CURRICULUM VITAE (Abridged)

Total Page:16

File Type:pdf, Size:1020Kb

CURRICULUM VITAE (Abridged) CURRICULUM VITAE (abridged) NAME : Mohammad Rafee bin Majid YEAR OF BIRTH : 1963 NATIONALITY : Malaysian MARITAL STATUS : Married CORRESPONDING : Faculty of Built Environment & Surveying ADDRESS Universiti Teknologi Malaysia 81310 UTM Johor Bahru Johor Darul Ta’zim Tel : +607-5537358 Fax : +607-5566155 H/P : +6012-7211501 E-mail: [email protected] ACADEMIC QUALIFICATIONS Year 2005 : PhD (City and Regional Planning) University of North Carolina-Chapel Hill North Carolina, USA Year 1992 : MSc. (Environmental Engineering) University of Oklahoma Oklahoma, USA Year 1985 : BSc. (Civil Engineering) University of Utah Utah, USA AREAS OF : Environmental Planning SPECIALISATION Water Resources Planning Watershed Planning GIS (Spatial Statistics, Environmental & Social Applications) Curriculum Vitae (abridged) M. Rafee Majid PROFESSIONAL EXPERIENCE Date : Position/Employer March 2018 – Present i) Professor of Environmental Planning Faculty of Built Environment & Surveying Universiti Teknologi Malaysia November 2010 – Feb 2018 ii) Associate Professor in Environmental Planning Department of Urban and Regional Planning Universiti Teknologi Malaysia May 2007 – November 2010 iii) Senior Lecturer Department of Urban and Regional Planning Universiti Teknologi Malaysia August 1992 – May 2007 iv) Lecturer Department of Urban and Regional Planning Universiti Teknologi Malaysia August 2002 – November 2005 v) Research Assistant Department of Geography University of North Carolina – Chapel Hill, USA July 1995 – June 1996 vi) Design Engineer (Civil) Ranhill Bersekutu Sdn Bhd Kuala Lumpur June 1991 – July 1992 vii) Teaching Assistant Department of Civil Engineering University of Oklahoma, Oklahoma, USA January 1987 – August 1992 viii) Assistant Lecturer ‘A’ Department of Urban and Regional Planning Universiti Teknologi Malaysia September 1986 – Dec 1986 ix) Construction Engineer Dept. of Irrigation and Drainage Kota Sarang Semut, Kedah PROFESSIONAL MEMBERSHIP AND RECOGNITION Date : Positions/Designation/Appointment April 2010 - Present American Planning Association (APA) (ID:241470) 6 August 2007 – 6 August Registered EIA Consultant (Subject Specialist) with 2012 Department of Environment (Reg. No:CS0327) 1987 - Present Registered Graduate Engineer with Board of Engineers Malaysia (Reg. No.: 21533A) 08/10/2019 Page 2 Curriculum Vitae (abridged) M. Rafee Majid TEACHING EXPERIENCE Summary Total Teaching Years: 30 years; Total Courses Taught: 10+ nos. UNDERGRADUATE COURSES TAUGHT Course Watershed Planning, Spatial Statistics For Social Science, Green Neighbourhoods, Feasibility Study Studio, Environmental Studies, GIS in Planning, Layout Design Studio, Urban Engineering, Spatial Analysis & Modelling, Quantitative Techniques POSTGRADUATE COURSES TAUGHT Course Research Methodology, Land Use And Environmental Planning, Spatial Analysis & Modelling, Planning Theory And Principles, Environmental Impact Assessment, Resource Economics, Environmental Resource Planning, Application and Implementation of GIS, Spatial Analysis & Modelling CONSULTANCY EXPERIENCE (Selected) Summary Number of Projects: 33 (2 – International, 31 – National); Total values: RM11.37mil. (from 21 projects bearing Vot Nos.); Clients: IUCN (International Union for Conservation of Nature), Pemerintah Provinsi Kepulauan Riau (KEPRI) Indonesia, Ministry of Tourism and Culture Malaysia (MOTAC), DBKL, Tourism Malaysia, UPEN Negeri Johor, UPEN Negeri Terengganu, Jabatan Perancangan Bandar dan Desa Semenanjung Malaysia (JPBD), Jabatan Pengairan dan Saliran Malaysia (JPS), JPBD Negeri Johor, Jabatan Landskap Negara, Eastern Corridor Economic Region (ECER), Lembaga Pembangunan