential utilised and Rs.40,000 per ha per annum of incremental income from rainfed to irrigated farming will be generated. This is also likely to create 76.90 lakhs of mandays of non-recurring employment and 34663 jobs will be created annually on recurring basis.

This intervention may result into increased acreage under crops thereby contributing to both agricultural and horticultural production. At the same time, it will create

84 | P a g e livelihood opportunities for the local population and contribute in generating direct and indirect employment.

5.5 Suggestions Lower Subansiri is slowly developing its economy with the aim of improving the quality of life of its people. The task ahead is uphill, available resources are many, but the ways and means to achieve the goal through the successful use of resources are not well defined.

Strategic planning and Implementation is necessary to develop agriculture and make marginally, if not significantly, surplus in food production by integrating research, extension and education duly supported by a time bound reforms in agricultural practises and institutions. Harnessing agricultural potential would generate surplus to support the secondary sector, create demand for goods in the rural areas, increase disposable income that could enhance purchasing power of some 0.83 lakhs people in the district and bring socio-economic development.

Agricultural development strategy has to be evolved depending on resources, conditions and people's needs and priorities. Private industry participation can provide additional resources and environment to create job opportunities, better utilization of resources and credit flow which will have direct impact on farm development sector. With Appropriately defined targets, clear outcomes, strategies and co-ordinated planning, the district can become increasingly self-reliant in food output. Effective computer-based monitoring and management information system can facilitate timely implementation of programs with improved quality and service delivery cost. It will avoid time over run and yield envisioned results.

Land productivity and agricultural production can be improved significantly by launching measures such as:

6. Formulating district and block specific land water use policy in the district. 7. Improving and expanding agricultural extension service network significantly to demonstrate and transfer technology. There should be region specific technology to be developed in the district so that it should not only match with the agro-ecological zones of the district but also should be easily imbibed among the farmers or the ultimate beneficiaries.

85 | P a g e

8. Promoting SHGs, FPOs and community action towards making small farm holding economically viable and profitable. 9. The public investment and institutional credit should enhance to enable farmers to access technology and achieve expected growth 10. Promoting integrated agriculture model in the district to enhance the productivity and farm income.

The district should emphasis more on the use of drip and sprinkler irrigation system. It ensures optimal delivery of water and nutrient directly to the plant’s active zone. It helps in lower evaporation rate which saves water, prevents run off, prevents deep percolation and leaching of nutrient reserves. It results in increased yield and production. The cost is saved in labour due to minimal hand on involvement in irrigation. As per the study conducted by National Mission on Micro Irrigation NMMI was conducted by Global Agri. System and their Impact Evaluation Study report (June 2014) brings-forth that following benefits have accrued on adoption of Micro Irrigation (Drip and Sprinkler):

a. Irrigation cost is reduced by 20%-50% with average of 32.3%. b. Reduction in electricity consumption after installation of MI system. The average electricity consumption reduces by about 31% after using the micro irrigation system. c. Saving of fertilizers with averages reduction of about 28% in total fertilizer consumption. Fertilizer saving vary from 7%- 42%. d. The average productivity of fruits and vegetables increases by about 42.3% and 52.8%, respectively mainly because of crop spacing, judicious use of water and other inputs etc. e. The application of micro irrigation system like drip and sprinkler results in increase in farmer’s income in the range of 20% to 68% with an average increase of 48.5%.

5.5.1 Water User’s Association (Participatory Governance) Farmers' participation is generally looked upon as a means of reducing the operation costs. This is no doubt that, farmers’ participation can leads to improvement in

86 | P a g e irrigation management. Response to any deterioration of the conveyance system (in charge of the farmers) is much faster. This means that any reduction in conveyance capacity at the minor level or damage to structures will be remedied quickly. Stealing (or unauthorized use) of water is easily countered, as the water now belongs to the group rather than Government. Waste of water is minimized, within the constraints of the main system, irrigation water distribution can, therefore, improve considerably. The benefits of Participatory Governance of Irrigation in the district:

a. There will be increase in the irrigated area as more number of farmers will have the access to year round source of water. b. Reduction in in-equity of head-tail irrigation as the water distribution under irrigation system will be mutually decided and monitored. c. There will be an improvement in the maintenance work through utilization of indigenous know how, community supervision and local wisdom. The Water User’s Association in the district can be formed through identification of cluster of villages with homogenous requirements. The Association can be formed through: a. Selection of site b. Creation of right atmosphere c. Meeting of promoter members d. Registration and agreement e. Bringing the distribution system to a proper shape and condition before handing over to the respective Water User’s Association in the district. f. Handing over the distribution system. The lone efforts of government might not bring the desired results as envisaged under PMKSY, it requires people active participation to the programme and policy. It will not only result in increased income but also high productivity in the farm land. It will also help in monitoring of the ongoing schemes under PMKSY and reduce the wastage of money and resources through effective utilization.

87 | P a g e

5.5 Strategic Action Plan for irrigation in respect of District Lower Subansiri, AP under Pradhan Mantri Krishi Sinchayee Yojna (PMKSY) Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Ziro I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MoWR/ Major 1 Ziro II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tamen WRD Irrigation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Raga AIBP Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ziro I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ziro II MoWR/ Medium 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tamen WRD Irrigation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Raga Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ziro I 1426.4 208.00 2972.00 5 Years 7132.10 2139.63 1783.03 1069.82 713.21 Har Surface 2 MoWR/ 3 Ziro II Khet Ko Minor 142.00 1052.00 5 Years 2630.00 526.00 789.00 657.50 394.50 263.00 WRD Tamen Pani Irrigation 227.00 1316.40 5 Years 3441.00 688.20 1032.30 860.25 516.15 344.10 Raga Sub Total 3960.9 577.00 5340.40 13203.10 2640.62 3300.78 1980.47 1320.31 3 Ziro I MoWR/ Lift 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4 Ziro II WRD Irrigation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

88 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Tamen Har Raga Khet Ko 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pani Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ziro I Ground 70.00 0.00 5 Years 195.00 39.00 58.50 48.75 29.25 19.50 Har Ziro II MoWR/ Water 5 Khet Ko 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tamen WRD Developme Pani 60.00 0.00 5 Years 180.00 36.00 54.00 45.00 27.00 18.00 Raga nt Sub Total 130.00 0.00 375.00 75.00 112.50 93.75 56.25 37.50 Ziro I 3978.8 3354.00 4294.00 5 Years 19894.00 5968.20 4973.50 2984.10 1989.40 Har RRR of 0 MoWR/ 6 Ziro II Khet Ko Water 398.00 212.00 5 Years 945.00 189.00 283.50 236.25 141.75 94.50 WRD Tamen Pani Bodies 18.00 334.00 5 Years 730.50 146.10 219.15 182.63 109.58 73.05 Raga Sub Total 6470.8 3770.00 4840.00 21569.50 4313.90 5392.38 3235.43 2156.95 5 7 Construction of field channel 7.1 Har Lined Field Channels ( 1029 1795 5 Years 2982.5 596.5 894.75 745.625 447.375 298.25 MoWR/ CAD) Ziro I Khet Ko WRD 7.2 Pani Un-Lined Field Channels (CAD)

89 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 7.3 Micro-

Irrigation

7.1 Lined Field Channels ( 151 197 5 Years 563 112.6 168.9 140.75 84.45 56.3 CAD)

7.2 Un-Lined Ziro II Field Channels (CAD) 7.3 Micro-

Irrigation

7.1 Lined Field Channels 206.00( 227.50 5 Years 1364.50 272.9 409.35 341.125 204.675 136.45 CAD)

7.2 Tamen Un-Lined Raga Field Channels (CAD) 7.3 Micro-

Irrigation Sub Total 1386.00 2219.50 4910.00 982 1473 1227.5 736.5 491 Grand 12399.9 5863.00 40057.60 8011.52 12017.28 10014.4 6008.64 4005.76 Total 0 Ziro I MOA & Per 50.00 1107.00 5 Years 2575.60 515.12 772.68 643.9 386.34 257.56 9 DPAP Drip Ziro II FWDAC&F drop

90 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Tamen W/ more Raga Agriculture crop Department (Micro 1.00 1.00 5 Years 58.10 11.62 17.43 14.525 8.715 5.81 Irrigatio n) 395.05 Sub Total 51.00 1108.00 2633.70 526.74 790.11 658.425 263.37 5

Ziro I Per 10 1110.00 5 Years 2556.60 511.32 766.98 639.15 383.49 255.66 Ziro II MOA & drop 0 0 0 FWDAC&F more Tamen DPAP 10 W/ crop Raga Sprinkler Agriculture (Micro 1 1 5 Years 31.1 6.22 9.33 7.775 4.665 3.11 Department Irrigatio n) Sub Total 11.00 1111.00 2587.70 517.54 776.31 646.925 388.155 258.77 Ziro I Per 0.00 5000.00 5 Years 1212.50 242.5 363.75 303.125 181.875 121.25 Ziro II MOA & drop 0.00 4000.00 5 Years 970.00 194 291 242.5 145.5 97 FWDAC&F more Tamen Non-DPAP 11 W/ crop Raga Drip Agriculture (Micro 0.00 4000.00 5 Years 970.00 194 291 242.5 145.5 97 Department Irrigatio n) Sub Total 0.00 13000.00 3152.50 630.5 945.75 788.125 472.875 315.25

91 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Ziro I Per 0.00 3000.00 5 Years 600.00 120 180 150 90 60 Ziro II MOA & drop 0.00 2000.00 5 Years 400.00 80 120 100 60 40 FWDAC&F more Tamen Non-DPAP 12 W/ crop Raga Sprinkler Agriculture (Micro 0.00 2000.00 5 Years 400.00 80 120 100 60 40 Department Irrigatio n) Sub Total 0.00 7000.00 1400.00 280 420 350 210 140 Ziro I Per 0 767.00 5 Years 918.70 183.74 275.61 229.675 137.805 91.87 Ziro II drop 0.00 0 0 0 0 0 more Tamen MOA & crop Raga FWDAC&F (Supple Topping up 13 W/ mentary of Agriculture water MGNREGA 0 0.00 0.00 0 0 0 0 0 Department manage ment activitie s) Sub Total 229.67 0.00 767.00 918.70 183.74 275.61 137.805 91.87 5 Ziro I MOA & Per Drought 25000 1500 5 Years 895 179 268.5 223.75 134.25 89.5 14 Ziro II FWDAC&F drop proofing 20000 1500 5 Years 770 154 231 192.5 115.5 77

92 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Tamen W/ more through Raga Agriculture crop index check Department (Supple Dams/ mentary RWHS water 20000 1500 5 Years 770.00 154 231 192.5 115.5 77 manage ment activitie s) Sub Total 65000.00 4500.00 2435.00 487 730.5 608.75 365.25 243.5 Ziro I Per 1500 0.00 5 Years 135 27 40.5 33.75 20.25 13.5 Ziro II drop 1500 0.00 5 Years 135 27 40.5 33.75 20.25 13.5 more Tamen Secondary MOA & crop Raga Storage FWDAC&F (Supple Structures 15 W/ mentary (Water Agriculture water Harvesting 1500 0.00 5 Years 135 27 40.5 33.75 20.25 13.5 Department manage Tanks) ment activitie s) Sub Total 4500.00 0.00 405.00 81 121.5 101.25 60.75 40.5 16 Ziro I 3000.00 5 Years 300.00 60 90 75 45 30

93 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Ziro II Per 3000.00 5 Years 300.00 60 90 75 45 30 Tamen drop On Farm Raga more Developme MOA & crop nt FWDAC&F (Supple (distributio W/ mentary n pipe/raise Agriculture water bed and 3000.00 5 Years 300.00 60 90 75 45 30 Department manage furrow ment system etc.) activitie (in RMT) s) Sub Total 0.00 9000.00 900.00 180 270 225 135 90 Grand 3608.1 69562.00 36486.00 14432.60 2886.52 4329.78 2164.89 1443.26 Total 5 17 Newly created WHS 17.1 Farm Ponds 370.00 4.00 5 Years 429.82 85.96 128.95 107.46 64.47 42.98 17.2 Check 370.00 37.00 5 Years 615.71 123.14 184.71 153.93 92.36 61.57 DolR- PMKSY Dams 17.3 Ziro I MoRD/ Watersh Nallah 370.00 35.00 5 Years 615.71 123.14 184.71 153.93 92.36 61.57 DRDA ed Bunds 17.4 Percolation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tanks

94 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 17.5 Other Ground Water 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Recharge Structure 17.6 Fishery ponds/cattl 370.00 6.00 5 Years 307.85 61.57 92.36 76.96 46.18 30.79 e pond Sub Total 393.8 1480.00 82.00 1969.09 590.73 492.27 295.36 196.91 2 17 17.1 Farm Ponds 318.00 15.00 5 Years 218.36 43.67 65.51 54.59 32.75 21.84 17.2 Check 318.00 150.00 5 Years 689.00 137.80 206.70 172.25 103.35 68.90 Dams 17.3 Nallah 318.00 200.00 5 Years 689.00 137.80 206.70 172.25 103.35 68.90 DolR- PMKSY Bunds 17.4 Percolation Ziro II MoRD/ Watersh 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DRDA ed Tanks 17.5 Other Ground Water 0.00 0.00 0.00 0.00 0.00 Recharge Structure

95 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Fishery 17.6 ponds/cattl 530.00 30.00 5 Years 337.38 67.48 101.21 84.35 50.61 33.74 e pond Sub Total 1484.00 395.00 1933.74 386.75 580.12 483.44 290.06 193.37 17 17.1 Farm Ponds 54.00 4.00 5 Years 162.00 32.40 48.60 40.50 24.30 16.20 17.2 Check 54.00 33.00 5 Years 162.00 32.40 48.60 40.50 24.30 16.20 Dams 17.3 Nallah 54.00 43.00 5 Years 162.00 32.40 48.60 40.50 24.30 16.20 Bunds 17.4 Percolation DolR- PMKSY 0.00 0.00 0.00 0.00 0.00 Tamen Tanks MoRD/ Watersh 17.5 Raga Other DRDA ed Ground Water 0.00 0.00 0.00 0.00 0.00 Recharge Structure Fishery 17.6 ponds/cattl 60.00 6.00 5 Years 60.00 12.00 18.00 15.00 9.00 6.00 e pond Sub Total 109.2 222.00 86.00 546.00 163.80 136.50 81.90 54.60 0 3186.00 563.00 4448.83 889.77 1334.65 1112.21 667.32 444.88

96 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 18 Renovated WHS 18.1 Farm Ponds 75.00 2.00 5 Years 58.10 11.62 17.43 14.53 8.72 5.81 18.2 Check 90.00 10.00 5 Years 69.71 13.94 20.91 17.43 10.46 6.97 Dams 18.3 Nallah 150.00 12.00 5 Years 121.99 24.40 36.60 30.50 18.30 12.20 Bunds 18.4 Percolation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DolR- PMKSY Tanks 18.5 Ziro I MoRD/ Watersh Other DRDA ed Ground Water 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Recharge Structure 18.6 Fishery ponds/cattl 175.00 2.00 5 Years 98.75 19.75 29.63 24.69 14.81 9.88 e pond Sub Total 490.00 26.00 348.55 69.71 104.57 87.14 52.28 34.86 18.1 Farm Ponds 122.00 17.00 5 Years 103.00 20.60 30.90 25.75 15.45 10.30 18.2 DolR- PMKSY Check 91.00 52.00 5 Years 102.00 20.40 30.60 25.50 15.30 10.20 Ziro II MoRD/ Watersh Dams 18.3 DRDA ed Nallah 150.00 60.00 5 Years 150.00 30.00 45.00 37.50 22.50 15.00 Bunds

97 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 18.4 Percolation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tanks 18.5 Other Ground Water 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Recharge Structure 18.6 Fishery ponds/cattl 150.00 10.00 5 Years 144.80 28.96 43.44 36.20 21.72 14.48 e pond Sub Total 513.00 139.00 499.80 99.96 149.94 124.95 74.97 49.98 18.1 Farm Ponds 16.00 3.00 5 Years 16.00 3.20 4.80 4.00 2.40 1.60 18.2 Check 19.00 11.00 5 Years 19.00 3.80 5.70 4.75 2.85 1.90 Dams 18.3 Nallah 30.00 12.00 5 Years 30.00 6.00 9.00 7.50 4.50 3.00 DolR- PMKSY Bunds Tamen 18.4 MoRD/ Watersh Percolation Raga 0.00 0.00 0.00 0.00 0.00 DRDA ed Tanks 18.5 Other Ground Water 0.00 0.00 0.00 0.00 0.00 Recharge Structure

98 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 18.6 Fishery ponds/cattl 30.00 2.00 5 Years 15.00 3.00 4.50 3.75 2.25 1.50 e pond Sub Total 95.00 28.00 80.00 16.00 24.00 20.00 12.00 8.00 19 Newly Created Ziro I 200.00 20.00 5 Years 987.43 197.49 296.23 246.86 148.11 98.74 Water Ziro II 5 Years 19.1 Conservatio 273.00 132.00 936.00 187.20 280.80 234.00 140.40 93.60 Tamen 5 Years n 50.00 20.00 159.00 Raga 31.80 47.70 39.75 23.85 15.90 Ziro I 100.00 40.00 5 Years 174.26 34.85 52.28 43.57 26.14 17.43 Ziro II Water 5 Years 19.2 75.00 150.00 150.00 30.00 45.00 37.50 22.50 15.00 Tamen Harvesting 5 Years Converg 15.00 30.00 30.00 Raga DolR- ence 6.00 9.00 7.50 4.50 3.00 Ziro I MoRD/ with Creation of 75.00 30.00 5 Years 174.26 34.85 52.28 43.57 26.14 17.43 Ziro II DRDA MGNRE Irrigation 5 Years 19.3 76.00 159.00 200.00 40.00 60.00 50.00 30.00 20.00 Tamen GA canals & 5 Years Raga Drains 15.00 30.00 30.00 6.00 9.00 7.50 4.50 3.00 Ziro I Providing 60.00 25.00 5 Years 139.42 27.88 41.83 34.86 20.91 13.94 Ziro II Infrastructu 5 Years 19.4 60.00 127.00 120.00 24.00 36.00 30.00 18.00 12.00 Tamen re for 5 Years 10.00 20.00 20.00 Raga Irrigation 4.00 6.00 5.00 3.00 2.00 19.5 Ziro I 60.00 30.00 5 Years 69.71 13.94 20.91 17.43 10.46 6.97

99 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Ziro II Land 116.00 181.00 5 Years 155.00 31.00 46.50 38.75 23.25 15.50 Tamen Developme 5 Years 10.00 25.00 10.00 Raga nt 2.00 3.00 2.50 1.50 1.00 Sub Total 1195.00 1019.00 3355.08 671.02 1006.52 838.77 503.26 335.51

20 Renovation 20.1 Ziro I Renovation 75.00 7.00 5 Years 87.15 17.43 26.15 21.79 13.07 8.72 Ziro II of water 89.00 30.00 5 Years 62.50 12.50 18.75 15.63 9.38 6.25 bodies Tamen including Raga 10.00 5.00 5 Years 10.00 2.00 3.00 2.50 1.50 1.00 desilting: 20.2 Ziro I Renovation 90.00 70.00 5 Years 104.55 20.91 31.37 26.14 15.68 10.46 Ziro II & 60.00 300.00 5 Years 60.00 12.00 18.00 15.00 9.00 6.00 Maintenanc Tamen e of Raga Irrigation 12.00 60.00 5 Years 12.00 2.40 3.60 3.00 1.80 1.20 Canals & Drains: Sub Total 336.00 472.00 336.20 67.24 100.86 84.05 50.43 33.62 Grand 5815.00 2247.00 9068.46 1813.69 2720.54 2267.12 1360.27 906.85 Total 21 State Planned Scheme of Irrigation

100 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 21.1 State Name of Major Irrigation Scheme Irrigation 0.00 0.00 0.00 0 0 0 0 0 Department 21.2 State Name of Medium Irrigation Scheme Irrigation 0.00 0.00 0.00 0 0 0 0 0 Department 21.3 State Name of Surface Irrigation Scheme Irrigation 0.00 0.00 0.00 0 0 0 0 0 Department Scheme 0 0 0 0 0 22 Irrigation Name of 0 Scheme of Scheme State 0.00 0.00 0.00 0 0 0 0 0 Agriculture Department

23 Irrigation Scheme of Line Department. Ziro I IWMP 9 1000.00 5 Years 150.00 30.00 45.00 37.50 22.50 15.00 DolR- PMKSY Ziro II 1000.00 5 Years 150.00 23.1 MoRD/ Watersh IWMP 10 3.00 30.00 45.00 37.50 22.50 15.00 Tamen 1000.00 5 Years 150.00 DRDA ed IWMP 11 Raga 30.00 45.00 37.50 22.50 15.00 Sub Total 3.00 3000.00 450.00 90.00 135.00 112.50 67.50 45.00 23.2

101 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Ziro I Flood Control 72.00 0.00 5 Years 18.00 3.60 5.40 4.50 2.70 1.80 a Structure Ziro I 51.00 0.00 5 Years 277.50 55.50 83.25 69.38 41.63 27.75 Water b Harvesting Ziro II Har MoWR/ Structure 3456.00 0.00 5 Years 864.00 172.80 259.20 216.00 129.60 86.40 Tamen Khet Ko WRD 10.00 1125.00 5 Years 281.25 56.25 84.38 70.31 42.19 28.13 Raga Pani Ziro II Creation of New c 220.00 0.00 5 Years 220.00 44.00 66.00 55.00 33.00 22.00 irrigation Structure Ziro II Desiltation d 412.00 0.00 5 Years 212.50 42.50 63.75 53.13 31.88 21.25 of Canal Sub Total 4221.00 1125.00 1873.25 374.65 561.98 468.31 280.99 187.33 23.3 Ziro I MOA & Per 13.00 200.00 5 Years 485.00 97.00 145.50 121.25 72.75 48.50 FWDAC&F drop Ziro II 5.00 35.00 5 Years 82.75 16.55 24.83 20.69 12.41 8.28 a W/ more DPAP Drip Tamen 5 Years Horticulture crop Raga 8.00 83.00 201.28 Department (Micro 40.26 60.38 50.32 30.19 20.13

102 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Irrigatio n) Sub Total 26.00 318.00 769.03 153.81 230.71 192.26 115.35 76.90 Ziro I Per 14.00 280.00 5 Years 207.47 41.49 62.24 51.87 31.12 20.75 MOA & drop Ziro II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 FWDAC&F more Tamen DPAP 5 Years b W/ crop Raga Sprinkler Horticulture (Micro 1.00 5.00 3.70 Department Irrigatio n) 0.74 1.11 0.93 0.56 0.37 Sub Total 15.00 285.00 211.18 42.24 63.35 52.79 31.68 21.12 Ziro I Per 35.00 1190.00 5 Years 2142.00 428.40 642.60 535.50 321.30 214.20 drop Ziro II 5.00 1010.00 5 Years 1818.00 363.60 545.40 454.50 272.70 181.80 more Tamen Drought MOA & crop Raga proofing FWDAC&F (Supple through c W/ mentary index check Horticulture water Dams/ 38.00 807.00 5 Years 703.60 140.72 211.08 175.90 105.54 70.36 Department manage RWHS ment activitie s) Sub Total 78.00 3007.00 4663.60 932.72 1399.08 1165.90 699.54 466.36

103 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Ziro I Per 91.00 1550.00 5 Years 1357.75 271.55 407.33 339.44 203.66 135.78 drop Ziro II 6.00 345.00 5 Years 181.13 36.23 54.34 45.28 27.17 18.11 more Tamen MOA & crop Raga FWDAC&F (Supple d W/ mentary Horticulture water 16.00 623.00 5 Years 343.50 68.70 103.05 85.88 51.53 34.35 Department manage Water ment Harvesting activitie structure/ s) Tube well Sub Total 113.00 2518.00 1882.38 376.4 8 564.71 470.59 282.36 188.24 Ziro I Per 35.00 630.00 5 Years 567.00 113.40 170.10 141.75 85.05 56.70 Ziro II drop 5.00 1280.00 5 Years 1152.00 230.40 345.60 288.00 172.80 115.20 more Tamen Secondary MOA & crop Raga Storage FWDAC&F (Supple Structures e W/ mentary (Water Horticulture water Harvesting 32.00 425.00 5 Years 400.50 80.10 120.15 100.13 60.08 40.05 Department manage Tanks) ment activitie s)

104 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Sub Total 72.00 2335.00 2119.50 423.90 635.85 529.88 317.93 211.95 Ziro I Per On Farm 41.00 945.00 5 Years 1064.00 212.80 319.20 266.00 159.60 106.40 drop Developme Ziro II 6.00 53.00 5 Years 736.00 147.20 220.80 184.00 110.40 73.60 more nt Tamen MOA & crop (distributio Raga FWDAC&F (Supple n pipe/raise f W/ mentary bed and Horticulture water furrow 5.00 47.00 5 Years 940.00 188.00 282.00 235.00 141.00 94.00 Department manage system etc.) ment (in RMT) activitie s) Sub Total 52.00 1045.00 2740.00 548.00 822.00 685.00 411.00 274.00 Grand 2477.1 356.00 9508.00 12385.68 3715.70 3096.42 1857.85 1238.57 total 4 Ziro I Per 5.00 79.00 5 Years 118.00 23.60 35.40 29.50 17.70 11.80 drop Ziro II DolR- 6.00 12.00 5 Years 18.00 3.60 5.40 4.50 2.70 1.80 more Canal and Tamen MoRD/ 23.4 crop Sprinkler Raga Forest (Micro Irrigation Department 6.00 79.00 5 Years 158.00 31.60 47.40 39.50 23.70 15.80 Irrigatio n) Sub Total 17.00 170.00 294.00 58.80 88.20 73.50 44.10 29.40

105 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21

23.5 Water harvestin g Structure s

Brush 700.00 3 Year 75.60 15.12 22.68 18.90 11.34 7.56 wood 500.00 3 Year 62.65 12.53 18.80 15.66 9.40 6.27 MoWR/ Check 350.00 3 Year 62.16 12.43 18.65 15.54 9.32 6.22 RWD (Soil PMKSY Dam Ziro I & Water Watersh 350.00 3 Year 97.16 19.43 29.15 24.29 14.57 9.72 Nallah Conservatio ed n) Bund Boulder Check Dam 50.00 3 Year 35.03 7.01 10.51 8.76 5.25 3.50 Gabion Check Dam Farm Pond 0.00 0.00 0.00 0.00 0.00

106 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Drainage Line 0.00 0.00 0.00 0.00 0.00 Treatme nt 0.00 0.00 0.00 0.00 0.00 Brush 250.00 3 Year 27.00 5.40 8.10 6.75 4.05 2.70 wood 300.00 3 Year 53.28 10.66 15.98 13.32 7.99 5.33 Check 3 Year 0.00 0.00 0.00 0.00 0.00 0.00 Dam in upper Reaches(U /R) Loose Boulder check Dam with 300.00 3 Year 83.28 16.66 24.98 20.82 12.49 8.33 vegetative support in Middle Reaches(M /R) Gabion

107 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 check Dam in Lower Reaches(L /R) 0.00 0.00 0.00 0.00 0.00 Soil and Moisture 0.00 0.00 0.00 0.00 0.00 Conserva tion 0.00 0.00 0.00 0.00 0.00 Afforestati 300.00 3 Year 170.55 34.11 51.17 42.64 25.58 17.06 on 500.00 3 Year 415.75 83.15 124.73 103.94 62.36 41.58 Agroforest 700.00 3 Year 364.00 72.80 109.20 91.00 54.60 36.40 ry 350.00 3 Year 140.00 28.00 42.00 35.00 21.00 14.00 Horticultu

re Developme nt Composite 350.00 3 Year 63.00 12.60 18.90 15.75 9.45 6.30 Nursery Raising Mulching

108 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 0.00 0.00 0.00 0.00 0.00 Soil Health

Manage ment

Vermicom 250.00 3 Year 163.13 32.63 48.94 40.78 24.47 16.31 posting 350.00 3 Year 157.50 31.50 47.25 39.38 23.63 15.75 (Pucca Bean) Vermicom posting (low Cost) 200.00 3 Year 42.00 8.40 12.60 10.50 6.30 4.20 In situ Green Manuring

Ridge Area

Treatme nt

109 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Contour/B ench 60.00 3 Year 11.17 2.23 3.35 2.79 1.68 1.12 Terracing

Sub- 2,023.25 404.65 606.98 505.81 303.49 202.33 Total Water harvestin g Structure s 0.00 0.00 0.00 0.00 0.00 MoWR/ Brush 81.00 16.20 24.30 20.25 12.15 8.10 RWD (Soil PMKSY 750.00 3 Year Ziro II & Water Watersh wood 500.00 3 Year 62.65 12.53 18.80 15.66 9.40 6.27 Conservatio ed Check 700.00 3 Year 124.32 24.86 37.30 31.08 18.65 12.43 Dam n) 300.00 3 Year 83.28 16.66 24.98 20.82 12.49 8.33 Nallah

Bund Boulder Check 70.00 3 Year 126.00 25.20 37.80 31.50 18.90 12.60 Dam Gabion

110 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Check Dam Farm Pond

Drainage Line

Treatme nt

Brush 750.00 3 Year 81.00 16.20 24.30 20.25 12.15 8.10 wood 500.00 3 Year 88.80 17.76 26.64 22.20 13.32 8.88 Check 3 Year 0.00 0.00 0.00 0.00 0.00 0.00 Dam in upper Reaches(U /R) Loose Boulder 750.00 3 Year 208.20 41.64 62.46 52.05 31.23 20.82 check Dam with vegetative support in

111 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Middle Reaches(M /R) Gabion check Dam in Lower Reaches(L /R)

Soil and Moisture

Conserva tion

Afforestati 500.00 3 Year 284.25 56.85 85.28 71.06 42.64 28.43 on 500.00 3 Year 415.75 83.15 124.73 103.94 62.36 41.58 Agroforest 950.00 3 Year 494.00 98.80 148.20 123.50 74.10 49.40 ry 150.00 3 Year 60.00 12.00 18.00 15.00 9.00 6.00 Horticultu

re Developme 350.00 3 Year 63.00 12.60 18.90 15.75 9.45 6.30 nt

112 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Composite Nursery Raising Mulching

Soil Health

Manage ment

Vermicom 300.00 3 Year 195.75 39.15 58.73 48.94 29.36 19.58 posting 500.00 3 Year 225.00 45.00 67.50 56.25 33.75 22.50 (Pucca Bean) Vermicom posting (low Cost) 300.00 3 Year 63.00 12.60 18.90 15.75 9.45 6.30 In situ Green Manuring 0.00 0.00 0.00 0.00 0.00

113 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Ridge Area 0.00 0.00 0.00 0.00 0.00 Treatme nt Contour/B ench 350.00 3 Year 65.17 13.03 19.55 16.29 9.78 6.52 Terracing 0.00 0.00 0.00 0.00 0.00 Sub- 544.2 2,721.17 816.35 680.29 408.18 272.12 Total 3 Water harvestin g 0.00 0.00 0.00 0.00 0.00 Structure MoWR/ s RWD (Soil PMKSY Tamen & Water Watersh Raga Conservatio ed Brush 950.00 3 Year 102.60 20.52 30.78 25.65 15.39 10.26 n) wood 500.00 3 Year 62.65 12.53 18.80 15.66 9.40 6.27 Check 910.00 3 Year 161.62 32.32 48.48 40.40 24.24 16.16 Dam 700.00 3 Year 194.32 38.86 58.30 48.58 29.15 19.43 Nallah

Bund 70.00 3 Year 126.00 25.20 37.80 31.50 18.90 12.60

114 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Boulder Check Dam Gabion Check Dam Farm Pond

Drainage Line

Treatme nt

Brush 1,010.00 3 Year 109.08 21.82 32.72 27.27 16.36 10.91 wood 500.00 3 Year 88.80 17.76 26.64 22.20 13.32 8.88 Check 3 Year 0.00 0.00 0.00 0.00 0.00 0.00 Dam in upper Reaches(U /R) 750.00 3 Year 208.20 41.64 62.46 52.05 31.23 20.82 Loose Boulder

115 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 check Dam with vegetative support in Middle Reaches(M /R) Gabion check Dam in Lower Reaches(L /R) Soil and Moisture

Conserva tion Afforestati 500.00 3 Year 284.25 56.85 85.28 71.06 42.64 28.43 on 500.00 3 Year 415.75 83.15 124.73 103.94 62.36 41.58 Agro- 950.00 3 Year 494.00 98.80 148.20 123.50 74.10 49.40 Forestry 350.00 3 Year 140.00 28.00 42.00 35.00 21.00 14.00 Horticultu

re 350.00 3 Year 63.00 12.60 18.90 15.75 9.45 6.30

116 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Developme nt Composite Nursery Raising Mulching

Soil Health

Manage ment

Vermicom 150.00 3 Year 97.88 19.58 29.36 24.47 14.68 9.79 posting 300.00 3 Year 135.00 27.00 40.50 33.75 20.25 13.50 (Pucca Bean) Vermicom posting (low Cost) 300.00 3 Year 63.00 12.60 18.90 15.75 9.45 6.30 In situ Green Manuring

117 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21

Ridge Area

Treatme nt Contour/B ench 250.00 3 Year 46.55 9.31 13.97 11.64 6.98 4.66 Terracing

Sub- 2,792.69 558.54 837.81 698.17 418.90 279.27 Total Ziro I MoWR/ Soil and 13.00 1,440.00 5 Years 1,305.00 261.00 391.50 326.25 195.75 130.50 RWD (Soil PMKSY Ziro II Water 14.00 1,780.00 5 Years 1,460.00 292.00 438.00 365.00 219.00 146.00 23.6 & Water Watersh Tamen Conservatio Conservatio ed Raga n work 9.00 1,170.00 5 Years 785.00 157.00 235.50 196.25 117.75 78.50 n) Sub Total 710.0 36.00 4,390.00 3,550.00 1,065.00 887.50 532.50 355.00 0 Ziro I Per Extension 385.00 5 Years 106.55 21.31 31.97 26.64 15.98 10.66 Ziro II Drop and 23.7 ATMA 385.00 5 Years 107.00 21.40 32.10 26.75 16.05 10.70 Tamen More Training, 385.00 5 Years 107.00 21.40 32.10 26.75 16.05 10.70 Raga Crop ATMA

118 | P a g e

Sl. Name Concerne Compo Activity Sub Total Comman Period Estimate Year Year Year Year Year No. of the d nent Number/C d of d cost 2016- 2017-18 2018-19 2019- 2020- Blocks Ministry/ apacity Area/Irr Implem (Rs. in 17 20 21 /Sub Departme (cum) igation entatio lacs) Distri nt Potential n (5 cts (Ha) yrs) from 2016-17 to 2020- 21 Sub- 1,155.00 0.00 320.55 64.11 96.17 80.14 48.08 32.06 Total 24 Externally aided projects 25 Other loan projects like NABARD

119 | P a g e

Annexure I

Crop water requirement :-

The crop water need (ET crop) is defined as the depth (or amount) of water needed to meet the water loss through evapotranspiration. In other words, it is the amount of water needed by the various crops to grow optimally.

The crop water need always refers to a crop grown under optimal conditions, i.e. a uniform crop, actively growing, completely shading the ground, free of diseases, and favourable soil conditions (including fertility and water). The crop thus reaches its full production potential under the given environment.

The crop water need mainly depends on:

1. The climate: in a sunny and hot climate crops need more water per day than in a cloudy and cool climate 2. The crop type: crops like maize or sugarcane need more water than crops like millet or sorghum 3. The growth stage of the crop; fully grown crops need more water than crops that have just been planted. 4. We have used the Blaney-Criddle Method to calculate the ETo The Blaney-Criddle formula: ETo = p (0.46 T mean +8), Where, ETo = Reference crop evapotranspiration (mm/day) as an average for a period of 1 month Tmean = mean daily temperature (°C) p = mean daily percentage of annual daytime hours For Arunachal Pradesh the Temperature data has been taken from IMDB web site for last One year. To calculate Tmean,

120 | P a g e

The Blaney-Criddle method always refers to mean monthly values, both for the temperature and the ETo. If, for example, it is found that T mean in March is 28°C, it means that during the whole month of March the mean daily temperature is 28°C.

If in a local meteorological station the daily minimum and maximum temperatures are measured, the mean daily temperature is calculated as follows:

P is calculate from the Table given by FAO,

121 | P a g e

From above calculation we can calculate the ETo for any particular site in the world.

Once we got the ETo value then easy to calculate Crop ETo. Each crop Kc (Crop Factor) has been calculated on the basis of four stages of crop from germination to harvesting.

Kc factor mainly depends upon,

122 | P a g e

· The type of crop · The growth stage of the crop · The climate

Required information regarding the Growing period of crop of which we are calculating the water requirement.

As we got the crop evapotranspiration we can calculate the crop water requirement. Further we have to add the all losses which incur in the flood irrigation.

123 | P a g e

For Example : Maize water requirement

Months Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Number of days 31 28 31 30 31 30 31 31 30 31 30 31 Crop Factor 1 0 0 0 0 0.4 0.8 1.15 1 0.4 0.8 1.15 Rainfall (mm/month) 365.5 612.4 748.4 315.5 177.6 142.1 22.4 52.2 147.9 42.7 233.8 130.5 106.749 41.32 85.39 122.7 103.3 42.69 82.64 122.7 Mean Evapo. (mm/month) 12 0 0 0 0 224 93 615 056 965 448 615 SAT required in mm 0 100 100 50 Water layer required in mm 50 40 30 0 50 40 30 0 50 40 30 Crop water requirment 106.749 346.5 294.3 357.1 103.3 303.0 286.1 357.1 (mm/month) 12 318 226 210 186 289 194 757 056 799 156 757 - - Crop Irrigation requirment 258.750 - - - 204.4 271.9 304.9 44.59 260.3 52.31 226.6 (mm/month) 88 294.4 522.4 105.5 8.4 289 194 757 44 799 558 757 - - - - - Crop irrrigation requirment 8.3468 10.51 16.85 3.516 0.270 6.814 8.771 9.837 1.486 8.399 1.743 7.312 (mm/day) 0258 43 16 67 968 297 595 926 48 35 853 12 Water requirment / ha Percolation and seepage loss in for soil (mm/day ) 0 6 6 6 6 6 6 6 0 6 6 6 Total PERC 0 168 186 180 186 180 186 186 0 186 180 186 Foliage projected cover (FPC) % 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% - - - - - Min.water. Requirment 245.813 279.6 496.2 100. 194.2 258.3 289.7 42.36 247.3 49.69 215.3 (mm/month) 336 8 8 225 7.98 075 235 269 47 609 98 419 - - - - - 2.45813 2.796 4.962 1.00 0.079 1.942 2.583 2.897 0.423 2.473 0.496 2.153 Min.water req. (ML/ha/month 336 8 8 225 8 075 235 269 65 609 998 419 Irrigation Efficiency (%) 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60%

124 | P a g e

- - - - - Final Water requirment in 4.0968 4.661 8.271 1.670 3.236 4.305 4.828 0.70 4.122 0.828 3.589 (ML/ha/month) 8893 33 33 42 0.133 791 391 782 608 681 33 032 - - - - - water requirment in MCM per 0.0040 0.00 0.00 0.00 0.00 0.00 0.004 0.004 0.00 0.00 0.000 0.003 season 9689 466 827 167 0133 3237 305 829 071 4123 828 589 - - - - - 0.0040 0.00 0.00 0.00 0.00 0.00 0.004 0.004 0.00 0.00 0.000 0.003 9689 466 827 167 0133 3237 305 829 071 4123 828 589 Water Requirement in MCM -0.014 0.012 0.004

125 | P a g e

Annexure II

1. WRD Strategic Action Plan under PMKSY

A. Ziro I PROPOSAL FOR CREATION OF MINOR IRRIGATION PROJECT UNDER PMKSY (HAR KHET KO PANI ) Nam Executin Estimat e of Concerned Comma Work g Sl.N Name of Location/Vill Pancha Compon Activi ed cost Longitud CD Ministry/Depart nd Area Lattitude Priorit Agency/ o. Scheme age ent ty (in e Remark yat Bloc ment in Ha y Departm lakh) ks ent C/o MIP from Ziro - Minor Recommend Yasibo to Har Khet Very 1 Hari Hari I CD WRD Irrigati 5.00 12.50 93*50'39"E 27*35'24"N ed by ACP, Ko Pani WRD Pudhang Block on High Hari with Headwork C/o MIP from Siya Ziro - Minor Recommend Har Khet Very 2 Piro to Hari Hari I CD WRD Irrigati 5.00 12.50 93*51'50"E 27*35'29"N WRD ed by ACP, Ko Pani High Bonii with Block on Hari Headwork C/o MIP from Mudo Bogo Ziro - Minor Recommend Har Khet Very 3 Sigang to Hari Hari I CD WRD Irrigati 5.00 12.50 93*51'32"E 27*35'32"N WRD ed by ACP, Ko Pani High Tari Lembo Block on Hari with Headwork

126 | P a g e

C/o MIP Ziro - Minor Recommend from Kotii Har Khet Very 4 Hari Hari I CD WRD Irrigati 5.00 12.50 93*51'30"E 27*35'54"N ed by ACP, Ko Pani WRD to Seli with Block on High Hari Headwork C/o MIP at Siilang Recommen Ziro - Minor Siigang Har Khet Very ded by 5 Dutta Diibo I CD WRD Irrigati 4.00 10.00 93*49'40"E 27*34'47"N Ko Pani WRD from Dutta Block on High ZPM, Paph to Diibo Main Kley C/o MIP at Rubu Recommen Ziro - Minor Siigang Har Khet Very ded by 6 Dutta Diibo I CD WRD Irrigati 3.00 7.50 93*49'42"E 27*34'38"N Ko Pani WRD from Dutta Block on High ZPM, village to Diibo Hari Gate C/o MIP l at Recommen Tage Ziro - Minor Har Khet Very ded by 7 Dutta Diibo I CD WRD Irrigati 4.00 10.00 93*49'49"E 27*34'18"N Hailyang Ko Pani WRD Block on High ZPM, Siigang to Diibo Main Kley C/o MIP from Recommen Mudang Ziro - Minor Har Khet Very ded by 8 Mudang Tage Diibo I CD WRD Irrigati 3.00 7.50 93*49'36"E 27*34'24"N amung to Ko Pani WRD Block on High ZPM, Tage Diibo Hailyang Siigang C/o MIP Recommen from Tagu Ziro - Minor Har Khet Very ded by 9 Mudang Tage Diibo I CD WRD Irrigati 2.00 5.00 93*48'56"E 27*34'38"N Dango Ko Pani WRD Block on High ZPM, Siigang to Diibo Main Kley

127 | P a g e

C/o MIP from Pyuli Recommen Ziro - Minor Siigang to Har Khet Very ded by 10 Mudang Tage Diibo I CD WRD Irrigati 2.00 5.00 93*50'33"E 27*34'30"N Ko Pani WRD Pechi Block on High ZPM, Aji(Okha Diibo Boko) C/o MIP from Pyiali Recommen Siigang to Ziro - Minor Har Khet Very ded by 11 Mudang Tage Diibo I CD WRD Irrigati 3.00 7.50 93*49'50"E 27*34'08"N Kensang Aji Ko Pani WRD Block on High ZPM, via pechi Diibo putu to Ngiikha Aji C/o MIP Recommen from Lengo Ziro - Minor Har Khet Very ded by 12 Mudang Tage Diibo I CD WRD Irrigati 4.00 10.00 93*49'47"E 27*34'14"N Bogo Pyuli Ko Pani WRD Block on High ZPM, Siigang to Diibo Gardu Aji C/o MIP from Recommen Ziro - Minor Kerang Har Khet Very ded by 13 Mudang Tage Diibo I CD WRD Irrigati 3.00 7.50 93*49'43"E 27*34'07"N Ko Pani WRD Bogo Pyuli Block on High ZPM, Siigang to Diibo Kerang Aji C/o MIP from Recommen Ziro - Minor Gyame Har Khet Very ded by 14 Mudang Tage Diibo I CD WRD Irrigati 4.00 10.00 93*51'04"E 27*34'28"N Ko Pani WRD Bogo Pyuli Block on High ZPM, Siigang to Diibo Gyame Aji Recommen C/o MIP Ziro - Minor Har Khet Very ded by 15 Mudang Tage Diibo I CD WRD Irrigati 5.00 12.50 93*50'57"E 27*34'20"N from Ko Pani WRD Block on High ZPM, Tanyang Diibo

128 | P a g e

Diire Bogo Selli siigang to Tanyang Diire Aji C/o MIP from Siikiir Recommen Ziro - Minor Relyang Har Khet Very ded by 16 Mudang Tage Diibo I CD WRD Irrigati 2.00 5.00 93*49'32"E 27*34'28"N Ko Pani WRD Bogo, Siikiir Block on High ZPM, Siigang to Diibo Pengu Aji C/o Irrigation Recommen channel Ziro - Minor Har Khet 93*51'1 27*34'34 Very ded by 17 Bamin Michi Diibo I CD WRD Irrigati 4.00 10.00 from Si Ko Pani WRD Block on 5"E "N High ZPM, Bogo Diibo Siigang to Pyuli Aji C/o MIP from Mybia Recommen Ziro - Minor Bogo Har Khet Very ded by 18 Bamin Michi Diibo I CD WRD Irrigati 4.00 10.00 93*49'45"E 27*34'14"N Ko Pani WRD Yasibo Block on High ZPM, Siigang to Diibo Mybia Aji C/oMIP from Sonyo Recommen Ziro - Minor Bogo Har Khet 93*49'3 27*33'22 Very ded by 19 Bamin Michi Diibo I CD WRD Irrigati 5.00 12.50 Ko Pani WRD Siiigang to Block on 9"E "N High ZPM, Sonyo and Diibo Miza Aji C/oMIP Recommen Ziro - Minor from Michi Har Khet Very ded by 20 Bamin Michi Diibo I CD WRD Irrigati 4.00 10.00 93*49'41"E 27*34'15"N Ko Pani WRD Harchi Block on High ZPM, Siigang to Diibo

