Sample Procurement Plan

(Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) Public Disclosure Authorized (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary).

I. General

1. Bank’s approval Date of the procurement Plan 4th February 2018 2. Date of General Procurement Notice: 3. Period covered by this procurement plan: 31st December 2018

Public Disclosure Authorized II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.]

Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract Public Disclosure Authorized 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary]

2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable]

Public Disclosure Authorized 4. Reference to (if any) Project Operational/Procurement Manual: Project Operation manual 2017 for details please contact [email protected]

5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] Not applicable

July 9, 2010

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement)

[List the Packages which require Bank’s prior review first and then the other packages]

1 2 3 4 5 6 7

Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 0 0 No NA the ICB (Works) Summary of 0 0 No NA the ICB (Goods) Summary of 16.9 14 No Post the NCB (Works) Summary of 0.099 1 No Post NA the NCB (Goods)

Summary of 5 1 No Prior the ICB (Non- Consultant Services)

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) 400,000 2. Single Source (Firms) Depend upon the category and same as competitive methods. 3. Individual Above 200,000

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable]

July 9, 2010 4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6

Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 5 1 Prior number of contracts that will be let under QBS

July 9, 2010 PROCUREMENT : Afghanistan Rural Access Project PLAN General Information

Country: Afghanistan Bank’s Approval Date of the Original Procurement Plan: 2018-02-05 Revised Plan Date(s): (comma delineated, leave blank if none)2019-09-17 Project ID: P125961 GPN Date: Project Name: Afghanistan Rural Access Project Loan / Credit No: TF / 13093 Executing Agency(ies):Ministry of public works

WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

WB/ARTF- IDA/ARAP/PM/BKN/BKN/168/ Component B - C2/001 / Periodic Pending Improvement and Single Stage - One Maintenance of Road via TF / 13093 Post Request for Bids Open - National 225,448.00 0.00 Implementati 2018-03-22 2018-03-27 2018-04-24 2018-05-24 2018-06-28 2019-08-22 maintenance of tertiary Envelope Shash Pul Bridge, started on roads from (Knda-e-Formoraq) Faizabad-Baharak main Road

WB/ARTF- IDA/ARAP/RM/CHL/BMN/111/ Component B - C2/001 / Periodic Pending Improvement and Single Stage - One Maintenance of 45 Km TF / 13093 Post Request for Bids Open - National 652,500.00 0.00 Implementati 2018-03-22 2018-03-27 2018-04-24 2018-05-24 2018-06-28 2019-06-28 maintenance of tertiary Envelope gravel surface road from on roads Bamyan Yakawalang Highway

WB/ARTF- IDA/ARAP/PM/NRHE/KNZ/11 Component B - 2/C2/001 / Periodic Pending Improvement and Single Stage - One Maintenance of 19.88 km of TF / 13093 Post Request for Bids Open - National 366,000.00 0.00 Implementati 2018-03-22 2018-03-27 2018-04-24 2018-05-24 2018-06-28 2019-06-28 maintenance of tertiary Envelope Gravel Road from End of on roads Archi Asphalt road to Archi District Center

WB/ARTF- IDA/ARAP/PM/STHE/GHI/183 Component B - Pending /C2/001 / Periodic Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 137,003.00 0.00 Implementati 2018-04-22 2018-04-27 2018-05-25 2018-06-24 2018-07-29 2019-07-29 Maintenance of 16+500 km maintenance of tertiary Envelope on Gravel Road from Sang E roads Masha to Kotal Qarghana

WB/ARTF- IDA/ARAP/NTH/JWN/168/C20 Component A - 01 / Rehabilitation of Road Pending Improvement and Single Stage - One from Qarqin to bandar Kilift TF / 13093 Post Request for Bids Open - National 1,061,983.50 0.00 Implementati 2018-02-02 2018-02-07 2018-03-07 2018-04-06 2018-05-11 2019-07-05 maintenance of secondary Envelope Road Phase-1 Lot-1 on roads Ch.0+000 to Ch.8+960 Km (Gravel Surface)

WB/ARTF- IDA/ARAP/EAST/NRN/025/C2/ Component A - 001 / Rehabilitation of Road Pending Improvement and Single Stage - One from Center of Nuristan to TF / 13093 Post Request for Bids Open - National 970,291.76 0.00 Implementati 2018-02-02 2018-02-07 2018-03-07 2018-04-06 2018-05-11 2019-07-05 maintenance of secondary Envelope West Nuristan (Kordar on roads Road) Phase 1 Lot 1, Gravel Surface.

WB/ARTF- IDA/ARAP/SOUTH/KNR/130/ Component A - Pending C2/001 / Construction of Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 178,411.72 0.00 Implementati 2018-02-02 2018-02-07 2018-03-07 2018-04-06 2018-05-11 2018-11-07 1.446km Approach Road for maintenance of secondary Envelope on Arghistan Bridge, (Gravel roads Surface)

Page 1 WB/ARTF- IDA/ARAP/EAST/NRN/025/C2/ Component A - 002 / Rehabilitation of Road Pending Improvement and Single Stage - One from Center of Nuristan to TF / 13093 Post Request for Bids Open - National 1,549,720.72 0.00 Implementati 2018-02-02 2018-02-07 2018-03-07 2018-04-06 2018-05-11 2019-07-05 maintenance of secondary Envelope West Nuristan (Kordar on roads Road) Phase 1 Lot 2, Gravel Surface.

WB/ARTF- IDA/ARAP/EAST/NRN/128/C2/ Component A - 001 / Rehabilitation of Road Pending Improvement and Single Stage - One from Center of Nuristan to TF / 13093 Post Request for Bids Open - National 1,353,199.33 0.00 Implementati 2018-02-02 2018-02-07 2018-03-07 2018-04-06 2018-05-11 2019-07-05 maintenance of secondary Envelope West Nuristan (Kordar on roads Road) Phase 2 Lot 1, Gravel Surface.

