SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected] AS BUILT

UNIVERSITY OF WESTERN - FIBRE OPTIC CABLE INSTALLATION - UNDERGROUND DESIGN PHASE 1 - MUSEUM - 1600 ATTAWANDARON RD, LONDON, ON ARIZON PROJECT #: 12-0009A

DRAWING A - GENERAL NOTES AND LEGEND 'A' UNDERGROUND - MUSEUM - 1600 ATTAWANDARON RD - FIBRE OPTIC CABLE INSTALLATION 1 OF 1

MATERIAL QUANTITY 1. NEW 24 FIBRE OPTIC CABLE 212.0m 2. NEW 50mm (2") HDPE CONDUIT 12.0m 3. NEW PEDESTAL 1 4. NEW SPLICE 1 27 FIMA CRESCENT , ONTARIO M8W 3R1 5. DIP LOCATION 1 PHONE: (416) 848-4220 6. FAX: (416) 752-8659 7. www.arizon.ca 8. 9. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 1\Phase 1 - Museum - 1600 Attawandaron Rd-AB -TITLE .dwg \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 1\Phase 1 - Museum - 1600 Attawandaron Rd-AB -DWG A .dwg 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, AND DIMENSIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO THE ENGINEER BEFORE PROCEEDING WITH NEW UNDERGROUND CONDUIT CABLE TRAY THE WORK. EXISTING UNDERGROUND CONDUIT NEW PULL BOX 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND NEW FIBER OPTIC CABLE EXISTING PULL BOX AND ABOVE GROUND UTILITIES AND STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE ACCURACY OF THE POSITION OF SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. EXISTING FIBER OPTIC CABLE NEW PANEL BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM THE EXACT LOCATION OF ALL NEW FIBER OPTIC CABLE IN EXISTING CONDUIT EXISTING PANEL SUCH UTILITIES AND STRUCTURES, AND SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. STRAND NEW JUNCTION BOX 3. ALL CONSTRUCTION MUST COMPLY WITH: STREET LINE NEW CHECK METER a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. PROPERTY LINE NEW HANDWELL b. TRANSPORT GENERAL ORDERS E11 & E12 AND CANADIAN STANDARDS ASSOCIATION STANDARD CAN/CSA-C22.3 No. 1-10 AND CAN 3-C22.3 No.7-10 AS APPLICABLE FENCE c. ONTARIO ELECTRICAL CODE. RAILWAY d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. FIELD SIDE STREET SIDE e. OCCUPATIONAL HEALTH AND SAFETY ACT. METRE MARK AS BUILT - FIBER OPTIC CABLE METER MARKS m 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBRE OPTIC CABLE.

5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. EXISTING POLE POLE DETAIL (WITH HEIGHTS OF SECONDARY ALL ATTACHMENTS EXCLUDING NEW FIBER 6. ALL FIBRE ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. NEW GUY & ANCHOR ? PRIMARY CABLES) ?m ? NEW GUY ?m 7. ALL LOOP BACK LENGTHS OF FIBRE CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. ?m EXISTING GUY & ANCHOR ?m 8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m FROM OTHER TELECOM ATTACHMENTS. EXISTING GUY W HP # $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  DIP LOCATION TRANSFORMER T TREE WOODEN POLE

ELECTRICAL BONDING LOCATIONS W HP # NEW LOOP BACK NEW FIBER OPTIC CLOSURE EXISTING LOOP BACK CONCRETE POLE

EXISTING FIBER OPTIC CLOSURE C

NEW FIBER OPTIC CABLE COIL

EXISTING FIBER OPTIC CABLE COIL RI ON Technologies Inc. NEW CONDUIT IN BUILDING

EXISTING CONDUIT SITE CONTACT: Brad W. Gray, Operations Manager UWO/ LARG* net Phone: (519) 661-2111x86981

GENERAL NOTES AND LEGEND MUSEUM - 1600 ATTAWANDARON RD LONDON, ONTARIO AS BUILT UNDERGROUND DRAWING

CHKD. BY : N.C. DATE : SEP 19, 2012 DWG No. : &4#9+0)ž#ž

DRWN. BY : X.W. SCALE : N.T.S. PROJ No. :12-0009A

\\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 1\Phase 1 - Museum - 1600 Attawandaron Rd-AB -DWG A .dwg \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 1\Phase 1 - Museum - 1600 Attawandaron Rd-AB -P1.dwg

CURB (NOTE: CONDUIT DEPTH MAY BE GREATER THAN 1.0m DUE TO EXISTING FACILITIES OR FIELD CONDITIONS. UNSHRINKABLE FILL TO BE USED IN REPLACEMENT OF NATIVE SOIL AT ALL ROAD CROSSINGS, TYPICAL UNDERGROUND CONDUIT DETAIL APPROX 389m TO WHITEACRES DR RAILWAY CROSSINGS AND NEXT TO CONCRETE SIDEWALKS EDGE OF PAVEMENTS.) INSTALL NEW 24 FIBRE OPTIC END CABLE AND 50mm(2") HDPE METRE MARK AT NEW SPLICE 5320 ft 600mm

CURB METRE MARK

5220 ft SIDEWALK CONDUIT 24 FOC 11.7m

FENCE P/L 7.1m SCALE: N.T.S. 1.1m

HP#T8336 FOR CONTINUATION SEE AERIAL DWG GAINSBOROUGH RD, P1 OF 5 WONDERLAND RD AND NEW PEDESTAL LOCATE EXISTING CONDUIT AND INSTALL 600mm 1.0m

FENCE Scale 1:500 PLAN 600mm INSTALL NEW 24 FIBRE CONDUIT TO MUSEUM OPTIC CABLE IN EXISTING

P/L CABLE DIP DETAIL SCALE: N.T.S. EXISTING PEDESTAL INSTALLED SLACK SPAN INSTALLED STRAND STRINGING TENSION POSITION: PERMIT #: DATE STRAND INSTALLED POSITION: PRINT NAME: DATE: SIGNATURE: STRAND STRINGING TENSION SIGNATURE: AMBIENT TEMPERATURE PRINT NAME: 24 FOC METRE MARK AT LAN RM 4740 ft * MUST BE AN ESA "QUALIFIED PERSON" OR A "COMPETENT PERSON" APPROVED BY THE ENGINEER. YES YES BY THE ENGINEER'S INSPECTOR NO NO BY THE CONTRACTOR METRE MARK AS CONSTRUCTED AS CONSTRUCTED U/G INSTALLATION BEEN SHOWN ON THIS DRAWING THE CONSTRUCTION AGREES WITH WORK INSTRUCTION AND ANY CHANGES HAVE APPROVED PLAN, STANDARD DESIGN, OR APPROVED EQUIPMENT HAS BEEN USED. AERIAL INSTALLATION 4624 ft END DATE: * N N C CONSTRUCTION NOTES : No.: DATE : REVISIONS BY: 1 2 FIBRE OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY : TORONTO, ONTARIO M8W 3R1 27 FIMA CRESCENT PHONE: (416) 848-4220 E-11 AND E-12 THE LATEST CANADIAN STANDARDS ASSOCIATION NOTES STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS

KEY MAP (N. T. S.) WONDERLAND RD WONDERLAND AT WORK AREA AUG 08, 2012 SEP 19, 2012 MUSEUM - 1600 ATTAWANDARON RD AS BUILT UNDERGROUND DRAWING

RI GAINSBOROUGH RD X.W. N.C. Technologies Inc. ON SCALE : DATE : INSTALL 165.0m OF NEW 24 FIBRE OPTIC CABLE INSTALL 47.0m OF NEW 24 FIBRE OPTIC CABLE THROUGH EXISTING CONDUIT TO MUSEUM LAN RM AND 12.0m OF NEW 50mm (2") HDPE CONDUIT PEDESTAL LOCATE EXISTING CONDUIT AND INSTALL NEW INITIAL PERMIT DRAWING AS BUILT DRAWING LONDON, ONTARIO 1:500 SEP 19, 2012 Phone: (519) 661-2111x86981 Operations Manager UWO/ LARG* net SITE CONTACT: Brad W. Gray,

PROJ No. : DWG No. : CORLEY DR CORLEY AMBLESIDE DR

WINDERMERE RD 12-0009A P1 OF1

X.W. W.P. WESTERN RD N SITE CONTACT: Brad W. Gray, CCNA, CCNP

Operations Manager UWO/ LARG* net

Phone: (519) 661-2111x86981 AS BUILT

UNIVERSITY OF WESTERN ONTARIO - FIBRE OPTIC CABLE INSTALLATION - UNDERGROUND DESIGN PHASE 1 - WINDERMERE RD AND GLENMORE DR, LONDON, ON ARIZON PROJECT #: 12-0009A

DRAWING A - GENERAL NOTES AND LEGEND 'A' UNDERGROUND - WINDERMERE RD AND GLENMORE DR - FIBRE OPTIC CABLE INSTALLATION 1 OF 1

MATERIAL QUANTITY 1. NEW 24 FIBRE OPTIC CABLE 95.0m 2. NEW SPLICE 1 3. 4. 27 FIMA CRESCENT TORONTO, ONTARIO M8W 3R1 5. PHONE: (416) 848-4220 6. FAX: (416) 752-8659 7. www.arizon.ca 8. 9. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 1\Phase 1 -Underground - Windermere Rd and Glenmore Dr-AB -TITLE.dwg 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, AND DIMENSIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO THE ENGINEER BEFORE PROCEEDING WITH NEW UNDERGROUND CONDUIT CABLE TRAY THE WORK. EXISTING UNDERGROUND CONDUIT NEW PULL BOX 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND NEW FIBER OPTIC CABLE EXISTING PULL BOX AND ABOVE GROUND UTILITIES AND STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE ACCURACY OF THE POSITION OF SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. EXISTING FIBER OPTIC CABLE NEW PANEL BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM THE EXACT LOCATION OF ALL NEW FIBER OPTIC CABLE IN EXISTING CONDUIT EXISTING PANEL SUCH UTILITIES AND STRUCTURES, AND SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. STRAND NEW JUNCTION BOX 3. ALL CONSTRUCTION MUST COMPLY WITH: STREET LINE NEW CHECK METER a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. PROPERTY LINE NEW HANDWELL b. TRANSPORT CANADA GENERAL ORDERS E11 & E12 AND CANADIAN STANDARDS ASSOCIATION STANDARD CAN/CSA-C22.3 No. 1-10 AND CAN 3-C22.3 No.7-10 AS APPLICABLE FENCE c. ONTARIO ELECTRICAL CODE. RAILWAY d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. FIELD SIDE STREET SIDE e. OCCUPATIONAL HEALTH AND SAFETY ACT. METRE MARK AS BUILT - FIBER OPTIC CABLE METER MARKS m 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBRE OPTIC CABLE.

5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. EXISTING POLE POLE DETAIL (WITH HEIGHTS OF SECONDARY ALL ATTACHMENTS EXCLUDING NEW FIBER 6. ALL FIBRE ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. NEW GUY & ANCHOR ? PRIMARY CABLES) ?m ? NEW GUY ?m 7. ALL LOOP BACK LENGTHS OF FIBRE CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. ?m EXISTING GUY & ANCHOR ?m 8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m FROM OTHER TELECOM ATTACHMENTS. EXISTING GUY W HP # $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  DIP LOCATION TRANSFORMER T TREE WOODEN POLE

ELECTRICAL BONDING LOCATIONS W HP # NEW LOOP BACK NEW FIBER OPTIC CLOSURE EXISTING LOOP BACK CONCRETE POLE

EXISTING FIBER OPTIC CLOSURE C

NEW FIBER OPTIC CABLE COIL

EXISTING FIBER OPTIC CABLE COIL RI ON Technologies Inc. NEW CONDUIT IN BUILDING

EXISTING CONDUIT SITE CONTACT: Brad W. Gray, Operations Manager UWO/ LARG* net Phone: (519) 661-2111x86981

FIBRE OPTIC CABLE INSTALLATION WINDERMERE RD AND GLENMORE DR LONDON, ONTARIO AS BUILT UNDERGROUNG DRAWING

CHKD. BY : N.C. DATE : SEP 19, 2012 DWG No. : &4#9+0)ž#ž

DRWN. BY : X.W. SCALE : N.T.S. PROJ No. :12-0009A

\\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 1\Phase 1 -Underground - Windermere Rd and Glenmore Dr-AB -DWG A.dwg \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 1\Phase 1 -Underground - Windermere Rd and Glenmore Dr-AB -P1.dwg (NOTE: CONDUIT DEPTH MAY BE GREATER THAN 1.0m DUE TO EXISTING FACILITIES OR FIELD CONDITIONS. UNSHRINKABLE FILL TO BE USED IN REPLACEMENT OF NATIVE SOIL AT ALL ROAD CROSSINGS, TYPICAL UNDERGROUND CONDUIT DETAIL RAILWAY CROSSINGS AND NEXT TO CONCRETE SIDEWALKS EDGE OF PAVEMENTS.) RD AND GAINSBOROUGH RD, AERIAL DWG WONDERLAND FOR CONTINUATION SEE 600mm

EDGE OF PAVEMENT

SHOULDER

EDGE OF PAVEMENT P5 OF 5 SCALE: N.T.S. TOP OF POLE METRE MARK AT HP#3579 7444 ft 1.0m

HP 600mm 6.5m

P/L EXISTING MANHOLE

P/L INSTALL NEW 24 FIBRE OPTIC CABLE IN EXISTING CONDUIT TO MANHOLE 21.9m

SHOULDER 1.0m 6.6m END METRE MARK AT SPLICE 600mm 7132 ft

14.2m Scale 1:500 P/L PLAN

11.7m

SIDEWALK CURB STEEL GUARD RAIL CABLE DIP DETAIL SCALE: N.T.S. INSTALLED SLACK SPAN INSTALLED STRAND STRINGING TENSION POSITION: PERMIT #: DATE STRAND INSTALLED POSITION: PRINT NAME: DATE: SIGNATURE: STRAND STRINGING TENSION SIGNATURE: AMBIENT TEMPERATURE PRINT NAME: * MUST BE AN ESA "QUALIFIED PERSON" OR A "COMPETENT PERSON" APPROVED BY THE ENGINEER. YES YES BY THE ENGINEER'S INSPECTOR NO NO BY THE CONTRACTOR AS CONSTRUCTED AS CONSTRUCTED BEEN SHOWN ON THIS DRAWING U/G INSTALLATION THE CONSTRUCTION AGREES WITH WORK INSTRUCTION AND ANY CHANGES HAVE APPROVED PLAN, STANDARD DESIGN, OR APPROVED EQUIPMENT HAS BEEN USED. AERIAL INSTALLATION DATE: * N N C CONSTRUCTION NOTES : No.: DATE : REVISIONS BY: 1 2 FIBRE OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY : TORONTO, ONTARIO M8W 3R1 27 FIMA CRESCENT PHONE: (416) 848-4220 E-11 AND E-12 THE LATEST CANADIAN STANDARDS ASSOCIATION NOTES STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS

KEY MAP (N. T. S.) WONDERLAND RD WONDERLAND AT AUG 08, 2012 SEP 19, 2012 WINDERMERE RD AND GLENMORE DR AS BUILT UNDERGROUND DRAWING

RI GAINSBOROUGH RD X.W. N.C. Technologies Inc. ON SCALE : DATE : IN EXISTING CONDUIT TO MANHOLE INSTALL 95.0m OF NEW 24 FIBRE OPTIC CABLE INSTALL NEW SPLICE IN EXISTING MANHOLE INITIAL PERMIT DRAWING AS BUILT DRAWING LONDON, ONTARIO 1:500 SEP 19, 2012 Phone: (519) 661-2111x86981 Operations Manager UWO/ LARG* net SITE CONTACT: Brad W. Gray, PROJ No. : DWG No. :

WORK AREA CORLEY DR CORLEY AMBLESIDE DR

WINDERMERE RD 12-0009A P1 OF1

X.W. W.P. WESTERN RD N SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected]

AS-BUILT

CP RAILWAY CROSSING UNDERGROUND AS BUILT - MILE MARKER 114.34 PHASE 2 - WATERLOO STREET, LONDON, ONTARIO ARIZON PROJECT #: 12-0009A

GENERAL NOTES AND LEGEND DRAWING 'A' MILE MARKER 114.34 - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P1 OF 1

MATERIAL QUANTITY 1. NEW 48 FIBRE OPTIC CABLE 50.6m 2. NEW 100mm(4") HDPE SDR11 (SCHED 40) CONDUIT 37.0m 3. 4. RI ON Technologies Inc. 5. 6. 27 FIMA CRESCENT 7. TORONTO, ONTARIO M8W 3R1 8. PHONE: (416) 848-4220 FAX: (416) 752-8659 9. www.arizon.ca 10. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Mile Marker 114.34 UNDERGROUND-AB -TITLE.dwg UNDERGROUND-AB Marker 114.34 2\Phase 2 - Mile Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Mile Marker 114.34 UNDERGROUND-AB -DWG 'A'.dwg 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBRE OPTIC CABLE. 3. ALL CONSTRUCTION MUST COMPLY WITH: 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, DIMENSIONS $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m 7. ALL LOOPBACK LENGTHS OF FIBRE CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. 6. ALL FIBRE ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. 5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. OTHER TELECOM ATTACHMENTS. e. OCCUPATIONAL HEALTH AND SAFETY ACT. d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. c. ONTARIO ELECTRICAL CODE. b. LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 THE CANADIAN STANDARD a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. SUCH UTILITIES AND STRUCTURES, SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM EXACT LOCATION OF ALL THE ACCURACY OF POSITION SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. AND ABOVE GROUND UTILITIES STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE WORK. AT THE SITE AND REPORT ANY DISCREPANCIES TO ENGINEER BEFORE PROCEEDING WITH ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE. EXISTING CONDUIT NEW CONDUIT IN BUILDING EXISTING FIBRE OPTIC CABLE COIL NEW FIBRE OPTIC CABLE COIL EXISTING FIBRE OPTIC CLOSURE EXISTING LOOP BACK NEW FIBRE OPTIC CLOSURE NEW LOOP BACK ELECTRICAL BONDING LOCATIONS TREE TRANSFORMER DIP LOCATION EXISTING GUY EXISTING GUY & ANCHOR NEW GUY NEW GUY & ANCHOR EXISTING POLE AS BUILT - FIBRE OPTIC CABLE METER MARKS RAILWAY FENCE PROPERTY LINE STREET LINE STRAND NEW FIBRE OPTIC CABLE IN EXISTING CONDUIT EXISTING FIBRE OPTIC CABLE NEW FIBRE OPTIC CABLE EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT METRE MARK T m CONCRETE POLE WOODEN POLE PRIMARY CABLES) ALL ATTACHMENTS EXCLUDING POLE DETAIL (WITH HEIGHTS OF NEW HANDWELL NEW CHECK METER NEW JUNCTION BOX EXISTING PANEL NEW PANEL EXISTING PULL BOX NEW PULL BOX CABLE TRAY ?m ?m SECONDARY FIELD SIDE ?m CP RAILWAY CROSSING UNDERGROUND AS BUILT NEW FIBRE DRWN. BY : CHKD. BY : ?m GENERAL NOTES AND LEGEND HP # HP # C W ? WATERLOO ST, LONDON, ONTARIO ? HP # RI W W.P. N.C. Technologies Inc. ON STREET SIDE SCALE : DATE : MILE MARKER 114.34 JAN 14, 2013 Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'A' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Mile Marker 114.34 UNDERGROUND-AB -P1.dwg 48 FIBRE OPTIC CABLE NEW SDR11 CONDUIT SUB BALLAST TOP BALLAST 100mm(4") AND NEW TOP OF RAIL NATIVE SOIL RAILWAY CROSSING DETAIL CABLE DIP DETAIL SCALE: N.T.S. SCALE: 1:50 600mm PHASE 2 - WATERLOO ST 300mm 1000mm MIN. SEE AERIAL DRAWING FOR CONTINUATION

250 WATER MAIN 1.68m(MIN) HP#NOTAG

BELOW BOTTOM P5 OF 7

OF LOWEST RAIL B

1200 ST

240 250 255 260 245 300 WM 300

375 SAN B

GROUP TEL 600x900 SAN 600x900 INSTALL NEW DOWN MARKERS GUY AND ANCHOR PRIMARY NEUTRAL PRIMARY PRIMARY

1.1m

BORE PIT 1200x3000 BOX CULVERT BOX 1200x3000 UWO RAIL 2.1m 2.1m A TOP OF POLE 6.8m METRE MARK AT HP 5962m

1 0+000 1 ST 1800 ROW

HP

CURB GUY L=3.7m 11.3m

850 ST 850 ROW 12.2m H = L = 12.2m 6.8m 3.7m

B SECTION A-A TWIN 1200Wx1370H HORIZONTAL SCALE 1:500 INSTALL NEW 100mm(4") 2.4m HDPE SDR11 (SCHED 40) CONDUIT AND NEW 48 FIBER OPTIC CABLE

PLAN VIEW

VERTICAL SCALE 1:250 INSTALL NEW 100mm(4") 13.2m HDPE SDR11 (SCHED 40) CONDUIT AND NEW 48 FIBER OPTIC CABLE

300 SAN BOX CULVERT TWIN 1200Wx1370H BOX SCALE 1:500

CULVERT ƒ 35.0m

250 WATER MAIN 35.0m 19.5m 15.6m 3.0m 1.0m 15.6m 1.0m B 3.0m

0+025 28.0m

2.3m

P/L B 14.8m

ROW CURB H = L = 7.2m L=3.7m 7.2m 7.8m 3.7m ROW MARKERS RAIL GUY

HP TOP OF POLE METRE MARK AT HP 6011m 7.8m 2 2 INSTALL NEW DOWN

GUY AND ANCHOR A BORE PIT SECONDARY PRIMARY GROUP TEL PRIMARY NEUTRAL UWO PRIMARY

B SIDEWALK

B 0+050 SAN 200

600 ST B OWNER ATTACHMENT P5 OF 7 PHASE 2 - WATERLOO ST FOR CONTINUATION SEE AERIAL DRAWING THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS WORK INSTRUCTION AND THAT APPROVED WITH CHANGES SHOWN ON THIS DRAWING RECORD OF INSPECTION U/G INSTALLATION AERIAL INSTALLATION RECORD OF INSPECTION POSITION PRINT NAME PERMIT # SIGNATURE AS CONSTRUCTED DATE CP RAILWAY CROSSING UNDERGROUND AS BUILT No.: FIBER OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY : 1 2

JULY 3, 2012 JAN 14, 2013 OXFORD ST E WATERLOO ST, LONDON, ONTARIO DATE: RI PICCADILLY ST W.P. N.C. Technologies Inc. ON SCALE : DATE : MILE MARKER 114.34 INSTALL 37.0m OF NEW 100mm(4") HDPE SDR11 OPTIC CABLE (SCHED 40) CONDUIT AND 50.6m OF NEW 48 FIBER INITIAL PERMIT DRAWING AS BUILT DRAWING AS SHOWN JAN 14, 2013

REVISIONS: WATERLOO ST WATERLOO AREA WORK Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: CENTRAL AVE PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected]

PALL MALL ST COLBORNE ST COLBORNE 12-0009A P1 OF 1 W.P. W.P. N BY: SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected]

AS-BUILT

UNDERGROUND AS BUILT PHASE 2 - DUFFERIN AVENUE, LONDON, ONTARIO ARIZON PROJECT #: 12-0009A

GENERAL NOTES AND LEGEND DRAWING 'A' TYPICAL DETAILS - UNDERGROUND AND AERIAL DRAWING 'B' DUFFERIN AVE - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P1 OF 1

