Why Locals Must Protect Mabira Forest Ugandans Should Learn From

Total Page:16

File Type:pdf, Size:1020Kb

Why Locals Must Protect Mabira Forest Ugandans Should Learn From Why Locals Must Protect Mabira Forest Fr. Joachim Omolo Ouko, 16 August 2011 Ugandans should learn from Kenya where former President Daniel arap Moi is being criticised for having given out Mau Forest Complex in the Rift Valley Province. Mau is the largest indigenous montane forest in East Africa. Despite the fact that Kenyans resisted, Moi went ahead and gave it out. Now it is being reclaimed because the forest area has some of the highest rainfall rates in Kenya. Mau is the largest water catchment area in Kenya. Numerous rivers originate from the forest, including Ewaso Ng'iro River, Sondu Miriwu River, Mara River, and Njoro River. These rivers feed Lake Victoria, Lake Nakuru and Lake Natron, a salt lake located in northern Tanzania, close to the Kenyan border, in the eastern branch of Africa's Great Rift Valley. Like Moi, despite the resistance by Ugandans, President Museveni wants to give away part of Mabira Forest for sugarcane growing to Sugar Corporation of Uganda Limited (Scoul) in Lugazi, to increase sugar production. It is to be recalled that the first attempt by Scoul, which is owned by the Mehta Group, to have one-third of the forest for the same purpose in 2007, met stiff public resistance that led to demonstration that left three people dead. http://www.newvision.co.ug An aerial view of Uganda's Mabira Ugandans were resisting because like Mau Forest, Mabira is a rainforest area covering about 300 square kilometres. It has been protected as Mabira Forest Reserve since 1932. It is home to many endangered species like the primate. Although the forest has been protected and reserved since 1932, President Museveni has not given up the plan to transfer part of the forest to Scoul despite the fact that the plan was opposed by Ugandan citizens. Ugandans opposed to the giveaway argue that de-gazetting the forest to some individuals for development would lead to the loss of hundreds of endangered species, increased erosion, the damage of livelihoods of local people and negative impacts on water balance and regional climate. On the other hand, those for the plan argue that it would create jobs and contribute to the national treasury. According to the President, the Save Mabira activists "don't understand that the future of all countries lies in processing". In 2007, when the plan was first resisted by angry protesters, the environment minister announced that the plans were suspended and that the government was trying to find alternative land for the Metha Group. Mabira is one of the biggest natural forests in Uganda, acting as a water catchment area for Lake Victoria Basin, which is the largest fresh water lake in the world and the source of River Nile- one of the longest rivers in the whole world. People for Peace in Africa (PPA) Nairobi, Kenya www.peopleforpeaceafrica.org .
Recommended publications
  • The Unresolved Issues in the Bujagali Dam Project in Uganda
    THE UNRESOLVED ISSUES IN THE BUJAGALI DAM PROJECT IN UGANDA A LACK OF TRANSPARENCY AND PUBLIC PARTICIPATION 1 Strengthen democratic values, reduce poverty and injustice, JUNE 2007 promote international cooperation and advance human achievement A Publication of National This publication is funded by the Ford Association of Professional Foundation Environmentalists (NAPE) A map of Uganda showing Bujagali Dam site Source: Bujagali Energy Limited (BEL) BACKGROUND The once stalled Bujagali dam project is back for the second time on the Ugandan scene and is being fast-tracked. Many outstanding and new concerns plague the project. The project developer, Bujagali Energy Limited (BEL), is seeking financial support from the World Bank Group (WBG), African Development Bank (AfDB), European Invest- ment Bank (EIB) and others. As part of the dialogue and campaign process on the Bujagali project, Uganda’s Na- tional Association of Professional Environmentalists (NAPE), with financial support from the Ford Foundation carried-out out a public consultative process to establish whether there were still outstanding issues and concerns regarding the Bujagali proj- ect. The consultative process involved meetings with the dam-affected communities, the private sector, the academia, the dam developer (BEL), Government of Uganda, Nation- al Environment Management Authority (NEMA), the World Bank, civil society, cultural institutions and other stakeholders to obtain views and facts on the Bujagali Project. As part of the consultative process a “Peoples’ Public Hearing on the Bujagali Project” was 3 also held on the 31st March 2007 in Kampala. Source: NAPE File photo Peoples’ Public Hearing on Bujagali This publication records key issues that emerged during the consultation process, 1 Applied Energy Services Nile Power (AESNP) which remain unresolved.