129 | P a g e

Siikiir Siigang

C/o MIP from Bamin Recommen Ziro - Minor Nami Har Khet Very ded by 21 Bamin Michi Diibo I CD WRD Irrigati 3.00 7.50 93*49'53''E 27*34'11"N Ko Pani WRD Lemba Block on High ZPM, Siigang to Diibo Miza Aji C/o Irrigation channel Recommen Ziro - Minor from Har Khet Very ded by 22 Bamin Michi Diibo I CD WRD Irrigati 4.00 10.00 93*49'50"E 27*33'27"N Ko Pani WRD Ragung Block on High ZPM, Siigang to Diibo Khotre and Piikhii Aji C/o MIP from Akho Recommen Ziro - Minor Ebio Har Khet Very ded by 23 Bamin Michi Diibo I CD WRD Irrigati 3.00 7.50 93*48'48"E 27*33'53"N Ko Pani WRD Siigang to Block on High ZPM, Lempii and Diibo Laru Aji C/o MIP Recommen Ziro - Minor from Hey Har Khet Very ded by 24 Bamin Michi Diibo I CD WRD Irrigati 4.00 10.00 93*49'58"E 27*34'05"N Ko Pani WRD Siigang to Block on High ZPM, Kleybia Aji Diibo C/o MIP Recommen Ziro - Minor from Durku Har Khet Very ded by 25 Bamin Michi Diibo I CD WRD Irrigati 5.00 12.50 93*49'55"E 27*33'11"N Ko Pani WRD Siigang to Block on High ZPM, Lanko Aji Diibo

130 | P a g e

C/o MIP Recommen Ziro - Minor from Porbu Har Khet Very ded by 26 Bamin Michi Diibo I CD WRD Irrigati 4.00 10.00 93*48'43"E 27*32'45"N Ko Pani WRD Siigang to Block on High ZPM, Lanko Aji Diibo C/o MIP from WTP Recommen Ziro - Minor Ziro over Har Khet Very ded by 27 Bamin Michi Diibo I CD WRD Irrigati 3.00 7.50 93*49'54"E 27*33'55:N Ko Pani WRD flow to Block on High ZPM, Durku and Diibo Kleybia Aji C/o MIP Recommen from Siigia Ziro - Minor Har Khet Very ded by 28 Bamin Michi Diibo I CD WRD Irrigati 4.00 10.00 93*49'14"E 27*32'29"N Hailyang Ko Pani WRD Block on High ZPM, Siigang to Diibo Yadi Siigang C/o MIP Recommen from Ziro - Minor Har Khet Very ded by 29 Bamin Michi Diibo I CD WRD Irrigati 5.00 12.50 93*48'41"E 27*32'59"N Byachi Ko Pani WRD Block on High ZPM, Siigang to Diibo Siibe aji C/o MIP Recommen from Ziro - Minor Har Khet Very ded by 30 Bamin Michi Diibo I CD WRD Irrigati 2.00 5.00 93*48'35"E 27*32'55"N Byassang Ko Pani WRD Block on High ZPM, Siigang to Diibo Siibe aji C/o MIP from Tilling tamo Recommen Ziro - Minor Byonii Har Khet Very ded by 31 Bamin Michi Diibo I CD WRD Irrigati 3.00 7.50 93*48'04"E 27*33'02"N Ko Pani WRD Siigang to Block on High ZPM, Yashibo Diibo and Kiijang area Aji

131 | P a g e

C/o MIP Recommen Ziro - Minor from Nano Har Khet Very ded by 32 Bamin Michi Diibo I CD WRD Irrigati 4.00 10.00 93*49'51"E 27*34'10"N Ko Pani WRD Siigang to Block on High ZPM, Byaping aji Diibo C/o MIP Recommen from Ziro - Minor Har Khet Very ded by 33 Bamin Michi Diibo I CD WRD Irrigati 5.00 12.50 93*49'50"E 27*34'07"N Morebu Ko Pani WRD Block on High ZPM, Siigang to Diibo Byaping Aji C/o MIP Recommen from Tiibe Ziro - Minor Har Khet Very ded by 34 Bamin Michi Diibo I CD WRD Irrigati 3.00 7.50 93*49'53"E 27*30'56"N Siigang to Ko Pani WRD Block on High ZPM, Taw Tiibe Diibo Aji C/o MIP Recommen from Ziro - Minor Har Khet Very de by 35 Hong Niichi I CD WRD Irrigati 2.00 5.00 93*52'12"E 27*33'32"N Siikhebo to Ko Pani WRD Block on High ACP/ZPM, Sisang with Niichii Headwork C/o MIP from Alyi Recommen Ziro - Minor Pabu to Har Khet Very de by 36 Hong Niichi I CD WRD Irrigati 3.00 7.50 93*50'20"E 27*32'44"N Ko Pani WRD Gano Aji Block on High ACP/ZPM, with Niichii Headwork C/o MIP Recommen Ziro - Minor from Har Khet Very de by 37 Hong Niichi I CD WRD Irrigati 4.00 10.00 93*50'21"E 27*33'03"N Ko Pani WRD Kelebya to Block on High ACP/ZPM, Minyi Niichii Recommen C/o MIP Ziro - Minor Har Khet Very de by 38 Hong Niichi I CD WRD Irrigati 5.00 12.50 93*50'57"E 27*33'38"N from Ko Pani WRD Block on High ACP/ZPM, Biihiisukun Niichii

132 | P a g e

g to Hage Aji

C/o MIP Recommen Ziro - Minor from Gyabu Har Khet Very de by 39 Hong Niichi I CD WRD Irrigati 3.00 7.50 93*51'19"E 27*33'56"N Ko Pani WRD to Kanoko Block on High ACP/ZPM, Sigang Niichii C/o MIP Recommen Ziro - Minor from Har Khet Very de by 40 Hong Niichi I CD WRD Irrigati 2.00 5.00 93'51'20" 27*34'02"N Ko Pani WRD Sikhebo to Block on High ACP/ZPM, Bakhan ani Niichii C/o Recommen Irrigation Ziro - Minor Har Khet Very de by 41 Hong Niichi I CD WRD Irrigati 2.00 5.00 93*51'40"E 27*33'40''N channel at Ko Pani WRD Block on High ACP/ZPM, Ago Niichii Sikhebo C/o Recommen Irrigation Ziro - Minor Har Khet Very de by 42 Hong Niichi I CD WRD Irrigati 3.00 7.50 93*51'15"E 27*33'59"N channel at Ko Pani WRD Block on High ACP/ZPM, Midinglya Niichii Sigang C/o Flood protection Recommen Ziro - Minor wall at Pai- Har Khet Very de by 43 Hong Niichi I CD WRD Irrigati 4.00 10.00 93*50'43"E 27*33'39"N Ko Pani WRD Achang Block on High ACP/ZPM, under Hong Niichii Sikhe Recommen C/o MIP at Ziro - Minor Har Khet Very de by 44 Hong Niichi I CD WRD Irrigati 5.00 12.50 93*50'55"E 27*33'38"N Parpii Silyo Ko Pani WRD Block on High ACP/ZPM, CC lined Niichii C/o MIP s Ziro - Minor Recommen Har Khet Very 45 at Siikhe Tajang Tajang I CD WRD Irrigati 2.00 5.00 93*49'38"E 27*36'37"N WRD de by ZPM, Ko Pani High Borang Block on Tajang

133 | P a g e

C/oMIP at Ziro - Minor Recommen Har Khet Very 46 Chabo Tajang Tajang I CD WRD Irrigati 3.00 7.50 93*49'45"E 27*36'49"N WRD de by ZPM, Ko Pani High Borang Block on Tajang C/o MIP at Ziro - Minor Recommen Upper Har Khet Very 47 Tajang Tajang I CD WRD Irrigati 5.00 12.50 93*49'19"E 27*36'52"N Ko Pani WRD de by ZPM, Siikhe Block on High Tajang Borang C/o MIP at Lower Ziro - Minor Recommen Har Khet Very 48 Supyu via Tajang Tajang I CD WRD Irrigati 4.00 10.00 93*49'36"E 27*36'26"N WRD de by ZPM, Ko Pani High Boling Block on Tajang Borang C/o MIP at Ziro - Minor Recommen Upper Har Khet Very 49 Tajang Tajang I CD WRD Irrigati 5.00 12.50 93*50'24"E 27*36'56"N Ko Pani WRD de by ZPM, Myolyang Block on High Tajang Borang C/o MIP at Lempia Ziro - Minor Recommen Akang Har Khet Very 50 Tajang Tajang I CD WRD Irrigati 2.00 5.00 93*49'50"E 27*36'13"N Ko Pani WRD de by ZPM, Gyadu Block on High Tajang Borang(Up per) C/o MIP at Ziro - Minor Recommen Jilyu Har Khet Very 51 Tajang Tajang I CD WRD Irrigati 3.00 7.50 93*49'42"E 27*36'18"N Ko Pani WRD de by ZPM, Borang(Eas Block on High Tajang t) C/o Irrigation Ziro - Minor Recommen channel at Har Khet Very 52 Tajang Tajang I CD WRD Irrigati 5.00 12.50 93*49'44"E 27*36'11"N Ko Pani WRD de by ZPM, Jilyu Block on High Tajang Borang(wes t)

134 | P a g e

C/o MIP at Ziro - Minor Recommen Har Khet Very 53 Midey Tajang Tajang I CD WRD Irrigati 4.00 10.00 93*50'15"E 27*36'12"N WRD de by ZPM, Ko Pani High Borang Block on Tajang

C/o MIP at Ziro - Minor Recommen Har Khet Very 54 Yanjo Tajang Tajang I CD WRD Irrigati 4.00 10.00 93*50'15"E 27*36'08"N WRD de by ZPM, Ko Pani High Borang Block on Tajang C/o MIP at Ziro - Minor Recommen Yalyo Har Khet Very 55 Tajang Tajang I CD WRD Irrigati 3.00 7.50 93*50'02"E 27*35'57"N de by ZPM, Ko Pani WRD Siigang Block on High Tajang Borang C/o MIP at Nebyo/Par Ziro - Minor Recommen ung telyu Har Khet Very 56 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'28"E 27*32'48"N Ko Pani WRD de by ZPM, under Lare Block on High Niitii Segang area C/o MIP at Sekhe Ziro - Minor Recommen Lembo Har Khet Very 57 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'08"E 27*32'37"N Ko Pani WRD de by ZPM, under Lare Block on High Niitii Segang area C/o MIP at Panang Ziro - Minor Recommen Moyoleye Har Khet Very 58 Hong Niitii I CD WRD Irrigati 4.00 10.00 93*51'23"E 27*32'57"N Ko Pani WRD de by ZPM, under Lare Block on High Niitii Segang area C/o MIP at Ziro - Minor Recommen Range Har Khet Very 59 Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'50"E 27*32'49"N Ko Pani WRD de by ZPM, Gaha under Block on High Niitii Lare

135 | P a g e

Segang area

C/o MIP at Dopa Ziro - Minor Recommen Lembo Har Khet Very 60 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'17"E 27*33'05"N de by ZPM, Ko Pani WRD under Lare Block on High Niitii Segang area C/o MIP at Ayo Pare Ziro - Minor Recommen bogo under Har Khet Very 61 Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51'29"E 27*32'58"N Ko Pani WRD de by ZPM, Lare Block on High Niitii Segang area C/o MIP at Yaloseko Ziro - Minor Recommen under Har Khet Very 62 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'36"E 27*32'28"N Ko Pani WRD de by ZPM, Myolyeko Block on High Niitii Segang area C/o MIP at Nyele Ziro - Minor Recommen Har Khet Very 63 under Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'21"E 27*32'17"N WRD de by ZPM, Ko Pani High Pokhe Block on Niitii Segang C/o MIP at Moko Ziro - Minor Recommen Har Khet Very 64 under Hong Niitii I CD WRD Irrigati 4.00 10.00 93*51'23"E 27*32'23"N WRD de by ZPM, Ko Pani High Pokhe Block on Niitii Segang

136 | P a g e

C/o MIP at Phoke Ayo Ziro - Minor Recommen Har Khet Very 65 under Hong Niitii I CD WRD Irrigati 4.00 10.00 93*51'15"E 27*32'21"N WRD de by ZPM, Ko Pani High Pokhe Block on Niitii Segang C/o MIP at Nyele Ziro - Minor Recommen Har Khet Very 66 under Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'09"E 27*32'27"N WRD de by ZPM, Ko Pani High Pokhe Block on Niitii Segang C/o MIP at Pokhe Ziro - Minor Recommen Har Khet Very 67 Saley under Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51'03"E 27*32'22"N WRD de by ZPM, Ko Pani High Pokhe Block on Niitii Segang C/o MIP at Duku Putu Ziro - Minor Recommen Har Khet Very 68 under Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'03"E 27*32'31"N WRD de by ZPM, Ko Pani High Pokhe Block on Niitii Segang C/o MIP at Liipa Pokhe Ziro - Minor Recommen Har Khet Very 69 under Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'10"E 27*32'08"N WRD de by ZPM, Ko Pani High Pokhe Block on Niitii Segang C/o MIP at Tampyo Ziro - Minor Recommen Lembo Har Khet Very 70 Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'15"E 27*32'09"N Ko Pani WRD de by ZPM, under Block on High Niitii Pokhe Segang

137 | P a g e

C/o MIP at Makeng Ziro - Minor Recommen Har Khet Very 71 under Hong Niitii I CD WRD Irrigati 4.00 10.00 93*51'10"E 27*32'08"N WRD de by ZPM, Ko Pani High Pokhe Block on Niitii Segang C/o MIP at Dolo Meiro Ziro - Minor Recommen Har Khet Very 72 under Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51'13"E 27*32'11"N WRD de by ZPM, Ko Pani High Pokhe Block on Niitii Segang C/o MIP at Nenchalyan Ziro - Minor Recommen Har Khet Very 73 g under Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'16"E 27*32'14"N WRD de by ZPM, Ko Pani High Pokhe Block on Niitii Segang C/o MIP at Puralya Ziro - Minor Recommen Har Khet Very 74 under Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'01"E 27*32'25"N WRD de by ZPM, Ko Pani High Pokhe Block on Niitii Segang C/o MIP at Paking Ziro - Minor Recommen Har Khet Very 75 Pabu under Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'17"E 27*32'04"N WRD de by ZPM, Ko Pani High Pokhe Block on Niitii Segang C/o MIP at Akang Ziro - Minor Recommen Har Khet Very 76 Okhe under Hong Niitii I CD WRD Irrigati 5.00 12.50 93*50'47"E 27*32'09"N WRD de by ZPM, Ko Pani High Seching Block on Niitii Segang

C/o MIP at Ziro - Minor Recommen Har Khet Very 77 Tabung Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'04"E 27*32'06"N WRD de by ZPM, Ko Pani High Burang Block on Niitii

138 | P a g e

under Seching Segang C/o MIP at Pargi Ziro - Minor Recommen Lempa Har Khet Very 78 Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'03"E 27*32'02"N de by ZPM, Ko Pani WRD under Block on High Niitii Seching Segang C/o MIP at Seth Acling Ziro - Minor Recommen Har Khet Very 79 under Hong Niitii I CD WRD Irrigati 4.00 10.00 93*51'02"E 27*31'55"N WRD de by ZPM, Ko Pani High Seching Block on Niitii Segang C/o MIP at Yapeng Ziro - Minor Recommen Har Khet Very 80 putu under Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'05"E 27*31'51"N WRD de by ZPM, Ko Pani High Seching Block on Niitii Segang C/o MIP at Ziro - Minor Recommen Dolo under Har Khet Very 81 Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51;02"E 27*31'48"N de by ZPM, Ko Pani WRD Lyochi Block on High Niitii Segang C/o MIP at Sangkhe Ziro - Minor Recommen Tuding Har Khet Very 82 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'23"E 27*32'02"N Ko Pani WRD de by ZPM, under Block on High Niitii Lyochi Segang

C/o MIP at Ziro - Minor Recommen Har Khet Very 83 Pobatucling Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'26"E 27*32'10"N WRD de by ZPM, Ko Pani High under Block on Niitii

139 | P a g e

Lyochi Segang

C/o MIP at Nanu Ziro - Minor Recommen Har Khet Very 84 under Hong Niitii I CD WRD Irrigati 4.00 10.00 9351'07"E 27*32'21"N WRD de by ZPM, Ko Pani High Lyotri Block on Niitii Segang C/o MIP at Kurabogo Ziro - Minor Recommen Har Khet Very 85 under Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'04"E 27*32'23"N WRD de by ZPM, Ko Pani High Lyotri Block on Niitii Segang C/o MIP at Yaminnii Ziro - Minor Recommen Har Khet Very 86 Putu under Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51'29"E 27*32'47"N WRD de by ZPM, Ko Pani High Lyotri Block on Niitii Segang C/o MIP at Ziro - Minor Recommen Dillo under Har Khet Very 87 Hong Niitii I CD WRD Irrigati 5.00 12.50 93*50'50"E 27*32'23"N Ko Pani WRD de by ZPM, Lyotri Block on High Niitii Segang C/o MIP at Ayo Dillo Ziro - Minor Recommen Har Khet Very 88 under Hong Niitii I CD WRD Irrigati 3.00 7.50 93*50'47"E 27*32'31"N WRD de by ZPM, Ko Pani High Lyotri Block on Niitii Segang C/o MIP at Ziro - Minor Recommen Tubeko Har Khet Very 89 Hong Niitii I CD WRD Irrigati 5.00 12.50 93*50'14"E 27*31'31"N Ko Pani WRD de by ZPM, Segang Block on High Niitii area

140 | P a g e

C/o MIP at Ziro - Minor Recommen Bleu under Har Khet Mediu 90 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'37"E 27*32'27"N Ko Pani WRD de by ZPM, Taru Block on m Niitii Segang C/o MIP at Ziro - Minor Recommen Parisi Har Khet Mediu 91 Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51'28"E 27*32'28"N de by ZPM, Ko Pani WRD under taru Block on m Niitii Segang C/o MIP at Kheyobo Ziro - Minor Recommen Har Khet Mediu 92 Ami under Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'25"E 27*32'25"N WRD de by ZPM, Ko Pani m Taru Block on Niitii Segang C/o MIP at Ziro - Minor Recommen Tiba Aji Har Khet Mediu 93 Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51'36"E 27*33'00"N Ko Pani WRD de by ZPM, under Tiiba Block on m Niitii Segang C/o MIP at Ziro - Minor Recommen Dilo Aji Har Khet Mediu 94 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'30"E 27*32'48"N Ko Pani WRD de by ZPM, under Tiiba Block on m Niitii Segang C/o MIP at Ziro - Minor Recommen Sechobo Har Khet Mediu 95 Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51'19"E 27*32'49"N Ko Pani WRD de by ZPM, under Tiiba Block on m Niitii Segang C/o MIP at Ziro - Minor Recommen Tayuga Har Khet Mediu 96 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'15"E 27*32'40"N de by ZPM, Ko Pani WRD under Tiiba Block on m Niitii Segang C/o MIP at Ziro - Minor Recommen Tiiro Ajo Har Khet Mediu 97 Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51'36"E 27*32'27"N Ko Pani WRD de by ZPM, under Tiiba Block on m Niitii Segang

141 | P a g e

C/o MIP at Ziro - Minor Recommen Tadu Har Khet Mediu 98 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'46"E 27*32'32"N Ko Pani WRD de by ZPM, Segang Block on m Niitii area

C/o MIP at Ziro - Minor Recommen Har Khet Mediu 99 Jho Segang Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'51"E 27*32'37"N WRD de by ZPM, Ko Pani m area Block on Niitii C/o MIP at Ziro - Minor Recommen Kulu Har Khet Mediu 100 Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'24"E 27*32'56"N Ko Pani WRD de by ZPM, Segang Block on m Niitii area C/o MIP at Wami Lego Ziro - Minor Recommen Har Khet Mediu 101 under Hong Niitii I CD WRD Irrigati 4.00 10.00 93*51'01"E 27*31'56"N WRD de by ZPM, Ko Pani m Tayuko Block on Niitii Segang C/o MIP at Sanyepo Ziro - Minor Recommen Har Khet Mediu 102 under Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'05"E 27*31'53"N WRD de by ZPM, Ko Pani m Tayuko Block on Niitii Segang C/o MIP at Taru Kebay Ziro - Minor Recommen Pankhe Har Khet Mediu 103 Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51'07"E 27*31'50"N Ko Pani WRD de by ZPM, under Block on m Niitii Tayuko Segang C/o MIP at Ziro - Minor Recommen Sugu under Har Khet Mediu 104 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'02"E 27*31'52"N Ko Pani WRD de by ZPM, Tayuko Block on m Niitii Segang

142 | P a g e

C/o MIP at Ziro - Minor Recommen Rubu under Har Khet Mediu 105 Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'02"E 27*32'05"N Ko Pani WRD de by ZPM, Dillo Block on m Niitii Segang C/o MIP at Tabum Ziro - Minor Recommen Har Khet Mediu 106 Byarang Hong Niitii I CD WRD Irrigati 3.00 7.50 93*50'40"E 27*32'08"N WRD de by ZPM, Ko Pani m under Dillo Block on Niitii Segang C/o MIP at Sisiko Ziro - Minor Recommen Dellopolyan Har Khet 27*32'27" Mediu 107 Hong Niitii I CD WRD Irrigati 5.00 12.50 93*50'50"E Ko Pani WRD de by ZPM, g under Block on N m Niitii Dillo Segang C/o MIP at Lamta Pabu Ziro - Minor Recommen Segang Har Khet Mediu 108 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'42"E 27*33"31"N Ko Pani WRD de by ZPM, under Block on m Niitii Tayhu Segang C/o MIP at Khayu Ziro - Minor Recommen Har Khet Mediu 109 under Hong Niitii I CD WRD Irrigati 4.00 10.00 93*50'53"E 27*32'01"N WRD de by ZPM, Ko Pani m Tayhu Block on Niitii Segang C/o MIP at Khoyo Ziro - Minor Recommen Har Khet Mediu 110 under Hong Niitii I CD WRD Irrigati 3.00 7.50 93*50'59"E 27*32"25"N WRD de by ZPM, Ko Pani m Tayhu Block on Niitii Segang

143 | P a g e

C/o MIP at Ziro - Minor Recommen Pachi Har Khet Mediu 111 Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51'28"E 27*33'40"N Ko Pani WRD de by ZPM, under Bogo Block on m Niitii Segang C/o MIP at Ziro - Minor Recommen parpei Har Khet Mediu 112 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'07"E 27*33'38"N de by ZPM, Ko Pani WRD under Bogo Block on m Niitii Segang C/o MIP at Ziro - Minor Recommen Lamper Har Khet Mediu 113 Hong Niitii I CD WRD Irrigati 5.00 12.50 93*51'18"E 27*33'36"N Ko Pani WRD de by ZPM, udner Bogo Block on m Niitii Segang C/o MIP at MIP at Ziro - Minor Recommen Har Khet Mediu 114 Lamper Hong Niitii I CD WRD Irrigati 4.00 10.00 93*51'21"E 27*33'36"N WRD de by ZPM, Ko Pani m Segang Block on Niitii area C/o MIP at Ziro - Minor Recommen Ukopho Har Khet Mediu 115 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'01"E 27*33'32"N Ko Pani WRD de by ZPM, Segang Block on m Niitii area C/o MIP at Seth Acling Ziro - Minor Recommen Har Khet Mediu 116 under Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51'08"E 27*33'26"N WRD de by ZPM, Ko Pani m Yaping Yaru Block on Niitii Sego C/o MIP at Ziro - Minor Recommen Khichi Har Khet Mediu 117 Hong Niitii I CD WRD Irrigati 2.00 5.00 93*51'11"E 27*33'31"N Ko Pani WRD de by ZPM, Segang Block on m Niitii area Ziro - Minor Recommen C/o MIP at Har Khet Mediu 118 Hong Niitii I CD WRD Irrigati 3.00 7.50 93*51'51 "E 27*33'27" N Ko Pani WRD de by ZPM, Tayaga Block on m Niitii

144 | P a g e

Segang area

Ziro - Minor Recommen C/o MIP at Har Khet Mediu 119 Hong Niitii I CD WRD Irrigati 2.00 5.00 93'50'31" E 27'31'36" N Ko Pani WRD de by ZPM, Byoru area Block on m Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Mediu 120 Tero Ago Hong Niitii I CD WRD Irrigati 3.00 7.50 93'50'33" E 27'31'18" N WRD de by ZPM, Ko Pani m area Block on Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Very 121 Selto Gha Hong Niitii I CD WRD Irrigati 2.00 5.00 93'50'36" E 27'32'42" N WRD de by ZPM, Ko Pani High area Block on Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Very 122 Sugusegay Hong Niitii I CD WRD Irrigati 3.00 7.50 93'51'20" E 27'31'47" N WRD de by ZPM, Ko Pani High area Block on Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Very 123 Katchu Pho Hong Niitii I CD WRD Irrigati 2.00 5.00 93'51'11" E 27'31'41" N WRD de by ZPM, Ko Pani High area Block on Niitii Ziro - Minor Recommen C/o MIP at Har Khet Very 124 Hong Niitii I CD WRD Irrigati 3.00 7.50 93'50'44 E 27'33'16" N Ko Pani WRD de by ZPM, Ranti area Block on High Niitii

Ziro - Minor Recommen C/o MIP at Har Khet Very 125 Hong Niitii I CD WRD Irrigati 22.00 55.00 93'50'56" E 27'33'05" N de by ZPM, Ko Pani WRD lutu area Block on High Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Very 126 Deapilang Hong Niitii I CD WRD Irrigati 3.00 7.50 93'51'04" E 27'33'05" N WRD de by ZPM, Ko Pani High area Block on Niitii Ziro - Minor Recommen C/o MIP at Har Khet Very 127 Hong Niitii I CD WRD Irrigati 2.00 5.00 93'51'07" E 27'33'15" N Ko Pani WRD de by ZPM, Phatu area Block on High Niitii

Ziro - Minor Recommen C/o MIP at Har Khet Very 128 Hong Niitii I CD WRD Irrigati 2.00 5.00 93'50'53" E 27'32'44" N Ko Pani WRD de by ZPM, Tasi Area Block on High Niitii

145 | P a g e

Ziro - Minor Recommen C/o MIP at Har Khet Very 129 Hong Niitii I CD WRD Irrigati 3.00 7.50 93'50'50" E 27'32'52" N Ko Pani WRD de by ZPM, Lyayo Area Block on High Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Very 130 Uko Sethi Hong Niitii I CD WRD Irrigati 3.00 7.50 93'50'53" E 27'32'45" N WRD de by ZPM, Ko Pani High Area Block on Niitii C/o MIP at Ziro - Minor Recommen Tabo Har Khet Very 131 Hong Niitii I CD WRD Irrigati 2.00 5.00 93'51'11" E 27'33'31" N de by ZPM, Ko Pani WRD Sarang Block on High Niitii Area C/o MIP at Ziro - Minor Recommen Bogo Har Khet Very 132 Hong Niitii I CD WRD Irrigati 2.00 5.00 93'51'21" E 27'33'36" N Ko Pani WRD de by ZPM, Lamchii Block on High Niitii area

C/o MIP at Ziro - Minor Recommen Har Khet Very 133 Ayo Sesang Hong Niitii I CD WRD Irrigati 4.00 10.00 93'51'35" E 27'33'49" N WRD de by ZPM, Ko Pani High area Block on Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Very 134 Liipa Hong Niitii I CD WRD Irrigati 5.00 12.50 93'51'30" E 27'33'47" N WRD de by ZPM, Ko Pani High Segang Block on Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Very 135 Akang Hong Niitii I CD WRD Irrigati 5.00 12.50 93'51'33" E 27'33'44" N WRD de by ZPM, Ko Pani High Segang Block on Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Very 136 Deganii Hong Niitii I CD WRD Irrigati 2.00 5.00 93'51'38" E 27'33'55" N WRD de by ZPM, Ko Pani High Segang Block on Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Very 137 Ragung Hong Niitii I CD WRD Irrigati 5.00 12.50 9351'48" E 27'33'59" N WRD de by ZPM, Ko Pani High Segang Block on Niitii Ziro - Minor Recommen C/o MIP at Har Khet Very 138 Hong Niitii I CD WRD Irrigati 3.00 7.50 93'51'48" E 27'33'59" N Ko Pani WRD de by ZPM, Bhu Segang Block on High Niitii

146 | P a g e

C/o MIP at Ziro - Minor Recommen Har Khet Very 139 Nanu Hong Niitii I CD WRD Irrigati 3.00 7.50 93'51'22" E 27'32'26" N WRD de by ZPM, Ko Pani High Segang Block on Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Very 140 Moko Hong Niitii I CD WRD Irrigati 2.00 5.00 93'52'26" E 27'33'30" N WRD de by ZPM, Ko Pani High Segang Block on Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Very 141 Tayuko Hong Niitii I CD WRD Irrigati 2.00 5.00 93'51'57" E 27'32'15" N WRD de by ZPM, Ko Pani High Segang Block on Niitii Ziro - Minor Recommen C/o MIP at Har Khet Very 142 Hong Niitii I CD WRD Irrigati 3.00 7.50 93'50'53" E 27'30'15" N Ko Pani WRD de by ZPM, Katupho Block on High Niitii

C/o MIP at Ziro - Minor Recommen Har Khet Very 143 Phokhe Hong Niitii I CD WRD Irrigati 2.00 5.00 93'53'54" E 27'31'15" N WRD de by ZPM, Ko Pani High Pabu Block on Niitii C/o MIP at Supyu Recommen Ziro - Minor Pyuchi Har Khet Very ded by 144 Hija Hija I CD WRD Irrigati 2.00 5.00 93*48'29"E 27*36'43"N Ko Pani WRD Bhogo to Block on High ZPM /ACP, Kley under Hija Siilang C/o MIP at Tacho Recommen Ziro - Minor Siigang Har Khet Very ded by 145 Hija Hija I CD WRD Irrigati 3.00 7.50 93*48'35"E 27*36'30"N Ko Pani WRD under Block on High ZPM /ACP, Siilang Hija Siigang C/o MIP at Piisabu Recommen Ziro - Minor Siigang Har Khet Very ded by 146 Hija Hija I CD WRD Irrigati 4.00 10.00 93'48'45"E 27*36'31"N Ko Pani WRD under Block on High ZPM /ACP, Siilang Hija Siigang

147 | P a g e

C/o MIP at Byoyung Recommen Ziro - Minor Siigang Har Khet Very ded by 147 Hija Hija I CD WRD Irrigati 4.00 10.00 93*49'07"E 27*36'30"N Ko Pani WRD under Block on High ZPM /ACP, Siilang Hija Siigang C/o MIP at Riitubo Recommen Ziro - Minor Siigang Har Khet Very ded by 148 Hija Hija I CD WRD Irrigati 4.00 10.00 93*48'52"E 27*36'05"N Ko Pani WRD under Block on High ZPM /ACP, Siilang Hija Siigang C/o MIP at Siibo Recommen Ziro - Minor Siigang Har Khet Very ded by 149 Hija Hija I CD WRD Irrigati 2.00 5.00 93*49'07"E 27*36'10"N Ko Pani WRD under Block on High ZPM /ACP, Siilang Hija Siigang C/o MIP at Yabyung to Recommen Dara Ziro - Minor Har Khet Very ded by 150 Hija Hija I CD WRD Irrigati 4.00 10.00 93*49'02"E 27*35'54"N Siigang Ko Pani WRD Block on High ZPM /ACP, under Hija Siilang Siigang C/o MIP at Yabyung to Recommen Diire Ziro - Minor Har Khet Very ded by 151 Hija Hija I CD WRD Irrigati 3.00 7.50 93*49'10"E 27*35'47"N Siigang Ko Pani WRD Block on High ZPM /ACP, under Hija Siilang Siigang

148 | P a g e

C/o Irrigation channel at Recommen Ziro - Minor Lanchi Har Khet 93*49'2 Very ded by 152 Hija Hija I CD WRD Irrigati 2.00 5.00 27*35'18"N Ko Pani WRD Siigang Block on 9"E High ZPM /ACP, under Hija Siilang Siigang C/o MIP at Tadubo Siigang Recommen Ziro - Minor (Dango to Har Khet Very ded by 153 Hija Hija I CD WRD Irrigati 3.00 7.50 93*49'35"E 27*34'46"N Ko Pani WRD Siiker) Block on High ZPM /ACP, under Hija Tadubo Bhogo C/o MIP at Tai Yasi Recommen Ziro - Minor Siigang Har Khet Very ded by 154 Hija Hija I CD WRD Irrigati 2.00 5.00 93*49'43"E 27*34'42"N Ko Pani WRD under Block on High ZPM /ACP, Tadubo Hija Siigang C/o MIP Siigo Tasi Recommen Ziro - Minor Siigang Har Khet Very ded by 155 Hija Hija I CD WRD Irrigati 3.00 7.50 93*49'19"E 27*34'54"N Ko Pani WRD under Block on High ZPM /ACP, Tadubo Hija Siigang C/o MIP at Recommen Ziro - Minor Chibo Har Khet Very ded by 156 Hija Hija I CD WRD Irrigati 2.00 5.00 93*49'11"E 27*34'54"N Ko Pani WRD Siigang Block on High ZPM /ACP, under Hija

149 | P a g e

Tadubo Siigang

C/o MIP at Binyibo Recommen Ziro - Minor Siigang Har Khet Very ded by 157 Hija Hija I CD WRD Irrigati 3.00 7.50 93*49'04"E 27*34'53"N Ko Pani WRD under Block on High ZPM /ACP, Tadubo Hija Siigang C/o MIP at Tadubo Siiling Recommen Ziro - Minor (Tadubo to Har Khet 93*491'12" Very ded by 158 Hija Hija I CD WRD Irrigati 2.00 5.00 27*34'47"N Ko Pani E WRD Siiker) Block on High ZPM /ACP, under Hija Tadubo Siigang C/o MIP at Tarilya Siiling Recommen Ziro - Minor (Tadubo to Har Khet Very ded by 159 Hija Hija I CD WRD Irrigati 3.00 7.50 93*48'53"E 27*35'15"N Ko Pani WRD Siiling) Block on High ZPM /ACP, under Hija Tadubo Siigang C/o MIP at Tarilya Recommen Ziro - Minor Siigang Har Khet Very ded by 160 Hija Hija I CD WRD Irrigati 2.00 5.00 93*48'47"E 27*35'10"N Ko Pani WRD (Tarilya to Block on High ZPM /ACP, Khanganii) Hija under

150 | P a g e

Tadubo Siigang

C/o MIP at Khanganii Recommen Ziro - Minor to Siiling Har Khet Very ded by 161 Hija Hija I CD WRD Irrigati 3.00 7.50 93*49.16"E 27*34'32"N Ko Pani WRD under Block on High ZPM /ACP, Tadubo Hija Siigang C/o MIP at Taku Siipi Sigang Recommen (Rubu to Ziro - Minor Har Khet Very ded by 162 Hija Hija I CD WRD Irrigati 2.00 5.00 93*48'39"E 27*34'40"N Mobya Ko Pani WRD Block on High ZPM /ACP, Leyu) Hija under Tadubo Sigang C/o MIP at Siiker Recommen Siigang Ziro - Minor Har Khet Mediu ded by 163 Hija Hija I CD WRD Irrigati 3.00 7.50 93*49'23"E 27*35'14"N (Bhyou to Ko Pani WRD Block on m ZPM /ACP, Kley under Hija Siiker Bhogo C/o MIP at Recommen Siiker Ziro - Minor Har Khet Mediu ded by 164 Hija Hija I CD WRD Irrigati 2.00 5.00 93*49'24"E 27*35'10"N Siigang Ko Pani WRD Block on m ZPM /ACP, (Bhyou to Hija Kley) under

151 | P a g e

Siiker Bhogo

C/o MIP at Tirara Recommen Ziro - Minor Siigang Har Khet Mediu ded by 165 Hija Hija I CD WRD Irrigati 3.00 7.50 93*49'25"E 27*35'05"N Ko Pani WRD under Block on m ZPM /ACP, Siiker Hija Siigang C/o MIP at Ruhing Recommen Ziro - Minor Siigang Har Khet Mediu ded by 166 Hija Hija I CD WRD Irrigati 4.00 10.00 93*49'25"E 27*34'59"N Ko Pani WRD under Block on m ZPM /ACP, Siiker Hija Siigang C/o MIP at Myochi Recommen Ziro - Minor Siigang Har Khet Mediu ded by 167 Hija Hija I CD WRD Irrigati 4.00 10.00 93*49'2"E 27*34'54"N Ko Pani WRD under Block on m ZPM /ACP, Siiker Hija Siigang C/o MIP at Saro Recommen Ziro - Minor Siigang Har Khet Mediu ded by 168 Hija Hija I CD WRD Irrigati 5.00 12.50 93*49'23"E 27*35'23"N Ko Pani WRD under Block on m ZPM /ACP, Siiker Hija Siigang C/o MIP at Recommen Gamchi Ziro - Minor Har Khet Mediu ded by 169 Hija Hija I CD WRD Irrigati 3.00 7.50 93*49'12"E 27*35'36"N Siigang Ko Pani WRD Block on m ZPM /ACP, under Saro Hija Siigang

152 | P a g e

C/o Irrigation Recommen channel at Ziro - Minor Har Khet Mediu ded by 170 Hija Hija I CD WRD Irrigati 2.00 5.00 93*49'10"E 27*35'47"N Piilo Myolyi Ko Pani WRD Block on m ZPM /ACP, Siigang Hija under Saro Siigang C/o Irrigation channel at Recommen Ziro - Minor Akang Har Khet Mediu ded by 171 Hija Hija I CD WRD Irrigati 5.00 12.50 93*49'03"E 27*35'34"N Ko Pani WRD Myolyi Block on m ZPM /ACP, Siigang Hija under Saro Siigang C/o MIP at Recommen Sakhung Ziro - Minor Har Khet Mediu ded by 172 Hija Hija I CD WRD Irrigati 3.00 7.50 93*48'55"E 27*35'43"N Siigang Ko Pani WRD Block on m ZPM /ACP, under Saro Hija Siigang C/o MIP at Recommen Palyu Ziro - Minor Har Khet Mediu ded by 173 Hija Hija I CD WRD Irrigati 2.00 5.00 93*48'58"E 27*35'58"N Siigang Ko Pani WRD Block on m ZPM /ACP, under Saro Hija Siigang C/o MIP at Akang Recommen Ziro - Minor Palyu Har Khet Mediu ded by 174 Hija Hija I CD WRD Irrigati 3.00 7.50 93*47'58"E 27*34'40"N Ko Pani WRD Siigang Block on m ZPM /ACP, under Saro Hija Siigang

153 | P a g e

C/o MIP at Recommen Ayo Tanyo Ziro - Minor Har Khet Mediu ded by 175 Hija Hija I CD WRD Irrigati 4.00 10.00 93*47'58"E 27*34'26"N Siigang Ko Pani WRD Block on m ZPM /ACP, under Saro Hija Siigang C/o Irrigation Recommen channel at Ziro - Minor Har Khet Mediu ded by 176 Hija Hija I CD WRD Irrigati 5.00 12.50 93*47'57"E 27*34'11"N Chibo Ko Pani WRD Block on m ZPM /ACP, Siigang Hija under Saro Siigang C/o MIP at Recommen Dribya Ziro - Minor Har Khet Mediu ded by 177 Hija Hija I CD WRD Irrigati 2.00 5.00 93*48'11"E 27*34'10"N Siigang Ko Pani WRD Block on m ZPM /ACP, under Saro Hija Siigang C/o MIP at Recommen Diiko Ziro - Minor Har Khet Mediu ded by 178 Hija Hija I CD WRD Irrigati 3.00 7.50 93*48'49"E 27*34'17"N Siigang Ko Pani WRD Block on m ZPM /ACP, under Saro Hija Siigang C/o MIP Recommen Ziro - Minor ded by from Reru Har Khet Mediu 179 Reru I CD WRD Irrigati 2.00 5.00 93*50'36"E 27*35'42"N Kalung Ko Pani WRD ZPM/ACP, Siidiibo to Block on m Reru Enn Bogya Kalung C/o MIP Recommen Ziro - Minor ded by from Reru Har Khet Mediu 180 Reru I CD WRD Irrigati 3.00 7.50 93*51'04"E 27*35'41"N Kalung Ko Pani WRD ZPM/ACP, Yassibo to Block on m Reru Tannaha Kalung

154 | P a g e

C/o MIP Recommen from Ziro - Minor ded by Reru Har Khet Mediu 181 Adahabo to Reru I CD WRD Irrigati 2.00 5.00 93*50'45"E 27*35'54"N WRD ZPM/ACP, Kalung Ko Pani m lengo Ago Block on Reru Kalung bogo C/o MIP Recommen from Ziro - Minor ded by Reru Har Khet Mediu 182 MideyAdab Reru I CD WRD Irrigati 3.00 7.50 93*50'57"E 27*36'02"N WRD ZPM/ACP, Kalung Ko Pani m o to Block on Reru Kalung Takubo Recommen C/o MIP Ziro - Minor ded by Reru Har Khet 93*49'0 Very 183 from Siikhe Reru I CD WRD Irrigati 2.00 5.00 27*36'56"N WRD ZPM/ACP, Kalung Ko Pani 1"E High to Bukhbo Block on Reru Kalung C/o MIP Recommen Ziro - Minor ded by from Chabo Reru Har Khet Very 184 Reru I CD WRD Irrigati 3.00 7.50 93*49'36"E 27*36'49"N Kalung Ko Pani WRD ZPM/ACP, to Block on High Reru Lankhiing Kalung C/o MIP Recommen Ziro - Minor ded by from Reru Har Khet Very 185 Reru I CD WRD Irrigati 4.00 10.00 93*48'55"E 27*37'09"N Kalung Ko Pani WRD ZPM/ACP, Yassibo to Block on High Reru Siikhe Kiiley Kalung C/o MIP Recommen from Ziro - Minor ded by Reru Har Khet Very 186 Tajang Reru I CD WRD Irrigati 5.00 12.50 93*49'46"E 27*36'25"N WRD ZPM/ACP, Kalung Ko Pani High Kiiley to Block on Reru Kalung Kokhii C/o MIP Recommen Ziro - Minor ded by from Reru Har Khet Very 187 Reru I CD WRD Irrigati 2.00 5.00 93*49'54"E 27*35'54"N Kalung Ko Pani WRD ZPM/ACP, Kiileybo to Block on High Reru Saha Aji Kalung

155 | P a g e

C/o MIP Recommen from Taro Ziro - Minor ded by Reru Har Khet Very 188 Nenting to Reru I CD WRD Irrigati 2.00 5.00 93*50'30:E 27*35'34"N WRD ZPM/ACP, Kalung Ko Pani High Tanahabo Block on Reru Kalung Bogo C/o MIP Recommen from Ziro - Minor ded by Reru Har Khet Very 189 Tanahabo Reru I CD WRD Irrigati 2.00 5.00 93*50'05"E 27*35'48"N WRD ZPM/ACP, Kalung Ko Pani High to kokhii Block on Reru Kalung Bogo C/o MIP Recommen Ziro - Minor ded by Jilyu Mide Reru Har Khet Very 190 Reru I CD WRD Irrigati 3.00 7.50 93*50'45"E 27*35'54"N Kalung Ko Pani WRD ZPM/ACP, to Tajang Block on High Reru Kiiley Kalung C/o MIP Recommen from Siya Ziro - Minor ded by Reru Har Khet Very 191 Piro to Reru I CD WRD Irrigati 2.00 5.00 93*51'20"E 27*35'39"N WRD ZPM/ACP, Kalung Ko Pani High beba Block on Reru Kalung Siigang C/o MIP Recommen Ziro - Minor ded by from Sidii Reru Har Khet Very 192 Reru I CD WRD Irrigati 2.00 5.00 93*51'08"E 27*35'33"N ZPM/ACP, Kalung Ko Pani WRD Bogo to Block on High Reru Sidii Siigang Kalung C/o MIP Recommen from Ziro - Minor ded by Reru Har Khet Very 193 Nenchang Reru I CD WRD Irrigati 3.00 7.50 93*50'21"E 27*36'17"N WRD ZPM/ACP, Kalung Ko Pani High Bogo to Block on Reru Kalung gam Bogo C/o MIP Recommen from Siya Ziro - Minor ded by Reru Har Khet Very 194 Kiiley to Reru I CD WRD Irrigati 2.00 5.00 93*51'30"E 27*35'30"N WRD ZPM/ACP, Kalung Ko Pani High Yalanbo Block on Reru Kalung Bogo