MATERIAL QUANTITY 1. NEW 48 FIBRE OPTIC CABLE 268.7m 2. NEW 50mm(2") HDPE CONDUIT 232.5m 3. NEW 24" x 36" x 24" HANDWELL 1 4. NEW SPLICE 1 RI ON Technologies Inc. 5. NEW STRAIGHT UGUARD 1 6. NEW FLARED UGUARD 1 27 FIMA CRESCENT 7. DIP LOCATION 1 TORONTO, ONTARIO M8W 3R1 8. PHONE: (416) 848-4220 FAX: (416) 752-8659 9. www.arizon.ca 10. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Dufferin Ave UNDERGROUND-R1-AB -TITLE.dwg Ave UNDERGROUND-R1-AB 2\Phase 2 - Dufferin Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Dufferin Ave UNDERGROUND-R1-AB -DWG 'A'.dwg 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBRE OPTIC CABLE. 3. ALL CONSTRUCTION MUST COMPLY WITH: 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, DIMENSIONS $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m 7. ALL LOOPBACK LENGTHS OF FIBRE CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. 6. ALL FIBRE ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. 5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. OTHER TELECOM ATTACHMENTS. e. OCCUPATIONAL HEALTH AND SAFETY ACT. d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. c. ONTARIO ELECTRICAL CODE. b. LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 THE CANADIAN STANDARD a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. SUCH UTILITIES AND STRUCTURES, SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM EXACT LOCATION OF ALL THE ACCURACY OF POSITION SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. AND ABOVE GROUND UTILITIES STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE WORK. AT THE SITE AND REPORT ANY DISCREPANCIES TO ENGINEER BEFORE PROCEEDING WITH ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE. EXISTING CONDUIT NEW CONDUIT IN BUILDING EXISTING FIBRE OPTIC CABLE COIL NEW FIBRE OPTIC CABLE COIL EXISTING FIBRE OPTIC CLOSURE EXISTING LOOP BACK NEW FIBRE OPTIC CLOSURE NEW LOOP BACK ELECTRICAL BONDING LOCATIONS TREE TRANSFORMER DIP LOCATION EXISTING GUY EXISTING GUY & ANCHOR NEW GUY NEW GUY & ANCHOR EXISTING POLE AS BUILT - FIBRE OPTIC CABLE METER MARKS RAILWAY FENCE PROPERTY LINE STREET LINE STRAND NEW FIBRE OPTIC CABLE IN EXISTING CONDUIT EXISTING FIBRE OPTIC CABLE NEW FIBRE OPTIC CABLE EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT METRE MARK T m CONCRETE POLE WOODEN POLE PRIMARY CABLES) ALL ATTACHMENTS EXCLUDING POLE DETAIL (WITH HEIGHTS OF NEW HANDWELL NEW CHECK METER NEW JUNCTION BOX EXISTING PANEL NEW PANEL EXISTING PULL BOX NEW PULL BOX CABLE TRAY ?m ?m SECONDARY FIELD SIDE ?m NEW FIBRE DRWN. BY : CHKD. BY : ?m GENERAL NOTES AND LEGEND HP # HP # C W UNDERGROUND AS BUILT DRAWING ? ? HP # RI W W.P. N.C. Technologies Inc. ON PHASE 2 - DUFFERIN AVE STREET SIDE SCALE : DATE : LONDON, ONTARIO OCT 30, 2012 Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'A' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Dufferin Ave UNDERGROUND-R1-AB -DWG 'B'.dwg ABOVE GRADE 2.4m MINIMUM UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES NEW FIBRE POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED B SCALE: N.T.S. ANCHOR DETAIL A NOTE: MINIMUM CABLE HEIGHT REQUIREMENTS SCALE: NTS EXPRESSWAYS AND RAMPS 7.0m (CONSTRUCTED) OVER FREEWAYS, 6.0m (MINIMUM) 300 TO 18000 VOLTS LIKELY TO BE TRAVELLED BY ALONGSIDE FARMLAND NOT B= 1.8m A= 150mm-300mm INSULATOR POWER COMPANY CONTACT AREA POSSIBLE SAG 4.7m (CONSTRUCTED) 3.3m (MINIMUM) A VEHICLES OVER OR B DRIVEWAYS (OTHER THAN TO RESIDENCES HIGHWAYS, STREETS, LANES, ALLEYS AND BY ROAD VEHICLES, INCLUDING KING'S OVER LAND LIKELY TO BE TRAVELLED THE LIMITS (WITH NO OVERHANG) OF STREETS AND KING'S HIGHWAYS IN TRAVELLED BY ROAD VEHICLES. ALONGSIDE LAND LIKELY TO BE DENSELY POPULATED AREAS. OVER THE RIGHT OF WAY UNDERGROUND PIPELINES OR RESIDENCE GARAGES) TRAVELLED BY VEHICLES. FARMLAND LIKELY TO BE ALONGSIDE AND WITHIN ABOVE GRADE 2.0m MINIMUM 5.5m (CONSTRUCTED) OVER OR ALONGSIDE NEW FIBRE UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED C 4.7m (MINIMUM) SCALE: N.T.S. ANCHOR DETAIL SIDEWALK GUY AND NOTE: ACCESSIBLE TO PEDESTRIANS 3.5m (CONSTRUCTED) OVER WALKWAYS OR GROUND NORMALLY 2.8m (MINIMUM) ONLY 300 TO 18000 VOLTS OVER DRIVEWAYS TO RESIDENCES AND RESIDENCE GARAGES FOR CONTACT AREA POSSIBLE SAG VEHICLES NOT OVER 2.4m 4.7m (CONSTRUCTED) B= 1.8m A= 150mm-300mm A INSULATOR POWER COMPANY 4.0m (MINMUM) IN HEIGHT OVERALL LENGTH B 8.2m (CONSTRUCTED) ABOVE TOP OF RAIL 7.6m (MINIMUM) AT RAILWAY CROSSINGS D BENDING RADIUS SCALE: N.T.S. VARIES CABLE DIP DETAIL 150mm 100mm 50 300mm REFERENCES: ONTARIO ELECTRICAL SAFETY CODE CSA STD. C22.3 NO. 1-10 OVERHEAD SYSTEMS FIBRE OPTIC INSTALLATION SEPARATIONS FOR OVERHEAD (AERIAL) OUTSIDE PLANT UNIVERSITY OF WESTERN ONTARIO CABLE - CLEARANCES AND R + 100mm 100 CONDUIT GRADE U-GUARD SEALED POLE F SCALE: N.T.S. HANDWELL DETAIL 1-38mm (1.5") DUCTS GRAVEL FOR DRAINAGE 0.3m DEPTH OF RADIUS) R- (MINIMUM BENDING GRASS BOULEVARD 1-38mm (1.5") DUCTS FOR DIAMETER, TYPE (REFER TO DRAWING NEW HDPE CONDUIT E AND QUANTITY) 4. INSTALL HANDWELL LID FLUSH TO GRASS 3. R IS THE MINIMUM BENDING RADIUS (R= 20x 2. SLACK TO BE STORED IN A FIGURE EIGHT 1. FOR HANDWELL DIMENSIONS SEE NOTES: CONFIGURATION FOR EASIER REUSE. CONSTRUCTION NOTES. THE OUTSIDE CABLE DIAMETER). BOULEVARD GRADE. WARNING TAPE NATIVE SOIL SCALE: N.T.S. CONDUIT DETAIL TYPICAL UNDERGROUND BOULEVARD/GRASS TYPICAL TRENCH WIDTH 24" NEW HDPE SDR11 CONDUIT GRAVEL FOR DRAINAGE 0.3m DEPTH OF LENGTH FOR DIAMETER, TYPE (REFER TO DRAWING 36" AND QUANTITY) GRANULAR BASE 1-38mm (1.5") DUCTS NATIVE SOIL ASPHALT DEPTH 0.3m 24" DRIVEWAY CROSSING (BORE) TYPICAL TYPICAL DETAILS - UNDERGROUND AND AERIAL DRWN. BY : CHKD. BY : UNDERGROUND AS BUILT DRAWING NEW HDPE SDR11 CONDUIT RI W.P. N.C. FOR DIAMETER, TYPE (REFER TO DRAWING Technologies Inc. ON AND QUANTITY) PHASE 2 - DUFFERIN AVE SCALE : DATE : FILL UNSHRINKABLE LONDON, ONTARIO ASPHALT NOT TO SCALE OCT 30, 2012 TYPICAL ROAD CROSSING (BORE) Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'B'

\\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Dufferin Ave UNDERGROUND-R1-AB-AB -P1.dwg

PHASE 2 - WELLINGTON ST A-A LINE MATCH SEE UNDERGROUND DWG

A A FOR CONTINUATION 3.8m

0.3m SIDEWALK

D/W SIDEWALK

P1 OF 2 CURB 6.1m 12.4m

7.5m

3 CURB CURB

CURB SIDEWALK 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, 2) BORE PITS MAY BE NEEDED AND WILL DETERMINED BY LOCATES CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT ELECTRICAL, FIBRE OPTIC, AND TELEPHONE CABLES PRIOR TO 3.1m 16.7m 0.5m 17.4m ALLSTREAM

ALLSTREAM MANHOLE SIDEWALK 0.3m CONSTRUCTION NOTES

4.1m CURB 3.9m 2

4.7m P/L

6.0m D/W 5.8m SCALE - 1:500 PLAN VIEW 4.4m 3.7m P/L 1.4m 0.3m

7.8m SIDEWALK 7.1m

SIDEWALK

P/L

CURB

SIDEWALK SIDEWALK 3.5m INSTALL NEW 50mm(2") HDPE CONDUIT AND NEW

48 FIBRE OPTIC CABLE P/L 0.3m INSTALL NEW 50mm(2") HDPE CONDUIT AND NEW 48 FIBRE OPTIC CABLE 2.9m 0.3m 4.4m D/W 0.3m 1.7m 6.8m CURB 5.5m 4.8m DIP LOCATION SEE DWG B DETAIL D

HP#NOTAG 3.9m

1.0m

SIDEWALK

P/L

CURB SIDEWALK

H = L = CURB

6.2m 3.85m

A A

11.2m MATCH LINE A-A LINE MATCH 1 INSTALL NEW FLARED UGUARDS DOWN 6.2m OF HP STRAIGHT AND 1.3m OWNER ATTACHMENT

THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS

WORK INSTRUCTION AND THAT APPROVED WITH CHANGES SHOWN ON THIS DRAWING RECORD OF INSPECTION CURB U/G INSTALLATION AERIAL INSTALLATION

RECORD OF INSPECTION POSITION PRINT NAME PERMIT # SIGNATURE

AS CONSTRUCTED P7 OF 7 PHASE 2 - WATERLOO ST FOR CONTINUATION SEE AERIAL DWG SIDEWALK TOP OF POLE METRE MARK AT HP

5188m SIDEWALK DATE No.: FIBRE OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY : E-11 AND E-12 THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS 1 2 3 RICHMOND ST OCT 30, 2012 JULY 3, 2012 JAN 15, 2013 UNDERGROUND AS BUILT DRAWING DATE: RI WORK

AREA W.P. N.C. CLARENCE ST CLARENCE Technologies Inc. ON PHASE 2 - DUFFERIN AVE SCALE : DATE : INSTALL 15.8m OF NEW 50mm(2") HDPE CONDUIT INSTALL NEW SPLICE FOR DETAIL, SEE DWG B DETAIL F INSTALL NEW 24" x 36" HANDWELL INSTALL 216.7m OF NEW 50mm(2") HDPE CONDUIT INSTALL NEW STRAIGHT AND FLARED UGUARDS BREAK INTO EXISTING HANDWELL DOWN 6.2m OF HP COIL 30.0m OF NEW 48 FIBRE OPTIC CABLE AND 15.8m OF NEW 48 FIBRE OPTIC CABLE AND 216.7m OF NEW 48 FIBRE OPTIC CABLE

LONDON, ONTARIO

WOLFE ST INITIAL PERMIT DRAWING REVISED ROUTE DRAWING AS BUILT DRAWING WELLINGTON ST WELLINGTON 1:500 JAN 15, 2013

REVISIONS: PICTON ST PICTON

DUNDAS ST

PRINCESS AVE Email: Phone: BRAD W. GRAY, CCNA, CCNP ST WATERLOO Operations Manager UWO / LARG* net SITE CONTACT:

QUEENS AVE DUFFERIN AVE PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected]

KING ST YORK ST ST COLBORNE 12-0009A P1 OF 1 W.P. W.P. X.W. N BY: SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected]

AS-BUILT

UNDERGROUND AS BUILT PHASE 2 - WATERLOO STREET AND REGENT STREET, LONDON, ONTARIO ARIZON PROJECT #: 12-0009A

GENERAL NOTES AND LEGEND DRAWING 'A' TYPICAL DETAILS - UNDERGROUND AND AERIAL DRAWING 'B' TOWER LN AND EPWORTH AVE - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P1 OF 6 EPWORTH AVE AND MEADOWDOWN DR - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P2 OF 6 EPWORTH AVE AND WATERLOO ST - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P3 OF 6 WATERLOO ST - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P4 OF 6 WATERLOO ST AND REGENT ST - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P5 OF 6 REGENT ST AND COLBORNE ST - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P6 OF 6

MATERIAL QUANTITY 1. NEW 96 FIBER OPTIC CABLE 1618.0m 2. NEW 50mm(2") HDPE CONDUIT 1481.5m 3. NEW 24" x 36" x 24" HANDWELL 5 4. NEW 'Y' CONNECTION 1 RI ON Technologies Inc. 5. DIP LOCATION 1 6. 27 FIMA CRESCENT 7. TORONTO, ONTARIO M8W 3R1 8. PHONE: (416) 848-4220 FAX: (416) 752-8659 9. www.arizon.ca 10. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Waterloo St and Regent St UNDERGROUND-R1 -TITLE.dwg St UNDERGROUND-R1 St and Regent 2\Phase 2 - Waterloo Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Waterloo St and Regent St UNDERGROUND-R1 -DWG 'A'.dwg 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBRE OPTIC CABLE. 3. ALL CONSTRUCTION MUST COMPLY WITH: 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, DIMENSIONS $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m 7. ALL LOOPBACK LENGTHS OF FIBRE CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. 6. ALL FIBRE ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. 5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. OTHER TELECOM ATTACHMENTS. e. OCCUPATIONAL HEALTH AND SAFETY ACT. d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. c. ONTARIO ELECTRICAL CODE. b. LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 THE CANADIAN STANDARD a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. SUCH UTILITIES AND STRUCTURES, SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM EXACT LOCATION OF ALL THE ACCURACY OF POSITION SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. AND ABOVE GROUND UTILITIES STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE WORK. AT THE SITE AND REPORT ANY DISCREPANCIES TO ENGINEER BEFORE PROCEEDING WITH ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE. EXISTING CONDUIT NEW CONDUIT IN BUILDING EXISTING FIBRE OPTIC CABLE COIL NEW FIBRE OPTIC CABLE COIL EXISTING FIBRE OPTIC CLOSURE EXISTING LOOP BACK NEW FIBRE OPTIC CLOSURE NEW LOOP BACK ELECTRICAL BONDING LOCATIONS TREE TRANSFORMER DIP LOCATION EXISTING GUY EXISTING GUY & ANCHOR NEW GUY NEW GUY & ANCHOR EXISTING POLE AS BUILT - FIBRE OPTIC CABLE METER MARKS RAILWAY FENCE PROPERTY LINE STREET LINE STRAND NEW FIBRE OPTIC CABLE IN EXISTING CONDUIT EXISTING FIBRE OPTIC CABLE NEW FIBRE OPTIC CABLE EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT METRE MARK T m CONCRETE POLE WOODEN POLE PRIMARY CABLES) ALL ATTACHMENTS EXCLUDING POLE DETAIL (WITH HEIGHTS OF NEW HANDWELL NEW CHECK METER NEW JUNCTION BOX EXISTING PANEL NEW PANEL EXISTING PULL BOX NEW PULL BOX CABLE TRAY ?m ?m SECONDARY FIELD SIDE ?m NEW FIBRE DRWN. BY : CHKD. BY : ?m GENERAL NOTES AND LEGEND PHASE 2 - WATERLOO ST AND REGENT HP # HP # C W UNDERGROUND AS BUILT DRAWING ? ? HP # RI W W.P. N.C. Technologies Inc. ON STREET SIDE SCALE : DATE : LONDON, ONTARIO JAN 15, 2013 Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'A' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Waterloo St and Regent St UNDERGROUND-R1 -DWG 'B'.dwg ABOVE GRADE 2.4m MINIMUM UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES NEW FIBRE POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED B SCALE: N.T.S. ANCHOR DETAIL A NOTE: MINIMUM CABLE HEIGHT REQUIREMENTS SCALE: NTS EXPRESSWAYS AND RAMPS 7.0m (CONSTRUCTED) OVER FREEWAYS, 6.0m (MINIMUM) 300 TO 18000 VOLTS LIKELY TO BE TRAVELLLED BY ALONGSIDE FARMLAND NOT B= 1.8m A= 150mm-300mm INSULATOR POWER COMPANY CONTACT AREA POSSIBLE SAG 4.7m (CONSTRUCTED) 3.3m (MINIMUM) A VEHICLES OVER OR B DRIVEWAYS (OTHER THAN TO RESIDENCES HIGHWAYS, STREETS, LANES, ALLEYS AND BY ROAD VEHICLES, INCLUDING KING'S OVER LAND LIKELY TO BE TRAVELLED THE LIMITS (WITH NO OVERHANG) OF STREETS AND KING'S HIGHWAYS IN TRAVELLED BY ROAD VEHICLES. ALONGSIDE LAND LIKELY TO BE DENSELY POPULATED AREAS. OVER THE RIGHT OF WAY UNDERGROUND PIPELINES OR RESIDENCE GARAGES) TRAVELLED BY VEHICLES. FARMLAND LIKELY TO BE ALONGSIDE AND WITHIN ABOVE GRADE 2.0m MINIMUM 5.5m (CONSTRUCTED) OVER OR ALONGSIDE NEW FIBRE UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED C 4.7m (MINIMUM) SCALE: N.T.S. ANCHOR DETAIL SIDEWALK GUY AND NOTE: ACCESSIBLE TO PEDESTRIANS 3.5m (CONSTRUCTED) OVER WALKWAYS OR GROUND NORMALLY 2.8m (MINIMUM) ONLY 300 TO 18000 VOLTS OVER DRIVEWAYS TO RESIDENCES AND RESIDENCE GARAGES FOR CONTACT AREA POSSIBLE SAG VEHICLES NOT OVER 2.4m 4.7m (CONSTRUCTED) B= 1.8m A= 150mm-300mm A INSULATOR POWER COMPANY 4.0m (MINMUM) IN HEIGHT OVERALL LENGTH B 8.2m (CONSTRUCTED) ABOVE TOP OF RAIL 7.6m (MINIMUM) AT RAILWAY CROSSINGS D BENDING RADIUS SCALE: N.T.S. VARIES CABLE DIP DETAIL 150mm 100mm 50 300mm REFERENCES: ONTARIO ELECTRICAL SAFETY CODE CSA STD. C22.3 NO. 1-10 OVERHEAD SYSTEMS FIBRE OPTIC INSTALLATION SEPARATIONS FOR OVERHEAD (AERIAL) OUTSIDE PLANT UNIVERSITY OF WESTERN ONTARIO CABLE - CLEARANCES AND R + 100mm 100 CONDUIT GRADE U-GUARD SEALED POLE F SCALE: N.T.S. HANDWELL DETAIL 1-38mm (1.5") DUCTS GRAVEL FOR DRAINAGE 0.3m DEPTH OF RADIUS) R- (MINIMUM BENDING GRASS BOULEVARD 1-38mm (1.5") DUCTS FOR DIAMETER, TYPE (REFER TO DRAWING NEW HDPE CONDUIT E AND QUANTITY) 4. INSTALL HANDWELL LID FLUSH TO GRASS 3. R IS THE MINIMUM BENDING RADIUS (R= 20x 2. SLACK TO BE STORED IN A FIGURE EIGHT 1. FOR HANDWELL DIMENSIONS SEE NOTES: CONFIGURATION FOR EASIER REUSE. CONSTRUCTION NOTES. THE OUTSIDE CABLE DIAMETER). BOULEVARD GRADE. WARNING TAPE NATIVE SOIL SCALE: N.T.S. CONDUIT DETAIL TYPICAL UNDERGROUND BOULEVARD/GRASS TYPICAL TRENCH WIDTH 24" NEW HDPE SDR11 CONDUIT GRAVEL FOR DRAINAGE 0.3m DEPTH OF LENGTH FOR DIAMETER, TYPE (REFER TO DRAWING 36" AND QUANTITY) GRANULAR BASE 1-38mm (1.5") DUCTS NATIVE SOIL ASPHALT DEPTH 0.3m 24" DRIVEWAY CROSSING (BORE) TYPICAL TYPICAL DETAILS - UNDERGROUND AND AERIAL DRWN. BY : CHKD. BY : PHASE 2 - WATERLOO ST AND REGENT UNDERGROUND AS BUILT DRAWING NEW HDPE SDR11 CONDUIT RI W.P. N.C. FOR DIAMETER, TYPE (REFER TO DRAWING Technologies Inc. ON AND QUANTITY) SCALE : DATE : FILL UNSHRINKABLE LONDON, ONTARIO ASPHALT NOT TO SCALE JAN 15, 2013 TYPICAL ROAD CROSSING (BORE) Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'B' A N

WORK AREA

RAYMOND AVE RICHMONDBERNARD ST AVE

WATERLOO ST

MAYFAIR DR EPWORTH AVE

CURB SIDEWALK BROUGH ST TOWER LN HURON ST 4.1m 1.0m COLBORNE ST 1.0m CURB CURB UNIVERSITY DR INSTALL 9.4m D/W D/W D/W D/W D/W WELLINGTON ST BROUGHDALE AVE NEW 24" x 36" x 24" HANDWELL 5.5m SIDEWALK SIDEWALK CHRISTIE ST SEE DWG B DETAIL F REGENT ST AT HANDWELL 2 P/L P/L P/L HURON ST METRE MARK METRE MARK 1.0m 1.0m MATCH LINE A-A 1.6m 4106m 4091m H 1.0m P/L 2.7m INSTALL NEW 96 FIBRE OPTIC CABLE 1.9m INSTALL 85.0m OF NEW 96 FIBER OPTIC CABLE IN 23.5m OF NEW 50mm(2") HDPE CONDUIT TO BUILDING AND NEW 50mm(2") HDPE CONDUIT SIDEWALK INSTALL NEW 96 FIBRE OPTIC CABLE LOCATE EXISTING CONDUIT AND 1.0m AND NEW 50mm(2") HDPE CONDUIT INSTALL NEW 'Y' CONNECTION AT BUILDING

P/L METRE MARK INSTALL 304m OF NEW 96 FIBER OPTIC CABLE IN

A 289.0m OF NEW 50mm(2") HDPE CONDUIT 4021m 1.0m SIDEWALK END 2.9m INSTALL NEW 24" x 36" x 24" HANDWELL AT SIDEWALK 5.8m SEE HANDWELL DETAIL IN DWG B DETAIL F

P/L CURB 1 CURB CONSTRUCTION NOTES : PLAN VIEW 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE SCALE - 1:500 UTILITIES WITH THE PROPOSED CONDUIT LOCATE EXISTING CONDUIT AND 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES EXISTING CONDUIT INSTALL NEW 'Y' CONNECTION CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN

P/L ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS HP E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

3 JAN 03, 2013 AS BUILT DRAWING X.W. 2 OCT 9, 2012 NEW CONDUIT EXTENDED ON RICHMOND ST W.P. 1 JUNE 19, 2012 INITIAL PERMIT DRAWING W.P. A

B No.: DATE: REVISIONS: BY:

RI ON Technologies Inc.

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP 3.7m WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net MATCH LINE A-A MATCH LINE 4.0m 1.0m CURB CURB ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 D/W D/W D/W D/W D/W D/W OWNER Email: [email protected] SIDEWALK SIDEWALK PRINT NAME

MATCH LINE B-B, SEE P2 OF 6 FIBRE OPTIC CABLE INSTALLATION P/L P/L P/L POSITION PHASE 2 - WATERLOO ST AND REGENT ST 1.8m 1.3m INSTALL NEW 96 FIBRE OPTIC CABLE 2.1m SIGNATURE LONDON, ONTARIO AND NEW 50mm(2") HDPE CONDUIT UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH A THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P1 OF 6 B WORK INSTRUCTION AND THAT APPROVED EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Waterloo St and Regent St UNDERGROUND-R1 -P1.dwg St UNDERGROUND-R1 St and Regent 2\Phase 2 - Waterloo Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Waterloo St and Regent St UNDERGROUND-R1 -P2.dwg

MATCH LINE C-C C C

SIDEWALK B

P/L 0.8m MATCH LINE B-B, SEE P1 OF 6

CURB B 3.0m 3.9m 1.0m 0.8m

CURB

SIDEWALK 1.9m

P/L

D/W

D/W INSTALL NEW 96 FIBRE OPTIC CABLE AND NEW 50mm(2") HDPE CONDUIT

D/W

SIDEWALK 24" x 36" HANDWELL 3.4m SEE DWG B DETAIL F 1.0m INSTALL NEW

CURB 3.2m METRE MARK AT HANDWELL

CURB 3.8m SIDEWALK 4395m 1.3m METRE MARK 4410m H SCALE - 1:500 PLAN VIEW 0.7m

3 SIDEWALK 2.4m 2.3m

D/W P/L INSTALL NEW 96 FIBRE OPTIC CABLE

CURB AND NEW 50mm(2") HDPE CONDUIT 3.0m

D/W 4.0m 3.7m

SIDEWALK 1.0m

D D 2.4m MATCH LINE D-D, SEE P3 OF 6 1.0m OWNER ATTACHMENT

P/L

CURB THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS WORK INSTRUCTION AND THAT APPROVED WITH CHANGES SHOWN ON THIS DRAWING

SIDEWALK

D/W RECORD OF INSPECTION U/G INSTALLATION AERIAL INSTALLATION RECORD OF INSPECTION POSITION PRINT NAME PERMIT # SIGNATURE AS CONSTRUCTED DATE C C MATCH LINE C-C No.: FIBRE OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY : CONSTRUCTION NOTES : E-11 AND E-12 THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS 1 2 3 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, 2) BORE PITS MAY BE NEEDED AND WILL DETERMINED BY LOCATES UTILITIES WITH THE PROPOSED CONDUIT FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE AT PHASE 2 - WATERLOO ST AND REGENT JUNE 19, 2012

JAN 03, 2013 UNIVERSITY DR OCT 9, 2012 UNDERGROUND AS BUILT DRAWING TOWER LN

DATE: RAYMOND AVE RI BROUGHDALE AVE ST RICHMOND W.P.

N.C. HURON ST Technologies Inc.

ON BERNARD AVE SCALE : DATE : INSTALL 329.0m OF NEW 96 FIBER OPTIC CABLE IN 299.0m OF NEW 50mm(2") HDPE CONDUIT EPWORTH AVE MAYFAIR DR INSTALL NEW 24" x 36" HANDWELL LONDON, ONTARIO SEE HANDWELL DETAIL IN DWG B F INITIAL PERMIT DRAWING NEW CONDUIT EXTENDED ON RICHMOND ST AS BUILT DRAWING

1:500 JAN 15, 2013

REVISIONS: ST BROUGH

WELLINGTON ST WELLINGTON WORK AREA Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : ST WATERLOO 1 (519) 661-2111 ext 86981 [email protected]

REGENT ST

HURON ST

12-0009A P2 OF 6

CHRISTIE ST CHRISTIE COLBORNE ST COLBORNE W.P. W.P. X.W. N BY: \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Waterloo St and Regent St UNDERGROUND-R1 -P3.dwg

MATCH LINE D-D, SEE P2 OF 6 D D

P/L 2.8m

SIDEWALK

CURB INSTALL NEW 96 FIBRE OPTIC CABLE AND NEW 50mm(2") HDPE CONDUIT 1.0m

HP#NOTAG 4.2m

E

P/L SIDEWALK 15.4m

MATCH LINE E-E

CURB P/L 5.2m 4.4m

10.6m

CURB D/W

4.8m D/W

H P/L 2.0m 2.0m 4 2.0m INSTALL NEW 96 FIBRE OPTIC CABLE AND NEW 50mm(2") HDPE CONDUIT E INSTALL NEW SEE DWG B DETAIL F 24" x 36" HANDWELL METRE MARK AT HANDWELL 4709m SCALE - 1:500 PLAN VIEW METRE MARK 4739m F E

MATCH LINE F-F, SEE P4 OF 6 SIDEWALK

MATCH LINE E-E CURB 5.7m

5.4m CURB

OWNER ATTACHMENT P/L 2.2m INSTALL NEW 96 FIBRE OPTIC CABLE AND NEW 50mm(2") HDPE CONDUIT THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS WORK INSTRUCTION AND THAT APPROVED 2.0m WITH CHANGES SHOWN ON THIS DRAWING 2.0m RECORD OF INSPECTION U/G INSTALLATION AERIAL INSTALLATION RECORD OF INSPECTION POSITION PRINT NAME PERMIT # SIGNATURE F AS CONSTRUCTED E DATE

No.: FIBRE OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY :

CONSTRUCTION NOTES : E-11 AND E-12 THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS 1 2 3 ST PATRICIA 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, 2) BORE PITS MAY BE NEEDED AND WILL DETERMINED BY LOCATES

UTILITIES WITH THE PROPOSED CONDUIT FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE

AT PHASE 2 - WATERLOO ST AND REGENT ST WELLINGTON JUNE 19, 2012 JAN 03, 2013 OCT 9, 2012

UNDERGROUND AS BUILT DRAWING DATE: ST WATERLOO RI W.P. N.C. Technologies Inc. WORK AREA ON

VICTORIA ST

HURON ST SCALE : DATE : ST CHRISTIE INSTALL 304.0m OF NEW 96 FIBER OPTIC CABLE IN 289m OF NEW 50mm(2") HDPE CONDUIT INSTALL NEW 24" x 36" HANDWELL LONDON, ONTARIO SEE HANDWELL DETAIL IN DWG B F REGENT ST INITIAL PERMIT DRAWING NEW CONDUIT EXTENDED ON RICHMOND ST AS BUILT DRAWING 1:500 JAN 15, 2013

REVISIONS: COLBORNE ST COLBORNE THORNTON AVE THORNTON

Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT:

MAITLAND ST MAITLAND HARRISON AVE HARRISON PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected]

CHEAPSIDE ST HURON ST

LAMBTON ST WILLIAM ST WILLIAM 12-0009A P3 OF 6

GROSVENOR ST LOGAN AVE LOGAN ADELAIDE ST N ST ADELAIDE W.P. W.P. X.W. N BY: BY: N X.W. W.P. W.P.