    [Show full text]
  • Buikwe District Economic Profile
    BUIKWE DISTRICT LOCAL GOVERNMENT P.O.BOX 3, LUGAZI District LED Profile A. Map of Buikwe District Showing LLGs N 1 B. Background 1.1 Location and Size Buikwe District lies in the Central region of Uganda, sharing borders with the District of Jinja in the East, Kayunga along river Sezibwa in the North, Mukono in the West, and Buvuma in Lake Victoria. The District Headquarters is in BUIKWE Town, situated along Kampala - Jinja road (11kms off Lugazi). Buikwe Town serves as an Administrative and commercial centre. Other urban centers include Lugazi, Njeru and Nkokonjeru Town Councils. Buikwe District has a total area of about 1209 Square Kilometres of which land area is 1209 square km. 1.2 Historical Background Buikwe District is one of the 28 districts of Uganda that were created under the local Government Act 1 of 1997. By the act of parliament, the district was inniatially one of the Counties of Mukono district but later declared an independent district in July 2009. The current Buikwe district consists of One County which is divided into three constituencies namely Buikwe North, Buikwe South and Buikwe West. It conatins 8 sub counties and 4 Town councils. 1.3 Geographical Features Topography The northern part of the district is flat but the southern region consists of sloping land with great many undulations; 75% of the land is less than 60o in slope. Most of Buikwe District lies on a high plateau (1000-1300) above sea level with some areas along Sezibwa River below 760m above sea level, Southern Buikwe is a raised plateau (1220-2440m) drained by River Sezibwa and River Musamya.
    [Show full text]
  • E464 Volume I1;Wj9,GALIPROJECT 4 TOMANSMISSIONSYSTEM
    E464 Volume i1;Wj9,GALIPROJECT 4 TOMANSMISSIONSYSTEM Public Disclosure Authorized Preparedfor: UGANDA A3 NILE its POWER Richmond;UK Public Disclosure Authorized Fw~~~~I \ If~t;o ,.-, I~~~~~~~ jt .4 ,. 't' . .~ Public Disclosure Authorized Prepared by: t~ IN),I "%4fr - - tt ?/^ ^ ,s ENVIRONMENTAL 111teinlauloln.al IMPACT i-S(. Illf STATEME- , '. vi (aietlph,t:an,.daw,,, -\S_,,y '\ /., 'cf - , X £/XL March, 2001 - - ' Public Disclosure Authorized _, ,;' m.. .'ILE COPY I U Technical Resettlement Technical Resettlement Appendices and A e i ActionPlan ,Community ApenicsAcinPla Dlevelopment (A' Action Plan (RCDAP') The compilete Bujagali Project EIA consists of 7 documents Note: Thetransmission system documentation is,for the most part, the same as fhat submittedto ihe Ugandcn National EnvironmentalManagement Authority(NEMAI in December 2000. Detailsof the changes made to the documentation betwoon Dccomber 2000 and the presentsubmission aro avoiloblo from AESN P. Only the graphics that have been changed since December, 2000 hove new dates. FILE: DOChUME[NTC ,ART.CD I 3 fOOt'ypnIp, .asod 1!A/SJV L6'.'''''' '' '.' epurf Ut tUISWXS XillJupllD 2UI1SIXg Itb L6 ... NOJIDSaS1J I2EIof (INY SISAlVNV S2IAIlVNTIuaJ bV _ b6.sanl1A Puu O...tp.s.. ZA .6san1r^A pue SD)flSUIa1DJltJJ WemlrnIn S- (7)6. .. .--D)qqnd llH S bf 68 ..............................................................--- - -- io ---QAu ( laimpod u2Vl b,-£ 6L ...................................... -SWulaue lu;DwIa:43Spuel QSI-PUU'l Z btl' 6L .............................................----- * -* -SaULepunog QAfjP.4SlUTtUPad l SL. sUOItllpuo ltUiOUOZg-OioOS V£ ££.~~~~~~~~~~~~~~~~~A2~~~~~~~~~3V s z')J -4IOfJIrN 'Et (OAIOsOa.. Isoa0 joJxxNsU uAWom osILr) 2AX)SO> IsaIo4 TO•LWN ZU£N 9s ... suotll puoD [eOT20olla E SS '' ''''''''..........''...''................................. slotNluolqur wZ S5 ' '' '' '' ' '' '' '' - - - -- -........................- puiN Z'Z'£ j7i.. .U.13 1uu7EF ...................