156 | P a g e

C/o MIP Recommen Ziro - Minor ded by from Siya Reru Har Khet Very 195 Reru I CD WRD Irrigati 3.00 7.50 93*51'20"E 27*3527"N Kalung Ko Pani WRD ZPM/ACP, kKiiley to Block on High Reru Porii Bogo Kalung C/o MIP Recommen from Siya Ziro - Minor ded by Reru Har Khet Very 196 KIIley to Reru I CD WRD Irrigati 2.00 5.00 93*50'58"E 27*35'26"N WRD ZPM/ACP, Kalung Ko Pani High nenchang Block on Reru Kalung Bogo C/o MIP Recommen Ziro - Minor ded by from Siya Reru Har Khet Very 197 Reru I CD WRD Irrigati 2.00 5.00 93*50'45"E 27*35'26"N Kalung Ko Pani WRD ZPM/ACP, Kiiley to Block on High Reru Borii Bogo Kalung C/o MIP Ziro - Minor Recommen from Reru Har Khet Very 198 Reru I CD WRD Irrigati 2.00 5.00 93*50'36"E 27*35'19"N Kalung Ko Pani WRD ded by Yalangbo to Block on High ADO, Ziro PIIlepu

C/o MIP Ziro - Minor Recommen Reru Har Khet Very 199 from Khoda Reru I CD WRD Irrigati 3.00 7.50 93*50'42"E 27*35'55"N WRD ded by Kalung Ko Pani High to Kokhii Block on ADO, Ziro C/o MIP from Ziro - Minor Recommen kalung Reru Har Khet Very 200 Reru I CD WRD Irrigati 2.00 5.00 93*50'00"E 27*35'37"N Kalung Ko Pani WRD ded by Lengo Block on High ADO, Ziro Piting to Kokhii C/o MIP Ziro - Minor Recommen from lantii Reru Har Khet Very 201 Reru I CD WRD Irrigati 3.00 7.50 93*50'16"E 27*36'00"N Kalung Ko Pani WRD ded by to Lengo Block on High ADO, Ziro Ago

157 | P a g e

C/o MIP Ziro - Minor Recommen from Kimin Reru Har Khet Very 202 Reru I CD WRD Irrigati 2.00 5.00 93*51'12"E 27*36'00"N Kalung Ko Pani WRD ded by Kombu to Block on High ADO, Ziro Lantii Yasi C/o MIP at Ziro - Minor Exucutive Mikhu Reru Har Khet Very 203 Bulla I CD WRD Irrigati 2.00 5.00 93'48'51 E 27'32'56" N Enginner Kalung Ko Pani WRD Agyang to Block on High WRD, Ziro Mura Ago C/o MIP at Ziro - Minor Exucutive Abasala Har Khet Very 204 Siiro Niitii I CD WRD Irrigati 3.00 7.50 93'48'51 E 27'32'56" N Ko Pani WRD Enginner home stay Block on High WRD, Ziro to Kley C/o MIP at Ziro - Minor Exucutive Salii Lemo Har Khet Very 205 Siiro Niitii I CD WRD Irrigati 4.00 10.00 93'48'51 E 27'32'56" N Ko Pani WRD Enginner to Goribo Block on High WRD, Ziro Pakha

Ziro - Minor Recommen Micro/Fede Har Khet Very 206 Ziro I CD Agri Irrigati 20.00 106.20 93'48'51 E 27'32'56" N Ko Pani WRD ded by r channel Block on High ADO, Ziro

Ziro - Minor Recommen Micro/Fede Hong/ Har Khet Very 207 Hong/ Hari I CD Agri Irrigati 20.00 106.20 93'48'51 E 27'32'56" N Hari Ko Pani WRD ded by r channel Block on High ADO, Ziro

Ziro - Minor Exucutive Horticultur Har Khet Very 208 Siiro Niitii I CD WRD Irrigati 2.00 5.00 93'48'51 E 27'32'56" N Ko Pani WRD Enginner e at Miiring Block on High WRD, Ziro

158 | P a g e

PROPOSAL OF SCHEME FOR REPAIR, RESTORATION & RENOVATION OF NATURAL & TRADITIONAL WATER BODIES UNDER PMKSY (HAR KHET KO PANI)

Nam Concerne Executin Estimat e of d Are Work g Sl.N Name of Location/Vill Panchay Compone ed cost Longitu Lattitud CD Ministry/ Activity a in Priorit Agency/ o. Scheme age nt (in de e Remark at Bloc Departme Ha y Departme lakh) ks nt nt Renovation of Irrigation channel at Ziro - I Repair,Renovat Recommende Har Khet 93*51'25" 27*35'22" Very 1 Yabey Hari Hari CD WRD ion & 5.00 12.50 WRD d by ACP, Ko Pani E N High Sigang from Block Restoration Hari Siya piro to pyali Renovation of Irrigation Ziro - I Repair,Renovat Recommende channel at Har Khet 93*51'26" 27*35'28" Mediu 2 Hari Hari CD WRD ion & 5.00 12.50 d by ACP, Ko Pani E N WRD Gyang Block Restoration m Hari Siigang from Siya to Tahe Renovation of Irigation channel at Ziro - I Repair,Renovat Recommende Har Khet 93*51'07" 27*35'42" Mediu 3 tari Siigang Hari Hari CD WRD ion & 5.00 12.50 WRD d by ACP, Ko Pani E N m from Block Restoration Hari Tanang to Siijbo Renovation of Irrigation Ziro - I Repair,Renovat Recommende Har Khet 93*50'35" 27*35'14" Mediu 4 channel at Hari Hari CD WRD ion & 4.00 10.00 WRD d by ACP, Ko Pani E N m Mudo Bogo Block Restoration Hari Siigang from

159 | P a g e

Misuko to Lampiyo

Renovation of Irrigation Ziro - I Repair,Renovat Recommende channel at Har Khet 93*50'46" 27*34'49" 5 Hari Hari CD WRD ion & 5.00 12.50 d by ACP, Ko Pani E N Low WRD Pige Siiigang Block Restoration Hari from Pura to Pige Renovation of Irrigation channel at Ziro - I Repair,Renovat Recommende Har Khet 93*51'14" 27*35'31" 6 Hari Hari CD WRD ion & 5.00 12.50 d by ACP, Yasibo Ko Pani E N High WRD Siigang from Block Restoration Hari Yasino to Seli Renovation of Ziro - I Repair,Renovat Recommende Irrrigation Har Khet 93*50'00" 27*34'43" Mediu 7 Hari Hari CD WRD ion & 5.00 12.50 d by ACP, Ko Pani E N WRD channel at Block Restoration m Hari Pyuli Siigang to Seli Renovation of Irrigation Ziro - I Repair,Renovat Recommende channel at Har Khet 93*50'11" 27*34'54" Very 8 Hari Hari CD WRD ion & 5.00 12.50 d by ACP, Ko Pani E N WRD Tahe Siigang Block Restoration High Hari from Bolya to Tahe

160 | P a g e

Renovation of Irrigation channel at Ziro - I Repair,Renovat Recommende Har Khet 93*50'40" 27*34'48" 9 Hari Hari CD WRD ion & 5.00 12.50 d by ACP, Kulu Siigang Ko Pani E N Low WRD from Block Restoration Hari Yalangbo to Kulu Renovation of Irrigation channel at Ziro - I Repair,Renovat Recommende Neyung Har Khet 93*50'18" 27*34'46" 10 Hari Hari CD WRD ion & 4.00 10.00 d by ACP, Ko Pani E N Low WRD Siigang from Block Restoration Hari Siigang Nenting to tari Aji Renovation Recommend of Irrigation Ziro - I Repair,Renovat Har Khet 93*51'16" 27*33'40" Very e by 11 Hong Niichi CD WRD ion & 3.00 7.50 channel Ko Pani E N WRD Block Restoration High ACP/ZPM, from Sisang Niichii to Bakhanee Renovation Recommend Ziro - I Repair,Renovat of Irrigation Har Khet 93*50'51: 27*33'38" Very e by 12 Hong Niichi CD WRD ion & 2.00 5.00 Ko Pani E N WRD channel at Block Restoration High ACP/ZPM, Boda Aji Niichii Renovation of Irrigation Recommend Ziro - I Repair,Renovat channel Har Khet 93*50'57" 27*33'38" Very e by 13 Hong Niichi CD WRD ion & 5.00 12.50 Ko Pani E N WRD from Block Restoration High ACP/ZPM, Bohang to Niichii Lante Aji

161 | P a g e

Renovation Recommend of irrigation Ziro - I Repair,Renovat Har Khet 93*50'42" 27*31''02 Very e by 14 Hong Niichi CD WRD ion & 20.00 50.00 channel Ko Pani E "N WRD Block Restoration High ACP/ZPM, from Hale Niichii to Konti Aji Renovation Recommend Ziro - I Repair,Renovat of Irrigation Har Khet 93*50'44" 27*31'06" Very e by 15 Hong Niichi CD WRD ion & 3.00 7.50 Ko Pani E N WRD channel at Block Restoration High ACP/ZPM, Dusu Aji Niichii Renovation Recommend Ziro - I Repair,Renovat of Irrigation Har Khet 93*51''01" 27*33'58" Very e by 16 Hong Niichi CD WRD ion & 2.00 5.00 Ko Pani E N WRD channel at Block Restoration High ACP/ZPM, Midingya Aji Niichii Renovation of Irrigation Recommend Ziro - I Repair,Renovat channel Har Khet 93*50'34" 27*33'35" Very e by 17 Hong Niichi CD WRD ion & 3.00 7.50 Ko Pani E N WRD from Block Restoration High ACP/ZPM, Narapabu to Niichii Kimelya Renovation of Irrigation Ziro - I Repair,Renovat Recommend Har Khet 93*49'54" 27*36'03" Very 18 channel at Tajang Tajang CD WRD ion & 3.00 7.50 WRD e by ZPM, Ko Pani E N High Paringliya Block Restoration Tajang Borang Renovation of Irrigation Ziro - I Repair,Renovat Recommend channel at Har Khet 93*50'16" 27*36'35" Very 19 Tajang Tajang CD WRD ion & 3.00 7.50 e by ZPM, Ko Pani E N WRD Lower Block Restoration High Tajang Myolyang Borang

162 | P a g e

Renovation of Irrigation channel at Ziro - I Repair,Renovat Recommend Lempia Har Khet 93*59'49" 27*03'07" Very 20 Tajang Tajang CD WRD ion & 3.00 7.50 e by ZPM, Ko Pani E N WRD Akang Block Restoration High Tajang Gyadu Borang(Low er) Renovation of Irrigation Ziro - I Repair,Renovat Recommend Har Khet 93*50'07" 27*35'50" Mediu 21 channel at Tajang Tajang CD WRD ion & 3.00 7.50 WRD e by ZPM, Ko Pani E N m Tajang Block Restoration Tajang Borang Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'51'18" 27'31'47" Very 22 Hong CD WRD ion & 20.00 50.00 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Tiibeko Repair, Renovation Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'50'28" 27'31'24" Very 23 & Hong CD WRD ion & 25.00 62.50 WRD Enginner Niiitii Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Dusu Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'50'33" 27'31'31" Very 24 Hong CD WRD ion & 25.00 62.50 Enginner Niiitii Ko Pani E N WRD Restoration Block Restoration High WRD, Ziro MIP at Siirii Pobu

163 | P a g e

Repair, Renovation Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'50'30" 27'31'42" Very 25 & Hong CD WRD ion & 40.00 100.00 WRD Enginner Niiitii Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Gyai Repair, Renovation Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'51'17" 27'32'02" Very 26 & Hong CD WRD ion & 30.00 75.00 WRD Enginner Niiitii Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Diilo Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'51'25" 27'32'08" Very 27 Hong CD WRD ion & 40.00 100.00 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Pokhe Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 120.0 93'50'37" 27'31'48" Very 28 Hong CD WRD ion & 300.00 Enginner Niiitii Ko Pani 0 E N WRD Restoration Block Restoration High WRD, Ziro MIP at Loder Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'50'39" 27'32'56" Very 29 Hong CD WRD ion & 60.00 150.00 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Tayuko Repair, Ziro - I Repair,Renovat Exucutive Renovation Niichi- Har Khet 93'50'32" 27'31'27" Very 30 Hong CD WRD ion & 30.00 75.00 Niiitii Ko Pani E N WRD Enginner & Block Restoration High WRD, Ziro Restoration

164 | P a g e

MIP at LIIpa Gyai

Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 160.0 93'50'36" 27'32'42" Very 31 Hong CD WRD ion & 400.00 Niiitii Ko Pani 0 E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Dokho Repair, Renovation Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'50'06" 27'32'58" Very 32 & Hong CD WRD ion & 40.00 100.00 WRD Enginner Niiitii Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Gano Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'49'58" 27'33'10" Very 33 Hong CD WRD ion & 60.00 150.00 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Kiilebya Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'51'03" 27'33'33" Very 34 Hong CD WRD ion & 45.00 112.50 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Ukopo Repair, Renovation Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'50'52" 27'33'38" Very 35 & Hong CD WRD ion & 60.00 150.00 WRD Enginner Niiitii Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Papii

165 | P a g e

Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'51'08" 27'33'30" Very 36 Hong CD WRD ion & 45.00 112.50 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Tabosorang Repair, Renovation Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'51'24" 27'33'39" Very 37 & Hong CD WRD ion & 20.00 50.00 WRD Enginner Niiitii Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Pachi Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'51'11" 27'33'37" Very 38 Hong CD WRD ion & 45.00 112.50 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Lampiir Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'51'39" 27'33'36" Very 39 Hong CD WRD ion & 40.00 100.00 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Sisang Repair, Renovation & Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'51'36" 27'33'39" Very 40 Restoration Hong CD WRD ion & 45.00 112.50 WRD Enginner Niiitii Ko Pani E N High MIP at Block Restoration WRD, Ziro Akang Sisang

166 | P a g e

Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'51'50" 27'33'28" Very 41 Hong CD WRD ion & 40.00 100.00 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Ayo Sisang Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'52'15" 27'33'30" Very 42 Hong CD WRD ion & 25.00 62.50 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Siikhebo Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'51'01" 27'33'48" Very 43 Hong CD WRD ion & 30.00 75.00 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Midingya Repair, Renovation & Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'51'32" 27'33'48" Very 44 Restoration Hong CD WRD ion & 35.00 87.50 WRD Enginner Niiitii Ko Pani E N High MIP at Block Restoration WRD, Ziro Bakhang Anii Repair, Renovation Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'50'51" 27'33'38" Very 45 & Hong CD WRD ion & 45.00 112.50 WRD Enginner Niiitii Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Siilyo

167 | P a g e

Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 936'50'50 27'33'35" Very 46 Hong CD WRD ion & 30.00 75.00 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Bari Bogo Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'50'41" 27'33'44" Very 47 Hong CD WRD ion & 60.00 150.00 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Hanoko Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'50'33" 27'33'38" Very 48 Hong CD WRD ion & 35.00 87.50 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Siikhe Piting Repair, Renovation Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'50'06" 27'33'35" Very 49 & Hong CD WRD ion & 60.00 150.00 WRD Enginner Niiitii Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Boda Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'50'34" 27'30'42" Very 50 Hong CD WRD ion & 25.00 62.50 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Hakhe Tari Repair, Ziro - I Repair,Renovat Exucutive Renovation Niichi- Har Khet 93'51'27" 27'31'55" Very 51 Hong CD WRD ion & 45.00 112.50 Niiitii Ko Pani E N WRD Enginner & Block Restoration High WRD, Ziro Restoration

168 | P a g e

MIP at Parung

Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'51'08" 27'32'23" Very 52 Hong CD WRD ion & 30.00 75.00 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Ayo Pokhe Repair, Renovation Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'50'53" 27'34'18" Very 53 & Hong CD WRD ion & 45.00 112.50 WRD Enginner Niiitii Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Pyuli Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'50'46" 27'34'20" Very 54 Hong CD WRD ion & 40.00 100.00 Niiitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Akang Pyuli Repair, Renovation Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'50'45" 27'34'29" Very 55 & Hong CD WRD ion & 45.00 112.50 WRD Enginner Niiitii Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Dobii Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'50'20" 27'33'57" Very 56 Hong CD WRD ion & 40.00 100.00 Enginner Niiitii Ko Pani E N WRD Restoration Block Restoration High WRD, Ziro MIP at Kensang

169 | P a g e

Repair, Renovation & Ziro - I Repair,Renovat Exucutive Har Khet 200.0 93'50'39" 27'35'14" Very 57 Restoration Hari Hari CD WRD ion & 500.00 WRD Enginner Ko Pani 0 E N High MIP at Block Restoration WRD, Ziro Gyayang Siigang Repair, Renovation & Ziro - I Repair,Renovat Exucutive Har Khet 120.0 93'50'41" 27'35'20" Very 58 Restoration Hari Hari CD WRD ion & 300.00 WRD Enginner Ko Pani 0 E N High MIP at Block Restoration WRD, Ziro Yabey Siigang Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 150.0 93'51'20" 27'35'04" Very 59 Hari Hari CD WRD ion & 375.00 Enginner Ko Pani 0 E N WRD Restoration Block Restoration High WRD, Ziro MIP at Yasibo Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 120.0 93'51'15" 27'35'25" Very 60 Hari Hari CD WRD ion & 300.00 Ko Pani 0 E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Hari- I Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 100.0 93'50'17" 27'34'42" Very 61 Hari Hari CD WRD ion & 250.00 Ko Pani 0 E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Hari- II

170 | P a g e

Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 93'51'16" 27'34'36" Very 62 Hari Hari CD WRD ion & 60.00 150.00 Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Hari- III Repair, Renovation Ziro - I Repair,Renovat Exucutive & Reru Har Khet 120.0 93'51'30" 27'35'49" Very 63 Reru Kalung CD WRD ion & 300.00 Kalung Ko Pani 0 E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Tanang Repair, Renovation Ziro - I Repair,Renovat Exucutive & Reru Har Khet 140.0 93'51'14" 27'35'43" Very 64 Reru Kalung CD WRD ion & 350.00 Kalung Ko Pani 0 E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Salaya Repair, Renovation Ziro - I Repair,Renovat Exucutive & Reru Har Khet 120.0 93'50'08" 27'35'47" Very 65 Reru Kalung CD WRD ion & 300.00 Kalung Ko Pani 0 E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Kokhii Repair, Renovation Ziro - I Repair,Renovat Exucutive & Reru Har Khet 93'50'45" 27'35'55" Very 66 Reru Kalung CD WRD ion & 80.00 200.00 Enginner Kalung Ko Pani E N WRD Restoration Block Restoration High WRD, Ziro MIP at Midey

171 | P a g e

Repair, Renovation Ziro - I Repair,Renovat Exucutive & Reru Har Khet 93'50'55" 27'36'00" Very 67 Reru Kalung CD WRD ion & 60.00 150.00 Kalung Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Mira Ago Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 100.0 93'50'14" 27'36'02" Very 68 Tajang Tajang CD WRD ion & 250.00 Ko Pani 0 E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Tajang Kley Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 120.0 93'50'17" 27'36'47" Very 69 Tajang Tajang CD WRD ion & 300.00 Ko Pani 0 E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Pine Groove Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 140.0 93'49'45" 27'36'22" Very 70 Tajang Tajang CD WRD ion & 350.00 Ko Pani 0 E N WRD Enginner Restoration Block Restoration High WRD, Ziro Mip at Lempia Kley Repair, Renovation & Ziro - I Repair,Renovat Exucutive Har Khet 145.0 93'49'46" 27'36'11" Very 71 Restoration Tajang Tajang CD WRD ion & 362.50 WRD Enginner Ko Pani 0 E N High MIP at Block Restoration WRD, Ziro Tajang Gyadu

172 | P a g e

Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 93'49'04" 27'36'34" Very 72 Tajang Tajang CD WRD ion & 60.00 150.00 Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Supyu Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 93'49'22" 27'36'49" Very 73 Tajang Tajang CD WRD ion & 30.00 75.00 Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Siikhe Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 93'35'48" 27'35'48: Very 74 Old Ziro Old Ziro CD WRD ion & 45.00 112.50 Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Old Ziro Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 93'48'58" 27'35'50" Very 75 Hija Hija CD WRD ion & 60.00 150.00 Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Siilang Repair, Renovation Ziro - I Repair,Renovat Exucutive Har Khet 93'49'23" 27'35'25" Very 76 & Hija Hija CD WRD ion & 45.00 112.50 WRD Enginner Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Siikar Repair, Ziro - I Repair,Renovat Exucutive Renovation Har Khet 93'49'24" 27'35'08" Very 77 Hija Hija CD WRD ion & 60.00 150.00 Ko Pani E N WRD Enginner & Block Restoration High WRD, Ziro Restoration

173 | P a g e

MIP at Tadubo

Repair, Renovation Ziro - I Repair,Renovat Exucutive Har Khet 93'49'13" 27'34'51" Very 78 & Hija Hija CD WRD ion & 40.00 100.00 WRD Enginner Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Hija-I Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 93'49'31" 27'34'49" Very 79 Hija Hija CD WRD ion & 45.00 112.50 Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Hija- II Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 93'49'45" 27'34'41" Very 80 Dutta Diibo CD WRD ion & 40.00 100.00 Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Dutta Repair, Renovation & Ziro - I Repair,Renovat Exucutive Har Khet 93'50'06" 27'34'23" Very 81 Restoration Mudang Tage Diibo CD WRD ion & 45.00 112.50 WRD Enginner Ko Pani E N High MIP at Block Restoration WRD, Ziro Mudang Tage Repair, Renovation Ziro - I Repair,Renovat Exucutive Har Khet 93'49'57" 27'34'16" Very 82 & Mudang Tage Diibo CD WRD ion & 60.00 150.00 WRD Enginner Ko Pani E N High Restoration Block Restoration WRD, Ziro Mip at Diibo

174 | P a g e

Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 93'49'51" 27;34;06" Very 83 Bamin MIchi Diibo CD WRD ion & 45.00 112.50 Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Bamin Michi Repair, Renovation Ziro - I Repair,Renovat Exucutive Har Khet 93'48'41" 27'32'45" Very 84 & Bamin MIchi Diibo CD WRD ion & 60.00 150.00 WRD Enginner Ko Pani E N High Restoration Block Restoration WRD, Ziro MIP at Siibe Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 93'48'23' 27'32'58" Very 85 Bamin MIchi Diibo CD WRD ion & 45.00 112.50 Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Kardo Repair, Renovation Ziro - I Repair,Renovat Exucutive & Har Khet 93'48'43" 27'32'16" Very 86 Bamin MIchi Diibo CD WRD ion & 40.00 100.00 Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Hill Top Repair, Renovation Ziro - I Repair,Renovat Exucutive & Niichi- Har Khet 93'50'04" 27'33'14" Very 87 Hong CD WRD ion & 60.00 150.00 Niitii Ko Pani E N WRD Enginner Restoration Block Restoration High WRD, Ziro MIP at Bochi

Repair, Ziro - I Repair,Renovat Exucutive Niichi- Har Khet 93'49'53" 27'33'13" Very 88 Renovation Hong CD WRD ion & 40.00 100.00 WRD Enginner Niitii Ko Pani E N High & Block Restoration WRD, Ziro

175 | P a g e

Restoration MIP at Duku

Repairing renovation & Ziro - I Repair,Renovat Recommend Har Khet 27'32'56" Very 89 Restoration Ziro CD Agri ion & 3.00 7.00 93'48'51 E WRD ed by ADO, Ko Pani N High of Existing Block Restoration Ziro irrigatio Channel Repairing renovation & Ziro - I Repair,Renovat Recommend Har Khet 27'32'56" Very 90 Restoration Hong/ Hari Hong/ Hari CD Agri ion & 3.00 7.00 93'48'51 E WRD ed by ADO, Ko Pani N High of Existing Block Restoration Ziro irrigatio Channel

176 | P a g e

PROPOSAL OF SCHEME FOR COMMAND AREA DEVELOPMENT AND STRENGTHENING OF DISTRIBUTION NETWORK UNDER PMKSY (HAR KHET KO PANI)

Name Concerne Executing of d Comma Estimate Work Sl.N Name of Location/Villa Panchay Compone Activit Longitu Lattitu Agency/ CD Ministry/ nd Area d cost Priorit o. Scheme ge nt y de de Departme Remark at Block Departme in Ha (in lakh) y nt s nt Command Area Developmen Ziro - I Exucutive t and Har Khet 27'14'12" Very 1 Siiro Niitii CD WRD CAD 100.00 150.00 93'50'49' E Ko Pani N WRD Enginner distribution Block High WRD, Ziro Network system at Siiro Command Area Developmen Ziro - I Exucutive t and Har Khet 27'22'59" Very 2 Hari Hari CD WRD CAD 90.00 135.00 93'56'49' E Ko Pani N WRD Enginner distribution Block High WRD, Ziro Network system at Siya Piro Command Area Developmen Ziro - I Exucutive t and Har Khet 27'32'52" Very 3 Tajang Tajang CD WRD CAD 80.00 120.00 93'49'19' E Ko Pani N WRD Enginner distribution Block High WRD, Ziro Network system at Supyu Command Area Ziro - I Exucutive NiIchii Har Khet 27'52'22" Very 4 Developmen Hong CD WRD CAD 85.00 127.50 93'53'29' E WRD Enginner Niitiii Ko Pani N High t and Block WRD, Ziro distribution

177 | P a g e

Network system at Pange Command Area Developmen Ziro - I Exucutive t and Reru Har Khet 27'33'42" Very 5 Reru CD WRD CAD 90.00 135.00 93'49'39' E Kalung Ko Pani N WRD Enginner distribution Block High WRD, Ziro Network system at Tanang Command Area Developmen Ziro - I Exucutive t and Har Khet 27'35'15" Very 6 Hija Hija CD WRD CAD 80.00 120.00 93'48'39' E Ko Pani N WRD Enginner distribution Block High WRD, Ziro Network system at Siilang Command Area Developmen Ziro - I Exucutive t and Har Khet 27'32'52" Very 7 Diibo Diibo CD WRD CAD 90.00 135.00 93'53'49' E Ko Pani N WRD Enginner distribution Block High WRD, Ziro Network system at Pyuli Command Area Developmen Ziro - I Exucutive t and NiIchii Har Khet 27'46'02" Very 8 Hong CD WRD CAD 80.00 120.00 93'56'29' E Niitiii Ko Pani N WRD Enginner distribution Block High WRD, Ziro Network system at Siikhebo

178 | P a g e

Comand Ziro - I Recommend area Har Khet 27'32'56" Very 9 Ziro Ziro CD Agri CAD 400.00 200.00 93'48'51 E Ko Pani N WRD ed by ADO, Developme Block High Ziro nt Comand Ziro - I Recommend area Har Khet 27'32'56" Very 10 Hong/ Hari Hong/ Hari CD Agri CAD 400.00 200.00 93'48'51 E ed by ADO, Ko Pani N WRD Developme Block High Ziro nt

Command Ziro - I Exucutive Har Khet 27'32'56" Very 11 Area at Hong NiIchii CD Agri CAD 100.00 150.00 93'48'51 E WRD Enginner Ko Pani N High Bakhanee Block WRD, Ziro Ziro - I Recommend Area Har Khet 27'32'56" Very 12 Ziro Ziro CD Agri CAD 100.00 75.00 93'48'51 E Ko Pani N WRD ed by ADO, expansion Block High Ziro Ziro - I Recommend Area Har Khet 27'32'56" Very 13 Hong/ Hari Hong/ Hari CD Agri CAD 100.00 75.00 93'48'51 E Ko Pani N WRD ed by ADO, expansion Block High Ziro

179 | P a g e

PROPOSAL OF SCHEME FOR IMPROVEMENT IN WATER MANAGEMENT AND DISTRIBUTION SYSTEM UNDER PMKSY (HAR KHET KO PANI) Nam Concerne Executin Estimat e of d Work g Name of Location/Vil Panchay Compone Activit No./Un ed cost Longitu Lattitu Sl.No. CD Ministry/ Priorit Agency/ Scheme lage nt y it (in de de Remark at Bloc Departme y Departme lakh) ks nt nt Water Drafting Plant for Kiwi Garden, Cardamom garden, Ziro - I Minor Recommende Domestic Har Khet 27'32'56" 1 Hari Hari CD WRD Irrigatio 4.00 10.00 93'48'51 E d by ACP, Ko Pani N Low WRD vegetale Block n Hari Garden at Yabey, Yachi, Siya Piro, Koth morey and Pyuli Watershed management plant for Plantation of Ziro - I Recommende Tree at Yachi, Har Khet Watersh 27'32'56" Very 2 Hari Hari CD WRD 5.00 12.50 93'48'51 E d by ACP, Ko Pani ed N WRD Yath, Balyi, Block High Hari Ngira, Koth, Siya Piro, Miichi, Molyi, and Yasibo

180 | P a g e

Watreshed management plant for Plantation of Recommend trees at Ziro - I Har Khet Watersh 27'32'56" Very e by 3 Hong Niichi CD WRD 2.00 5.00 93'48'51 E Sikhebo, Giha, Ko Pani ed N WRD Block High ACP/ZPM, Sibiko, Niichii Sitingko, Khahu Lalasasung, Khatiyorlo Water Drifting plan for Kiwi Recommend Ziro - I Garden at Har Khet Watersh 27'32'56" Very e by 4 Hong Niichi CD WRD 5.00 12.50 93'48'51 E Ko Pani ed N WRD Manipolyang Block High ACP/ZPM, and Siiro(5 Niichii sets)

Watershed Ziro - I Minor Recommend Har Khet 27'32'56" Very 5 development Ziro CD Agri Irrigatio 500.00 600.00 93'48'51 E WRD ed by ADO, Ko Pani N High programme Block n Ziro

Watershed Ziro - I Recommend Har Khet 27'32'56" Very 6 development Hong/ Hari Hong/ Hari CD Agri WDP 500.00 600.00 93'48'51 E WRD ed by ADO, Ko Pani N High programme Block Ziro

181 | P a g e

PROPOSAL OF SCHEME FOR FLOOD CONTROL STRUCTURE UNDER PMKSY (HAR KHET KO PANI) Concerne Name d Estimate Executing Sl.N Name of Location/Villa Panchay of CD Compone No./Un Work Ministry/ Activity d cost Longitude Lattitude Agency/ o. Scheme ge Block nt it Priority Remark at Departme (in lakh) Department s nt C/o Flood Constructi on of control Ziro - I check dam, Har Khet Ko Very Recommended by 1 Hari Hari CD WRD Barrage 10.00 2.50 93*50'40"E 27*35'24"N structure Pani WRD ACP, Hari Block and High at Siya Eatrhen Kiiley Bund C/o Flood Constructi on of control Ziro - I check dam, Har Khet Ko Very Recommended by 2 Hari Hari CD WRD Barrage 3.00 0.75 93*51'39"E 27*36'00"N structure Pani WRD ACP, Hari Block and High at Giyang Eatrhen Siigang Bund Constructi C/o Flood on of Ziro - I check dam, control Har Khet Ko Very Recommended by 3 Hari Hari CD WRD Barrage 4.00 1.00 93*51'19"E 27*35'08"N Pani WRD ACP, Hari structure Block and High at Yasibo Eatrhen Bund C/o Flood Constructi on of Control Ziro - I check dam, Recommende Har Khet Ko Very 4 Hong Niichi CD WRD Barrage 3.00 0.75 93*50'13"E 27*32'53"N structure Pani WRD by ACP/ZPM, Block and High Niichii at Gano Eatrhen Nallah Bund C/o Flood Constructi on of Control Ziro - I check dam, Recommende Har Khet Ko Very 5 Hong Niichi CD WRD Barrage 5.00 1.25 93*50'22"E 27*33'08"N structure Pani WRD by ACP/ZPM, Block and High Niichii at Minyi Eatrhen Nallah Bund

182 | P a g e

C/o Flood Control Constructi on of structure Ziro - I check dam, Recommende Har Khet Ko Very 6 Hong Niichi CD WRD Barrage 4.00 1.00 93*50'45"E 27*33'36"N from Pai Pani WRD by ACP/ZPM, Block and High Niichii achang to Eatrhen Sikhe Bund Piiting C/o Flood Constructi on of Control Ziro - I check dam, Recommende Har Khet Ko Very 7 Hong Niichi CD WRD Barrage 3.00 0.75 93*49'41"E 27*32'41"N structure Pani WRD by ACP/ZPM, Block and High Niichii at Sibey Eatrhen siigang Bund

C/o Flood Constructi control on of Ziro - I check dam, Recommende structure Har Khet Ko Very 8 Hong Niichi CD WRD Barrage 5.00 1.25 93*50'31"E 27*33'46"N Pani WRD by ACP/ZPM, at Hanoko Block and High Niichii under Sirey Eatrhen Bund Sigang C/o Flood control Constructi on of structure Ziro - I check dam, Recommende Har Khet Ko Very 9 Hong Niichi CD WRD Barrage 4.00 1.00 93*50'55"E 27*33'34"N at Lengo Pani WRD by ACP/ZPM, Block and High Niichii Aji under Eatrhen Hong Sikhe Bund river C/o Flood Constructi on of Control Ziro - I check dam, Har Khet Ko Very Recommende 10 Hong Niitii CD WRD Barrage 3.00 0.75 93'50'24" E 27'31'32" N Structure Pani WRD Block and High by ZPM, Niitii at Uko Earthen Sethi Bund Constructi C/o Flood Ziro - I Har Khet Ko on of Very Recommende 11 Hong Niitii CD WRD 2.00 0.50 93'50'31" E 27'31'03" N Control Pani check dam, WRD Block High by ZPM, Niitii Structure Barrage

183 | P a g e

at Siro and Earthen bridge Bund point Constructi C/o Flood on of Ziro - I check dam, Control Har Khet Ko Very Recommende 12 Hong Niitii CD WRD Barrage 5.00 1.25 93'51'29" E 27'33'39" N Pani WRD Structure Block and High by ZPM, Niitii at Parchi Earthen Bund Constructi C/o Flood on of Ziro - I check dam, Control Har Khet Ko Very Recommende 13 Hong Niitii CD WRD Barrage 3.00 0.75 93'51'16" E 27'32'08" N Pani WRD Structure Block and High by ZPM, Niitii at Nanu Earthen Bund C/o Flood Constructi on of Control Ziro - I check dam, Har Khet Ko Very Recommende 14 Hong Niitii CD WRD Barrage 2.00 0.50 93'50'59" E 27'33'28" N Structure Pani WRD Block and High by ZPM, Niitii at Tilling Earthen Sukung Bund Constructi C/o Flood on of Ziro - I check dam, Control Har Khet Ko Very Recommende 15 Hong Niitii CD WRD Barrage 3.00 0.75 93'51'01" E 27'33'36" N Pani WRD Structure Block and High by ZPM, Niitii at Parpii Earthen Bund Constructi C/o Flood on of Ziro - I check dam, Control Har Khet Ko Very Recommende 16 Hong Niitii CD WRD Barrage 3.00 0.75 93'51'60" E 27'27'15" N Pani WRD Structure Block and High by ZPM, Niitii at Lyago Earthen Bund Constructi C/o Flood on of Ziro - I check dam, Control Har Khet Ko Very Recommende 17 Hong Niitii CD WRD Barrage 2.00 0.50 93'50'45" E 27'32'10" N Pani WRD Structure Block and High by ZPM, Niitii at Sesang Earthen Bund

184 | P a g e

C/o Flood Constructi on of Constructi Ziro - I check dam, Har Khet Ko Very Recommende 18 Hong Niitii CD WRD Barrage 3.00 0.75 93'50'68" E 27'32'18" N on Pani WRD Block and High by ZPM, Niitii Structure Earthen at Diignane Bund Constructi C/o Flood on of Ziro - I check dam, Control Har Khet Ko Very Recommende 19 Hong Niitii CD WRD Barrage 2.00 0.50 93'50'57" E 27'32'15" N Pani WRD Structure Block and High by ZPM, Niitii at Lyoyo Earthen Bund C/o Flood Constructi on of Control Ziro - I check dam, Har Khet Ko Very Recommende 20 Hong Niitii CD WRD Barrage 3.00 0.75 93'50'55" E 27'28'18" N Structure Pani WRD Block and High by ZPM, Niitii at Segang Earthen Pabu Bund

185 | P a g e

PROPOSAL OF SCHEME FOR CREATION AND REJUVENATION OF TRADITIONAL WATER STORAGE SYSTEM UNDER PMKSY (HAR KHET KO PANI)

Name Concerne Executing of d Estimate Sl.No Name of Location/Villa Panchay Compone No./Un Work Agency/ CD Ministry/ Activity d cost Longitude Lattitude . Scheme ge nt it Priority Departmen Remark at Block Departme (in lakh) t s nt Constructi on of Water Check Ziro - I Dam/ Exucutive consrvetion Har Khet 1 Hari Hari CD WRD Irrigation 800.00 2000.00 93*51'26"E 27*35'28"N Ko Pani Very High WRD Enginner WRD, and MIP at Block Tank/pond Ziro Siya Kley and irigation channel Constructi on of Water Check Ziro - I Dam/ Exucutive consrvetion Har Khet 2 Tajang Tajang CD WRD Irrigation 600.00 1500.00 93'49'22" E 27'36'49" N Ko Pani Very High WRD Enginner WRD, and MIP Block Tank/pond Ziro Tajang Siikhe and irigation channel Constructi on of Water Check Ziro - I Dam/ Exucutive consrvetion Har Khet 3 Tajang Tajang CD WRD Irrigation 400.00 1000.00 93'49'04" E 27'36'34" N Ko Pani Very High WRD Enginner WRD, and MIP Block Tank/pond Ziro Supyu and irigation channel Constructi on of Water Check Ziro - I Dam/ Exucutive consrvetion Har Khet 4 Hong Hongi CD WRD Irrigation 400.00 1000.00 93*52'12"E 27*33'32"N Ko Pani Very High WRD Enginner WRD, and MIP Hong Block Tank/pond Ziro Siikhe and irigation channel

186 | P a g e

Constructi on of Water Check Ziro - I Dam/ Exucutive consrvetion Har Khet 5 Hija Hija CD WRD Irrigation 200.00 500.00 93'48'58" E 27'35'50" N Ko Pani Very High WRD Enginner WRD, and MIP Block Tank/pond Ziro Siilang and irigation channel Constructi on of Water Check Ziro - I Dam/ Exucutive consrvetion Har Khet 6 Hong Hong CD WRD Irrigation 1200.00 3000.00 93'53'49' E 27'32'52" N Ko Pani Very High WRD Enginner WRD, and MIP Block Tank/pond Ziro Pange and irigation channel

Ziro - I Har Khet Minor Recommended 7 Ziro CD Agri 10.00 50.00 93'48'51 E 27'32'56" N Farm pond Ko Pani Irrigation Medium WRD Block by ADO, Ziro

Ziro - I Har Khet Recommended 8 Hong/ Hari Hong/ Hari CD Agri Fishery 10.00 50.00 93'48'51 E 27'32'56" N Farm pond Ko Pani Very High WRD Block by ADO, Ziro

C/o of Intake Minor Dam for Ziro - I Har Khet Irrigation, Recommended by 9 Hari Hari CD WRD 4.00 10.00 93*52'06"E 27*35'33"N irrigation Ko Pani Contructio Low WRD ACP, Hari Block canal at Siya n of Canal piro Capacity Ziro - I Building, Har Khet Recommended 10 Ziro CD Agri Training 25.00 93'48'51 E 27'32'56" N Ko Pani Very High WRD training and Block by ADO, Ziro Exposure visit Capacity Ziro - I Building, Har Khet Minor Recommended 11 Hong/ Hari Hong/ Hari CD Agri 25.00 93'48'51 E 27'32'56" N Ko Pani Irrigation Very High WRD training and Block by ADO, Ziro Exposure visit

187 | P a g e

PROPOSAL OF SCHEME FOR GROUND WATER DEVELOPMENT UNDER PMKSY (HAR KHET KO PANI)

Nam Concerne Executin Estimat e of d g Sl.N Location/Vill Panchay Compon Activi No./U ed cost Work Name of Scheme CD Ministry/ Longitude Lattitude Agency/ o. age ent ty nit (in Priority Remark at Bloc Departm Departm lakh) ks ent ent Ziro - Minor C/o of Tube well at Har Khet Recommended by 1 Hari Hari I CD WRD Irrigatio 3.00 7.50 93*50'39"E 27*34'59"N Ko Pani Low WRD ACP, Hari Tasso lemba Block n Ziro - Minor C/o of Tube well at Har Khet Recommended by 2 Hari Hari I CD WRD Irrigatio 5.00 12.50 93*50'46"E 27*34'52"N Ko Pani Low WRD ACP, Hari Bolya Block n Ziro - Minor C/o of Tube well at Har Khet Recommended by 3 Hari Hari I CD WRD Irrigatio 5.00 12.50 93*50'28"E 27*'34'47"N Ko Pani Low WRD ACP, Hari Megyang Block n

Ziro - Minor C/o Tube well at Har Khet Recommended by 4 Hari Hari I CD WRD Irrigatio 4.00 10.00 93*50'30"E 27*35'03"N Ko Pani Low WRD ACP, Hari Byara Block n Ziro - Minor C/o of Tube well at Har Khet Recommended by 5 Hari Hari I CD WRD Irrigatio 5.00 12.50 93*50'22"E 27*34'57"N Ko Pani Low WRD ACP, Hari Anthali Block n Ziro - Minor C/o of Tube well at Har Khet Recommended by 6 Hari Hari I CD WRD Irrigatio 3.00 7.50 93*50'38"E 27*56'28"N Ko Pani Low WRD ACP, Hari Gyati Nako Block n Ziro - Minor Har Khet Recommended by 7 C/o Tube well at Puru Hari Hari I CD WRD Irrigatio 4.00 10.00 93*50'39"E 27*35'04"N Ko Pani Low WRD ACP, Hari Sukung Block n Ziro - Minor C/o Tube well at Har Khet Recommended by 8 Hari Hari I CD WRD Irrigatio 5.00 12.50 93*50'34"E 27*34'57"N Ko Pani Low WRD ACP, Hari Dinkhung Block n Ziro - Minor C/o Tube well at Tari Har Khet Recommended by 9 Hari Hari I CD WRD Irrigatio 6.00 15.00 93*50'41"E 27*35'02"N Ko Pani Low WRD ACP, Hari Lembo Block n Ziro - Minor Har Khet Recommended by 10 C/o Tube well at Hari Hari I CD WRD Irrigatio 2.00 5.00 93*50'35"E 27*35'04"N Ko Pani Low WRD ACP, Hari Landi Sukung Block n Ziro - Minor Har Khet Recommended by 11 C/o Tube well at Hari Hari I CD WRD Irrigatio 3.00 7.50 93*50'34"E 27*35'05"N Ko Pani Low WRD ACP, Hari Tailyang Sukung Block n

188 | P a g e

Ziro - Minor Har Khet Recommended by 12 C/o Tube well at Siiko Hari Hari I CD WRD Irrigatio 4.00 10.00 93*50'36"E 27*35'07"N Ko Pani Low WRD ACP, Hari Siibyo Block n Ziro - Minor C/o Tube well at Har Khet Recommended by 13 Hari Hari I CD WRD Irrigatio 5.00 12.50 93*50'26"E 27*35'01"N Ko Pani Low WRD ACP, Hari Doging Sukung Block n Ziro - Minor C/o Tube well at Har Khet Recommended by 14 Hari Hari I CD WRD Irrigatio 5.00 12.50 93*50'24"E 27*35'00:N Ko Pani Low WRD ACP, Hari Dimper Sukung Block n Ziro - Minor C/o Tube well at Kuru Har Khet Recommended by 15 Hari Hari I CD WRD Irrigatio 6.00 15.00 93*50"26"E 27*34'57"N Ko Pani Low WRD ACP, Hari Sukung Block n Construction of Tube wells to tap the ground water fro Ziro - Minor Recommende by Har Khet 16 Hong Niichi I CD WRD Irrigatio 3.00 7.50 93'48'51 E 27'32'56" N domestic uses, Ko Pani Low WRD ACP/ZPM, Argi/Horti and Block n Niichii irrigation purposes (10 nos.) Ziro - Minor Har Khet Recommended by 17 Ziro I CD Agri Irrigatio 1.00 12.50 93'48'51 E 27'32'56" N Dug well Ko Pani Low WRD Block n ADO, Ziro Ziro - Minor Har Khet Very Recommended by 18 Hong/ Hari Hong/ Hari I CD Agri Irrigatio 1.00 12.50 93'48'51 E 27'32'56" N Dug well Ko Pani WRD Block n High ADO, Ziro

189 | P a g e

PROPOSAL OF SCHEME FOR WATER HARVESTING STRUCTURE UNDER PMKSY

Name Concerned Executing Estimate Work Sl.No Name of Location/Villag Panchaya of CD Ministry/ Componen No./Uni Agency/ Activity d cost (in Longitude Lattitude Priorit Remark e t Block Departmen t t Departmen . Scheme lakh) y s t t C/o Water Ziro - Recommende Harvesting Har Khet Minor 93*50'42" 27*35'13" Very 1 Hari Hari I CD WRD 6.00 15.00 WRD d by ACP, Ko Pani Irrigation E N plant at Block High Hari Miichi C/o Water Ziro - Recommende Harvesting Har Khet Minor 93*51'28" 27*35'52" Very 2 Hari Hari I CD WRD 8.00 20.00 WRD d by ACP, Ko Pani Irrigation E N plant at Block High Hari Hagio C/o Water Ziro - Recommende harvesting Har Khet Minor 93*51'08" 27*35'39" Very 3 Hari Hari I CD WRD 6.00 15.00 WRD d by ACP, Ko Pani Irrigation E N plant at Block High Hari Taglemp Water Ziro - Recommende harvesting Har Khet Minor 93*51'28" 27*34'02" Very 4 Hong Niichi I CD WRD 3.00 7.50 WRD by ACP/ZPM, Ko Pani Irrigation E N High Plant at Block Niichii Sikhebo Water Ziro - Recommende harvesting Har Khet Minor 93*50'19" 27*32'44" Very 5 Hong Niichi I CD WRD 2.00 5.00 WRD by ACP/ZPM, Ko Pani Irrigation E N Plant at Block High Niichii Gano Rain water Ziro - Recommende harvesting Har Khet Minor Very 6 Hong Niichi I CD WRD 4.00 10.00 93'48'51 E 27'32'56" N WRD by ACP/ZPM, Ko Pani Irrigation Tank-25 Block High Niichii Units

Ziro - Recommende Rain Har Khet Minor Very 7 Ziro Ziro I CD Agri 10.00 100.00 93'48'51 E 27'32'56" N WRD d by ADO, Ko Pani Irrigation Water Block High Ziro

190 | P a g e

Harvestio n

Rain Ziro - Water Recommende Water Hong/ Har Khet Very 8 Hong/ Hari I CD Agri Harvestio 10.00 100.00 93'48'51 E 27'32'56" N WRD d by ADO, Hari Ko Pani High Harvestio Block n Ziro n C/o water Ziro - Recommende Harverting Har Khet Minor Very 9 Hija Hija I CD WRD 2.00 5.00 93'48'51 E 27'32'56" N WRD d by ZPM Ko Pani Irrigation Plants (25 Block High /ACP, Hija Units)

191 | P a g e

B. Ziro II PROPOSAL FOR CREATION OF MINOR IRRIGATION PROJECT UNDER PMKSY (HAR KHET KO PANI ) Name Concerned Comman Estimate Sl.No Name of Location/Villa Panchaya of CD Compone Activit Work Ministry/Departme d Area in d cost (in Lattitude Longitude . Scheme ge Block nt y Priority t nt Ha lakh) s C/o MIP from Nyuth Ziro - II river to Tajin Har Khet Ko Minor Very 1 Peel Joram Joram CD WRD 10.00 25.00 27*30'37"N 93*47'03"E Pako unde Pani Irrigation Block High Peel Joram village C/o MIP Ziro - II from Bomi Har Khet Ko Minor Very 2 Suil Joram Suil Joram CD WRD 15.00 37.50 27*30'34"N 93*46'22"E Segu Stream Pani Irrigation Block High to Suil Happa C/o Irrigation Channel from Ziro - II Nyuth river Har Khet Ko Minor Very 3 Peel Joram Joram CD WRD 8.00 20.00 27*30'27"N 93*46'37"E to Pani Irrigation Block High Dechbeding at Peel Joram C/o MIP from Toon Ziro - II stream to Har Khet Ko Minor Very 4 Toon Yachuli CD WRD 8.00 20.00 27*28'09"N 93*47'27"E peto Paddy Pani Irrigation Block High field at Toon Village C/o MIp from Tao river to Ziro - II Har Khet Ko Minor Very 5 Jiri Happa at Tadarko Tadarko CD WRD 5.00 12.50 27*41'05"N 93*51'47"E Pani Irrigation Tadarko Block High village C/o MIP from Puk Ziro - II river to Neri Har Khet Ko Minor Mediu 6 Upper Talo Talo CD WRD 10.00 25.00 27*31'44"N 93*44'17"E Geka at Pani Irrigation Block m Upper Talo Village C/o MIP from Sopin Ziro - II Har Khet Ko Minor Mediu 7 Stream to Jath Jath CD WRD 12.00 30.00 27*28'37"N 93*47'12"E Pani Irrigation Riya paddy Block m field at

192 | P a g e

Commissione r Area

C/o MIP from Pein Ziro - II river to Haah Har Khet Ko Minor Mediu 8 Lower Talo Rumlin CD WRD 18.00 45.00 27*31'42"N 93*45'30"E Duilii at Pani Irrigation Block m lower Talo Village. C/o MIP from Ruth Ziro - II Har Khet Ko Minor 9 river to Dor Tilli Rumlin CD WRD 15.00 37.50 27*31'08"N 93*44'30'E Pani Irrigation Low Happa under Block Tilli Area C/o MIP from Menk Ziro - II river to Har Khet Ko Minor 10 Tilli Rumlin CD WRD 8.00 20.00 27*32'01"N 93*44'33"E Dikum Happa Pani Irrigation High Block under Rumlin Panchayat C/o MIP from Ruth Ziro - II Har Khet Ko Minor Mediu 11 river to Tomu Tilli Rumlin CD WRD 10.00 25.00 27*32'12"N 93*44'27"E Pani Irrigation Happa in Block m Rumlin area C/o MIP from Ruth river to Polw, Ziro - II Kui, Dorb, Har Khet Ko Minor Very 12 Tilli Rumlin CD WRD 35.00 87.50 27*32'17"N 93*44'12"E Toku Happa Pani Irrigation Block High and Aribu Happa under Talo area C/o MIP from Mai Ziro - II Har Khet Ko Minor 13 Tank to Dur Toon Yachuli CD WRD 15.00 37.50 27*27'47"N 93*46'33"E Pani Irrigation Low Happa at Block Toon Village C/o MIP Channel from Ziro - II Lumri to Har Khet Ko Minor 14 Lumri Yachuli CD WRD 8.00 20.00 27*28'30"N 93*44'07"E Kamt Happa Pani Irrigation Low Block at Lumri village.