WB/ARTF- IDA/ARAP/STHE/GHI/030/C2/ Component A - 001 / Rehabilitation of road Pending Improvement and Single Stage - One from Chaharburja to TF / 13093 Post Request for Bids Open - National 601,156.65 0.00 Implementati 2018-02-02 2018-02-07 2018-03-07 2018-04-06 2018-05-11 2019-05-11 maintenance of secondary Envelope Rashidan and Nawar, Phase on roads 1, Lot 1, 0+000 to 9+750 Km, Gravel Surface)

WB/ARTF- IDA/ARAP/STHE/GHI/126/C2/ Component B - Pending 001 / Road from Charburja Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 1,699,927.54 0.00 Implementati 2018-03-22 2018-03-27 2018-04-24 2018-05-24 2018-06-28 2019-06-28 to Rashidan and Nawar maintenance of tertiary Envelope on phase 2 lot 1, (Gravel roads Surfaced)

WB/ARTF- IDA/ARAP/STHE/KHT/054/C2/ Component A - Pending 001 / Rehabilitation of Road Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 2,042,021.44 0.00 Implementati 2018-03-22 2018-03-27 2018-04-24 2018-05-24 2018-06-28 2019-06-28 from Dowamanda Mangal to maintenance of secondary Envelope on Qalander Phase 1 Lot 1, roads (Gravel Surface)

WB/ARTF- IDA/ARAP/STHE/KHT/054/C2/ Component A - Pending 002 / Rehabilitation of Road Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 1,657,670.38 0.00 Implementati 2018-03-22 2018-03-27 2018-04-24 2018-05-24 2018-06-28 2019-06-28 from Dowamanda Mangal to maintenance of secondary Envelope on Qalander Phase 1 Lot 2, roads (Gravel Surface)

WB/ARTF- IDA/ARAP/APT/EAST/NGR/09 Component A - 8/C2/001 / Rehabilitation of Pending Improvement and Single Stage - One Road from Pol-e-Kama to TF / 13093 Post Request for Bids Open - National 2,338,606.76 0.00 Implementati 2018-02-02 2018-02-07 2018-03-07 2018-04-06 2018-05-11 2019-05-11 maintenance of secondary Envelope Bar Kash Kot Village on roads Phase-2 Lot-1 (Asphalte surface)

WB/ARTF- IDA/ARAP/NTH/JWN/168/C2/ Component A - 002 / Rehabilitation of Road Pending Improvement and Single Stage - One from Qarqin to Bandar Kilift TF / 13093 Post Request for Bids Open - National 973,354.32 0.00 Implementati 2018-06-02 2018-06-07 2018-07-07 2018-08-06 2018-09-10 2019-09-10 maintenance of secondary Envelope Road Phase-1 lot-2 Ch.8+960 on roads to Ch.18+100 Km (Gravel Surfaced)

WB/ARTF- IDA/ARAP/NTH/JWN/168/C2/ Component A - 003 / Rehabilitation of Road Pending Improvement and Single Stage - One from Qarqin to Kilift TF / 13093 Post Request for Bids Open - National 1,350,000.00 0.00 Implementati 2018-06-02 2018-06-07 2018-07-07 2018-08-06 2018-09-10 2019-09-10 maintenance of secondary Envelope Ch.018+000 to 27+000Km on roads (Gravel surfaced) Jawzjan Province, North Region.

Page 2 WB/ARTF- Component A - IDA/ARAP/CHL/WDK/202/C2/ Pending Improvement and Single Stage - One 001 / Rehabilitation of Road TF / 13093 Post Request for Bids Open - National 2,730,000.00 0.00 Implementati 2018-07-28 2018-08-02 2018-09-13 2018-10-13 2018-11-17 2019-11-17 maintenance of secondary Envelope from Behsood to Shafa on roads Khana-e-Tagab Phase-1 Lot-1

WB/ARTF- IDA/ARAP/NTH/FRB/034/C2/0 01 / Rehabilitation of Road Component A - Pending from Maymana to Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 1,662,500.00 0.00 Implementati 2018-07-28 2018-08-02 2018-09-13 2018-10-13 2018-11-17 2019-11-17 balcharagh district Phase-1 maintenance of secondary Envelope on Lot-1 Ch.0+000 to Ch.9+500 roads Km (Gravel Surface) , North Region.

MPW/WB/ARTF- IDA/ARAP/NTH/FRB/034/C2/0 02 / Rehabilitation of Road Component A - Pending from Maymana to Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 1,282,324.00 0.00 Implementati 2018-07-28 2018-08-02 2018-09-13 2018-10-13 2018-11-17 2019-11-17 balcharagh district Phase-1 maintenance of secondary Envelope on Lot-1 Ch.9+000 to Ch.18+898 roads Km (Gravel Surface) Faryab Province, North Region.

WB/ARTF- Component A - IDA/ARAP/CHL/WDK/201/C2/ Pending Improvement and Single Stage - One 001 / Rehabilitation of Road TF / 13093 Post Request for Bids Open - National 2,340,000.00 0.00 Implementati 2018-07-28 2018-08-02 2018-09-13 2018-10-13 2018-11-17 2019-11-17 maintenance of secondary Envelope from Behsood to Garden on roads Boreda Phase-1 Lot-1

WB/ARTF- IDA/ARAP/CHL/WDK/202/C2/ Component A - Pending 002 / Rehabilitation of Road Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 1,425,220.00 0.00 Implementati 2018-08-05 2018-08-10 2018-09-21 2018-10-21 2018-11-25 2019-11-25 from Behsood to Shafa maintenance of secondary Envelope on Khana-e-Tagab Phase-1 roads Lot-2

WB/ARTF- Component A - IDA/ARAP/CHL/WDK/206/C2/ Pending Improvement and Single Stage - One 001 / Rehabilitation of TF / 13093 Post Request for Bids Open - National 1,501,940.00 0.00 Implementati 2018-07-28 2018-08-02 2018-09-13 2018-10-13 2018-11-17 2019-11-17 maintenance of secondary Envelope Dahan abdara Road 20+000 on roads to 28+113 Km Gravel Road.

WB/ARTF- IDA/ARAP/EAST/NRN/022/C2/ Component A - Pending 001 / Rehabillitation of Road Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 1,480,710.00 0.00 Implementati 2018-08-05 2018-08-10 2018-09-21 2018-10-21 2018-11-25 2019-11-25 from waygal to chatras maintenance of secondary Envelope on phase-2 Lot-1 ch.30+000 to roads 40+220 Gravel Surface

WB/ARTF- Component A - IDA/ARAP/CHL/BMN/205/C2/ Pending Improvement and Single Stage - One 001 / Rehabilitation of 12 TF / 13093 Post Request for Bids Open - National 2,769,624.00 0.00 Implementati 2018-08-05 2018-08-10 2018-09-21 2018-10-21 2018-11-25 2019-11-25 maintenance of secondary Envelope Km approach road for Abdal on roads Bridge

WB/ARTF- IDA/ARAP/SOUTH/HLD/107/C 2/001 / Rehabilitation of Component A - Pending road from Grishk to Nawzad Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 2,726,275.00 0.00 Implementati 2018-07-28 2018-08-02 2018-09-13 2018-10-13 2018-11-17 2020-03-11 district center, Phase 2 Lot maintenance of secondary Envelope on 1 (Asphalt Surface) roads Hilmand province South Region.