Langkawi (LADA), Lembaga Kemajuan Terengganu Tengah (KETENGAH), NAHRIM, Local Authorities and private companies. INTERNATIONAL Project Title Outcome i) Natural Resource Governance Framework (NRGF) Document on Natural Resource Asia: Scoping Work. Governance Framework (NRGF) Date: Nov 2016 – Dec 2016 for Asia to be implemented by Client: IUCN (International Union for Conservation IUCN. of Nature) ii) Tourism Master Plan for the Islands of Anambas in A Marine Tourism Master Plan for Riau Islands Province, Indonesia. Pemerintah Kepulauan Riau Date: Jun 2012-Jan 2013 (KEPRI) to implement their Client: Pemerintah Provinsi Kepulauan Riau tourism strategies and programmes. NATIONAL Project Title Outcome iii) National Tourism Policy Study National Tourism Policy 2020- Date: Aug 2017 – Apr 2018 2050 Client: Ministry of Tourism Malaysia Kuala Lumpur Pedestrian and iv) Kuala Lumpur Pedestrian and Bicycle Master Plan Bcycle Master Plan 2020-2030 Date: Mac 2017 – Dec 2022 Client: DBKL 08/10/2019 Page 3 Curriculum Vitae (abridged) M. Rafee Majid v) Kajian Pelan Induk Pembangunan Pelancongan Pelan Induk Pelancongan yg Bandar Baru Gawi, Tasik Kenyir, Hulu Terengganu, menjadi polisi KETENGAH Terengganu Date: Jan 2015 – Apr 2016 Client: KETENGAH vi) Study on the Performance and Improvement of Development strategies and Registered Homestays in Malaysia programmes to be Date: Jan 2015 – Apr 2016 implemented by Ministry of Client: Ministry of Tourism Malaysia Tourism and Culture (MOTAC) untill 2030. vii) National Ecotourism Plan National policies on ecotourism Date: Mac 2015 – Dec 2015 development to be adopted by Client: Ministry of Tourism, Malaysia MOTAC until 2025 and beyond. viii) Kajian Keupayaan Tampungan (Carrying Polisi dan garispanduan Capacity) Pembangunan Pelancongan di pembangunan pelancongan Langkawi yang akan dilaksanakan oleh Date: Sept 2014 – June 2015 LADA untuk kelestarian Client: Langkawi Development Authority (LADA) pelancongan di Langkawi. ix) Study on the Repositioning of Pulau Perhentian as Policy directions for tourism a Premier Ecotourism Destination. development on Pulau Date: July 2014 – Dec 2014 Perhentian for high yields with Client: Tourism Malaysia ecosystems intact. x) Developing an Endorsement Guideline for Tourism Guidelines & training packages Products in Langkawi for government-sanctioned Date: July 2012 – Mar 2013 endorsements of tourism Client: Ministry of Tourism, Malaysia products to ensure high quality. xi) Strategic Review of the Malaysian Tourism Industry Policies on direction of tourism Policy And Implementation industry in Malaysia Date: Apr 2012 – Mar 2013 Client: Ministry of Tourism, Malaysia xii) Pelan Induk Pelancongan Negeri Johor, 2012- Polisi dan program-program 2021 pelancongan Negeri Johor Date: Oct 2011 – Apr 2012 sehingga 2021. Client: Unit Perancangan Ekonomi Negeri (UPEN), Johor xiii) Kajian Pelan Pengurusan dan Pelaksanaan Pelan pengurusan dan Pembangunan Pelancongan di Gugusan pelaksanaan program Kepulauan Mersing pelancongan di pulau-pulau Date: Jan 2011 – Jun 2011 luar Mersing, Johor. Client: Radiant Starfish Development Sdn Bhd xiv) Kajian Pembangunan Pelancongan Komuniti Polisi dan program-program Kepulauan Mersing, Johor untuk menjayakan Date: Mar 2010 – Aug 2010 pelancongan komuniti di Pulau- Client: Jabatan Perancangan Bandar Dan Desa pulau Sibu, Tinggi, Pemanggil (JPBD) Negeri Johor dan Aur di Mersing. xv) Penempatan Gugusan Pulau Di Pesisiran Pantai Garispanduan petempatan Negeri Johor komuniti di Pulau-pulau Sibu, 08/10/2019 Page 4 Curriculum Vitae (abridged) M. Rafee Majid Date: Jun - Dec 2009 Tinggi, Pemanggil dan Aur di Client: Jabatan Perancangan Bandar Dan Desa Mersing. (JPBD) Negeri Johor xvi) Kajian Cadangan Mewujudkan Zon Bebas Cukai Pelan Induk