193 | P a g e

C/o MIP from sekh Ziro - II Har Khet Ko Minor 15 stream to Suil Suil Jara Suil Joram CD WRD 25.00 62.50 27*31'07"N 93*46'39"E Pani Irrigation Low Sepa at Suil Block Jara Village C/o MIP from Hara Ziro - II Har Khet Ko Minor 16 river to Hara Jara Jara CD WRD 5.00 12.50 27*31'31"N 93*46'23"E Pani Irrigation Low Paddy field at Block Jara village C/o MIP from Sekh Ziro - II river to Taa Har Khet Ko Minor 17 Jara Jara CD WRD 10.00 25.00 27*31'00"N 93*45'44"E Pakkam Pani Irrigation Low Block Paddy field at Jara MIP from Ziro - II Sekh river to Har Khet Ko Minor 18 Jara Jara CD WRD 15.00 37.50 27*31'43"N 93*45'45"E Peri Paddy Pani Irrigation Low Block field at Jara C/o MIP Ziro - II work at Nyul Har Khet Ko Minor 19 Peel Joram Joram CD WRD 10.00 25.00 27*30'03"N 93*47'21"E river to Pani Irrigation Low Block Kopakpu area C/o MIP from Pedi Ziro - II Har Khet Ko Minor 20 river to Jath Jath Jath CD WRD 7.00 17.50 27*29'15"N 93*44'53"E Pani Irrigation Low Happa at Jath Block village C/o MIP from Teri Ziro - II stream to Har Khet Ko Minor 21 Jath Jath CD WRD 5.00 12.50 27*28'53"N 93*44'56"E Yachuli Pani Irrigation Low Block Happa at Jath C/o MIP from Pine Ziro - II Har Khet Ko Minor 22 river to Neha Tajgi Tajgi CD WRD 8.00 20.00 27*40'51"N 93*51'04"E Pani Irrigation Low Happa at Block Tajgi C/o MIP Ziro - II work at Har Khet Ko Minor 23 Linia Linia CD WRD 7.00 17.50 27*41'10"N 93*50'06"E Tabumko Pani Irrigation Low Block Linia village C/o MIP Ziro - II Har Khet Ko Minor 24 channel Mai Mai CD WRD 5.00 12.50 27*29'03"N 93*47'45"E Pani Irrigation Low Nyuch Nallah Block

194 | P a g e

to Nyouli See at Mai village

C/o MIP from Nyuch Ziro - II Har Khet Ko Minor 25 river to Techi Mai Mai CD WRD 7.00 17.50 27*28'27"N 93*47'27"E Pani Irrigation Low Happa at Block Mai C/o MIP from Rubra Ziro - II Har Khet Ko Minor 26 stream to Yakh Yakh CD WRD 6.00 15.00 27*32'22"N 93*44'08"E Pani Irrigation Low Menk Happa Block at Yakh area C/o MIP from Tashi Ziro - II Har Khet Ko Minor 27 river to Kora Yakh Yakh CD WRD 5.00 12.50 27*32'00"N 93*44'25"E Pani Irrigation Low happa at Block Yakh C/o MIP from pewe Ziro - II River to Har Khet Ko Minor 28 Rubdi Rubdi CD WRD 9.00 22.50 27*24'18"N 93*37'34"E Tadosilly Pani Irrigation Low Block Happa at Rubdi C/o MIP from Ngotha Ziro - II Har Khet Ko Minor 29 river to Pewe Rubdi Rubdi CD WRD 7.00 17.50 27*21'45"N 93*42'54"E Pani Irrigation Low Happa at Block Rubdi C/o MIP from Rach Ziro - II Har Khet Ko Minor 30 river to Rath Rach Tabi Kuch-Kuth CD WRD 11.00 27.50 27*27'51"N 93*39'01"E Pani Irrigation Low Happa at Block Rach Tabi C/o MIP from Pej Ziro - II Har Khet Ko Minor 31 River to Deli Peji Tabi Kuch-Kuth CD WRD 8.00 20.00 27*27'15"N 93*39'57"E Pani Irrigation Low Happa at Peji Block Tabi C/o MIP from Lekhi Ziro - II river to Har Khet Ko Minor Very 32 Delipaji Kuch-Kuth CD WRD 6.00 15.00 27*26'09"N 93*39'06"E Kuch-kut Pani Irrigation Block High Happa Delipaji

195 | P a g e

C/o MIP from Palin Ziro - II River to Har Khet Ko Minor Very 33 Kuch Kuth Kuch-Kuth CD WRD 8.00 20.00 27*26'40"N 93*40'06"E Kuch-Kut Pani Irrigation Block High Happa at Kuch Kuth C/o MIP from Peji Ziro - II Har Khet Ko Minor Very 34 River Lur Komp Kuch-Kuth CD WRD 6.00 15.00 27*26'13"N 93*40'56"E Pani Irrigation Happa at Block High Komp C/o MIp from Ziro - II pame river to Har Khet Ko Minor Very 35 Pei Dodo CD WRD 10.00 25.00 27*27'14"N 93*47'51"E Piteli Happa Pani Irrigation Block High at Pei village C/o MIP from Panyi Ziro - II Har Khet Ko Minor Very 36 River to Dodo Dodo CD WRD 7.00 17.50 27*25'52"N 93*46'38"E Pani Irrigation Seram Happa Block High Dodo village C/o MIP from Panyi Ziro - II Har Khet Ko Minor Very 37 river to Tapo Tanio Dodo CD WRD 5.00 12.50 27*25'37"N 93*45'39"E Pani Irrigation Happa at Block High Tanio village C/o MIP from Both Ziro - II River to Har Khet Ko Minor Very 38 Pochu Dodo CD WRD 4.00 10.00 27*27'39"N 93*48'52"E Techli Happa Pani Irrigation Block High at Pochu village C/o MIP from pai river Ziro - II Har Khet Ko Minor Very 39 to Paya Swelly Dodo CD WRD 6.00 15.00 27*27'35"N 93*48'09"E Pani Irrigation Happa at Pei Block High Village C/o MIP from Pani Ziro - II river to Har Khet Ko Minor Very 40 Pei Dodo CD WRD 5.00 12.50 27*26'19"N 93*47'10"E Lodder Pani Irrigation Block High Happa at Pei village C/o MIP from Lenyi Ziro - II Har Khet Ko Minor Very 41 River to lenyi Yoizat Yoizat CD WRD 8.00 20.00 27*23'23"N 93*43'21"E Pani Irrigation Happa at Block High Yoizat

196 | P a g e

C/o MIP Ziro - II from Pepi Har Khet Ko Minor Very 42 Yoizat Yoizat CD WRD 6.00 15.00 27*25'07"N 93*41'40"E river to Dhew Pani Irrigation Block High Happa Yoizat C/o MIP from Dido Ziro - II Har Khet Ko Minor Very 43 river to Teli Amgi Takam Passa CD WRD 7.00 17.50 27*21'41"N 93*42'39"E Pani Irrigation Happa at Block High Amgi C/o MIP from Lur Ziro - II Har Khet Ko Minor Very 44 river to Lur Takam Passa Takam Passa CD WRD 4.00 10.00 27*22'35"N 93*44'16"E Pani Irrigation Happa at Block High Takam Passa C/o MIP from Tashko Ziro - II river to Har Khet Ko Minor Very 45 Takam Passa Takam Passa CD WRD 5.00 12.50 27*25'55"N 93*42'21"E Tashko Pani Irrigation Block High Tappa at Takam Passa C/o MIP from Peni Ziro - II river to Bora Har Khet Ko Minor Very 46 Peni Pitapool CD WRD 10.00 25.00 27*23'07"N 93*45'31"E Happa at agri Pani Irrigation Block High farm area at Peni C/o MIP from Pey Ziro - II Stream to Har Khet Ko Minor Very 47 Bilo Pitapool CD WRD 8.00 20.00 27*24'10"N 93*46'50"E Billo Happa Pani Irrigation Block High at Bilo village C/o MIP from Yuj Ziro - II Har Khet Ko Minor Very 48 Stream to Yuj Pitapool Pitapool CD WRD 10.00 25.00 27*21'42"N 93*46'53"E Pani Irrigation Happa at Block High Pitapool C/o MIP from Pelye Ziro - II Har Khet Ko Minor Very 49 river Pith Pitapool Pitapool CD WRD 6.00 15.00 27*21'31"N 93*47'03"E Pani Irrigation Happa at Block High Pitapool C/o MIP from Towa Ziro - II Stream to Har Khet Ko Minor Very 50 Towa Pitapool CD WRD 7.00 17.50 27*23'32"N 93*46'02"E Towa Happa Pani Irrigation Block High at Towa village

197 | P a g e

C/o MIP from Panyor Ziro - II New Har Khet Ko Minor 27*23'33" 93*45'41" Very 51 river to Paye Possa CD WRD 6.00 15.00 Pitapool Pani Irrigation Happa at Block N E High Possa C/o MIP from Pnyor Ziro - II river to New Har Khet Ko Minor Very 52 Possa CD WRD 4.00 10.00 27*19'48"N 93*47'11"E NEEPCO Pitapool Pani Irrigation Block High Happa at Possa C/o MIP from Panyor Ziro - II New Har Khet Ko Minor 27*21'50" 93*46'10" Very 53 to Moub New Pitapool CD WRD 8.00 20.00 Pitapool Pani Irrigation Happa at Block N E High New Pitapool C/o MIP from Pith Ziro - II river to New Har Khet Ko Minor Very 54 Chod CD WRD 6.00 15.00 27*22'31"N 93*45'35"E Khuwo Pitapool Pani Irrigation Block High Happa at Chod C/o MIP from Pith Ziro - II river to Lichi New Har Khet Ko Minor Very 55 Lichi Hochi CD WRD 5.00 12.50 27*22'08"N 93*45'18"E Happa at Pitapool Pani Irrigation Block High Lichi Hochi village C/o MIP from Tohw Ziro - II Har Khet Ko Minor Very 56 Stream to Amchi Potin CD WRD 4.00 10.00 27*19'43"N 93*49'38"E Pani Irrigation Amchi Happa Block High at Amchi C/o MIP from Rub Ziro - II Har Khet Ko Minor Very 57 Stream to Rub Potin CD WRD 5.00 12.50 27*19'45"N 93*49'39"E Pani Irrigation Rub Happa at Block High Rub village C/o MIP from Poth Ziro - II Har Khet Ko Minor Very 58 river to Potin Potin Potin CD WRD 4.00 10.00 27*19'51"N 93*49'25"E Pani Irrigation Happa at Block High Potin /o MIP from Ziro - II potin Nallah Har Khet Ko Minor Very 59 Potin Potin CD WRD 5.00 12.50 27*20'55"N 93*50'40"E to reyi Happa Pani Irrigation Block High at Potin

198 | P a g e

C/o MIP from Pith Ziro - II Har Khet Ko Minor Very 60 river to Howu Kebi Kebi CD WRD 8.00 20.00 27*20'05"N 93*43'32"E Pani Irrigation Happa at Block High Kebi C/o MIP from Pengio Stream to Ziro - II Har Khet Ko Minor Very 61 Pengio Happa Komochotaram Kebi CD WRD 6.00 15.00 27*20'52"N 93*43'46"E Pani Irrigation at Block High Kamochtara m C/o MIP from Penru Ziro - II Har Khet Ko Minor Very 62 Stream to Kebi Kebi CD WRD 4.00 10.00 27*21'03"N 93*43'42"E Pani Irrigation Penru Happa Block High at Kebi C/o MIP from Pich Ziro - II Har Khet Ko Minor Very 63 river to Mub Depo Kebi CD WRD 6.00 15.00 27*25'12"N 93*41'35"E Pani Irrigation Happa at Block High Depo village C/o MIP from Khompu Ziro - II Har Khet Ko Minor Very 64 Stream to Depo Kebi CD WRD 4.00 10.00 27*25'53"N 93*42'19"E Pani Irrigation Khompu Block High Happa at Depo /o MIP from Pith river to Ziro - II Har Khet Ko Minor Very 65 Derya & Sekhi Kebi CD WRD 5.00 12.50 27*19'38"N 93*42'51"E Pani Irrigation Bugup Happa Block High at Sekhi C/o MIP from Pith Ziro - II river to Har Khet Ko Minor Very 66 Pith Kebi CD WRD 6.00 15.00 27*25'44"N 93*42'52"E Cherma Pani Irrigation Block High Happa at Pith village C/o MIP Ziro - II from Penru Har Khet Ko Minor Very 67 Pop Kebi CD WRD 4.00 10.00 27*25'46"N 93*42'38"E Stream to taib Pani Irrigation Block High Happa at Pop C/o MIP Ziro - II Har Khet Ko Minor Very 68 from Jullung Seer Kebi CD WRD 5.00 12.50 27*24'54"N 93*40'54"E Pani Irrigation Stream to Block High

199 | P a g e

Penru Happa at Seer

C/o MIP from Peni Ziro - II Har Khet Ko Minor Very 69 Stream to Peni Khel Yazali CD WRD 15.00 37.50 27*22'27"N 93*45'37"E Pani Irrigation Rom Happa Block High at peni C/o MIP from peni Ziro - II Stream to Har Khet Ko Minor Very 70 Peni Khel Yazali CD WRD 8.00 20.00 27*25'06"N 93*45'14"E Tagi Happa Pani Irrigation Block High at Peni village C/o MIP from Peni Ziro - II Har Khet Ko Minor Very 71 stream to Peni Khel Yazali CD WRD 10.00 25.00 27*24'09"N 93*44'58"E Pani Irrigation Peni Happa at Block High Peni C/o MIP from Peni Ziro - II Stream to Har Khet Ko Minor Very 72 Peni Khel Yazali CD WRD 30.00 75.00 27*24'00"N 93*44'53"E Govt. Agri- Pani Irrigation Block High Farm at Pani area C/o MIP from Khel Ziro - II river to Har Khet Ko Minor Very 73 Yazali Khel Yazali CD WRD 20.00 50.00 27*24'55"N 93*44'45"E Panyor Pani Irrigation Block High Todum at Yazali C/o MIP from Khel Ziro - II Har Khet Ko Minor Very 74 river to A- Yazali Khel Yazali CD WRD 10.00 25.00 27*24'07"N 93*44'49"E Pani Irrigation Sector Happa Block High at Yazali C/o MIP from Khel Ziro - II Har Khet Ko Minor Very 75 river to bojir Yazali Yazali town CD WRD 10.00 25.00 27*24'06"N 93*44'57"E Pani Irrigation Happa at Block High Yazali C/o MIP from Khel Ziro - II river to Har Khet Ko Minor Very 76 Yazali Yazali town CD WRD 12.00 30.00 27*23'59"N 93*44'56"E Yapum happa Pani Irrigation Block High left bank at Yazali

200 | P a g e

C/o MIP from Khel Ziro - II Har Khet Ko Minor Very 77 river to Bora Yazali Yazali town CD WRD 15.00 37.50 27*24'34"N 93*44'41"E Pani Irrigation Happa for at Block High Yazali C/o MIP from Pith Ziro - II river to Har Khet Ko Minor Very 78 Chulyu Chulyu CD WRD 9.00 22.50 27*21'07"N 93*46'24"E Tobbum Pani Irrigation Block High Happa at Chulyu C/o MIP from Paye Ziro - II Har Khet Ko Minor Very 79 river to Dekhi Chulyu Chulyu CD WRD 10.00 25.00 27*21'42"N 93*46'33"E Pani Irrigation Happa at Block High chulyu C/o MIP from pei river Ziro - II Har Khet Ko Minor Very 80 to pei happa Seya Seya CD WRD 6.00 15.00 27*37'51"N 93*42'32"E Pani Irrigation at Seya Block High village C/o MIP from Dego Ziro - II Nallah to Har Khet Ko Minor Very 81 Seya Seya CD WRD 4.00 10.00 27*38'35"N 93*42'43"E Keyi Happa Pani Irrigation Block High under Seya village C/o MIP from Charpu Ziro - II Har Khet Ko Minor Very 82 to keyi pada Seya Seya CD WRD 5.00 12.50 27*37'34"N 93*43'40"E Pani Irrigation at seya Block High village C/o MIP from Karam Ziro - II Har Khet Ko Minor Very 83 Nallah to Seya Seya CD WRD 5.00 12.50 27*37'08"N 93*42'04"E Pani Irrigation keyi pada at Block High Seya village C/o MIP from Lal Ziro - II Nallah to Har Khet Ko Minor Very 84 Seya Seya CD WRD 4.00 10.00 27*38'57"N 93*42'52"E Keyi Happa Pani Irrigation Block High at Seya village C/o MIP from Heth Ziro - II Har Khet Ko Minor Very 85 rive to tao Dem-I Dem CD WRD 10.00 25.00 27*36'50"N 93*40'21"E Pani Irrigation happa at dem Block High village

201 | P a g e

C/o MIP from kerom Ziro - II Har Khet Ko Minor Very 86 nallah to Dem-I Dem CD WRD 4.00 10.00 27*36'54"N 93*39'42"E Pani Irrigation kerom happa Block High at Dem C/o MIP from simen Ziro - II Har Khet Ko Minor Very 87 Nallah to Dem-I Dem CD WRD 4.00 10.00 27*37'11"N 93*39'16"E Pani Irrigation simen Happa Block High at Dem C/o MIP from tilli Ziro - II Har Khet Ko Minor Very 88 nallah to Tilli Dem-II Dem CD WRD 8.00 20.00 27*37'48"N 93*39'20'E Pani Irrigation Happa at Block High Dem C/o MIP Ziro - II from Cheyi Har Khet Ko Minor Very 89 Dem - II Dem CD WRD 4.00 10.00 27*36'20"N 93*39'06"E river to Cheyi Pani Irrigation Block High happa at Dem C/o MIP Ziro - II from Ralo sii Har Khet Ko Minor Very 90 Dem - III Dem CD WRD 4.00 10.00 27*36'38"N 93*38'30"E to Ralo happa Pani Irrigation Block High at Dem C/o MIP from Talo Ziro - II Har Khet Ko Minor Very 91 river to talo Dem - I Dem CD WRD 4.00 10.00 27*37'15"N 93*38'26"E Pani Irrigation Pakam at Block High Dem C/o MIP from Yapio Ziro - II Har Khet Ko Minor Very 92 Nalla to Dem - II Dem CD WRD 4.00 10.00 27*36'47"N 93*38'14"E Pani Irrigation Yapio Happa Block High at Dem C/o MIP Ziro - II from rith Har Khet Ko Minor Very 93 Dem - III Dem CD WRD 5.00 12.50 27*36'44"N 93*40'11"E stream to rith Pani Irrigation Block High happa at Dem C/o MIP from hata Ziro - II Har Khet Ko Minor Very 94 nallah to hata Kugi Kugitago CD WRD 6.00 15.00 27*33'43"N 93*38'18"E Pani Irrigation happa at Kugi Block High village C/o MIP from Ziro - II seblepew Har Khet Ko Minor Very 95 Kugi Kugitago CD WRD 4.00 10.00 27*33'33"N 93*38'33"E nallah to Pani Irrigation Block High seblepew happa at Kugi

202 | P a g e

C/o MIP from Jiri Ziro - II Har Khet Ko Minor Very 96 Nallah to Jiri Kugi Kugitago CD WRD 6.00 15.00 27*33'25"N 93*39'01"E Pani Irrigation happa at Kugi Block High village C/o MIP Ziro - II from toju Har Khet Ko Minor Very 97 Kugi Kugitago CD WRD 6.00 15.00 27*33'13"N 93*38'00'E nallah to toju Pani Irrigation Block High happa at kugi C/o MIP from Rii Ziro - II Har Khet Ko Minor Very 98 stream to rii Dem-III Dem CD WRD 4.00 10.00 27*36'22"N 93*39'04"E Pani Irrigation happa at Block High Dem-III C/o MIP from Tash Ziro - II Har Khet Ko Minor Very 99 stream to Sikhe Sito CD WRD 4.00 10.00 27*33'02"N 93*37'33"E Pani Irrigation Polyu happa Block High at Sikhe C/o MIP from Shekho Ziro - II Har Khet Ko Minor Very 100 nalla to sekho Sito Sito CD WRD 3.00 7.50 27*32'18"N 93*38'03"E Pani Irrigation paddy field at Block High Sito C/o MIP from tebli Ziro - II Har Khet Ko Minor Very 101 stream to Sikhe Sito CD WRD 5.00 12.50 27*32'39"N 93*37'42"E Pani Irrigation pulyee happa Block High at sikhe C/o MIP from polyu Ziro - II Har Khet Ko Minor Very 102 river to Sito Sito CD WRD 3.00 7.50 27*31'02"N 93*36'49"E Pani Irrigation koham happa Block High at Lai C/o MIP Ziro - II payei river to Har Khet Ko Minor Very 103 Tapi Sito CD WRD 6.00 15.00 27*31'18"N 93*37'12"E dilli happa at Pani Irrigation Block High tapi C/o Mip from Ziro - II Pakh river to Har Khet Ko Minor Very 104 Old Pania Pania CD WRD 6.00 15.00 27*32'36"N 93*41'09"E pakh happa at Pani Irrigation Block High Pania C/o MIP Ziro - II from Pakh to Har Khet Ko Minor Very 105 Pania Pania CD WRD 10.00 25.00 27*31'11"N 93*39'30"E Tagu happa Pani Irrigation Block High at Pania

203 | P a g e

C/o MIP from techer Ziro - II Har Khet Ko Minor Very 106 stream to New Pania Pania CD WRD 6.00 15.00 27*31'30"N 93*39'34"E Pani Irrigation techer happa Block High at new pania C/o Nyenth river to Ziro - II Har Khet Ko Minor Very 107 Nyenth New Pania Pania CD WRD 4.00 10.00 27*31'14"N 93*39'29"E Pani Irrigation Happa at Block High New Pania C/o MIP from Pakh Ziro - II river to Har Khet Ko Minor Very 108 Nyolibar Pania CD WRD 15.00 37.50 27*31'36"N 93*39'34"E Taguhaa Pani Irrigation Block High happa at Nyolibar C/o MIP from ruth Ziro - II Har Khet Ko Minor Very 109 river to Tilli Rumlin CD WRD 10.00 25.00 27*32'01"N 93*44'33"E Pani Irrigation kampia happa Block High at Tilli C/o MIP from Polyu Ziro - II River to Har Khet Ko Minor Very 110 Radhpu Radhpu CD WRD 8.00 20.00 27*35'16"N 93*39'35"E Miyom Tapo Pani Irrigation Block High under Radhpu Panchayat C/o MIP at Ziro - II tabum tabi Har Khet Ko Minor Very 111 Radhpu Radhpu CD WRD 10.00 25.00 27*35'25"N 93*39'38"E under Radhpu Pani Irrigation Block High Panchayat C/o MIP from toju Ziro - II stream to Har Khet Ko Minor Very 112 Shally Shally CD WRD 5.00 12.50 27*28'28"N 93"41'25"E mano happa Pani Irrigation Block High under shally panchayat C/o MIP at Ziro - II shally happa Har Khet Ko Minor Very 113 Shally Shally CD WRD 12.00 30.00 27*28'47"N 93*42'12"E under shally Pani Irrigation Block High panchayat C/o MIP from Deed Ziro - II Har Khet Ko Minor Very 114 river to Deed Deed CD WRD 5.00 12.50 27*35'24"N 93*41'40"E Pani Irrigation deedlijo at Block High Deed village

204 | P a g e

C/o MIP at Ngora under Ziro - II Har Khet Ko Minor Very 115 Khach Khach Neelam Neelam CD WRD 4.00 10.00 27*34'06"N 93*40'59"E Pani Irrigation Neelam Block High village C/o MIP from peet Ziro - II river to moya Har Khet Ko Minor Very 116 Ambam Ambam CD WRD 6.00 15.00 27*28'34"N 93*38'04"E happa at Pani Irrigation Block High ambam village C/o MIP at Ziro - II Chami under Har Khet Ko Minor Very 117 Ambam Ambam CD WRD 4.00 10.00 27*28'44"N 93837'39"E Ambam Pani Irrigation Block High Panchayat C/o MIP from Paab river to Ziro - II Har Khet Ko Minor Very 118 Tollum Neelam Neelam CD WRD 4.00 10.00 27*34'21"N 93*39'59"E Pani Irrigation Happa at Block High Neelam Village C/o MIP from Polyu Ziro - II river to yolab Har Khet Ko Minor Very 119 Ekhataya Radhpu CD WRD 4.00 10.00 27*35'07"N 93*39'06"E happa under Pani Irrigation Block High Ekhataya village C/o MIP from Riya Ziro - II Har Khet Ko Minor Very 120 stream to Jara Jara CD WRD 6.00 15.00 27*31'21"N 93*46'08"E Pani Irrigation Riya Happa Block High at Jara village C/o MIP from Diid Ziro - II river to Neri Har Khet Ko Minor Very 121 Ekhataya Radhpu CD WRD 4.00 10.00 27*35'19"N 93*38'44"E Happa under Pani Irrigation Block High Ekhataya villlage C/o MIP from peti Ziro - II river to taka Har Khet Ko Minor Very 122 Bentam Bello CD WRD 5.00 12.50 27*28'16"N 93*37'32"E happa at Pani Irrigation Block High Bentam village

205 | P a g e

C/o MIP from pitch Ziro - II Har Khet Ko Minor Very 123 river to chera Bello Bello CD WRD 6.00 15.00 27*29'00"N 93*35'54"E Pani Irrigation happa at Block High Bello village C/o MIP from heyi Ziro - II Har Khet Ko Minor Very 124 river to kuli Tom Kugitago CD WRD 4.00 10.00 27*35'10"N 93*38'05"E Pani Irrigation happa at Tom Block High village C/o MIP at Ziro - II pulli happa Har Khet Ko Minor Very 125 Sito Sito CD WRD 4.00 10.00 27*32'21"N 93*38'04"E under Sito Pani Irrigation Block High panchayat C/o MIP Ziro - II from bikh to Har Khet Ko Minor Very 126 Miya Kugitago CD WRD 4.00 10.00 27*34'11"N 93*36'22"E yajje happa at Pani Irrigation Block High Miya village C/o MIP from Pai Ziro - II Har Khet Ko Minor Very 127 River to Pai Chulyu Chulyu CD WRD 6.00 15.00 27*21'19"N 93*46'37"E Pani Irrigation Happa at Block High Chulyu C/o MIP from pho Ziro - II Har Khet Ko Minor Very 128 river to pho Takam Passa Takam Passa CD WRD 4.00 10.00 27*23'49"N 93*44'32"E Pani Irrigation Happa at Block High Takam Passa C/o MIP from Ruth Ziro - II river to Har Khet Ko Minor Very 129 Talo Talo CD WRD 5.00 12.50 27*22'49"N 93*43'12"E Khach Happa Pani Irrigation Block High at Lodum Talo C/o MIP from Tash Ziro - II Har Khet Ko Minor Very 130 river to Meri Talo Talo CD WRD 6.00 15.00 27*25'59"N 93*44'30"E Pani Irrigation Happa Block High Lodum Talo C/o MIP from Pedw Ziro - II Har Khet Ko Minor Very 131 river to Yagar Venyi Dodo CD WRD 7.00 17.50 27*21'29"N 93*22'12"E Pani Irrigation happa at Block High Venyi tago C/o MIP cum Ziro - II Har Khet Ko Minor Very 132 CAD at Belo Belo Yazali CD WRD 12.00 30.00 27*23'09"N 93*43'58"E Pani Irrigation village(Shee Block High

206 | P a g e

wr Chowu) under Yazali

C/o MIP at Toju Stream to Mono Happa at Pistana Har Khet Ko Minor Very 133 Village Hitu Hitu Shallyi CD WRD 4.00 10.00 27*32'21"N 93*38'04"E Pani Irrigation under Shallyi Block High Panchayat under Pistana Circle. C/o MIP from Kolu Pistana scource to Har Khet Ko Minor Very 134 Hitu Shallyi CD WRD 5.00 12.50 27*27'28"N 93"40'25"E Hitu Happa Pani Irrigation Block High atHitu Village C/o MIP from Pwmsiem stream to Pistana Har Khet Ko Minor Very 135 Ngurak koto Hitu Shallyi CD WRD 4.00 10.00 27*26'28"N 93"39'25"E Pani Irrigation at Hitu Block High Village under Shallyi Pancayat. C/o MIP from Peiyu stream to Nieriup Pistana Har Khet Ko Minor Very 136 Happa at Lai Lai Shallyi CD WRD 5.00 12.50 27*25'28"N 93"38'25"E Pani Irrigation village under Block High Sito Pancayat of Pistana Circle. C/o MIP from Tap Source to Lai Pistana Har Khet Ko Minor Very 137 Happa at Sikhe Sito CD WRD 6.00 15.00 27*31'21"N 93*37'04"E Pani Irrigation village Sikhe Block High under Sito Pancayat. C/o MIP Pistana from Pakh Har Khet Ko Minor Very 138 Nyolibar Shallyi CD WRD 5.00 12.50 27*24'28"N 93"37'25"E Source to Gai Pani Irrigation Block High Happa at

207 | P a g e

Nyoliber village under Shallyi panchayat. C/o MIP at Rukom Pistana Har Khet Ko Minor Very 139 Happa at Nyoliber Shallyi CD WRD 4.00 10.00 27*23'28"N 93"36'25"E Pani Irrigation Nyoliber Block High village. C/o MIP Lekhi Source to Hechi Pistana Har Khet Ko Minor Very 140 Happa village Deed Deed CD WRD 5.00 12.50 Pani Irrigation Deed under Block High Deed Panchayat C/o MIP from Rapam source to Pistana Har Khet Ko Minor Very 141 Hechi Ringjo Deed Deed CD WRD 6.00 15.00 Pani Irrigation village Deed Block High under Deed Panchayat C/o MIP from Bekhi source to Pistana Har Khet Ko Minor Very 142 Hath Happa Deed Deed CD WRD 5.00 12.50 Pani Irrigation village Deed Block High under Deed Pancayat.

208 | P a g e

PROPOSAL OF SCHEME FOR REPAIR, RESTORATION & RENOVATION OF NATURAL & TRADITIONAL WATER BODIES UNDER PMKSY (HAR KHET KO PANI)

Concerned Estimate Sl.No Location/Villag Name of CD Componen Work Name of Scheme Panchayat Ministry/Departmen Activity No./Unit d cost (in . e Blocks t Priority t lakh)

RRR of natural water bodies & Conservation of natural strengthening of Ziro - II CD Har Khet Ko 1 water bodies at yachuli Yachuli Yachuli WRD carrying 15.00 37.50 Block Pani Very High circle capacity of tradiditional water bodies

RRR of natural water bodies & Conservation of natural strengthening of Ziro - II CD Har Khet Ko 2 water bodies at Yazali Yazali Yazali WRD carrying 10.00 25.00 Block Pani Very High circle capacity of tradiditional water bodies

RRR of natural water bodies & Conservation of natural strengthening of Ziro - II CD Har Khet Ko 3 water bodies at Pistana Pistana Pistana WRD carrying 10.00 25.00 Block Pani Very High circle capacity of tradiditional water bodies

RRR of natural water bodies & Conservation of natural strengthening of Ziro - II CD Har Khet Ko 4 water bodies under Deed Deed WRD carrying 15.00 37.50 Block Pani Very High Deed circle capacity of tradiditional waer bodies

209 | P a g e

RRR of natural water bodies & Conservation of natural strengthening of Ziro - II CD Har Khet Ko 5 water bodies at Joram Joram Joram WRD carrying 15.00 37.50 Block Pani Very High area capacity of tradiditional waer bodies

RRR of natural water bodies & Consrvation of natural strengthening of Ziro - II CD Har Khet Ko 6 water bodies at Nyolibar Nyolibar Nyolibar WRD carrying 10.00 25.00 Block Pani Medium area capacity of tradiditional waer bodies

RRR of natural water bodies & Conservation of natural strengthening of Ziro - II CD Har Khet Ko 7 water bodies at Talo Talo Talo WRD carrying 15.00 37.50 Block Pani Medium area capacity of tradiditional waer bodies

RRR of natural water bodies & Conservation of natural strengthening of Ziro - II CD Har Khet Ko 8 water bodies at Dem Dem Dem WRD carrying 10.00 25.00 Block Pani Medium area capacity of tradiditional waer bodies

RRR of natural Repair, Restoration & water bodies & Renovation of strengthening of Ziro - II CD Har Khet Ko 9 traditional water bodies Suil Joram Suil Joram WRD carrying 12.00 30.00 Block Pani Low to recharging ground capacity of water at Suil Joram area tradiditional waer bodies

210 | P a g e

RRR of natural Repair, Restoration & water bodies & Renovation of strengthening of Ziro - II CD Har Khet Ko 10 traditional water bodies Seya Seya WRD carrying 15.00 37.50 Block Pani High to recharging ground capacity of water at seya village tradiditional waer bodies

RRR of natural Repair, Restoration & water bodies & Renovation of strengthening of Ziro - II CD Har Khet Ko 11 traditional water bodies Kugi Kugitago WRD carrying 10.00 25.00 Block Pani Medium to recharging ground capacity of water at kugitago area tradiditional waer bodies

RRR of natural Repair, Restoration & water bodies & Renovation of strengthening of Ziro - II CD Har Khet Ko 12 traditional water bodies Bellow Bellow WRD carrying 10.00 25.00 Block Pani Very High to recharging ground capacity of water at Bellow vilage tradiditional waer bodies

RRR of natural Repair, Restoration & water bodies & Renovation of strengthening of Ziro - II CD Har Khet Ko 13 traditional water bodies Yazali Yazali WRD carrying 15.00 37.50 Block Pani Low to recharging ground capacity of water at yazali tradiditional waer bodies

RRR of natural Repair, Restoration & water bodies & Renovation of strengthening of Ziro - II CD Har Khet Ko 14 traditional water bodies Pitapool Pitapool WRD carrying 5.00 12.50 Block Pani Low to recharging ground capacity of water at Pitapool area tradiditional waer bodies

211 | P a g e

RRR of natural Repair, Restoration & water bodies & Renovation of strengthening of Ziro - II CD Har Khet Ko 15 traditional water bodies Yoglu Yoglu WRD carrying 10.00 25.00 Block Pani Low to recharging ground capacity of water at Yoglu village tradiditional waer bodies

RRR of natural water bodies & Conservation of natural strengthening of Upper Ziro II Ziro - II CD Har Khet Ko 16 water bodies at upper Upper Ziro II Area WRD carrying 10.00 25.00 Area Block Pani Low Ziro II area capacity of tradiditional waer bodies

RRR of natural Repair, Restoration & water bodies & Renovation of strengthening of Ziro - II CD Har Khet Ko 17 traditional water bodies Yachuli Yachuli WRD carrying 10.00 25.00 Block Pani Low to recharging ground capacity of water at Yachuli tradiditional waer bodies

RRR of natural Strengthening & rain water bodies & water harvesting strengthening of Yachuli sub- Yachuli sub- Ziro - II CD Har Khet Ko 18 structure at various WRD carrying 15.00 37.50 division division Block Pani Low village under Yachuli capacity of sub-division. tradiditional waer bodies

212 | P a g e

PROPOSAL OF SCHEME FOR COMMAND AREA DEVELOPMENT AND STRENGTHENING OF DISTRIBUTION NETWORK UNDER PMKSY (HAR KHET KO PANI)

Concerned Location/Villag Name of CD Command Estimated Sl.No. Name of Scheme Panchayat Ministry/D Component Activity Work Priority e Blocks Area in Ha cost (in lakh) epartment

Command area development and CAD & strengthening of distribution Ziro - II CD Har Khet Ko Strenthening of 1 Yazali Khel Yazali WRD 15.00 22.50 network system at Yapum happa at Block Pani distribution Very High khel Yazali network

Command area development and CAD & strengthening of distribution Ziro - II CD Har Khet Ko Strenthening of 2 Yazali Khel Yazali WRD 20.00 30.00 network system at Borasily happa Block Pani distribution Very High at khel Yazali network

Command area development and CAD & strengthening of distribution Ziro - II CD Har Khet Ko Strenthening of 3 Peni Peni WRD 10.00 15.00 network system at Peni Happa at Block Pani distribution Very High Peni village network

Command area development and CAD & strengthening of distribution Ziro - II CD Har Khet Ko Strenthening of 4 Chulyu Chulyu WRD 10.00 15.00 network system at Chulyu Happa Block Pani distribution Very High at Chulyu village network

CAD & Command area development and Ziro - II CD Har Khet Ko Strenthening of 5 strengthening of distribution system Mai Mai WRD 7.00 10.50 Block Pani distribution Very High atTechli Happa at Mai village network

Command area development and CAD & strengthening of distribution Ziro - II CD Har Khet Ko Strenthening of 6 Nyolibar Pania WRD 20.00 30.00 network system atTaguha Happa at Block Pani distribution Medium Nyolibar village network

213 | P a g e

Command area development and CAD & strengthening of distribution Ziro - II CD Har Khet Ko Strenthening of 7 Suil Joram Suil Joram WRD 25.00 37.50 network system at Suil Happa at Block Pani distribution Medium Suil Joram village network

Command area development and CAD & strengthening of distribution Ziro - II CD Har Khet Ko Strenthening of 8 Dem Dem WRD 12.00 18.00 network system at Tilli area at Dem Block Pani distribution Medium village network

Command area development and CAD & strengthening of distribution Ziro - II CD Har Khet Ko Strenthening of 9 Lower Talo Rumlin WRD 10.00 15.00 network system at Haduli Happa at Block Pani distribution Low Lower Talo village network

Command area development and CAD & strengthening of distribution Ziro - II CD Har Khet Ko Strenthening of 10 Deed Deed WRD 10.00 15.00 network system at Deedlijo Happa Block Pani distribution High at Deed village network

Command area development and CAD & strengthening of distribution Ziro - II CD Har Khet Ko Strenthening of 11 Seya Seya WRD 6.00 9.00 network system at keyi Happa at Block Pani distribution Medium Seya village network

Command area development and CAD & strengthening of distribution Ziro - II CD Har Khet Ko Strenthening of 12 Kugitago Kugitago WRD 15.00 22.50 network system at Hata, Toju & Jiri Block Pani distribution Very High Happa under Kugitago Panchayat network

Command area development and CAD & strengthening of distribution Upper Ziro II Ziro - II CD Har Khet Ko Strenthening of 13 Upper Ziro II Area WRD 25.00 37.50 network system at Linia, Tadarko Area Block Pani distribution Low & Tajgi Panchayat network

Command area development and CAD & strengthening of distribution system Ziro - II CD Har Khet Ko Strengthening 14 Rumlin Rumlin WRD 12.00 18.00 at Kampia, Dorb Sii & Tamchogi Block Pani of distribution Low Happa under Rumlin Panchayat network

214 | P a g e

PROPOSAL OF SCHEME FOR IMPROVEMENT IN WATER MANAGEMENT AND DISTRIBUTION SYSTEM UNDER PMKSY (HAR KHET KO PANI)

Estimated Name of Concerned Work Sl.No. Name of Scheme Location/Village Panchayat Component Activity No./Unit cost (in CD Blocks Ministry/Department Priority lakh) Improvement Improvement in Water in water management and distribution management Yachuli Ziro - II CD Har Khet Ko Very 1 network system of available Yachuli Circle WRD & distribution 15.00 22.50 Circle Block Pani water bodies under Yachuli system in High circle available sources Improvement Improvement in Water in water management and distribution management Ziro - II CD Har Khet Ko Very 2 network system of available Yazali Circle Yazali Circle WRD & distribution 25.00 37.50 Block Pani water bodies under Yazali system in High circle available sources Improvement Improvement in Water in water management and distribution management Ziro - II CD Har Khet Ko Very 3 network system of available Pistana Circle Pistana Circle WRD & distribution 20.00 30.00 Block Pani water bodies under Pistana system in High circle available sources Improvement Improvement in Water in water management and distribution management Ziro - II CD Har Khet Ko Very 4 network system of available Deed Circle Deec Circle WRD & distribution 15.00 22.50 Block Pani water bodies under Deed system in High circle available sources