Page 3 WB/ARTF- IDA/ARAP/CHL/BMN/136/C2/ Component B - 001 / Rehabilitation of from Pending Improvement and Single Stage - One Saighan to Kahmard Phase-1 TF / 13093 Post Request for Bids Open - National 1,890,000.00 0.00 Implementati 2018-08-05 2018-08-10 2018-09-21 2018-10-21 2018-11-25 2019-11-25 maintenance of tertiary Envelope Lot-1 Ch.0+000 to Ch.9+000 on roads Km (Gravel Surface) , CHL Region

WB/ARTF- Component A - Pending IDA/ARAP/BKN/BKN / Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 6,577,941.00 0.00 Implementati 2018-08-05 2018-08-10 2018-09-21 2018-10-21 2018-11-25 2019-11-25 Rehabilitation of 30 Km maintenance of secondary Envelope on Wahkhan Pamir Road. roads

WB/ARTF- Component A - IDA/ARAP/CHL/WDK/204/C2/ Pending Improvement and Single Stage - One 001 / Rehabilitation of TF / 13093 Post Request for Bids Open - National 1,140,049.00 0.00 Implementati 2018-08-15 2018-08-20 2018-10-01 2018-10-31 2018-12-05 2019-12-05 maintenance of secondary Envelope Dahan abdara Road 10+000 on roads to 20+000 Km Gravel Road

WB/ARTF- IDA/ARAP/PM/NTH/BLH/187/ Component A - C2/001 / Periodic Pending Improvement and Single Stage - One maintenance of 16.05 km TF / 13093 Post Request for Bids Open - National 192,120.00 0.00 Implementati 2018-09-29 2018-10-04 2018-11-15 2018-12-15 2019-01-19 2019-07-18 maintenance of secondary Envelope Gravel Road from Entezar on roads Squre of Khalid Bin Walid Road to Tangi Marmol

WB/ARTF- IDA/ARAP/PM/WEST/GOR/11 Component B - Pending 4/C2/001 / Periodic Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 358,102.17 0.00 Implementati 2018-03-22 2018-03-27 2018-04-24 2018-05-24 2018-06-28 2019-06-28 maintenance of 33 Km maintenance of tertiary Envelope on Gravel Road from Maidan roads Bazar to Pay-e-Khakbadak

RRD/WB/ARAP/BKN/BKN/173 Component B - /C2/001 / Construction of 20 Pending Improvement and Single Stage - One m Dara-e-Nawi Bridge in TF / 13093 Post Request for Bids Open - National 120,000.00 0.00 Implementati 2016-11-20 2016-11-25 2016-12-25 2017-01-24 2017-02-28 2017-08-27 maintenance of tertiary Envelope Kishm District of on roads

RRD/WB/ARAP/BKN/BKN/174 /C2/001 / Construction of 18 Component B - Pending km gravel surfaced road and Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 810,000.00 0.00 Implementati 2016-11-20 2016-11-25 2016-12-25 2017-01-24 2017-02-28 2017-08-27 drainage structures of Pamir maintenance of tertiary Envelope on Road, of roads Badakhshan Province

RRD/WB/ARAP/BKN/BKN/145 /R/C2/001 / Construction of 10 km gravel surfaced road Component B - Pending and drainage structures from Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 500,000.00 0.00 Implementati 2016-12-20 2016-12-25 2017-01-24 2017-02-23 2017-03-30 2017-09-26 Shahresafa to Quraishi maintenance of tertiary Envelope on (Ghorchi) village, Darayim roads District of Badakhshan Province

RRD/WB/ARAP/WEST/BDS/03 Component B - 6/C2/001 / Construction of Pending Improvement and Single Stage - One 25 m Tagab Ismayel Bridge TF / 13093 Post Request for Bids Open - National 150,000.00 0.00 Implementati 2016-12-01 2016-12-06 2017-01-05 2017-02-04 2017-03-11 2018-03-11 maintenance of tertiary Envelope in Qala-e- Naw District of on roads

RRD/WB/ARAP/NRHE/BGN/0 94/C2/001 / Rehabilitation of Component B - 4 km PCC surfaced road Pending Improvement and Single Stage - One and drainage structures of TF / 13093 Post Request for Bids Open - National 560,000.00 0.00 Implementati 2016-12-09 2016-12-14 2017-01-13 2017-02-12 2017-03-19 2017-04-24 maintenance of tertiary Envelope Khwaja khan baba village, on roads Baghlan Markazi District of

Page 4 RRD/WB/ARAP/NRHE/BGN/0 95/C2/001 / Rehabilitation of Component B - 16 km gravel surfaced road Pending Improvement and Single Stage - One and construction of drainage TF / 13093 Post Request for Bids Open - National 800,000.00 0.00 Implementati 2016-11-20 2016-11-25 2016-11-28 2016-12-28 2017-02-01 2017-07-31 maintenance of tertiary Envelope structures from Dahan Lala on roads to Ab Barik village, Khost district, Baghlan Province

RRD/WB/ARAP/NRHE/BGN/0 Component B - 34/C2/001 / Construction of Pending Improvement and Single Stage - One 20 m Spech Bridge in TF / 13093 Post Request for Bids Open - National 120,000.00 0.00 Implementati 2016-11-16 2016-11-21 2016-12-21 2017-01-20 2017-02-24 2018-01-28 maintenance of tertiary Envelope District of Baghlan on roads Province

RRD/WB/ARAP/NRHE/BGN/0 60/R/C2/001 / Rehabilitation Component B - of 6km gravel surfaced road Pending Improvement and Single Stage - One and construction of drainage TF / 13093 Post Request for Bids Open - National 300,000.00 0.00 Implementati 2016-11-17 2016-11-22 2016-12-22 2017-01-21 2017-02-25 2017-08-24 maintenance of tertiary Envelope structures from Sayadi to on roads Tarakhil village, , Baghlan Province