    [Show full text]
  • Assessing the Bujagali Hydropower Project in Uganda
    Modern Approaches in Oceanography and Petrochemical Sciences DOI: 10.32474/MAOPS.2019.02.000141 ISSN: 2637-6652 Research Article Assessing the Bujagali Hydropower Project in Uganda George Kimbowa1 and Khaldoon A Mourad2* 1Busitema University, Uganda 2Center for Middle Eastern Studies, Lund, Sweden *Corresponding author: Khaldoon A Mourad, Center for Middle Eastern Studies, Lund, Sweden Received: January 21, 2019 Published: January 29, 2019 Abstract The development of great dams and hydropower plants increases power supply and access. However, the process is considered a threat to livelihoods, ecosystem and biodiversity because in most cases it brings about human displacement and natural resources degradation. This paper seeks to assess the development of the Bujagali Hydropower Plant in Uganda (BHP) and its compliance with IWRM principles based on water knowledges, societal values, and inter-disciplinary approach. The paper develops a set of strategic interventions for the dam and the BHP based on SWOT analysis, XLRM framework, Multi-sectoral and interdisciplinary development approach, and sustainable management. These measures are deemed socially and ecologically acceptable by all stakeholders including the cultural and historical institutions, societal actor groups, including mega-hydraulic bureaucracies, the private sectors and national politicians. The results show that project developers should always carry out Environment and Social Impact Assessments (ESIA); develop timely ‘Resettlement Action Plan’; carry out informed consultation and participation; promote transparency; and communicate project’s risks, potential impacts and probable mitigation actions to attain sustainability. The paper proposes some policy interventions to be implemented along the project’s lifetime. Furthermore, it presents a sustainable development plan for such projects based on the IWRM principles.
    [Show full text]
  • Bujagali Energy Limited Project Number
    BUJAGALI ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT SUMMARY Project Title: Bujagali Energy Limited Project Number: P-UG-FAB-008 Country: Uganda Department: Energy Financial Solutions, Policy & Regulation Division: Energy Financial Solutions Project Category: 1 1.0 Introduction Bujagali Energy Limited (BEL) is owned by SG Bujagali Holdings Ltd (an affiliate of Sithe Global Power LLC), Jubilee Insurance Company Ltd., as well as the Africa Power Platform PCC, which is owned by CDC (the UK’s Development Finance Institution), the Aga Khan Fund for Economic Development (AKFED) and IPS Kenya (“the Sponsors”). Operations and Maintenance Energy (Uganda) Limited (O&ME) operates the Hydropower project. The Bujagali Project is a 250MW hydropower facility — developed through a build-own-operate-transfer (BOOT) model — on the Victoria Nile River near the town of Jinja. It reached financial close in 2007, eight years after Government of Uganda (GoU) liberalized its electricity sector in 1999. When commissioned in 2012, it did not only displace expensive emergency power generation, but also contributed towards paving the way for a handful of other smaller scale IPPs that will provide more than 200 MW of small hydro, solar, and bagasse power to the network by around 2020. However, to drive the country’s industrialization program, the GoU is actively looking for ways to reduce the country’s electricity tariffs. In this context, and based on the projected tariff profile, the Bujagali tariff is set to increase from 11.3 US cents/kWh in 2016 to 13.3 US cents/kWh in 2018 and to 14.7 US cents by 2023 due to end of a tax ‘holiday’ (accelerated depreciation) and the debt amortization — before decreasing to 7 US cents/kWh from 2024.