215 | P a g e

PROPOSAL OF SCHEME FOR DIVERSION OF WATER FROM AVAILABLE SOURCES TO WATER SCARCE AREA UNDER PMKSY (HAR KHET KO PANI)

Estimated Name of CD Concerned Work Sl.No. Name of Scheme Location/Village Panchayat Component Activity No./Unit cost (in Blocks Ministry/Department Priority lakh)

Construction of diversion structure to divert water to Ziro - II CD Har Khet Ko RRR of natural 1 water scarce area from Pistana Circle Pistana Circle WRD 10.00 25.00 Block Pani water bodies Low near by sources under Pistana circle

Construction of diversion structure to divert water to Ziro - II CD Har Khet Ko RRR of natural 2 water scarce area from Deed Circle Deed Circle WRD 15.00 37.50 Block Pani water bodies Low near by sources under Deed circle

Construction of diversion structure to divert water to Ziro - II CD Har Khet Ko RRR of natural 3 water scarce area from Yachuli Circle Yachuli Circle WRD 12.00 30.00 Block Pani water bodies Low near by sources under Yachuli circle

Construction of diversion structure to divert water to Ziro - II CD Har Khet Ko RRR of natural 4 water scarce area from Yazali circle Yazali circle WRD 15.00 37.50 Block Pani water bodies Low near by sources under Yazali circle

Construction of diversion structure to divert water to Upper Ziro II Ziro - II CD Har Khet Ko RRR of natural 5 water scarce area from Upper Ziro II Area WRD 10.00 25.00 Area Block Pani water bodies Low near by sources under upper ziro - II area

216 | P a g e

PROPOSAL OF SCHEME FOR CREATION AND REJUVENATION OF TRADITIONAL WATER STORAGE SYSTEM UNDER PMKSY (HAR KHET KO PANI)

Estimated Name of CD Concerned Work Sl.No. Name of Scheme Location/Village Panchayat Component Activity No./Unit cost (in Blocks Ministry/Department Priority lakh)

Creation and rejuvenation of Ziro - II CD Har Khet Ko RRR of natural water 1 traditional water storage system at Talo Talo WRD 10.00 20.00 Block Pani bodies Low Talo village

Creation and rejuvenation of Ziro - II CD Har Khet Ko RRR of natural water 2 traditional water storage system at Kuch Kuth Kuch Kuth WRD 15.00 30.00 Block Pani bodies Low Kuch-kuth panchayat

Creation and rejuvenation of Ziro - II CD Har Khet Ko RRR of natural water 3 traditional water storage system at Shally Shally WRD 15.00 30.00 Block Pani bodies Low Shally panchayat

Creation and rejuvenation of Ziro - II CD Har Khet Ko RRR of natural water 4 traditional water storage system at Dodo Dodo WRD 10.00 20.00 Block Pani bodies Low Dodo panchayat

Creation and rejuvenation of Ziro - II CD Har Khet Ko RRR of natural water 5 traditional water storage system at Yazali Yazali WRD 20.00 40.00 Block Pani bodies Low Yazali

Creation and rejuvenation of Ziro - II CD Har Khet Ko RRR of natural water 6 traditional water storage system at Yachuli Yachuli WRD 25.00 50.00 Block Pani bodies Low Yachuli

Creation and rejuvenation of Ziro - II CD Har Khet Ko RRR of natural water 7 traditional water storage system at Chulyu Chulyu WRD 10.00 20.00 Block Pani bodies Low Chulyu

Creation and rejuvenation of Ziro - II CD Har Khet Ko RRR of natural water 8 traditional water storage system at Dem Dem WRD 10.00 20.00 Block Pani bodies Low Dem

Creation and rejuvenation of Ziro - II CD Har Khet Ko RRR of natural water 9 traditional water storage system at Kugitago Kugitago WRD 25.00 50.00 Block Pani bodies Very High Kugitago Panchayat

Creation and rejuvenation of Ziro - II CD Har Khet Ko RRR of natural water 10 traditional water storage system at Pania Pania WRD 10.00 20.00 Block Pani bodies Very High Pania Panchayat

217 | P a g e

PROPOSAL OF SCHEME FOR PROMOTING EFFICIENT WATER CONVEYANCE & WATER APPLICATION SYSTEM UNDER PMKSY (PER DROP MORE CROP)

Comman Estimated Name of CD Concerned Work Sl.No. Name of Scheme Location/Village Panchayat Component Activity d Area in cost (in Blocks Ministry/Department Priority Ha lakh)

Promoting efficient C/o Drip Irrigation for large water coneyance & Ziro - II CD 1 cardamom garden at yakirang Yakiring, Dem Dem WRD Per Drop More Crop water application 5.00 50.00 Block Very High under Dem Panchayat system through drip irrigation

Promoting efficient C/o Drip Irrigation for large water coneyance & Ziro - II CD 2 cardamom garden at hata under Hata, Kugitago Kugitago WRD Per Drop More Crop water application 6.00 60.00 Block Very High Kugitago Panchayat system through drip irrigation

Promoting efficient water coneyance & C/o Drip Irrigation for tea Ziro - II CD 3 Yachuli Yachuli WRD Per Drop More Crop water application 15.00 150.00 garden at Yachuli Block system through drip irrigation

Promoting efficient C/o Drip Irrigation for large water coneyance & Ziro - II CD 4 cardamom garden at Seblepew Seblepew, Kugitago Kugitago WRD Per Drop More Crop water application 4.00 40.00 Block Very High under Kugitago Panchayat system through drip irrigation

Promoting efficient water coneyance & C/o Drip Irrigation for tea Ziro - II CD 5 New Pania Pania WRD Per Drop More Crop water application 10.00 100.00 garden at Pania Block system through drip irrigation

218 | P a g e

Improvement in water C/o Drip Irrigation for large Ziro - II CD management & 6 cardamom garden at Jiri under Jiri, Kugitago Kugitago WRD Per Drop More Crop 3.00 30.00 Block distribution system in Very High Kugitago Panchayat available sources

Improvement in water C/o Drip Irrigation for tea Ziro - II CD management & 7 garden at Potin under Yazali Potin Potin WRD Per Drop More Crop 10.00 100.00 Block distribution system in Circle available sources

Improvement in water C/o Drip Irrigation for large Ziro - II CD management & 8 cardamom garden at Tao Tao Happa, Dem Dem WRD Per Drop More Crop 3.00 30.00 Block distribution system in Low Happa under Dem Panchayat available sources

Improvement in water C/o Drip Irrigation to Govt. Ziro - II CD management & 9 agriculture farm at Peni under Peni Khel Yazali WRD Per Drop More Crop 5.00 50.00 Block distribution system in Yazali Circle available sources

Improvement in water C/o Drip Irrigation for large Ziro - II CD management & 10 cardamom garden at Kampia Tilli Area Rumlin WRD Per Drop More Crop 3.00 30.00 Block distribution system in Low putu under Tilli Area available sources

Improvement in water C/o Drip Irrigation for large Ziro - II CD management & 11 vegetables garden at Yapum Papum Putu Yazali WRD Per Drop More Crop 3.00 30.00 Block distribution system in putu under Yazali available sources

219 | P a g e

Improvement in water C/o Drip Irrigation for large Ziro - II CD management & 12 Yachuli Yachuli WRD Per Drop More Crop 3.00 30.00 orange garden at Yachuli Block distribution system in available sources

Improvement in water C/o Drip Irrigation for large Ziro - II CD management & 13 cardamom garden at Linia Linia Linia WRD Per Drop More Crop 2.00 20.00 Block distribution system in village available sources

Improvement in water C/o Drip Irrigation for large Ziro - II CD management & 14 cardamom garden under Sito Sito Sito WRD Per Drop More Crop 3.00 30.00 Block distribution system in Low Panchayat available sources

PROPOSAL OF SCHEME FOR WATER HARVESTING STRUCTURE UNDER PMKSY (WATERSHED)

Estimated Name of CD Concerned Work Sl.No. Name of Scheme Location/Village Panchayat Component Activity No./Unit cost (in Blocks Ministry/Department Priority lakh)

C/o water harvesting structures to Construction of Check Ziro - II CD 1 recharging ground water at Dem Dem Dem WRD Watershed Dam, Nalla bunds, Farm 125.00 31.25 Block Very High Panchayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 2 recharging ground water at Joram Joram Joram WRD Watershed Dam, Nalla bunds, Farm 150.00 37.50 Block Very High Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 3 recharging ground water at Tilli Tilli Rumlin WRD Watershed Dam, Nalla bunds, Farm 75.00 18.75 Block Area pond,

220 | P a g e

C/o water harvesting structures to Construction of Check Ziro - II CD 4 recharging ground water at Yakha Yakha Yakha WRD Watershed Dam, Nalla bunds, Farm 60.00 15.00 Block Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 5 recharging ground water at upper Upper Talo Talo WRD Watershed Dam, Nalla bunds, Farm 80.00 20.00 Block Talo Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 6 recharging ground water at Yachuli Yachuli WRD Watershed Dam, Nalla bunds, Farm 180.00 45.00 Block Very High Yachuli Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 7 recharging ground water at Yazali Yazali Yazali WRD Watershed Dam, Nalla bunds, Farm 220.00 55.00 Block Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 8 recharging ground water at Pitapool Pitapool WRD Watershed Dam, Nalla bunds, Farm 50.00 12.50 Block Very High Pitapool Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 9 recharging ground water at Pania Pania Pania WRD Watershed Dam, Nalla bunds, Farm 75.00 18.75 Block Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 10 recharging ground water at Sito Sito Sito WRD Watershed Dam, Nalla bunds, Farm 110.00 27.50 Block Low Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 11 recharging ground water at Shally Shally Shally WRD Watershed Dam, Nalla bunds, Farm 100.00 25.00 Block Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 12 recharging ground water at Pistana Pistana WRD Watershed Dam, Nalla bunds, Farm 65.00 16.25 Block Low Pistana Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 13 recharging ground water at Kuch- Kuch Kuth Kuch Kuth WRD Watershed Dam, Nalla bunds, Farm 175.00 43.75 Block Kuth Pancahayat pond,

221 | P a g e

C/o water harvesting structures to Construction of Check Ziro - II CD 14 recharging ground water at Takam Takam Passa Takam Passa WRD Watershed Dam, Nalla bunds, Farm 75.00 18.75 Block Passa Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 15 recharging ground water at Rubdi Rubdi Rubdi WRD Watershed Dam, Nalla bunds, Farm 50.00 12.50 Block Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 16 recharging ground water at Yoizat Yoizat Yoizat WRD Watershed Dam, Nalla bunds, Farm 45.00 11.25 Block Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 17 recharging ground water at Dodo Dodo Dodo WRD Watershed Dam, Nalla bunds, Farm 90.00 22.50 Block Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 18 recharging ground water at Tadarko Tadarko WRD Watershed Dam, Nalla bunds, Farm 45.00 11.25 Block Tadarko Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 19 recharging ground water at Tajgi Tajgi Tajgi WRD Watershed Dam, Nalla bunds, Farm 50.00 12.50 Block Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 20 recharging ground water at Linia Linia Linia WRD Watershed Dam, Nalla bunds, Farm 95.00 23.75 Block Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 21 recharging ground water at Loth Loth Tajgi WRD Watershed Dam, Nalla bunds, Farm 45.00 11.25 Block Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 22 recharging ground water at Bellow Bellow WRD Watershed Dam, Nalla bunds, Farm 120.00 30.00 Block Bellow Pancahayat pond,

222 | P a g e

C/o water harvesting structures to Construction of Check Ziro - II CD 23 recharging ground water at Ambam Ambam WRD Watershed Dam, Nalla bunds, Farm 100.00 25.00 Block Ambam Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 24 recharging ground water at Yoglu Yoglu Yoglu WRD Watershed Dam, Nalla bunds, Farm 140.00 35.00 Block Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 25 recharging ground water at Neelam Neelam WRD Watershed Dam, Nalla bunds, Farm 125.00 31.25 Block Neelam Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 26 recharging ground water at Seya Seya Seya WRD Watershed Dam, Nalla bunds, Farm 70.00 17.50 Block Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 27 recharging ground water at Deed Deed Deed WRD Watershed Dam, Nalla bunds, Farm 95.00 23.75 Block Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 28 recharging ground water at Radhpu Radhpu WRD Watershed Dam, Nalla bunds, Farm 70.00 17.50 Block Radhpu Pancahayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 29 recharging ground water at Ekhataya Radhpu WRD Watershed Dam, Nalla bunds, Farm 45.00 11.25 Block Ekhataya village pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 30 recharging ground water at Mai Mai Mai WRD Watershed Dam, Nalla bunds, Farm 65.00 16.25 Block Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 31 recharging ground water at Meya Meya Kugitago WRD Watershed Dam, Nalla bunds, Farm 35.00 8.75 Block Area pond,

223 | P a g e

C/o water harvesting structures to Construction of Check Ziro - II CD 32 recharging ground water at Tom Tom Kugitago WRD Watershed Dam, Nalla bunds, Farm 55.00 13.75 Block Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 33 recharging ground water at Tapi Tapi Sito WRD Watershed Dam, Nalla bunds, Farm 45.00 11.25 Block Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 34 recharging ground water at Sekhe Sekhe Sito WRD Watershed Dam, Nalla bunds, Farm 55.00 13.75 Block Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 35 recharging ground water at Aribu Aribu Yachuli WRD Watershed Dam, Nalla bunds, Farm 50.00 12.50 Block Area pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 36 recharging ground water at Kebi Kebi Kebi WRD Watershed Dam, Nalla bunds, Farm 135.00 33.75 Block Panchayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 37 recharging ground water at Bilo Bilo Pitapool WRD Watershed Dam, Nalla bunds, Farm 65.00 16.25 Block Village pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 38 recharging ground water at Chulyu Chulyu WRD Watershed Dam, Nalla bunds, Farm 96.00 24.00 Block Chulyu Village pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 39 recharging ground water at Jara Jara Jara WRD Watershed Dam, Nalla bunds, Farm 75.00 18.75 Block Panchayat pond,

C/o water harvesting structures to Construction of Check Ziro - II CD 40 recharging ground water at Jath Jath Jath WRD Watershed Dam, Nalla bunds, Farm 55.00 13.75 Block Low Area pond,

224 | P a g e

PROPOSAL OF SCHEME FOR CREATION OF NEW IRRIGATION SOURCES UNDER PMKSY (WATERSHED)

Estimated Name of Concerned Work Sl.No. Name of Scheme Location/Village Panchayat Component Activity No./Unit cost (in CD Blocks Ministry/Department Priority lakh)

Creation of new irrigation sources, Creation of new irrigation sources & Ziro - II CD upgradation of 1 conservation of tradition water Deed circle Deed Circle WRD MGNREGA 50.00 50.00 Block traditional water bodies Very High bodies under Deed Circle & Natural Water conservation,

Creation of new irrigation sources, Creation of new irrigation sources & Ziro - II CD upgradation of 2 conservation of tradition water Pistana Circle Pistana Circle WRD MGNREGA 20.00 20.00 Block traditional water bodies Very High bodies under Pistana Circle & Natural Water conservation,

Creation of new irrigation sources, Creation of new irrigation sources & Yachuli Ziro - II CD upgradation of 3 conservation of tradition water Yachuli Circle WRD MGNREGA 50.00 50.00 Circle Block traditional water bodies bodies under Yachuli Circle & Natural Water conservation, Creation of new irrigation sources, Creation of new irrigation sources & Ziro - II CD upgradation of 4 conservation of tradition water Yazali Circle Yazali Circle WRD MGNREGA 50.00 50.00 Block traditional water bodies bodies under Yazali Circle & Natural Water conservation, Creation of new irrigation sources, Creation of new irrigation sources & Upper Ziro - Ziro - II CD upgradation of 5 conservation of tradition water Upper Ziro - II WRD MGNREGA 50.00 50.00 II Block traditional water bodies bodies under Upper Ziro - II area & Natural Water conservation,

225 | P a g e

PROPOSAL OF SCHEME FOR DESILTATION OF CANAL & DISTRIBUTION SYSTEM UNDER PMKSY (WATERSHED)

Estimated Name of Concerned Work Sl.No. Name of Scheme Location/Village Panchayat Component Activity No./Unit cost (in CD Blocks Ministry/Department Priority lakh)

Desiltation of Canal & Desiltation of distribution system & canal, water deepening of existing water Ziro - II CD bodies & Very 1 bodies by strengthening Deed circle Deed Circle WRD MGNREGA 100.00 50.00 Block stregthening of bund/embankment to High bund/ recharging ground water embankment under Deed Circle

Desiltation of Canal & Desiltation of distribution system & canal, water deepening of existing water Ziro - II CD bodies & Very 2 bodies by strengthening Pistana Circle Pistana Circle WRD MGNREGA 65.00 32.50 Block stregthening of bund/embankment to High bund/ recharging ground water embankment under Pistana Circle

Desiltation of Canal & Desiltation of distribution system & canal, water deepening of existing water Yachuli Ziro - II CD bodies & 3 bodies by strengthening Yachuli Circle WRD MGNREGA 85.00 42.50 Circle Block stregthening of bund/embankment to bund/ recharging ground water embankment under Yachuli Circle Desiltation of Canal & Desiltation of distribution system & canal, water deepening of existing water Ziro - II CD bodies & 4 bodies by strengthening Yazali Circle Yazali Circle WRD MGNREGA 125.00 62.50 Block stregthening of bund/embankment to bund/ recharging ground water embankment under Yazali Circle Desiltation of Canal & Desiltation of distribution system & canal, water deepening of existing water Upper Ziro - Ziro - II CD bodies & 5 bodies by strengthening Upper Ziro - IIi WRD MGNREGA 50.00 25.00 IIi Block stregthening of bund/embankment to bund/ recharging ground water embankment under Upper Ziro - II area

226 | P a g e

PROPOSAL OF SCHEME FOR RESTORATION OF TRADITIONAL WATER STORAGE SYSTEM UNDER PMKSY (WATERSHED)

Estimated Name of Concerned Work Sl.No. Name of Scheme Location/Village Panchayat Component Activity No./Unit cost (in CD Blocks Ministry/Department Priority lakh)

Restore the potential of Restoration of traditional water Ziro - II CD traditional storage system 1 Deed circle Deed Circle WRD MGNREGA 40.00 20.00 storage system under Deed circle Block by desiltation & deepening Very High of traditional water bodies

Restore the potential of Restoration of traditional water Ziro - II CD traditional storage system 2 Pistana Circle Pistana Circle WRD MGNREGA 35.00 17.50 storage system under Pistana circle Block by desiltation & deepening Very High of traditional water bodies

Restore the potential of Restoration of traditional water Yachuli Ziro - II CD traditional storage system 3 storage system under Yachuli Yachuli Circle WRD MGNREGA 65.00 32.50 Circle Block by desiltation & deepening circle of traditional water bodies

Restore the potential of Restoration of traditional water Ziro - II CD traditional storage system 4 Yazali Circle Yazali Circle WRD MGNREGA 55.00 27.50 storage system under Yazali circle Block by desiltation & deepening of traditional water bodies

Restore the potential of Restoration of traditional water Upper Ziro - Ziro - II CD traditional storage system 5 storage system under Upper ziro - Upper Ziro - II WRD MGNREGA 35.00 17.50 II Block by desiltation & deepening II Area of traditional water bodies

227 | P a g e

C. Tamen Raga PROPOSAL FOR CREATION OF MINOR IRRIGATION PROJECT UNDER PMKSY (HAR KHET KO PANI )

Concerned Estimated Name of CD Command Work Sl. No. Name of Scheme Location/Village Panchayat Ministry/ Component Activity cost (in Lattitude Longitude Blocks Area in Ha Priority Department lakh)

1 C/O MIP from Sim river to Raga CD Har Khet Minor Topurijo&Hothrijo at Kigam Block Ko Pani Irrigation Village. Kigam Kigam WRD 8.0 20.00 27'49''05 N 94'09'25 E Medium

2 C/O MIC at Pami rijo at Raga CD Har Khet Minor Kigam village Kigam Kigam Block WRD Ko Pani Irrigation 8.0 20.00 27'49''04 N 91'09'01 E Medium

3 Raga CD Har Khet Minor C/O MIP at Erubog rijo & Yeli Godak Godak Block WRD Ko Pani Irrigation 5.0 12.50 27'48''37 N 93*39'57"E Medium rijo under Godak village. 4 Raga CD Har Khet Minor C/O MIP from hajhko to Sibi Godak Godak Block WRD Ko Pani Irrigation 3.0 7.50 27'48''07 N 94'05'25 E Medium at Godak Village. 5 Raga CD Har Khet Minor C/O MIP from Sikka Koro to Godak Godak Block WRD Ko Pani Irrigation 2.0 5.00 27'49''15 N 94'10''57 E Medium Per Paba Rijo. 6 Raga CD Har Khet Minor C/O MIP from Singin Koro to Godak Godak Block WRD Ko Pani Irrigation 2.5 6.25 27'49''04 N 94'11'01 E Medium singin Rijo. 7 Raga CD Har Khet Minor C/O MIP from Kangbo Koro Godak Godak Block WRD Ko Pani Irrigation 4.0 10.00 27'48''37 N 94'06'25 E Medium to Sey Muri. 8 Raga CD Har Khet Minor C/O MIP from Sim Koro to Godak Godak Block WRD Ko Pani Irrigation 2.0 5.00 27'49''25 N 94'10'27 E Medium Ngoka Ko. 9 Raga CD Har Khet Minor C/O MIP from Karba Koro to Godak Godak Block WRD Ko Pani Irrigation 3.0 7.50 27'48''37 N 94'06'25 E Medium Dek Pada.

10 C/O MIP from Yada Nallah to Raga CD Har Khet Minor Very Raga Raga-II WRD 18.0 45.00 27'47''49 N 94'03''24 E Yada rijo at Yada. Block Ko Pani Irrigation High 11 Raga CD Har Khet Minor C/O MIP from Dikyor river to Block Ko Pani Irrigation Lidrijo at Dokum Village Raga Raga-II WRD 1.8 4.5 27'49''06 N 94'05''26 E Medium under Raga.

228 | P a g e

12 Raga CD Har Khet Minor C/O MIP from Lebi Rijo to Block Ko Pani Irrigation Lebi Pure under Dukum Raga Raga WRD 4.0 10 27'48''16 N 94'05''18 E Low Anchal Segment.

13 Raga CD Har Khet Minor C/O MIP from Tan Koro via Block Ko Pani Irrigation Hosulubu Koro to Luth Rijo Raga Raga WRD 2.0 5 27'47''39 N 94'04''40 E Medium Under Dukum Anchal segment.

14 Raga CD Har Khet Minor C/O MIP at Kangbu to Shey Raga Raga Block WRD Ko Pani Irrigation 4.0 10 27'49''06 N 94'05''26 E Low Nuri

15 C/O MIP at Skka koro to Silen Raga CD Har Khet Minor Raga Raga WRD 3.0 7.50 27'47''39 N 94'04''40 E Low rijo Block Ko Pani Irrigation

16 C/O MIP from Tabne Nallah Raga CD Har Khet Minor Raga Raga WRD 5.0 12.50 27'49''06 N 94'04''40 E Low to Boti rijo Block Ko Pani Irrigation

17 C/O MIP from Sikso nallah to Raga CD Har Khet Minor Raga Raga WRD 6.0 15.00 27'49''06 N 94'04''40 E Medium Boken happa Block Ko Pani Irrigation

18 C/O MIP from Jorjor nallah to Raga CD Har Khet Minor Raga Raga WRD 8.0 20.00 27'47''12 N 94'04''12 E Medium Bollen happa Block Ko Pani Irrigation

19 C/O MIP from Kortane nallah Raga CD Har Khet Minor Raga Raga WRD 5.0 12.50 27'49''06 N 94'04''40 E Medium to Teri rijo Block Ko Pani Irrigation

20 C/O MIP from Kuch koro to Raga CD Har Khet Minor Raga Raga WRD 4.0 10.00 27'47''12 N 94'04''40 E Low Bangku happa Block Ko Pani Irrigation 21 C/O MIP from Pugang River Raga CD Har Khet Minor to Luterijo under Dokum Raga Raga-II Block WRD Ko Pani Irrigation 3.0 7.50 27'49''06 N 94'05''26 E Low village. 22 Raga CD Har Khet Minor C/O MIP from Potu nallah to Very Sektap Sektap Block WRD Ko Pani Irrigation 8.0 20.00 27'41''43 N 93*54''27"E Kot rijo Agri. field at Sektap. High 23 Raga CD Har Khet Minor C/o MIP from Paa koro to Very Kicho Kicho Block WRD Ko Pani Irrigation 5.0 12.50 27'48''28 N 93*07'45"E Namdagi at Kicho Village. High

24 C/O MIP at Hackrijo under Raga CD Har Khet Minor Kicho Kicho WRD 6.0 15.00 27'48''37 N 93*08'12"E Medium Kicho Village. Block Ko Pani Irrigation 25 C/O MIP at & Serrijo at Raga CD Har Khet Minor Kicho Kicho WRD 4.0 10.00 27'48''28 N 93'07''45 E Medium Kicho Village. Block Ko Pani Irrigation

229 | P a g e

26 C/O MIP from PatuNallah to Raga CD Har Khet Minor Yatap Yatap WRD 10.0 25.00 27'42''13 N 93'54''31 E Medium Ganna happa. Block Ko Pani Irrigation

27 C/O MIP from PatuPabu to Raga CD Har Khet Minor Yatap Yatap WRD 12.0 30.00 27'48''18 N 93'54''36 E Medium Bomori Hapa. Block Ko Pani Irrigation

28 C/O MIC from Pein river to Raga CD Har Khet Minor Yatap Yatap WRD 2.0 5.00 27'42''18 N 93'54''38 E Low Nicha Namchi. Block Ko Pani Irrigation 29 C/O MIP at Pamluk nallah to Raga CD Har Khet Minor Han Hapaunder Yattap Yatap Yatap Block WRD Ko Pani Irrigation 4.0 10.00 27'34''18 N 93'54'40"E Medium Village. 30 C/O MIP from Pamluk river Raga CD Har Khet Minor Very to Pamluk Happa at Yattap Yatap Yatap Block WRD Ko Pani Irrigation 3.0 7.50 27'42''18 N 93'54'46"E High village. 31 C/O MIC from Pein rijo to Raga CD Har Khet Minor Very Lachap Happa at Loktap Yatap Yatap Block WRD Ko Pani Irrigation 2.0 5.00 27'22''18 N 93'54'18"E High village. 32 C/O MIC from Pein river to Raga CD Har Khet Minor Nacha Happa at Yattap Yatap Yatap Block WRD Ko Pani Irrigation 3.6 9.00 27'32''18 N 93'54'32"E Medium village. 33 C/O MIP from Himuksho to Raga CD Har Khet Minor Boasimla-I Boasimla-I WRD 24.0 60.00 27'43''31 N 93'57'46"E Medium Bugi Koto at Boasimla. Block Ko Pani Irrigation

34 C/O MIP at Korpu Yorbe Raga CD Har Khet Minor Boasimla-I Boasimla-I WRD 8.0 20.00 27'43''42 N 93'58'04"E Low &nBoasite under Boa Village. Block Ko Pani Irrigation

35 C/O MIP at Simla Pobu to Raga CD Har Khet Minor Boasimla-I Boasimla-I WRD 6.0 15.00 27'43''50 N 93'58'24"E Medium Hagirijo& Simlarijo. Block Ko Pani Irrigation

36 C/O MIC from Nipoko to Raga CD Har Khet Minor Boasimla Boasimla WRD 3.6 9.00 27'43''31 N 93'57'46"E Low Nipoko happa. Block Ko Pani Irrigation

37 C/O MIP from Simla koro to Raga CD Har Khet Minor Boasimla Boasimla WRD 6.0 15.00 27'43''28 N 93'60'46"E Medium Jobi Hapa. Block Ko Pani Irrigation 38 C/O Flood Control at Pein Raga CD Har Khet Minor Very river at Kotrijo village under Boasimla Boasimla Block WRD 8.0 20.00 27'43''31 N 93'57'46"E Ko Pani Irrigation High Boasimla-I Anchal Segment. 39 C/O MIP from Kotrijo to Raga CD Har Khet Minor Very Boasimla Boasimla WRD 5.0 12.50 27'43''31 N 93'57'46"E Tudu Rijo at Boasimla. Block Ko Pani Irrigation High

40 C/O MIP at Tedek Sey under Raga CD Har Khet Minor Boasimla Boasimla WRD 4.2 10.50 27'43''45 N 93'59'08"E Low Boasimla-II Block Ko Pani Irrigation

230 | P a g e

41 C/O MIP at Kart pabu Raga CD Har Khet Minor Very Boasimla Boasimla WRD 4.8 12.00 27'43''31 N 93'57'46"E KarchKart happa. Block Ko Pani Irrigation High 42 C/O Flood Control work at Raga CD Har Khet Minor Boasimla-I Village at Pein Boasimla Boasimla Block WRD 6.0 15.00 27'43''31 N 93'60'46"E Low Ko Pani Irrigation River. 43 C/O MIP at Taying Paddy Raga CD Har Khet Minor Very Boasimla Boasimla WRD 2.0 5.00 27'43''52 N 93'58'53"E field under Boasimla-II Block Ko Pani Irrigation High 44 Raga CD Har Khet Minor C/O MIP from PlitoPliRijo at Hebang Radum Block WRD Ko Pani Irrigation 15.0 37.50 27'58"00 N 93'58'27'E Medium Hebang Village. 45 Raga CD Har Khet Minor C/O MIP from Pai Nallah to Hebang Radum Block WRD Ko Pani Irrigation 5.0 12.50 27*50"03 N 93*57"24''E Medium Hebang Rijo, Hebang Village. 46 C/O MIP from Pai Nallah Raga CD Har Khet Minor stream to Ledin Rijo under Hebang Radum Block WRD Ko Pani Irrigation 4.3 10.75 27*56"03 N 93*56"24''E Low Hebang village. 47 Raga CD Har Khet Minor C/O MIP from Gopo stream to Very Hebang Radum Block WRD Ko Pani Irrigation 2.4 6.00 27*52"08 N 93*52"12 Tad Rijo Hebang Village. High

48 C/O MIP from tabum Rijo to Raga CD Har Khet Minor Radum Radum WRD 5.0 12.50 27'49''40"N 93'57'54"E High Lake rijo at Radum village. Block Ko Pani Irrigation

49 C/O MIP from Taliko rijo to Raga CD Har Khet Minor Radum Radum WRD 3.2 8.00 27'48''42"N 93'55'54"E Low Radum. Block Ko Pani Irrigation

50 C/O MIP from Kote River to Raga CD Har Khet Minor Radum Radum WRD 2.3 5.75 27'49''44"N 93'53'44"E Low Kot rijo, Village Radum. Block Ko Pani Irrigation

51 C/O MIP from Koch to Sodrik Raga CD Har Khet Minor Sodrik Sodrik WRD 10.0 25.00 27*32'12"N 93*44'27"E Medium village. Block Ko Pani Irrigation

52 C/O MIP from Benak River to Raga CD Har Khet Minor Sodrik Sodrik WRD 6.0 15.00 27*30"20"N 93*40"'27 E Medium Depobu at Sodrik village. Block Ko Pani Irrigation 53 C/O MIP with CC Lining&Headwork from Sim Raga CD Har Khet Minor Very nallah to Gumto -rijo Agri Sodrik Sodrik WRD 18.0 45.00 27*32'12"N 93*48'27"E Block Ko Pani Irrigation High field at Gumto & Sodrik village. 54 C/O MIP from Rairacha to Raga CD Har Khet Minor Very Deed Rakhe Deed Rakhe WRD 12.0 30.00 27'46''29"N 93'56''12 E Path Nallah. Block Ko Pani Irrigation High 55 C/O MIP at Pudu Rijo to Raga CD Har Khet Minor Tedik nallah under Deed Deed Rakhe Deed Rakhe Block WRD Ko Pani Irrigation 6.0 15.00 27'44''22"N 93*46''30 E Low Rakhe village.

231 | P a g e

56 C/O MIP at Dap Sapa to Tebin Raga CD Har Khet Minor Deed Rakhe Deed Rakhe WRD 4.4 11.00 27'46''22"N 93'56''30 E Medium Rijo under Deed Rakhe . Block Ko Pani Irrigation

57 C/O MIP from Tabe nallah to Raga CD Har Khet Minor Deed Rakhe Deed Rakhe WRD 3.4 8.50 27'42''22"N 93'45''30 E Medium Botirijo Deed Rakhe. Block Ko Pani Irrigation

58 C/O MIC from Chegbe to Raga CD Har Khet Minor Deed Rakhe Deed Rakhe WRD 3.8 9.50 27'46''22"N 93'56''30 E Medium Deed Rakhe. Block Ko Pani Irrigation 59 Raga CD Har Khet Minor C/O MIP at Rai racha koro Block Ko Pani Irrigation Tamarmarto Happa under Deed Rakhe Deed Rakhe WRD 4.6 11.50 27'16''22"N 93'54''30 E Medium Deed Rakhe village.

60 Raga CD Har Khet Minor C/O MIP at Sikso koro to Block Ko Pani Irrigation Very Tamarmarto Happa under Deed Rakhe Deed Rakhe WRD 3.0 7.50 27'46''22"N 93'56''30 E High Deed Rakhe village.

61 Raga CD Har Khet Minor C/O MIP at Path koro to Block Ko Pani Irrigation Tayo Tamar water field under Deed Rakhe Deed Rakhe WRD 2.8 7.00 27'48''29"N 93'54''23 E Medium Deed Rakhe village. 62 C/O MIP at Path nallah to Raga CD Har Khet Minor Pudu Hapa under Deed Rakhe Deed Rakhe Deed Rakhe Block WRD Ko Pani Irrigation 5.3 13.25 27'46''22"N 93'54''32 E Medium village. 63 C/O MIP with Land Raga CD Development at Block Har Khet Minor Very Tompurijo Deed Rakhe WRD 12.0 30.00 27'47''30 N 93'55''08 E DagbukNallah to DitHapa of Ko Pani Irrigation High length 2KM under Tompurijo. 64 Raga CD C/O MIP from Hanko Rijo to Block Har Khet Minor Very Path Hapa, Length 5 km Serin Rakhe Deed Rakhe WRD 4.0 10.00 27'46''24 N 93'60''16 E Ko Pani Irrigation High ,under Serin Rakhe Village.

65 Raga CD Har Khet Minor C/O MIP from Lopurijo Block Ko Pani Irrigation Nallah to Chapen Hapa under Deed Rakhe Deed Rakhe WRD 4.1 10.25 27'44''33 N 93'54''26 E Medium Deed Rakhe -III. 66 C/O MIP from Dabi Hapa to Raga CD Har Khet Minor Seso Nallah, under Deed Deed Rakhe Deed Rakhe Block WRD Ko Pani Irrigation 2.3 5.75 27'44''36 N 93'52''12 E Medium Rakhe village. 67 Raga CD Har Khet Minor C/O MIP from Chapenrijo to Block Ko Pani Irrigation Pachi Palen Nallah, 2.1km Deed Rakhe Deed Rakhe WRD 3.1 7.75 27'42'30 N 93'58''13 E Medium under Deed Rakhe village.

232 | P a g e

68 Raga CD Har Khet Minor C/O MIP from Jalle Sapa to Block Ko Pani Irrigation Podu Nallah, 2 km under Deed Rakhe Deed Rakhe WRD 4.1 10.25 27'46''30 N 93'57''10 E Low Deed Rakhe village. 69 Raga CD Har Khet Minor C/O MIP from Enik koro to Yukar Yukar Block WRD Ko Pani Irrigation 15.0 37.50 27'47'20"N 93*58''07"E Low Tobum Sor at Yukar Village. 70 Raga CD Har Khet Minor C/O MIP at Kuchi rijo under Very Yukar Yukar Block WRD Ko Pani Irrigation 3.0 7.50 27'45"22 N 93*57''17"E Yuker Village. High 71 Raga CD Har Khet Minor C/O MIP from Poku Nallah to Yukar Yukar Block WRD Ko Pani Irrigation 2.0 5.00 27'47'20"N 93*58''07"E Medium Poku,Dekdene rijo.

72 C/O MIP at Hati Camp Rijo Raga CD Har Khet Minor Bus camp Bus camp WRD 8.0 20.00 27*28'30"N 93*44'07"E Low near Bas Camp. Block Ko Pani Irrigation

73 C/O MIP at Pakrijo under Raga CD Har Khet Minor Bus camp Bus camp WRD 4.0 10.00 27*43''20 N 93*56''48 Medium Buscamp Boa Simla. Block Ko Pani Irrigation

74 C/O MIP,FC & LD at Pein Raga CD Har Khet Minor Very Bus camp Bus camp WRD 6.0 15.00 27*43'08"N 93*57''01 E river to puchung rijo. Block Ko Pani Irrigation High

75 C/O MIP at Yajik Rijo to Raga CD Har Khet Minor Bus camp Bus camp WRD 5.9 14.75 27*42'18"N 93*53''11 E Medium Hapoo koro at Buscamp. Block Ko Pani Irrigation

76 C/O MIP at NaniyaPabu to Raga CD Har Khet Minor Rete Rete WRD 14.0 35.00 27*31'07"N 93*46'39"E Low Rete Sapa. Block Ko Pani Irrigation

77 C/O MIP at RippileNallah to Raga CD Har Khet Minor Rete Rete WRD 10.0 25.00 27*30'17"N 93*53'42"E Medium Rite Village. Block Ko Pani Irrigation 78 C/O MIP from Kampu to Raga CD Har Khet Minor Kompurijo Kompurijo WRD 5.0 12.50 27*46'44"N 93*58''16 E Low kompu Site Rijo. Block Ko Pani Irrigation

79 C/O MIP from Path Nalah to Raga CD Har Khet Minor Kompurijo Kompurijo WRD 4.0 10.00 27*44'41"N 93*57''26 E Medium Logirijo at Kamporijo. Block Ko Pani Irrigation

80 Raga CD Har Khet Minor Very C/O MIP at Heka Koro. Kompurijo Kompurijo WRD 8.0 20.00 27*45'41"N 93*57''19 E Block Ko Pani Irrigation High

81 C/O MIP from ToluRijo to Raga CD Har Khet Minor Very Kamporijo Kamporijo WRD 6.0 15.00 27*46'42"N 93*58''10 E Nguriksapa. Block Ko Pani Irrigation High

82 C/O MIP from Path nallah Raga CD Har Khet Minor Kamporijo Kamporijo WRD 5.0 12.50 27*45'44"N 93*58''06 E Medium Tagis rijo at Kamporijo. Block Ko Pani Irrigation 83 C/O MIP from Peth Nallah to Raga CD Har Khet Minor Very Kamporijo Kamporijo WRD 6.0 15.00 27*40'46"N 93*57''36 E Tedik& Leji Hapa. Block Ko Pani Irrigation High

233 | P a g e

84 C/O MIP from Path Nallah to Raga CD Har Khet Minor Kamporijo Hapa,under Kamporijo Kamporijo Block WRD Ko Pani Irrigation 16.0 40.00 27*46'47"N 93*58''20 E Low Komporijo Village. 85 C/O MIP from Pein River to Kamporijo- Raga CD Har Khet Minor Tabko WRD 3.8 9.50 27*45'34"N 93*57''24 E Low mikcha Nomchi. II Block Ko Pani Irrigation

86 C/O MIP from Takbo Pabu to Kamporijo- Raga CD Har Khet Minor Bomte rijo WRD 5.4 13.50 27*43'40"N 93*57''09 E Low Tabko happa. II Block Ko Pani Irrigation

87 C/O MIP from Kot Nallah at Kamporijo- Raga CD Har Khet Minor Bomte rijo WRD 4.0 10.00 27*42'43"N 93*58''12 E Medium Bomte Rijo. II Block Ko Pani Irrigation

88 C/O MIP from Tek Nallah to Kamporijo- Raga CD Har Khet Minor Tek Nallah WRD 6.0 15.00 27*45'46"N 93*58''30 E Medium Tek Seppa. II Block Ko Pani Irrigation

89 C/O MIP from Math Nallah to Kamporijo- Raga CD Har Khet Minor Math Nallah WRD 6.3 15.75 27*40'34"N 93*56''10 E Medium Sediso Rijo. II Block Ko Pani Irrigation

90 C/O MIC from Pein river to Kamporijo- Raga CD Har Khet Minor Very Tassarbo Happa WRD 2.0 5.00 27*47'47"N 93*58''20 E Tassarbo Happa. II Block Ko Pani Irrigation High

91 C/O MIC cum Storage Tank at Kamporijo- Raga CD Har Khet Minor Very Simla Pabu WRD 6.2 15.50 27*42'49"N 93*56''23 E Ret Happa from Simla Pabu. II Block Ko Pani Irrigation High

92 C/O MIP from Pein River Kamporijo- Raga CD Har Khet Minor Pein WRD 2.1 5.25 27*45'45"N 93*57''20 E Low Sualum Rijo. II Block Ko Pani Irrigation

93 C/O MIP from Koth Koro to Kamporijo- Raga CD Har Khet Minor Koth Koro WRD 3.0 7.50 27*44'46"N 93*58''12 E Low Parling Happa. II Block Ko Pani Irrigation

94 C/O MIP from Koch River to Kamporijo- Raga CD Har Khet Minor Koch river WRD 8.0 20.00 27*40'41"N 93*57''22 E Medium Koto colony happa. II Block Ko Pani Irrigation

95 C/O MIP from Tagung Koro Kamporijo- Raga CD Har Khet Minor Tagung Koro WRD 6.4 16.00 27*46'47"N 93*56''49 E Medium to Namchi. II Block Ko Pani Irrigation

96 C/O MIC from Pene River to Kamporijo- Raga CD Har Khet Minor Pein WRD 4.2 10.50 27*42'44"N 93*56''43 E Low Takuso Rijo. II Block Ko Pani Irrigation

97 C/O MIP from Gidi Koro to Kamporijo- Raga CD Har Khet Minor Gidi Koro WRD 5.2 13.00 27*46'47"N 93*58''22 E Low Rebe Happa. II Block Ko Pani Irrigation

98 C/O MIP from Pein River to Kamporijo- Raga CD Har Khet Minor Pein WRD 3.8 9.50 27*43'48"N 93*57''29 E Medium Pein Rijo. II Block Ko Pani Irrigation

99 C/O MIP from Pein River to Kamporijo- Raga CD Har Khet Minor Pein WRD 5.6 14.00 27*46'47"N 93*57''19 E Medium Ngurik Rijo. II Block Ko Pani Irrigation 100 C/O MIP from Pein River to Kamporijo- Raga CD Har Khet Minor Pein WRD 6.2 15.50 27*45'41"N 93*58''32 E Medium Yach Rijo. II Block Ko Pani Irrigation

234 | P a g e

101 C/O MIP from Pein River to Kamporijo- Raga CD Har Khet Minor Very Pein WRD 10.0 25.00 27*46'47"N 93*57''38 E Nyimbo. II Block Ko Pani Irrigation High 102 C/O MIP from Panrijo to Raga CD Har Khet Minor Kampopuri at Kemliko Kemliko Kemliko Block WRD Ko Pani Irrigation 5.0 12.50 27*48'57"N 94*08'59"E Low Village. 103 Raga CD Har Khet Minor C/O MIP from Pare Nallah to Putmilli Putmilli Block WRD Ko Pani Irrigation 4.0 10.00 27*42'44"N 94*03'28"E Low Tomle,at Putmilli village.