RRD/WB/ARAP/NTH/BLH/050 /C2/001 / Construction of 3.2 km PCC surfaced road and Component B - Pending construction of drainage Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 448,000.00 0.00 Implementati 2016-11-30 2016-12-05 2017-01-04 2017-02-03 2017-03-10 2017-04-15 structures from Shayesta maintenance of tertiary Envelope on Mir khil dawlat zayee to roads Panj Jareb village, district,

RRD/WB/ARAP/NTH/BLH/051 /C2/001 / Rehabilitation of 2.4 km PCCsurfaced road Component B - Pending and construction of drainage Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 336,000.00 0.00 Implementati 2016-12-09 2016-12-14 2017-01-13 2017-02-12 2017-03-19 2017-04-24 structures from Main Road maintenance of tertiary Envelope on to Qala -e-Qul Mohammad , roads Nahr-e-shahi district, Balkh Province

RRD/WB/ARAP/NTH/BLH/052 /C1/001 / Construction of 3 Component B - km gravel surfaced road and Pending Improvement and construction of drainage TF / 13093 Post Direct Selection Direct 150,000.00 0.00 Implementati 2016-11-23 2016-11-28 2017-01-02 2017-07-01 maintenance of tertiary structures from Bazzar Tonj on roads to Chochola , Kishindeh district, Balkh Province

RRD/WB/ARAP/NTH/BLH/053 /C1/001 / Construction of 0.3 km PCC surfaced road and construction of drainage Component B - Pending structures from Dehdadi Improvement and TF / 13093 Post Direct Selection Direct 45,000.00 0.00 Implementati 2016-12-13 2016-12-18 2017-01-22 2017-07-21 Concret/Asphalt Road to maintenance of tertiary on Khan Aqa village , Dehdadi roads district, Balkh Province (RRD/WB/ARAP/NTH/BLH/05 3)

RRD/WB/ARAP/CHL/BMN/079 /C2/001 / Construction of Component B - Pending Access to National Ancient Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 2,000,000.00 0.00 Implementati 2016-12-09 2016-12-14 2017-01-13 2017-02-12 2017-03-19 2018-02-20 Heritage (Buddah) Bamyan maintenance of tertiary Envelope on Province(4.1 Road and 1km roads Path way (Pilot Project)

Page 5 RRD/WB/ARAP/CHL/DKI/044/ C2/001 / Rehabilitation of 5 km gravel surfaced road and construction of drainage Component B - Pending structures from Main Road Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 250,000.00 0.00 Implementati 2016-11-30 2016-12-05 2017-01-04 2017-02-03 2017-03-10 2017-03-13 Bazaare Keshkak ( Geroye maintenance of tertiary Envelope on Ulya-Provincial Center) to roads Seji wa Raq Bargar of of

RRD/WB/ARAP/WEST/FAH/02 1/C2/001 / Construction of 4 km Asphalt surfaced road and construction of drainage Component B - Pending structures of Shahrake Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 560,000.00 0.00 Implementati 2016-11-09 2016-11-14 2016-12-14 2017-01-13 2017-02-17 2018-01-21 Hanafi (through Sediq khan maintenance of tertiary Envelope on village and Shahrake Sufi) roads to Abdurrahman and Kerji Tahsildar Village of Farah district,

RRD/WB/ARAP/WEST/FAH/01 6/R/C2/001 / Construction of Component B - 5 km Asphalt surfaced road Pending Improvement and Single Stage - One and construction of drainage TF / 13093 Post Request for Bids Open - National 623,000.00 0.00 Implementati 2016-12-18 2016-12-23 2017-01-22 2017-02-21 2017-03-28 2018-03-28 maintenance of tertiary Envelope structures of Shahrake on roads Muhajirin Kirji road, Farah district, Farah Province

RRD/WB/ARAP/NTH/FRB/021/ Component B - C2/001 / Construction of 25 Pending Improvement and Single Stage - One m Bazaare Sar Chakan TF / 13093 Post Request for Bids Open - National 150,000.00 0.00 Implementati 2016-12-10 2016-12-15 2017-01-14 2017-02-13 2017-03-20 2017-09-16 maintenance of tertiary Envelope Bridge in Gurziwan District on roads of Faryab Province

RRD/WB/ARAP/NTH/FRB/018/ Component B - C1/001 / Construction of 8 Pending Improvement and m Qazal Qule Bridge in TF / 13093 Post Direct Selection Direct 48,000.00 0.00 Implementati 2016-12-20 2016-12-25 2017-01-29 2017-07-28 maintenance of tertiary Pashtun of on roads Faryab Province

RRD/WB/ARAP/STHE/GZI/062 /C2/001 / Construction of Component B - 10 km gravel surfaced road Pending Improvement and Single Stage - One and construction of drainage TF / 13093 Post Request for Bids Open - National 500,000.00 0.00 Implementati 2016-11-22 2016-11-27 2017-01-08 2017-02-07 2017-03-14 2017-09-10 maintenance of tertiary Envelope structures from Barik to on roads Shahr e Zahid , Jaghuri district, Province

RRD/WB/ARAP/STHE/GZI/063 /C2/001 / Rehabilitation of Component B - 11 km gravel surfaced road Pending Improvement and Single Stage - One and drainage structures from TF / 13093 Post Request for Bids Open - National 550,000.00 0.00 Implementati 2016-12-20 2016-12-25 2016-12-28 2017-01-27 2017-03-03 2017-04-02 maintenance of tertiary Envelope Noh Burja to Ghojorak of on roads District of .

RRD/WB/ARAP/STHE/GHR/03 4/C2/001 / Construction of Component B - Pending 20 m Waz Bridge Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 120,000.00 0.00 Implementati 2016-12-10 2016-12-15 2017-01-14 2017-02-13 2017-03-20 2017-09-16 (Construction of 2 Bridges maintenance of tertiary Envelope on 10 m each) in roads District of

RRD/WB/ARAP/CHL/GHR/045 /B/C2/001 / Construction of Component B - Pending 40m suspension Bridge in Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 240,000.00 0.00 Implementati 2016-12-10 2016-12-15 2017-01-14 2017-02-13 2017-03-20 2017-04-25 Jam village (Near Munare maintenance of tertiary Envelope on Jam) of , roads Ghor Province

Page 6 RRD/WB/ARAP/SOUTH/HLD/ 015/C2/001 / Rehabilitation Component B - of 5 km Asphalt surfaced Pending Improvement and Single Stage - One road and drainage structures TF / 13093 Post Request for Bids Open - National 700,000.00 0.00 Implementati 2016-11-15 2016-11-20 2016-12-20 2017-01-19 2017-02-23 2022-03-05 maintenance of tertiary Envelope from main Road to Tarekh on roads village of of .