    [Show full text]
  • Stakeholder Engagement Plan
    Kampala-Jinja Expressway PPP Project Phase 1 Environmental and Social Impact Assessment Volume D: Stakeholder Engagement Plan prepared for Uganda National Roads Authority (UNRA) by Earth Systems and Atacama Consulting EARTH SYSTEMS Environment · Water · Sustainability August 2018 Rev2 Kampala-Jinja Expressway PPP Project Phase 1 Volume D: Stakeholder Engagement Plan DOCUMENT INFORMATION Project Title Kampala-Jinja Expressway PPP Project Phase 1 Document Title Volume D: Stakeholder Engagement Plan Document Name KJEXP1775_Ph1_SEP_Rev2 Document Version Rev1 Version Date August 2018 File name KJEXP1775_Ph1_SEP_Rev2 Project Manager Project Director Prepared for Uganda National Roads Authority (UNRA) Project ID KJEXP1775 DOCUMENT REVISION HISTORY Revision Issue Date Status Approved by Revision 0 May 2017 Rev0 Nigel Murphy Revision 1 May 2018 Rev1 Nigel Murphy Revision 2 August 2018 Rev2 Nigel Murphy DISTRIBUTION RECORD Copy Number Company / Position Name 1 Uganda National Roads Authority (UNRA) 2 Earth Systems 3 Atacama Consulting © Earth Systems Earth Systems This report is not to be used for purposes other than that for which it was intended. ABN 42 120 062 544 Environmental conditions change with time. The site conditions described in this report are 14 Church St based on observations made during the site visit and on subsequent monitoring results. Earth Hawthorn, Victoria 3122 Systems does not imply that the site conditions described in this report are representative of Australia past or future conditions. Where this report is to be made available, either in part or in its Tel: +61 (0)3 9810 7500 entirety, to a third party, Earth Systems reserves the right to review the information and Fax: +61 (0)3 9853 5030 documentation contained in the report and revisit and update ndings, conclusions and Web: www.earthsystems.com.au recommendations.
    [Show full text]
  • Kalagala Offset Sustainable Managedlent Plan (20To-20T9)
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Kalagala Offset Sustainable ManageDlent Plan (20tO-20t9) Popular Version Ministry of Water and Environment P.O Box 20026 Kampala, Uganda Kalagala Offset Sustainable Management Plan(2010-2019) 1 PREAMBLE This is a Popular Version of the Kalagala Offset Sustainable Management Plan (SMP) that was developed under the auspices of. Kalagala Offset Indemnity Agreement between Government of Uganda and IDA! World bank (2007). The SMP Plan comprises of the main plan document and six Appendices addressing sectoral plans on Ecotourism Development, Forestry and District Development. The SectoraL pLans have been described as separate component PLans in order to grant them the autonomy for their approvaL and impLementation by the respective mandated institutions. The SMP provides an over­ all development planning framework for addressing ObLigations of Kalagala Offset whilst promoting sustainable development in the Mabira ecosystem. Government of Uganda (GoU) entered the Indemnity Agreement with IDA/World Bank in JuLy 2007 whereby IDA committed to be a Guarantor to Uganda under the "IDA Guarantee Facility Agreement' between Bujagali Energy Limited and finanCing institutions ("IDA Guarantee lenders") and ABSA Bank Limited as the Agent for the IDA Guarantee Lenders amounting to US$ 115,000,000 to support a portion of the financing of the Bujagali project. The Indemnity Agreement is an integral component of the approved Bujagali Hydro Power Project by the IDA/World Bank. The Indemnity Agreement provides for preparation and impLementation of a SustainabLe Management Plan (SMP) for the Kalagala Offset, which includes the Mabira CentraL Forest Reserve. The Indemnity Agreement committed Uganda Government to: a) Set aside the KaLagala Falls site exclusively to protect its naturaL habitat and environmental and spiritual values in conformity with sound social and environmental standards.