104 C/O MIP from PujuKoro to Raga CD Har Khet Minor Putmilli Putmilli WRD 6.0 15.00 27*41'43"N 94*05'26"E Low Pare,at Putmilli village. Block Ko Pani Irrigation

105 C/O MIP from PeinNallah to Raga CD Har Khet Minor Very Putmilli Putmilli WRD 7.0 17.50 27*42'46"N 94*06'23"E Getsui at Pet mili. Block Ko Pani Irrigation High

106 C/O MIP from PokuNallah to Raga CD Har Khet Minor Paimilli Paimilli WRD 8.0 20.00 27*44'50"N 94*04'22"E Low MilliPada,at Paimilli. Block Ko Pani Irrigation

107 C/O MIP from Sesi Nallah to Raga CD Har Khet Minor Sesi Nalla Milli WRD 12.0 30.00 27*44'50"N 94*06'29"E Medium Lege Yorb Plain. Block Ko Pani Irrigation

108 C/O MIP from Togoko Nallah Raga CD Har Khet Minor Togoko Nallah Milli WRD 2.0 5.00 27*47'46"N 94*07'28"E Medium to Togoko Leth. Block Ko Pani Irrigation

109 C/O MIP from Paa Nallah to Raga CD Har Khet Minor Paa Nalla Milli WRD 3.0 7.50 27*45'49"N 94*04'20"E Medium Paa Rijo. Block Ko Pani Irrigation 110 Raga CD Har Khet Minor C/O MIP at Guage Rijo. Pein Stream Milli Block WRD Ko Pani Irrigation 4.0 10.00 27*40'44"N 94*03'28"E Medium

111 Raga CD Har Khet Minor C/O MIP at Mekom Rijo. Poku Stream Milli Block WRD Ko Pani Irrigation 3.3 8.25 27*43'49"N 94*03'28"E Medium

112 Raga CD Har Khet Minor C/O MIP at Mekom Rijo. Koch Stream Milli Block WRD Ko Pani Irrigation 4.1 10.25 27*49"50"N 94*04'27"E Medium

113 Raga CD Har Khet Minor C/O MIP at Mekom Rijo. Pabone stream Milli Block WRD Ko Pani Irrigation 2.8 7.00 27*40'45"N 94*04'24"E Low 114 Raga CD Har Khet Minor C/O MIP at Mekom Rijo. Bende sream Milli Block WRD Ko Pani Irrigation 3.6 9.00 27*44'52"N 94*02'32"E Low

115 C/O MIP from PuruNalah to Raga CD Har Khet Minor Hach milli Hach milli WRD 5.0 12.50 27*46'54"N 94*03'30"E Low Puru Rite at Hach Milli. Block Ko Pani Irrigation

116 C/O MIP from Deli koro to Raga CD Har Khet Minor Nimar Nimar WRD 8.0 20.00 27*43'47"N 94*04'26"E Low sepparijo at Nimar Village. Block Ko Pani Irrigation

235 | P a g e

117 C/O MIP at Paharijo under Raga CD Har Khet Minor Nimar Nimar WRD 6.0 15.00 27*42'46"N 94*03'28"E Low Nimar village. Block Ko Pani Irrigation

118 C/O MIC at Rhaanallah to Laa Raga CD Har Khet Minor Laa Laa WRD 7.0 17.50 27*41'43"N 94*05'27"E Low Village. Block Ko Pani Irrigation

Raga CD Har Khet Minor 119 C/O MIP at Laa village. Paa Nallah Laa WRD 4.0 10.00 27*45'47"N 94*04'26"E Low Block Ko Pani Irrigation

120 Kamporijo Har Khet Minor C/O MIP from TanaRijo to Mengi Mengi Kabak Block WRD Ko Pani Irrigation 5.0 12.50 27*40'46"N 94*05'18"E Low Mengi Kabak. Kabak 121 Kamporijo Har Khet Minor C/O MIP from Kotkoro to Mengi Mengi Kabak Block WRD Ko Pani Irrigation 3.0 7.50 27*45'47"N 94*05'32"E Medium Kalre at Mengi Kabak. Kabak 122 Kamporijo Har Khet Minor C/O MIP from Robikoro to Mengi Very Mengi Kabak Block WRD Ko Pani Irrigation 3.4 8.50 27*44'47"N 94*06'30"E Heri paminrijo Mangi Kabak. Kabak High

123 C/O MIP from Rakpe rijo to Kamporijo Har Khet Minor Rai Rai WRD 7.0 17.50 27*46'47"N 94*04'27"E Low Rai Village. Block Ko Pani Irrigation

124 C/o MIP from Hoji Village to Kamporijo Har Khet Minor Hoj Radum WRD 5.0 12.50 27*51''28 N 93*59''46 E Low Kampu Silo Rijo. Block Ko Pani Irrigation

125 C/O MIP at Koma Pabo to Kamporijo Har Khet Minor Very Hoj Radum WRD 6.4 16.00 27*53''36 N 93*62''44 E Pitap Hapa at village Hoj. Block Ko Pani Irrigation High 126 Kamporijo Har Khet Minor C/O MIP from Dah stream to Dugi Dugi Block WRD Ko Pani Irrigation 9.0 22.50 27*48''27 N 93*56''48 E Low TamensiRijo at Dugi. 127 Kamporijo Har Khet Minor C/O MIP from Mabu Soku to Very Dugi Dugi Block WRD Ko Pani Irrigation 5.0 12.50 27*49''16 N 93*57''56 E Gitam Happa at Dugi. High

128 C/O MIP at Dhakoro&Bedak Kamporijo Har Khet Minor Pai Pai WRD 10.0 25.00 27*50''57 N 93*59"06 E Low to Pai Rijo. Block Ko Pani Irrigation 129 C/O MIP from Luogu Seka to Kamporijo Har Khet Minor Getam Hapa,under Jully Dugi Dugi Block WRD Ko Pani Irrigation 2.0 5.00 27*48''27 N 93*54"45 E Medium village Dugi. 130 Kamporijo Har Khet Minor C/O MIP at Dha Sui to Dha Dha Dha Block WRD Ko Pani Irrigation 11.0 27.50 27*49''34 N 93*56''14 E Low Rijo.

131 C/O MIP from Haminsok to Kamporijo Har Khet Minor Yurkum Yurkum WRD 8.0 20.00 27*50''01 N 93*58''27 E Low Yorkum Village. Block Ko Pani Irrigation

236 | P a g e

132 C/O MIP with FC from Pamin Kamporijo Har Khet Minor Yurkum Yurkum WRD 4.0 10.00 27*56''10 N 93*60''28 E Low River to Amjirijo. Block Ko Pani Irrigation 133 C/O MIP at Saparijo to Kamporijo Har Khet Minor Hallrijo with LD 8ha at Rintum Yurkum Block WRD Ko Pani Irrigation 12.0 30.00 27*52''08 N 93*65''37 E Medium Rintum. 134 C/O MIP from Hamin Sok to Kamporijo Har Khet Minor Heka Koro,under Rintum Rintum Yurkum Block WRD Ko Pani Irrigation 4.0 10.00 27*54''11 N 93*57''30 E Medium village. 135 C/O MIP from Sachi Rijo to Kamporijo Har Khet Minor Tayio Koro,under Yorkum Yurkum Yurkum Block WRD Ko Pani Irrigation 3.5 8.75 27*50''01 N 93*58''27 E Medium village. 136 C/O MIP at Poku rijo under Kamporijo Har Khet Minor Very Poku Poku WRD 6.0 15.00 27*46''49 N 93*58''43 E Poku village. Block Ko Pani Irrigation High 137 C/O MIP Channel Math Kamporijo Har Khet Minor Nallah to Matrijo at poku Poku Poku Block WRD Ko Pani Irrigation 4.1 10.25 27*46''40 N 93*58''40 E Low village. 138 C/O MIP from Tapi koro to Kamporijo Har Khet Minor Very Luba Luba WRD 8.0 20.00 27*51''12 N 94*00''01 E Nedha at Luba Village. Block Ko Pani Irrigation High

139 C/O MIP channel at Lopu Raga CD Har Khet Minor Very Raker Raker WRD 6.0 15.00 27*47''09 N 94*04''03 E Korto to Tag seppa Raker. Block Ko Pani Irrigation High

140 C/O MIP at Nidurijo under Raga CD Har Khet Minor Raker Raker WRD 2.8 7.00 27*47''09 N 94*04''03 E Low Raker. Block Ko Pani Irrigation

141 C/O MIP Channel at Tek Sepa Kamporijo Har Khet Minor Very Ayi Ayi WRD 10.0 25.00 27*46''52 N 93*03''45 E Ayi Village. Block Ko Pani Irrigation High

142 C/O MIC from Patu Nallah to Kamporijo Har Khet Minor Very Ayi Ayi WRD 7.0 17.50 27*40''42 N 93*06''35 E Bomori Hapa at Ayi. Block Ko Pani Irrigation High 143 C/O MIP from Tech Pabu,Sele Kamporijo Har Khet Minor Den shobu to Telik Pabu Ayi Ayi Block WRD Ko Pani Irrigation 5.0 12.50 27*45''42 N 93*04''35 E Medium under Aye village. 144 C/O MIP from Pakh Pabu to Kamporijo Har Khet Minor Pakh Happa,under Aye Ayi Ayi Block WRD Ko Pani Irrigation 4.2 10.50 27*46''52 N 93*03''45 E Medium village. 145 C/O MIP Channel at WRC Kamporijo Har Khet Minor Very Pamluk Pamluk WRD 5.0 12.50 27*40''19 N 93*54''49 E field Pamlukrijo. Block Ko Pani Irrigation High

146 C/O MIP from Pein river to Kamporijo Har Khet Minor Very Pamluk Pamluk WRD 4.0 10.00 27*40''13 N 93*55''03 E Nicha Namchi. Block Ko Pani Irrigation High

237 | P a g e

147 C/O MIP from Oyipu to Kamporijo Har Khet Minor Pamluk Pamluk WRD 6.0 15.00 27*40''13 N 93*55''03 E Medium Ouipu hapa at Pamluk village. Block Ko Pani Irrigation

148 C/O MIP at Poru koro get Kamporijo Har Khet Minor Very Gaa Gaa WRD 6.0 15.00 27*40"46 N 93*54'46"E happa at Gaa village. Block Ko Pani Irrigation High 149 C/O MIP from Sha Koro to Kamporijo Har Khet Minor Very Sandar rijo under Gaa Anchal Gaa Gaa Block WRD Ko Pani Irrigation 4.0 10.00 27*48"38 N 93*08'44"E High Segment.. 150 C/O MIP from Redik Koro to Kamporijo Har Khet Minor Very Mempu rijo under Gaa Gaa Gaa Block WRD Ko Pani Irrigation 3.1 7.75 27*46"36 N 93*00'41"E High Anchal Segment. 151 C/O MIP from Jordi Sui to Kamporijo Har Khet Minor Very Show Rijo under Gaa Anchal Gaa Gaa Block WRD Ko Pani Irrigation 2.6 6.50 27*44"35 N 93*00'38"E High Segment. 152 C/O MIP at Nido rijo to nido Kamporijo Har Khet Minor Tamen Tamen WRD 5.0 12.50 27*45'24"N 94*00'25"E Medium Happa. Block Ko Pani Irrigation

153 C/O MIP near Paddy Field of Kamporijo Har Khet Minor Tamen Tamen WRD 2.0 5.00 27*40'21"N 94*02'20"E Low Nido koro nallah. Block Ko Pani Irrigation

154 C/O MIC Nampamkoro to Kamporijo Har Khet Minor Tamen Tamen WRD 2.6 6.50 27*46'22"N 94*04'25"E Low Nampamrijo. Block Ko Pani Irrigation

155 C/O MIP at Pagu Rijo, under Kamporijo Har Khet Minor Tamen Tamen WRD 1.9 4.75 27*47'22"N 94*10'26"E Low Tamen. Block Ko Pani Irrigation

156 C/O MIP at Tamen-I and Kamporijo Har Khet Minor Sha koro Tamen-I,II WRD 14.0 35.00 27*45'24"N 94*08'28"E Medium Tamen II. Block Ko Pani Irrigation

157 C/O MIP from Paa river to Kamporijo Har Khet Minor Kemyir Kemyir WRD 8.0 20.00 27*23'23"N 93*43'21"E Medium Mobsi rijo at Kemyer Village. Block Ko Pani Irrigation

158 C/O MIP from Tumchak to Raga CD Har Khet Minor Bomte Bomte WRD 7.0 17.50 27*21'41"N 93*42'39"E Medium Kulurijo. Block Ko Pani Irrigation 159 C/O MIC channel from Kebi Raga CD Har Khet Minor River to Lupuni Hapa at Bomte Bomte Block WRD Ko Pani Irrigation 4.0 10.00 27*22'35"N 93*44'16"E Medium Bumte Village. 160 C/O MIC from Mobla Sho Raga CD Har Khet Minor River to Bushow Hapa Bumte Bomte Bomte Block WRD Ko Pani Irrigation 5.0 12.50 27*25'55"N 93*42'21"E Low Village. 161 C/O MIP from Kot River to Raga CD Har Khet Minor Very Halum rijo under Bomte Bomte Bomte Block WRD Ko Pani Irrigation 4.8 12.00 27*24'52"N 93*40'21"E High Village.

238 | P a g e

162 C/O MIP from Pani Rijo to Raga CD Har Khet Minor Very Kemliko Kemliko WRD 15.0 37.50 27*23'07"N 93*45'31"E Jawan camp. Block Ko Pani Irrigation High

163 C/O MIP from Paniya Rijo to Raga CD Har Khet Minor Kemliko Kemliko WRD 12.0 30.00 27*24''17 N 93*46'50"E Medium Kicho Rijo. Block Ko Pani Irrigation 164 C/O MIP from Pan-Koro to Raga CD Har Khet Minor Jaing-Camrijo under Kemliko Kemliko Kemliko Block WRD Ko Pani Irrigation 6.6 16.50 27*26''21 N 93*42'52"E Medium village. 165 C/O MIP from Panrijo to Raga CD Har Khet Minor Kampopuri at Kemliko Kemliko Kemliko Block WRD Ko Pani Irrigation 5.4 13.50 27*24'10"N 93*44'54"E Medium Village. 166 C/O MIP from Pabe Nallah to Kamporijo Har Khet Minor Jorjo Hapa,under Chudi Yom Yom Yom Block WRD Ko Pani Irrigation 10.0 25.00 27*46''32 N 93*55'37"E Low Village. 167 Kamporijo Har Khet Minor C/O MIP from Roru,Pup,Cusa Block Ko Pani Irrigation Nallah to Ruth Hapa,under Yom Yom WRD 6.0 15.00 27*21'31"N 93*47'03"E Low Gep Yom Village. 168 Kamporijo Har Khet Minor C/O MIP from Pene Koro to Block Ko Pani Irrigation Harasow Nallah under Repari Repari Repari WRD 7.0 17.50 27*42''59 N 93*55'33"E Medium village.

169 Kamporijo Har Khet Minor C/O MIP from Mote Koro to Repari Repari Block WRD Ko Pani Irrigation 6.0 15.00 27*20'31"N 93*40'42"E Medium Tai Sapa under Repari village. 170 C/O MIP from Bara Koro to Kamporijo Har Khet Minor Peni River,under Repari Repari Repari Block WRD Ko Pani Irrigation 4.0 10.00 27*19'48"N 93*45'41"E Medium village. 171 C/O MIP from Salla Nalla to Kamporijo Har Khet Minor Sein Koro under Repari Repari Repari Block WRD Ko Pani Irrigation 8.0 20.00 27*21'50"N 93*45'41"E Medium village. 172 C/O MIP from Petchpeet Kamporijo Har Khet Minor nallah to Takam Soree under Repari Repari Block WRD Ko Pani Irrigation 6.0 15.00 27*19'60"N 93*47'11"E Medium Repari Village. 173 Kamporijo Har Khet Minor C/O MIP from Pein River to Repari Repari Block WRD Ko Pani Irrigation 5.0 12.50 27*21'50"N 93*46'10"E Low Tor Hapa at Repari village.

174 C/O MIP with CC Lining&Headwork from Rath Har Khet Minor Old Mutem Tayasimla WRD 4.0 10.00 27*45'03"N 94*05'05"E Low nallah to Rath-rijo Agri field at Ko Pani Irrigation Tayasimla.

239 | P a g e

175 Har Khet Minor C/O MIP with CC Ko Pani Irrigation Lining&Headwork from Rachi Very Old Mutem Tayasimla WRD 5.0 12.50 27*40'03"N 94*03'05"E nallah to Rachi-rijo Agri field High at Tayasimla.

176 Har Khet Minor C/O MIP at Taya Rite and Very Tayasimla Tayasimla WRD Ko Pani Irrigation 10.0 25.00 27*44'03"N 94*05'04"E Taya Keti under Tayasimla. High

177 Tamen Raga Har Khet Ko Minor Paro Paro WRD 3.00 7.50 27*29'28"N 94*11'05"E Very High C/o MIP From Paro koro to CD-Block Pani Irrigation Yapa rijo at Paro . 178 Tamen Raga Har Khet Ko Minor Paro Paro WRD 5.00 12.50 27*29'35"N 94*11'24"E Very High C/o MIP Channel from Tacho CD-Block Pani Irrigation Pabu to Tama rijo at Paro . 179 Tamen Raga Har Khet Ko Minor Paro Paro WRD 5.00 12.50 27*30'27"N 93*46'37"E Very High C/o MIP from Pipe Nallah to CD-Block Pani Irrigation Tali Rijo at Paro, Dollungmukh 180 C/o MIP from Pipe Nallah to Tamen Raga Har Khet Ko Minor Paro Paro WRD 7.00 17.50 27*28'09"N 93*47'27"E Very High ShalaRijo at Paro, CD-Block Pani Irrigation Dollungmukh 181 C/o MIP from Paro Koro to Tamen Raga Har Khet Ko Minor Paro Paro WRD 4.00 10.00 27*29'52"N 94*11'27"E Very High Tamen-Rijo at Paro, CD-Block Pani Irrigation Dollungmukh 182 C/o MIP cum CC work with Head Work from That Nallah Tamen Raga Har Khet Ko Minor to Yater-Rijo Agri-Field area at Rigyu Kalaptukar WRD 20.00 200.00 27*30'44'' 94*14'13"E Very High CD-Block Pani Irrigation Rigyu under Dollungmukh Circle. 183 C/O MIP work from Sharyaso nallah to Daryso rijo agri field Tamen Raga Har Khet Ko Minor Rigyu Kalaptukar WRD 10.00 25.00 27*30'28"N 94*13'49"E Medium at Rigyu village under CD-Block Pani Irrigation Dollungmukh. 184 Tamen Raga Har Khet Ko Minor Rigyu Kalaptukar WRD 3.00 7.50 27*30'33"N 94*14'01"E Medium C/o MIP Channel TujumRijo at CD-Block Pani Irrigation Rigyu, Dollungmukh 3 Hectres 185 Tamen Raga Har Khet Ko Minor Rigyu Kalaptukar WRD 6.00 15.00 27*30'28"N 94*14'04"E Medium C/o MIP from Rigyu Nallah to CD-Block Pani Irrigation Sit rijo at Rigyu

240 | P a g e

186 Tamen Raga Har Khet Ko Minor Rigyu Kalaptukar WRD 5.00 12.50 27*30'24"N 93*14'00'E high C/o MIP from Rigyu Nallah to CD-Block Pani Irrigation Takar rijo at Rigyu 187 Tamen Raga Har Khet Ko Minor Rigyu Kalaptukar WRD 7.00 17.50 27*30'19"N 94*13'41"E High C/o MIP from Tath koro to CD-Block Pani Irrigation Techi rijo at Rigyu 188 Tamen Raga Har Khet Ko Minor Rigyu Kalaptukar WRD 6.00 15.00 27*29'44"N 94*11'09"E High C/o MIP from Rigyu Nallah to CD-Block Pani Irrigation Yaka rijo at Rigyu 189 Tamen Raga Har Khet Ko Minor Lumsi Tanio WRD 4.00 10.00 27*28'26"N 94*09'25"E High C/o MIP from Kundha Nallah CD-Block Pani Irrigation to Yayik rijo at Lumsi 190 Flood Proction Work over Tamen Raga Har Khet Ko Minor Lumsi Tanio WRD 8.00 20.00 27*28'40"N 94*10'06"E High Dollung koro near Yayik at CD-Block Pani Irrigation Lumsi 191 Tamen Raga Har Khet Ko Minor Lumsi Tanio WRD 8.00 20.00 27*28'56"N 94*10'19"E High C/O MIP from RathSow Nallah CD-Block Pani Irrigation to Sala rijo at Lumsi. 192 Tamen Raga Har Khet Ko Minor Lumsi Tanio WRD 10.00 25.00 27*28'57"N 94*10'24"E High C/O MIP from RothSow Nallah CD-Block Pani Irrigation to Tellirijo at Lumsi 193 C/o MIP from Bomt koro to Tamen Raga Har Khet Ko Minor bomte Tanio WRD 7.00 17.50 27*29'10"N 94*11'05"E High Bomte Seppa at Bomte. CD-Block Pani Irrigation

194 C/O MIP From Bomte Nallah Tamen Raga Har Khet Ko Minor to Chimi Bini Paddy field for 2 bomte Tanio WRD 6.00 15.00 27*29'14"N 94*11'33"E Medium CD-Block Pani Irrigation km, 3 Hect. 195 C/o MIP Tanio Nallah to YegdiRijo at tanio, Tamen Raga Har Khet Ko Minor Tanio Tanio WRD 5.00 12.50 27*29'31"N 94*11'39"E Medium Dollungmukh. CD-Block Pani Irrigation

196 Tamen Raga Har Khet Ko Minor Tanio Tanio WRD 6.00 15.00 27*29'11"N 94*11'08"E Medium MIP from Dollung koro to Telli CD-Block Pani Irrigation rijo at Tanio. 197 C/o MIP from Loth Nallah to Tamen Raga Har Khet Ko Minor Yama rijo Paddy Field at kherbari Kherbari WRD 7.00 17.50 27*29'21"N 94*12'10"E Medium CD-Block Pani Irrigation Kherbari .

241 | P a g e

198 C/o MIP from Nido Nallah to Tamen Raga Har Khet Ko Minor Gepi rijo Paddy Field at kherbari Kherbari WRD 5.00 12.50 27*2\9'37"N 94*11'30"E Medium CD-Block Pani Irrigation Dollung rijo. 199 C/o MIP from Tania koro to Tamen Raga Har Khet Ko Minor kherbari Kherbari WRD 4.00 10.00 27*29'20"N 94*12'14"E Medium Yasom rijo at Kherbari CD-Block Pani Irrigation

200 C/o MIP from Temi koro to Tor Tamen Raga Har Khet Ko Minor kherbari Kherbari WRD 3.00 7.50 27*29'21"N 94*12'04"E Medium Seppa at Kherbari. CD-Block Pani Irrigation

201 C/o MIP Channel ChemmiRijo at Kerbari, Dollungmukh Tamen Raga Har Khet Ko Minor kherbari Kherbari WRD 5.00 12.50 27*29'21"N 94*12'10"E Medium CD-Block Pani Irrigation

202 C/o MIP from Tania Nallah to Tamen Raga Har Khet Ko Minor kherbari Kherbari WRD 4.00 10.00 27*29'13"N 94*12'03"E Medium Yeri rijo at Kherbari CD-Block Pani Irrigation

203 C/o MIP from Tania Nallah to Tamen Raga Har Khet Ko Minor kherbari Kherbari WRD 3.00 7.50 27*29'11"N 94*12'40"E Medium Teyi rijo at Kherbari CD-Block Pani Irrigation

204 C/o MIP from Dicho Nallah to Tamen Raga Har Khet Ko Minor kherbari Kherbari WRD 5.00 12.50 27*29'41"N 94*12'53"E Medium Gepi rijo at Kherbari CD-Block Pani Irrigation

205 C/o MIP from Nido Nallah to Tamen Raga Har Khet Ko Minor kherbari Kherbari WRD 5.00 12.50 27*29'34"N 94*12'10"E Medium Yama rijo at Kherbari CD-Block Pani Irrigation

206 Tamen Raga Har Khet Ko Minor kherbari Kherbari WRD 4.00 10.00 27*29'37"N 94*12'20"E Medium C/o MIP from Tami Nallah to CD-Block Pani Irrigation Taja rijo at Kherbari. 207 Tamen Raga Har Khet Ko Minor kherbari Kherbari WRD 3.00 7.50 27*29'37"N 94*12'10"E Medium C/o MIP from Tami Nallah to CD-Block Pani Irrigation Yhe rijo at Kherbari. 208 Tamen Raga Har Khet Ko Minor kherbari Kherbari WRD 5.00 12.50 27*29'09"N 94*13'01"E Medium C/o MIP from Koila Nallah to CD-Block Pani Irrigation Yago rijo at Rajali. 209 Tamen Raga Har Khet Ko Minor kherbari Kherbari WRD 4.00 10.00 27*29'31"N 94*12'24"E Very High C/o MIP from Nido nallah to CD-Block Pani Irrigation Nitin rijo at Kherbari.

242 | P a g e

210 C/o MIP from Lipu Libla koro Tamen Raga Har Khet Ko Minor to Bei rijo near Sec. School Midpu Kherbari WRD 3.00 7.50 27*28'21"N 94*13'07"E Very High CD-Block Pani Irrigation Dollungmukh. 211 C/O MIP From Midpu Nallah to Tamen Raga Har Khet Ko Minor Midpu Kherbari WRD 3.50 8.75 27*29'07"N 94*12'28"E Very High Binny Talom Paddy field. CD-Block Pani Irrigation

212 C/O MIP From Ten Nallah to Tamen Raga Har Khet Ko Minor Midpu Kherbari WRD 3.00 7.50 27*28'53"N 94*12'28"E Very High Yayik Murtyem Paddy field. CD-Block Pani Irrigation

213 C/O MIP From Tatta Nallah to Tamen Raga Har Khet Ko Minor Midpu Kherbari WRD 4.00 10.00 27*28'50"N 94*12'11"E Very High Tebi Daknyo Paddy field. CD-Block Pani Irrigation

214 C/O MIP From Tatta Nallah to Tamen Raga Har Khet Ko Minor Tetek Daknyo Paddy field for Midpu Kherbari WRD 3.00 7.50 27*28'50"N 94*12'10"E Very High CD-Block Pani Irrigation 1.5km, 2 Hect. 215 C/o MIP from Koila Nallah to Tamen Raga Har Khet Ko Minor Rajali Rajali WRD 6.00 15.00 27*28'23"N 94*11'05"E Very High Taja rijo Paddy Field at Rajali. CD-Block Pani Irrigation

216 C/o MIP from Koila Nallah to Tamen Raga Har Khet Ko Minor Bhisnu rijo Paddy Field at Rajali Rajali WRD 4.00 10.00 27*28'36"N 94*13'35"E Very High CD-Block Pani Irrigation Rajali .

217 C/o MIP from Koila Nallah to Tamen Raga Har Khet Ko Minor Nyade rijo Paddy Field at Rajali Rajali WRD 7.00 17.50 27*28'23"N 94*13'36"E Medium CD-Block Pani Irrigation Rajali . 218 C/o MIP from Koila Nallah to Tamen Raga Har Khet Ko Minor Rajali Rajali WRD 5.00 12.50 27*28'30"N 94*13'31"E Medium Tape rijo at Rajali . CD-Block Pani Irrigation

219 C/o MIP from Koila Nallah to Tamen Raga Har Khet Ko Minor Rajali Rajali WRD 4.00 10.00 27*28'36"N 94*13'36"E Medium Hirom rijo at Rajali CD-Block Pani Irrigation

220 Tamen Raga Har Khet Ko Minor Rajali Rajali WRD 5.00 12.50 27*29'15"N 94*13'04"E Medium C/o MIP from Koila Nallah to CD-Block Pani Irrigation Yayik rijo at Rajali 221 Tamen Raga Har Khet Ko Minor Rajali Rajali WRD 4.00 10.00 27*28'47"N 94*13'33"E Medium C/o MIP from Koila Nallah to CD-Block Pani Irrigation Tagem rijo at Rajali

243 | P a g e

222 Tamen Raga Har Khet Ko Minor Rajali Rajali WRD 5.00 12.50 27*28'47"N 94*13'27"E Medium C/o MIP from Koila Nallah to CD-Block Pani Irrigation Makcha rijo at Rajali. 223 C/o MIP from Lipu libla Nallah Tamen Raga Har Khet Ko Minor Rajali Rajali WRD 8.00 20.00 27*28'34"N 94*12'50"E Medium to Tayuk rijo at Rajali CD-Block Pani Irrigation

224 C/o MIP from Lipu libla Nallah Tamen Raga Har Khet Ko Minor Rajali Rajali WRD 7.00 17.50 27*28'34"N 94*12'50"E Medium to Tapu rijo at Rajali CD-Block Pani Irrigation

225 Tamen Raga Har Khet Ko Minor Rajali Rajali WRD 8.00 20.00 27*28'27"N 94*13'42"E Medium C/o MIP from Koila Nallah to CD-Block Pani Irrigation Uday rijo at Rajali 226 Tamen Raga Har Khet Ko Minor Kalaptukar Kalaptukar WRD 6.00 15.00 27*30'58"N 94*14'45"E Medium C/o MIP from Soni Nallah to CD-Block Pani Irrigation Tajek rijo at Kalaptukar 227 C/o MIP from Soni Nallah to Tamen Raga Har Khet Ko Minor Kalaptukar Kalaptukar WRD 7.00 17.50 27*31'13"N 94*15'05"E Medium Binny Paddy field at CD-Block Pani Irrigation Kalaptukar.

PROPOSAL OF SCHEME FOR REPAIR, RESTORATION & RENOVATION OF NATURAL & TRADITIONAL WATER BODIES UNDER PMKSY (HAR KHET KO PANI)

Concerned Name of Estimated cost Work Sl.No. Name of Scheme Location/Village Panchayat Ministry/ Component Activity No./Unit Lattitude Longitude CD Blocks (in lakh) Priority Department

1 RRR of natural Conservation of natural water bodies & water bodies at Path Sepa Deed Raga CD Har Khet strengthening of & Dogbuk nallah to Deet Tompurijo WRD 30.00 45.00 27'47''30 N 93'55''08 E Very High Rakhe Block Ko Pani carrying capacity Happa under Deed Rakhe of tradiditional Village. water bodies. 2 RRR of natural Conservation of natural water bodies & water bodies at Pai Raga CD Har Khet strengthening of Pabung to Deet & Dha Yorkum Yorkum WRD 55.00 82.50 27*50''01 N 93*58''27 E Very High Block Ko Pani carrying capacity Happa under Yorkum of tradiditional Village. water bodies

244 | P a g e

3 RRR of natural water bodies & C/O Water Conservation Raga CD Har Khet strengthening of Plan at Paka Geko at Dukum Raga WRD 25.00 37.50 27'47''39 N 94'04''40 E Very High Block Ko Pani carrying capacity Dukum village. of tradiditional water bodies RRR of natural water Repair, Restoration & bodies & Tamen Renovation of traditional Har Khet Ko strengthening of 4 Kalaptukar Kalaptukar Raga CD- WRD 30.00 45.00 27*31'07"N 94*15'03"E Very High water bodies to recharging Pani carrying capacity of Block ground water at Kolaptukar. tradiditional water bodies RRR of natural water Repair, Restoration & bodies & Tamen Renovation of traditional Har Khet Ko strengthening of 5 Paro Paro Raga CD- WRD 20.00 30.00 27*29'48"N 94*11'23"E Very High water bodies to recharging Pani carrying capacity of Block ground water at Paro. tradiditional water bodies RRR of natural water Repair, Restoration & bodies & Tamen Renovation of traditional Har Khet Ko strengthening of 6 Rigyu Kalaptukar Raga CD- HORT. 10.00 15.00 27*30'32"N 94*14'02"E Very High water bodies to recharging Pani carrying capacity of Block ground water at Rigyu. tradiditional water bodies RRR of natural water Repair, Restoration & bodies & Tamen Renovation of traditional Har Khet Ko strengthening of 7 Rajali Kherbari Raga CD- HORT. 5.00 7.50 27*28'40"N 94*13'28"E Very High water bodies to recharging Pani carrying capacity of Block ground water at Rajali. tradiditional waer bodies RRR of natural water Repair, Restoration & bodies & Tamen Renovation of traditional Har Khet Ko strengthening of 8 Tanio Tanio Raga CD- HORT. 6.00 9.00 27*29'17"N 94*11'32"E Very High water bodies to recharging Pani carrying capacity of Block ground water at Tanio. tradiditional waer bodies

245 | P a g e

PROPOSAL OF SCHEME FOR COMMAND AREA DEVELOPMENT AND STRENGTHENING OF DISTRIBUTION NETWORK UNDER PMKSY (HAR KHET KO PANI)

Concerned Command Estimated Location/ Name of CD Work Sl.No. Name of Scheme Panchayat Ministry/ Component Activity Area in cost (in Lattitude Longitude Village Blocks Priority Department Ha lakh)

1 Command area development and CAD & strengthening of distribution network Strenthening Raga CD- Har Khet system at Boasimla Boasimla WRD of 20.00 50.00 27*43''20 N 93*56''48 Very High Block Ko Pani Buscamp,Repari,Bogra,Boasimla- distribution I,&Boasimla-II at Talo Rijo. network

2 CAD & Command area development and Strenthening Raga CD- Har Khet strengthening of distribution network Tompurijo Tompurijo WRD of 30.00 75.00 27'47''30 N 93'55''08 E Very High Block Ko Pani system at Paath Seppa at Tompurijo. distribution network CAD & Command area development and Strenthening Raga CD- Har Khet 3 strengthening of distribution network Sey Godak Godak WRD of 10.00 25.00 27'48''37 N 94'06'25 E Very High Block Ko Pani system at Sey Godak at Godak village distribution network CAD & Command area development and Strenthening Raga CD- Har Khet 4 strengthening of distribution network Yom Yom WRD of 10.00 25.00 27*21'31"N 93*47'03"E Very High Block Ko Pani system at Yom village. distribution network CAD & Command area development and Strenthening Raga CD- Har Khet 5 strengthening of distribution system at Hatikim Buscamp WRD of 7.00 17.50 27*43''20 N 93*56''48 Very High Block Ko Pani Hatikim rijo under Repari. distribution network CAD & Command area development and Strenthening strengthening of distribution network Raga CD- Har Khet 6 Taya Keti Tayasimla WRD of 20.00 50.00 27*40'03"N 94*03'05"E Medium system at Tayaketi under Tayasimla Block Ko Pani distribution village. network CAD & Command area development and Strenthening Raga CD- Har Khet 7 strengthening of distribution network Kigam Kigam WRD of 45.00 112.50 27'49''05 N 94'09'25 E Medium Block Ko Pani system at Kigam village. distribution network

246 | P a g e

CAD & Command area development and Strenthening Raga CD- Har Khet 8 strengthening of distribution network Dokum Dokum WRD of 15.00 37.50 27'47''39 N 94'04''40 E Medium Block Ko Pani system at Dokum village. distribution network CAD & Command area development and Strenthening strengthening of distribution network Raga CD- Har Khet 9 Rentum Yerkum WRD of 25.00 62.50 27*50''01 N 93*58''27 E Low system at Rentum Happa under Rentum Block Ko Pani distribution village. network CAD & Command area development and Strenthening Tamen Raga Har Khet 10 strengthening of distribution network Paro Paro WRD of 15.00 37.50 27*29'09"N 94*10'19"E Very High CD-Block Ko Pani system of Dollung Basin at Paro. distribution network CAD & Command area development and Strenthening Tamen Raga Har Khet 11 strengthening of distribution network Midpu Kherbari WRD of 20.00 50.00 27*28'28"N 94*12'03"E Very High CD-Block Ko Pani system at Lipu Libla Haapa at Midpu. distribution network CAD & Command area development and Strenthening Tamen Raga Har Khet 12 strengthening of distribution network Kalaptukar Kalaptukar WRD of 10.00 25.00 27*31'13"N 94*14'27"E Very High CD-Block Ko Pani system Soni Haapa at Kalaptukar. distribution network

PROPOSAL OF SCHEME FOR IMPROVEMENT IN WATER MANAGEMENT AND DISTRIBUTION SYSTEM UNDER PMKSY (HAR KHET KO PANI)

Concerned Estimated Location/ Name of CD Work Sl.No. Name of Scheme Panchayat Ministry/ Component Activity No./Unit cost (in Lattitude Longitude Village Blocks Priority Department lakh)

Improvement in Improvement in Water water management and distribution Raga CD Har Khet management & 1 Raga Circle Raga Circle WRD 30.00 90.00 27*47'31"N 94*04'24"E Very High network system of available water Block Ko Pani distribution bodies under Raga circle system in available sources

247 | P a g e

Improvement in Improvement in Water water management and distribution Kamporijo Kamporijo Raga CD Har Khet management & 2 WRD 30.00 90.00 27*46'45"N 93*58'12"E Very High network system of available water Circle Circle Block Ko Pani distribution bodies under Kamporijo circle. system in available sources Improvement in Improvement in Water water management and distribution Raga CD Har Khet management & 3 Dollungmukh Dollungmukh WRD 40.00 120.00 27*31'17"N 94*15'07"E Very High network system of available water Block Ko Pani distribution bodies under Dollungmukh circle. system in available sources Improvement in Improvement in Water water management and distribution Dollungmukh Dollungmukh Tamen-Raga Har Khet management & 4 WRD 8.00 24.00 27*30'52"N 94*13'40"E Very High network system of available water Circle Circle CD Block Ko Pani distribution bodies under Dollungmukh circle system in available sources

PROPOSAL OF SCHEME FOR DIVERSION OF WATER FROM AVAILABLE SOURCES TO WATER SCARCE AREA UNDER PMKSY (HAR KHET KO PANI)

Concerned Name of Estimated cost Work Sl.No. Name of Scheme Location/ Village Panchayat Ministry/ Component Activity No./Unit Lattitude Longitude CD Blocks (in lakh) Priority Department

1 RRR of Construction of diversion structure to Raga- CD Har Khet natural divert water to water scarce area from Raga Circle Raga Circle WRD 18.00 99.00 27*47'31"N 94*04'24"E Low Block Ko Pani water near by sources under Raga Circle. bodies 2 Construction of diversion structure to RRR of divert water to water scarce area from Kamporijo Raga- CD Har Khet natural Kamporijo Circle WRD 12.00 66.00 27*46'45"N 93*58'12"E Low near by sources under Kamporijo Circle Block Ko Pani water Circle. bodies 3 Construction of diversion structure to RRR of divert water to water scarce area from Dollungmukh Raga- CD Har Khet natural Dollungmukh Circle WRD 20.00 110.00 27*31'17"N 94*15'07"E Low near by sources under Dollungmukh Circle Block Ko Pani water Circle. bodies

248 | P a g e

4 Construction of diversion structure to Mengi RRR of Mengi Kabak, divert water to water scarce area from Kabak, Raga- CD Har Khet natural Habang,Luba,Radum WRD 24.00 132.00 27'49''40"N 93'57'54"E Low near by sources at Mengi Kabak, Radum Block Ko Pani water Village. Habang,Luba,Radum Village. Phanchayat. bodies

5 RRR of C/O MIP from Tellik Rijo to Chege Tamen- Raga- CD Har Khet natural Rijo, 12 Hect., 4 km ,Water source Tamen WRD 6.00 33.00 27*45'24"N 94*00'25"E I,Tamen-II Block Ko Pani water Diesel Pumping. bodies 6 RRR of C/O Water Pump[ing set from Pein Raga- CD Har Khet natural Pein Kamporijo WRD 6.00 33.00 27*46'45"N 93*58'12"E River to Hoji Rijo, 8 Hect. Block Ko Pani water bodies

PROPOSAL OF SCHEME FOR CREATION AND REJUVENATION OF TRADITIONAL WATER STORAGE SYSTEM UNDER PMKSY (HAR KHET KO PANI)

Concerned Location/ Name of Estimated cost Work Sl.No. Name of Scheme Panchayat Ministry/ Component Activity No./Unit Lattitude Longitude Village CD Blocks (in lakh) Priority Department

Creation and rejuvenation of RRR of Raga CD Har Khet 1 traditional water storage system at Mengi Kabak Mengi Kabak WRD natural 12.00 36.00 27*29'03"N 93*47'45"E Low Block Ko Pani Mengikabak village water bodies

Creation and rejuvenation of RRR of Raga CD Har Khet 2 traditional water storage system at Radum Radum WRD natural 18.00 54.00 27*28'27"N 93*47'27"E Low Block Ko Pani Radum panchayat water bodies

Creation and rejuvenation of RRR of Raga CD Har Khet 3 traditional water storage system at Kamporijo Kamporijo WRD natural 15.00 45.00 27*32'22"N 93*44'08"E Low Block Ko Pani Kamporijo panchayat water bodies

Creation and rejuvenation of RRR of Raga CD Har Khet 4 traditional water storage system at Boasimla-I Boasimla-I WRD natural 10.00 30.00 27*32'00"N 93*44'25"E Low Block Ko Pani Boasimla-I panchayat. water bodies

249 | P a g e

Creation and rejuvenation of RRR of Raga CD Har Khet 5 traditional water storage system at Boasimla-II Boasimla-II WRD natural 18.00 54.00 27*24'18"N 93*37'34"E Low Block Ko Pani Boasimla-II Phanchayat. water bodies

Creation and rejuvenation of RRR of Raga CD Har Khet 6 traditional water storage system at Raga Raga-II WRD natural 25.00 75.00 27*47'31"N 94*04'24"E Low Block Ko Pani Raga Headquarter. water bodies

Creation and rejuvenation of RRR of Raga CD Har Khet 7 traditional water storage system at Tayasimla Tayasimla WRD natural 10.00 30.00 27*27'51"N 93*39'01"E Low Block Ko Pani Tayasimla. water bodies

Creation and rejuvenation of RRR of Raga CD Har Khet 8 traditional water storage system at Yerkum/Rentum Yerkum WRD natural 10.00 30.00 27*27'15"N 93*39'57"E Low Block Ko Pani Yerkum&Rentum Phanchayat. water bodies

Creation and rejuvenation of RRR of Raga CD Har Khet 9 traditional water storage system at Tompurijo Deed Rakhe WRD natural 25.00 75.00 27*26'09"N 93*39'06"E Very High Block Ko Pani Deed-Rakhe Panchayat. water bodies

Creation and rejuvenation of RRR of Raga CD Har Khet 10 traditional water storage system at Kigam Kigam WRD natural 10.00 30.00 27*26'40"N 93*40'06"E Very High Block Ko Pani Kigam Panchayat water bodies

250 | P a g e

PROPOSAL OF SCHEME FOR GROUND WATER DEVELOPMENT UNDER PMKSY (HAR KHET KO PANI)

Name Concerned Estimate of CD Ministry/ Componen Activit No./Uni Work Sl.No. Name of Scheme Location/ Village Panchayat d cost (in Lattitude Longitude Block Departmen t y t Priority lakh) s t C/O Dug Wells Tame and n HAR lifting 1 Kherbari Kherbari Raga WRD KHET KO 10.00 30.00 27*29'14''N 94*12'02"E Very High CD- PANI of Block Water by Ground water development at Diesel Kherbari village under Dollungmukh. Pump. C/O Dug Wells Tame and n HAR Kalaptuka lifting 2 Rigyu Raga HORT. KHET KO 5.00 15.00 27*30'31''N 94*13'57"E Very High r CD- PANI of Block Water by Ground water development at Rigyu Diesel under Dollungmukh. Pump. C/O Dug Wells Tame and n HAR lifting 3 Midpu Kherbari Raga WRD KHET KO 10.00 30.00 27*28'54''N 94*12'17"E Very High CD- PANI of Block Water by Ground water development at Midpu Diesel under Dollungmukh. Pump. C/O Tame Dug Creation of New Water sources through n HAR Wells Kalaptuka 4 minor Irrigation(Ground Watder) at Kalaptukar Raga WRD KHET KO and 8.00 24.00 27*91'14''N 94*14'47"E Very High r Kalaptukar. CD- PANI lifting Block of Water

251 | P a g e

by Diesel Pump.

C/O Dug Wells Tame and n HAR Creation of New Water sources through lifting 5 Tanio Tanio Raga WRD KHET KO 8.00 24.00 27*29'31"N 94*11'39"E Very High minor Irrigation(Ground Watder) at Tanio. CD- PANI of Block Water by Diesel Pump. C/O Dug Wells Tame and Creation of New Water sources through n HAR lifting 6 minor Irrigation(Ground Watder) at Rajali Kherbari Raga HORT. KHET KO 5.00 15.00 27*29'15"N 94*13'04"E Very High Rajali.. CD- PANI of Block Water by Diesel Pump. C/O Dug Wells Tame and Creation of New Water sources through n HAR lifting 7 minor Irrigation(Ground Watder) at Bomte Tanio Raga WRD KHET KO 6.00 18.00 27*29'10"N 94*11'05"E Very High Bomte. CD- PANI of Block Water by Diesel Pump. C/O Dug Wells Tame and Creation of New Water sources through n HAR lifting 8 minor Irrigation(Ground Watder) at Paro Paro Raga WRD KHET KO 8.00 24.00 27*29'35"N 94*11'24"E Very High Bomte. CD- PANI of Block Water by Diesel Pump.