ADELAIDE ST N

LOGAN AVE GROSVENOR ST GROSVENOR P4 OF 6 12-0009A

WILLIAM ST

LAMBTON ST LAMBTON

HURON ST HURON CHEAPSIDE ST CHEAPSIDE [email protected] 1 (519) 661-2111 ext 86981 HARRISON AVE DWG No. : PROJ No. : MAITLAND ST SITE CONTACT: Operations Manager UWO / LARG* net BRAD W. GRAY, CCNA, CCNP Phone: Email:

THORNTON AVE REGENT ST REGENT

COLBORNE ST REVISIONS: JAN 15, 2013 1:500 AS BUILT DRAWING NEW CONDUIT EXTENDED ON RICHMOND ST INITIAL PERMIT DRAWING LONDON, ONTARIO SEE HANDWELL DETAIL IN DWG B DETAIL F INSTALL NEW 24" x 36" x 24" HANDWELL 296.0m OF NEW 50mm(2") HDPE CONDUIT INSTALL 311.0m OF NEW 96 FIBER OPTIC CABLE IN INSTALL 311.0m OF NEW 96 FIBER OPTIC AREA

WORK CHRISTIE ST DATE : SCALE :

VICTORIA ST VICTORIA HURON ST HURON ON Technologies Inc. N.C. W.P. RI

WATERLOO ST DATE: UNDERGROUND AS BUILT DRAWING OCT 9, 2012 JAN 03, 2013 JUNE 19, 2012

WELLINGTON ST PHASE 2 - WATERLOO ST AND REGENT ST AT FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL,

PATRICIA ST 3 2 1 ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION CONSTRUCTION NOTES : CHKD. BY : DRWN. BY : FIBRE OPTIC CABLE INSTALLATION No.: DATE G AS CONSTRUCTED H SIGNATURE PERMIT # PRINT NAME POSITION RECORD OF INSPECTION AERIAL INSTALLATION U/G INSTALLATION RECORD OF INSPECTION AND NEW 50mm(2") HDPE CONDUIT INSTALL NEW 96 FIBRE OPTIC CABLE 2.0m WITH CHANGES SHOWN ON THIS DRAWING WORK INSTRUCTION AND THAT APPROVED THIS IS TO CERTIFY THAT THE CONSTRUCTION AS THE APPROVED PLAN, STANDARD DESIGNS, OR RECORDED IN THIS DRAWING IS CONSISTENT WITH EQUIPMENT HAS BEEN USED. 2.0m THIRD PARTY AS CONSTRUCTED

P/L ATTACHMENT OWNER

D/W 6.9m 7.1m

CURB

MATCH LINE G-G MATCH CURB

SIDEWALK SIDEWALK MATCH LINE H-H, SEE P5 OF 6 G H PLAN VIEW SCALE - 1:500 5043m METRE MARK G F 5028m AT HANDWELL METRE MARK AND NEW 50mm(2") HDPE CONDUIT INSTALL NEW 96 FIBRE OPTIC CABLE 24" x 36" x 24" HANDWELL SEE DWG B DETAIL F INSTALL NEW 2.0m 2.0m 5 H P/L P/L 6

CURB CURB 5.9m 1.4m 6.7m 58.7m CURB MATCH LINE G-G CURB MATCH LINE F-F, SEE P3 OF 6 LINE F-F, SEE MATCH SIDEWALK SIDEWALK G F

SIDEWALK

SIDEWALK \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Waterloo St and Regent St UNDERGROUND-R1 -P4.dwg UNDERGROUND-R1 St Regent and St Waterloo - 2 2\Phase Ontario\Phase Western Of \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Waterloo St and Regent St UNDERGROUND-R1 -P5.dwg

SIDEWALK

SIDEWALK I H

MATCH LINE H-H, SEE P4 OF 6

SIDEWALK SIDEWALK

MATCH LINE I-I

CURB CURB

CURB CURB

4.3m

4.3m

D/W D/W

D/W D/W

D/W 7.2m 10.8m 11.0m SIDEWALK 1.8m

4.2m

2.0m P/L

SIDEWALK 4.2m 3.0m I 4.2m H INSTALL NEW 96 FIBRE OPTIC CABLE AND NEW 50mm(2") HDPE CONDUIT

SIDEWALK SCALE - 1:500 PLAN VIEW I 24" x 36" HANDWELL SEE DWG B DETAIL F

SIDEWALK

INSTALL NEW

SIDEWALK SIDEWALK

MATCH LINE I-I

CURB CURB METRE MARK AT HANDWELL

5339m

CURB CURB

4.4m

D/W D/W METRE MARK D/W

11.2m

5354m

SIDEWALK SIDEWALK 1.8m H 6 10.7m OWNER ATTACHMENT

THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH P/L THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS WORK INSTRUCTION AND THAT APPROVED 3.0m WITH CHANGES SHOWN ON THIS DRAWING 3.0m 4.2m RECORD OF INSPECTION U/G INSTALLATION AERIAL INSTALLATION I RECORD OF INSPECTION POSITION PRINT NAME PERMIT # SIGNATURE AS CONSTRUCTED INSTALL NEW 96 FIBRE 50mm(2") HDPE CONDUIT OPTIC CABLE AND NEW 3.7m SIDEWALK CURB CURB 7.1m DATE

J J MATCH LINE J-J, SEE P6 OF 6

No.: FIBRE OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY :

CONSTRUCTION NOTES : E-11 AND E-12 THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS 1 2 3 ST PATRICIA 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, 2) BORE PITS MAY BE NEEDED AND WILL DETERMINED BY LOCATES

UTILITIES WITH THE PROPOSED CONDUIT FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE

AT PHASE 2 - WATERLOO ST AND REGENT ST WELLINGTON WATERLOO ST WATERLOO JUNE 19, 2012 JAN 03, 2013 OCT 9, 2012 UNDERGROUND AS BUILT DRAWING DATE: RI W.P. N.C. Technologies Inc.

ON HURON ST

VICTORIA ST SCALE : DATE : ST CHRISTIE WORK AREA INSTALL NEW 24" x 36" HANDWELL LONDON, ONTARIO SEE HANDWELL DETAIL IN DWG B F INITIAL PERMIT DRAWING NEW CONDUIT EXTENDED ON RICHMOND ST AS BUILT DRAWING 1:500 JAN 15, 2013

REVISIONS: COLBORNE ST COLBORNE

REGENT ST THORNTON AVE THORNTON

Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT:

MAITLAND ST MAITLAND HARRISON AVE HARRISON PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected]

CHEAPSIDE ST HURON ST

LAMBTON ST WILLIAM ST WILLIAM 12-0009A P5 OF 6

GROSVENOR ST LOGAN AVE LOGAN ADELAIDE ST N ST ADELAIDE W.P. W.P. X.W. N BY: \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Waterloo St and Regent St UNDERGROUND-R1 -P6.dwg

MATCH LINE K-K MATCH LINE J-J, SEE P5 OF 6 K K J J D/W 1.1m

D/W 6.4m 2.3m 7.1m 2.9m CURB CURB P/L 7.8m D/W

D/W P/L 2.7m

SIDEWALK

D/W CURB CURB SIDEWALK 7.0m

SIDEWALK INSTALL NEW 96 FIBRE OPTIC CABLE AND NEW 50mm(2") HDPE CONDUIT 10.5m

1.2m

SIDEWALK

CURB CURB

11.5m SCALE - 1:500 SIDEWALK

2.3m

PLAN VIEW

SIDEWALK SIDEWALK 3.3m INSTALL NEW 96 FIBRE OPTIC CABLE AND NEW 50mm(2") HDPE CONDUIT

12.6m

10.8m CURB CURB 6.2m 2.3m 6.8m CURB CURB 8.8m 7

SIDEWALK

CURB CURB 2.0m 2.4m 1.8m

8.8m SIDEWALK

SIDEWALK SIDEWALK P1 OF 7 PHASE 2 - WATERLOO ST FOR CONTINUATION SEE AERIAL DWG DIP LOCATION

D/W 1.8m

SIDEWALK P/L METRE MARK AT POLE

D/W 5639m SIDEWALK SIDEWALK P/L CURB CURB D/W D/W

CURB CURB

P/L SIDEWALK

D/W 8.5m OWNER ATTACHMENT 6.5m 2.3m THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS WORK INSTRUCTION AND THAT APPROVED WITH CHANGES SHOWN ON THIS DRAWING RECORD OF INSPECTION U/G INSTALLATION AERIAL INSTALLATION RECORD OF INSPECTION POSITION PRINT NAME PERMIT # SIGNATURE 3.0m AS CONSTRUCTED D/W

K K

DATE MATCH LINE K-K

No.: FIBRE OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY :

CONSTRUCTION NOTES : E-11 AND E-12 THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS 1 2 3 ST PATRICIA

1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, 2) BORE PITS MAY BE NEEDED AND WILL DETERMINED BY LOCATES UTILITIES WITH THE PROPOSED CONDUIT FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE

PHASE 2 - WATERLOO ST AND REGENT ST WELLINGTON JUNE 19, 2012 ST WATERLOO JAN 03, 2013 OCT 9, 2012 UNDERGROUND AS BUILT DRAWING DATE: RI W.P. N.C.

HURON ST Technologies Inc. ON

VICTORIA ST

SCALE : DATE : CHRISTIE ST CHRISTIE INSTALL 285.0m OF NEW 96 FIBER OPTIC CABLE IN 285.0m OF NEW 50mm(2") HDPE CONDUIT LONDON, ONTARIO INITIAL PERMIT DRAWING NEW CONDUIT EXTENDED ON RICHMOND ST AS BUILT DRAWING AREA WORK 1:500 JAN 15, 2013

REVISIONS: COLBORNE ST COLBORNE

REGENT ST THORNTON AVE THORNTON

Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT:

MAITLAND ST MAITLAND HARRISON AVE HARRISON PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected]

CHEAPSIDE ST HURON ST

LAMBTON ST WILLIAM ST WILLIAM 12-0009A P6 OF 6

GROSVENOR ST LOGAN AVE LOGAN ADELAIDE ST N ST ADELAIDE W.P. W.P. X.W. N BY: SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected]

AS-BUILT

UNDERGROUND AS BUILT PHASE 2 - WELLINGTON STREET, LONDON, ONTARIO ARIZON PROJECT #: 12-0009A

GENERAL NOTES AND LEGEND DRAWING 'A' TYPICAL DETAILS - UNDERGROUND AND AERIAL DRAWING 'B' WELLINGTON ST - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P1 OF 2 TO P2 OF 2

MATERIAL QUANTITY 1. NEW 48 FIBRE OPTIC CABLE 415.1m 2. NEW 50mm(2") HDPE CONDUIT 1.3m 3. 4. RI ON Technologies Inc. 5. 6. 27 FIMA CRESCENT 7. TORONTO, ONTARIO M8W 3R1 8. PHONE: (416) 848-4220 FAX: (416) 752-8659 9. www.arizon.ca 10. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Wellington St UNDERGROUND-AB -TITLE.dwg St UNDERGROUND-AB 2\Phase 2 - Wellington Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Wellington St UNDERGROUND-AB -DWG 'A'.dwg 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBRE OPTIC CABLE. 3. ALL CONSTRUCTION MUST COMPLY WITH: 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, DIMENSIONS $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m 7. ALL LOOPBACK LENGTHS OF FIBRE CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. 6. ALL FIBRE ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. 5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. OTHER TELECOM ATTACHMENTS. e. OCCUPATIONAL HEALTH AND SAFETY ACT. d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. c. ONTARIO ELECTRICAL CODE. b. LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 THE CANADIAN STANDARD a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. SUCH UTILITIES AND STRUCTURES, SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM EXACT LOCATION OF ALL THE ACCURACY OF POSITION SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. AND ABOVE GROUND UTILITIES STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE WORK. AT THE SITE AND REPORT ANY DISCREPANCIES TO ENGINEER BEFORE PROCEEDING WITH ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE. EXISTING CONDUIT NEW CONDUIT IN BUILDING EXISTING FIBRE OPTIC CABLE COIL NEW FIBRE OPTIC CABLE COIL EXISTING FIBRE OPTIC CLOSURE EXISTING LOOP BACK NEW FIBRE OPTIC CLOSURE NEW LOOP BACK ELECTRICAL BONDING LOCATIONS TREE TRANSFORMER DIP LOCATION EXISTING GUY EXISTING GUY & ANCHOR NEW GUY NEW GUY & ANCHOR EXISTING POLE AS BUILT - FIBRE OPTIC CABLE METER MARKS RAILWAY FENCE PROPERTY LINE STREET LINE STRAND NEW FIBRE OPTIC CABLE IN EXISTING CONDUIT EXISTING FIBRE OPTIC CABLE NEW FIBRE OPTIC CABLE EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT METRE MARK T m CONCRETE POLE WOODEN POLE PRIMARY CABLES) ALL ATTACHMENTS EXCLUDING POLE DETAIL (WITH HEIGHTS OF NEW HANDWELL NEW CHECK METER NEW JUNCTION BOX EXISTING PANEL NEW PANEL EXISTING PULL BOX NEW PULL BOX CABLE TRAY ?m ?m SECONDARY FIELD SIDE ?m NEW FIBRE DRWN. BY : CHKD. BY : ?m GENERAL NOTES AND LEGEND HP # HP # C W UNDERGROUND AS BUILT DRAWING ? ? HP # RI W W.P. N.C. Technologies Inc. PHASE 2 - WELLINGTON ST ON STREET SIDE SCALE : DATE : LONDON, ONTARIO JAN 15, 2013 Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'A' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Wellington St UNDERGROUND-AB -DWG 'B'.dwg ABOVE GRADE 2.4m MINIMUM UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES NEW FIBRE POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED B SCALE: N.T.S. ANCHOR DETAIL A NOTE: MINIMUM CABLE HEIGHT REQUIREMENTS SCALE: NTS EXPRESSWAYS AND RAMPS 7.0m (CONSTRUCTED) OVER FREEWAYS, 6.0m (MINIMUM) 300 TO 18000 VOLTS LIKELY TO BE TRAVELLLED BY ALONGSIDE FARMLAND NOT B= 1.8m A= 150mm-300mm INSULATOR POWER COMPANY CONTACT AREA POSSIBLE SAG 4.7m (CONSTRUCTED) 3.3m (MINIMUM) A VEHICLES OVER OR B DRIVEWAYS (OTHER THAN TO RESIDENCES HIGHWAYS, STREETS, LANES, ALLEYS AND BY ROAD VEHICLES, INCLUDING KING'S OVER LAND LIKELY TO BE TRAVELLED THE LIMITS (WITH NO OVERHANG) OF STREETS AND KING'S HIGHWAYS IN TRAVELLED BY ROAD VEHICLES. ALONGSIDE LAND LIKELY TO BE DENSELY POPULATED AREAS. OVER THE RIGHT OF WAY UNDERGROUND PIPELINES OR RESIDENCE GARAGES) TRAVELLED BY VEHICLES. FARMLAND LIKELY TO BE ALONGSIDE AND WITHIN ABOVE GRADE 2.0m MINIMUM 5.5m (CONSTRUCTED) OVER OR ALONGSIDE NEW FIBRE UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED C 4.7m (MINIMUM) SCALE: N.T.S. ANCHOR DETAIL SIDEWALK GUY AND NOTE: ACCESSIBLE TO PEDESTRIANS 3.5m (CONSTRUCTED) OVER WALKWAYS OR GROUND NORMALLY 2.8m (MINIMUM) ONLY 300 TO 18000 VOLTS OVER DRIVEWAYS TO RESIDENCES AND RESIDENCE GARAGES FOR CONTACT AREA POSSIBLE SAG VEHICLES NOT OVER 2.4m 4.7m (CONSTRUCTED) B= 1.8m A= 150mm-300mm A INSULATOR POWER COMPANY 4.0m (MINMUM) IN HEIGHT OVERALL LENGTH B 8.2m (CONSTRUCTED) ABOVE TOP OF RAIL 7.6m (MINIMUM) AT RAILWAY CROSSINGS D BENDING RADIUS SCALE: N.T.S. VARIES CABLE DIP DETAIL 150mm 100mm 50 300mm REFERENCES: ONTARIO ELECTRICAL SAFETY CODE CSA STD. C22.3 NO. 1-10 OVERHEAD SYSTEMS FIBRE OPTIC INSTALLATION SEPARATIONS FOR OVERHEAD (AERIAL) OUTSIDE PLANT UNIVERSITY OF WESTERN ONTARIO CABLE - CLEARANCES AND R + 100mm 100 CONDUIT GRADE U-GUARD SEALED POLE F SCALE: N.T.S. HANDWELL DETAIL 1-38mm (1.5") DUCTS GRAVEL FOR DRAINAGE 0.3m DEPTH OF RADIUS) R- (MINIMUM BENDING GRASS BOULEVARD 1-38mm (1.5") DUCTS FOR DIAMETER, TYPE (REFER TO DRAWING NEW HDPE CONDUIT E AND QUANTITY) 4. INSTALL HANDWELL LID FLUSH TO GRASS 3. R IS THE MINIMUM BENDING RADIUS (R= 20x 2. SLACK TO BE STORED IN A FIGURE EIGHT 1. FOR HANDWELL DIMENSIONS SEE NOTES: CONFIGURATION FOR EASIER REUSE. CONSTRUCTION NOTES. THE OUTSIDE CABLE DIAMETER). BOULEVARD GRADE. WARNING TAPE NATIVE SOIL SCALE: N.T.S. CONDUIT DETAIL TYPICAL UNDERGROUND BOULEVARD/GRASS TYPICAL TRENCH WIDTH 24" NEW HDPE SDR11 CONDUIT GRAVEL FOR DRAINAGE 0.3m DEPTH OF LENGTH FOR DIAMETER, TYPE (REFER TO DRAWING 36" AND QUANTITY) GRANULAR BASE 1-38mm (1.5") DUCTS NATIVE SOIL ASPHALT DEPTH 0.3m 24" DRIVEWAY CROSSING (BORE) TYPICAL TYPICAL DETAILS - UNDERGROUND AND AERIAL DRWN. BY : CHKD. BY : UNDERGROUND AS BUILT DRAWING NEW HDPE SDR11 CONDUIT RI W.P. N.C. FOR DIAMETER, TYPE (REFER TO DRAWING Technologies Inc. PHASE 2 - WELLINGTON ST ON AND QUANTITY) SCALE : DATE : FILL UNSHRINKABLE LONDON, ONTARIO ASPHALT NOT TO SCALE JAN 15, 2013 TYPICAL ROAD CROSSING (BORE) Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'B' INSTALL NEW 50mm(2") EXISTING SPLICE IN HDPE CONDUIT AND NEW EXISTING HANDWELL MATCH LINE A-A 1 A A 48 FIBRE OPTIC CABLE COIL 30.0m OF 48 FIBRE N WOLFE ST OPTIC CABLE WELLINGTON ST PRINCESS AVE

2 COLBORNE ST FOR CONTINUATION DUFFERIN AVE EXISTING TC SEE UNDERGROUND DWG PICTON ST MANHOLE PHASE 2 - DUFFERIN AVE ST RICHMOND WORK WATERLOO ST P1 OF 1 AREA INSTALL NEW 48 FIBRE OPTIC CABLE THROUGH

EXISTING CONDUIT QUEENS AVE

CLARENCE ST DUNDAS ST KING ST

YORK ST

EXISTING SPLICE IN EXISTING HANDWELL COIL 30.0m OF NEW 48 FIBRE OPTIOC CABLE

INSTALL 1.3m OF NEW 50mm(2") HDPE CONDUIT FROM EXISTING HANDWELL TO EXISTING TC MANHOLE AND INSTALL 1.3m OF NEW 48 FIBRE OPTIC CABLE

INSTALL NEW 48 FIBRE INSTALL 207.7m OF NEW 48 FIBRE OPTIC CABLE OPTIC CABLE THROUGH THROUGH EXISTING CONDUIT EXISTING CONDUIT

CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING X.W. 1 AUG 22, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

RI ON 3 Technologies Inc. B B MATCH LINE B-B, SEE P2 OF 2 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 2 - WELLINGTON ST SIGNATURE LONDON, ONTARIO UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS A A PLAN VIEW RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P1 OF 2 MATCH LINE A-A SCALE - 1:500 WORK INSTRUCTION AND THAT APPROVED EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Wellington St UNDERGROUND-AB -P1.dwg St UNDERGROUND-AB 2\Phase 2 - Wellington Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University N WOLFE ST MATCH LINE B-B, SEE P1 OF 2 MATCH LINE C-C PRINCESS AVE B B C C WELLINGTON ST

COLBORNE ST 3 DUFFERIN AVE

CLARENCE ST PICTON ST

RICHMOND ST RICHMOND WATERLOO ST

WORK QUEENS AVE AREA INSTALL NEW 48 FIBRE DUNDAS ST INSTALL NEW 48 FIBRE OPTIC CABLE THROUGH KING ST OPTIC CABLE THROUGH EXISTING CONDUIT EXISTING CONDUIT YORK ST

INSTALL 176.1m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING CONDUIT

CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE 4

C C 2 JAN 15, 2013 AS BUILT DRAWING X.W. MATCH LINE C-C 1 AUG 22, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

RI ON Technologies Inc.