    [Show full text]
  • Forest-Based Associations As Drivers for Sustainable Development in Uganda
    Discussion paper Forest-based associations as drivers for sustainable development in Uganda Cornelius Kazoora, James Acworth, Charles Tondo and Bob Kazungu 2006 Sustainable Development Centre, Uganda Contacts: Cornelius Kazoora Sustainable Development Centre Makerere University Campus Senate building, Level 1, Office 3 P.O. Box 5463, Kampala-Uganda Tel: +39 726253 Email: [email protected] Duncan Macqueen Forestry and Land Use Programme International Institute for Environment and Development (IIED) 4 Hanover Street, Edinburgh, Scotland EH2 2EN, UK Tel: +44 131 226 6860, Fax: +44 131 624 7050 Email: [email protected] Website: www.iied.org Citation: Kazoora, C., Acworth, J., Tondo, C., and Kazungu, B. (2006). Forest-based associations as drivers for sustainable development in Uganda. IIED Small and Medium Forest Enterprise Series No. 15. International Institute for Environment and Development, Edinburgh, UK. ISBN: 1 84369 609 6 Copyright © International Institute for Environment and Development, 2006 Small and medium forestry enterprises for poverty reduction and sustainability Most international attention in forestry has been given to improving the conditions for large-scale or micro-scale forestry, and much less to the 'messy middle' – which produces a high proportion of forest products and involves huge numbers of people. Ways need to be found by which small and medium-scale forestry enterprises (SMFEs) can better contribute to reducing poverty and improving the prospects for sustainability. IIED, with partners in Uganda, South Africa, India, Brazil, Guyana and China have been investigating these issues. Country diagnostics show that the SMFE sector is of major significance for livelihoods in these countries – the net effect of myriad small players represents a substantial part of local economies.
    [Show full text]
  • Local Government Councils' Perfomance and Public
    LOCAL GOVERNMENT COUNCILS’ PERFOMANCE AND PUBLIC SERVICE DELIVERY IN UGANDA MUKONO DISTRICT COUNCIL SCORE-CARD REPORT 2009/2010 LOCAL GOVERNMENT COUNCILS’ PERFOMANCE AND PUBLIC SERVICE DELIVERY IN UGANDA MUKONO DISTRICT COUNCIL SCORE-CARD REPORT 2009/2010 Lillian Muyomba-Tamale Godber W. Tumushabe Ivan Amanigaruhanga Viola Bwanika-Semyalo Emma Jones 1 ACODE Policy Research Series No. 45, 2011 LOCAL GOVERNMENT COUNCILS’ PERFOMANCE AND PUBLIC SERVICE DELIVERY IN UGANDA MUKONO DISTRICT COUNCIL SCORE-CARD REPORT 2009/2010 2 LOCAL GOVERNMENT COUNCILS’ PERFOMANCE AND PUBLIC SERVICE DELIVERY IN UGANDA MUKONO DISTRICT COUNCIL SCORE-CARD REPORT 2009/2010 LOCAL GOVERNMENT COUNCILS’ PERFORMANCE AND PUBLIC SERVICE DELIVERY IN UGANDA MUKONO DISTRICT COUNCIL SCORE-CARD REPORT 2009/10 Lillian Muyomba-Tamale Godber W. Tumushabe Ivan Amanigaruhanga Viola Bwanika-Semyalo Emma Jones i LOCAL GOVERNMENT COUNCILS’ PERFOMANCE AND PUBLIC SERVICE DELIVERY IN UGANDA MUKONO DISTRICT COUNCIL SCORE-CARD REPORT 2009/2010 Published by ACODE P. O. Box 29836, Kampala Email: [email protected], [email protected] Website: http://www.acode-u.org Citation: Muyomba-Tamale, L., (2011). Local Government Councils’ Performance and public Service Delivery in Uganda: Mukono District Council Score-Card Report 2009/10. ACODE Policy Research Series, No. 45, 2011. Kampala. © ACODE 2011 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means electronic, mechanical, photocopying, recording or otherwise without the prior written permission of the publisher. ACODE policy work is supported by generous donations and grants from bilateral donors and charitable foundations. The reproduction or use of this publication for academic or charitable purpose or for purposes of informing public policy is excluded from this general exemption.
