Technical Report Kabul 7/2/2016 Subject/Title Place Date Report on projects to be implemented OA +93 (0) 744119120

under the strategic plan of Capital Author(s), E-mail Department/Division Tel. Signature Region Independent Authority Tawab Yousufzai (CRIDA) [email protected] Sultan Azizi [email protected]

Ahmad Mustafa Faizi [email protected] Abdullah Nazari [email protected]

Khatera Fanos Wali [email protected] Ajmal Shams [email protected] Project S. Azim Hussainy [email protected]

Capital Region Independent Signature for Release by Division/Dept. Head Signature for External Release General Director (for Contents, Handling, Distribution) Development Authority Handling Instructions Dipl. Eng. Alham Omar Hotaki to according international persecuted national and legally laws. attachment any and document this return this and in contained information the on immediately sender the rely notify error, in received If attachments. any or or document use way corpor other any in contain or circulate thereof attachment CRIDA of any information and document This Confidential General Director of CRIDA Export Classification*) President Approval (if needed)

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision

AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 .

f o ae o te drse, o o dsls, copy, disclose, not do addressee, the not are you If Pages of Text: Summary*) 27 Appendices: 3 As per the Islamic Republic of ’s cabinet decision dated 11 Saur 1395 (30 April 2016) and Presidential Decree No. 44 dated 3/4/1395 of the Islamic Republic of Afghanistan, in order to create a healthy urban environment and to tackle the problems caused by an exponential population growth in the capital and considering the centralized nature of

s of it to to it of s economic activities and services, Dehsabz City Development Authority (DCDA) is thereafter renamed as Capital Region Independent Development Authority (CRIDA) having the authority as Independent Budgetary Unit within the organizational structure of the Islamic Republic of Afghanistan.

CRIDA The capital region comprises the Kabul city and all districts of , Maidan Shahr (the capital of Maidan

Mss wl be will Misuse .

t proprietary ate Wardak), Charikar (the capital of Parwan) and the districts of Bagram and Jabal Siraj of Parwan, Mahmud Raqi (capital of Kapisa) and of , Pul-e-Alam (the capital of Logar) and Mohammad Agha and Khoshi districts of . The total area of the capital region is about 7735 km2. As per Directive No. 2 of the meeting dated 25 Hamal 1395 (13 April 2016) of the cabinet of the Islamic Republic of Afghanistan, the following projects, as per their priority, have been endorsed and the implementation work will commence soon: 1. Development of first agro-industrial Park at Barikab 2. Resolving the problem floodwater of Kabul City 3. Cleaning of Kabul-Logar River and building Charchata Market on a portion above the river. 4. Upgrading of unplanned areas of Yaka Toot, Pul-i-Charkhi, Dasht-i-Barchi, Gul Bagh and construction of residential buildings on top of Kabul city hills. 5. Construction of Surkhab Road from Kandahari bridge till Surkhab dam (about 15.36 km long) 6. Construction of stone roads in Taimany and Shah Shaheed areas 7. Development of the first project of phase 1 of Kabul New City (parcel 2.2)

CRIDA, based on instructions from H.E. the president and as per objectives of the organization has prepared the concepts of several development projects, which are described in this report.

*) In Technical Reports add key words (max. 12) at the end of the Summary and enter Export Classification Initials of Initials Distribution Index Vers. Date Page(s) Author(s) for Release

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

Contents

BRIEF INTRODUCTION OF CAPITAL REGION INDEPENDENT DEVELOPMENT AUTHORITY (CRIDA)...... 4

1 CRIDA Vision ...... 5

2 Goals and Objectives of CRIDA ...... 5

3 Location, Area and Physical Boundaries of the Capital Region ...... 6 3.1 Location ...... 6 3.2 Area ...... 6 3.3 Boundaries ...... 6