RRD/WB/ARAP/WEST/HRT/02 9/C2/001 / Rehabilitation of Component B - 5 km Asphalt surfaced road Pending Improvement and Single Stage - One and drainage structures from TF / 13093 Post Request for Bids Open - National 700,000.00 0.00 Implementati 2016-11-25 2016-11-30 2016-12-30 2017-01-29 2017-03-05 2018-03-05 maintenance of tertiary Envelope District Center to Shetak on roads and bedak villages of of

RRD/WB/ARAP/WEST/HRT/02 8/C2/001 / Rehabilitation of Component B - 13 km Asphalt surfaced road Pending Improvement and Single Stage - One and drainage structures from TF / 13093 Post Request for Bids Open - National 1,820,000.00 0.00 Implementati 2016-12-13 2016-12-18 2017-01-17 2017-02-16 2017-03-23 2018-03-23 maintenance of tertiary Envelope Islam Qala main Road to on roads Jeghati village, , Herat province

RRD/WB/ARAP/KBL/KBL/102/ Component B - Pending C2/001 / Construction of 100 Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 600,000.00 0.00 Implementati 2016-11-09 2016-11-14 2016-11-17 2016-12-17 2017-01-21 2018-01-21 m Naghlo Bridge in Surobi maintenance of tertiary Envelope on District of roads

RRD/WB/ARAP/KBL/KBL/105/ C2/001 / Rehabilitation of 8.3 km PCC surfaced road Component B - and drainage structures from Pending Improvement and Single Stage - One Kabul-Bagram Highway to TF / 13093 Post Request for Bids Open - National 1,162,000.00 0.00 Implementati 2016-12-09 2016-12-14 2017-01-13 2017-02-12 2017-03-19 2017-09-15 maintenance of tertiary Envelope Kata khil village , Deh Sabz on roads district, Kabul province (RRD/WB/ARAP/KBL/KBL/105 )

RRD/WB/ARAP/SOUTH/KDR/ 027/C2/001-002 / Rehabilitation of 22 km Component B - Gravel surfaced road and Pending Improvement and Single Stage - One drainage structures from TF / 13093 Post Request for Bids Open - National 990,000.00 0.00 Implementati 2016-12-09 2016-12-14 2017-01-13 2017-02-12 2017-03-19 2017-09-15 maintenance of tertiary Envelope District Center to Chashma- on roads e-Mohammad khan of Maiwand District of

RRD/WB/ARAP/STHE/KHT/02 0/C2/001 / Rehabilitation of Component B - 5 km Asphalt surfaced road Pending Improvement and Single Stage - One and drainage structures from TF / 13093 Post Request for Bids Open - National 700,000.00 0.00 Implementati 2017-02-22 2017-02-27 2017-03-29 2017-04-28 2017-06-02 2027-06-05 maintenance of tertiary Envelope District Center to Samawaat on roads village of Mandozai District of

RRD/WB/ARAP/EAST/KUN/02 7/C2/001 / Construction of 6 Component B - km gravel surfaced road and Pending Improvement and Single Stage - One construction of drainage TF / 13093 Post Request for Bids Open - National 300,000.00 0.00 Implementati 2016-11-09 2016-11-14 2016-12-14 2017-01-13 2017-02-17 2018-02-17 maintenance of tertiary Envelope structures of Darah Samlam on roads vilalge, of Shegal District,

Page 7 RRD/WB/ARAP/NRHE/KNZ/0 25/C2/001 / Construction of Component B - Pending 20 m Haji Amanullah Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 120,000.00 0.00 Implementati 2016-11-29 2016-12-04 2017-01-03 2017-02-02 2017-03-09 2017-09-05 (Kocha Qazaq) Bridge in maintenance of tertiary Envelope on Chahar Dara District of roads

RRD/WB/ARAP/EAST/LMN/04 Component B - 3/C2/001 / Construction of Pending Improvement and Single Stage - One Road, MHP and Irragation TF / 13093 Post Request for Bids Open - National 1,000,000.00 0.00 Implementati 2016-11-30 2016-12-05 2016-12-08 2017-01-07 2017-02-11 2017-08-10 maintenance of tertiary Envelope Projects (Pilot Project ) on roads

RRD/WB/ARAP/EAST/LMN/01 Component B - 9/C2/001 / Construction of Pending Improvement and Single Stage - One 75 m Mangal Poor Bridge in TF / 13093 Post Request for Bids Open - National 450,000.00 0.00 Implementati 2016-12-15 2016-12-20 2017-01-19 2017-02-18 2017-03-25 2018-03-25 maintenance of tertiary Envelope of on roads Laghman Province

RD/WB/ARAP/KBL/LGR/063/C 2/001 / Rehabilitation of 3.7 Component B - km PCC surfaced road and Pending Improvement and Single Stage - One drainage structures from TF / 13093 Post Request for Bids Open - National 518,000.00 0.00 Implementati 2016-11-27 2016-12-02 2017-01-01 2017-01-31 2017-03-07 2017-09-03 maintenance of tertiary Envelope Bagh Mazaar to Deh Naw on roads village of of

RRD/WB/ARAP/KBL/LGR/064/ C2/001 / Rehabilitation of 4.2 km Asphalt surfaced Component B - Pending road and drainage structures Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 588,000.00 0.00 Implementati 2016-11-08 2016-11-13 2016-12-13 2017-01-12 2017-02-16 2017-08-15 from Khoshi Maain Road to maintenance of tertiary Envelope on Kandab and Kariz ha village roads of of Logar Province

RRD/WB/ARAP/KBL/LGR/065/ Component B - Pending C2/001 / Construction of 18 Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 108,000.00 0.00 Implementati 2016-11-13 2016-11-18 2016-12-18 2017-01-17 2017-02-21 2018-02-21 m Shahidan Bridge in Azrah maintenance of tertiary Envelope on District of Logar Province roads