RECORD OF INSPECTION PLAN VIEW THIRD PARTY AS CONSTRUCTED SCALE - 1:500 RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 2 - WELLINGTON ST SIGNATURE LONDON, ONTARIO UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P2 OF 2 WORK INSTRUCTION AND THAT APPROVED EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 2\Phase 2 - Wellington St UNDERGROUND-AB -P2.dwg St UNDERGROUND-AB 2\Phase 2 - Wellington Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected]

AS-BUILT

UNDERGROUND AS BUILT DRAWING PHASE 3 - HIGHBURY AVENUE AND OXFORD STREET, LONDON, ONTARIO ARIZON PROJECT #: 12-0009A

GENERAL NOTES AND LEGEND DRAWING 'A' TYPICAL DETAILS - UNDERGROUND AND AERIAL DRAWING 'B' HIGHBURY AVE AND OXFORD ST - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P1 OF 1

MATERIAL QUANTITY 1. NEW 48 FIBRE OPTIC CABLE 136.5m 2. NEW 50mm(2") HDPE CONDUIT 136.5m 3. DIP LOCATION 2 4. RI ON Technologies Inc. 5. 6. 27 FIMA CRESCENT 7. TORONTO, ONTARIO M8W 3R1 8. PHONE: (416) 848-4220 FAX: (416) 752-8659 9. www.arizon.ca 10. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Highbury Ave and Oxford St UNDERGROUND-R1-AB -TITLE.dwg St UNDERGROUND-R1-AB Ave and Oxford 3\Phase 3 - Highbury Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Highbury Ave and Oxford St UNDERGROUND-R1-AB -DWG 'A'.dwg 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBRE OPTIC CABLE. 3. ALL CONSTRUCTION MUST COMPLY WITH: 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, DIMENSIONS $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m 7. ALL LOOPBACK LENGTHS OF FIBRE CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. 6. ALL FIBRE ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. 5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. OTHER TELECOM ATTACHMENTS. e. OCCUPATIONAL HEALTH AND SAFETY ACT. d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. c. ONTARIO ELECTRICAL CODE. b. LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 THE CANADIAN STANDARD a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. SUCH UTILITIES AND STRUCTURES, SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM EXACT LOCATION OF ALL THE ACCURACY OF POSITION SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. AND ABOVE GROUND UTILITIES STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE WORK. AT THE SITE AND REPORT ANY DISCREPANCIES TO ENGINEER BEFORE PROCEEDING WITH ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE. EXISTING CONDUIT NEW CONDUIT IN BUILDING EXISTING FIBRE OPTIC CABLE COIL NEW FIBRE OPTIC CABLE COIL EXISTING FIBRE OPTIC CLOSURE EXISTING LOOP BACK NEW FIBRE OPTIC CLOSURE NEW LOOP BACK ELECTRICAL BONDING LOCATIONS TREE TRANSFORMER DIP LOCATION EXISTING GUY EXISTING GUY & ANCHOR NEW GUY NEW GUY & ANCHOR EXISTING POLE AS BUILT - FIBRE OPTIC CABLE METER MARKS RAILWAY FENCE PROPERTY LINE STREET LINE STRAND NEW FIBRE OPTIC CABLE IN EXISTING CONDUIT EXISTING FIBRE OPTIC CABLE NEW FIBRE OPTIC CABLE EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT METRE MARK T m CONCRETE POLE WOODEN POLE PRIMARY CABLES) ALL ATTACHMENTS EXCLUDING POLE DETAIL (WITH HEIGHTS OF NEW HANDWELL NEW CHECK METER NEW JUNCTION BOX EXISTING PANEL NEW PANEL EXISTING PULL BOX NEW PULL BOX CABLE TRAY ?m ?m SECONDARY FIELD SIDE ?m NEW FIBRE DRWN. BY : CHKD. BY : ?m PHASE 3 - HIGHBURY AVE AND OXFORD ST GENERAL NOTES AND LEGEND HP # HP # C W UNDERGROUND AS BUILT DRAWING ? ? HP # RI W W.P. N.C. Technologies Inc. ON STREET SIDE SCALE : DATE : LONDON, ONTARIO JANUARY 15, 2013 Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'A' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Highbury Ave and Oxford St UNDERGROUND-R1-AB -DWG 'B'.dwg ABOVE GRADE 2.4m MINIMUM UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES NEW FIBRE POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED B SCALE: N.T.S. ANCHOR DETAIL A NOTE: MINIMUM CABLE HEIGHT REQUIREMENTS SCALE: NTS EXPRESSWAYS AND RAMPS 7.0m (CONSTRUCTED) OVER FREEWAYS, 6.0m (MINIMUM) 300 TO 18000 VOLTS LIKELY TO BE TRAVELLED BY ALONGSIDE FARMLAND NOT B= 1.8m A= 150mm-300mm INSULATOR POWER COMPANY CONTACT AREA POSSIBLE SAG 4.7m (CONSTRUCTED) 3.3m (MINIMUM) A VEHICLES OVER OR B DRIVEWAYS (OTHER THAN TO RESIDENCES HIGHWAYS, STREETS, LANES, ALLEYS AND BY ROAD VEHICLES, INCLUDING KING'S OVER LAND LIKELY TO BE TRAVELLED THE LIMITS (WITH NO OVERHANG) OF STREETS AND KING'S HIGHWAYS IN TRAVELLED BY ROAD VEHICLES. ALONGSIDE LAND LIKELY TO BE DENSELY POPULATED AREAS. OVER THE RIGHT OF WAY UNDERGROUND PIPELINES OR RESIDENCE GARAGES) TRAVELLED BY VEHICLES. FARMLAND LIKELY TO BE ALONGSIDE AND WITHIN ABOVE GRADE 2.0m MINIMUM 5.5m (CONSTRUCTED) OVER OR ALONGSIDE NEW FIBRE UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED C 4.7m (MINIMUM) SCALE: N.T.S. ANCHOR DETAIL SIDEWALK GUY AND NOTE: ACCESSIBLE TO PEDESTRIANS 3.5m (CONSTRUCTED) OVER WALKWAYS OR GROUND NORMALLY 2.8m (MINIMUM) ONLY 300 TO 18000 VOLTS OVER DRIVEWAYS TO RESIDENCES AND RESIDENCE GARAGES FOR CONTACT AREA POSSIBLE SAG VEHICLES NOT OVER 2.4m 4.7m (CONSTRUCTED) B= 1.8m A= 150mm-300mm A INSULATOR POWER COMPANY 4.0m (MINMUM) IN HEIGHT OVERALL LENGTH B 8.2m (CONSTRUCTED) ABOVE TOP OF RAIL 7.6m (MINIMUM) AT RAILWAY CROSSINGS D BENDING RADIUS SCALE: N.T.S. VARIES CABLE DIP DETAIL 150mm 100mm 50 300mm REFERENCES: ONTARIO ELECTRICAL SAFETY CODE CSA STD. C22.3 NO. 1-10 OVERHEAD SYSTEMS FIBRE OPTIC INSTALLATION SEPARATIONS FOR OVERHEAD (AERIAL) OUTSIDE PLANT UNIVERSITY OF WESTERN ONTARIO CABLE - CLEARANCES AND R + 100mm 100 CONDUIT GRADE U-GUARD SEALED POLE F SCALE: N.T.S. HANDWELL DETAIL 1-38mm (1.5") DUCTS GRAVEL FOR DRAINAGE 0.3m DEPTH OF RADIUS) R- (MINIMUM BENDING GRASS BOULEVARD 1-38mm (1.5") DUCTS FOR DIAMETER, TYPE (REFER TO DRAWING NEW HDPE CONDUIT E AND QUANTITY) 4. INSTALL HANDWELL LID FLUSH TO GRASS 3. R IS THE MINIMUM BENDING RADIUS (R= 20x 2. SLACK TO BE STORED IN A FIGURE EIGHT 1. FOR HANDWELL DIMENSIONS SEE NOTES: CONFIGURATION FOR EASIER REUSE. CONSTRUCTION NOTES. THE OUTSIDE CABLE DIAMETER). BOULEVARD GRADE. WARNING TAPE NATIVE SOIL SCALE: N.T.S. CONDUIT DETAIL TYPICAL UNDERGROUND BOULEVARD/GRASS TYPICAL TRENCH WIDTH 24" NEW HDPE SDR11 CONDUIT GRAVEL FOR DRAINAGE 0.3m DEPTH OF LENGTH FOR DIAMETER, TYPE (REFER TO DRAWING 36" AND QUANTITY) GRANULAR BASE 1-38mm (1.5") DUCTS NATIVE SOIL ASPHALT DEPTH 0.3m 24" DRIVEWAY CROSSING (BORE) TYPICAL TYPICAL DETAILS - UNDERGROUND AND AERIAL DRWN. BY : CHKD. BY : PHASE 3 - HIGHBURY AVE AND OXFORD ST UNDERGROUND AS BUILT DRAWING NEW HDPE SDR11 CONDUIT RI W.P. N.C. FOR DIAMETER, TYPE (REFER TO DRAWING Technologies Inc. ON AND QUANTITY) SCALE : DATE : FILL UNSHRINKABLE LONDON, ONTARIO ASPHALT JANUARY 15, 2013 NOT TO SCALE TYPICAL ROAD CROSSING (BORE) Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'B' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Highbury Ave and Oxford St UNDERGROUND-R1-AB -P1.dwg

HP#NOTAG

P/L SIDEWALK

HP#PUC130 P/L CURB

B

‘6$1 HP#NOTAG (BELL POLE)

B CURB

HP#07

H

‘67 DIP LOCATION

H

H 16" WATER MAIN WATER 16"

P10 OF 10 PHASE 3 - CHEAPSIDE ST FOR CONTINUATION SEE AERIAL DWG

HP#P1_6 CURB 1

B

SIDEWALK H

P/L

B H

B

‘67 16" WATER MAIN WATER 16" 23.8m

B B SCALE - 1:500

PLAN VIEW B B

H H

H

HP 1.2m B

H B ST

0.3m TO P/L CURB 12" WATER MAIN

B 0.3m TO SIDEWALK CONDUIT BY DIRECTIONAL BORE AND NEW 48 FIBRE OPTIC CABLE

B

H 78.0m

INSTALL NEW 50mm(2") HDPE H

4.5m H

B CURB

H 54.2m

CURB

B B

HP#631 ‘67

H

‘:$7(50$,1

P/L

SIDEWALK

B 0.3m TO P/L

B 93.2m 4.6m

H 26.7m B

B

H ‘67 1.5m

2.3m H

H H

‘67 H B 1.5m B 0.3m TO P/L OWNER ATTACHMENT 17.9m THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH

THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS WORK INSTRUCTION AND THAT APPROVED

WITH CHANGES SHOWN ON THIS DRAWING H

H RECORD OF INSPECTION U/G INSTALLATION AERIAL INSTALLATION RECORD OF INSPECTION POSITION PRINT NAME PERMIT # SIGNATURE AS CONSTRUCTED FOR CONTINUATION P1 OF 10 PHASE 3 - OXFORD ST E SEE AERIAL DWG

B

B ‘:$7(50$,1 HP#2162

2 H DATE TOP OF HP#2162 METRE MARK 28620ft No.:

FIBRE OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY :

CONSTRUCTION NOTES : E-11 AND E-12 THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS 1 2 3 MCNAY ST MCNAY 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, 2) BORE PITS MAY BE NEEDED AND WILL DETERMINED BY LOCATES UTILITIES WITH THE PROPOSED CONDUIT FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE PHASE 3 - HIGHBURY AVE AND OXFORD ST

VICTORIA DR CLEMENS ST CLEMENS MAY 22, 2012 AUG 15, 2012 JAN 15, 2013

UNDERGROUND AS BUILT DRAWING CECILIA AVE

KRUPP ST DATE: RI WETHERED ST WETHERED W.P. N.C. Technologies Inc. ON

OAKSIDE ST

SCALE : DATE : BUCKE ST LANDOR ST FIBRE OPTIC CABLE INSTALL 136.5m OF NEW 50mm(2") HDPE CONDUIT BY DIRECTIONAL BORE AND INSTALL 136.5m OF NEW 48 LONDON, ONTARIO INITIAL PERMIT DRAWING REVISED ROUTE DRAWING AS BUILT DRAWING

CHEAPSIDE ST JANUARY 15, 2013 CRES GENEVIVE 1:500

REVISIONS:

WISTOW ST WISTOW RHINE AVE RHINE

MARK ST Email: Phone: BRAD W. GRAY, CCNA, CCNP AVE HIGHBURY Operations Manager UWO / LARG* net SITE CONTACT: IRVING PL PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] AREA WORK

12-0009A P1 OF 1 OXFORD ST W.P. X.W. W.P. N BY: SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected]

AS-BUILT

GEXR RAILWAY CROSSING UNDERGROUND AS BUILT - MILE 0.45 GENERAL MOTORS SPUR PHASE 3 - OXFORD ST E, LONDON, ONTARIO ARIZON PROJECT #: 12-0009A

GENERAL NOTES AND LEGEND DRAWING 'A' MILE 0.45 GENERAL MOTORS SPUR - UNDERGROUND FIBER OPTIC CABLE INSTALLATION P1 OF 1

MATERIAL QUANTITY 1. NEW 48 FIBER OPTIC CABLE 47.5m[155'11"] 2. NEW 100mm(4") HDPE SDR11 (SCHED 40) CONDUIT 47.5m[155'11"] 3. 4. RI ON Technologies Inc. 5. 6. 27 FIMA CRESCENT 7. TORONTO, ONTARIO M8W 3R1 8. PHONE: (416) 848-4220 FAX: (416) 752-8659 9. www.arizon.ca 10. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Mile 0.45 General Motors Spur UNDERGROUND-R1-AB -TITLE.dwg Spur UNDERGROUND-R1-AB 0.45 General Motors 3\Phase 3 - Mile Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Mile 0.45 General Motors Spur UNDERGROUND-R1-AB -DWG 'A'.dwg 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBER OPTIC CABLE. 3. ALL CONSTRUCTION MUST COMPLY WITH: 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, DIMENSIONS $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m 7. ALL LOOPBACK LENGTHS OF FIBER CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. 6. ALL FIBER ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. 5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. OTHER TELECOM ATTACHMENTS. e. OCCUPATIONAL HEALTH AND SAFETY ACT. d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. c. ONTARIO ELECTRICAL CODE. b. LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 THE CANADIAN STANDARD a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. SUCH UTILITIES AND STRUCTURES, SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM EXACT LOCATION OF ALL THE ACCURACY OF POSITION SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. AND ABOVE GROUND UTILITIES STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE WORK. AT THE SITE AND REPORT ANY DISCREPANCIES TO ENGINEER BEFORE PROCEEDING WITH ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE. EXISTING CONDUIT NEW CONDUIT IN BUILDING EXISTING FIBER OPTIC CABLE COIL NEW FIBER OPTIC CABLE COIL EXISTING FIBER OPTIC CLOSURE EXISTING LOOP BACK NEW FIBER OPTIC CLOSURE NEW LOOP BACK ELECTRICAL BONDING LOCATIONS TREE TRANSFORMER DIP LOCATION EXISTING GUY EXISTING GUY & ANCHOR NEW GUY NEW GUY & ANCHOR EXISTING POLE AS BUILT - FIBER OPTIC CABLE METER MARKS RAILWAY FENCE PROPERTY LINE STREET LINE STRAND NEW FIBER OPTIC CABLE IN EXISTING CONDUIT EXISTING FIBER OPTIC CABLE NEW FIBER OPTIC CABLE EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT METRE MARK T m CONCRETE POLE WOODEN POLE PRIMARY CABLES) ALL ATTACHMENTS EXCLUDING POLE DETAIL (WITH HEIGHTS OF NEW HANDWELL NEW CHECK METER NEW JUNCTION BOX EXISTING PANEL NEW PANEL EXISTING PULL BOX NEW PULL BOX CABLE TRAY ?m ?m SECONDARY FIELD SIDE ?m GEXR RAILWAY CROSSING UNDERGROUND AS BUILT NEW FIBER DRWN. BY : CHKD. BY : ?m GENERAL NOTES AND LEGEND HP # HP # C W ? ? HP # RI MILE 0.45 GENERAL MOTORS SPUR OXFORD ST E, LONDON, ONTARIO W W.P. N.C. Technologies Inc. ON STREET SIDE SCALE : DATE : JANUARY 14, 2013 Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'A' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Mile 0.45 General Motors Spur UNDERGROUND-R1-AB -P1.dwg 48 FIBRE OPTIC CABLE NEW SDR11 CONDUIT SUB BALLAST TOP BALLAST 100mm(4") AND NEW AND TRACER WIRE CABLE DIP DETAIL TOP OF RAIL NATIVE SOIL RAILWAY CROSSING DETAIL SCALE: N.T.S. 600mm SCALE: 1:50

300mm

1220mm(4') MIN. PHASE 3 - OXFORD ST E SEE AERIAL DRAWING FOR CONTINUATION

3.05m(10')(MIN) P7 OF 10 BELOW BASE PAVEMENT OF EDGE OF LOWEST RAIL

HP 300mm WM (ABANDONED) WM 300mm 265 270 275 280 285 FIBER OPTIC CABLE MIN 1.22m HDPE SDR11CONDUIT AND NEW [4'-0"] METRE MARK AT HP#NOTAG PRIMARY PRIMARY PRIMARY PRIMARY NEUTRAL NEUTRAL 3104m HOT UWO HOT INSTALL NEW 100mm(4") MARKERS 48 FIBER OPTIC CABLE

BORE PIT

A HP#NOTAG

1 EDGE OF PAVEMENT OF EDGE 5.9m 1 HDPE SDR11CONDUIT AND NEW

0+025 ALLSTREAM H = L = 5.9m 3.5m INSTALL NEW 100mm(4") [22'-7"] 48 FIBER OPTIC CABLE [27'-6"] [27'-8"] 6.9m [27'-6"] 8.4m 8.4m 8.4m L=3.5m [11'-6"] ARM [29'-11"] [29'-11"] [29'-11"] MIN 3.05m ƒ 9.1m 9.1m 9.1m [10'-0"] SIGNAL SECTION A-A HORIZONTAL SCALE 1:500 [126'-5"] PLAN VIEW 38.5m [126'-5"] VERTICAL SCALE 1:250 38.5m ƒ [150'-9"] MIN 3.05m [9'-9"] 46.0m 3.0m [10'-0"] [12'-7"] SCALE 1:500 3.8m [44'-6"] [44'-6"] 13.6m 13.6m [44'-6"] 13.6m 46.0m

[151']

250mm SAN 250mm P/L [8'-1"] 2.5m [24'-4"] ƒ [24'-4"] 7.4m 7.4m MIN 3.05m[10'-0"] [48'-11"] 14.9m ARM L=3.5m [11'-6"] [45'-1"] 13.7m

B.T.U.C. [24'-8"] [24'-8"] 7.5m [4'-1"] 7.5m 1.2m 32mm GM FIBER OPTIC CABLE MAKERS

SIGNAL

HP#2026 300mm WM (ABANDONED) WM 300mm

T HP#2026 ALLSTREAM MANHOLE H = L = 6.1m 2 6.1m

0+075 3.5m 2 BORE PIT METRE MARK AT HP#2026 3163m

STREETLIGHT CABLE-N,E / NEUTRAL A

UWO DITCH HOT HOT NEUTRAL PRIMARY PRIMARY PRIMARY PRIMARY P7 OF 10 PHASE 3 - OXFORD ST E FOR CONTINUATION SEE AERIAL DRAWING P/L 1.0m [3'-4"] OWNER ATTACHMENT THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS WORK INSTRUCTION AND THAT APPROVED WITH CHANGES SHOWN ON THIS DRAWING RECORD OF INSPECTION U/G INSTALLATION AERIAL INSTALLATION RECORD OF INSPECTION POSITION PRINT NAME PERMIT # SIGNATURE AS CONSTRUCTED DATE GEXR RAILWAY CROSSING UNDERGROUND AS BUILT No.: FIBER OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY : 1 2 3 1. 3. 2. CHEAPSIDE ST 1.22m(4') BELOW NATURAL GRADE FRAC OUT PLAN FOR APPROVAL BY GEXR PRIOR TO CONSTRUCTION OF WAY CONTRACTOR TO INSTALL FIBER OPTIC CABLE MARKERS AT RIGHT CONTRACTOR TO MAINTAIN 3.05m(10') BELOW BASE OF RAIL AND CONTRACTOR TO PROVIDE DETAILED BORE PLAN AND JULY 3, 2012 AUG 30,2012 JAN 14, 2013 DATE: RI MILE 0.45 GENERAL MOTORS SPUR HURON ST OXFORD ST E, LONDON, ONTARIO W.P. N.C. Technologies Inc. ON SCALE : DATE :

FIBER OPTIC CABLE AND 47.5m[155'-11"] OF TRACER INSTALL 47.5m[155'-11"] OF NEW 100mm(4") HDPE DRILL CONDUIT INSTALLED BY HORIZONTAL DIRECTIONAL SDR11 CONDUIT AND 47.5m[155'-11"] OF NEW 48 WIRE (10 AWG) CLARKE RD CLARKE INITIAL PERMIT DRAWING REVISION - AMERICAN ENGINEER REQUEST AS BUILT DRAWING JANUARY 14, 2013 AS SHOWN REVISIONS: WORK AREA Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT:

OXFORD ST E

PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected]

INDUSTRIAL RD INDUSTRIAL

V

E

12-0009A P1 OF 1 T

E

R

A

N

S MEMORIAL PKWY MEMORIAL W.P. X.W. X.W. N BY: SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected]

AS-BUILT

GEXR RAILWAY CROSSING UNDERGROUND AS BUILT - MILE 116.92 GUELPH SUB PHASE 3 - OXFORD ST E AND CLARKE RD, LONDON, ONTARIO ARIZON PROJECT #: 12-0009A

GENERAL NOTES AND LEGEND DRAWING 'A' MILE 116.92 GUELPH SUB - UNDERGROUND FIBER OPTIC CABLE INSTALLATION P1 OF 1

MATERIAL QUANTITY 1. NEW 48 FIBER OPTIC CABLE 60.5m[198'-4"] 2. NEW 100mm(4") HDPE SDR11 (SCHED 40) CONDUIT 60.5m[198'-4"] 3. 4. RI ON Technologies Inc. 5. 6. 27 FIMA CRESCENT 7. TORONTO, ONTARIO M8W 3R1 8. PHONE: (416) 848-4220 FAX: (416) 752-8659 9. www.arizon.ca 10. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Mile 116.92 Guelph Sub UNDERGROUND-R1-AB -TITLE.dwg Sub UNDERGROUND-R1-AB 116.92 Guelph 3\Phase 3 - Mile Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Mile 116.92 Guelph Sub UNDERGROUND-R1-AB -DWG 'A'.dwg 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBER OPTIC CABLE. 3. ALL CONSTRUCTION MUST COMPLY WITH: 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, DIMENSIONS $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m 7. ALL LOOPBACK LENGTHS OF FIBER CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. 6. ALL FIBER ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. 5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. OTHER TELECOM ATTACHMENTS. e. OCCUPATIONAL HEALTH AND SAFETY ACT. d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. c. ONTARIO ELECTRICAL CODE. b. LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 THE CANADIAN STANDARD a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. SUCH UTILITIES AND STRUCTURES, SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM EXACT LOCATION OF ALL THE ACCURACY OF POSITION SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. AND ABOVE GROUND UTILITIES STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE WORK. AT THE SITE AND REPORT ANY DISCREPANCIES TO ENGINEER BEFORE PROCEEDING WITH ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE. EXISTING CONDUIT NEW CONDUIT IN BUILDING EXISTING FIBER OPTIC CABLE COIL NEW FIBER OPTIC CABLE COIL EXISTING FIBER OPTIC CLOSURE EXISTING LOOP BACK NEW FIBER OPTIC CLOSURE NEW LOOP BACK ELECTRICAL BONDING LOCATIONS TREE TRANSFORMER DIP LOCATION EXISTING GUY EXISTING GUY & ANCHOR NEW GUY NEW GUY & ANCHOR EXISTING POLE AS BUILT - FIBER OPTIC CABLE METER MARKS RAILWAY FENCE PROPERTY LINE STREET LINE STRAND NEW FIBER OPTIC CABLE IN EXISTING CONDUIT EXISTING FIBER OPTIC CABLE NEW FIBER OPTIC CABLE EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT METRE MARK T m CONCRETE POLE WOODEN POLE PRIMARY CABLES) ALL ATTACHMENTS EXCLUDING POLE DETAIL (WITH HEIGHTS OF NEW HANDWELL NEW CHECK METER NEW JUNCTION BOX EXISTING PANEL NEW PANEL EXISTING PULL BOX NEW PULL BOX CABLE TRAY ?m ?m SECONDARY FIELD SIDE ?m GEXR RAILWAY CROSSING UNDERGROUND AS BUILT NEW FIBER DRWN. BY : CHKD. BY : OXFORD ST AND CLARKE RD, LONDON, ONTARIO ?m GENERAL NOTES AND LEGEND HP # HP # C W ? ? HP # RI W W.P. N.C. Technologies Inc. ON MILE 116.92 GUELPH SUB STREET SIDE SCALE : DATE : JANUARY 14, 2013 Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'A' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Mile 116.92 Guelph Sub UNDERGROUND-R1-AB -P1.dwg 48 FIBRE OPTIC CABLE NEW SDR11 CONDUIT SUB BALLAST TOP BALLAST 100mm(4") AND NEW AND TRACER WIRE TOP OF RAIL NATIVE SOIL CABLE DIP DETAIL RAILWAY CROSSING DETAIL SCALE: N.T.S. 600mm SCALE: 1:50

300mm

120mm (4')MIN. PHASE 3 - OXFORD ST E SEE AERIAL DRAWING FOR CONTINUATION

3.05m(10')(MIN)

BELOW BASE P6 OF 10

OF LOWEST RAIL 35.0m 285 275 280 270 265

UWO

PRIMARY

PRIMARY

PRIMARY NEUTRAL PRIMARY P/L BORE PIT

BORE PIT ROW 250mm SAN 250mm

8.6m

METRE MARK AT POLE CURB 2264m GUY [3'-4"] 1.0m FIBER OPTIC CABLE MARKERS

A HP#T147 1

1 HP INSTALL NEW 100mm(4") L=4.9m 48 FIBER OPTIC CABLE H = L =

HP 0+050 [42'-4"] 12.9m CONDUIT AND NEW 8.6m [42'-4"] 4.9m 12.9m [20'-4"] MIN 1.22m 6.2m [4'-0"]

HDPE SDR11 250mm SAN 250mm

ROW [3'-8"] 1.1m [98'-8"]

30.1m P/L [104'-2"] 31.7m MIN 0.6m [2'] INSTALL NEW 100mm(4") HDPE SDR11 CONDUIT AND NEW 48 FIBER OPTIC CABLE [61'-9"] 7.0m [23'] HYDRO 18.8m

5'%6+10#Ä#

B.T.U.C. 375mm STM 375mm SCALE - 1:500 HORIZONTAL SCALE 1:500 PLAN VIEW VERTICAL SCALE 1:250 ROGERS MIN 1.0m [61'-9"] 18.8m [171'-4"] [3'-4"] 52.2m [4'-1"]

1.2m 300mm WM(ABANDONED) 300mm [171'-4"] 52.2m

0+075 WM PVC 400mm ROW 375mm STM

P/L

ƒ L.H.U.C. [46'-9"] MIN 3.05m 14.3m [10'-0"] [46'-9"] L=4.55m 14.3m [24'-1"] [41'-10"] 7.4m 12.7m

H = L = CURB [33'-4"] 10.2m 7.5m 4.55m MIN 1.22m 3 [66'-6"] [33'-2"] 20.3m HP 10.1m

[4'-0"] HP

[16'-6"] [16'-6"]

5.0m 5.0m HP#PUC956 3 METRE MARK AT POLE

ROW 2326m SIDEWALK

0+100 HYDRO MARKERS FIBER OPTIC CABLE

2

PRIMARY

PRIMARY PRIMARY

NEUTRAL

PRIMARY

PRIMARY 1.2m PRIMARY 1.2m [4']

[4'] UWO [3'-5"] 1.0m

2 A INSTALL NEW HANDWELL INSTALL NEW HANDWELL RECEIVER PIT

7.5m L.H.U.C.

1200mm WM CONC ROW RECEIVER PIT

B.T. 1 DUCT 1 B.T.

200mm G.M.(ABANDONED) 200mm SIDEWALK

CURB OWNER

ATTACHMENT B.T. 8 DUCT 8 B.T. BELL THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS WORK INSTRUCTION AND THAT APPROVED WITH CHANGES SHOWN ON THIS DRAWING RECORD OF INSPECTION BELL U/G INSTALLATION AERIAL INSTALLATION

B.T.U.C.