pembangungan di Tasik Kenyir zon bebas cukai di Tasik Kenyir. Date: Jan 2010 – Jun 2010 Client: KETENGAH & UPEN, Terengganu xvii) Landscape Master Plan for Majlis Daerah Segamat Landscape Master Plan to be Date: Nov 2010 – Mac 2012 implemented by Majlis Client: Jab. Landskap Negara Daerah Segamat. xviii) Monitoring System of Land Use Planning in The GIS sytem for monitoring of land State of Selangor. use applications and Date: Completed Dec 2011 developments in the State of Client: JPBD Selangor Selangor. xix) Desk Study on River Buffer Zone in Malaysia: Policies and recommendations Policies, By Laws and Incentives. on creation and protection of Date: Completed Feb 2010 river buffer zones in Client: Nat. Hydraulics Inst. of Malaysia (NAHRIM) Semenanjung Malaysia. xx) Jerantut District Local Plan for Majlis Daerah Local Plan for planning and Jerantut, Pahang control of developmnents in Date:Completed Apr 2010 Majlis Daerah Jerantut’s (In association with MN Consult). administrative area. Client: JPBD Semenanjung Malaysia xxi) Optimization of Rainfall Observation Network on Optimisation plan for networks Model Calibration and Application for the Johor, of rainfall gauges. Batu Pahat and Muar River Basins. Date: Completed Nov 2009 Client: JPS Malaysia xxii) Study on Auditing and Improvement of Tourism Inventory and suggestions for Products and Package Tours in Pulau Pinang improvement of tourism Date: Completed Nov 2008 products and packages for Client: Ministry of Tourism, Malaysia Pulau Pinang. xxiii) Kajian Pelan Pembangunan Mengikut Zon Di Polisi dan program Sepanjang Laluan Jalan Simpang Pulai – Gua pembangunan mengikut zon di Musang – Kuala Berang, Tasik Kenyir, Negeri Tasik Kenyir. Terengganu Darul Iman (2007 – 2027) Date: Completed Aug 2008 Client: KETENGAH & UPEN, Terengganu xxiv) A Study on the Incorporation of Geohazard Policies and guidelines on Guidelines in Development Plan Manuals. geohazards for incorporation Date: Completed July 2007 into in planning manuals. Client: JPBD Semenanjung Malaysia 08/10/2019 Page 5 Curriculum Vitae (abridged) M. Rafee Majid RESEARCH EXPERIENCE Summary International External Grants: 2
Recommended publications
  • The Provider-Based Evaluation (Probe) 2014 Preliminary Report
    The Provider-Based Evaluation (ProBE) 2014 Preliminary Report I. Background of ProBE 2014 The Provider-Based Evaluation (ProBE), continuation of the formerly known Malaysia Government Portals and Websites Assessment (MGPWA), has been concluded for the assessment year of 2014. As mandated by the Government of Malaysia via the Flagship Coordination Committee (FCC) Meeting chaired by the Secretary General of Malaysia, MDeC hereby announces the result of ProBE 2014. Effective Date and Implementation The assessment year for ProBE 2014 has commenced on the 1 st of July 2014 following the announcement of the criteria and its methodology to all agencies. A total of 1086 Government websites from twenty four Ministries and thirteen states were identified for assessment. Methodology In line with the continuous and heightened effort from the Government to enhance delivery of services to the citizens, significant advancements were introduced to the criteria and methodology of assessment for ProBE 2014 exercise. The year 2014 spearheaded the introduction and implementation of self-assessment methodology where all agencies were required to assess their own websites based on the prescribed ProBE criteria. The key features of the methodology are as follows: ● Agencies are required to conduct assessment of their respective websites throughout the year; ● Parents agencies played a vital role in monitoring as well as approving their agencies to be able to conduct the self-assessment; ● During the self-assessment process, each agency is required to record