RRD/WB/ARAP/KBL/LGR/067/ C2/001 / Construction of 1.5 km PCC surfaced road, with Component B - 20 meter bridge and Pending Improvement and Single Stage - One drainage structures from TF / 13093 Post Request for Bids Open - National 370,000.00 0.00 Implementati 2016-11-10 2016-11-15 2016-11-18 2016-12-18 2017-01-22 2018-01-22 maintenance of tertiary Envelope Beni Shir Afghan to Ezat on roads khil village of Mohammad Agha District of Logar Province

RRD/WB/APRA/EAST/NGR/03 5/C2/001 / Construction of Component B - Pending Small Structures,bridge, Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 1,000,000.00 0.00 Implementati 2016-12-16 2016-12-21 2017-01-20 2017-02-19 2017-03-26 2017-03-29 Irragation and MHP Projects maintenance of tertiary Envelope on (Pilot Project) Nangarhar roads Province

RRD/WB/ARAP/SOUTH/NRZ/ 017/R/C2/001 / Rehabilitation of 5 km Asphatl surfaced Component B - Pending road and construction of Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 700,000.00 0.00 Implementati 2016-11-28 2016-12-03 2016-12-06 2017-01-05 2017-02-09 2017-08-08 drainage structures from maintenance of tertiary Envelope on city to Allah abad roads vilalge, , Nimroz Province

Page 8 RRD/WB/ARAP/EAST/NRN/01 Component B - 9/C2 / Construction of 25 m Pending Improvement and Single Stage - One Dahane Zhonya Bridge in TF / 13093 Post Request for Bids Open - National 150,000.00 0.00 Implementati 2016-12-14 2016-12-19 2017-01-18 2017-02-17 2017-03-24 2018-03-24 maintenance of tertiary Envelope of Nuristan on roads Province

RRD/WB/ARAP/EAST/NRN/02 Component B - 0/C2/001 / Construction of Pending Improvement and Single Stage - One 25 m Dahane Korgal Bridge TF / 13093 Post Request for Bids Open - National 150,000.00 0.00 Implementati 2016-12-30 2017-01-04 2017-01-07 2017-02-06 2017-03-13 2018-04-09 maintenance of tertiary Envelope in Du Ab District of on roads

RRD/WB/ARAP/EAST/NRN/04 1/R/C1/001 / Rehabilitation of Component B - 10 km gravel surfaced road Pending Improvement and and drainage structures from TF / 13093 Post Direct Selection Direct 500,000.00 0.00 Implementati 2016-11-30 2016-12-05 2017-01-09 2017-07-08 maintenance of tertiary Kigal village to Katar on roads District , Waygl district, Nuristan Province.

RRD/WB/ARAP/SHTE/PKA/01 1/C2/001 / Construction of 8 km Asphalt surfaced road Component B - Pending and construction of drainage Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 1,120,000.00 0.00 Implementati 2016-12-17 2016-12-22 2017-01-21 2017-02-20 2017-03-27 2017-05-14 structures from Deh Munda maintenance of tertiary Envelope on to Abass khil village of roads ,

RRD/WB/ARAP/SHTE/PKA/01 2/C2/001 / Rehabilitation of 5 km gravel surfaced road Component B - Pending and construction of drainage Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 250,000.00 0.00 Implementati 2016-12-11 2016-12-16 2017-01-15 2017-02-14 2017-03-21 2017-04-26 structures from District maintenance of tertiary Envelope on Center to Qaribuddin village roads of Yahya khil district, Paktika Province

RRD/WB/ARAP/STHE/PKY/03 3/C2/001 / Rehabilitation of 5.95 km Asphalt surfaced Component B - Pending road and drainage structures Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 1,013,000.00 0.00 Implementati 2016-11-08 2016-11-13 2016-12-13 2017-01-12 2017-02-16 2018-02-16 inc luding 30 M RCC bridge maintenance of tertiary Envelope on from District Center to roads Musa Khel Village of Shwak District of Paktya Province

RRD/WB/ARAP/STHE/PKY/06 4/C1/001 / Construction of 7 Component B - km gravel surfaced road and Pending Improvement and construction of drainage TF / 13093 Post Direct Selection Direct 350,000.00 0.00 Implementati 2016-12-20 2016-12-25 2017-01-29 2017-07-28 maintenance of tertiary structures of Sizhinak Road, on roads Sayed Karam district, Paktya Province

RRD/WB/ARAP/KBL/PRN/138/ C2/001 / Rehabilitation of 2.9 km PCC surfaced road Component B - Pending and construction of drainage Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 406,000.00 0.00 Implementati 2016-11-10 2016-11-15 2016-12-15 2017-01-14 2017-02-18 2018-02-18 structures from Dawlat khil maintenance of tertiary Envelope on villages to Qala Naw roads &Shahi ha village, Bagram district,

Page 9 RRD/WB/ARAP/KBL/PRN/139/ C2/001 / Rehabilitation of 5.3 km Asphatl surfaced Component B - Pending road and construction of Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 742,000.00 0.00 Implementati 2016-11-10 2016-11-15 2016-12-15 2017-01-14 2017-02-18 2018-01-22 drainage structures from maintenance of tertiary Envelope on Ghorband main Road to roads Ashawa village, Jabalusaraj district, Parwan Province

RRD/WB/ARAP/NTH/SMN/040 /C2/001 / Construction of 15 km Gravel surfaced road Component B - Pending and construction of drainage Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 750,000.00 0.00 Implementati 2016-11-11 2016-11-16 2016-11-19 2016-12-19 2017-01-23 2018-03-03 structures from Main Road maintenance of tertiary Envelope on to Qinar ha Village Khoram roads sarbagh district,

RRD/WB/ARAP/NTH/SMN/035 /R/C1/001 / Construction of 3 km gravel surfaced road and Component B - Pending construction of drainage Improvement and TF / 13093 Post Direct Selection Direct 150,000.00 0.00 Implementati 2016-11-30 2016-12-05 2017-01-09 2017-07-08 structures from Tagab Qoriq maintenance of tertiary on to Mirhazar Village , Dare- roads Sufe Bala district, Samangan Province Province

RRD/WB/ARAP/NTH/SRL/026/ R/C2/001 / Rehabilitation of 12 km gravel surfaced road Component B - Pending and construction of drainage Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 600,000.00 0.00 Implementati 2016-11-08 2016-11-13 2016-12-13 2017-01-12 2017-02-16 2017-03-24 structures from District maintenance of tertiary Envelope on center to Chamadan wa roads Sayadha village, , Saripul Province