    [Show full text]
  • A Critical Analysis of the Protetion and Conservation of Forests in Uganda
    A CRITICAL ANALYSIS OF THE PROTETION AND CONSERVATION OF FORESTS IN UGANDA. A CASE STUDY OF MABIRA FOREST MUKONO DISTRICT. ASIIMWE RICHARD LLB/31722/102/DU A DISSERTATION SUBMITTED TO THE SCHOOL OF LAW IN PARTIAL FULFILMENT OF THE REQUIREMENT FOR THE AWARD OF THE DEGREE OF BACHELOR OF LAWS OF KAMPALA INTERNATIONAL UNIVERSITY JUNE 2014 DECLARATION I ASIIMWE RICHARD declare that this work is original work of my hands and had never been handed over to any other institution for any purpose. Signed A-, ... ...... .. .~ ... ........ .. ....... .................. ... ..... 2 DEDICATION I dedicate this research to my father Bwengye Micheal , mum katushabe Jolly,my uncle Mwesigwa Dan , my brothers Kusiima Edwin and Kwesiga Hillary ,my sisters Atwikiriza Faith and Agumenitwe Macbeth for their encouragement through my academic journey and making me who I am today, thank you and may God bless you abundantly. APPROVAL This dissertation has been submitted for examination to the school of law with my approval as the student supervisor. Supervisor: Prof. Magnus.N. Chima Dale ...............b ...... .. ... ....... l ~ ~ (9 ~~ I~ Signature:...... v ( ii ACKNOWLDGEMENT I do greatly acknowledge God's blessing for enabling me reach this far without Him I couldn't have reached here. Also great appreciation goes to my supervisor prof.Magnus.N. Chima for his due diligence and ensuring that my work meets the required standards. To my best friend kagombe Dan with whom we have been together in this academic journey, walugembe Paul, Namulinde peace, Mazimwe Lillian and Hanifa for her great effort to make sure that the work is typed and printed in time. iii TABLE OF CONTENT DECLARATION ...............................................................................................................................
    [Show full text]
  • Brief on Mabira
    Facts on Mabira Mabira forest is one of the 65 Forest Reserves covering an area of 29,974 ha legal 518ha of which are fall under Strict Nature Reserve. Strict nature reserves are areas which are maintained in their natural state without any form of exploitation to act as benchmarks against the activities and operations of silviculture and management (Dawkins, 1958). Importance • Many compartments of Mabira forest reserve are important for recreational purposes; a total area of the recreation zone is 5079 ha, equivalent to 16.2% of the whole reserve. Ecotourism is among the best non-consumptive uses of the Tropical High Forest (THF) provided of course that it is carefully planned and regulated according to the available forest resources and the number of users. • Mabira is ecologically important, it provides a habitat for many species of plants and animals including 312 trees and shrub species, 287 species of birds, 16 small mammals and 199 species of butterflies and 97 species of large months. Mabira has wild robusta coffee, dioscoria tubers, yams and other plants whose economic importance is unknown, which would then be lost. • Mabira forest is still an important area for conservation. It is the only large forest in the bio- geographical zone of the Lake Victoria Crescent thus providing the only watershed for this already water stressed area. The watershed feeds the streams that flow into L. Victoria and R Ssezibwa and also provide sources of water for the neighbouring communities. Cutting down of Mabira will escalate the water stress that already exists. • The Alam group of companies together with its international partners have invested over $1m dollars in a hoel facility that is due to be opened in April to tap into this potential.
    [Show full text]
  • Chapter 10 Natural and Social Environmental Studies
    CHAPTER 10 NATURAL AND SOCIAL ENVIRONMENTAL STUDIES The Feasibility Study on the Construction of JICA / MOWT / UNRA A New Bridge across River Nile at Jinja Oriental Consultants Co., Ltd. Final Report Eight - Japan Engineering Consultants INC. 10. NATURAL AND SOCIAL ENVIRONMENTAL STUDIES 10.1 Natural Environmental Study 10.1.1 General This Chapter summarizes the initial environmental examination (IEE) for the engineering options (i.e., three route alternatives, named Routes A, B and C, respectively), regarding the study on natural environment, and potential environmental issues associated with the implementation of each alternative option. Firstly, the current baseline of the environmental condition surrounding the study site is described. The study area is located between Lake Victoria and the on-going construction site in Bujagali Dam, so that the current local environmental topics, linking both sites, were also studied. Technical site inspections were carried out in November and December 2008 and February and March 2009. Based on the major findings obtained from the technical site inspections and the review of available reports, the baseline environmental information, regarding the natural environment surrounding the study area, was collected. Based on the baseline environmental information and the engineering features of each alternatives, prepared by the study, the IEE was carried out. Basically, the IEE was carried out in two steps. In the first step, a preliminary IEE for two scenarios was carried out: (i) Do - Nothing scenario, and (ii) Do – Project scenario for all prepared route alternatives (i.e., Routes A, B and C); for which preliminary scenarios analysis was conducted. In the second step, a more detailed, route-specific IEE was carried out using more specific engineering information prepared in March 2009, and possible adverse environmental impacts that may occur during and/after the construction of works for each alternative alignment option was summarized.
    [Show full text]