4 Major Responsibilities of CRIDA ...... 8

STRATEGIC PLAN OF THE CAPITAL REGION INDEPENDENT DEVELOPMENT AUTHORITY ...... 9

(1395 - 1405) ...... 9

5 Proposed Projects ...... 10 5.1 Short-term Projects ...... 10 5.2 Medium-term Projects ...... 10 5.3 Long-term Projects ...... 11

6 Expected Outcomes ...... 11

THE IMPLEMENTATION RESULT OF CRIDA’S STRATEGIC PLAN FOR YEARS 1395- 1405 ...... 13

7 Attachments ...... 25 7.1 Attachment-1: List of Projects ...... 25 7.2 Attachment-2: Projects’ Analysis ...... 26 7.3 Attachment-3: Projects’ Schedule ...... 27 7.3.1 Cash Flow ...... 27

Figure 1: Location Map of Capital Region showing various districts of relevant provinces ...... 7 Figure 2: Agro-Industrial Park ...... 15 Figure 3: Image of indoor market ...... 16 Figure 4: Traditional Afghan indoor market ...... 16 Figure 5: Image of gullies ...... 17 Figure 6: Image of gullies ...... 17 Figure 7: View of Kabul River ...... 18 Figure 8: Promote the use of local raw materials, particularly local stone for paving the streets in Kabul ...... 19 Figure 9: Bus Rapid Transit (BRT) ...... 20 Figure 10: Vertical Parking...... 21 Figure 11: Chaharchata Bazar ...... 22 Figure 12: Qargha Recreational Facility ...... 23 Figure 13: an imagination of wholesale market in Kabul city ...... 24

7/2/2016 2

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

List of Abbreviations

BRT Bus Rapid Transit CRIDA Capital Region Independent Development Authority CEO Chief Executive Officer DCDA Dehsabz and Barikab City Development Authority GDP Grand Domestic Products IRA Islamic Republic of Afghanistan KNC Kabul New City PPP Public Private Partnership

7/2/2016 3

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

BRIEF INTRODUCTION OF CAPITAL REGION INDEPENDENT DEVELOPMENT AUTHORITY (CRIDA)

7/2/2016 4

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

Kabul is currently facing a host of problems and challenges due to lack of healthy urban environment. The population of the city is growing at exponential rate due to availability of economic opportunities and services resulting into large-scale problems for city residents. Therefore, CRIDA (comprising Kabul province and areas from surrounding provinces of Parwan, Kapisa, Maidan Wardak and Logar) should address the above-mentioned problems.

1 CRIDA Vision

1. Transforming the Capital Region by turning it into a mega city that is clean, full of greenery, cultured with booming industries and commerce, sports and tourism and ultimately a city with all facilities that are available in any modern city of the world. 2. Building a metropolitan city that is self-reliant and sustainable, a city that has infrastructure and facilities of high standards with healthy physical environment. 3. Building a city that is free of ethnic, linguistic, racial and religious prejudices 4. Promoting urban culture and enhancing the standard of city life through development of the Capital Region. 5. Development of cities (through decentralization for balanced development) within the Capital Region by protecting the originality, historical value and organic linkages with the existing Kabul city to transform the entire capital zone into a symbol of national unity.

2 Goals and Objectives of CRIDA

1. Development of facilities within the Capital Region in coordination with relevant agencies of urban sector by planning, designing and implementation of certain developmental projects. 2. Assessment of current capacity within CRIDA and building capacity in relevant sectors as needed. 3. Preparation of plans for more effective use of government land within the Capital Region. 4. Establishment of good urban governance practices. 5. Expansion and development of Capital Region in a feasible, sustainable manner and revival of its historical value. 6. Establishment of regional networks and economic integration among cities within the Capital Region. 7. Decentralization of population and economic activities to cities within the Capital Region. 8. Providing employment opportunities, social welfare and preventing out of the country migration. 9. Effective utilization of existing land resources and poverty alleviation through development of the Capital Region. 10. Promotion of women participation in the management of cities within the Capital Region.

7/2/2016 5

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

11. Increasing opportunities for youth participation in the development and management of cities within the Capital Region. 12. Bringing about a fundamental economic and social change within the Capital Region to act as a role model for the entire country.