63.0m FOR CONTINUATION P6 OF 10 PHASE 3 - OXFORD ST E RECORD OF INSPECTION SEE AERIAL DRAWING POSITION PRINT NAME PERMIT # SIGNATURE AS CONSTRUCTED

250mm SAN

DATE B.T. 8 DUCT 8 B.T. GEXR RAILWAY CROSSING UNDERGROUND AS BUILT No.: FIBER OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY : OXFORD ST AND CLARKE RD, LONDON, ONTARIO 1 2 3 CHEAPSIDE ST 1. 3. 2. AT AUG 29, 2012 1.22m(4') BELOW NATURAL GRADE FRAC OUT PLAN FOR APPROVAL BY GEXR PRIOR TO CONSTRUCTION OF WAY CONTRACTOR TO INSTALL FIBER OPTIC CABLE MARKERS AT RIGHT CONTRACTOR TO MAINTAIN 3.05m(10') BELOW BASE OF RAIL AND CONTRACTOR TO PROVIDE DETAILED BORE PLAN AND JULY 3, 2012 JAN 14, 2013 DATE: RI

HURON ST W.P. N.C. Technologies Inc. ON MILE 116.92 GUELPH SUB

SCALE : DATE : INSTALL 7.0m[23'-0"] OF NEW 100mm(4") HDPE SDR11 DRILL INSTALL 53.5m[175'-4"] OF NEW 100mm(4") HDPE SDR11 CONDUIT INSTALLED BY HORIZONTAL DIRECTIONAL CABLE AND 7.0m[23'-0"] OF TRACER WIRE (10 AWG) CONDUIT AND 7.0m[23'-0"] OF NEW 48 FIBER OPTIC INSTALL NEW 24"x36"x24" HANDWELL DRILL CONDUIT INSTALLED BY HORIZONTAL DIRECTIONAL CABLE AND 53.5m[175'-4"] OF TRACER WIRE (10 AWG) CONDUIT AND 53.5m[175'-4"] OF NEW 48 FIBER OPTIC CLARKE RD CLARKE INITIAL PERMIT DRAWING REVISION - AMERICAN ENGINEER REQUEST AS BUILT DRAWING WORK AREA JANUARY 14, 2013 AS SHOWN REVISIONS:

OXFORD ST E Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT:

PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected]

INDUSTRIAL RD INDUSTRIAL

V

E

12-0009A P1 OF 1 T

E

R

A

N

S MEMORIAL PKWY MEMORIAL W.P. X.W. W.P. N BY: SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected]

AS-BUILT

UNDERGROUND AS BUILT DRAWING PHASE 3 - OXFORD STREET EAST AND BOULEVARD, LONDON, ONTARIO ARIZON PROJECT #: 12-0009A

GENERAL NOTES AND LEGEND DRAWING 'A' TYPICAL DETAILS - UNDERGROUND AND AERIAL DRAWING 'B' OXFORD ST E AND FENSHAWE COLLEGE BLVD - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P1 OF 2 OXFORD ST E AND THIRD ST - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P2 OF 2

MATERIAL QUANTITY 1. NEW 48 FIBRE OPTIC CABLE 531.6m 2. NEW 50mm(2") HDPE CONDUIT 506.5m 3. NEW 24" x 36" x 24" HANDWELL 1 4. NEW SPLICE 1 RI ON Technologies Inc. 5. DIP LOCATION 2 6. 27 FIMA CRESCENT 7. TORONTO, ONTARIO M8W 3R1 8. PHONE: (416) 848-4220 FAX: (416) 752-8659 9. www.arizon.ca 10. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Oxford St and Fanshawe College UNDERGROUND-R1-AB -TITLE.dwg College UNDERGROUND-R1-AB St and Fanshawe 3\Phase 3 - Oxford Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Oxford St and Fanshawe College UNDERGROUND-R1-AB -DWG 'A'.dwg 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBRE OPTIC CABLE. 3. ALL CONSTRUCTION MUST COMPLY WITH: 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, DIMENSIONS $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m 7. ALL LOOPBACK LENGTHS OF FIBRE CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. 6. ALL FIBRE ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. 5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. OTHER TELECOM ATTACHMENTS. e. OCCUPATIONAL HEALTH AND SAFETY ACT. d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. c. ONTARIO ELECTRICAL CODE. b. LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 THE CANADIAN STANDARD a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. SUCH UTILITIES AND STRUCTURES, SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM EXACT LOCATION OF ALL THE ACCURACY OF POSITION SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. AND ABOVE GROUND UTILITIES STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE WORK. AT THE SITE AND REPORT ANY DISCREPANCIES TO ENGINEER BEFORE PROCEEDING WITH ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE. EXISTING CONDUIT NEW CONDUIT IN BUILDING EXISTING FIBRE OPTIC CABLE COIL NEW FIBRE OPTIC CABLE COIL EXISTING FIBRE OPTIC CLOSURE EXISTING LOOP BACK NEW FIBRE OPTIC CLOSURE NEW LOOP BACK ELECTRICAL BONDING LOCATIONS TREE TRANSFORMER DIP LOCATION EXISTING GUY EXISTING GUY & ANCHOR NEW GUY NEW GUY & ANCHOR EXISTING POLE AS BUILT - FIBRE OPTIC CABLE METER MARKS RAILWAY FENCE PROPERTY LINE STREET LINE STRAND NEW FIBRE OPTIC CABLE IN EXISTING CONDUIT EXISTING FIBRE OPTIC CABLE NEW FIBRE OPTIC CABLE EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT METRE MARK T m CONCRETE POLE WOODEN POLE PRIMARY CABLES) ALL ATTACHMENTS EXCLUDING POLE DETAIL (WITH HEIGHTS OF NEW HANDWELL NEW CHECK METER NEW JUNCTION BOX EXISTING PANEL NEW PANEL EXISTING PULL BOX NEW PULL BOX CABLE TRAY ?m ?m SECONDARY FIELD SIDE PHASE 3 - OXFORD ST AND FANSHAWE COLLEGE ?m NEW FIBRE DRWN. BY : CHKD. BY : ?m GENERAL NOTES AND LEGEND HP # HP # C W UNDERGROUND AS BUILT DRAWING ? ? HP # RI W W.P. N.C. Technologies Inc. ON STREET SIDE SCALE : DATE : LONDON, ONTARIO JANUARY 04, 2013 Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'A' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Oxford St and Fanshawe College UNDERGROUND-R1-AB -DWG 'B'.dwg ABOVE GRADE 2.4m MINIMUM UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES NEW FIBRE POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED B SCALE: N.T.S. ANCHOR DETAIL A NOTE: MINIMUM CABLE HEIGHT REQUIREMENTS SCALE: NTS EXPRESSWAYS AND RAMPS 7.0m (CONSTRUCTED) OVER FREEWAYS, 6.0m (MINIMUM) 300 TO 18000 VOLTS LIKELY TO BE TRAVELLED BY ALONGSIDE FARMLAND NOT B= 1.8m A= 150mm-300mm INSULATOR POWER COMPANY CONTACT AREA POSSIBLE SAG 4.7m (CONSTRUCTED) 3.3m (MINIMUM) A VEHICLES OVER OR B DRIVEWAYS (OTHER THAN TO RESIDENCES HIGHWAYS, STREETS, LANES, ALLEYS AND BY ROAD VEHICLES, INCLUDING KING'S OVER LAND LIKELY TO BE TRAVELLED THE LIMITS (WITH NO OVERHANG) OF STREETS AND KING'S HIGHWAYS IN TRAVELLED BY ROAD VEHICLES. ALONGSIDE LAND LIKELY TO BE DENSELY POPULATED AREAS. OVER THE RIGHT OF WAY UNDERGROUND PIPELINES OR RESIDENCE GARAGES) TRAVELLED BY VEHICLES. FARMLAND LIKELY TO BE ALONGSIDE AND WITHIN ABOVE GRADE 2.0m MINIMUM 5.5m (CONSTRUCTED) OVER OR ALONGSIDE NEW FIBRE UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED C 4.7m (MINIMUM) SCALE: N.T.S. ANCHOR DETAIL SIDEWALK GUY AND NOTE: ACCESSIBLE TO PEDESTRIANS 3.5m (CONSTRUCTED) OVER WALKWAYS OR GROUND NORMALLY 2.8m (MINIMUM) ONLY 300 TO 18000 VOLTS OVER DRIVEWAYS TO RESIDENCES AND RESIDENCE GARAGES FOR CONTACT AREA POSSIBLE SAG VEHICLES NOT OVER 2.4m 4.7m (CONSTRUCTED) B= 1.8m A= 150mm-300mm A INSULATOR POWER COMPANY 4.0m (MINMUM) IN HEIGHT OVERALL LENGTH B 8.2m (CONSTRUCTED) ABOVE TOP OF RAIL 7.6m (MINIMUM) AT RAILWAY CROSSINGS D BENDING RADIUS SCALE: N.T.S. VARIES CABLE DIP DETAIL 150mm 100mm 50 300mm REFERENCES: ONTARIO ELECTRICAL SAFETY CODE CSA STD. C22.3 NO. 1-10 OVERHEAD SYSTEMS FIBRE OPTIC INSTALLATION SEPARATIONS FOR OVERHEAD (AERIAL) OUTSIDE PLANT UNIVERSITY OF WESTERN ONTARIO CABLE - CLEARANCES AND R + 100mm 100 CONDUIT GRADE U-GUARD SEALED POLE F SCALE: N.T.S. HANDWELL DETAIL 1-38mm (1.5") DUCTS GRAVEL FOR DRAINAGE 0.3m DEPTH OF RADIUS) R- (MINIMUM BENDING GRASS BOULEVARD 1-38mm (1.5") DUCTS FOR DIAMETER, TYPE (REFER TO DRAWING NEW HDPE CONDUIT E AND QUANTITY) 4. INSTALL HANDWELL LID FLUSH TO GRASS 3. R IS THE MINIMUM BENDING RADIUS (R= 20x 2. SLACK TO BE STORED IN A FIGURE EIGHT 1. FOR HANDWELL DIMENSIONS SEE NOTES: CONFIGURATION FOR EASIER REUSE. CONSTRUCTION NOTES. THE OUTSIDE CABLE DIAMETER). BOULEVARD GRADE. WARNING TAPE NATIVE SOIL SCALE: N.T.S. CONDUIT DETAIL TYPICAL UNDERGROUND BOULEVARD/GRASS TYPICAL TRENCH WIDTH 24" NEW HDPE SDR11 CONDUIT GRAVEL FOR DRAINAGE 0.3m DEPTH OF LENGTH FOR DIAMETER, TYPE (REFER TO DRAWING 36" AND QUANTITY) GRANULAR BASE 1-38mm (1.5") DUCTS NATIVE SOIL ASPHALT DEPTH 0.3m 24" DRIVEWAY CROSSING (BORE) TYPICAL PHASE 3 - OXFORD ST AND FANSHAWE COLLEGE TYPICAL DETAILS - UNDERGROUND AND AERIAL DRWN. BY : CHKD. BY : UNDERGROUND AS BUILT DRAWING NEW HDPE SDR11 CONDUIT RI W.P. N.C. FOR DIAMETER, TYPE (REFER TO DRAWING Technologies Inc. ON AND QUANTITY) SCALE : DATE : FILL UNSHRINKABLE LONDON, ONTARIO ASPHALT JANUARY 04, 2013 NOT TO SCALE TYPICAL ROAD CROSSING (BORE) Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'B'

N

CURB CURB INSTALL NEW 24"x36"x24" SIDEWALK INSTALL NEW 50mm(2") HDPE CHEAPSIDE ST FLEMING DR HANDWELL AND NEW SPLICE P/L FENSHAWE CONDUIT BY DIRECTIONAL BORE CO 31.3m LL E A ROGERS AND NEW 48 FIBRE OPTIC CABLE G E

0.7m 2 BLVD WORK

ROGERS 4.7m AREA 1.2m 3.3m 0.6m P/L BOLLARD 0.6m THIRD ST

1.0m HYDRO OIL LINE

ROGERS ROGERS 5.6m H 3.3m SIDEWALK HYDRO OIL LINE 3.5m SECOND ST CURB SIDEWALK HP JIM ASHTON CURB FIRST ST ST B.T.U.C. B.T.U.C. B.T.U.C. 3.7m B.T.U.C. B.T.U.C. B.T.U.C. OXFORD ST E 200mm STM MARDELL ST HOWLAND AVE DALE ST 19.0m HARTLET ST

200mm SAN

ROGERS

L.H..U.C.

L.H..U.C. 975mm STM 975mm STM 975mm STM

200mm WM INSTALL 30.0m OF NEW 50mm(2") HDPE CONDUIT BY

39.9m MATCH LINE A-A B.T.U.C. DIRECTIONAL BORE AND INSTALL 60.0m OF NEW 48 HP HP#NOTAG CURB CURB 300mm WM FIBRE OPTIC CABLE HP#NOTAG HP#SW39 400mm WM B.T.U.C. B.T.U.C. B.T.U.C. T/L 50mm DUCT INSTALL 249.0m OF NEW 50mm(2") HDPE CONDUIT BY L.H..U.C. DIP DIRECTIONAL BORE AND INSTALL 279.0m OF NEW 48 LOCATION 1 FIBRE OPTIC CABLE SIDEWALK AT HP#SW39 FOR CONTINUATION INSTALL NEW 24" x 36" x 24" HANDWELL

METRE MARK SIDEWALK AT SEE AERIAL DWG WATER MAIN TO BE FOR HANDWELL DETAIL SEE DWG 'B' DETAIL F 24734ft LOCATED BY POT HOLES PHASE 3 - OXFORD ST E AT TIME OF CONSTRUCTION A CONSTRUCTION NOTES : P3 OF 10 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE A B 3 JAN 04, 2013 AS BUILT DRAWING X.W. 2 AUG 28, 2012 REVISED ROUTE DRAWING X.W. P/L P/L P/L 1.0m 1 MAY 18, 2012 INITIAL PERMIT DRAWING W.P. SIDEWALK 1.0m 5.2m 5.0m No.: DATE: REVISIONS: BY:

B.T.U.C. B.T.U.C. B.T.U.C. D/W HP#02802 CURB 3 HP#R46R-1 CURB 4.4m 3.1m RI ON Technologies Inc. B.T.U.C. B.T.U.C. B.T.U.C. INSTALL NEW 50mm(2") HDPE CONDUIT BY DIRECTIONAL BORE AND NEW 48 FIBRE OPTIC CABLE RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED 975mm STM 975mm STM

MATCH LINE A-A LINE MATCH CURB RECORD OF INSPECTION 300mm WM (ABANDONED) CURB 300mm WM (ABANDONED) AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: 400mm WM 400mm WM 400mm WM B.T.U.C. U/G INSTALLATION B.T.U.C. B.T.U.C. MATCH LINE B-B, SEE P2 OF 2 BRAD W. GRAY, CCNA, CCNP T/L 50mm DUCT T/L 50mm DUCT WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION A

B PHASE 3 - OXFORD ST AND FANSHAWE COLLEGE SIGNATURE LONDON, ONTARIO UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. PLAN VIEW THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 04, 2013 DWG No. : P1 OF 2 WORK INSTRUCTION AND THAT APPROVED SCALE - 1:500 EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Oxford St and Fanshawe College UNDERGROUND-R1-AB -P1.dwg College UNDERGROUND-R1-AB St and Fanshawe 3\Phase 3 - Oxford Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University N

INSTALL NEW 50mm(2") HDPE CHEAPSIDE ST FLEMING DR FENSHAWE CONDUIT BY DIRECTIONAL BORE CO LL E AND NEW 48 FIBRE OPTIC CABLE G E WORK B 1.0m BLVD

4.3m C AREA P/L P/L 3.65x2.44mm BOX CULVERT STM SIDEWALK 3 5.0m THIRD ST

SIDEWALK HP B.T.U.C. B.T.U.C.

B.T.U.C. B.T.U.C. B.T.U.C. SECOND ST CURB HP#NOTAG 200mm SAN (ABANDONED) CURB JIM ASHTON HP#4328 HP#PUC1864

ST 200mm SAN FIRST ST 3.2m 3.5m 0.8m OXFORD ST E B.T.U.C. B.T.U.C. B.T.U.C. B.T.U.C. MARDELL ST HOWLAND AVE DALE ST HARTLET ST

1200mm STM

975mm STM 975mm STM 200mm SAN CURB 400mm WM 400mm WM CURB INSTALL 227.5m OF NEW 50mm(2") HDPE CONDUIT BY 300mm WM (ABANDONED) DIRECTIONAL BORE AND INSTALL 227.5m OF NEW 48 300mm WM (ABANDONED) FIBRE OPTIC CABLE SIDEWALK 150mm SAN MATCH LINE C-C B.T.U.C. B.T.U.C. B.T.U.C. 200mm SAN

MATCH LINE B-B, SEE P1 POF 2 P1 POF B-B, SEE LINE MATCH B.T.U.C.

CONSTRUCTION NOTES : B 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, C INSTALL NEW 50mm(2") HDPE FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE CONDUIT BY DIRECTIONAL BORE UTILITIES WITH THE PROPOSED CONDUIT

AND NEW 48 FIBRE OPTIC CABLE 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES SIDEWALK CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS

CURB CURB E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE AT SW01479 METRE MARK C

300mm STM FOR CONTINUATION 3.4m 22990ft 3 JAN 04, 2013 AS BUILT DRAWING X.W. 4.3m SEE AERIAL DWG 0.6m 2 AUG 28, 2012 REVISED ROUTE DRAWING X.W. P/L L.H.U.C PHASE 3 - OXFORD ST E 0.7m 0.5m DIP LOCATION 3.65x2.44mm BOX CULVERT STM 1 MAY 18, 2012 INITIAL PERMIT DRAWING W.P. 3.65x2.44mm BOX CULVERT STM P4 OF 10 No.: DATE: REVISIONS: BY: SIDEWALK 3.1m SIDEWALK L.H.U.C B.T.U.C. CURB 1.2m HP#SW01479 CURB HP#NOTAG 200mm SAN (ABANDONED) HP#NOTAG 4.3m B.T.2 DUCTS B.T.U.C. 0.4m B.T.3 DUCTS 4 RI ON 3.5m Technologies Inc. B.T. 8 DUCTS WM 300mm B.T. 8 DUCTS 26.6m

L.H.U.C RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED 400mm WM CURB 400mm WM CURB 300mm WM (ABANDONED)

MATCH LINE C-C LINE MATCH RECORD OF INSPECTION

B.T. 2 DUCTS 200mm STM AS CONSTRUCTED 300mm WM (ABANDONED) FH SIDEWALK AERIAL INSTALLATION SITE CONTACT: B.T.U.C. 200mm SAN 200mm SAN U/G INSTALLATION 200mm STM BRAD W. GRAY, CCNA, CCNP L.H.U.C WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

B.T.U.C.

PRINT NAME SIDEWALK

SIDEWALK FIBRE OPTIC CABLE INSTALLATION POSITION C PHASE 3 - OXFORD ST AND FANSHAWE COLLEGE SIGNATURE LONDON, ONTARIO UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. PLAN VIEW THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 04, 2013 DWG No. : P2 OF 2 WORK INSTRUCTION AND THAT APPROVED SCALE - 1:500 EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Oxford St and Fanshawe College UNDERGROUND-R1-AB -P2.dwg College UNDERGROUND-R1-AB St and Fanshawe 3\Phase 3 - Oxford Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected]

AS-BUILT

UNDERGROUND AS BUILT DRAWING - FROM GORE RD TO BRADLEY AVE PHASE 3 - VETERANS MEMORIAL PARKWAY, LONDON, ONTARIO ARIZON PROJECT #: 12-0009A

GENERAL NOTES AND LEGEND DRAWING 'A' TYPICAL DETAILS - UNDERGROUND AND AERIAL DRAWING 'B' VETERANS MEMORIAL PKWY - FROM GORE RD TO BRADLEY AVE P1 OF 18 TO P18 OF 18

MATERIAL QUANTITY 1. NEW 48 FIBRE OPTIC CABLE 4002.0m 2. NEW SPLICE 2 3. NEW HANDWELL 3 4. RI ON Technologies Inc. 5. 6. 27 FIMA CRESCENT 7. TORONTO, ONTARIO M8W 3R1 8. PHONE: (416) 848-4220 FAX: (416) 752-8659 9. www.arizon.ca 10. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -TITLE.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -DWG 'A'.dwg 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBRE OPTIC CABLE. 3. ALL CONSTRUCTION MUST COMPLY WITH: 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, DIMENSIONS $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m 7. ALL LOOPBACK LENGTHS OF FIBRE CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. 6. ALL FIBRE ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. 5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. OTHER TELECOM ATTACHMENTS. e. OCCUPATIONAL HEALTH AND SAFETY ACT. d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. c. ONTARIO ELECTRICAL CODE. b. LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 THE CANADIAN STANDARD a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. SUCH UTILITIES AND STRUCTURES, SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM EXACT LOCATION OF ALL THE ACCURACY OF POSITION SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. AND ABOVE GROUND UTILITIES STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE WORK. AT THE SITE AND REPORT ANY DISCREPANCIES TO ENGINEER BEFORE PROCEEDING WITH ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE. EXISTING CONDUIT NEW CONDUIT IN BUILDING EXISTING FIBRE OPTIC CABLE COIL NEW FIBRE OPTIC CABLE COIL EXISTING FIBRE OPTIC CLOSURE EXISTING LOOP BACK NEW FIBRE OPTIC CLOSURE NEW LOOP BACK ELECTRICAL BONDING LOCATIONS TREE TRANSFORMER DIP LOCATION EXISTING GUY EXISTING GUY & ANCHOR NEW GUY NEW GUY & ANCHOR EXISTING POLE AS BUILT - FIBRE OPTIC CABLE METER MARKS RAILWAY FENCE PROPERTY LINE STREET LINE STRAND NEW FIBRE OPTIC CABLE IN EXISTING CONDUIT EXISTING FIBRE OPTIC CABLE NEW FIBRE OPTIC CABLE EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT METRE MARK T m CONCRETE POLE WOODEN POLE PRIMARY CABLES) ALL ATTACHMENTS EXCLUDING POLE DETAIL (WITH HEIGHTS OF NEW HANDWELL NEW CHECK METER NEW JUNCTION BOX EXISTING PANEL NEW PANEL EXISTING PULL BOX NEW PULL BOX CABLE TRAY ?m ?m SECONDARY FIELD SIDE ?m NEW FIBRE DRWN. BY : CHKD. BY : ?m FROM GORE RD TO BRADLEY AVE, LONDON GENERAL NOTES AND LEGEND HP # HP # PHASE 3 - VETERANS MEMORIAL PKWY C W UNDERGROUND AS BUILT DRAWING ? ? HP # RI W W.P. N.C. Technologies Inc. ON STREET SIDE SCALE : DATE : JAN 15, 2013 Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'A' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -DWG 'B'.dwg ABOVE GRADE 2.4m MINIMUM UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES NEW FIBRE POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED B SCALE: N.T.S. ANCHOR DETAIL A NOTE: MINIMUM CABLE HEIGHT REQUIREMENTS SCALE: NTS EXPRESSWAYS AND RAMPS 7.0m (CONSTRUCTED) OVER FREEWAYS, 6.0m (MINIMUM) 300 TO 18000 VOLTS LIKELY TO BE TRAVELLED BY ALONGSIDE FARMLAND NOT B= 1.8m A= 150mm-300mm INSULATOR POWER COMPANY CONTACT AREA POSSIBLE SAG 4.7m (CONSTRUCTED) 3.3m (MINIMUM) A VEHICLES OVER OR B DRIVEWAYS (OTHER THAN TO RESIDENCES HIGHWAYS, STREETS, LANES, ALLEYS AND BY ROAD VEHICLES, INCLUDING KING'S OVER LAND LIKELY TO BE TRAVELLED THE LIMITS (WITH NO OVERHANG) OF STREETS AND KING'S HIGHWAYS IN TRAVELLED BY ROAD VEHICLES. ALONGSIDE LAND LIKELY TO BE DENSELY POPULATED AREAS. OVER THE RIGHT OF WAY UNDERGROUND PIPELINES OR RESIDENCE GARAGES) TRAVELLED BY VEHICLES. FARMLAND LIKELY TO BE ALONGSIDE AND WITHIN ABOVE GRADE 2.0m MINIMUM 5.5m (CONSTRUCTED) OVER OR ALONGSIDE NEW FIBRE UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED C 4.7m (MINIMUM) SCALE: N.T.S. ANCHOR DETAIL SIDEWALK GUY AND NOTE: ACCESSIBLE TO PEDESTRIANS 3.5m (CONSTRUCTED) OVER WALKWAYS OR GROUND NORMALLY 2.8m (MINIMUM) ONLY 300 TO 18000 VOLTS OVER DRIVEWAYS TO RESIDENCES AND RESIDENCE GARAGES FOR CONTACT AREA POSSIBLE SAG VEHICLES NOT OVER 2.4m 4.7m (CONSTRUCTED) B= 1.8m A= 150mm-300mm A INSULATOR POWER COMPANY 4.0m (MINMUM) IN HEIGHT OVERALL LENGTH B 8.2m (CONSTRUCTED) ABOVE TOP OF RAIL 7.6m (MINIMUM) AT RAILWAY CROSSINGS D BENDING RADIUS SCALE: N.T.S. VARIES CABLE DIP DETAIL 150mm 100mm 50 300mm REFERENCES: ONTARIO ELECTRICAL SAFETY CODE CSA STD. C22.3 NO. 1-10 OVERHEAD SYSTEMS FIBRE OPTIC INSTALLATION SEPARATIONS FOR OVERHEAD (AERIAL) OUTSIDE PLANT UNIVERSITY OF WESTERN ONTARIO CABLE - CLEARANCES AND R + 100mm 100 CONDUIT GRADE U-GUARD SEALED POLE F SCALE: N.T.S. HANDWELL DETAIL 1-38mm (1.5") DUCTS GRAVEL FOR DRAINAGE 0.3m DEPTH OF RADIUS) R- (MINIMUM BENDING GRASS BOULEVARD 1-38mm (1.5") DUCTS FOR DIAMETER, TYPE (REFER TO DRAWING NEW HDPE CONDUIT E AND QUANTITY) 4. INSTALL HANDWELL LID FLUSH TO GRASS 3. R IS THE MINIMUM BENDING RADIUS (R= 20x 2. SLACK TO BE STORED IN A FIGURE EIGHT 1. FOR HANDWELL DIMENSIONS SEE NOTES: CONFIGURATION FOR EASIER REUSE. CONSTRUCTION NOTES. THE OUTSIDE CABLE DIAMETER). BOULEVARD GRADE. WARNING TAPE NATIVE SOIL SCALE: N.T.S. CONDUIT DETAIL TYPICAL UNDERGROUND BOULEVARD/GRASS TYPICAL TRENCH WIDTH 24" NEW HDPE SDR11 CONDUIT GRAVEL FOR DRAINAGE 0.3m DEPTH OF LENGTH FOR DIAMETER, TYPE (REFER TO DRAWING 36" AND QUANTITY) GRANULAR BASE 1-38mm (1.5") DUCTS NATIVE SOIL ASPHALT DEPTH 0.3m 24" DRIVEWAY CROSSING (BORE) TYPICAL TYPICAL DETAILS - UNDERGROUND AND AERIAL DRWN. BY : CHKD. BY : FROM GORE RD TO BRADLEY AVE, LONDON PHASE 3 - VETERANS MEMORIAL PKWY UNDERGROUND AS BUILT DRAWING NEW HDPE SDR11 CONDUIT RI W.P. N.C. FOR DIAMETER, TYPE (REFER TO DRAWING Technologies Inc. ON AND QUANTITY) SCALE : DATE : FILL UNSHRINKABLE ASPHALT NOT TO SCALE JAN 15, 2013 TYPICAL ROAD CROSSING (BORE) Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'B' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P1.dwg A PHASE 3 - VETERANS MEMORIAL PKWY FROM OXFORD ST TO GORE RD MATCH LINE A-A