252 | P a g e

PROPOSAL OF SCHEME FOR PROMOTING EFFICIENT WATER CONVEYANCE & WATER APPLICATION SYSTEM UNDER PMKSY (PER DROP MORE CROP)

Concerned Location/Vill Name of CD Command Estimated cost Work Sl.No. Name of Scheme Panchayat Ministry/ Component Activity Lattitude Longitude age Blocks Area in Ha (in lakh) Priority Department

C/O Drip Irrigation project at Promoting efficient Kherbari Geni Tea Garden Cum water coneyance & Tamen Raga Per Drop 1 Agriculture Field. Kherbari Kherbari WRD water application 5.00 100.00 27*29'17"N 94*12'02"E Very High CD-Block More Crop system through drip irrigation C/O Drip Irrigation project for Promoting efficient Murtem Tea Garden at Tanio. water coneyance & Tamen Raga Per Drop 2 Tanio Tanio WRD water application 5.50 110.00 27*29'13"N 94*11'34"E Very High CD-Block More Crop system through drip irrigation C/O Drip Irrigation project for Promoting efficient Yoba Agriculture Field near Sec. water coneyance & Tamen Raga Per Drop 3 School at Dollungmukh. Midpu Kherbari WRD water application 7.00 140.00 27*28'31"N 94*13'20"E Very High CD-Block More Crop system through drip irrigation C/O Drip Irrigation project for Promoting efficient Tadak Gab Tea Garden at Paro. water coneyance & Tamen Raga Per Drop 4 Paro Paro WRD water application 6.00 120.00 27*29'54"N 94*11'32"E Very High CD-Block More Crop system through drip irrigation C/O Drip Irrigation project for Soni Promoting efficient Tea Garden at Kalaptukar. water coneyance & Tamen Raga Per Drop 5 Kalaptukar Kalaptukar WRD water application 8.00 160.00 27*31'00"N 94*14'21"E Very High CD-Block More Crop system through drip irrigation

C/O Drip Irrigation project for Improvement in Phentom Tea Garden at Kherbari. Tamen Raga Per Drop water management & 6 Kherbari Kherbari WRD 7.00 140.00 27*29'20"N 94*12'25"E Very High CD-Block More Crop distribution system in available sources

253 | P a g e

C/O Drip Irrigation project for Improvement in Gepi Tea Garden cum Agriculture Tamen Raga Per Drop water management & 7 Kherbari Kherbari WRD 7.00 140.00 27*29'36"N 94*12'45"E Very High Field at Kherbari. CD-Block More Crop distribution system in available sources

C/O Drip Irrigation project for Improvement in Agriculture Field at Rajali. Tamen Raga Per Drop water management & 8 Rajali Rajali WRD 3.00 60.00 27*28'54"N 94*13'22"E Low CD-Block More Crop distribution system in available sources

C/O Drip Irrigation project for Improvement in Agriculture Field at Rigyu. Tamen Raga Per Drop water management & 9 Rigyu Kalaptukar WRD 3.00 60.00 27*30'20"N 94*12'46"E Medium CD-Block More Crop distribution system in available sources

C/O Drip Irrigation project for Improvement in Agriculture Field at Tanio. Tamen Raga Per Drop water management & 10 Tanio Tanio WRD 3.00 60.00 27*29'14"N 94*11'12"E Low CD-Block More Crop distribution system in available sources

C/O Drip Irrigation project for Improvement in Agriculture Field at Paro. Tamen Raga Per Drop water management & 11 Paro Paro WRD 4.00 80.00 27*29'13"N 94*10'33"E Medium CD-Block More Crop distribution system in available sources

C/O Drip Irrigation project for Improvement in Agriculture Field at Lumsi. Tamen Raga Per Drop water management & 12 Lumsi Tanio WRD 3.00 60.00 27*28'51"N 94*10'04"E Medium CD-Block More Crop distribution system in available sources C/O Drip Irrigation project for Tea Garden cum Agriculture Field Improvement in Tamen Raga Per Drop water management & 13 backside of Sec.School at Midpu Kherbari WRD 5.00 100.00 27*28'31"N 94*13'16"E High CD-Block More Crop distribution system in doolungmukh. available sources

C/O Drip Irrigation project for Improvement in Agriculture Field of Chimmi Bini, Tamen Raga Per Drop water management & 14 Kherbari Kherbari WRD 3.00 60.00 27*29'19"N 94*12'13"E Low Terik Bini etc. at Kherbari. CD-Block More Crop distribution system in available sources

C/O Drip Irrigation project for Improvement in Agriculture Field of Tebi rijo at Tamen Raga Per Drop water management & 15 Kherbari Kherbari WRD 3.00 60.00 27*29'18"N 94*12'33"E Kherbari. CD-Block More Crop distribution system in available sources

254 | P a g e

C/O Drip Irrigation project Improvement in Composite Horticulture Nursery at Tamen Raga Per Drop water management & 16 Kherbari Kherbari HORT. 2.50 50.00 Kherbari. CD-Block More Crop distribution system in available sources

PROPOSAL OF SCHEME FOR PROMOTING EFFICIENT WATER CONVEYANCE & WATER APPLICATION SYSTEM UNDER PMKSY (PER DROP MORE CROP)

Concerned Command Estimated Name of Work Sl. No. Name of Scheme Location/Village Panchayat Ministry/ Component Activity Area in cost (in Lattitude Longitude CD Blocks Priority Department Ha lakh)

Promoting efficient (Horticulture) Gaech Nallah Raga CD Per Drop water coneyance & 1 to Gaech Atak at Kicho Kicho Village Kicho HORT 4.00 80.00 27*30'37"N 93*47'03"E Very High Block More Crop water application system Village. through MIC. Promoting efficient (Horticulture) Akoka Atak at Kicho Raga CD Per Drop water coneyance & 2 Kicho Village HORT 6.00 120.00 27'48''28 N 93'07''45 E Very High Kicho Village. Village Block More Crop water application system through MIC. C/O MIC from Heka Nallah Promoting efficient to Betam Rijo, 3 km under Raga CD Per Drop water coneyance & 3 Yerkum Yerkum HORT 12.00 240.00 27*27'15"N 93*39'57"E Very High Yorkum village. (Dept. of Block More Crop water application system Horti.) through MIC.

C/O MIC from Harin River to Promoting efficient Kudum Ha-Rijo, 3 km under Raga CD Per Drop water coneyance & 4 Mengi Kabak Mengi Kabak HORT 4.00 80.00 27*29'03"N 93*47'45"E Very High Luba-II village. (Dept. of Block More Crop water application system Horti.) through MIC.

C/O MIC from Harin River to Promoting efficient Harin Rijo, 3 km under Raga CD Per Drop water coneyance & 5 Mengi Kabak Mengi Kabak HORT 6.00 120.00 27*29'03"N 93*47'45"E Very High Mengi Kabak-II village. Block More Crop water application system (Dept. of Horti.) through MIC.

C/O MIC from Hal River to Promoting efficient Nint Hapa, 8 km under Raga CD Per Drop water coneyance & 6 Rentum Yerkum HORT 3.00 60.00 27*27'15"N 93*39'57"E Very High Rintum village. (Dept. of Block More Crop water application system Horti.) through MIC.

255 | P a g e

C/O MIC from Harin River to Promoting efficient Hatak Koto, 10 km under Raga CD Per Drop water coneyance & 7 Mengi Kabak Mengi Kabak HORT 10.00 200.00 27*27'15"N 93*39'57"E Very High Mengi Kabak village. (Dept. Block More Crop water application system of Horti.) through MIC. Capacity building, training and awareness campaign including low cost Training and Awarness publication, use of pico campaign for projectors and low cost Tamen- encouraging potential Dollungmukh Dollungmukh Per Drop 8 Raga CD WRD use of water Sources 15.00 45.00 27*30'52"N 94*13'40"E very High films for encouraging Circle Circle More Crop potential use water source Block through technological, through technological, agronomics and agronomics and management practices. management practices.

Secondary storage structure at tail end of Tamen- C/O secondary storage Canal system to store water Dollungmukh Dollungmukh Per Drop 9 Raga CD WRD tank at tail end of Canal 40.00 120.00 27*30'52"N 94*13'40"E very High when available in Circle Circle More Crop abundance for use during Block system. dry period .

PROPOSAL OF SCHEME FOR PROMOTING EFFICIENT WATER CONVEYANCE & WATER APPLICATION SYSTEM UNDER PMKSY (PER DROP MORE CROP)

Name of Concerned Command Estimated Work Sl.No. Name of Scheme Location/Village Panchayat CD Ministry/ Component Activity Lattitude Longitude Area in Ha cost (in lakh) Priority Blocks Department

Promoting efficient water coneyance & Watershed Development Raga Raga CD Per Drop water application 1 Raga Block AGRI 12.00 600.00 27*47'31"N 94*04'24"E Very High programme 12 nos. Block Block More Crop system through construction of Watershed structure. Land Development/ Land Raga Raga CD Per Drop Land Development/ 2 Raga Block AGRI 5.00 50.00 27*47'31"N 94*04'24"E Very High Terracing Block Block More Crop Land Terracing Raga Raga CD Per Drop Construction of farm 3 Farm Ponds 200 nos. Raga Block AGRI 200.00 50.00 27*47'31"N 94*04'24"E medium Block Block More Crop ponds

256 | P a g e

Promoting efficient water coneyance & Rain Water Harvesting 200 Raga Raga CD Per Drop 4 Raga Block AGRI water application by 200.00 100.00 27*47'31"N 94*04'24"E Very High nos. Block Block More Crop adopting Rain water Harvesting. Raga Raga CD Per Drop Micro/Feeder 5 Micro/ Feeder channel 300 nos. Raga Block AGRI 300.00 106.20 27*47'31"N 94*04'24"E medium Block Block More Crop Channel Improvement in water management & Raga Raga CD Per Drop distribution system in 6 Drip Irrigation Raga Block AGRI 1.00 58.10 27*47'31"N 94*04'24"E Very High Block Block More Crop available sources through Drip Irrigation. Improvement in water management & Raga Raga CD Per Drop 7 Mini Sprinkler Raga Block AGRI distribution system by 1.00 31.10 27*47'31"N 94*04'24"E medium Block Block More Crop adopting Mini Sprinkler. Improvement in water Raga Raga CD Per Drop management & 8 Dug wells 50 nos. Raga Block AGRI 50.00 12.50 27*47'31"N 94*04'24"E Low Block Block More Crop distribution system in available sources.

PROPOSAL OF SCHEME FOR WATER HARVESTING STRUCTURE UNDER PMKSY (WATERSHED)

Concerned Estimated Name of Work Sl. No. Name of Scheme Location/ Village Panchayat Ministry/ Component Activity No./Unit cost (in Lattitude Longitude CD Blocks Priority Department lakh)

Construction of C/o water harvesting structures Ziro - II Check Dam, 1 to recharging ground water at Dokum Raga WRD Watershed 125.00 31.25 27*47'31"N 94*04'24"E Very High CD Block Nalla bunds, Dokum Panchayat Farm pond, Construction of C/o water harvesting structures Ziro - II Check Dam, 2 to recharging ground water at Tayasimla Tayasimla WRD Watershed 150.00 37.50 27*44'03"N 94*05'04"E Very High CD Block Nalla bunds, Tayasimla Area. Farm pond, Construction of C/o water harvesting structures Mengi Ziro - II Check Dam, 3 to recharging ground water at Mengi Kabak WRD Watershed 75.00 18.75 27*44'47"N 94*06'30"E Kabak CD Block Nalla bunds, Mengi Kabak. Farm pond,

257 | P a g e

Construction of C/o water harvesting structures Ziro - II Check Dam, 4 to recharging ground water at Radum,Hebang&Luba Radum WRD Watershed 60.00 15.00 27*52"08 N 93*52"12 CD Block Nalla bunds, Rdaum,Hebang & Luba. Farm pond, Construction of C/o water harvesting structures Ziro - II Check Dam, 5 to recharging ground water at Yom Yom WRD Watershed 80.00 20.00 27*46''32 N 93*55'37"E CD Block Nalla bunds, Yom Village. Farm pond, Construction of C/o water harvesting structures Boasimla- Ziro - II Check Dam, 6 to recharging ground water at Boasimla WRD Watershed 180.00 45.00 27'43''31 N 93'57'46"E Very High II CD Block Nalla bunds, Boasimla. Farm pond, Construction of C/o water harvesting structures Ziro - II Check Dam, 7 to recharging ground water at Yatap Yatap WRD Watershed 220.00 55.00 27'42''13 N 93'54''31 E CD Block Nalla bunds, Yatap Area. Farm pond,

Construction of C/o water harvesting structures Ziro - II Check Dam, 8 to recharging ground water at Godak Godak WRD Watershed 50.00 12.50 27'48''37 N 94'06'25 E Very High CD Block Nalla bunds, Godak Area. Farm pond, Construction of C/o water harvesting structures Ziro - II Check Dam, 9 to recharging ground water at Kigam Kigam WRD Watershed 75.00 18.75 27'49''05 N 94'09'25 E CD Block Nalla bunds, Kigam Area Farm pond, Construction of C/o water harvesting structures Put Milli,Hak Milli Ziro - II Check Dam, 10 to recharging ground water at Milli WRD Watershed 110.00 27.50 27*45'49"N 94*04'20"E Low Pill Milli CD Block Nalla bunds, Pill Milli,Hach Milli,Put Milli. Farm pond,

ACTION PLAN UNDER PRADHAN MANTRI KRISHI SINCHAYEE YOJANA

Sl Name of activities Location/Village Name of Component No./Unit Estimated cost Executing Agency No. CD Block in Lakh /Department 1 Repair, Renovation & Mide under Ziro-I Har Khet ko pani 15 ha. 37.5 WRD Restoration MIP at Mide Reru Village (command area) 2 C/o MIP from Tiikung Siigang to Siiro Hari Hong Har Khet ko pani 10 ha. 25.0 WRD Siichusi (command area) 3 C/o MIP from Miigriilin to Biirii Biirii Ziro-I Har Khet ko pani 15 ha. 37.5 WRD (command area)

258 | P a g e

2. Agriculture Department

PHYSICAL AND FINANCIAL PHASING OF PRADAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY) LOWER SUBANSIRI DISTRICT, ZIRO CD Block : Ziro – I Rs. in Lakh(s) Total Estimate Physical target Sl. Name of Concerned Total Cost per Component Activities Unit Cost Department No. CD Block Ministry/De Qnty. unit In Lakhs 2016- 2017- 2018- 2019- 2020- 17 18 19 20 21 1 Ziro-I CD MOA & Per drop Non-DPAP 5000 Ha. 2.425/- 1212.5 1000 1500 1000 8000 7000 Agriculture Block FW-DAC & more crop Drip irrigation FW 2 -do- -do- - do - Non-DPAP 3000 Ha. 2.0/- 600.0 500 800 700 600 400 Agriculture Sprinkler irrigation 3 -do- -do- -do- Drought proofing 25000 Nos. 0.25/- 625.0 3000 8000 7000 5000 2000 Agriculture through check dams 4 -do- -do- -do- C/O of Rain Water 1500 Ha 1.8/- 270.0 300 400 300 300 200 Agriculture Harvesting structure (20X20X3)M @ 150/ Cu3 @ Rs. 1,80,000/- Per unit/Per Ha 5 -do- -do- -do- Secondary Storage 1500 Nos. 0.9/- 135.0 300 400 300 300 200 Agriculture structure at tail end of Canal System to store water when available in abundance for use during dry periods. 6 -do- MoWR Har khet ko Desiltation and 3000 Ha. 1.0/- 300.0 500 800 700 600 400 Agriculture pani deepening of existing water

259 | P a g e

bodies and distribution system 7 -do- MOA & Farmer Capacity building 15 Nos. 1.0/- 15.0 4 4 3 2 2 Agriculture FW-DAC & oriented FW activities 8 -do- Training 50 Nos. 0.25/- 12.50 15 10 10 10 5 Agriculture 9 -do- Exposure visit (10 Agriculture farmers per visit) (i) Inter State 15 Nos. 1.50/ - 22.05 4 4 3 2 2 (ii) Within State 15 0.70/- 7.0 3 3 2 1 1 Nos.

10 -do- Demonstration 250 Nos. 0.12/- 30.0 60 60 50 40 40 Agriculture 11 -do- Farm School 25 Nos. 0.50/- 12.50 6 6 5 4 4 Agriculture 12 -do- (i) Printing of 20,000 Nos. 0.0002/- 4.o 6000 5000 4000 3000 2000 Agriculture leaflets 13 -do- Field days/Kisan 15 Nos. 0.50/- 7.5 4 4 3 2 2 Agriculture gosthi

PHYSICAL AND FINANCIAL PHASING OF PRADAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY) LOWER SUBANSIRI DISTRICT, ZIRO CD Block : Ziro – II Rs. in Lakh(s) Total Estimate Physical target Sl. Name of Concerned Total Cost per Component Activities Unit Cost Department No. CD Block Ministry/De Qnty. unit In Lakhs 2016- 2017- 2018- 2019- 2020- 17 18 19 20 21 1 Ziro-I CD MOA & Per drop Non-DPAP 4000 Ha. 2.425/- 970.0 800 1000 800 700 700 Agriculture Block FW-DAC & more crop Drip irrigation FW 2 -do- -do- - do - Non-DPAP 2000 Ha. 2.0/- 400.0 300 500 500 400 300 Agriculture Sprinkler irrigation 3 -do- -do- -do- Drought proofing 20000 Nos. 0.25/- 500.0 3000 7000 5000 3000 2000 Agriculture through check dams

260 | P a g e

4 -do- -do- -do- C/O of Rain Water 1500 Ha 1.8/- 270.0 300 400 300 300 200 Agriculture Harvesting structure (20X20X3)M @ 150/ Cu3 @ Rs. 1,80,000/- Per unit/Per Ha 5 -do- -do- -do- Secondary Storage 1500 Nos. 0.9/- 135.0 300 400 300 300 200 Agriculture structure at tail end of Canal System to store water when available in abundance for use during dry periods. 6 -do- MoWR Har khet ko Desiltation and 3000 Ha. 1.0/- 300.0 500 800 700 600 400 Agriculture pani deepening of existing water bodies and distribution system 7 -do- MOA & Farmer Capacity building 15 Nos. 1.0/- 15.0 4 4 3 2 2 Agriculture FW-DAC & oriented FW activities 8 -do- Training 50 Nos. 0.25/- 12.50 15 10 10 10 5 Agriculture 9 -do- Exposure visit (10 Agriculture farmers per visit) (i) Inter State 15 Nos. 1.50/ - 22.05 4 4 3 2 2 (ii) Within State 15 0.70/- 7.0 3 3 2 1 1 Nos.

10 -do- Demonstration 250 Nos. 0.12/- 30.0 60 60 50 40 40 Agriculture 11 -do- Farm School 25 Nos. 0.50/- 12.50 6 6 5 4 4 Agriculture 12 -do- (i) Printing of 20,000 Nos. 0.0002/- 4.o 6000 5000 4000 3000 2000 Agriculture leaflets 13 -do- Field days/Kisan 15 Nos. 0.50/- 7.5 4 4 3 2 2 Agriculture gosthi

261 | P a g e

PHYSICAL AND FINANCIAL PHASING OF PRADAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY) LOWER SUBANSIRI DISTRICT, ZIRO CD Block : Raga Rs. in Lakh(s) Total Estimate Physical target Sl. Name of Concerned Total Cost per Component Activities Unit Cost Department No. CD Block Ministry/De Qnty. unit In Lakhs 2016- 2017- 2018- 2019- 2020- 17 18 19 20 21 1 Ziro-I CD MOA & Per drop Non-DPAP 4000 Ha. 2.425/- 970.0 800 1000 800 700 700 Agriculture Block FW-DAC & more crop Drip irrigation FW 2 -do- -do- - do - Non-DPAP 2000 Ha. 2.0/- 400.0 300 500 500 400 300 Agriculture Sprinkler irrigation 3 -do- -do- -do- Drought proofing 20000 Nos. 0.25/- 500.0 3000 7000 5000 3000 2000 Agriculture through check dams 4 -do- -do- -do- C/O of Rain Water 1500 Ha 1.8/- 270.0 300 400 300 300 200 Agriculture Harvesting structure (20X20X3)M @ 150/ Cu3 @ Rs. 1,80,000/- Per unit/Per Ha 5 -do- -do- -do- Secondary Storage 1500 Nos. 0.9/- 135.0 300 400 300 300 200 Agriculture structure at tail end of Canal System to store water when available in abundance for use during dry periods. 6 -do- MoWR Har khet ko Desiltation and 3000 Ha. 1.0/- 300.0 500 800 700 600 400 Agriculture pani deepening of existing water bodies and distribution system

262 | P a g e

7 -do- MOA & Farmer Capacity building 15 Nos. 1.0/- 15.0 4 4 3 2 2 Agriculture FW-DAC & oriented FW activities 8 -do- Training 50 Nos. 0.25/- 12.50 15 10 10 10 5 Agriculture 9 -do- Exposure visit (10 Agriculture farmers per visit) (i) Inter State 15 Nos. 1.50/ - 22.05 4 4 3 2 2 (ii) Within State 15 0.70/- 7.0 3 3 2 1 1 Nos.

10 -do- Demonstration 250 Nos. 0.12/- 30.0 60 60 50 40 40 Agriculture 11 -do- Farm School 25 Nos. 0.50/- 12.50 6 6 5 4 4 Agriculture 12 -do- (i) Printing of 20,000 Nos. 0.0002/- 4.o 6000 5000 4000 3000 2000 Agriculture leaflets 13 -do- Field days/Kisan 15 Nos. 0.50/- 7.5 4 4 3 2 2 Agriculture gosthi

263 | P a g e

PROPOSAL OF SCHEME FOR PROMOTING EFFICIENT WATER CONVEYANCE & WATER APPLICATION SYSTEM UNDER PMKSY (PER DROP MORE CROP)

Name of Concerned Estimated Command Work Sl.No. Name of Scheme Location/Village Panchayat CD Ministry/ Component Activity cost (in Lattitude Longitude Area in Ha Priority Blocks Department lakh)

Promoting efficient water coneyance & Watershed Raga Raga CD Per Drop water application 1 Development Raga Block AGRI 12.00 600.00 27*47'31"N 94*04'24"E Very High Block Block More Crop system through programme 12 nos. construction of Watershed structure. Land Development/ Raga Raga CD Per Drop Land Development/ 2 Raga Block AGRI 5.00 50.00 27*47'31"N 94*04'24"E Very High Land Terracing Block Block More Crop Land Terracing Raga Raga CD Per Drop Construction of farm 3 Farm Ponds 200 nos. Raga Block AGRI 200.00 50.00 27*47'31"N 94*04'24"E medium Block Block More Crop ponds Promoting efficient water coneyance & Rain Water Harvesting Raga Raga CD Per Drop 4 Raga Block AGRI water application by 200.00 100.00 27*47'31"N 94*04'24"E Very High 200 nos. Block Block More Crop adopting Rain water Harvesting. Micro/ Feeder channel Raga Raga CD Per Drop Micro/Feeder 5 Raga Block AGRI 300.00 106.20 27*47'31"N 94*04'24"E medium 300 nos. Block Block More Crop Channel Improvement in water management & Raga Raga CD Per Drop distribution system in 6 Drip Irrigation Raga Block AGRI 1.00 58.10 27*47'31"N 94*04'24"E Very High Block Block More Crop available sources through Drip Irrigation. Improvement in water management & Raga Raga CD Per Drop 7 Mini Sprinkler Raga Block AGRI distribution system by 1.00 31.10 27*47'31"N 94*04'24"E medium Block Block More Crop adopting Mini Sprinkler. Improvement in water Raga Raga CD Per Drop management & 8 Dug wells 50 nos. Raga Block AGRI 50.00 12.50 27*47'31"N 94*04'24"E Low Block Block More Crop distribution system in available sources.

264 | P a g e

3. Horticulture Department

PROPOSAL UNDER BLOCK IRRIGATION PLANS FOR RAGA BLOCKS, LOWER SUBANSIRI DISRTRICT, ARUNACHAL PRADESH Sl. Components/Particular Water sources Village/Location Area Total Amount No. (Ha.) (Rs) 1. C/O of Rain Water Harvesting structure Rain water 1. Orange Garden at Biruk Nare 15 27,00,000/- (per drop more crop). (20X20X3)M @ 2. Horticulture Garden at Yano Area of 08 14,40,000/- 150/ Cu3 Bogbarijo Village @ Rs. 1,80,000/- Per unit/Per Ha. 3. Kherbari paddy field 08 14,40,000/- 4. Large Cardamom Garden at Bollu 10 18,00,000/- Yomle. 5. Orange Garden at Mith Pob. 10 18,00,000/- 6. Orange Garden at Sath Pob. 10 18,00,000/- 7. Cardamom Garden at Sigram Geko. 10 18,00,000/- 8. Orange Garden at Rek Rujo to Tamer 12 21,60,000/- Sappa 9. Orange Garden at Sek Rujo to Haan 08 14,40,000/- Sappa 10. Banana Garden at Pamluk Rujo 08 14,40,000/- 11. Banana Garden at Yattap 15 27,00,000/- 12. L/Cardamom Garden at Ei Sappa to 10 18,00,000/- Tamo Rujo 13. L/Cardamom Garden at Bomt Sappa to 10 18,00,000/- Tago Rujo 14. Orange Garden at Gaa Sappa 08 14,40,000/- 15. Orange Garden at Tali Rujo 10 18,00,000/- 16. Orange Garden at Sinyik 05 9,00,000/-

265 | P a g e

17. Orange Garden at Deed Happa of Deed 12 21,60,000/- Rake area 18. L/Cardamom Garden at Ampor Happa of 10 18,00,000/- Deed Rakhe area 19. Pineapple Garden at Dabi of Deed Rakhe 12 21,60,000/- area 20. Banana Garden at Puttu Rake of Deed 12 21,60,000/- Rakhe area 21. L/Cardamom Garden at Ripari of Deed 12 21,60,000/- Rakhe area 22. L/Cardamom Garden at Chutak Yorb of 12 21,60,000/- Deed Rake area. 23. Orange Garden at Ripari Deed Rakhe 10 18,00,000/- area 24. L/Cardamom Garden at Serik Nayor of 10 18,00,000/- Kicho Village under Raga Area 25. L/Cardamom Garden at Pinchir Liyer 15 27,00,000/- under Raga Area 26. L/Cardamom Garden at Tali Bopi under 10 18,00,000/- Raga Area

2. Secondary Storage structure at tail end of Perennial Streams/ 1. Compact Horticulture Garden at Yano to 30 27,00,000/- Canal System to store water when Rain Water Tubum muri area of Bogbarijo village. available in abundance for use during dry 2. Large Cardamom Garden at Kulugii. 20 18,00,000/- periods. 3. Large Cardamom Gaden at Bomjo Atak. 15 13,50,000/- RCC Lining Ponds/Dug wells @ 4. Banana Garden at Tumporijo under Deed 12 10,80,000/- Rs.90,000/- Per Ha. Rake area

266 | P a g e

5. Orange Garden at Suk Ripa under Deed 20 27,00,000/- Rakhe area 6. Orange Garden at Radum Happa under 30 27,00,000/- Radum area 7. Banana Garden at Hoj Happa under 12 10,80,000/- Radum area 8. Orange Garden at Mengi Kabak under 12 10,80,000/- Deed Rake area 9. Banana Garden at Habang Happa 10 9,00,000/- 10. Pineapple Garden at Da Yorb 16 14,40,000/- 11. Orange Garden at Gep Yorm 12 10,80,000/- 12. Banana Garden at Bokak Yorm 10 9,00,000/- 13. Banana Garden at Yukar 10 9,00,000/- 14. Orange Garden at Bam 12 10,80,000/- 15. Banana Garden at Kamporijo 20 27,00,000/- 16. Orange Garden at Palap 9 8,10,000/- 17. Pineapple Garden at Yorkum 10 9,00,000/- 18. Pineapple Garden at Dugi 9 8,10,000/- 19. Banana Garden at Dugi 08 7,20,000/- 20. L/Cardamom Garden at Gaech Atak of 15 13,50,000/- Kicho Village under Raga Area 21. L/Cardamom Garden at Boghe Atak of 10 9,00,000/- Kicho Village under Raga Area 22. Tea Garden at Kicho Village under Raga 10 9,00,000/- Area 23. L/Cardamom Garden at Chumring Area 15 13,50,000/- of Radum Village 24. Orange Garden at Tumporijo 11 9,90,000/- 25. Banana Garden at Puttu Rakhe 10 9,00,000/- 26. Banana Garden at Deed Rakhe 15 13,50,000/- 27. Banana Garden at Ampur Rakhe 9 8,10,000/-

267 | P a g e

28. Banana Garden at Dabi of Deed Rake 9 8,10,000/- area 29. L/Cardamom Garden at Kasa Yorb of 20 18,00,000/- Repari

30. Orange Garden at Repari 07 6,30,000/-

31. Orange Garden at Palab Rakhe 07 6,30,000/-

32. L/Cardamom Garden at Repari 10 9,00,000/- 3. Diversion of water from different source of a) Hiigiir Koro 1. Large Cardamom Garden at Tubum 10 2,00,00,000/- different location where from it is plenty to Murii. nearby water scarce area, from b) Biruk Koro 2. Large Cardamom Garden at Biruk Nare 06 1,20,00,000/- rivers/streams at lower elevations to c) Pein Koro 3. Orange Garden at Tamen –III under 06 1,20,00,000/- supplement requirements beyond IWMP, Kaporijo Block MGNREGS, irrespective of irrigation d) Pein Koro 4. Compact Area Horticulture Garden at 15 3,00,00,000/- commands. Tamen –III under Kaporijo Block (Approx. Rs. 20,00,000/- per unit) e) Chakya Koro 5. L/Cardamom Garden at Ampar Yorb 10 2,00,00,000/-

4. Construction of Drip Irrigation System. 1. Composite Horticulture Nursery at Yano 15 36,37,500/-

(Rs. 2,42,500 per set/Ha.) Area, Bogba Rijo. 2. Orange Garden at Yada, Raga. 10 24,25,000/-

3. Composite Horticulture Nursery at 07 16,97,500/- Kherbri Village Dollungmukh.

268 | P a g e

4. Large Cardamom Garden at Bollu 10 24,25,000/- Yomle. 5. Orange Garden at Biruk Nare. 12 29,10,000/-

6. Orange Garden at Mith Pob. 10 24,25,000/-

7. Orange Garden at Sath Pob. 10 24,25,000/-

8. Large Cardamom Garden at Sigram 9 21,82,500/- Geko.

5. Water Harvesting Structure 1. L/Cardamom Garden at Raga 80 42,00,000/- (4X10X1) M. @ Rs. 52,500/- 2. Orange Garden at Raga 50 26,25,000/-

3. Vegetable Garden at Raga 20 10,50,000/-

4. Banana Garden at Raga 30 15,75,000/-

5. L/Cardamom Garden at Kamporijo, circle 80 42,00,000/-

6. Orange Garden at Kamporijo, circle 50 26,25,000/-

7. Vegetable Garden at Kamporijo, circle 60 31,50,000/-

8. Banana Garden at Kamporijo, circle 30 15,75,000/-

9. Banana Garden at Dollungmukh, circle 25 13,12,500/-

10. Pineapple Garden at Dollungmukh, circle 50 26,25,000/-

11. L/Cardamom Garden at Dollungmukh, 25 13,12,500/- circle

269 | P a g e

12. Orange Garden at Dollungmukh, circle 50 26,25,000/-

6. Tube well (Shallow) @ Rs. 75,000/- 1. Vegetable Garden at Raga Circle 15 11,25,000/-

2. Horticulture Garden at Kamporijo Circle 20 15,00,000/-

3. Vegetable Garden at Dollungmukh Circle 30 22,50,000/-

4. Horticulture Nursery at Dollungmukh 8 6,00,000/- Circle 7. Sprinkler Irrigation Set (10X10)M point 1. Horticulture Nursery at Dollungmukh 5 3,70,485/- Distance. @ Rs. 74,097 per Set Circle 8. C/O of Rain Water Harvesting structure 2. L/Cardamom Garden at Raga 80 32,00,000/- (per drop more crop). Silpauline Sheath Lining Ponds for water Storage( @ Rs. 40,000/- per unit) 3. Orange Garden at Raga 50 20,00,000/-

4. Vegetable Garden at Raga 30 12,00,000/-

5. Banana Garden at Raga 30 12,00,000/-

6. L/Cardamom Garden at Kamporijo, circle 80 32,00,000/-

7. Orange Garden at Kamporijo, circle 50 20,00,000/-

8. Vegetable Garden at Kamporijo, circle 50 20,00,000/-

9. Banana Garden at Kamporijo, circle 40 16,00,000/-

10. Banana Garden at Dollungmukh, circle 25 10,00,000/-

11. Pineapple Garden at Dollungmukh, circle 20 8,00,000/-

270 | P a g e

12. L/Cardamom Garden at Dollungmukh, 30 12,00,000/- circle 13. Orange Garden at Dollungmukh, circle 50 20,00,000/-

Total 25,92,57,985/-

(Rupees Twenty Five Crore Ninety Two Lakhs Fifty Seven Thousand Nine Hundred Eighty Five) only.

Horticulture Development Officer District Horticulture Officer Lower Subansiri District, Raga Lower Subansiri District, Ziro PROPOSAL UNDER BLOCK IRRIGATION PLANS FOR ZIRO-I BLOCKS, LOWER SUBANSIRI DISRTRICT, ARUNACHAL PRADESH Sl. Components/Particular Water sources Village/Location Area Total Amount No. (Ha.) (Rs) 1. C/O of Rain Water Harvesting Rain water 1. Kiwi Garden at Hong (Niichi) 80 1,44,00,000/- structure (per drop more crop). Villages @ Rs. 1,80,000/- Per unit/Per Ha. 2. Kiwi Garden at Hong (Niitii) 80 1,44,00,000/- Villages 3. Kiwi Garden at Hari Villages 80 1,44,00,000/- 4. Kiwi Garden at Kalung Reru 80 1,44,00,000/- Villages 5. Kiwi Garden at Tajang Villages 80 1,44,00,000/- 6. Kiwi Garden at Hija Villages 80 1,44,00,000/- 7. Kiwi Garden at Diibo Villages 80 1,44,00,000/- 8. L/Cardamom Garden at Hong 30 54,00,000/- (Niichi) Villages 9. L/Cardamom Garden at Hong 30 54,00,000/- (Niitii) Villages

271 | P a g e

10. L/Cardamom Garden at Hari 30 54,00,000/- Villages 11. L/Cardamom Garden at Kalung 30 54,00,000/- Reru Villages 12. L/Cardamom Garden at Tajang 30 54,00,000/- Villages 13. L/Cardamom Garden at Hija 30 54,00,000/- Villages

14. L/Cardamom Garden at Diibo 30 54,00,000/- Villages 15. Plum Garden at Hong (Niichi) 5 9,00,000/- Villages 16. Plum Garden at Hong (Niitii) 5 9,00,000/- Villages 17. Plum Garden at Hari Villages 5 9,00,000/- 18. Plum Garden at Kalung Reru 5 9,00,000/- Villages 19. Plum Garden at Tajang Villages 5 9,00,000/- 20. Plum Garden at Hija Villages 5 9,00,000/- 21. Plum Garden at Diibo Villages 5 9,00,000/- 22. Peach Garden at Hong (Niichi) 5 9,00,000/- Villages 23. Peach Garden at Hong (Niitii) 5 9,00,000/- Villages 24. Peach Garden at Hari Villages 5 9,00,000/- 25. Peach Garden at Kalung Reru 5 9,00,000/- Villages 26. Peach Garden at Tajang 5 9,00,000/- Villages 27. Peach Garden at Hija Villages 5 9,00,000/-

272 | P a g e

28. Peach Garden at Diibo Villages 5 9,00,000/- 29. Vegetable Garden at Hong 50 90,00,000/- (Niichi) Villages 30. Vegetable Garden at Hong 50 90,00,000/- (Niitii) Villages 31. Vegetable Garden at Hari 50 90,00,000/- Villages 32. Vegetable Garden at Kalung 50 90,00,000/- Reru Villages 33. Vegetable Garden at Tajang 50 90,00,000/- Villages 34. Vegetable Garden at Hija 50 90,00,000/- Villages 35. Vegetable Garden at Diibo 50 90,00,000/- Villages 2. Secondary Storage structure at tail end Perennial Streams/ 36. Kiwi Garden at Hong (Niichi) 30 27,00,000/- of Canal System to store water when Rain Water Villages available in abundance for use during 37. Kiwi Garden at Hong (Niitii) 30 27,00,000/- dry periods. Villages RCC Lining Ponds/Dug wells @ 38. Kiwi Garden at Hari Villages 30 27,00,000/- Rs.90,000/- Per Ha. 39. Kiwi Garden at Kalung Reru 30 27,00,000/- Villages 40. Kiwi Garden at Tajang Villages 30 27,00,000/- 41. Kiwi Garden at Hija Villages 30 27,00,000/- 42. Kiwi Garden at Diibo Villages 30 27,00,000/- 43. L/Cardamom Garden at Hong 20 18,00,000/- (Niichi) Villages 44. L/Cardamom Garden at Hong 20 18,00,000/- (Niitii) Villages 45. L/Cardamom Garden at Hari 20 18,00,000/- Villages

273 | P a g e

46. L/Cardamom Garden at Kalung 20 18,00,000/- Reru Villages 47. L/Cardamom Garden at Tajang 20 18,00,000/- Villages 48. L/Cardamom Garden at Hija 20 18,00,000/- Villages 49. L/Cardamom Garden at Diibo 20 18,00,000/- Villages 50. Plum Garden at Hong (Niichi) 5 4,50,000/- Villages 51. Plum Garden at Hong (Niitii) 5 4,50,000/- Villages 52. Plum Garden at Hari Villages 5 4,50,000/- 53. Plum Garden at Kalung Reru 5 4,50,000/- Villages 54. Plum Garden at Tajang Villages 5 4,50,000/- 55. Plum Garden at Hija Villages 5 4,50,000/- 56. Plum Garden at Diibo Villages 5 4,50,000/- 57. Peach Garden at Hong (Niichi) 5 4,50,000/- Villages 58. Peach Garden at Hong (Niitii) 5 4,50,000/- Villages 59. Peach Garden at Hari Villages 5 4,50,000/- 60. Peach Garden at Kalung Reru 5 4,50,000/- Villages 61. Peach Garden at Tajang 5 4,50,000/- Villages 62. Peach Garden at Hija Villages 5 4,50,000/- 63. Peach Garden at Diibo Villages 5 4,50,000/- 64. Vegetable Garden at Hong 30 27,00,000/- (Niichi) Villages

274 | P a g e

65. Vegetable Garden at Hong 30 27,00,000/- (Niitii) Villages 66. Vegetable Garden at Hari 30 27,00,000/- Villages 67. Vegetable Garden at Kalung 30 27,00,000/- Reru Villages 68. Vegetable Garden at Tajang 30 27,00,000/- Villages 69. Vegetable Garden at Hija 30 27,00,000/- Villages 70. Vegetable Garden at Diibo 30 27,00,000/- Villages 3. Diversion of water from different 71. Hong (Niichi) Villages area 5 1,00,00,000/- Bhogo source of different location where 72. Hong (Niitii) Villages area 5 1,00,00,000/- from it is plenty to nearby water Bhogo scarce area, from rivers/streams at 73. Hari Villages area 5 1,00,00,000/- lower elevations to supplement Bhogo requirements beyond IWMP, 74. Kalung Reru Villages area 5 1,00,00,000/- MGNREGS, irrespective of irrigation Bhogo commands. 75. Tajang Villages area 5 1,00,00,000/- (Approx. Rs. 20,00,000/- per units) Bhogo 76. Hija Villages area 5 1,00,00,000/- Bhogo 77. Diibo Villages area 5 1,00,00,000/- Bhogo 4. Construction of Drip Irrigation 78. Kiwi Garden at Hong (Niichi) 20 48,50,000/-

System. Villages (Rs. 2,42,500 per set/Ha.) 79. Kiwi Garden at Hong (Niitii) 20 48,50,000/- Villages 80. Kiwi Garden at Hari Villages 20 48,50,000/-

275 | P a g e

81. Kiwi Garden at Kalung Reru 20 48,50,000/- Villages 82. Kiwi Garden at Tajang Villages 20 48,50,000/-

83. Kiwi Garden at Hija Villages 20 48,50,000/-

84. Kiwi Garden at Diibo Villages 20 48,50,000/-

85. L/Cardamom Garden at Hong 10 24,25,000/-

(Niichi) Villages 86. L/Cardamom Garden at Hong 10 24,25,000/-

(Niitii) Villages 87. L/Cardamom Garden at Hari 10 24,25,000/-

Villages 88. L/Cardamom Garden at Kalung 10 24,25,000/-

Reru Villages 89. L/Cardamom Garden at Tajang 10 24,25,000/-

Villages

90. L/Cardamom Garden at Hija 10 24,25,000/-

Villages Water Harvesting Structure 91. L/Cardamom Garden at Diibo 10 24,25,000/-

(4X10X1) M. @ Rs. 52,500/- Villages 92. Plum Garden at Hong (Niichi) 5 12,12,500/-

Villages 93. Plum Garden at Hong (Niitii) 5 12,12,500/-

Villages 94. Plum Garden at Hari Villages 5 12,12,500/-

95. Plum Garden at Kalung Reru 5 12,12,500/-

Villages

276 | P a g e

96. Plum Garden at Tajang Villages 5 12,12,500/-

97. Plum Garden at Hija Villages 5 12,12,500/-

98. Plum Garden at Diibo Villages 5 12,12,500/-

99. Peach Garden at Hong (Niichi) 5 12,12,500/-

Villages 100. Peach Garden at Hong 5 12,12,500/-

(Niitii) Villages 101. Peach Garden at Hari 5 12,12,500/-

Villages 102. Peach Garden at Kalung 5 12,12,500/-

Reru Villages 103. Peach Garden at Tajang 5 12,12,500/-

Villages 104. Peach Garden at Hija 5 12,12,500/-

Villages 105. Peach Garden at Diibo 5 12,12,500/-

Villages

106. Vegetable Garden at Hong 20 48,50,000/-

(Niichi) Villages 107. Vegetable Garden at Hong 20 48,50,000/-

(Niitii) Villages 108. Vegetable Garden at Hari 20 48,50,000/-

Villages 109. Vegetable Garden at Kalung 20 48,50,000/-

Reru Villages 110. Vegetable Garden at Tajang 20 48,50,000/-

Villages

277 | P a g e

111. Vegetable Garden at Hija 20 48,50,000/-

Villages 112. Vegetable Garden at Diibo 20 48,50,000/-

Villages 5. 113. Kiwi Garden at Hong 50 26,25,000/-

(Niichi) Villages 114. Kiwi Garden at Hong 50 26,25,000/-

(Niitii) Villages 115. Kiwi Garden at Hari 50 26,25,000/-

Villages 116. Kiwi Garden at Kalung 50 26,25,000/-

Reru Villages 117. Kiwi Garden at Tajang 50 26,25,000/-

Villages 118. Kiwi Garden at Hija 50 26,25,000/-

Villages 119. Kiwi Garden at Diibo 50 26,25,000/-

Villages 120. L/Cardamom Garden at 20 10,50,000/-

Hong (Niichi) Villages 121. L/Cardamom Garden at 20 10,50,000/-

Hong (Niitii) Villages

122. L/Cardamom Garden at Hari 20 10,50,000/-

Villages 123. L/Cardamom Garden at 20 10,50,000/-

Kalung Reru Villages 124. L/Cardamom Garden at 20 10,50,000/-

Tajang Villages 125. L/Cardamom Garden at Hija 20 10,50,000/-

Villages

278 | P a g e

126. L/Cardamom Garden at 20 10,50,000/-

Diibo Villages 127. Plum Garden at Hong 5 2,62,500/-

(Niichi) Villages 128. Plum Garden at Hong 5 2,62,500/-

(Niitii) Villages 129. Plum Garden at Hari 5 2,62,500/-

Villages 130. Plum Garden at Kalung 5 2,62,500/-

Reru Villages 131. Plum Garden at Tajang 5 2,62,500/-

Villages 132. Plum Garden at Hija 5 2,62,500/-

Villages 133. Plum Garden at Diibo 5 2,62,500/-

Villages 134. Peach Garden at Hong 5 2,62,500/-

(Niichi) Villages 135. Peach Garden at Hong 5 2,62,500/-

(Niitii) Villages 136. Peach Garden at Hari 5 2,62,500/-

Villages 137. Peach Garden at Kalung 5 2,62,500/-

Reru Villages

138. Peach Garden at Tajang 5 2,62,500/-

Villages 139. Peach Garden at Hija 5 2,62,500/-

Villages 140. Peach Garden at Diibo 5 2,62,500/-

Villages

279 | P a g e

141. Vegetable Garden at Hong 30 15,75,000/-

(Niichi) Villages 142. Vegetable Garden at Hong 30 15,75,000/-

(Niitii) Villages 143. Vegetable Garden at Hari 30 15,75,000/-

Villages 144. Vegetable Garden at Kalung 30 15,75,000/-

Reru Villages 145. Vegetable Garden at Tajang 30 15,75,000/-

Villages 146. Vegetable Garden at Hija 30 15,75,000/-

Villages 147. Vegetable Garden at Diibo 30 15,75,000/-

Villages 6. Tube well (Shallow) @ Rs. 75,000/- 148. Kiwi Garden at Hong 30 22,50,000/-

(Niichi) Villages 149. Kiwi Garden at Hong 30 22,50,000/-

(Niitii) Villages 150. Kiwi Garden at Hari 30 22,50,000/-

Villages 151. Kiwi Garden at Kalung 30 22,50,000/-

Reru Villages 152. Kiwi Garden at Tajang 30 22,50,000/-

Villages 153. Kiwi Garden at Hija 30 22,50,000/-

Villages

154. Kiwi Garden at Diibo 30 22,50,000/-

Villages 155. L/Cardamom Garden at 10 7,50,000/-

Hong (Niichi) Villages

280 | P a g e

156. L/Cardamom Garden at 10 7,50,000/-

Hong (Niitii) Villages 157. L/Cardamom Garden at Hari 10 7,50,000/-

Villages 158. L/Cardamom Garden at 10 7,50,000/-

Kalung Reru Villages 159. L/Cardamom Garden at 10 7,50,000/-

Tajang Villages 160. L/Cardamom Garden at Hija 10 7,50,000/-

Villages 161. L/Cardamom Garden at 10 7,50,000/-

Diibo Villages 162. Plum Garden at Hong 5 3,75,000/-

(Niichi) Villages 163. Plum Garden at Hong 5 3,75,000/-

(Niitii) Villages 164. Plum Garden at Hari 5 3,75,000/-

Villages 165. Plum Garden at Kalung 5 3,75,000/-

Reru Villages 166. Plum Garden at Tajang 5 3,75,000/-

Villages 167. Plum Garden at Hija 5 3,75,000/-

Villages 168. Plum Garden at Diibo 5 3,75,000/-

Villages 169. Peach Garden at Hong 5 3,75,000/-

(Niichi) Villages

170. Peach Garden at Hong 5 3,75,000/-

(Niitii) Villages

281 | P a g e

171. Peach Garden at Hari 5 3,75,000/-

Villages 172. Peach Garden at Kalung 5 3,75,000/-

Reru Villages 173. Peach Garden at Tajang 5 3,75,000/-

Villages 174. Peach Garden at Hija 5 3,75,000/-

Villages 175. Peach Garden at Diibo 5 3,75,000/-

Villages 176. Vegetable Garden at Hong 30 22,50,000/-

(Niichi) Villages 177. Vegetable Garden at Hong 30 22,50,000/-

(Niitii) Villages 178. Vegetable Garden at Hari 30 22,50,000/-

Villages 179. Vegetable Garden at Kalung 30 22,50,000/-

Reru Villages 180. Vegetable Garden at Tajang 30 22,50,000/-

Villages

181. Vegetable Garden at Hija 30 22,50,000/-

Villages

182. Vegetable Garden at Diibo 30 22,50,000/-

Villages

7. Sprinkler Irrigation Set (10X10)M 183. Horticultural Nursery at 10 7,40,970/-

point Distance. @ Rs. 74,097 per Set Hong (Niichi) Villages

282 | P a g e

184. Horticultural Nursery at 10 7,40,970/-

Hong (Niitii) Villages 185. Horticultural Nursery at 10 7,40,970/-

Hari Villages 186. Horticultural Nursery at 10 7,40,970/-

Kalung Reru Villages 187. Horticultural Nursery at 10 7,40,970/-

Tajang Villages 188. Horticultural Nursery at 10 7,40,970/-

Hija Villages 189. Horticultural Nursery at 10 7,40,970/-

Diibo Villages 190. Vegetable Garden at Hong 30 22,22,910/-

(Niichi) Villages 191. Vegetable Garden at Hong 30 22,22,910/-

(Niitii) Villages 192. Vegetable Garden at Hari 30 22,22,910/-

Villages 193. Vegetable Garden at Kalung 30 22,22,910/

Reru Villages 194. Vegetable Garden at Tajang 30 22,22,910/

Villages 195. Vegetable Garden at Hija 30 22,22,910/-

Villages

196. Vegetable Garden at Diibo 30 22,22,910/-

Villages

8. 197. Kiwi Garden at Hong 50 20,00,000/-

(Niichi) Villages

283 | P a g e

Silpauline Sheath Lining Ponds for 198. Kiwi Garden at Hong 50 20,00,000/-

water Storage( @ Rs. 40,000/- per (Niitii) Villages unit) 199. Kiwi Garden at Hari 50 20,00,000/-

Villages 200. Kiwi Garden at Kalung 50 20,00,000/-

Reru Villages 201. Kiwi Garden at Tajang 50 20,00,000/-

Villages 202. Kiwi Garden at Hija 50 20,00,000/-

Villages 203. Kiwi Garden at Diibo 50 20,00,000/-

Villages 204. L/Cardamom Garden at 20 8,00,000/-

Hong (Niichi) Villages 205. L/Cardamom Garden at 20 8,00,000/-

Hong (Niitii) Villages 206. L/Cardamom Garden at Hari 20 8,00,000/-

Villages 207. L/Cardamom Garden at 20 8,00,000/-

Kalung Reru Villages 208. L/Cardamom Garden at 20 8,00,000/-

Tajang Villages 209. L/Cardamom Garden at Hija 20 8,00,000/-

Villages 210. L/Cardamom Garden at 20 8,00,000/-

Diibo Villages 211. Plum Garden at Hong 5 2,00,000/-

(Niichi) Villages 212. Plum Garden at Hong 5 2,00,000/-

(Niitii) Villages 213. Plum Garden at Hari 5 2,00,000/-

Villages

284 | P a g e

214. Plum Garden at Kalung 5 2,00,000/-

Reru Villages 215. Plum Garden at Tajang 5 2,00,000/-

Villages 216. Plum Garden at Hija 5 2,00,000/-

Villages 217. Plum Garden at Diibo 5 2,00,000/-

Villages 218. Peach Garden at Hong 5 2,00,000/-

(Niichi) Villages 219. Peach Garden at Hong 5 2,00,000/-

(Niitii) Villages 220. Peach Garden at Hari 5 2,00,000/-

Villages 221. Peach Garden at Kalung 5 2,00,000/-

Reru Villages 222. Peach Garden at Tajang 5 2,00,000/-

Villages 223. Peach Garden at Hija 5 2,00,000/-

Villages 224. Peach Garden at Diibo 5 2,00,000/-

Villages 225. Vegetable Garden at Hong 50 20,00,000/-

(Niichi) Villages 226. Vegetable Garden at Hong 50 20,00,000/-

(Niitii) Villages 227. Vegetable Garden at Hari 50 20,00,000/-

Villages 228. Vegetable Garden at Kalung 50 20,00,000/-

Reru Villages

285 | P a g e

229. Vegetable Garden at Tajang 50 20,00,000/-

Villages 230. Vegetable Garden at Hija 50 20,00,000/-

Villages 231. Vegetable Garden at Diibo 50 20,00,000/-

Villages Total (Rs.) 58,23,22,160

(Rupees Fifty Eight Crore Twenty Three Lakhs Twenty Two Thousand One Hundred Sixty) only.