    [Show full text]
  • Malaysia Industrial Park Directory.Pdf
    MALAYSIA INDUSTRIAL PARK DIRECTORY CONTENT 01 FOREWORD 01 › Minister of International Trade & Industry (MITI) › Chief Executive Officer of Malaysian Investment Development Authority (MIDA) › President, Federation of Malaysian Manufacturers (FMM) › Chairman, FMM Infrastructure & Industrial Park Management Committee 02 ABOUT MIDA 05 03 ABOUT FMM 11 04 ADVERTISEMENT 15 05 MAP OF MALAYSIA 39 06 LISTING OF INDUSTRIAL PARKS › NORTHERN REGION Kedah & Perlis 41 Penang 45 Perak 51 › CENTRAL REGION Selangor 56 Negeri Sembilan 63 › SOUTHERN REGION Melaka 69 Johor 73 › EAST COAST REGION Kelantan 82 Terengganu 86 Pahang 92 › EAST MALAYSIA Sarawak 97 Sabah 101 PUBLISHED BY PRINTED BY Federation of Malaysian Manufacturers (7907-X) Legasi Press Sdn Bhd Wisma FMM, No 3, Persiaran Dagang, No 17A, (First Floor), Jalan Helang Sawah, PJU 9 Bandar Sri Damansara, 52200 Kuala Lumpur Taman Kepong Baru, Kepong, 52100 Kuala Lumpur T 03-62867200 F 03-62741266/7288 No part of this publication may be reproduced in any form E [email protected] without prior permission from Federation of Malaysian Manufacturers. All rights reserved. All information and data www.fmm.org.my provided in this book are accurate as at time of printing MALAYSIA INDUSTRIAL PARK DIRECTORY FOREWORD MINISTER OF INTERNATIONAL TRADE & INDUSTRY (MITI) One of the key ingredients needed is the availability of well-planned and well-managed industrial parks with Congratulations to the Malaysian Investment eco-friendly features. Thus, it is of paramount importance Development Authority (MIDA) and the for park developers and relevant authorities to work Federation of Malaysian Manufacturers together in developing the next generation of industrial (FMM) for the successful organisation of areas to cater for the whole value chain of the respective the Industrial Park Forum nationwide last industry, from upstream to downstream.
    [Show full text]
  • Act 171 LOCAL GOVERNMENT ACT 1976
    Local Government 1 LAWS OF MALAYSIA REPRINT Act 171 LOCAL GOVERNMENT ACT 1976 Incorporating all amendments up to 1 January 2006 PUBLISHED BY THE COMMISSIONER OF LAW REVISION, MALAYSIA UNDER THE AUTHORITY OF THE REVISION OF LAWS ACT 1968 IN COLLABORATION WITH MALAYAN LAW JOURNAL SDN BHD AND PERCETAKAN NASIONAL MALAYSIA BHD 2006 2 Laws of Malaysia ACT 171 LOCAL GOVERNMENT ACT 1976 Date of Royal Assent ... ... ... … 18 March 1976 Date of publication in the Gazette ... … 25 March 1976 PREVIOUS REPRINTS First Reprint ... ... ... ... ... 1998 Second Reprint ... ... ... ... ... 2001 Local Government 3 LAWS OF MALAYSIA Act 171 LOCAL GOVERNMENT ACT 1976 ARRANGEMENT OF SECTIONS PART I PRELIMINARY Section 1. Short title, application and commencement 2. Interpretation PART II ADMINISTRATION OF LOCAL AUTHORITIES 3. Declaration and determination of status of local authority areas 4. Change of name and status, and alteration of boundaries 5. Merger of two or more local authorities 6. Succession of rights, liabilities and obligations 7. Extension of this Act to non-local authority areas 8. Administration of local authority areas 9. Power of State Authority to issue directions 10. Councillors 11. Declaration by Councillor before assuming office 12. Councillors exempt from service as assessors or jurors 13. Local authorities to be corporations 14. Common seal 15. Provisions relating to local government elections ceasing to have effect 4 Laws of Malaysia ACT 171 PART III OFFICERS AND EMPLOYEES OF LOCAL AUTHORITIES Section 16. List of offices 17. Power of local authority to provide for discipline, etc., of its officers 18. Superannuation or Provident Fund PART IV CONDUCT OF BUSINESS 19.