SEE UNDERGROUND DWG B.T.U.C. FOR CONTINUATION END METRE MARK AT SPLICE IN NEW HANDWELL P20 OF 20 2762m GOING SOUTH METRE MARK

2747m B.T.U.C. INSTALL NEW 48 FIBER EXISTING 2-50mm RPVC OPTIC CABLE THROUGH JUNCTION BOX INSTALL NEW SPLICE AND NEW HANDWELL 1 A SCALE - 1:500 B A PLAN VIEW MATCH LINE B-B, SEE P2 OF 18 MATCH LINE A-A OWNER ATTACHMENT THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS WORK INSTRUCTION AND THAT APPROVED WITH CHANGES SHOWN ON THIS DRAWING RECORD OF INSPECTION U/G INSTALLATION AERIAL INSTALLATION RECORD OF INSPECTION POSITION PRINT NAME PERMIT # SIGNATURE 2 AS CONSTRUCTED EXISTING 2-50mm RPVC INSTALL NEW 48 FIBER OPTIC CABLE THROUGH JUNCTION BOX DATE B A No.: FIBRE OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY : CONSTRUCTION NOTES : E-11 AND E-12 THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS 1 2

1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, 2) BORE PITS MAY BE NEEDED AND WILL DETERMINED BY LOCATES UTILITIES WITH THE PROPOSED CONDUIT FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE FROM GORE RD TO BRADLEY AVE, LONDON ABERDEEN DR ABERDEEN PHASE 3 - VETERANS MEMORIAL PKWY JULY 24, 2012 JAN 15, 2013 UNDERGROUND AS BUILT DRAWING DATE: RI W.P. N.C. GORE RD WORK AREA Technologies Inc. ON JUNCTION BOX SCALE : DATE : INSTALL 154.7m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC INITIAL PERMIT DRAWING AS BUILT DRAWING

1:500 JAN 15, 2013

REVISIONS: RD SOVEREIGN

VETERANS MEMORIAL PKWY MEMORIAL VETERANS SCANLAN ST SCANLAN

Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: CRUMLIN RD CRUMLIN

PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected]

CRUMLIN RD CRUMLIN 12-0009A P1 OF 18 RD TRAVELLED W.P. W.P. N BY: MATCH LINE B-B, SEE P1 OF 18 MATCH LINE C-C B B C C ABERDEEN DR SOVEREIGN RD N 2 CRUMLIN RD

GORE RD

JUNCTION BOX WORK AREA

VETERANS MEMORIAL PKWY

CRUMLIN RD

TRAVELLED RD

SCANLAN ST

INSTALL 213.1m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX INSTALL NEW 48 FIBER CONSTRUCTION NOTES : JUNCTION BOX OPTIC CABLE THROUGH 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, EXISTING 2-50mm RPVC FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. INSTALL NEW 48 FIBER OPTIC CABLE THROUGH No.: DATE: REVISIONS: BY: EXISTING 2-50mm RPVC

3 RI ON Technologies Inc. D D MATCH LINE D-D, SEE P3 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON SCALE - 1:500 UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH C C THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P2 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE C-C EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P2.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE D-D, SEE P2 OF 18 MATCH LINE E-E D D E E ABERDEEN DR SOVEREIGN RD N 3 VETERANS MEMORIAL PKWY CRUMLIN RD

JUNCTION BOX

GORE RD

WORK AREA

CRUMLIN RD

TRAVELLED RD

SCANLAN ST

INSTALL 213.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT INSTALL NEW 48 FIBER 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES OPTIC CABLE THROUGH EXISTING 2-50mm RPVC CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH 2 JAN 15, 2013 AS BUILT DRAWING W.P. EXISTING 2-50mm RPVC 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

JUNCTION BOX

4 RI ON Technologies Inc. F F MATCH LINE F-F, SEE P4 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON SCALE - 1:500 UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH E E THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P3 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE E-E EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P3.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE F-F, SEE P3 OF 18 MATCH LINE G-G F F G G ABERDEEN DR SOVEREIGN RD N 4 VETERANS MEMORIAL PKWY CRUMLIN RD

GORE RD

WORK AREA

CRUMLIN RD TRAVELLED RD

SCANLAN ST

JUNCTION BOX INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC INSTALL 212.9m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES INSTALL NEW 48 FIBER CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN OPTIC CABLE THROUGH ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS EXISTING 2-50mm RPVC E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE JUNCTION BOX

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

5 RI ON Technologies Inc. H H MATCH LINE H-H, SEE P5 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected] JUNCTION BOX PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON SCALE - 1:500 UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH G G THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P4 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE G-G EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P4.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University CRUMLIN RD

TRAVELLED RD

MATCH LINE H-H, SEE P4 OF 18 MATCH LINE I-I SCANLAN ST H H I I N 5 CATHERINE ST RIVER RD WORK AREA

VETERANS MEMORIAL PKWY

JUNCTION BOX

INSTALL 213.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT JUNCTION BOX 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES INSTALL NEW 48 FIBER CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN OPTIC CABLE THROUGH ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS EXISTING 2-50mm RPVC E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

6 RI ON Technologies Inc. J J MATCH LINE J-J, SEE P6 OF 18 RECORD OF INSPECTION INSTALL NEW 48 FIBER OPTIC CABLE THROUGH THIRD PARTY AS CONSTRUCTED EXISTING 2-50mm RPVC RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON SCALE - 1:500 UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH I I THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P5 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE I-I EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P5.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P6.dwg OWNER ATTACHMENT J K THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS WORK INSTRUCTION AND THAT APPROVED WITH CHANGES SHOWN ON THIS DRAWING RECORD OF INSPECTION U/G INSTALLATION AERIAL INSTALLATION RECORD OF INSPECTION POSITION PRINT NAME PERMIT # SIGNATURE AS CONSTRUCTED DATE MATCH LINE J-J, SEE P5 OF 18 MATCH LINE K-K JUNCTION BOX 6 INSTALL NEW 48 FIBER EXISTING 2-50mm RPVC OPTIC CABLE THROUGH K J SCALE - 1:500 PLAN VIEW K

L B.T.U.C. MATCH LINE L-L, SEE P7 OF 18 MATCH LINE K-K JUNCTION BOX AND NEW HANDWELL INSTALL NEW SPLICE 7

JUNCTION BOX B.T.U.C. INSTALL NEW 48 FIBER EXISTING 2-50mm RPVC OPTIC CABLE THROUGH END METRE MARK AT SPLICE IN NEW HANDWELL 4165m GOING NORTH METRE MARK AT SPLICE IN NEW HANDWELL 1542m K GOING SOUTH METRE MARK 4150m METRE MARK 1527m L

END B.T.U.C. No.: FIBRE OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY : CONSTRUCTION NOTES : E-11 AND E-12 THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS 1 2 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, 2) BORE PITS MAY BE NEEDED AND WILL DETERMINED BY LOCATES UTILITIES WITH THE PROPOSED CONDUIT FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE FROM GORE RD TO BRADLEY AVE, LONDON PHASE 3 - VETERANS MEMORIAL PKWY JULY 24, 2012 JAN 15, 2013 UNDERGROUND AS BUILT DRAWING DATE: RI W.P. N.C. Technologies Inc. ON

JUNCTION BOX RIVER RD RIVER SCALE : DATE :

INSTALL 201.8m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC INITIAL PERMIT DRAWING AS BUILT DRAWING ST SCANLAN WORK AREA 1:500 JAN 15, 2013

REVISIONS:

CRUMLIN RD CRUMLIN VETERANS MEMORIAL PKWY MEMORIAL VETERANS

Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: TRAVELLED RD TRAVELLED PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected]

CATHERINE ST 12-0009A P6 OF 18 W.P. W.P. N BY: CRUMLIN RD

TRAVELLED RD

MATCH LINE L-L, SEE P6 OF 18 MATCH LINE M-M SCANLAN ST L L M M N 7 CATHERINE ST

RIVER RD

WORK AREA VETERANS MEMORIAL PKWY

INSTALL 213.5m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC JUNCTION BOX

JUNCTION BOX

JUNCTION BOX CONSTRUCTION NOTES : INSTALL NEW 48 FIBER 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, OPTIC CABLE THROUGH FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE EXISTING 2-50mm RPVC UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC 2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

8 RI ON Technologies Inc. N N MATCH LINE N-N, SEE P8 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON SCALE - 1:500 UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH M M THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P7 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE M-M EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P7.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University CRUMLIN RD

TRAVELLED RD

MATCH LINE N-N, SEE P7 OF 18 MATCH LINE O-O SCANLAN ST N N O O N 8 CATHERINE ST

RIVER RD

VETERANS MEMORIAL PKWY

WORK AREA

INSTALL 213.2m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH JUNCTION BOX 2 JAN 15, 2013 AS BUILT DRAWING W.P. EXISTING 2-50mm RPVC 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

9 RI ON Technologies Inc. P P MATCH LINE P-P, SEE P9 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW JUNCTION BOX SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON SCALE - 1:500 UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH O O THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P8 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE O-O EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P8.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University CRUMLIN RD

TRAVELLED RD

MATCH LINE P-P, SEE P8 OF 18 MATCH LINE Q-Q SCANLAN ST P P Q Q N 9 CATHERINE ST

RIVER RD

VETERANS MEMORIAL PKWY

JUNCTION BOX WORK AREA

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC INSTALL 212.9m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN JUNCTION BOX ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH 2 JAN 15, 2013 AS BUILT DRAWING W.P. EXISTING 2-50mm RPVC 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

10 RI ON Technologies Inc. R R MATCH LINE R-R, SEE P10 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON SCALE - 1:500 UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH Q Q THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P9 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE Q-Q EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P9.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE R-R, SEE P9 OF 18 MATCH LINE S-S R R S S CATHERINE ST N

10 RIVER RD

VETERANS MEMORIAL PKWY JUNCTION BOX

WORK AREA

INSTALL 212.9m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

INSTALL NEW 48 FIBER JUNCTION BOX OPTIC CABLE THROUGH EXISTING 2-50mm RPVC JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC 2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

11 RI ON Technologies Inc. JUNCTION BOX T T MATCH LINE T-T, SEE P11 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON SCALE - 1:500 UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH S S THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P10 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE S-S EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P10.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE T-T, SEE P10 OF 18 MATCH LINE U-U T T U U WORK AREA N 11

VETERANS MEMORIAL PKWY

HAMILTON RD INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

INSTALL 213.3m OF NEW 48 FIBRE OPTIC CABLE JUNCTION BOX THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX INSTALL NEW 48 FIBER OPTIC CABLE THROUGH CONSTRUCTION NOTES : EXISTING 2-50mm RPVC 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. JUNCTION BOX No.: DATE: REVISIONS: BY:

12 RI ON Technologies Inc. V V MATCH LINE V-V, SEE P12 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON JUNCTION BOX SCALE - 1:500 UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH U U THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P11 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE U-U EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P11.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P12.dwg W V MATCH LINE V-V, SEE P11 OF 18 MATCH LINE W-W 12 JUNCTION BOX INSTALL NEW 48 FIBER EXISTING 2-50mm RPVC OPTIC CABLE THROUGH V W SCALE - 1:500 PLAN VIEW OWNER ATTACHMENT THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH WORK INSTRUCTION AND THAT APPROVED THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS WITH CHANGES SHOWN ON THIS DRAWING RECORD OF INSPECTION U/G INSTALLATION AERIAL INSTALLATION RECORD OF INSPECTION POSITION PRINT NAME PERMIT # SIGNATURE AS CONSTRUCTED X W

B.T.U.C. DATE MATCH LINE X-X, SEE P13 OF 18 END METRE MARK AT SPLICE IN NEW HANDWELL 4165m JUNCTION BOX MATCH LINE W-W

B.T.U.C. GOING SOUTH METRE MARK 4180m 13 JUNCTION BOX INSTALL NEW 48 FIBER EXISTING 2-50mm RPVC OPTIC CABLE THROUGH GOING NORTH METRE MARK AT SPLICE IN NEW HANDWELL 2778m

B.T.U.C. METRE MARK INSTALL NEW SPLICE AND NEW HANDWELL 2763m END W X No.: FIBRE OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY : CONSTRUCTION NOTES : E-11 AND E-12 THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS 1 2 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, 2) BORE PITS MAY BE NEEDED AND WILL DETERMINED BY LOCATES UTILITIES WITH THE PROPOSED CONDUIT FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE FROM GORE RD TO BRADLEY AVE, LONDON PHASE 3 - VETERANS MEMORIAL PKWY JULY 24, 2012 JAN 15, 2013 UNDERGROUND AS BUILT DRAWING DATE: RI W.P. N.C.

HAMILTON RD Technologies Inc. ON JUNCTION BOX SCALE : DATE : INSTALL 256.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC INITIAL PERMIT DRAWING AS BUILT DRAWING 1:500 JAN 15, 2013

REVISIONS:

VETE RANS MEMORIAL PKWY MEMORIAL RANS WORK AREA Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A P12 OF 18 W.P. W.P. N BY: MATCH LINE X-X, SEE P12 OF 18 MATCH LINE Y-Y X X Y Y VETERANS MEMORIAL PKWY N 13

WORK AREA JUNCTION BOX HAMILTON RD

INSTALL 214.2m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH JUNCTION BOX EXISTING 2-50mm RPVC CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES JUNCTION BOX CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

INSTALL NEW 48 FIBER 2 JAN 15, 2013 AS BUILT DRAWING W.P. OPTIC CABLE THROUGH 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. EXISTING 2-50mm RPVC No.: DATE: REVISIONS: BY:

14 RI ON Technologies Inc. Z Z MATCH LINE Z-Z, SEE P14 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION JUNCTION BOX AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON PLAN VIEW UNDERGROUND AS BUILT DRAWING SCALE - 1:500 THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH Y Y THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P13 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE Y-Y EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P13.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE Z-Z, SEE P13 OF 18 MATCH LINE A'-A' Z Z A' A' VETERANS MEMORIAL PKWY N 14

JUNCTION BOX

HAMILTON RD

WORK AREA

INSTALL 215.9m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES INSTALL NEW 48 FIBER CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN OPTIC CABLE THROUGH ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS EXISTING 2-50mm RPVC E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

15 RI ON Technologies Inc. B' B' JUNCTION BOX MATCH LINE B'-B', SEE P15 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP INSTALL NEW 48 FIBER WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 OPTIC CABLE THROUGH ATTACHMENT PERMIT # DATE Email: [email protected] EXISTING 2-50mm RPVC OWNER PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON PLAN VIEW UNDERGROUND AS BUILT DRAWING SCALE - 1:500 THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH A' A' THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P14 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE A'-A' EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P14.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University VETERANS MEMORIAL PKWY MATCH LINE B'-B', SEE P14 OF 18 MATCH LINE C'-C' B' B' C' C' N 15

HAMILTON RD

WORK AREA

INSTALL NEW 48 FIBER JUNCTION BOX OPTIC CABLE THROUGH EXISTING 2-50mm RPVC INSTALL 215.1m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS INSTALL NEW 48 FIBER E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION OPTIC CABLE THROUGH STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE EXISTING 2-50mm RPVC JUNCTION BOX

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

16 RI ON Technologies Inc. D' D' MATCH LINE D'-D', SEE P16 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION JUNCTION BOX PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON PLAN VIEW UNDERGROUND AS BUILT DRAWING SCALE - 1:500 THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH C' C' THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P15 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE C'-C' EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P15.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE D'-D', SEE P15 OF 18 MATCH LINE E'-E' D' D' E' E' WORK N 16 AREA

VETERANS MEMORIAL PKWY

JUNCTION BOX

BRADLEY AVE

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC INSTALL 213.2m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT JUNCTION BOX 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN INSTALL NEW 48 FIBER ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS OPTIC CABLE THROUGH E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION EXISTING 2-50mm RPVC STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

17 RI ON Technologies Inc. F' F' MATCH LINE F'-F', SEE P17 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON PLAN VIEW UNDERGROUND AS BUILT DRAWING SCALE - 1:500 THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH E' E' THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P16 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE E'-E' EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P16.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE F'-F', SEE P16 OF 18 MATCH LINE G'-G' F' F' G' G' N 17

JUNCTION BOX WORK AREA

VETERANS MEMORIAL PKWY

BRADLEY AVE INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

INSTALL 213.0m OF NEW 48 FIBRE OPTIC CABLE INSTALL NEW 48 FIBER THROUGH EXISTING 2-50mm RPVC OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

JUNCTION BOX 18 RI ON Technologies Inc. H' H' MATCH LINE H'-H', SEE P18 OF 18 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON PLAN VIEW UNDERGROUND AS BUILT DRAWING SCALE - 1:500 THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH G' G' THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P17 OF 18 WORK INSTRUCTION AND THAT APPROVED MATCH LINE G'-G' EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P17.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University VETERANS MEMORIAL PKWY N

MATCH LINE H'-H', SEE P17 OF 18 H' H' 18 WORK AREA

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC BRADLEY AVE

INSTALL 36.4m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

INSTALL NEW FOR CONTINUATION HANDWELL SEE UNDERGROUND DRAWING 19 PHASE 3 - VETERANS MEMORIAL PKWY TO AMP, P1 OF 2 JUNCTION BOX

AT NEW HANDWELL CONSTRUCTION NOTES : METRE MARK METRE MARK 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, 5515m 5530m FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 48 FOC 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

RI ON Technologies Inc.

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP APPROX 485.0m FROM CENTERLINE OF BRADLEY AVE APPROX 485.0m FROM CENTERLINE OF BRADLEY WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM GORE RD TO BRADLEY AVE, LONDON PLAN VIEW UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS SCALE - 1:500 RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P18 OF 18 WORK INSTRUCTION AND THAT APPROVED EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Gore Rd to Bradley Ave UG-AB -P18.dwg Rd to Bradley Ave Pkwy from Gore Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected]

AS-BUILT

UNDERGROUND AS BUILT DRAWING - FROM OXFORD ST E TO GORE RD PHASE 3 - VETERANS MEMORIAL PARKWAY, LONDON, ONTARIO ARIZON PROJECT #: 12-0009A

GENERAL NOTES AND LEGEND DRAWING 'A' TYPICAL DETAILS - UNDERGROUND AND AERIAL DRAWING 'B' VETERANS MEMORIAL PKWY - FROM OXFORD ST TO GORE RD P1 OF 20 TO P20 OF 20

MATERIAL QUANTITY 1. NEW 48 FIBRE OPTIC CABLE 4753.0m 2. NEW SPLICE 5 3. NEW HANDWELL 5 4. DIP LOCATION 1 RI ON Technologies Inc. 5. 6. 27 FIMA CRESCENT 7. TORONTO, ONTARIO M8W 3R1 8. PHONE: (416) 848-4220 FAX: (416) 752-8659 9. www.arizon.ca 10. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -TITLE.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -DWG 'A'.dwg 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBRE OPTIC CABLE. 3. ALL CONSTRUCTION MUST COMPLY WITH: 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, DIMENSIONS $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m 7. ALL LOOPBACK LENGTHS OF FIBRE CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. 6. ALL FIBRE ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. 5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. OTHER TELECOM ATTACHMENTS. e. OCCUPATIONAL HEALTH AND SAFETY ACT. d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. c. ONTARIO ELECTRICAL CODE. b. LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 THE CANADIAN STANDARD a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. SUCH UTILITIES AND STRUCTURES, SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM EXACT LOCATION OF ALL THE ACCURACY OF POSITION SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. AND ABOVE GROUND UTILITIES STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE WORK. AT THE SITE AND REPORT ANY DISCREPANCIES TO ENGINEER BEFORE PROCEEDING WITH ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE. EXISTING CONDUIT NEW CONDUIT IN BUILDING EXISTING FIBRE OPTIC CABLE COIL NEW FIBRE OPTIC CABLE COIL EXISTING FIBRE OPTIC CLOSURE EXISTING LOOP BACK NEW FIBRE OPTIC CLOSURE NEW LOOP BACK ELECTRICAL BONDING LOCATIONS TREE TRANSFORMER DIP LOCATION EXISTING GUY EXISTING GUY & ANCHOR NEW GUY NEW GUY & ANCHOR EXISTING POLE AS BUILT - FIBRE OPTIC CABLE METER MARKS RAILWAY FENCE PROPERTY LINE STREET LINE STRAND NEW FIBRE OPTIC CABLE IN EXISTING CONDUIT EXISTING FIBRE OPTIC CABLE NEW FIBRE OPTIC CABLE EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT METRE MARK T m CONCRETE POLE WOODEN POLE PRIMARY CABLES) ALL ATTACHMENTS EXCLUDING POLE DETAIL (WITH HEIGHTS OF NEW HANDWELL NEW CHECK METER NEW JUNCTION BOX EXISTING PANEL NEW PANEL EXISTING PULL BOX NEW PULL BOX CABLE TRAY ?m ?m SECONDARY FIELD SIDE ?m NEW FIBRE DRWN. BY : CHKD. BY : ?m GENERAL NOTES AND LEGEND FROM OXFORD ST TO GORE RD, LONDON HP # HP # PHASE 3 - VETERANS MEMORIAL PKWY C W UNDERGROUND AS BUILT DRAWING ? ? HP # RI W W.P. N.C. Technologies Inc. ON STREET SIDE SCALE : DATE : JANUARY 15, 2013 Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'A' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -DWG 'B'.dwg ABOVE GRADE 2.4m MINIMUM UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES NEW FIBRE POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED B SCALE: N.T.S. ANCHOR DETAIL A NOTE: MINIMUM CABLE HEIGHT REQUIREMENTS SCALE: NTS EXPRESSWAYS AND RAMPS 7.0m (CONSTRUCTED) OVER FREEWAYS, 6.0m (MINIMUM) 300 TO 18000 VOLTS LIKELY TO BE TRAVELLED BY ALONGSIDE FARMLAND NOT B= 1.8m A= 150mm-300mm INSULATOR POWER COMPANY CONTACT AREA POSSIBLE SAG 4.7m (CONSTRUCTED) 3.3m (MINIMUM) A VEHICLES OVER OR B DRIVEWAYS (OTHER THAN TO RESIDENCES HIGHWAYS, STREETS, LANES, ALLEYS AND BY ROAD VEHICLES, INCLUDING KING'S OVER LAND LIKELY TO BE TRAVELLED THE LIMITS (WITH NO OVERHANG) OF STREETS AND KING'S HIGHWAYS IN TRAVELLED BY ROAD VEHICLES. ALONGSIDE LAND LIKELY TO BE DENSELY POPULATED AREAS. OVER THE RIGHT OF WAY UNDERGROUND PIPELINES OR RESIDENCE GARAGES) TRAVELLED BY VEHICLES. FARMLAND LIKELY TO BE ALONGSIDE AND WITHIN ABOVE GRADE 2.0m MINIMUM 5.5m (CONSTRUCTED) OVER OR ALONGSIDE NEW FIBRE UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED C 4.7m (MINIMUM) SCALE: N.T.S. ANCHOR DETAIL SIDEWALK GUY AND NOTE: ACCESSIBLE TO PEDESTRIANS 3.5m (CONSTRUCTED) OVER WALKWAYS OR GROUND NORMALLY 2.8m (MINIMUM) ONLY 300 TO 18000 VOLTS OVER DRIVEWAYS TO RESIDENCES AND RESIDENCE GARAGES FOR CONTACT AREA POSSIBLE SAG VEHICLES NOT OVER 2.4m 4.7m (CONSTRUCTED) B= 1.8m A= 150mm-300mm A INSULATOR POWER COMPANY 4.0m (MINMUM) IN HEIGHT OVERALL LENGTH B 8.2m (CONSTRUCTED) ABOVE TOP OF RAIL 7.6m (MINIMUM) AT RAILWAY CROSSINGS D BENDING RADIUS SCALE: N.T.S. VARIES CABLE DIP DETAIL 150mm 100mm 50 300mm REFERENCES: ONTARIO ELECTRICAL SAFETY CODE CSA STD. C22.3 NO. 1-10 OVERHEAD SYSTEMS FIBRE OPTIC INSTALLATION SEPARATIONS FOR OVERHEAD (AERIAL) OUTSIDE PLANT UNIVERSITY OF WESTERN ONTARIO CABLE - CLEARANCES AND R + 100mm 100 CONDUIT GRADE U-GUARD SEALED POLE F SCALE: N.T.S. HANDWELL DETAIL 1-38mm (1.5") DUCTS GRAVEL FOR DRAINAGE 0.3m DEPTH OF RADIUS) R- (MINIMUM BENDING GRASS BOULEVARD 1-38mm (1.5") DUCTS FOR DIAMETER, TYPE (REFER TO DRAWING NEW HDPE CONDUIT E AND QUANTITY) 4. INSTALL HANDWELL LID FLUSH TO GRASS 3. R IS THE MINIMUM BENDING RADIUS (R= 20x 2. SLACK TO BE STORED IN A FIGURE EIGHT 1. FOR HANDWELL DIMENSIONS SEE NOTES: CONFIGURATION FOR EASIER REUSE. CONSTRUCTION NOTES. THE OUTSIDE CABLE DIAMETER). BOULEVARD GRADE. WARNING TAPE NATIVE SOIL SCALE: N.T.S. CONDUIT DETAIL TYPICAL UNDERGROUND BOULEVARD/GRASS TYPICAL TRENCH WIDTH 24" NEW HDPE SDR11 CONDUIT GRAVEL FOR DRAINAGE 0.3m DEPTH OF LENGTH FOR DIAMETER, TYPE (REFER TO DRAWING 36" AND QUANTITY) GRANULAR BASE 1-38mm (1.5") DUCTS NATIVE SOIL ASPHALT DEPTH 0.3m 24" DRIVEWAY CROSSING (BORE) TYPICAL TYPICAL DETAILS - UNDERGROUND AND AERIAL DRWN. BY : CHKD. BY : FROM OXFORD ST TO GORE RD, LONDON PHASE 3 - VETERANS MEMORIAL PKWY UNDERGROUND AS BUILT DRAWING NEW HDPE SDR11 CONDUIT RI W.P. N.C. FOR DIAMETER, TYPE (REFER TO DRAWING Technologies Inc. ON AND QUANTITY) SCALE : DATE : FILL UNSHRINKABLE ASPHALT JANUARY 15, 2013 NOT TO SCALE TYPICAL ROAD CROSSING (BORE) Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'B' MATCH LINE A-A A A N OXFORD ST E FOR CONTINUATION SEE AERIAL DWG CRUMLIN RD