3 Location, Area and Physical Boundaries of the Capital Region

3.1 Location The areas located within the Capital Region are as follows:

1. The Kabul province comprising the Kabul city and the following districts:  Dehsabz  Mirbacha kot  Kalakan  Qara Bagh  Guldara  Farza  Estalif  Shakardara  Paghman  Char Asyab  Mosahee  Khak-i-Jabar  Bagrami  Surubi

2. Maidan Shahr of . 3. Charikar City, Jabal Siraj district, Saidkhil district and Bagram districts of 4. Mahmud Raqi district and Kohistanat district of Kapisa Province 5. Pul-i-Alam City and and Khoshi district of Logar Province. 3.2 Area The total area of the Capital Region is 7735 kilometer.

3.3 Boundaries The boundaries of the Capital Region are illustrated in Figure 1 below.

7/2/2016 6

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

Figure 1: Location Map of Capital Region showing various districts of relevant provinces

7/2/2016 7

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

4 Major Responsibilities of CRIDA

1. Implementation of the Master Plan for Kabul New City and Greater Kabul as part of Capital Region as per national and international standards. 2. Planning, designing and implementation of development projects within the Capital Region. 3. Encouraging the private sector to participate in the development of the Capital Region through various types of public private partnerships in coordination with the Ministry of Urban Development and Housing. 4. Establishment of economic, industrial, agricultural, residential and recreational zones. 5. Development of residential cities, establishment of administrative and diplomatic enclaves within the Greater Kabul taking into account technical, financial, economic and legal considerations and as per the approved master plans by the Ministry of Urban Development and Housing. 6. Upgrading informal settlements and preventing further expansion of illegal and unplanned settlements founded on linguistic, religious and ethnic basis. 7. Creation of economic and commercial activities for better employment opportunities within the Capital Region to improve the quality of life. 8. Conducting surveys, investigations and research studies by using nationally and internationally accepted methodologies for the implementation of commercial, agricultural and economic plans in the Capital Region. 9. Preparation and implementation of economic and financial plans for partially developed and fully developed government lands under the greater Kabul master plan. 10. Development of new plans and amending the already available plans for maximum utilization of government land under the approved master plans by the Ministry of Urban Development and Housing for increasing the financial, economic and social effectiveness. 11. Development of compact plans for selected areas and creating linkages within the Capital Region by making use of effective economic strategies. 12. Improving the environmental, social and cultural conditions of Kabul for reviving the originality of Kabul and enhancing the identity of old Kabul. 13. Feasibility studies for recreational parks to be built in destroyed gardens of old Kabul. 14. Feasibility studies for the construction of urban wastewater networks within the existing Kabul and residential areas within the city hills and carrying out actions that encourage community participation to implement such initiatives. 15. Any other tasks assigned by His Excellency, the President or supreme council of urban development to CRIDA.

7/2/2016 8

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

STRATEGIC PLAN OF THE CAPITAL REGION INDEPENDENT DEVELOPMENT AUTHORITY

(1395 - 1405)

7/2/2016 9

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

5 Proposed Projects

The Capital Region Development Authority, based on instructions from HE, the President and in the light of Directive No. 3 of the cabinet of the IRA meeting dated 11 Saur 1395 (30 April 2016), and Presidential Decree No. 44 dated 3/4/1395 of the IRA has identified the following five priority programs for the Capital Region:

1. Establishment of good governance 2. Balanced urban development in the Capital Region 3. Creation of economic activities 4. Upgrading, renovation and improving the quality of unplanned settlements 5. Development of basic infrastructure After careful assessment, CRIDA has proposed the following short-term, medium term and long-term projects as part of its development plan:

5.1 Short-term Projects 1. Development of first agro-industrial Park at Barikab 2. Resolving the problem floodwater of Kabul City 3. Cleaning of Kabul-Logar River and building Charchata Market on a portion above the river. 4. Upgrading of unplanned areas of Yaka Toot, Pul-i-Charkhi, Dasht-i-Barchi, Gul Bagh and construction of residential buildings on top of Kabul city hills. 5. Construction of Surkhab Road from Kandahari bridge till Surkhab dam (about 15.36 km long) 6. Construction of stone roads in Taimany and Shah Shaheed areas 7. Development of the first project of phase 1 of Kabul New City (parcel 2.2) Note: the above-mentioned projects were endorsed in the cabinet meeting dated 25 Hamal 1395.

