Major Elements of the Environment
Total Page:16
File Type:pdf, Size:1020Kb
PROPOSED OIL PALM PLANTATION DEVELOPMENT ON 8,094.43 HECTARES (20,001 ACRES) LAND ON PT4951-PT4955 AND PT4987-PT4991 IN MUKIM TEMBELING, DISTRICT OF JERANTUT, PAHANG DARUL MAKMUR. (ENVIRONMENTAL SCOPING INFORMATION) SECTION 4 MAJOR ELEMENTS OF THE ENVIRONMENT 4.1 INTRODUCTION This section will describe the baseline studies in the Project area in terms of the physical, environmental, biological and socio economic. The description of the baseline studies is based on field surveys and review of existing literature related to the study area sourced from published reports. Both the primary and secondary data are used to describe the existing environment. 4.1.1 Current Site Condition The current condition of the project site is a logged-over forest. A visit to the project site was conducted on 5th September 2018. During the site visit, a log yard (matau) was found in the existing oil palm plantation development (phase 1) adjacent to the project site. Plate 4.1.1 shows the location of the log yard in Phase 1 area. Plate 4.1.1: Existing Log Yard at the Project Site MAJOR ELEMENTS OF THE ENVIRONMENT 4 - 1 PROPOSED OIL PALM PLANTATION DEVELOPMENT ON 8,094.43 HECTARES (20,001 ACRES) LAND ON PT4951-PT4955 AND PT4987-PT4991 IN MUKIM TEMBELING, DISTRICT OF JERANTUT, PAHANG DARUL MAKMUR. (ENVIRONMENTAL SCOPING INFORMATION) 4.2 TOPOGRAPHY The topography of the project site is described based on the range of elevation, river system and slope terrain. The topographical view is illustrated in Figure 4.2.1. Elevation Generally the topography within and outside of the Project site can be categorized as flat, rolling and hilly. The elevations of the Project site vary from 60 m to 260 m above mean sea level (M.S.L.). The flat area mostly covers the entire area where it is distributed all over the Project Site whereby the lowest land is sited in the middle and sloping down to the north side which is near to the river valley. The hilly area are located in the middle of the project area, at the west and also at the northwest of the project area. The elevation of the project site is presented in Figure 4.2.2. River System There are five major river systems within the project site which are Sg. Terengan, Sg. Dohong, Sg. Lenggung, Sg. Kuang, tributaries of Sg. Yong and Sg. Kuran. The project site is drained by tributaries of Sg. Terengan where it flows from northwest to east and drained onto main river, Sg. Tembeling. Tributaries of Sg. Dohong will directly flows from the north to the south and the tributaries of Sg. Lenggung flows from the northeast onto the main river, Sg. Tembeling. Additionally, the tributaries of Sg. Yong will flow into Sg Jelai which will eventually drained to Sg. Pahang. Overall, based on the topography map, all of the tributary which are coming from project site will flow onto main rivers, Sg. Tembeling and Sg Jelai and finally discharged onto Sg Pahang. In short, Sg Jelai and Sg Tembeling confluence onto Sg. Pahang. These rivers and its tributaries formed a dendritic river pattern. Slope Terrain The slope within project site has been analysed based on contour data acquired from Department of Survey and Mapping Malaysia (JUPEM). Most of the Project site is classified as terrain Class 1 which covers about 45.79% followed by Class 3 (22.27%), Class 4 (15.86%), Class 2 (12.84%), Class 5 (2.57%), Class 6 (0.66%) and Class 7 (0.01%) respectively. For the project site, very steep area of more than 35° about 0.81 hectares are strictly prohibited from any land development to protect the sloping structure and minimize the erosion. Table 4.2.1 shows the distribution of terrain within the Project site while the terrain analysis map is shown in Figure 4.2.3. MAJOR ELEMENTS OF THE ENVIRONMENT 4 - 2 PROPOSED OIL PALM PLANTATION DEVELOPMENT ON 8,094.43 HECTARES (20,001 ACRES) LAND ON PT4951-PT4955 AND PT4987-PT4991 IN MUKIM TEMBELING, DISTRICT OF JERANTUT, PAHANG DARUL MAKMUR. (ENVIRONMENTAL SCOPING INFORMATION) Table 4.2.1 Terrain Analysis of the Project Site TERRAIN SLOPE PERCENTAGE AREA LEGEND CLASSIFICATION CLASS (DEGREE) (%) (HECTARE) 1 Flat 0˚ -2˚ 45.79 3706.44 2 Undulating 2˚ - 6˚ 12.84 1039.32 3 Rolling 6˚ - 12˚ 22.27 1802.63 4 Hilly 12˚ - 20˚ 15.86 1283.78 5 Very Hilly 20˚ - 25˚ 2.57 208.03 6 Steep 25˚ - 35˚ 0.66 53.42 7 Very Steep > 35˚ 0.01 0.81 TOTAL 100 8,094.43 Source: Consultant's Estimation MAJOR ELEMENTS OF THE ENVIRONMENT 4 - 3 PROPOSED OIL PALM PLANTATION DEVELOPMENT ON 8,094.43 HECTARES (20,001 ACRES) LAND ON PT4951-PT4955 AND PT4987-PT4991 IN MUKIM TEMBELING, DISTRICT OF JERANTUT, PAHANG DARUL MAKMUR. (ENVIRONMENTAL SCOPING INFORMATION) Figure 4.2.1 Topography of the Project Site MAJOR