PHASE 3 - OXFORD ST E ARTISANS CRES P10 OF 10 WORK AREA VETERANS MEMORIAL PKWY

CUDDY BLVD

COIL IN NEW HANDWELL JUNCTION INDUSTRIAL RD METRE MARK METRE MARK BOX 5443m 5473m

PAGE ST

1 AT SPLICE METRE MARK METRE MARK INSTALL NEW HANDWELL DIP LOCATION 5287m 5317m END 48 FOC INSTALL 126.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING TRAFFIC CONDUIT

INSTALL 162.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

INSTALL NEW 48 FIBER JUNCTION BOX OPTIC CABLE THROUGH JUNCTION BOX EXISTING 2-50mm RPVC CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, 2 FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE JUNCTION BOX UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

3 RI ON INSTALL NEW 48 FIBER B B Technologies Inc. OPTIC CABLE THROUGH EXISTING 2-50mm RPVC MATCH LINE B-B, SEE P2 OF 20 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS A A RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. MATCH LINE A-A PLAN VIEW THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P1 OF 20 WORK INSTRUCTION AND THAT APPROVED SCALE - 1:500 EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P1.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE B-B, SEE P1 OF 20 MATCH LINE C-C VETERANS MEMORIAL PKWY B B C C N OXFORD ST E 3

CRUMLIN RD

ARTISANS CRES

WORK AREA

CUDDY BLVD

INDUSTRIAL RD

JUNCTION BOX

PAGE ST

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH INSTALL 211.0m OF NEW 48 FIBRE OPTIC CABLE EXISTING 2-50mm RPVC THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX

INSTALL NEW 48 FIBER CONSTRUCTION NOTES : OPTIC CABLE THROUGH 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, JUNCTION BOX EXISTING 2-50mm RPVC FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

4 RI ON D D Technologies Inc. MATCH LINE D-D, SEE P3 OF 20

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED JUNCTION BOX RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING PLAN VIEW THIS IS TO CERTIFY THAT THE CONSTRUCTION AS C C RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. MATCH LINE C-C SCALE - 1:500 THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P2 OF 20 WORK INSTRUCTION AND THAT APPROVED EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P2.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE D-D, SEE P2 OF 20 MATCH LINE E-E D D E E N OXFORD ST E 4

VETERANS MEMORIAL PKWY JUNCTION BOX CRUMLIN RD

ARTISANS CRES

CUDDY BLVD

INDUSTRIAL RD WORK AREA

PAGE ST

INSTALL 211.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC JUNCTION BOX JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC 2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

JUNCTION BOX 5 RI ON F F Technologies Inc. MATCH LINE F-F, SEE P4 OF 20

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS E E PLAN VIEW RECORDED IN THIS DRAWING IS CONSISTENT WITH CHKD. BY : N.C. DATE : JANUARY 15, 2013 DWG No. : P3 OF 20 MATCH LINE E-E SCALE - 1:500 THE APPROVED PLAN, STANDARD DESIGNS, OR WORK INSTRUCTION AND THAT APPROVED EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P3.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE F-F, SEE P3 OF 20 MATCH LINE G-G F F G G N OXFORD ST E 5

CRUMLIN RD

ARTISANS CRES VETERANS MEMORIAL PKWY

CUDDY BLVD

INDUSTRIAL RD

WORK PAGE ST AREA

INSTALL 216.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH INSTALL NEW 48 FIBER EXISTING 2-50mm RPVC OPTIC CABLE THROUGH EXISTING 2-50mm RPVC JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES JUNCTION BOX CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P.

JUNCTION BOX No.: DATE: REVISIONS: BY:

6 RI ON H H Technologies Inc. MATCH LINE H-H, SEE P5 OF 20

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME JUNCTION BOX FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS G G RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. MATCH LINE G-G PLAN VIEW THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P4 OF 20 WORK INSTRUCTION AND THAT APPROVED SCALE - 1:500 EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P4.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE H-H, SEE P4 OF 20 MATCH LINE I-I H H I I CRUMLIN RD PAGE ST N 6 WORK JUNCTION BOX AREA

INDUSTRIAL RD

OSLER ST

DUNDAS ST

VETERANS MEMORIAL PKWY INSTALL NEW 48 FIBER OPTIC CABLE THROUGH BONAVENTURE DR EXISTING 2-50mm RPVC SOVEREIGN RD CARLYLE DR

TIFFANY DR

INSTALL 213.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. INSTALL NEW 48 FIBER 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. OPTIC CABLE THROUGH EXISTING 2-50mm RPVC No.: DATE: REVISIONS: BY: JUNCTION BOX

7 RI ON J J Technologies Inc. MATCH LINE J-J, SEE P6 OF 20

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS I I RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. MATCH LINE I-I PLAN VIEW THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P5 OF 20 WORK INSTRUCTION AND THAT APPROVED SCALE - 1:500 EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P5.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE J-J, SEE P5 OF 20 MATCH LINE K-K J J K K CRUMLIN RD PAGE ST N 7

WORK AREA

INDUSTRIAL RD

OSLER ST

DUNDAS ST

VETERANS MEMORIAL PKWY

BONAVENTURE DR SOVEREIGN RD INSTALL NEW 48 FIBER CARLYLE DR

OPTIC CABLE THROUGH TIFFANY DR EXISTING 2-50mm RPVC

INSTALL 212.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY: JUNCTION BOX

8 RI ON L L Technologies Inc. MATCH LINE L-L, SEE P7 OF 20

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS K K RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. MATCH LINE K-K PLAN VIEW THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P6 OF 20 WORK INSTRUCTION AND THAT APPROVED SCALE - 1:500 EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P6.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE L-L, SEE P6 OF 20 MATCH LINE M-M L L M M VETERANS MEMORIAL PKWY PAGE ST N 8 AT SPLICE IN NEW HANDWELL METRE MARK METRE MARK 6901m 6916m

INDUSTRIAL RD GOING NORTH END WORK OSLER ST AREA CRUMLIN RD

DUNDAS ST

BONAVENTURE DR SOVEREIGN RD AT SPLICE IN NEW HANDWELL CARLYLE DR METRE MARK METRE MARK INSTALL NEW SPLICE TIFFANY DR 6916 6931 AND NEW HANDWELL END GOING SOUTH

INSTALL 220.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, JUNCTION BOX FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS INSTALL NEW 48 FIBER E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION OPTIC CABLE THROUGH STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE EXISTING 2-50mm RPVC

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. JUNCTION BOX No.: DATE: REVISIONS: BY:

9 RI ON N N Technologies Inc. MATCH LINE N-N, SEE P8 OF 20

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS M M RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. MATCH LINE M-M PLAN VIEW THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P7 OF 20 WORK INSTRUCTION AND THAT APPROVED SCALE - 1:500 EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P7.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE N-N, SEE P7 OF 20 MATCH LINE O-O N N O O VETERANS MEMORIAL PKWY PAGE ST N 9

INDUSTRIAL RD

OSLER ST CRUMLIN RD DUNDAS ST WORK AREA

BONAVENTURE DR SOVEREIGN RD CARLYLE DR

TIFFANY DR

INSTALL 212.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX

JUNCTION BOX CONSTRUCTION NOTES : INSTALL NEW 48 FIBER 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, OPTIC CABLE THROUGH FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE INSTALL NEW 48 FIBER EXISTING 2-50mm RPVC UTILITIES WITH THE PROPOSED CONDUIT OPTIC CABLE THROUGH 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES EXISTING 2-50mm RPVC CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY: JUNCTION BOX

10 RI ON P P Technologies Inc. MATCH LINE P-P, SEE P9 OF 20

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS O O RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. MATCH LINE O-O PLAN VIEW THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P8 OF 20 WORK INSTRUCTION AND THAT APPROVED SCALE - 1:500 EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P8.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE P-P, SEE P8 OF 20 MATCH LINE Q-Q P P Q Q SOVEREIGN RD N WORK 10 AREA CRUMLIN RD

BONAVENTURE DR

VAUBOIS PL CARLYLE DR

VETERANS MEMORIALINTREPID PKWY CT BELLEISLE CT ADMIRAL DR

NAPOLEON DR MARTINET AVE SWIFTSURE CT

JUNCTION BOX JENA CRES BUCHAN RD

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH INSTALL 211.0m OF NEW 48 FIBRE OPTIC CABLE EXISTING 2-50mm RPVC THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC 2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. JUNCTION BOX No.: DATE: REVISIONS: BY:

11 RI ON R R Technologies Inc. MATCH LINE R-R, SEE P10 OF 20

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net JUNCTION BOX ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS Q Q RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. MATCH LINE Q-Q PLAN VIEW THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P9 OF 20 WORK INSTRUCTION AND THAT APPROVED SCALE - 1:500 EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P9.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE R-R, SEE P9 OF 20 MATCH LINE S-S R R S S SOVEREIGN RD N 11 CRUMLIN RD

BONAVENTURE DR WORK AREA

VAUBOIS PL CARLYLE DR

VETERANS MEMORIALINTREPID PKWY CT BELLEISLE CT ADMIRAL DR JUNCTION BOX

NAPOLEON DR MARTINET AVE SWIFTSURE CT

JENA CRES BUCHAN RD

INSTALL 211.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN JUNCTION BOX ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH 2 JAN 15, 2013 AS BUILT DRAWING W.P. EXISTING 2-50mm RPVC 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

12 RI ON T T Technologies Inc. MATCH LINE T-T, SEE P11 OF 20

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS S S RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. MATCH LINE S-S PLAN VIEW THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P10 OF 20 WORK INSTRUCTION AND THAT APPROVED SCALE - 1:500 EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P10.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE T-T, SEE P10 OF 20 MATCH LINE U-U T T U U SOVEREIGN RD N VETERANS MEMORIAL PKWY

12 CRUMLIN RD

BONAVENTURE DR

JUNCTION BOX JUNCTION BOX WORK VAUBOIS PL AREA CARLYLE DR

AT SPLICE IN NEW HANDWELL INTREPID CT BELLEISLE CT ADMIRAL DR METRE MARK METRE MARK

7770 7785m NAPOLEON DR MARTINET AVE SWIFTSURE CT GOING NORTH END JENA CRES BUCHAN RD

AT SPLICE IN NEW HANDWELL INSTALL NEW 48 FIBER METRE MARK METRE MARK OPTIC CABLE THROUGH INSTALL 198.0m OF NEW 48 FIBRE OPTIC CABLE EXISTING 2-50mm RPVC 8495m 8480m INSTALL NEW SPLICE THROUGH EXISTING 2-50mm RPVC END GOING SOUTH AND NEW HANDWELL

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, JUNCTION BOX FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE U U MATCH LINE U-U

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

RI ON Technologies Inc.

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION JUNCTION BOX SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER INSTALL NEW 48 FIBER Email: [email protected] PRINT NAME OPTIC CABLE THROUGH PLAN VIEW EXISTING 2-50mm RPVC FIBRE OPTIC CABLE INSTALLATION POSITION SCALE - 1:500 PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS 13 RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR V V CHKD. BY : N.C. DATE : JANUARY 15, 2013 DWG No. : P11 OF 20 WORK INSTRUCTION AND THAT APPROVED MATCH LINE V-V, SEE P12 OF 20 EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P11.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE V-V, SEE P11 OF 20 MATCH LINE W-W V V W W SOVEREIGN RD N VETERANS MEMORIAL PKWY

13 CRUMLIN RD

BONAVENTURE DR

VAUBOIS PL WORK JUNCTION BOX CARLYLE DR AREA

INTREPID CT BELLEISLE CT ADMIRAL DR

NAPOLEON DR MARTINET AVE SWIFTSURE CT

JENA CRES BUCHAN RD

INSTALL NEW 48 FIBER INSTALL 214.0m OF NEW 48 FIBRE OPTIC CABLE OPTIC CABLE THROUGH THROUGH EXISTING 2-50mm RPVC EXISTING 2-50mm RPVC

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN JUNCTION BOX INSTALL NEW 48 FIBER ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS OPTIC CABLE THROUGH E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION EXISTING 2-50mm RPVC STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

14 RI ON Technologies Inc. X X MATCH LINE X-X, SEE P13 OF 20 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS PLAN VIEW RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. W W SCALE - 1:500 THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P12 OF 20 WORK INSTRUCTION AND THAT APPROVED MATCH LINE W-W EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P12.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE X-X, SEE P12 OF 20 MATCH LINE Y-Y X X Y Y SOVEREIGN RD N VETERANS MEMORIAL PKWY

14 CRUMLIN RD

BONAVENTURE DR JUNCTION BOX

VAUBOIS PL CARLYLE DR

INTREPID CT BELLEISLE CT ADMIRAL DR WORK NAPOLEON DR MARTINET AVE AREA SWIFTSURE CT

INSTALL NEW 48 FIBER JENA CRES BUCHAN RD OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

INSTALL 214.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC 2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

JUNCTION BOX

15 RI ON Technologies Inc. Z Z MATCH LINE Z-Z, SEE P14 OF 20 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS PLAN VIEW RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. Y Y SCALE - 1:500 THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P13 OF 20 WORK INSTRUCTION AND THAT APPROVED MATCH LINE Y-Y EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P13.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE Z-Z, SEE P13 OF 20 MATCH LINE A'-A' MARTINET AVE SWIFTSURE Z Z A' A' CT BOURBON LN N 15 WORK AREA

TRAFALGAR ST

SOVEREIGN RD

CRUMLIN RD VETERANS MEMORIAL PKWY

MAYNARD PATTERSON BLVD

RAILTON AVE SUNRISE CRES

AT SPLICE IN NEW HANDWELL NEPTUNE CRES METRE MARK METRE MARK 7800m 7785m KENNEDY PL ROMAN GOING NORTH END CRES INSTALL NEW SPLICE TARTAN DR AND NEW HANDWELL BOWCOTT CRES

INSTALL 215.0m OF NEW 48 FIBRE OPTIC CABLE JUNCTION BOX THROUGH EXISTING 2-50mm RPVC INSTALL NEW 48 FIBER OPTIC CABLE THROUGH AT SPLICE IN NEW HANDWELL EXISTING 2-50mm RPVC INSTALL NEW 48 FIBER METRE MARK METRE MARK OPTIC CABLE THROUGH EXISTING 2-50mm RPVC 8495m 8510m END GOING SOUTH JUNCTION BOX JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE JUNCTION BOX

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

A' A' RI ON MATCH LINE A'-A' Technologies Inc.

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS 16 RECORDED IN THIS DRAWING IS CONSISTENT WITH PLAN VIEW CHKD. BY : N.C. DATE : JANUARY 15, 2013 DWG No. : P14 OF 20 THE APPROVED PLAN, STANDARD DESIGNS, OR SCALE - 1:500 B' B' WORK INSTRUCTION AND THAT APPROVED EQUIPMENT HAS BEEN USED. MATCH LINE B'-B', SEE P15 OF 20 DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P14.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE B'-B', SEE P14 OF 20 MATCH LINE C'-C' MARTINET AVE SWIFTSURE B' B' C' C' CT BOURBON LN N 16

TRAFALGAR ST JUNCTION BOX WORK SOVEREIGN RD AREA CRUMLIN RD

MAYNARD PATTERSON BLVD

RAILTON AVE SUNRISE CRES

VETERANS MEMORIAL PKWY NEPTUNE CRES

KENNEDY PL ROMAN CRES TARTAN DR

BOWCOTT CRES

INSTALL 214.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC 2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

JUNCTION BOX

17 RI ON Technologies Inc. D' D' MATCH LINE D'-D', SEE P16 OF 20 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS PLAN VIEW RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. C' C' SCALE - 1:500 THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P15 OF 20 WORK INSTRUCTION AND THAT APPROVED MATCH LINE C'-C' EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P15.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE D'-D', SEE P15 OF 20 MATCH LINE E'-E' MARTINET AVE SWIFTSURE D' D' E' E' CT BOURBON LN N VETERANS MEMORIAL PKWY 17

TRAFALGAR ST

CRUMLIN RD

MAYNARD PATTERSON BLVD

RAILTON AVE SUNRISE CRES WORK AREA

NEPTUNE CRES

SOVEREIGN RD

KENNEDY PL ROMAN CRES TARTAN DR JUNCTION BOX BOWCOTT CRES

INSTALL 214.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX INSTALL NEW 48 FIBER CONSTRUCTION NOTES : OPTIC CABLE THROUGH EXISTING 2-50mm RPVC 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

JUNCTION BOX 2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

18 RI ON Technologies Inc. F' F' MATCH LINE F'-F', SEE P17 OF 20 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY SIGNATURE FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS PLAN VIEW RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. E' E' SCALE - 1:500 THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P16 OF 20 WORK INSTRUCTION AND THAT APPROVED MATCH LINE E'-E' EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P16.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE F'-F', SEE P16 OF 20 MATCH LINE G'-G' MARTINET AVE SWIFTSURE F' F' G' G' CT BOURBON LN N 18 VETERANS MEMORIAL PKWY

RECORD OF INSPECTION TRAFALGAR ST THIRD PARTY AS CONSTRUCTED INSTALL NEW 48 FIBER OPTIC CABLE THROUGH RECORD OF INSPECTION CRUMLIN RD EXISTING 2-50mm RPVC SOVEREIGN RD AS CONSTRUCTED MAYNARD PATTERSON BLVD AERIAL INSTALLATION RAILTON AVE U/G INSTALLATION SUNRISE CRES WITH CHANGES SHOWN ON THIS DRAWING ATTACHMENT PERMIT # DATE NEPTUNE CRES OWNER WORK JUNCTION BOX PRINT NAME AREA KENNEDY PL ROMAN POSITION CRES TARTAN DR SIGNATURE BOWCOTT CRES THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR WORK INSTRUCTION AND THAT APPROVED INSTALL 251.0m OF NEW 48 FIBRE OPTIC CABLE EQUIPMENT HAS BEEN USED. THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN JUNCTION BOX ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH 2 JAN 15, 2013 AS BUILT DRAWING W.P. EXISTING 2-50mm RPVC 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

JUNCTION BOX RI ON Technologies Inc.

JUNCTION BOX

SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected] FIBRE OPTIC CABLE INSTALLATION PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW FROM OXFORD ST TO GORE RD, LONDON SCALE - 1:500 19 UNDERGROUND AS BUILT DRAWING

G' G' H' H' CHKD. BY : N.C. DATE : JANUARY 15, 2013 DWG No. : P17 OF 20 MATCH LINE G'-G' MATCH LINE H'-H', SEE P18 OF 20 DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P17.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE H'-H', SEE P17 OF 20 MATCH LINE I'-I' H' H' I' I' N 19 WORK TARTAN DR AREA NEPTUNE CRES JUNCTION BOX SOVEREIGN RD CRUMLIN RD

ABERDEEN DR

BOURNEMOUTH DR VETERANS MEMORIAL PKWY

KINGSBRIDGE ST

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC WEYMOUTH DR GORE RD

MARCONI BLVD

INSTALL 214.0m OF NEW 48 FIBRE OPTIC CABLE JUNCTION BOX THROUGH EXISTING 2-50mm RPVC INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY:

JUNCTION BOX 20 RI ON Technologies Inc. J' J' MATCH LINE J'-J', SEE P19 OF 20 RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW SIGNATURE FROM OXFORD ST TO GORE RD, LONDON SCALE - 1:500 UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH N.C. I' I' THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : DATE : JANUARY 15, 2013 DWG No. : P18 OF 20 WORK INSTRUCTION AND THAT APPROVED MATCH LINE I'-I' EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P18.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE J'-J', SEE P18 OF 20 MATCH LINE K'-K' J' J' K' K' VETERANS MEMORIAL PKWY TARTAN DR N 20 SOVEREIGN RD

RECORD OF INSPECTION NEPTUNE CRES

THIRD PARTY AS CONSTRUCTED CRUMLIN RD RECORD OF INSPECTION WORK AS CONSTRUCTED AREA AERIAL INSTALLATION ABERDEEN DR U/G INSTALLATION BOURNEMOUTH DR

KINGSBRIDGE ST WITH CHANGES SHOWN ON THIS DRAWING ATTACHMENT PERMIT # DATE OWNER

PRINT NAME

POSITION WEYMOUTH DR JUNCTION BOX GORE RD SIGNATURE

MARCONI BLVD THIS IS TO CERTIFY THAT THE CONSTRUCTION AS RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR WORK INSTRUCTION AND THAT APPROVED EQUIPMENT HAS BEEN USED. INSTALL 247.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

JUNCTION BOX CONSTRUCTION NOTES : INSTALL NEW 48 FIBER 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, OPTIC CABLE THROUGH FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE EXISTING 2-50mm RPVC UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN JUNCTION BOX ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE

INSTALL NEW 48 FIBER 2 JAN 15, 2013 AS BUILT DRAWING W.P. OPTIC CABLE THROUGH 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. EXISTING 2-50mm RPVC No.: DATE: REVISIONS: BY:

RI ON Technologies Inc.

SITE CONTACT: BRAD W. GRAY, CCNA, CCNP JUNCTION BOX Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected] FIBRE OPTIC CABLE INSTALLATION PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW FROM OXFORD ST TO GORE RD, LONDON UNDERGROUND AS BUILT DRAWING SCALE - 1:500 21 K' K' L' L' CHKD. BY : N.C. DATE : JANUARY 15, 2013 DWG No. : P19 OF 20 MATCH LINE K'-K' MATCH LINE L'-L', SEE P20 OF 20 DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P19.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University MATCH LINE L'-L', SEE P19 OF 20 MATCH LINE M'-M' L' L' M' M' N 21 SOVEREIGN RD RECORD OF INSPECTION TARTAN DR VETERANS MEMORIAL PKWY NEPTUNE CRES THIRD PARTY AS CONSTRUCTED CRUMLIN RD RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION

U/G INSTALLATION ABERDEEN DR BOURNEMOUTH DR

WITH CHANGES SHOWN ON THIS DRAWING KINGSBRIDGE ST ATTACHMENT PERMIT # DATE WORK OWNER AREA JUNCTION BOX PRINT NAME

POSITION WEYMOUTH DR SIGNATURE GORE RD

THIS IS TO CERTIFY THAT THE CONSTRUCTION AS MARCONI BLVD RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR WORK INSTRUCTION AND THAT APPROVED EQUIPMENT HAS BEEN USED. INSTALL 224.0m OF NEW 48 FIBRE OPTIC CABLE THROUGH EXISTING 2-50mm RPVC INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC

INSTALL NEW 48 FIBER OPTIC CABLE THROUGH EXISTING 2-50mm RPVC JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE JUNCTION BOX

2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY: AT SPLICE IN NEW HANDWELL METRE MARK METRE MARK 10025m 10040m GOING NORTH END RI ON Technologies Inc.