5.2 Medium-term Projects 1. Construction of roads. 2. Land re-adjustment of Dasht-e-Barchi, Qala-e -Zaman Khan, Gul Bagh and Karta-e- Naw. 3. Construction of Bus Rapid Transit (BRTs) 4. Construction of multi-storey car parks 5. Construction of waste-water systems (package type) 6. Transformation of market area into commercial area 7. Renovation of Charchata market 8. Construction of markets in the city peripheries. 9. Rehabilitation of Shahr-i- Naw Park 10. Development of economic and recreational zone in Qarghah

7/2/2016 10

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

11. Development of economic and recreational zone in Sayyad 12. Development of economic and recreational zone in Gul Ghondi 13. Development of economic and recreational zone in Band-i-Ghazi 14. Development of urban e-governance through creation of urban information database 15. Construction of agro-industrial park and cold-storage houses at Mohammad Agha. 16. Construction of economic and recreational zone at Mohammad Agha 17. Linkage of economic and cultural zone of Paghman to Salang 18. Planning for the roadside development from Kabul to Jabal Siraj 19. Construction of agro-industrial park and cold-storage houses at Maidan Shahr. 5.3 Long-term Projects 1. Construction of industrial and logistics Park at Surubi.

Note: Complete list of projects and their descriptions are available in Appendix 1 & 2.

6 Expected Outcomes

Following are various expected outcomes from the CDRA development programs:

S. No. Program Outcomes 1 Establishment of  Introduction of new and modern system of good governance governance.  Capacity development of professionals at all levels for enhancing good governance.  Introduction of balanced work system through e- governance.  Supporting the outcomes of activities from implementation of projects by various governmental organizations. 2 Balanced urban  Use of national and international standards in the development in the urban development practices. Capital Region  Encouragement and promotion of public private partnerships (PPP) in the development of modern cities.  Decreasing the gap between the quality of lives within cities and villages and taking social and economic measures in a balanced manner.  Linkages and networking of cities and economic decentralization for balanced development of cities and employment generation within the Capital Region.  Stimulating the tourist industry and mobility and promoting the attraction of tourists in the Capital Region.

7/2/2016 11

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

3 Creation of  Providing opportunities for private sector economic activities development and their participation in the national economic development process.  Accelerating the pace of economic growth and proving an appropriate foundation for economic and commercial activities.  Paving the way for economic and cultural activities through restoration of Bagh Omumi Kabul (Kabul Central Park) and rebuilding of Kabul traditional markets.  Decentralization of economic centers from Kabul city to the surroundings for better access by the residents for work and business.  Promoting the access of residents to retail and wholesale business activities and creation of new economic centers through linkages with neighboring provinces. (Positive steps towards economic development of neighboring provinces).  Balanced development and progress in cultural and recreational areas within the Capital Region by utilization of recreational and cultural areas in the South (Mohammad Agha district).  Creation of required commercial areas along the Kabul-Jabal Siraj highway.  Growth of national products and positive impacts on the overall Grand Domestic Products (GDP). 4 Upgrading,  Better utilization of land for economic activities and renovation and improving the quality of lives of the residents. improving the  Providing a suitable platform for better services and quality of unplanned welfare for the residents. settlements  Promotion of urban life and increasing access to public facilities by connectivity with city centers. 5 Development of  Avoiding traffic jams during rainfall events. basic infrastructure  Preventing early damages of roads.  Effective use of surface water for recharge of groundwater.  Improvement in the physical environment of Kabul.  Better conditions for development of industries.  Promotion of standards for commodities for better usage of national and agricultural products for export.  Promotion of multi-storey cark parks for the first time in the country and facilitating private sector investment in the service sector.  Paving the way for better urban transportation and conveyance of freight.