RRD/WB/ARAP/NRHE/TKR/04 Component B - 6/C2/001 / Construction of Pending Improvement and Single Stage - One 20 m Dashte Amani Bridge TF / 13093 Post Request for Bids Open - National 120,000.00 0.00 Implementati 2016-11-09 2016-11-14 2016-12-14 2017-01-13 2017-02-17 2017-08-16 maintenance of tertiary Envelope in Rustaq District of Takhar on roads Province

RRD/WB/ARAP/NRHE/TKR/03 Component B - 2/C2/001 / Construction of Pending Improvement and Single Stage - One 23 m Zardalo Dara Ulya TF / 13093 Post Request for Bids Open - National 138,000.00 0.00 Implementati 2016-12-20 2016-12-25 2017-02-05 2017-03-07 2017-04-11 2017-10-08 maintenance of tertiary Envelope Bridge in Kalafgan District on roads of

RRD/WB/ARAP/SOUTH/URN/ 018/C2/001 / Rehabilitation of 12 km asphalt surfaced Component B - Pending road and drainage structures Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 1,680,000.00 0.00 Implementati 2016-12-08 2016-12-13 2017-01-12 2017-02-11 2017-03-18 2017-09-14 from Qala Ragh to Chora maintenance of tertiary Envelope on Main Road (Poza Bridge) of roads of

RRD/WB/ARAP/KBL/WRK/021 Component B - Pending /C2/001 / Construction of 52 Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 312,000.00 0.00 Implementati 2016-12-25 2016-12-30 2017-01-29 2017-02-28 2017-04-04 2017-10-01 m Chenzaye Bridge in Nirkh maintenance of tertiary Envelope on District of Wardak Province roads

RRD/WB/ARAP/SOUTH/ZBL/0 04/C1/001 / Rehabilitation of 1.5 km PCC surfaced road Component B - Pending and drainage structures from Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 225,000.00 0.00 Implementati 2016-07-30 2016-08-04 2016-08-07 2016-09-06 2016-10-11 2017-04-09 Haji Baz Mohammad Naway maintenance of tertiary Envelope on Kalay to Bakorzai Village of roads of

Page 10 RRD/WB/ARAP/BKN/BKN/172 /C2 / Rehabilitation of 5 km Component B - Pending Asphalt surfaced road and Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 700,000.00 0.00 Implementati 2019-08-01 2019-08-06 2019-09-05 2019-10-05 2019-11-09 2020-11-08 drainage structures of Chata maintenance of tertiary Envelope on village, Faizabad roads Badakhshan Province

RRD/WB/ARAP/WEST/BDS/03 7/C2 / Construction of 10 km gravel surfaced road and Component B - Pending construction of drainage Improvement and Single Stage - One TF / 13093 Post Request for Bids Open - National 500,000.00 0.00 Implementati 2019-08-01 2019-08-06 2019-09-05 2019-10-05 2019-11-09 2020-11-08 structures from zeyarat maintenance of tertiary Envelope on khwoja mohammad to roads Aabkhore Sangee village, Badghis Province

RRD/WB/ARAP/NRHE/BGN/0 96/C1 / Construction of 12 Component B - km asphalt surfaced road Pending Improvement and Single Stage - One and construction of drainage TF / 13093 Post Request for Bids Open - National 1,680,000.00 0.00 Implementati 2019-08-01 2019-08-06 2019-09-05 2019-10-05 2019-11-09 2020-11-08 maintenance of tertiary Envelope structures from District on roads center (Folol village) to Sea Hazara, Baghlan Province

RRD/WB/ARAP/CHL/DKI/026 Component B - / Construction of 15 m Pending Improvement and Single Stage - One Surkh Joy Bridge (Rabat-e- TF / 13093 Post Request for Bids Open - National 90,000.00 0.00 Implementati 2019-08-01 2019-08-06 2019-09-05 2019-10-05 2019-11-09 2019-12-15 maintenance of tertiary Envelope Nazdike Bazaar) of on roads DaiKundi Province

GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Component C- Program WB/ARTF- Planning and Development, Pending Request for Single Stage - One IDA/ARAP/GDS/KBL/KBL/010 TF / 13093 Institutional Strengthening Post Limited 900.00 0.00 Implementati 2018-01-08 2018-02-08 2018-03-10 Quotations Envelope /C2/001 / Electric Equipment and Program Coordination on Support

Component C- Program WB/ARTF- Planning and Development, Pending Request for Single Stage - One IDA/ARAP/GDS/KBL/KBL/011 TF / 13093 Institutional Strengthening Post Limited 2,400.00 0.00 Implementati 2018-01-08 2018-02-08 2018-06-08 Quotations Envelope /C2/001 / Revolving Chairs and Program Coordination on Support

Component C- Program WB/ARTF- Planning and Development, Pending Request for Single Stage - One IDA/ARAP/GDS/KBL/KBL/012 TF / 13093 Institutional Strengthening Post Limited 889.00 0.00 Implementati 2018-01-08 2018-02-08 2018-03-10 Quotations Envelope /C2/001 / Security Equipment and Program Coordination on Support

Component C- Program WB/ARTF- Planning and Development, Pending IDA/ARAP/GDS/KBL/KBL/013 Request for Single Stage - One TF / 13093 Institutional Strengthening Post Limited 4,083.00 0.00 Implementati 2018-01-06 2018-01-30 2018-05-30 /C2/001 / Engineering Quotations Envelope and Program Coordination on Equipment Support

Component C- Program WB/ARTF- Planning and Development, Pending Single Stage - One IDA/ARAP/GDS/KBL/KBL/014 TF / 13093 Institutional Strengthening Post Request for Bids Open - National 99,439.00 0.00 Implementati 2018-01-01 2018-01-08 2018-02-05 2018-03-07 2018-04-11 2018-08-09 Envelope /C2/001 / IT Equipment and Program Coordination on Support

Page 11 Component C- Program WB/ARTF- Planning and Development, Pending Request for Single Stage - One IDA/ARAP/GDS/KBL/KBL/015 TF / 13093 Institutional Strengthening Post Limited 6,350.00 0.00 Implementati 2018-01-08 2018-02-08 2018-04-09 Quotations Envelope /C2/001 / Office Equipment and Program Coordination on Support