    [Show full text]
  • Molecular Characterisation of the Tick Rhipicephalus Microplus in Malaysia
    Low et al. Parasites & Vectors (2015) 8:341 DOI 10.1186/s13071-015-0956-5 RESEARCH Open Access Molecular characterisation of the tick Rhipicephalus microplus in Malaysia: new insights into the cryptic diversity and distinct genetic assemblages throughout the world Van Lun Low1*, Sun Tee Tay2, Kai Ling Kho2, Fui Xian Koh2, Tiong Kai Tan3, Yvonne Ai Lian Lim3, Bee Lee Ong4, Chandrawathani Panchadcharam5, Yusoff Norma-Rashid1 and Mohd Sofian-Azirun1 Abstract Background: The morphotaxonomy of Rhipicephalus microplus complex has been challenged in the last few years and prompted many biologists to adopt a DNA-based method for distinguishing the members of this group. In the present study, we used a mitochondrial DNA analysis to characterise the genetic assemblages, population structure and dispersal pattern of R. microplus from Southeast Asia, the region where the species originated. Methods: A phylogeographic analysis inferred from the 16S rRNA and cytochrome oxidase subunit I (COI) genes was performed with five populations of R. microplus collected from cattle in Malaysia. Malaysian R. microplus sequences were compared with existing COI and 16S rRNA haplotypes reported globally in NCBI GenBank. Results: A total of seven and 12 unique haplotypes were recovered by the 16S rRNA and COI genes, respectively. The concatenated sequences of both 16S rRNA and COI revealed 18 haplotypes. Haplotype network and phylogenetic analyses based on COI+16S rRNA sequences revealed four genetically divergent groups among Malaysian R. microplus. The significantly low genetic differentiation and high gene flow among Malaysian R. microplus populations supports the occurrence of genetic admixture. In a broader context, the 16S rRNA phylogenetic tree assigned all isolates of Malaysian R.
    [Show full text]
  • Your Business Our Priority
    ANNUAL REPORT 2014 YOUR BUSINESS OUR PRIORITY www.pemudah.gov.my ANNUAL REPORT 2014 BREAKTHROUGH IDEAS THROUGH PUBLIC-PRIVATE SECTOR COLLABORATION ISSN 2289-7275 Published by PEMUDAH in collaboration with Malaysia Productivity Corporation (MPC) CONTENTS 04 Message from the Honourable CHAPTER 1 Prime Minister ENHANCING BUSINESS GROWTH 06 Foreword from the PEMUDAH 18 Snapshot of Initiatives Chairman 28 Completed Efficiency Improvements 08 Foreword from the PEMUDAH Co-Chair u Trading Across Borders 10 Vision and Values u Enforcing Contracts 11 About PEMUDAH u Dealing with Construction Permits 12 Members of PEMUDAH u Kuala Lumpur City Hall (DBKL) 14 Structure of PEMUDAH u Abandoned Housing 15 Collaboration Driven by Equality u Implementation of e-Payment Facilities u Safety and Security u Private Sector Efficiency and Accountability Towards Consumerism u Business Process Re-Engineering in Business Licensing u Halal Certification Management Focus Group u Public Relations 40 Completed Policy Improvements CHAPTER 2 u Paying Taxes PROPELLING THE CHANGE u Abandoned Housing Projects 52 Good Regulatory Practice (GRP) u Implementation of e-Payment 52 PEMUDAH at State Level Facilities 53 PEMUDAH Challenge 42 On-Going Efficiency Initiatives u Trading Across Borders 56 PEMUDAH Portal u Enforcing Contracts 58 Engagement with International Experts u Getting Credit u Safety and Security 59 Outreach Programmes u Getting Electricity 59 International Competitiveness u Business Process Re-Engineering in 67 The Way Forward Business Licensing u Registering Property
    [Show full text]
  • Tourism Management at Taman Negara (National Park), Pahang, Malaysia: Conflict and Synergy
    Tourism Management at Taman Negara (National Park), Pahang, Malaysia: Conflict and Synergy Yahaya Ibrahim* Mohd Sayuti Hassan** Abstract Many developing countries successfully use the attractions of nature to promote tourism in protected and unprotected areas. The attainment of sustainable tourism requires careful management of tourists to prevent deleterious effects on the environment, the host community and tourist satisfaction. The emphasis on conflict management and sustainable development is based on the diligent usage of available resources, especially in the context of planning, commitment and the involvement of management as well as the interested parties. The focus of the study is on‘ Taman Negara’ or National Park in Pahang, Malaysia which is a protected area of