7/2/2016 12

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

THE IMPLEMENTATION RESULT OF CRIDA’S STRATEGIC PLAN FOR YEARS 1395-1405

7/2/2016 13

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

 Socio-Economic Development

 Creation of Job Opportunities

 Reduction of Poverty

7/2/2016 14

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

Depiction of Barikab Agro-Industrial Park Year 1405

Figure 2: Agro-Industrial Park

Construction of Barikab Agro-Industrial Park shall commence within the short term program.

7/2/2016 15

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

Depiction of Indoor Market, Rehabilitation and Construction of Ancient Kabul Markets Year 1405

Figure 3: Image of indoor market

Figure 4: Traditional Afghan indoor market In order to create business facilities in Kabul city and revive the ancient indoor markets, an indoor market is to be constructed along the Kabul River.

7/2/2016 16

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

Depiction of Gullies in Kabul after Renewal and Rehabilitation

Figure 5: Image of gullies

Figure 6: Image of gullies In order to solve the problems of surface water accumulation in the city, soon gullies will be tunneled in specific areas of the city as per the plan.

7/2/2016 17

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

A Clean and Ecologic River for Capital Region “Rehabilitating the Originality of Ancient Kabul River”

Figure 7: View of Kabul River

For improving the environment in Kabul city, Kabul River is to be cleaned on continuous basis.

7/2/2016 18

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

Kabul without unpaved roads

Figure 8: Promote the use of local raw materials, particularly local stone for paving the streets in Kabul

For improving the urban roads and reducing pollution in the city, around 28 km of roads are to be paved and another 5.31 km of roads is to be constructed out of stone.

7/2/2016 19

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

Introduction of new urban transportation system – Bus Rapid Transit (BRT)

Figure 9: Bus Rapid Transit (BRT)

The first BRT project on specified lines that connect remote areas to the city center, to be created.

7/2/2016 20

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

Promoting vertical parking system in the city

Figure 10: Vertical Parking

In order to avoid unnecessary congestion in city centers, the first vertical parking on two locations are to be constructed in Kabul city, one at city center and other at Bagh-e- Alimardan each with a capacity of 400 and 500 vehicles at a time respectively.

7/2/2016 21

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

Reviving the authentic ancient Kabul - Rehabilitation of Chaharchata Bazar

Figure 11: Chaharchata Bazar

In order to preserve and restore the authenticity of ancient Kabul, Chaharchata Bazar is to be re-constructed in its original location.

7/2/2016 22

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

Additional recreational facilities for the residents of capital region Year 1405

Figure 12: Qargha Recreational Facility

For improving the recreational facilities for the residents of capital region at a greater scale, economic-recreational zones at Qargha Lake, Sayad, Gulghundi are upgraded and Ghazi lake and Mohammad Agha lake are newly constructed.

7/2/2016 23

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

Adjust, improve and modernize the wholesale market system in Kabul Year 1405

Figure 13: an imagination of wholesale market in Kabul city

In order to better regulate the wholesale transactions and removing the burden of transportation in Kabul, Mandawis’ are to be constructed and inaugurated on the four entrance gates of Kabul city.

7/2/2016 24

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

7 Attachments

7.1 Attachment-1: List of Projects

7/2/2016 25

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

7.2 Attachment-2: Projects’ Analysis

7/2/2016 26

Project Code Location Program/Type/Project/Division/Sub Division Document/Sub Document/Reference/Revision Action / AFG/KBL/Gen KBL Pg 1-5/ / /OA/Sub Div TR/ /(CRIDA/ OA / 2016 /625)/00 Dates

7.3 Attachment-3: Projects’ Schedule 7.3.1 Cash Flow

7/2/2016 27