MPW/WB/ARTF- Component C- Program IDA/ARAP/GDS/KBL/KBL/011 Planning and Development, Pending Request for Single Stage - One /C2/ / Procurement of 650m TF / 13093 Institutional Strengthening Post Open - National 31,200.00 0.00 Implementati 2019-01-27 2019-03-24 2019-04-23 Quotations Envelope Cable for NRAP Office in and Program Coordination on THRCP building. Support

WB/ARTF- Component C- Program IDA/ARAP/GDS/KBL/KBL/014 Planning and Development, Pending Request for Single Stage - One /C2/003 / Procurement of 2 TF / 13093 Institutional Strengthening Post Open - National 1,135.00 0.00 Implementati 2019-03-20 2019-05-01 2019-05-15 Quotations Envelope Finger print attendance and Program Coordination on machinces Support

WB/ARTF- Component C- Program IDA/ARAP/GDS/KBL/KBL/018 Planning and Development, Pending Single Stage - One /C2/001 / Procurement of 5 TF / 13093 Institutional Strengthening Post Request for Bids Open - National 175,000.00 0.00 Implementati 2019-03-20 2019-03-25 2019-04-24 2019-05-24 2019-06-21 2019-12-18 Envelope Total Stations for projects and Program Coordination on Survey. Support

Component C- Program WB/ARTF- Planning and Development, Pending IDA/ARAP/GDS/KBL/KBL/017 Request for Single Stage - One TF / 13093 Institutional Strengthening Post Open - National 14,000.00 0.00 Implementati 2019-03-20 2019-05-01 2019-05-31 /C2/001 / Purchasing of files Quotations Envelope and Program Coordination on Shelf and office furnitures. Support

Component C- Program WB/ARTF- Planning and Development, Pending IDA/ARAP/GDS/KBL/KBL/019 Request for Single Stage - One TF / 13093 Institutional Strengthening Post Open - National 2,400.00 0.00 Implementati 2019-03-25 2019-04-29 2019-05-14 /C2/001 / Procurement of 2 Quotations Envelope and Program Coordination on Power transformer 30KW Support

Component C- Program MPW/WB/ARTF- Planning and Development, Pending IDA/ARAP/GDS/KBL/KBL/010 Request for Single Stage - One TF / 13093 Institutional Strengthening Post Open - National 1,200.00 0.00 Implementati 2019-03-20 2019-05-08 2019-06-07 /C2/ / Procurement of 20 Quotations Envelope and Program Coordination on Stabilizer Support

Component C- Program WB/ARTF- Planning and Development, Pending IDA/ARAP/GDS/KBL/KBL/011 Request for Single Stage - One TF / 13093 Institutional Strengthening Post Open - National 3,600.00 0.00 Implementati 2019-03-21 2019-05-02 2019-06-01 /C2/ / Procurement of 30 Quotations Envelope and Program Coordination on Revolving Chairs Support

Component C- Program MPW/WB/ARTF- Planning and Development, Pending IDA/ARAP/GDS/KBL/KBL/012 Request for Single Stage - One TF / 13093 Institutional Strengthening Post Open - National 590.00 0.00 Implementati 2019-03-21 2019-05-02 2019-06-01 /C2/ / Procurement of Quotations Envelope and Program Coordination on Security Equipment Support

Component C- Program MPW/WB/ARTF- Planning and Development, Pending IDA/ARAP/GDS/KBL/KBL/013 Request for Single Stage - One TF / 13093 Institutional Strengthening Post Open - National 3,190.00 0.00 Implementati 2019-03-21 2019-05-02 2019-06-01 /C2/ / Procurement of Survey Quotations Envelope and Program Coordination on Equipment Support

Component C- Program MPW/WB/ARTF- Planning and Development, Pending IDA/ARAP/GDS/KBL/KBL/015 Request for Single Stage - One TF / 13093 Institutional Strengthening Post Open - National 2,000.00 0.00 Implementati 2019-03-21 2019-05-09 2019-06-08 /C2/ / Procurement of 2 Air Quotations Envelope and Program Coordination on Conditions Support

Component C- Program WB/ARTF- Planning and Development, Pending IDA/ARAP/GDS/KBL/KBL/014 Request for Single Stage - One TF / 13093 Institutional Strengthening Post Open - National 19,217.00 0.00 Implementati 2019-03-20 2019-04-17 2019-05-17 /C2/002 / Procurement of Quotations Envelope and Program Coordination on Computer softwares Support

Page 12 Component C- Program MPW/WB/ARTF- Planning and Development, Pending IDA/ARAP/GDS/KBL/KBL/014 Request for Single Stage - One TF / 13093 Institutional Strengthening Post Open - National 45,700.00 0.00 Implementati 2019-05-25 2019-07-20 2020-01-16 /C2/ / Procurement of IT Quotations Envelope and Program Coordination on Equipment. Support

MPW/WB/ARTF- IDA/ARAP/GDS/KBL/KBL/023 Component C- Program /C2/ / Purchasing and Planning and Development, Pending Single Stage - One installation of Network TF / 13093 Institutional Strengthening Post Request for Bids Open - National 199,373.00 0.00 Implementati 2019-08-01 2019-08-06 2019-09-05 2019-10-05 2019-11-09 2020-05-07 Envelope System and security and Program Coordination on Cameras in NRAP new Support building in Pol-e-Charkh.

NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

NPA/MPW/97/CS-1126/QCBS / Selection of Preferred Technical Alternative and Component A - Preliminary Design for Improvement and Quality And Cost- Open - Under TF / 13093 Prior 5,000,000.00 0.00 2018-06-20 2018-07-11 2018-08-24 2018-09-21 2018-10-21 2018-11-25 2018-12-30 2019-12-30 Upgrading the Torkham- maintenance of secondary Based Selection International Implementation -Kabul Highway roads into a Multilane, Dual- Carriageway Facilities

NPA/MPW/99/CS-1127/QCBS / Environmental Assessment Component A - (EA) and Social Assessment Improvement and Quality And Cost- Open - Under TF / 13093 Prior 745,168.00 0.00 2018-09-15 2018-10-06 2018-11-19 2018-12-17 2019-01-16 2019-02-20 2019-03-27 2020-03-26 (SA) Preparatory Studies for maintenance of secondary Based Selection International Implementation Torkham-Jalalabad-Kabul roads Highway Development

INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Page 13