ELEMENTS OF THE ENVIRONMENT 4 - 4 PROPOSED OIL PALM PLANTATION DEVELOPMENT ON 8,094.43 HECTARES (20,001 ACRES) LAND ON PT4951-PT4955 AND PT4987-PT4991 IN MUKIM TEMBELING, DISTRICT OF JERANTUT, PAHANG DARUL MAKMUR. (ENVIRONMENTAL SCOPING INFORMATION) Figure 4.2.2 Elevation of the Project Site MAJOR ELEMENTS OF THE ENVIRONMENT 4 - 5 PROPOSED OIL PALM PLANTATION DEVELOPMENT ON 8,094.43 HECTARES (20,001 ACRES) LAND ON PT4951-PT4955 AND PT4987-PT4991 IN MUKIM TEMBELING, DISTRICT OF JERANTUT, PAHANG DARUL MAKMUR. (ENVIRONMENTAL SCOPING INFORMATION) Figure 4.2.3 Slope Terrain of the Project Site MAJOR ELEMENTS OF THE ENVIRONMENT 4 - 6 PROPOSED OIL PALM PLANTATION DEVELOPMENT ON 8,094.43 HECTARES (20,001 ACRES) LAND ON PT4951-PT4955 AND PT4987-PT4991 IN MUKIM TEMBELING, DISTRICT OF JERANTUT, PAHANG DARUL MAKMUR. (ENVIRONMENTAL SCOPING INFORMATION 4.3 LAND USE The following paragraphs describe the land use types found in the study area. Figure 4.3.1 and Table 4.3.1 show the land use activities within 5 km radius from the Project site. Table 4.3.1 Land Use of the Project Site within 5 km Radius PHOTO AND DESCRIPTION 1) AGRICULTURE The land use surrounding of the project site are oil palm and rubber plantations. These plantations are owned and operated by FELCRA whereby rubber plantation is owned by smallholder and also private ownership. They are located approximately ±2 km from the project boundary. There are also some vegetable farms found near the project site. MAJOR ELEMENTS OF THE ENVIRONMENT 4 - 7 PROPOSED OIL PALM PLANTATION DEVELOPMENT ON 8,094.43 HECTARES (20,001 ACRES) LAND ON PT4951-PT4955 AND PT4987-PT4991 IN MUKIM TEMBELING, DISTRICT OF JERANTUT, PAHANG DARUL MAKMUR. (ENVIRONMENTAL SCOPING INFORMATION PHOTO AND DESCRIPTION 2) FOREST Existing conditions of the Project site is a logged-over forest. 3) AQUACULTURE Aquaculture activities run by local people along Sg Jelai, Sg. Tembeling and Sg. Pahang. They are located approximately ±3 km from the project boundary. MAJOR ELEMENTS OF THE ENVIRONMENT 4 - 8 PROPOSED OIL PALM PLANTATION DEVELOPMENT ON 8,094.43 HECTARES (20,001 ACRES) LAND ON PT4951-PT4955 AND PT4987-PT4991 IN MUKIM TEMBELING, DISTRICT OF JERANTUT, PAHANG DARUL MAKMUR. (ENVIRONMENTAL SCOPING INFORMATION PHOTO AND DESCRIPTION 4) SETTLEMENTS AREA Some of the human settlements found situated within ±1 to ±5 km radius from the project site. MAJOR ELEMENTS OF THE ENVIRONMENT 4 - 9 PROPOSED OIL PALM PLANTATION DEVELOPMENT ON 8,094.43 HECTARES (20,001 ACRES) LAND ON PT4951-PT4955 AND PT4987-PT4991 IN MUKIM TEMBELING, DISTRICT OF JERANTUT, PAHANG DARUL MAKMUR. (ENVIRONMENTAL SCOPING INFORMATION) Figure 4.3.1 Land Use in the Study Area MAJOR ELEMENTS OF THE ENVIRONMENT 4 - 10 PROPOSED OIL PALM PLANTATION DEVELOPMENT ON 8,094.43 HECTARES (20,001 ACRES) LAND ON PT4951-PT4955 AND PT4987-PT4991 IN MUKIM TEMBELING, DISTRICT OF JERANTUT,PAHANG DARUL MAKMUR. (ENVIRONMENTAL SCOPING INFORMATION) 4.3.1 Agriculture The land use surrounding of the Project site is primarily oil palm plantations and small part of it is rubber plantation. These oil palm plantations are mostly located to the east, southeast, south and southwest of the Project site. The oil palm plantations which is within 5 km radius from the project boundary are owned by Kemajuan Tanah Kg. Merting (FELCRA) located ± 4 km to the east of the proposed Lot PT 4989, Kemajuan Tanah Pasir Sia (RISDA) located ± 3 km to the southeast of the proposed Lot PT 4951 whereby Kemajuan Tanah Pasir Durian (FELCRA) and Kemajuan Tanah Hulu Retang are located ± 3 km and ± 4 km respectively to the south of the proposed Lot PT 4953. Besides, rubber plantation is owned and operated by smallholding and also private ownership. Additionally, there are also some vegetable farms found near the project site. 4.3.2 Forest The existing condition of the project site is a logged over forest and it also dominates the northern, northwest, northeast, western and southwest parts of the Project site surrounding. The nearest forest reserve in the vicinity of the project site is Yong Forest Reserve. Besides, Taman Negara is located towards the north of the project site. The distance between the Taman Negara Pahang boundary and the Project site boundary is approximately 15 km. 4.3.3 Aquaculture Ikan Sangkar is one major contributors to the villager’s economy especially at Mukim Tembeling. Patin and Talapia are the fish species that are most widely cultured in cages along Sg. Tembeling, Sg. Jelai. and also Sg. Pahang. 4.3.4 Human Settlements Within 5 km radius from the Project site, there are several human settlements as shown in Table 4.3.2. The nearest human settlement area is located about ±1 km to the southeast of the project site boundary which is Kg.