Horticulture Development Officer District Horticulture Officer Lower Subansiri District, Ziro Lower Subansiri District, Ziro

286 | P a g e

PROPOSAL UNDER BLOCK IRRIGATION PLANS FOR YACHULI BLOCKS, LOWER SUBANSIRI DISTRICT, ARUNACHAL PRADESH Sl.N Components/Particulars Water sources Village/Location Area(Ha.) Total o Amount(Rs.) 1. C/O of Rain water Harvesting Rain water a) Large cardamom garden at yachuli circle 180 32400000 structure(Per drop more crop) (20X20X3)m@ 150/cu3 @ 1,80,000/ unit b) Compact area horticulture garden at 200 36000000 yachuli. c) Large Cardamom Garden at Yazali Circle 180 32400000

d) Large cardamom garden at Pistana circle 200 36000000

e) Large Cardamom Garden at Deed Circle. 250 45000000

2. Secondary storage structure at Perennial streams/ a) Orange garden at Yazali circle. 150 13500000 tail end of Canal system to rain water store water when available in b) Vegetable garden at yazali circle 250 22500000 abundance for use during dry periods. RCC lining c) Compact horticulture garden at Yazali 250 22500000 ponds/dug wells @ 90,000/- circle. per Ha. d) Horticulture garden at Yachuli circle. 280 25200000

e) Large cardamom garden at Yachuli circle. 350 31500000

3. Diversion of water from Rivers /streams a) Orange garden at Yazali circle. 5 10000000 different source of different b) Pineapple garden at yazali circle. 9 18000000 location where from it is c) Banana garden at Yazali Circle. 7 14000000

287 | P a g e

plenty to nearby water scarce d) Large cardamom garden at Yazali circle 6 12000000 area, from rivers/streams at e) Composite horticulture garden at Yachuli 8 16000000 lower elevations to Circle. supplement requirements f) Large cardamom garden at Yachuli Circle. 6 1200000 beyond IWMP, MGNREGS, g) Orange garden at Yachuli circle. 5 1000000 irrespective of irrigation h) Large cardamom Garden at Deed circle. 7 1400000 commands. i) Large Cardamom Garden at Pistana Circle. 5 1000000 (Approx. Rs. 20,00,000/- per units)

288 | P a g e

4. C/O drip irrigation system @ a) Composite Horticulture nursery at 5 1212500 2,42,500/- per Ha. Yazali Circle. b) Orange Nursery at Yachuli Circle. 7 1697500 c) Large cardamom Nursery at Deed Circle. 7 1697500 d) Large Cardamom Nursery at Pistana circle. 6 1455000 e) Vegetable garden at Yachuli circle. 5 1212500

5. Water Harvesting Structure Rain water a) Orange garden at Yazali circle. 50 2625000 (4X10X1) M. @ Rs. 52,500/- b) Pineapple garden at yazali circle. 70 3675000 c) Banana garden at Yazali Circle. 50 2625000

289 | P a g e

d) Large cardamom garden at Yazali circle 30 1575000 e) Composite horticulture garden at Yachuli Circle. 30 1575000 f) Large cardamom garden at Yachuli Circle. 25 1312500 g) Orange garden at Yachuli circle. 30 1575000 h) Large cardamom Garden at Deed circle. 30 1575000 i) Large Cardamom Garden at Pistana Circle. 30 1575000

39,69,87,500/- Total

(Rupees Thirty Nine Crore Sixty Nine Lakhs Eighty Seven Thousand Five Hundred)

Horticulture Development Officer District Horticulture Officer Lower Subansiri District, Yachuli Lower Subansiri District, Ziro

290 | P a g e

4. DRDA

Ziro I Strategic Action plan for Irrigation in District under PMKSY in respect of Ziro-I CD Block for year the 2016-17 Name of the Concerned Command Estimated Total Number Period of SI.No. blocks/Sub ministry/ Component Activity area/Irrigation Cost(Rs. /capaity(cum) implementation district Department potential In Lakh) 1 Newly created WHS 1.1 Farm ponds 74 nos 4 Ha 2016-17 74.00 1.2 Check Dams 74 nos 37 Ha 2016-17 106.00 1.3 Nallah Bunds 74 nos 35 Ha 2016-17 106.00 1.4 Percolation Tank 1.5 Other Ground water Recharge structures 1.6 PMKSY Fishery ponds/cattle ponds 74 nos 6 Ha 2016-17 53.00 DoLR-MoRD 2 watershed Renovated WHS 2.1 Farm ponds 15 nos 2 Ha 2016-17 10.00

2.2 Check Dams 18 nos 10 Ha 2016-17 12.00 2.3 Nallah Bunds 30 nos 12 Ha 2016-17 21.00

2.4 I CD Block Percolation Tank

- 2.5 Other Ground water Recharge structures

Ziro 2.6 Fishery ponds/cattle ponds 35 nos 2 Ha 2016-17 17.00 3 Sub-Total(A)=Rs. 399.00 4 Newly created 4.1 Water conservation 40 nos 20 Ha 2016-17 170.00 4.2 Water Harvesting 20 nos 40 Ha 2016-17 30.00 4.3 Convergence Creation of Irrigation canals&Drains 15 nos 30 Ha 2016-17 30.00 DoLR-MoRD with 4.4 Providing Infrastuctures for Irrigation 12 nos 25 Ha 2016-17 24.00 MGNREGA 4.5 Land Development 12 nos 30 Ha 2016-17 12.00 5 Renovation

291 | P a g e

5.1 Renovation of water bodies i/c desilting 15 nos 7 Ha 2016-17 15.00 5.2 Renovation & maintenance of Irrigation 18 nos 70 Ha 2016-17 18.00 canals&Drains 6 Sub-Total(B)=Rs. 299.00 7 Grand Total( A+B)=Rs. 698.00 Rs. 698.00(Rupees Six hundred ninety eight lakh ) only

Strategic Action plan for Irrigation in District under PMKSY in respect of Ziro-I CD Block for year the 2017-18 SI.No. Name of the Concerned Component Activity Total Number Command Period of Estimated blocks/Sub ministry/ /capaity(cum) area/Irrigation implementation Cost(Rs. district Department potential In Lakh) 1 Newly created WHS 1.1 Farm ponds 74 nos 4 Ha 2017-18 79.55 1.2 Check Dams 74 nos 37 Ha 2017-18 113.95 1.3 Nallah Bunds 74 nos 35 Ha 2017-18 113.95 1.4 Percolation Tank 1.5 Other Ground water Recharge structures

1.6 PMKSY Fishery ponds/cattle ponds 74 nos 6 Ha 2017-18 56.98 DoLR-MoRD 2 watershed Renovated WHS 2.1 Farm ponds 15 nos 2 Ha 2017-18 10.75

I I CD Block 2.2 - Check Dams 18 nos 10 Ha 2017-18 12.90

2.3 Ziro Nallah Bunds 30 nos 12 Ha 2017-18 22.58 2.4 Percolation Tank 2.5 Other Ground water Recharge structures 2.6 Fishery ponds/cattle ponds 35 nos 2 Ha 2017-18 18.28 3 Sub-Total(A)=Rs. 428.94 4 Newly created 4.1 DoLR-MoRD Water conservation 40 nos 20 Ha 2017-18 182.75

292 | P a g e

4.2 Water Harvesting 20 nos 40 Ha 2017-18 32.25 4.3 Creation of Irrigation canals&Drains 15 nos 30 Ha 2017-18 32.25 4.4 Providing Infrastuctures for Irrigation 12 nos 25 Ha 2017-18 25.80 Convergence 4.5 Land Development 12 nos 30 Ha 2017-18 12.90 with 5 MGNREGA Renovation 5.1 Renovation of water bodies i/c desilting 15 nos 7 Ha 2017-18 16.13 5.2 Renovation & maintenance of Irrigation 18 nos 70 Ha 2017-18 19.35 canals&Drains 6 Sub-Total(B)=Rs. 321.43 7 Grand Total( A+B)=Rs. 750.37

Strategic Action plan for Irrigation in District under PMKSY in respect of Ziro-I CD Block for year the 2018-19 Name of Concerned Command Estimated the Total Number Period of SI.No. ministry/ Component Activity area/Irrigation Cost(Rs. blocks/Sub /capaity(cum) implementation Department potential In Lakh) district 1 Newly created WHS 1.1 Farm ponds 74 nos 4 Ha 2016-17 85.52 1.2 Check Dams 74 nos 37 Ha 2016-17 122.50

1.3 Nallah Bunds 74 nos 35 Ha 2016-17 122.50 1.4 Percolation Tank PMKSY 1.5 DoLR-MoRD Other Ground water Recharge structures

I I CD Block watershed 1.6 - Fishery ponds/cattle ponds 74 nos 6 Ha 2016-17 61.25

2 Ziro Renovated WHS 2.1 Farm ponds 15 nos 2 Ha 2016-17 11.56 2.2 Check Dams 18 nos 10 Ha 2016-17 13.87 2.3 Nallah Bunds 30 nos 12 Ha 2016-17 24.27

293 | P a g e

2.4 Percolation Tank 2.5 Other Ground water Recharge structures 2.6 Fishery ponds/cattle ponds 35 nos 2 Ha 2016-17 19.65 3 Sub-Total(A)=Rs. 461.12 4 Newly created 4.1 Water conservation 40 nos 20 Ha 2016-17 196.46 4.2 Water Harvesting 20 nos 40 Ha 2016-17 34.67 4.3 Creation of Irrigation canals&Drains 15 nos 30 Ha 2016-17 34.67 4.4 Convergence Providing Infrastuctures for Irrigation 12 nos 25 Ha 2016-17 27.74 4.5 DoLR-MoRD with Land Development 12 nos 30 Ha 2016-17 13.87 5 MGNREGA Renovation 5.1 Renovation of water bodies i/c desilting 15 nos 7 Ha 2016-17 17.34 5.2 Renovation & maintenance of Irrigation 18 nos 70 Ha 2016-17 20.80 canals&Drains 6 Sub-Total(B)=Rs. 345.55 7 Grand Total( A+B)=Rs. 806.67 Rs. 806.67(Rupees Eight hundred six lakh sixty seven thousand ) only

Strategic Action plan for Irrigation in District under PMKSY in respect of Ziro-I CD Block for the year 2019-20. Name of the Concerned Command Estimated Total Number Period of SI.No. blocks/Sub ministry/ Component Activity area/Irrigation Cost(Rs. /capaity(cum) implementation district Department potential In Lakh)

1 Newly created WHS 1.1 Farm ponds 74 nos 4 Ha 2016-17 91.93 PMKSY 1.2 DoLR-MoRD Check Dams 74 nos 37 Ha 2016-17 131.69

I I CD Block watershed 1.3 - Nallah Bunds 74 nos 35 Ha 2016-17 131.69

1.4 Ziro Percolation Tank

294 | P a g e

1.5 Other Ground water Recharge structures 1.6 Fishery ponds/cattle ponds 74 nos 6 Ha 2016-17 65.84 2 Renovated WHS 2.1 Farm ponds 15 nos 2 Ha 2016-17 12.43 2.2 Check Dams 18 nos 10 Ha 2016-17 14.91 2.3 Nallah Bunds 30 nos 12 Ha 2016-17 26.09 2.4 Percolation Tank 2.5 Other Ground water Recharge structures 2.6 Fishery ponds/cattle ponds 35 nos 2 Ha 2016-17 21.12 3 Sub-Total(A)=Rs. 495.70 4 Newly created 4.1 Water conservation 40 nos 20 Ha 2016-17 211.19 4.2 Water Harvesting 20 nos 40 Ha 2016-17 37.27 4.3 Creation of Irrigation canals&Drains 15 nos 30 Ha 2016-17 37.27 4.4 Convergence Providing Infrastuctures for Irrigation 12 nos 25 Ha 2016-17 29.82 4.5 DoLR-MoRD with Land Development 12 nos 30 Ha 2016-17 14.91 MGNREGA 5 Renovation 5.1 Renovation of water bodies i/c desilting 15 nos 7 Ha 2016-17 18.64 5.2 Renovation & maintenance of Irrigation 18 nos 70 Ha 2016-17 22.36 canals&Drains 6 Sub-Total(B)=Rs. 371.46 7 Grand Total( A+B)=Rs. 867.16 Rs. 867.16(Rupees Eight hundred sixty seven lakh sixteen thousand ) only

295 | P a g e

Strategic Action plan for Irrigation in District under PMKSY in respect of Ziro-I CD Block for year the 2020-21. Name of Concerned Command Estimated the Total Number Period of SI.No. ministry/ Component Activity area/Irrigation Cost(Rs. blocks/Sub /capaity(cum) implementation Department potential In Lakh) district 1 Newly created WHS 1.1 Farm ponds 74 nos 4 Ha 2016-17 98.82 1.2 Check Dams 74 nos 37 Ha 2016-17 141.57 1.3 Nallah Bunds 74 nos 35 Ha 2016-17 141.57 1.4 Percolation Tank 1.5 Other Ground water Recharge structures 1.6 PMKSY Fishery ponds/cattle ponds 74 nos 6 Ha 2016-17 70.78 DoLR-MoRD 2 watershed Renovated WHS 2.1 Farm ponds 15 nos 2 Ha 2016-17 13.36

2.2 Check Dams 18 nos 10 Ha 2016-17 16.03 2.3 Nallah Bunds 30 nos 12 Ha 2016-17 28.05 2.4 Percolation Tank

I I CD Block 2.5 - Other Ground water Recharge structures

2.6 Ziro Fishery ponds/cattle ponds 35 nos 2 Ha 2016-17 22.70 3 Sub-Total(A)=Rs. 532.88 4 Newly created 4.1 Water conservation 40 nos 20 Ha 2016-17 227.03 4.2 Water Harvesting 20 nos 40 Ha 2016-17 40.07

4.3 Convergence Creation of Irrigation canals&Drains 15 nos 30 Ha 2016-17 40.07 4.4 DoLR-MoRD with Providing Infrastuctures for Irrigation 12 nos 25 Ha 2016-17 32.06 4.5 MGNREGA Land Development 12 nos 30 Ha 2016-17 16.03 5 Renovation 5.1 Renovation of water bodies i/c desilting 15 nos 7 Ha 2016-17 20.04

296 | P a g e

5.2 Renovation & maintenance of Irrigation 18 nos 70 Ha 2016-17 24.04 canals&Drains 6 Sub-Total(B)=Rs. 399.34 7 Grand Total( A+B)=Rs. 932.22 Rs. 932.22(Rupees Nine hundred thirty two lakh twenty two thousand ) only

Ziro II

Strategic Action plan for Irrigation in District under PMKSY in respect of Hong-Hari CD Block for year the 2016-17 to 2020-21 SI.No. Name of the Concerned Component Activity Total Number Command Period of Estimated blocks/Sub district ministry/ /capaity(cum) area/Irrigation implementation Cost(Rs. Department potential In Lakh) 1 Hong-Hari CD Block Newly created WHS 1.1 Farm ponds 318 15 2016-17 218.36 1.2 Check Dams 318 150 2016-17 689.00 1.3 Nallah Bunds 318 200 2016-17 689.00 1.4 Percolation Tank 0 0 0.00 1.5 Other Ground water Recharge structures 1.6 PMKSY Fishery ponds/cattle ponds 530 30 2016-17 337.38 DoLR-MoRD 2 watershed Renovated WHS 2.1 Farm ponds 122 17 2016-17 103.00 2.2 Check Dams 91 52 2016-17 102.00 2.3 Nallah Bunds 150 60 2016-17 150.00 2.4 Percolation Tank 0 0 0.00 2.5 Other Ground water Recharge 0 0 0.00 structures 2.6 Fishery ponds/cattle ponds 150 10 2016-17 144.80

297 | P a g e

3 Sub-Total(A)=Rs. 2433.54 4 Newly created 4.1 Water conservation 273 132 2016-17 936.00 4.2 Water Harvesting 75 150 2016-17 150.00 4.3 Creation of Irrigation canals&Drains 76 159 2016-17 200.00 4.4 Providing Infrastuctures for Irrigation 60 127 2016-17 120.00 Convergence 4.5 DoLR-MoRD with Land Development 116 181 2016-17 155.00 5 MGNREGA Renovation 5.1 Renovation of water bodies i/c 89 30 2016-17 62.50 desilting 5.2 Renovation & maintenance of 60 300 2016-17 60.00 Irrigation canals&Drains 6 Sub-Total(B)=Rs. 1683.50 7 Grand Total( A+B)=Rs. 4117.04

Tamen Raga

Strategic Action plan for Irrigation in District under PMKSY in respect of Raga CD Block Name of the Concerned Command Estimated Total Number Period of SI.No. blocks/Sub ministry/ Component Activity area/Irrigation Cost(Rs. /capaity(cum) implementation district Department potential In Lakh) 1 Newly created WHS

1.1 Farm ponds 54 nos 4 Ha 162.00 1.2 Check Dams 54 nos 33 Ha 162.00 PMKSY 1.3 DoLR-MoRD Nallah Bunds 54 nos 43 Ha 162.00

I I CD Block watershed 1.4 - Percolation Tank

1.5 Ziro Other Ground water Recharge structures 1.6 Fishery ponds/cattle ponds 60 nos 6 Ha 2016-17 60.00

298 | P a g e

2 Renovated WHS 2.1 Farm ponds 16 nos 3 Ha 2016-17 16.00 2.2 Check Dams 19 nos 11 Ha 2016-17 19.00 2.3 Nallah Bunds 30 nos 12 Ha 2016-17 30.00 2.4 Percolation Tank 2.5 Other Ground water Recharge structures 2.6 Fishery ponds/cattle ponds 30 nos 2 Ha 2016-17 15.00 3 Sub-Total(A)=Rs. 626.00 4 Newly created

4.1 Water conservation 50 nos 20 Ha 2016-17 159.00 4.2 Water Harvesting 15 nos 30 Ha 2016-17 30.00 4.3 Creation of Irrigation canals&Drains 15 nos 30 Ha 2016-17 30.00 4.4 Convergence Providing Infrastuctures for Irrigation 10 nos 20 Ha 2016-17 20.00 4.5 DoLR-MoRD with Land Development 10 nos 25 Ha 2016-17 10.00

I I CD Block - MGNREGA 5 Renovation 5.1 Ziro Renovation of water bodies i/c desilting 10 nos 5 Ha 2016-17 10.00 5.2 Renovation & maintenance of Irrigation 12 nos 60 Ha 2016-17 12.00 canals&Drains 6 Sub-Total(B)=Rs. 271.00 7 Grand Total( A+B)=Rs. 897.00

299 | P a g e

BLOCK DEVELOPMENT OFFICE PISTANA PMKSY (WATERSHED) SCHEME FOR CD- BLOCK PISTANA District: - Lower Subansiri Block: - Pistana Concern Dept. - DRDA Component: - Watershed Ministry : - MoLR & RD Name Sl. Name Tota Comman Catchme Period of Estimate Name of of Block Work No of Activity l d Area nt Implimentati d cost(In Latitudes Longitudes Project Pancha priority Priority . Block No. (Ha.) area(Ha.) on (In Year) Lakh) yat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 C/o Minor Irrigation Chnnel Pistan Water 1 (MIC) at Belo 1 8 140.64 1 15.00 22025'36.84"N 93034'27.90"E High Medium a distribution Piich river to Chiira happa. C/o Chech Pistan Soil & 2 Dam at Moya Ambam 1 2 35.16 1 12.00 22⁰32'6.68”N 93⁰22'31.21”E High Medium a Moisture paddy field. C/o Land protection Pistan Land 3 work at Ambam 2 4 0 1 15.00 27024'21.22"N 91031'36.81"E High Medium a Protection Biker Happa paddy field. C/o Farm pond at Water Pistan Moya 4 Ambam Conservati 2 1 17.58 1 8.00 27021'23.55"N 92030'34.82"E High Medium a Namchi on Happa paddy field. C/o Farm pond at Toju Water Pistan 5 paddy field Shally Conservati 3 4 70.32 1 12.00 26023'22.51"N 92036'34.82"E High Medium a under Hitu on village. C/o Land Land Pistan 6 Developmen Shally Developme 2 4 0 2 10.00 26020'22.54"N 92036'34.82"E High Medium a t work at nt

300 | P a g e

Dem Happa paddy field under Dem. C/o CC Drain at Pakh river to Pistan Sillee happa Water 7 Shally 1 9 158.22 2 50.00 27⁰27'18.97”N 93⁰27'31.35”E High Medium a paddy field distribution Under Nyoliber Village. C/o Land Developmen Land Pistan t work at 8 Dem Developme 1 2 0 1 10.00 27⁰29'09.90”N 93⁰31'48.12”E High Medium a Dem Happa nt paddy field under Dem. C/o Minor Irrigation Chnnel Pistan Water 9 (MIC) at Dem 1 1 17.58 1 8.00 27026'19.97"N 93⁰33'13.24”E High Medium a Distribution Rallo river to Rallo happa Paddy field. C/O Farm Pond at Water Pistan Taah Paddy 10 Yoglu Conservati 4 2 0 1 8.00 21⁰32'6.72”N 90⁰35'13.24”E High Medium a field under on Yoglu village. C/o Minor Irrigation Chnnel Pistan (MIC) at KugiTag Water 11 1 5 87.9 1 10.00 21⁰28'6.98”N 90⁰36'13.27”E High Medium a Sega river to o distribution Lal happa under Tom village.

301 | P a g e

C/o Land Protection work at Pei Pistan Land 12 Happa Seya 2 4 70.32 1 12.00 26⁰32'6.75”N 92⁰27'31.34”E High Medium a protection paddy field under Seya village. C/o Minor Irrigation Chnnel (MIC) at Poliyu river Pistan to Yollap Water 13 Radhpu 1 5 87.9 2 45.00 26⁰27'18.95”N 92⁰27'31.33”E High Medium a happa Distribution Paddy field under Ekhataya & Radhpu village. C/o CC MIC from Pab river to Pistan Docho Sei Water 14 Neelam 1 4 70.32 2 35.00 26⁰28'6.95”N 92⁰36'13.26”E High Medium a New Neelam Distribution village under Neelam Panchayat. C/o Land Developmen t at Taikho Land Pistan happa new 15 Neelam Developme 1 2 0 1 9.00 26⁰32'6.63”N 92⁰27'31.21”E High Medium a Neelam nt village under Neelam Panchayat. C/o Land Land Pistan Developmen 16 Sito Developme 3 1 0 1 9.00 26⁰32'6.63”N 92⁰27'31.21”E High Medium a t at Min sikh nt village under

302 | P a g e

sito Panchayat. C/o Land Protection work at Pistan phulyi paddy Land 17 Sito 2 6 0 1 12.00 26⁰32'6.73”N 92⁰27'31.31”E High Medium a field at Mudo Protection village under Sito Panchayat. C/o Land Developmen Land Pistan t at Deed 18 Deed Developme 2 8 0 1 18.00 26⁰32'6.76”N 92⁰27'31.29”E High Medium a happa under nt Deed Panchayat. C/o CC MIC from Keyi river to Deed Pistan Water 19 happa paddy Deed 1 6 105.48 1 42.00 26⁰32'6.73”N 92⁰27'31.41”E High Medium a Distribution field under Deed Panchayat. C/o CC MIC from Poiko to Paley Pistan Water 20 Habia happa Pania 2 5 87.9 1 18.00 26⁰32'09.16”N 93⁰29'32.68”E High Medium a distribution pania village under Pania Panchayat. C/o MIC from Pakh river to Pakh Pistan Water 21 happa at Old Pania 1 4 70.32 1 10.00 27⁰32'6.71”N 92⁰29'32.66”E High Medium a distribution pania village under Pania Panchayat.

303 | P a g e

5. RWD (Soil & Water Conservation Department)

PLAN PROPOSAL UNDER PRADHAN MENTRI KRISHI SINCHAYEE YOJANA (PMKSY) FROM RURAL WORK DEPARTMENT, LOWER SUBANSIRI DISTRICT (Rs. In lakhs)

ZIRO-l BLOCK

Sl.N Name of scheme/Project Latitude Longitude Total Estimated o area cost (Ha)

1. Soil Conservation works for enhancing the productivity of Degraded lands at 27 0 33’ 28.077” 93 051’ 32.452 150 100 Hong village, Lower Subansiri.

2. Reduction of soil erosion and surface runoff through Afforestration at 27 0 31’ 51.925” 93 0 51’41.374” 100 80 Dilopolyang, Lower Subansiri

3. Soil conservation and ground water restoration works on Watershed basis 27 0 35’ 12.433” 93051’1.745” 150 100 Siya kley river basin, Lower Subansiri.

4. Soil and water conservation works through water harvesting Structures and 27 0 37’ 18.069” Dug93 050’41.048” 90 70 out Ponds at Myolyang, Lower Subansiri

5. Integrated Wasteland Development Programme(IWDP) at Manipolyang. 27031’ 44.071” 93051’11.602” 150 120

6. Composite Nursery at Sulya Village, Lower Subansiri 27036’ 12.342” 93049’50.122” 20 50

7. Nallah Bank Erosion Control at kley river, Lower Subansiri 27036’ 1.96” 93049’40.60” 100 100

304 | P a g e

8. Composite nursery at Hari Village, Lower Subansiri 27035’ 15.342” 93051’40.73” 20 50

9 Composite nursery at Manipolyang, Lower Subansiri 27031’ 44.071 93051’11.602 30 30 10. Sustainable and integrated Watershed development programme at Hari 27035’ 15.342” 93051’40.73” 200 150

60 85 10. Nallah Bank Erosion Control at Mioya Yanjo Nallah at Pine 27036’ 57.875” 93052’ 3.489” Grove, Lower Subansiri. 150 150 11. Soil Conservation Works on watershed basis at Tibayko Nallah, Hong-lll 27032’ 49.259” 93052’23.292” 100 100 12. Soil Conservation Works Microwatershed basis at Pokhe Nallah 27033’ 28.077” 93051’32.452” 120 120 13. Soil Conservation Works on Watershed basis at Tayako Nallah 27033’ 15.169” 93051’40.711”

ZIRO-ll BLOCK

Sl.N Name of Scheme / Projective Latitude Longitude Total Estimated o area cost (Ha)

1. Soil Conservation works for enhancing the productivity of Degraded lands at 27 0 36’ 54.614” 93040’ 33.134” 200 150 Deed Village, Lower Subansiri

2. Reduction of soil erosion and runoff rainwater at Peel Joram Village, Lower 27 0 31’10.446 ” 93049’3.468” 200 150 Subansiri.

3. Soil conservation and ground water restoration works on Watershed basis at 27 0 32’ 17.125” 93 046’ 2.041” 100 100 Hoi area Tallo village, Lower Subansiri.

305 | P a g e

4. Soil conservation works on microwatershed basis at Possa, Lower Subansiri 27020’24.604 ” 93048’0.454 ” 150 100

5. Soil and water conservation through Water Harvesting Structures and Dug out 27 0 23’ 49.948” 93045’ 10.848” 100 80 Ponds at Yachuli, Lower Subansiri

6. Watershed Development Project in Shifting Cultivation areas at Pistana , Lower 27 0 31’ 0.111” 93039’ 53.026” 240 160 Subansiri

7. Integrated Wasteland Development Programme(IWDP) at Sugsi area Tallo Village 27 0 32’ 7.822” , Lower 93045’ 32.64” 200 200 Subansiri

8. Composite Nursery at Seya, Lower Subansiri 27036’ 56.465” 93042’ 5.153” 10 25

9. Nallah Bank Erosion Control at Yachuli, Lower Subansiri 27023’ 49.948” 93045’ 10.848” 150 100

10. Composite Nursery at Laj-Pochu area, Lower Subansiri 27024’ 10.902” 93044’ 54.995” 15 30

11. Composite Nursery at Phu Joram, Lower Subansiri 27032’ 17.418” 93047’ 55.484” 15 30

12. Soil and Water Conservation works at Neelam, Lower Subansiri 27033’ 59.147” 93040’ 3.827” 150 75

13. Integrated Wasteland Development Programme(IWDP) at Jabli area, Tallo Village , Lower Subansiri 27031’ 5.712” 93045’ 2.647” 150 150

14. Soil and Water Conservation Works at Bentam Belo, Lower Subansiri 27033’ 0.172” 93046’ 1.941” 100 110

306 | P a g e

RAGA BLOCK

Sl.No. Name of Scheme / Projective Latitude Longitude Total Estimated area cost. (Ha)

1. Soil Conservation works for enhancing the productivity of Degraded lands at 27 0 44’ 17.44” 9400’ 0.279” 150 100 Boasimla , Lower Subansiri

2. Soil conservation works on Microwatershed basis along Kamle River and Math 27 0 44’ 39.63 1” 94 0 6’ 47.231” 200 150 river at Murtem old (Rite Village, Lower Subansiri

3. Soil and water conservation works through Water Harvesting Structures and Dug 27 0 44’ 39.631” 94 0 6’ 47.231” 100 80 out Ponds at Rite village, Lower Subansiri

4. Watershed Development Project in Shifting Cultivation areas at Raga , Lower 27 0 47’ 50.798” 9404’ 51.22” 230 150 Subansiri

5. Integrated Wasteland Development Programme (IWDP) at Tamen, Lower 27045’ 13.573” 9400’ 42.44” 95 50 Subansiri

6. Composite Nursery at Tamin, Lower Subansiri 27045’ 13.573” 9400’ 42.44” 15 25

7. Nallah Bank Erosion Control at Yattap, Lower Subansiri 27042’ 54.585” 93057’23.751” 150 100

8. Composite Nursery at Boasimla, Lower Subansiri 27044’ 17.44” 9400’ 0.279” 10 20

9 Soil and water conservation works on Watershed basis 27046’23.81 ” 93057’58.158” 220 110 at Kamporijo, Lower Subansiri

Total: 3400.00 Lakhs.

307 | P a g e

STRATEGIC ACTION PLAN FOR IRRIGATION IN DISTRICT LOWER SUBANSIRI UNDER PMKSY Concerned Period of Unit Sl Name of Ministry compon Rate Implemen Estimated cost Activity (No./Ha No. Block / ent (No./Ha) taion (In Lakhs) ) Department (Years)

PMKSY watersh ed 1.0 Ministry of Ziro - I Block (Soil and 0 Agriculture water conserva tion) A Water harvesting Structures

i Brush wood Check Dam 700.00 10,800.00 3.00 75,60,000.00 ii Nallah Bund 500.00 12,530.00 3.00 62,65,000.00 iii Boulder Check Dam 350.00 17,760.00 3.00 62,16,000.00 iv Gabion Check Dam 350.00 27,760.00 3.00 97,16,000.00 v Farm Pond 50.00 70,050.00 3.00 35,02,500.00

B Drainage Line Treatment

Brush wood Check Dam in upper 250.00 10,800.00 3.00 27,00,000.00 i Reaches(U/R) 300.00 17,760.00 3.00 53,28,000.00 ii Loose Boulder check Dam with vegetative

308 | P a g e

support in Middle Reaches(M/R) iii Gabion check Dam in Lower Reaches(L/R) 300.00 27,760.00 3.00 83,28,000.00

C Soil and Moisture Conservation

i Afforestation 300.00 56,850.00 3.00 170,55,000.00 ii Agroforestry 500.00 83,150.00 3.00 415,75,000.00 iii Horticultre Development 700.00 52,000.00 3.00 364,00,000.00 iv Composite Nursery Raising 350.00 40,000.00 3.00 140,00,000.00 v Mulching 350.00 18,000.00 3.00 63,00,000.00

D Soil Health Management

250.00 65,250.00 3.00 163,12,500.00 i Vermicomposting (Pucca Bean) ii Vermicomposting (low Cost) 350.00 45,000.00 3.00 157,50,000.00 iii In situ Green Manuring 200.00 21,000.00 3.00 42,00,000.00

E Ridge Area Treaatment i Contour/Bench Terracing 60.00 18,620.00 3.00 11,17,200.00

Sub-Total 2023,25,200.00

PMKSY watersh 2.0 Yachuli Ministry of ed 0 Block Agriculture (Soil and water A Water harvesting Structures

309 | P a g e

conserva tion)

i Brush wood Check Dam 750.00 10,800.00 3.00 81,00,000.00 ii Nallah Bund 500.00 12,530.00 3.00 62,65,000.00 iii Boulder Check Dam 700.00 17,760.00 3.00 124,32,000.00 iv Gabion Check Dam 300.00 27,760.00 3.00 83,28,000.00 v Farm Pond 70.00 1,80,000.00 3.00 126,00,000.00

B Drainage Line Treatment

Brush wood Check Dam in upper 750.00 10,800.00 3.00 81,00,000.00 i Reaches(U/R) 500.00 17,760.00 3.00 88,80,000.00 ii Loose Boulder check Dam with vegetative support in Middle Reaches(M/R) iii Gabion check Dam in Lower Reaches(L/R) 750.00 27,760.00 3.00 208,20,000.00

C Soil and Moisture Conservation

i Afforestation 500.00 56,850.00 3.00 284,25,000.00 ii Agroforestry 500.00 83,150.00 3.00 415,75,000.00 iii Horticultre Development 950.00 52,000.00 3.00 494,00,000.00 iv Composite Nursery Raising 150.00 40,000.00 3.00 60,00,000.00 v Mulching 350.00 18,000.00 3.00 63,00,000.00

D Soil Health Management

300.00 65,250.00 3.00 195,75,000.00

310 | P a g e

i Vermicomposting (Pucca Bean) 500.00 45,000.00 3.00 225,00,000.00 ii Vermicomposting (low Cost) iii In situ Green Manuring 300.00 21,000.00 3.00 63,00,000.00

E Ridge Area Treaatment i Contour/Bench Terracing 350.00 18,620.00 3.00 65,17,000.00

Sub-Total 2721,17,000.00

PMKSY watersh ed 3.0 Ministry of Raga Block (Soil and 0 Agriculture water conserva tion) A Water harvesting Structures

i Brush wood Check Dam 950.00 10,800.00 3.00 102,60,000.00 ii Nallah Bund 500.00 12,530.00 3.00 62,65,000.00 iii Boulder Check Dam 910.00 17,760.00 3.00 161,61,600.00 iv Gabion Check Dam 700.00 27,760.00 3.00 194,32,000.00 v Farm Pond 70.00 1,80,000.00 3.00 126,00,000.00

B Drainage Line Treatment

i 1,010.0 ii Brush wood Check Dam in upper 0 10,800.00 3.00 109,08,000.00 Reaches(U/R) 500.00 17,760.00 3.00 88,80,000.00 iii Loose Boulder check Dam with vegetative

311 | P a g e

support in Middle Reaches(M/R) Gabion check Dam in Lower Reaches(L/R) 750.00 27,760.00 3.00 208,20,000.00 C Soil and Moisture Conservation i Afforestation 500.00 56,850.00 3.00 284,25,000.00 ii AgroForestry 500.00 83,150.00 3.00 415,75,000.00 iii Horticultre Development 950.00 52,000.00 3.00 494,00,000.00 iv Composite Nursery Raising 350.00 40,000.00 3.00 140,00,000.00 v Mulching 350.00 18,000.00 3.00 63,00,000.00

D Soil Health Management

i Vermicomposting (Pucca Bean) 150.00 65,250.00 3.00 97,87,500.00 ii Vermicomposting (low Cost) 300.00 45,000.00 3.00 135,00,000.00 ii In situ Green Manuring 300.00 21,000.00 3.00 63,00,000.00

E Ridge Area Treaatment i Contour/Bench Terracing 250.00 18,620.00 3.00 46,55,000.00

Sub-Total 2792,69,100.00 Grand Total Rs 753711300

312 | P a g e

6. Forest Department

GOVT. OF ARUNACHAL PRADESH OFFICE OF THE DIVISIONAL FOREST OFFICER: HAPOLI FOREST DIVISION HAPOLI

PHYSICAL AND FINANCIAL PHASING OF PRADAN MANTRI KRISHI SINCHAYEE YOJANA(PMKSY) LOWER SUBANSIRI DISTRICT, ZIRO.

CD Block: Ziro –I

Sl. Name of CD Concerned Component Activities Total Unit. Total Physical target Department No. Block. Ministry/Deptt. qnty. estimate cost 2016-17 2017-18 2018-19 2019-20 2020-21 (in lakhs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14. 1. Jugo MOA & FW- Per drop more Canal and 1 Ha. 2.0 0.2 0.2 0.2 0.2 0.2 Forest DAC & FW crop. sprinkler irrigation. 2. Taring -do- Water shed -do- 5 Ha. 10.0 1 1 1 1 1 -do- 3. Manipolyang -do- Per drop more -do- 1 Ha. 2.0 0.2 0.2 0.2 0.2 0.2 -do- crop. 4. Dilopolyang -do- -do- -do- 2 Ha. 4.0 0.4 0.4 0.4 0.4 0.4 -do- 5. Hakhe Tari -do- -do- -do- 50 Ha. 100.0 10 10 10 10 10 -do-

Sd/- DIVISIONAL FOREST OFFICER HAPOLI FOREST DIVISION:ZIRO

Memo No.HFD/PMKSY/2016/1419 Dated Ziro, the 7th Sept/2016.

Submitted to :-

313 | P a g e

GOVT. OF ARUNACHAL PRADESH OFFICE OF THE DIVISIONAL FOREST OFFICER: HAPOLI FOREST DIVISION HAPOLI

PHYSICAL AND FINANCIAL PHASING OF PRADAN MANTRI KRISHI SINCHAYEE YOJANA(PMKSY) LOWER SUBANSIRI DISTRICT, ZIRO.

CD Block: Ziro –II

Sl. Name of CD Concerned Component Activities Total Unit Total Physical target Department No. Block. Ministry/Deptt. qnty. estimate cost 2016-17 2017-18 2018-19 2019-20 2020-21 (in lakhs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14. 1. Yachuli MOA & FW- Per drop more Canal and 2 Ha. 4.0 0.4 0.4 0.4 0.4 0.4 Forest DAC & FW crop. sprinkler irrigation. 2. -do- -do- Water shed -do- 1 Ha. 2.0 0.2 0.2 0.2 0.2 0.2 -do- 3. Yazali -do- Per drop more -do- 2 Ha. 4.0 0.4 0.4 0.4 0.4 0.4 -do- crop. 4. Pistana -do- -do- -do- 2 Ha. 4.0 0.4 0.4 0.4 0.4 0.4 -do- 5. -do- -do- -do- -do- 5 Ha. 4.0 1 1 1 1 1 -do-

314 | P a g e

GOVT. OF ARUNACHAL PRADESH OFFICE OF THE DIVISIONAL FOREST OFFICER: HAPOLI FOREST DIVISION HAPOLI

PHYSICAL AND FINANCIAL PHASING OF PRADAN MANTRI KRISHI SINCHAYEE YOJANA(PMKSY) LOWER SUBANSIRI DISTRICT, ZIRO.

CD Block: Raga

Sl. Name of CD Concerned Component Activities Total Unit Total Physical target Department No. Block. Ministry/Deptt. qnty. estimate cost 2016-17 2017-18 2018-19 2019-20 2020-21 (in lakhs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14. 1. Kicho MOA & FW- Per drop more Canal and 10 Ha. 20.0 2 2 2 2 2 Forest DAC & FW crop. sprinkler irrigation. 2. Raga /Nimar -do- Water shed -do- 5 Ha. 10.0 1 1 1 1 1 -do- 3. Raga -do- Per drop more -do- 2 Ha. 4.0 0.4 0.4 0.4 0.4 0.4 -do- crop. 4. Rotom -do- -do- -do- 50 Ha. 100.0 10 10 10 10 10 -do- 5. -do- -do- Water shed -do- 10 Ha. 20.0 2 2 2 2 2 -do- 6. Boa simla -do- Per drop more -do- 2 Ha. 4.0 0.4 0.4 0.4 0.4 0.4 -do- crop.

Sd/- DIVISIONAL FOREST OFFICER HAPOLI FOREST DIVISION:ZIRO

Memo No.HFD/PMKSY/2016/1421

315 | P a g e

List of Maps

Pistana Circle

Map 2: Land use map of Pistana circle

316 | P a g e

Yachuli circle

Map 3: Land use of Yachuli circle

317 | P a g e

Ziro Circle

Map 4: Land use map of Ziro circle

318 | P a g e

Dullungmukh Circle

Map 5: Land use map of Dullungmukh circle

319 | P a g e