international importance as reflected in its listing as an Association of South East Asian (ASEAN) Heritage Site (DWNP, 1987). The main goal is to develop synergy and conflict management among the local government, communities and private sector strategy in order to realize the sustainable high quality nature based tourism that is promised by Taman Negara. To achieve this goal, the following objectives will be looked into. First, the characteristics of synergy and conflict among the departments related to Taman Negara; second, to examine the development by private sector and motivations of visitors to Taman Negara; third, to explore the issues that impact the local communities and tourists; and fourth, to ensure the preservation of nature and to promote the concept of sustainable use of resources at Taman Negara to ensure its sustainability both for the present and the future. This paper examines the management role of various departments over this national park.
    [Show full text]
  • Table of Contents
    ASIA International Multidisciplinary Conference (AIMC 2017) 1-2 May, Universiti Teknologi Malaysia, Johor Bahru, Malaysia TABLE OF CONTENTS CHAPTERS PAGE Table of Contents i Pre-Conference Training Workshop ii Conference Program AIMC 2017 iii Schedule for AIMC 2017 iv Conference Gala Dinner v Welcome Messages from Conference Chair vi Guide to Session Chairs vii Session Chairs & Judges viii Editorial Team x Team ASIA xiii Team for AIMC 2017 xiv Coordinators for AIMC 2017 xv Our Dignitaries xvi Connecting Asia Conference Management System Network (CACMSN) xix Abstracts for AIMC2017 1-295 Future Conferences 296 Future Workshops 297 ASIA International Multidisciplinary Conference (AIMC 2017) 1-2 May, Universiti Teknologi Malaysia, Johor Bahru, Malaysia ii Pre-Conference Training Workshop ASIA International Multidisciplinary Conference (AIMC 2017) 1-2 May, Universiti Teknologi Malaysia, Johor Bahru, Malaysia iii Conference Program ASIA International Multidisciplinary Conference (AIMC 2017) 1-2 May, Universiti Teknologi Malaysia, Johor Bahru, Malaysia iv Schedule for AIMC 2017 Conference Theme: Technology and Society: a multidisciplinary pathway for sustainable development Venue: Seminar Room 2, FAB, Universiti Teknologi Malaysia, Johor Bahru, Malaysia Monday, 1st May 2017 Time Event 07:30-08:45 Registration 08:45-09:00 Guests Seating 09:00-09:20 Opening Note by Prof. Dr Amran Rasli (UTM) 09:20-09:40 Keynote Speech by Prof. Dr Rajah Rasiah (UM) 09:40-10:00 Keynote Speech Prof. Dr Hadi Nur (UTM) 10:00-10:15 Introduction of Connecting Asia by
    [Show full text]
  • Orang Asli in Peninsular Malaysia : Population, Spatial Distribution and Socio-Economic Condition
    Orang Asli in Peninsular Malaysia : Population, Spatial Distribution and Socio-Economic Condition Tarmiji Masron*, Fujimaki Masami**, Norhasimah Ismail*** Abstract Orang Asli or indigenous peoples are peoples with unique languages, knowledge systems and beliefs. Indigenous peoples often have much in common with other neglected segments of societies, such as lack of political representation and participation, economic marginalization and poverty, lack of access to social services and discrimination. Besides that, there is population problem in the community and among them often leads to the neglect of their health and of essential needs like proper clothing and nutritious foods for the whole family. In Peninsular Malaysia, Orang Asli is separated into three main tribal groups includes Semang (Negrito), Senoi and Proto Malay (Aboriginal Malay) and consists of 19 ethnic. This study was an attempt to study and mapped the spatial distribution of the Orang Asli where two kind of data collection were applied; primary data obtained from the Department of Statistics of Malaysia, consist of Orang Asli population data for each states in Peninsular between 1947 and 2010; and secondary data collection based on the literature review or previous study for any information of Orang Asli from history, distribution, issues and problems and others which significant to the study. The result showed that overall, populations of Orang Asli in Peninsular Malaysia increasing between 1947 and 2010 which the highest growth rate recorded in 1991 (32.96%) while the lowest in 1957 (16.01%). Between 1947 and 2010, highest Orang Asli population was recorded in Pahang and Perak while the lowest in Pulau Pinang and Perlis.
    [Show full text]
  • Risk Factors of Undernutrition Among Children Under 5 Years Old In
    6th Asia-Pacific Conference on Public Health Supplement Risk Factors of Undernutrition Among Sarawak Pregnant Women re Iodine Children Under 5 Years Old in Jerantut, Deficient Despite Adequate Iodine Intake Pahang: A Case-Control Study Among School-Age Children Rafidah Binti Abdul Latif Lim Kuang Kuay, MSc, Tan Beng Chin, MSc, Chan Jerantut District Health Office, Ministry of Health Malaysia Ying Ying, MMedSc, Husniza Hussain, PhD, Nur Azna Mahmud, MSc, Mohd Shaiful Azlan Kassim, ABSTRACT MPH, Abdul Aziz Harith, MD, Cheong Siew Man, INTRODUCTION: There are nearly 815 million people MSc, Ruhaya Salleh, MSc, Tahir Aris, MPH who are chronically undernourished, which contributes to Institute for Public Health, Ministry of Health, Malaysia, Sarawak an estimated 3.1 million deaths annually. The National State Health Department, Ministry of Health, Malaysia Health and Morbidity Survey (NHMS) 2015 reported that ABSTRACT 8% of children suffer from undernutrition. In Jerantut, the prevalence of under-nutrition among children below the INTRODUCTION: The universal salt iodisation (USI) age of 5 was 5.67%. This study aims to determine the risk has been implemented to control the iodine deficiency factors associated with undernutrition among children disorders (IDD) in many countries. However, several below 5 years old in Jerantut, Pahang. METHODS: A studies conducted among school-age children (SAC) and case-control study design was conducted in March 2019. pregnant women (PW) found that adequate iodine status The case dealt with a child suffering from moderate to in SAC may not reflect adequate iodine status in PW. The severe undernutrition with a z-score < -2SD from the aim of this study was to assess the current iodine status median baseline recommended by World Health among SAC and PW after 10 years of USI in Sarawak.
    [Show full text]
  • Guidebook to Starting Warehousing Business in Malaysia .Pdf
    Guidebook to Starting Warehousing Business in Malaysia A Practical Toolkit May 2021 Version 1.2.0 Published by National Logistics Task Force (NLTF) Table of Contents Table of Contents Foreword by Yang Berhormat Datuk Seri Ir. Dr. Wee Ka Siong, viii Minister of Transport Malaysia Message by Yang Berbahagia Datuk Isham bin Ishak, ix Secretary General, Ministry of Transport Malaysia Message by Yang Berbahagia Dato' Abdul Latif Hj. Abu Seman, x Director General, Malaysia Productivity Corporation Technical Terminology xi Acronyms xiv Objective 15 Target of this Guidebook 15 Introduction 15 Disclaimer Statement 16 Copyright Statement 16 1. General Conditions for Building of Logistics Services Warehouses 17 1.1 Introduction 17 1.2 Duties of the Owner or Investor 18 1.3 Duties of the Consulting Designer 18 1.4 Duties of the Consulting Architect 19 1.5 Duties of the Contractor 19 2. Types of Warehouse and Storage Facility 20 2.1 What is a Warehouse? 20 2.2 Classification of Warehouses 20 General Warehouses 21 Cold Storage Warehouses 21 Controlled Humidity 22 Flammable / Hazardous Storehouse 22 Shed Storage 23 3. General Principles for Planning Warehouse Buildings and Storage Facilities 24 3.1 Planning for Manpower and Area Requirements 24 3.2 Planning for Warehouse Location 24 General Approach 25 Optimisation of Space Distribution in Location 25 Determining Area Requirements for Traffic Flow 26 Directional Facing of Warehouse Building 26 Determining the Warehouse Structural Shape 27 Other Factors affecting Traffic Flows 27 3.3 Elements of Design for Warehouse buildings 27 Types of Storage 27 Elements of Storage 28 Supporting Areas 33 3.4 Guidelines for Managing Land Usage 34 Table of Contents Table of Contents 4.
    [Show full text]
  • Terrestrial Gamma Radia Its Inhalation to the Internal
    Special Conference Edition , November, 2017 http://dx.doi.org/10.4314/bajopas.v10i1.17S Bayero Journal of Pure and Applied Sciences , 10(1): 84 - 88 ISSN 2006 – 6996 TERRESTRIAL GAMMA RADIATION ABSORPTION AND THE EFFECT OF ITS INHALATION TO THE INTERNAL ORGANS OF A HUMAN BODY: A CASE STUDY OF PAHANG STATE MALAYSIA *Gabdo , H.T.1 and Garba, N.N.2 1Federal College of Education Yola, Nigeria 2Department of Physics, Ahmadu Bello University Zaria, Nigeria *Correspondence author: [email protected] ; GSM: +2348062291996, +2348034298444 ABSTRACT Measurements for Terrestrial Gamma dose rate (TGDR) were made in Pahang state Malaysia with the average value found to be 176 nGy h -1. The outdoor and the indoor annual effective dose is found to be 0.216 mSv and 0.863mSv respectively. This gives the Total annual effective dose (AED tot ) to be 1.079 mSv. The computed lifetime effective dose, cancer risk and the lifetime cancer risk for each person living in the state were 81 mSv, 6.28×10 -5 and 4.7 x 10 -3 respectively. These values are more than two times the world average values of 34 mSv, 2.82 10 -5, and 2 10 -3 Considering the tissue weighing factors, the effective doses due to inhalation of gamma radiation on internal organs like the Gonads (testes or ovaries), Lung, liver and the bone surface of the body were found to be 35.2 nSv, 21.12 nSv, 8.8 nSv and 1.76 nSv respectively. Key words: Terrestrial Gamma Dose Rate (TGDR), effective dose, cancer risk. INTRODUCTION for each organ or tissue type (ICRP 1990).
    [Show full text]
  • Impact of Oil Palm Plantation to Water Intake River Water Quality
    Impact of Oil palm plantation to Water Intake River Water Quality 1.0 Introduction This project is titled “The Proposed Oil Palm Plantation Development on 8,094.43 Hectares (20,001 Acres) Land on PT4951-PT4955 and PT4987-PT4991 in Mukim Tembeling, District of Jerantut, Pahang Darul Makmur " (Figure 1). The Project seeks to create an oil palm plantation covering an area of about 8,094.43 hectares (20,001 acres). The process of land use changes has increased the frequency of flash flood in an area that is not normally associated with flash flood. The process of land use change is normally associated with the reduction of natural infiltration rate due to removal of the existing undergrowth and increasing the percentage of impervious area. The changes in topography and land use could result in the tremendous increase in surface runoff. The flooding problem may aggravate due to increase of directly connected impervious area. This phenomenon could result in extensive flooding where property damage and loss of lives is imminent. The process of land use changes has increased the frequency of flash flood in an area that is not normally associated with flash flood. The process of land use change is normally associated with the reduction of natural flood detention storage due to reclamation of the existing depression area or wetland and increasing the percentage of impervious area. The changes in topography and land use could result in the tremendous increase in surface runoff. The flooding problem may aggravate due to increase of directly connected impervious area. This phenomenon could result in extensive flooding where property damage and loss of lives is imminent.
    [Show full text]