JUNCTION BOX

JUNCTION BOX 22 SITE CONTACT: INSTALL NEW SPLICE BRAD W. GRAY, CCNA, CCNP FOR CONTINUATION AND NEW HANDWELL Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 SEE UNDERGROUND DWG Email: [email protected] PHASE 3 - VETERANS MEMORIAL PKWY FROM GORE RD TO BRADLEY AVE FIBRE OPTIC CABLE INSTALLATION P1 OF 18 PHASE 3 - VETERANS MEMORIAL PKWY PLAN VIEW FROM OXFORD ST TO GORE RD, LONDON SCALE - 1:500 UNDERGROUND AS BUILT DRAWING

M' M' CHKD. BY : N.C. DATE : JANUARY 15, 2013 DWG No. : P20 OF 20 MATCH LINE M'-M' DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy from Oxford St to Gore Rd UG-AB -P20.dwg St to Gore Rd Pkwy from Oxford Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected]

AS-BUILT

UNDERGROUND AS BUILT DRAWING - FROM VETERANS MEMORIAL PKWY TO AMP PHASE 3 - VETERANS MEMORIAL PARKWAY, LONDON, ONTARIO ARIZON PROJECT #: 12-0009A

GENERAL NOTES AND LEGEND DRAWING 'A' TYPICAL DETAILS - UNDERGROUND AND AERIAL DRAWING 'B' FROM VETERANS MEMORIAL PKWY TO AMP P1 OF 2 TO P2 OF 2

MATERIAL QUANTITY 1. NEW 48 FIBRE OPTIC CABLE 503.0m 2. NEW 50mm(2") HDPE CONDUIT 590.4m 3. NEW HANDWELL 1 4. RI ON Technologies Inc. 5. 6. 27 FIMA CRESCENT 7. TORONTO, ONTARIO M8W 3R1 8. PHONE: (416) 848-4220 FAX: (416) 752-8659 9. www.arizon.ca 10. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy to AMP UG-AB -TITLE.dwg Pkwy to AMP UG-AB Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy to AMP UG-AB -DWG 'A'.dwg 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBRE OPTIC CABLE. 3. ALL CONSTRUCTION MUST COMPLY WITH: 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, DIMENSIONS $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m 7. ALL LOOPBACK LENGTHS OF FIBRE CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. 6. ALL FIBRE ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. 5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. OTHER TELECOM ATTACHMENTS. e. OCCUPATIONAL HEALTH AND SAFETY ACT. d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. c. ONTARIO ELECTRICAL CODE. b. LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 THE CANADIAN STANDARD a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. SUCH UTILITIES AND STRUCTURES, SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM EXACT LOCATION OF ALL THE ACCURACY OF POSITION SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. AND ABOVE GROUND UTILITIES STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE WORK. AT THE SITE AND REPORT ANY DISCREPANCIES TO ENGINEER BEFORE PROCEEDING WITH ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE. EXISTING CONDUIT NEW CONDUIT IN BUILDING EXISTING FIBRE OPTIC CABLE COIL NEW FIBRE OPTIC CABLE COIL EXISTING FIBRE OPTIC CLOSURE EXISTING LOOP BACK NEW FIBRE OPTIC CLOSURE NEW LOOP BACK ELECTRICAL BONDING LOCATIONS TREE TRANSFORMER DIP LOCATION EXISTING GUY EXISTING GUY & ANCHOR NEW GUY NEW GUY & ANCHOR EXISTING POLE AS BUILT - FIBRE OPTIC CABLE METER MARKS RAILWAY FENCE PROPERTY LINE STREET LINE STRAND NEW FIBRE OPTIC CABLE IN EXISTING CONDUIT EXISTING FIBRE OPTIC CABLE NEW FIBRE OPTIC CABLE EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT METRE MARK T m CONCRETE POLE WOODEN POLE PRIMARY CABLES) ALL ATTACHMENTS EXCLUDING POLE DETAIL (WITH HEIGHTS OF NEW HANDWELL NEW CHECK METER NEW JUNCTION BOX EXISTING PANEL NEW PANEL EXISTING PULL BOX NEW PULL BOX CABLE TRAY ?m ?m SECONDARY FIELD SIDE ?m NEW FIBRE DRWN. BY : CHKD. BY : ?m FROM VETERANS MEMORIAL PKWY TO AMP GENERAL NOTES AND LEGEND HP # HP # C W UNDERGROUND AS BUILT DRAWING ? ? HP # RI W W.P. N.C. Technologies Inc. ON STREET SIDE SCALE : DATE : JAN 15, 2013 PHASE 3 Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'A' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy to AMP UG-AB -DWG 'B'.dwg ABOVE GRADE 2.4m MINIMUM UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES NEW FIBRE POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED B SCALE: N.T.S. ANCHOR DETAIL A NOTE: MINIMUM CABLE HEIGHT REQUIREMENTS SCALE: NTS EXPRESSWAYS AND RAMPS 7.0m (CONSTRUCTED) OVER FREEWAYS, 6.0m (MINIMUM) 300 TO 18000 VOLTS LIKELY TO BE TRAVELLED BY ALONGSIDE FARMLAND NOT B= 1.8m A= 150mm-300mm INSULATOR POWER COMPANY CONTACT AREA POSSIBLE SAG 4.7m (CONSTRUCTED) 3.3m (MINIMUM) A VEHICLES OVER OR B DRIVEWAYS (OTHER THAN TO RESIDENCES HIGHWAYS, STREETS, LANES, ALLEYS AND BY ROAD VEHICLES, INCLUDING KING'S OVER LAND LIKELY TO BE TRAVELLED THE LIMITS (WITH NO OVERHANG) OF STREETS AND KING'S HIGHWAYS IN TRAVELLED BY ROAD VEHICLES. ALONGSIDE LAND LIKELY TO BE DENSELY POPULATED AREAS. OVER THE RIGHT OF WAY UNDERGROUND PIPELINES OR RESIDENCE GARAGES) TRAVELLED BY VEHICLES. FARMLAND LIKELY TO BE ALONGSIDE AND WITHIN ABOVE GRADE 2.0m MINIMUM 5.5m (CONSTRUCTED) OVER OR ALONGSIDE NEW FIBRE UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED C 4.7m (MINIMUM) SCALE: N.T.S. ANCHOR DETAIL SIDEWALK GUY AND NOTE: ACCESSIBLE TO PEDESTRIANS 3.5m (CONSTRUCTED) OVER WALKWAYS OR GROUND NORMALLY 2.8m (MINIMUM) ONLY 300 TO 18000 VOLTS OVER DRIVEWAYS TO RESIDENCES AND RESIDENCE GARAGES FOR CONTACT AREA POSSIBLE SAG VEHICLES NOT OVER 2.4m 4.7m (CONSTRUCTED) B= 1.8m A= 150mm-300mm A INSULATOR POWER COMPANY 4.0m (MINMUM) IN HEIGHT OVERALL LENGTH B 8.2m (CONSTRUCTED) ABOVE TOP OF RAIL 7.6m (MINIMUM) AT RAILWAY CROSSINGS D BENDING RADIUS SCALE: N.T.S. VARIES CABLE DIP DETAIL 150mm 100mm 50 300mm REFERENCES: ONTARIO ELECTRICAL SAFETY CODE CSA STD. C22.3 NO. 1-10 OVERHEAD SYSTEMS FIBRE OPTIC INSTALLATION SEPARATIONS FOR OVERHEAD (AERIAL) OUTSIDE PLANT UNIVERSITY OF WESTERN ONTARIO CABLE - CLEARANCES AND R + 100mm 100 CONDUIT GRADE U-GUARD SEALED POLE F SCALE: N.T.S. HANDWELL DETAIL 1-38mm (1.5") DUCTS GRAVEL FOR DRAINAGE 0.3m DEPTH OF RADIUS) R- (MINIMUM BENDING GRASS BOULEVARD 1-38mm (1.5") DUCTS FOR DIAMETER, TYPE (REFER TO DRAWING NEW HDPE CONDUIT E AND QUANTITY) 4. INSTALL HANDWELL LID FLUSH TO GRASS 3. R IS THE MINIMUM BENDING RADIUS (R= 20x 2. SLACK TO BE STORED IN A FIGURE EIGHT 1. FOR HANDWELL DIMENSIONS SEE NOTES: CONFIGURATION FOR EASIER REUSE. CONSTRUCTION NOTES. THE OUTSIDE CABLE DIAMETER). BOULEVARD GRADE. WARNING TAPE NATIVE SOIL SCALE: N.T.S. CONDUIT DETAIL TYPICAL UNDERGROUND BOULEVARD/GRASS TYPICAL TRENCH WIDTH 24" NEW HDPE SDR11 CONDUIT GRAVEL FOR DRAINAGE 0.3m DEPTH OF LENGTH FOR DIAMETER, TYPE (REFER TO DRAWING 36" AND QUANTITY) GRANULAR BASE 1-38mm (1.5") DUCTS NATIVE SOIL ASPHALT DEPTH 0.3m 24" DRIVEWAY CROSSING (BORE) TYPICAL TYPICAL DETAILS - UNDERGROUND AND AERIAL DRWN. BY : CHKD. BY : FROM VETERANS MEMORIAL PKWY TO AMP UNDERGROUND AS BUILT DRAWING NEW HDPE SDR11 CONDUIT RI W.P. N.C. FOR DIAMETER, TYPE (REFER TO DRAWING Technologies Inc. ON AND QUANTITY) SCALE : DATE : FILL UNSHRINKABLE ASPHALT NOT TO SCALE JAN 15, 2013 PHASE 3 TYPICAL ROAD CROSSING (BORE) Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'B' FOR CONTINUATION

VETERANS MEMORIAL PKWY SEE UNDERGROUND DRAWING A N PHASE 3 - VETERANS MEMORIAL PKWY P18 OF 18

WORK AREA

1

INSTALL NEW AT NEW HANDWELL HANDWELL

METRE MARK METRE MARK MATCH LINE A-A 5515m 5530m INSTALL NEW 2-50mm(2") HDPE BRADLEY AVE 48 FOC CONDUIT BY DIRECTIONAL BORE AND NEW 48 FIBRE OPTIC CABLE A INSTALL 251.2m OF NEW 48 FIBRE OPTIC CABLE AND INSTALL 251.2m OF NEW 2-50mm(2") HDPE CONDUIT BY DIRECTIONAL BORE

JUNCTION BOX CONSTRUCTION NOTES : 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE A B 2 JAN 15, 2013 AS BUILT DRAWING W.P. 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY: INSTALL NEW 2-50mm(2") HDPE AT NEW HANDWELL CONDUIT BY DIRECTIONAL BORE METRE MARK METRE MARK AND NEW 48 FIBRE OPTIC CABLE 5682m 5697m RI ON Technologies Inc.

2 APPROX 152.0m FROM JUNCTION BOX APPROX. 136.0m FROM EXISTING MANHOLE RECORD OF INSPECTION MATCH LINE A-A LINE MATCH THIRD PARTY AS CONSTRUCTED INSTALL NEW HANDWELL RECORD OF INSPECTION AS CONSTRUCTED MATCH LINE B-B, SEE P2 OF 2 AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP A B WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 SIGNATURE FROM VETERANS MEMORIAL PKWY TO AMP PLAN VIEW UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS SCALE - 1:500 RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P1 OF 2 WORK INSTRUCTION AND THAT APPROVED EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy to AMP UG-AB -P1.dwg Pkwy to AMP UG-AB Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University VETERANS MEMORIAL PKWY N

WORK AREA

BRADLEY AVE

INSTALL 44.0m OF NEW 48 FIBRE OPTIC CABLE AND INSTALL 44.0m OF NEW 2-50mm(2") HDPE CONDUIT

CENTERLINE OF BOYD CRT BY DIRECTIONAL BORE TO EXISTING MANHOLE

APPROX. 32.6 FROM AT LEAVE 200.0m COIL AS PER PAUL B

CONSTRUCTION NOTES : INSTALL NEW 2-50mm(2") HDPE CONDUIT BY DIRECTIONAL BORE 1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL, AND NEW 48 FIBRE OPTIC CABLE FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE UTILITIES WITH THE PROPOSED CONDUIT 3 2) BORE PITS MAY BE NEEDED AND WILL BE DETERMINED BY LOCATES CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS COIL AT MANHOLE E-11 AND E-12 AND THE LATEST CANADIAN STANDARDS ASSOCIATION METRE MARK METRE MARK STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 No. 7-10 AS APPLICABLE 2 AT MANHOLE METRE MARK 5833m 6033m 5833m 48 FOC END 2 JAN 15, 2013 AS BUILT DRAWING W.P.

MATCH LINE B-B, SEE P1 OF 2 MATCH LINE B-B, 1 JULY 24, 2012 INITIAL PERMIT DRAWING W.P. No.: DATE: REVISIONS: BY: B

RI ON Technologies Inc.

RECORD OF INSPECTION THIRD PARTY AS CONSTRUCTED RECORD OF INSPECTION AS CONSTRUCTED AERIAL INSTALLATION SITE CONTACT: U/G INSTALLATION BRAD W. GRAY, CCNA, CCNP WITH CHANGES SHOWN ON THIS DRAWING Operations Manager UWO / LARG* net ATTACHMENT PERMIT # DATE Phone: 1 (519) 661-2111 ext 86981 OWNER Email: [email protected]

PRINT NAME FIBRE OPTIC CABLE INSTALLATION POSITION PHASE 3 SIGNATURE FROM VETERANS MEMORIAL PKWY TO AMP PLAN VIEW UNDERGROUND AS BUILT DRAWING THIS IS TO CERTIFY THAT THE CONSTRUCTION AS SCALE - 1:500 RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR CHKD. BY : N.C. DATE : JAN 15, 2013 DWG No. : P2 OF 2 WORK INSTRUCTION AND THAT APPROVED EQUIPMENT HAS BEEN USED. DRWN. BY : W.P. SCALE : 1:500 PROJ No. :12-0009A \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Veterans Memorial Pkwy to AMP UG-AB -P2.dwg Pkwy to AMP UG-AB Memorial 3\Phase 3 - Veterans Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University SITE CONTACT: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net Phone: 1 (519) 661-2111 ext 86981 Email: [email protected]

AS-BUILT

UNDERGROUND DESIGN PHASE 3 - VICTORIA STREET, LONDON, ONTARIO ARIZON PROJECT #: 12-0009A

GENERAL NOTES AND LEGEND DRAWING 'A' TYPICAL DETAILS - UNDERGROUND AND AERIAL DRAWING 'B' VICTORIA ST - UNDERGROUND FIBRE OPTIC CABLE INSTALLATION P1 OF 1

MATERIAL QUANTITY 1. NEW 48 FIBRE OPTIC CABLE 265.0m 2. NEW 50mm(2") HDPE CONDUIT 224.0m 3. NEW STRAIGHT UGUARD 1 4. NEW FLARED UGUARD 1 RI ON Technologies Inc. 5. DIP LOCATION 2 6. 27 FIMA CRESCENT 7. TORONTO, ONTARIO M8W 3R1 8. PHONE: (416) 848-4220 FAX: (416) 752-8659 9. www.arizon.ca 10. \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Victoria St UNDERGROUND-AB -TITLE.dwg St UNDERGROUND-AB 3\Phase 3 - Victoria Ontario\Phase Of Western \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Victoria St UNDERGROUND-AB -DWG 'A'.dwg 4. INSTALL SPIRAL WRAP AND TAG ALL EXPOSED FIBRE OPTIC CABLE. 3. ALL CONSTRUCTION MUST COMPLY WITH: 2. THE POSITION OF POLE LINES, CONDUITS, WATERMAINS. SEWERS AND OTHER UNDERGROUND 1. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS, CLEARANCES, DIMENSIONS $//6$*&$/&8/$7,216:(5('21($6680,1*7+(,167$//$7,21,6'21($7$7(03(5$785(2)ƒ& ƒ)  8. ALL NEW ATTACHMENTS TO BE 1.0m FROM EXISTING HYDRO SECONDARY AND MINIMUM 0.3m 7. ALL LOOPBACK LENGTHS OF FIBRE CABLE LASHED TO STRAND ARE AS SPECIFIED ON DRAWINGS. 6. ALL FIBRE ATTACHMENTS ON STREET SIDE EXCEPT AS NOTED. 5. ALL REVISIONS MUST BE MADE PRIOR TO CONSTRUCTION. OTHER TELECOM ATTACHMENTS. e. OCCUPATIONAL HEALTH AND SAFETY ACT. d. EUSA (ELECTRICAL UTILITIES SAFETY ASSOCIATION) RULEBOOK. c. ONTARIO ELECTRICAL CODE. b. LATEST TRANSPORT CANADA GENERAL ORDERS E-11 AND E-12 THE CANADIAN STANDARD a. UNIVERSITY OF WESTERN ONTARIO STANDARDS. SUCH UTILITIES AND STRUCTURES, SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. BEFORE STARTING WORK, THE CONTRACTOR SHALL CONFIRM EXACT LOCATION OF ALL THE ACCURACY OF POSITION SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. AND ABOVE GROUND UTILITIES STRUCTURES ARE NOT NECESSARILY SHOWN AS EXACT, THE WORK. AT THE SITE AND REPORT ANY DISCREPANCIES TO ENGINEER BEFORE PROCEEDING WITH ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE. EXISTING CONDUIT NEW CONDUIT IN BUILDING EXISTING FIBRE OPTIC CABLE COIL NEW FIBRE OPTIC CABLE COIL EXISTING FIBRE OPTIC CLOSURE EXISTING LOOP BACK NEW FIBRE OPTIC CLOSURE NEW LOOP BACK ELECTRICAL BONDING LOCATIONS TREE TRANSFORMER DIP LOCATION EXISTING GUY EXISTING GUY & ANCHOR NEW GUY NEW GUY & ANCHOR EXISTING POLE AS BUILT - FIBRE OPTIC CABLE METER MARKS RAILWAY FENCE PROPERTY LINE STREET LINE STRAND NEW FIBRE OPTIC CABLE IN EXISTING CONDUIT EXISTING FIBRE OPTIC CABLE NEW FIBRE OPTIC CABLE EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT METRE MARK T m CONCRETE POLE WOODEN POLE PRIMARY CABLES) ALL ATTACHMENTS EXCLUDING POLE DETAIL (WITH HEIGHTS OF NEW HANDWELL NEW CHECK METER NEW JUNCTION BOX EXISTING PANEL NEW PANEL EXISTING PULL BOX NEW PULL BOX CABLE TRAY ?m ?m SECONDARY FIELD SIDE ?m NEW FIBRE DRWN. BY : CHKD. BY : ?m GENERAL NOTES AND LEGEND HP # HP # C W UNDERGROUND AS BUILT DRAWING ? ? HP # RI W W.P. N.C. Technologies Inc. ON STREET SIDE PHASE 3 - VICTORIA ST SCALE : DATE : LONDON, ONTARIO JAN 14, 2013 Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'A' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Victoria St UNDERGROUND-AB -DWG 'B'.dwg ABOVE GRADE 2.4m MINIMUM UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES NEW FIBRE POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED B SCALE: N.T.S. ANCHOR DETAIL A NOTE: MINIMUM CABLE HEIGHT REQUIREMENTS SCALE: NTS EXPRESSWAYS AND RAMPS 7.0m (CONSTRUCTED) OVER FREEWAYS, 6.0m (MINIMUM) 300 TO 18000 VOLTS LIKELY TO BE TRAVELLED BY ALONGSIDE FARMLAND NOT B= 1.8m A= 150mm-300mm INSULATOR POWER COMPANY CONTACT AREA POSSIBLE SAG 4.7m (CONSTRUCTED) 3.3m (MINIMUM) A VEHICLES OVER OR B DRIVEWAYS (OTHER THAN TO RESIDENCES HIGHWAYS, STREETS, LANES, ALLEYS AND BY ROAD VEHICLES, INCLUDING KING'S OVER LAND LIKELY TO BE TRAVELLED THE LIMITS (WITH NO OVERHANG) OF STREETS AND KING'S HIGHWAYS IN TRAVELLED BY ROAD VEHICLES. ALONGSIDE LAND LIKELY TO BE DENSELY POPULATED AREAS. OVER THE RIGHT OF WAY UNDERGROUND PIPELINES OR RESIDENCE GARAGES) TRAVELLED BY VEHICLES. FARMLAND LIKELY TO BE ALONGSIDE AND WITHIN ABOVE GRADE 2.0m MINIMUM 5.5m (CONSTRUCTED) OVER OR ALONGSIDE NEW FIBRE UTILITIES LOCATE. PLACEMENT OF ANCHOR REQUIRES POWER ABOVE 18000 VOLTS. A SECOND INSULATOR IS USED C 4.7m (MINIMUM) SCALE: N.T.S. ANCHOR DETAIL SIDEWALK GUY AND NOTE: ACCESSIBLE TO PEDESTRIANS 3.5m (CONSTRUCTED) OVER WALKWAYS OR GROUND NORMALLY 2.8m (MINIMUM) ONLY 300 TO 18000 VOLTS OVER DRIVEWAYS TO RESIDENCES AND RESIDENCE GARAGES FOR CONTACT AREA POSSIBLE SAG VEHICLES NOT OVER 2.4m 4.7m (CONSTRUCTED) B= 1.8m A= 150mm-300mm A INSULATOR POWER COMPANY 4.0m (MINMUM) IN HEIGHT OVERALL LENGTH B 8.2m (CONSTRUCTED) ABOVE TOP OF RAIL 7.6m (MINIMUM) AT RAILWAY CROSSINGS D BENDING RADIUS SCALE: N.T.S. VARIES CABLE DIP DETAIL 150mm 100mm 50 300mm REFERENCES: ONTARIO ELECTRICAL SAFETY CODE CSA STD. C22.3 NO. 1-10 OVERHEAD SYSTEMS FIBRE OPTIC INSTALLATION SEPARATIONS FOR OVERHEAD (AERIAL) OUTSIDE PLANT UNIVERSITY OF WESTERN ONTARIO CABLE - CLEARANCES AND R + 100mm 100 CONDUIT GRADE U-GUARD SEALED POLE F SCALE: N.T.S. HANDWELL DETAIL 1-38mm (1.5") DUCTS GRAVEL FOR DRAINAGE 0.3m DEPTH OF RADIUS) R- (MINIMUM BENDING GRASS BOULEVARD 1-38mm (1.5") DUCTS FOR DIAMETER, TYPE (REFER TO DRAWING NEW HDPE CONDUIT E AND QUANTITY) 4. INSTALL HANDWELL LID FLUSH TO GRASS 3. R IS THE MINIMUM BENDING RADIUS (R= 20x 2. SLACK TO BE STORED IN A FIGURE EIGHT 1. FOR HANDWELL DIMENSIONS SEE NOTES: CONFIGURATION FOR EASIER REUSE. CONSTRUCTION NOTES. THE OUTSIDE CABLE DIAMETER). BOULEVARD GRADE. WARNING TAPE NATIVE SOIL SCALE: N.T.S. CONDUIT DETAIL TYPICAL UNDERGROUND BOULEVARD/GRASS TYPICAL TRENCH WIDTH 24" NEW HDPE SDR11 CONDUIT GRAVEL FOR DRAINAGE 0.3m DEPTH OF LENGTH FOR DIAMETER, TYPE (REFER TO DRAWING 36" AND QUANTITY) GRANULAR BASE 1-38mm (1.5") DUCTS NATIVE SOIL ASPHALT DEPTH 0.3m 24" DRIVEWAY CROSSING (BORE) TYPICAL TYPICAL DETAILS - UNDERGROUND AND AERIAL DRWN. BY : CHKD. BY : UNDERGROUND AS BUILT DRAWING NEW HDPE SDR11 CONDUIT RI W.P. N.C. FOR DIAMETER, TYPE (REFER TO DRAWING Technologies Inc. ON AND QUANTITY) PHASE 3 - VICTORIA ST SCALE : DATE : FILL UNSHRINKABLE LONDON, ONTARIO ASPHALT NOT TO SCALE JAN 14, 2013 TYPICAL ROAD CROSSING (BORE) Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT: PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected] 12-0009A DRAWING 'B' \\EBOX-SMB3\engineering\jobdocs\jobdoc_2012\University Of Western Ontario\Phase 3\Phase 3 - Victoria St UNDERGROUND-AB -P1.dwg

HP#NOTAG PHASE 2 - WATERLOO ST CURB CURB

MATCH LINE A-A FOR CONTINUATION

A A SIDEWALK SIDEWALK SEE AERIAL DWG DIP LOCATION EXISTING SPLICE

CURB CURB P1 OF 7 2.2m P/L 2.3m 2.0m 1 14.1m

HP#NOTAG

HP#NOTAG

HP#SW1418

2 SIDEWALK

SIDEWALK HP#NOTAG 3.1m CURB CURB

SIDEWALK

2.1m P/L METRE MARK AT SPLICE 2.1m 39226ft P/L

HP#NOTAG METRE MARK 39126ft INSTALL NEW 50mm(2") HDPE CONDUIT BY DIRECTIONAL BORE AND NEW 48 FIBRE OPTIC CABLE SIDEWALK

HP#NOTAG P/L 1.0m

SCALE - 1:500 SIDEWALK PLAN VIEW CONDUIT BY DIRECTIONAL BORE AND NEW 48 FIBRE OPTIC CABLE INSTALL NEW 50mm(2") HDPE 2.0m

HP#NOTAG

HP#NOTAG 2.4m

3 P/L P/L

17.8m DIP LOCATION

SIDEWALK SIDEWALK FOR CONTINUATION P1 OF 9 PHASE 3 - CHEAPSIDE ST

SEE AERIAL DWG SIDEWALK

HP#NOTAG CURB CURB 2.1m

HP#NOTAG 2.2m

CURB

CURB SIDEWALK P/L

P/L SIDEWALK OWNER ATTACHMENT THIRD PARTY AS CONSTRUCTED EQUIPMENT HAS BEEN USED. RECORDED IN THIS DRAWING IS CONSISTENT WITH THE APPROVED PLAN, STANDARD DESIGNS, OR THIS IS TO CERTIFY THAT THE CONSTRUCTION AS WORK INSTRUCTION AND THAT APPROVED WITH CHANGES SHOWN ON THIS DRAWING RECORD OF INSPECTION U/G INSTALLATION AERIAL INSTALLATION

RECORD OF INSPECTION POSITION PRINT NAME PERMIT # SIGNATURE

AS CONSTRUCTED SIDEWALK SIDEWALK 2.4m P/L

HP#9174

2.0m P/L DATE

A A MATCH LINE A-A No.: FIBRE OPTIC CABLE INSTALLATION DRWN. BY : CHKD. BY : CONSTRUCTION NOTES : E-11 AND E-12 THE LATEST CANADIAN STANDARDS ASSOCIATION STANDARDS CAN/CSA-C22.3 No. 1-10 AND CAN3-C22.3 7-10 AS APPLICABLE CONSTRUCTION, MAINTENANCE AND OPERATION OF THE LINE SHALL BE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL ORDERS 1 2

1) USE ' HYDROVAC' EQUIPMENT TO EXPOSE ALL GAS, ELECTRICAL,

2) BORE PITS MAY BE NEEDED AND WILL DETERMINED BY LOCATES UTILITIES WITH THE PROPOSED CONDUIT FIBER OPTIC, AND TELEPHONE CABLES PRIOR TO CROSSING THESE

PATRICIA ST PATRICIA

WELLINGTON ST WELLINGTON MAY 22, 2012 ST WATERLOO JAN 14, 2013 UNDERGROUND AS BUILT DRAWING DATE: RI W.P. N.C.

HURON ST Technologies Inc. WORK ON AREA

VICTORIA ST

PHASE 3 - VICTORIA ST SCALE : DATE : ST CHRISTIE FIBRE OPTIC CABLE INSTALL 224.0m OF NEW 50mm(2") HDPE CONDUIT BY INSTALL NEW STRAIGHT AND FLARED UGUARDS FIBRE OPTIC CABLE. DIRECTIONAL BORE AND INSTALL 224.0m OF NEW 48 DOWN 6.0m OF HP EXISTING STRAND ENTER EXISTING SPLICE AND COIL 30.0m OF NEW 48 OVERLASH 5.0m OF NEW 48 FIBRE OPTIC CABLE ON LONDON, ONTARIO INITIAL PERMIT DRAWING AS BUILT DRAWING 1:500 JAN 14, 2013 REVISIONS:

REGENT ST COLBORNE ST COLBORNE THORNTON AVE THORNTON

Email: Phone: BRAD W. GRAY, CCNA, CCNP Operations Manager UWO / LARG* net SITE CONTACT:

MAITLAND ST MAITLAND HARRISON AVE HARRISON PROJ No. : DWG No. : 1 (519) 661-2111 ext 86981 [email protected]

CHEAPSIDE ST HURON ST

LAMBTON ST WILLIAM ST WILLIAM 12-0009A P1 OF 1

GROSVENOR ST LOGAN AVE LOGAN ADELAIDE ST N ST ADELAIDE W.P. W.P. N BY: