Annexure-Form-1A

Total Page:16

File Type:pdf, Size:1020Kb

Annexure-Form-1A Form – 1A For “HappyNest Rosella” Capital City Amaravati, Andhra Pradesh. March – 2019 Project Proponent Environmental Consultant Andhra Pradesh Capital Region SV Enviro Labs & Consultants, Auto Development Authority Nagar, Visakhapatnam Vijayawada, Andhra Pradesh NABET Accreditation No : 1 4 7 APPENDIX II (See paragraph 6) FORM-1 A (Only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme) 1. LAND ENVIRONMENT 1.0 (Attach panoramic view of the project site Perspective view of the project is and the vicinity) enclosed in Annexure - A1 1.1. Will the existing land use get significantly The proposed HappyNest Rosella is part altered from the project that is not of the Amaravati Capital City. consistent with the surroundings? (Proposed land use must conform to the approved Total plot area of the proposed project is Master Plan / Development Plan of the area. 6.50 Ha. (16.05 Acres) with built-up area Change of land use if any and the statutory of 3,91,537.24 Sq.m. and the details are approval from the competent authority are furnished in the Annexure – A2. submitted). The proposed plot is falling in S3 zone as per the Master Plan of Amaravati Capital City by Andhra Pradesh Capital Region Development Authority (APCRDA). The S3 Zone as per master plan is for special development which permits residential, commercial and institutional land use. 2 Attach Maps of Approved Master Plan of the Andhra (i) Site location, Pradesh Capital Region Development (ii) Surrounding features of the Authority (APCRDA) and plot plan of proposed site (within 500 proposed Building project is given in meters) Annexure – A3. (iii) The site (indicating levels & contours) to appropriate scales. Location Map is given in Annexure – A4 If not available attach only conceptual plans. Google Earth Imagery is given in Annexure – A5 Conceptual /perspective plan of project is given in Annexure – A1 1.2. List out all the major project requirements The salient features of the proposed in terms of the land area, built up area, project are given in Annexure – A6. water consumption, power requirement, connectivity, community facilities, parking needs etc. 1.3. What are the likely impacts of the proposed Present land for the project site area is an activity on the existing facilities adjacent to open fallow land. Proposed project does the proposed site? (Such as open spaces, not involve any activities which cause community facilities, details of the existing disturbance to the ecology. There will be landuse, disturbance to the local ecology). temporary generation of fugitive dust and noise during the construction phase. Environmental Management Plan (EMP) will be implemented during the construction phase of the project to mitigate the likely impacts. 1.4. Will there be any significant land There will be no significant land disturbance resulting in erosion, subsidence disturbance, since no major below ground & instability? level excavation is planned except for (Details of soil type, slope analysis, basement works. vulnerability to subsidence, seismicity etc may be given). 1.5. Will the proposal involve alteration of The proposal does not involve the natural drainage systems? (Give details on a alteration of natural drainage. A proper contour map showing the natural drainage Storm Water Management System is near the proposed project site) planned for the Amaravati Capital City Project considering the existing natural streams, nallas/ irrigation channels. 1.6. What are the quantities of earthwork The quantity of work excavation will be 3 involved in the construction activity- minimal to meet the design requirements. cutting, filling, reclamation etc. (Give Any surplus excavated earth will be details of the quantities of earthwork reused at site and other capital city involved, transport of fill materials from development works. outside the site etc) 1.7. Give details regarding water supply, waste It is estimated about 534 KLD of water is handling etc during the construction period. required during construction. This will be sourced from the Thulluru Lift Irrigation scheme. Labour camp as per NBC code will be developed having secure accommodation with proper potable drinking water facility and separate sanitation facilities for men and women. 1.8. Will the low-lying areas & wetlands get Not Applicable altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity) 1.9. Whether construction debris & waste during Construction debris will be collected and construction cause health hazard? (Give suitably utilized on site as per quantities of various types of wastes construction waste management plan. generated during construction including the Stacking and disposal of such material construction labour and the means of will be such that it will not disturb the disposal) surrounding land use. Maximum reuse of construction waste on site and removal of non- reusable waste from the site and proper disposal is proposed, which would reduce the impact significantly. 2. WATER ENVIRONMENT 2.1. Give the total quantity of water Total water requirement of the project is requirement for the proposed project with 1617 KLD. Details of the water the breakup of requirements for various requirement and wastewater generation are uses. How will the water requirement met? given in Annexure – A7. State the sources & quantities and furnish a water balance statement. 4 2.2. What is the capacity (dependable flow or Water will be sourced from Thulluru lift yield) of the proposed source of water? irrigation scheme on River Krishna. The water is already being supplied to IGC and other educational institutes in APCRDA region. This will be primary source of water for both construction and operation phase till the trunk infrastructure of capital city is in place. 2.3. What is the quality of water required, in The water will be treated to potable water case, the supply is not from a municipal quality during operation phase. source? (Provide physical, chemical, biological characteristics with class of water quality) 2.4. How much of the water requirement can be Two STPs of 675 KLD capacity each is met from the recycling of treated provided to treat the wastewater. It is wastewater? (Give the details of quantities, estimated that about 1215 KLD of treated sources and usage) wastewater is generated from the STP. The details are given in Annexure – A7. 2.5. Will there be diversion of water from other No. The Amaravati Capital City is at the users? (Please assess the impacts of the tail-end River Krishna project on other existing uses and quantities of consumption) 2.6. What is the incremental pollution load from The wastewater generated will be treated wastewater generated from the proposed in a Sewage Treatment Plant (STP) within activity? (Give details of the quantities and project premises and utilized for flushing, composition of wastewater generated from landscaping, car wash and excess will be the proposed activity) stored in a temporary storage pond within the site. 2.7. Give details of the water requirements met Roof top Rain Water Harvesting is from water harvesting? Furnish details of planned. the facilities created. 2.8. What would be the impact of the land use Since the project site is a flat terrain and as changes occurring due to the proposed such the project site is small there will be project on the runoff characteristics no adverse impact on the land use changes (quantitative as well as qualitative) of the envisaged due to the proposed project both area in the post construction phase on a during construction and operation phase. long-term basis? Would it aggravate the There would not be any water logging or problems of flooding or water logging in flooding due to the proposed project as the any way? project proponent proposes storm water management plan to mitigate such incidents. The development of greenbelt 5 will be improving the aesthetics of the project. 2.9. What are the impacts of the proposal on the No ground water is tapped for the project. ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any) 2.10. What precautions/measures are taken to The runoff from the construction activities prevent the run-off from construction will be contained within the project site by activities polluting land & aquifers? (Give using garland drain and construction of details of quantities and the measures taken sediment ponds. No runoff will be to avoid the adverse impacts) disposed outside the project boundary. 2.11. How is the storm water from within the site A garland drain will be developed along managed?(State the provisions made to with a sediment pond to control the runoff avoid flooding of the area, details of the and soil erosion. drainage facilities provided along with a site layout indication contour levels) 2.12. Will the deployment of construction No. Local labour will be hired during labourers particularly in the peak period construction. Proper drinking water and lead to unsanitary conditions around the sanitation facilities will be provided in the project site (Justify with proper labour colony. explanation) 2.13. What on-site facilities are provided for the The wastewater generated during the collection, treatment & safe disposal of operation phase will be treated in a sewage? (Give details of the quantities of fabricated STP. wastewater generation, treatment capacities with technology & facilities for recycling and disposal). 2.14. Give details of dual plumbing system if About 450 KLD of treated wastewater is treated waste is used for flushing of toilets utilized within project premises for of toilets or any other use. Flushing, Landscaping, Car Wash.
Recommended publications
  • Progress Report St St 1 January 2016 to 31 March 2016
    Groundwater Governance through Panchayat Raj Institutions in Andhra Pradesh Progress Report st st 1 January 2016 to 31 March 2016 Bharati Integrated Rural Development Society (BIRDS) # 26/130 B-2, EVA Nest, Gnanapuram, Nandyal (R.S) Kurnool District, Pin: 518 502, A.P, India. Phone No: +91 8514 222266 | Fax: +91 8514 248444 | E-mail: [email protected] | web: www.birdsorg.net 1. Introduction The ‘Groundwater Governance through Panchayat Raj Institutions in Andhra Pradesh’ pilot project is being implemented in five districts of Andhra Pradesh (Anantapur, Chittoor, Kadapa, Kurnool, and Prakasam), where FAO-APFAMGS successfully demonstrated the impact of the work on changes in the demand side in managing groundwater distress. In the pilot phase, the project aims to refurbish all groundwater monitoring infrastructure and establish linkages with Gram Panchayat for improved governance of this key resource. This initiative is co-funded by FAO and the Government of Andhra Pradesh. It is expected that the pilot initiative will develop a model for upscaling the project to cover all areas in these five districts as well as parts of Nellore. The pilot project’s duration is one year. The project has two major components. The first focuses on revitalizing the GMCs and HUNs formed under APFAMGS in 518 villages of the five districts. Additionally, it invests on repairing the PHM monitoring equipment to ensure that data collection is restored and done regularly. APFAMGS promoted Groundwater Monitoring Committees (GMCs) and Hydrologic Unit Networks (HUNs) are taking lead in technical data generation, water budgeting, crop planning and crop adoption. The second component focuses on initiating groundwater governance through Gram Panchayats in 72 villages of Kurnool district.
    [Show full text]
  • Not Applicable for IOC/HPC
    APPOINTMENT OF RETAIL OUTLET DEALERSHIPS IN AP BY IOC Location Sl. Name Of Location Revenue District Type of RO Estimated Category Type of Site Minimum Minimum Minimum Estimated Estimated Mode of Fixed Fee / Security No. (Not (Regular/Rur monthly (CC/DC/CFS) Frontage of Depth of Site Area of site working fund selection Min bid Deposit ( Rs applicable al) Sales Site (in M) (in M) (in Sq. M.). capital required for (Draw of amount ( Rs in Lakhs) for IOC/HPC) Potential requirement developmen Lots/Bidding in Lakhs) (MS+HSD) in for t of ) Kls operation of infrastructur RO (Rs in e at RO (Rs Lakhs) in Lakhs ) DRAW OF 1 BUKKAPATNAM VILLAGE & MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 2 GOTLUR VILLAGE, DHARMAVARAM MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 3 VAYALPADU (NOT ON NH - SH), VAYALAPADU MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS THONDAVADA VILLAGE (NOT ON NH/SH), CHANDRAGIRI DRAW OF 4 CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 5 DODDIPALLE (NOT ON NH/SH), PILERU MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS NARAYANA NELLORE VILLAGE (NOT ON SH/NH) NANDALUR DRAW OF 6 KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 7 ARAKATAVEMULA NOT ON SH/NH , RAJUPALEM MANDAL KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 8 GUTTURU VILLAGE, PENUKONDA MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 9 MADDALACHERUVU VILLAGE, KANAGANAPALLE MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 10 KALICHERLA (NOT ON NH/SH), PEDDAMANDYAM MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS CHINNACHEPALLE, NOT ON SH/ NH, KAMALAPURAM DRAW OF 11 KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 12 GUDIPADU NOT ON SH/NH, DUVVUR MANDAL KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS BUGGANIPALLE VILLAGE NOT ON NH/SH, BETHAMCHERLA DRAW OF 13 KURNOOL Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 14 GOVINDPALLE VILLAGE NOT ON NH/SH, SIRVEL MANDAL KURNOOL Rural 48 ST CFS 20 20 400 0 0 0 2 LOTS DRAW OF 15 POLAKAL VILLAGE NOT ON NH/SH, C .
    [Show full text]
  • Meeseva Photos Quality-Aponline
    Authorized Sl.No Address E Mail Phone No Quality District Agent Id Opp:Indian Bank,Kallur 1 USDP-CTCO [email protected] 9912048036 Good Road,Sodam,Chittoor-517123 Chittoor Akula Bazaar Street, Ramasamudram, [email protected] 2 APO-CTR-KER 9441330274 Good Chittoor-517417 .in Chittoor H.No.6-122-5,ThimmareddY 3 USDP-CTSO [email protected] 9441574209 Good Complex,Kalikiri,Chittoor-517234 Chittoor H.No.1-292, Main Raod, Kalakada, 4 USDP-CTSC [email protected] 9966940669 Good Chittoor-517236 Chittoor D.No: 27-47-15-3, Gokul Circle, padmaja.mahesh@gmai 5 USDP-CTMM 9866767928 Good Punganur,Chittoor-517247 l.com Chittoor Raja ReddY Complex, Opp: SBI, 6 USDP-CTJA [email protected] 9963165353 Good Polakala(V&P), Irala, Chittoor-517130 Chittoor D.No: 4-127/1, Bazaar Street, [email protected] 7 USDP-CTRA 9948947926 Good Rompichrela, Chittoor-517192 m Chittoor Near Bus Stand, Gangadhara Nellore, gnpreddY_rsdp_ctr@Ya 8 APO-CTR-GNP 9985192450 Good Chittoor-517125 hoo.co.in Chittoor C-64/4, MBT Road, Angallu, [email protected] 9 APO-CTR-ESM 9441573950 Good Kurabalakota Mandal, Chittoor-517325 o.in Chittoor Patrapalli [email protected] 10 USDP-CTNN 9052852280 Good Thanda,mittachittavaripalli,pungnur m Chittoor S/o G Sreenivasulu, Post Office Street, [email protected] 11 USDP-CTOS Rallabudugur(V&P), Shanthipuram 9550986909 Good om Mandal., Chittor-517423 Chittoor D.No: 8-119, Main Bazaar, Main Road, 12 USDP-CTRR [email protected] 9701594124 Good PeddamandYam, Chittoor-517297 Chittoor 13 USDP-CTSN K V Palli, Chitoor-517213 [email protected] 9052092803 Good Chittoor Shop No: 5, B P K N Complex, M B T venkatchalla_5@Yahoo.
    [Show full text]
  • Fairs and Festival, 4 West Godavari, Part VII
    PRO. 179.4 (N) o . 7S0 .~ WEST GODAVARI CENSUS OF INDIA 1961 VOLUME II ANDHRA PRADESH PART VII - B (4) FAIRS AND FESTIV (4. West Godavari District) A: CHANDRA SEKHAR OF THE INDIAN ADMINISTRATIVE SERVICB Superintendent o.J,...J;_"UJIF. Q_wations, Andhra Pradesh Pnce: Rs .. 6.50 P. or 15 Sh. 2 d. or $ 2.34 c. ~9t{ CENSUS PUBLICATIONS, ANDHRA PRADESH . , ,! (All the Census Publications of this State bear Vol. No. II) PART I-A General Report PART J-B Report on Vital Statistics PART I-C Subsidiary Tables PART II-A General Population Tables PART II-B (i) Economic Tables [B-1 to B-IV] PART IJ-B (ii) Economic Tables fB-V to B-IXJ PART n-c Cultural and Migration Tables PART III .J Household Economic Tables PART IV-A Report on Housing and Establishments (with Subsidiary Tables) PART IV-B Housing and Establishment Tables PART V-A Special Tables for Scheduled Castes and Scheduled Tribes PART V-B Ethnographic Notes on Scheduled Castes and Scheduled Tribes PART VI Village Survey MonogTaphs (46) PART VII-A (1) ~ Handicrafts Survey Reports (Selected Crafts) PART VII-A (2) PART VII-B (1 to 20), .. Fairs and Festivals (Separate Book for each District) PART VIII-A Administration Report-Enumeration I ~ (Not for sale) PART VIII-B Administration Report-Tabulation .J PART IX State Atlas PART X Special Report on Hyderabad City District Census Handbooks (Separate Volume for each District) ! I, f Plate I: Sri Venkateswaraswamv-Dwaraka Thirumala. Eluru Taluk - Courtesy : Commissioner. H.R.&C .E . (Admn.) Dept., A .
    [Show full text]
  • Zoning Regulations Amaravati Capital City
    ZONING REGULATIONS February 2016 AMARAVATI CAPITAL CITY ANDHRA PRADESH CAPITAL REGION DEVELOPMENT AUTHORITY (APCRDA) This page has been intentionally left blank. contents I PRELIMINARY 8 101 General 8 102 Definitions 8 II PERMIT PROCEDURE 20 201 Compliance with the Regulations 20 202 Chief City Planner 20 203 Commissioner 21 204 Executive Committee (EC) 21 205 Hearings, Appeals and Amendments 22 206 Violations 23 207 Development Permits 23 208 Application for development 24 209 Application details 25 210 Fees, Deposits and Charges 29 211 Environmentally sensitive developments 29 212 Decision on application 29 213 Procedure during development 30 214 Conditional Uses 32 215 TDR / Concessions in road widening cases 33 III ZONING DISTRICTS AND USE GROUPS 39 301 Classification of Zoning Districts 39 302 Zoning Map 39 303 Annexed territory 40 Page 1 2015 Zoning Regulations, Amaravati City 304 Classification of Uses 40 305 Classification of Regulations 40 IV ZONES DEFINED 41 401 Residential zone 41 402 Commercial Zone 43 403 Industrial Zone 43 404 Parks and Open Spaces Zone 44 405 Institutional Zone 44 406 Infrastructure Zone 45 V OTHER REGULATIONS 46 501 Off-Street Parking 46 502 Fencing 47 503 Location of ancillary buildings 47 504 Allowable Projections into setbacks 47 505 Green Strip Requirements 48 506 Loading Spaces 48 507 Passageways 48 508 Approval for and availability of essential services 48 509 Grading and Excavation Regulations 49 VI NON STANDARD APPLICATIONS 51 601 General 51 602 Non-conforming existing use 51 603 Zoning lots divided
    [Show full text]
  • (To Be Published in the Gazette of India, Part-II, and Section 3, Sub-Section (Ii) MINISTRY of ENVIRONMENT and FORESTS
    FORM – I FORM – IA & ENVIRONMENTAL MANAGEMENT PLAN of “Amaravati Happy Nest Project” Amaravati Capital City, Andhra Pradesh October – 2018 PROJECT PROPONENT ENVIRONMENTAL CONSULTANT Andhra Pradesh Capital Region Sri Sai Manasa Nature Tech Pvt Ltd, Development Authority Hyderabad. Vijayawada, Andhra Pradesh NABET Accreditation No : 142 Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) BASIC INFORMATION S. Item Details No 1 Name of the Project/s “Amaravati Happy Nest” at Capital City, Amaravti, Andhra Pradesh. 2 S. No. in the schedule 8(a) 3 Proposed capacity/ area/ APCDRA proposes to build Amaravati length/ tonnage to be handled/ Happy Nest Project command area/ lease area/ number of wells to be drilled Total plot area of the proposed project is 5.78 Ha. (14.29 Acres) with built-up area of 1,40,756.19 Sq.m. and the details are furnished in the Annexure – 1. Proposed Project consist of 6 Towers & 2 Amenities Blocks 4 New/ expansion/ New modernization 5 Existing capacity/ Area etc. Not Applicable 6 Category of Project i.e ‘A’ or ‘B’ Category ‘B2’ 7 Does it attract the general No condition? If yes please specify. 8 Does it attract the specific No condition? If yes please specify. 9 Location Location Map of the proposed project site is given in Annexure - 2. The location of proposed building projects on APCRDA master plan is given in Annexure - 3 The proposed plot is falling in S3 Zone as per the Master plan of Amaravati Capital City by Andhra Pradesh Capital Region Development Authority (APCRDA).
    [Show full text]
  • S.No. State Name State Code District Name District Code Sub District
    Sub State District Village/Town S.no. State Name District Name Sub District Name District Village/Town Name Name of DA Code Code Code Code 1 Andhra Pradesh 28 Ananthapur 553 Ananthapuram 5330 A.Narayanapuramu 595096 Anantapur–Hindupur Urban Development Authority 2 Andhra Pradesh 28 Ananthapur 553 Penukonda 5356 Adadakulapalli 595434 Anantapur–Hindupur Urban Development Authority 3 Andhra Pradesh 28 Ananthapur 553 Ananthapuram 5330 Alamuru 595088 Anantapur–Hindupur Urban Development Authority 4 Andhra Pradesh 28 Ananthapur 553 Uravakonda 5317 Amidala 594897 Anantapur–Hindupur Urban Development Authority 5 Andhra Pradesh 28 Ananthapur 553 Ananthapuram 5330 Anantapur (CT) 595098 Anantapur–Hindupur Urban Development Authority 6 Andhra Pradesh 28 Ananthapur 553 Beluguppa 5318 Ankampalli 594908 Anantapur–Hindupur Urban Development Authority 7 Andhra Pradesh 28 Ananthapur 553 Bathalapalli 5337 Apparacheruvu 595170 Anantapur–Hindupur Urban Development Authority 8 Andhra Pradesh 28 Ananthapur 553 Beluguppa 5318 Avulenna 594910 Anantapur–Hindupur Urban Development Authority 9 Andhra Pradesh 28 Ananthapur 553 Bukkarayasamudram 5329 B.K.Samudram 595075 Anantapur–Hindupur Urban Development Authority 10 Andhra Pradesh 28 Ananthapur 553 Kothacheruvu 5346 Bandlapalle 595304 Anantapur–Hindupur Urban Development Authority 11 Andhra Pradesh 28 Ananthapur 553 Bathalapalli 5337 Bathalapalli 595169 Anantapur–Hindupur Urban Development Authority 12 Andhra Pradesh 28 Ananthapur 553 Beluguppa 5318 Beluguppa 594905 Anantapur–Hindupur Urban Development Authority
    [Show full text]
  • A Case of the Abusive, Greedy and Failing Amaravati Capital City Project (2014-2019) Research: Tani Alex Layout: Ankit Agrawal
    Encroachment of Nature, People and Livelihoods: A Case of the Abusive, Greedy and Failing Amaravati Capital City Project (2014-2019) Research: Tani Alex Layout: Ankit Agrawal Published by: Centre for Financial Accountability New Delhi www.cenfa.org [email protected] Cover Photo: Rahul Maganti/PARI April 2019 Copylef: Free to use any part of this document for non-commercial purpose, with acknowledgement of source. For Private Circulation Only Encroachment of Nature, People and Livelihoods: A Case of the Abusive, Greedy and Failing Amaravati Capital City Project (2014-2019) 3 Background of the Amaravati Project (2014-2017) Prime Minister Narendra Modi laid the foundation of the Amaravati Capital City Project. Photo courtesy: AP Capital Region Development Authority fer bifurcation of the erstwhile Indian crops irrigated on the foodplains. Te area sited for state of Andhra Pradesh in June 2014, both the city presently has a population of 1.03 lakh while the new states of Telangana and Andhra that of the entire capital region would be 5.8 million. APradesh are sharing the Hyderabad as capital for 10 years. In September 2014, N Chandrababu Naidu, Te following contraventions of this project are the Chief Minister of Andhra Pradesh announced elicited, during 2014-2017, with regard to World that a single capital would be built for the State. Bank’s Operational Policies, in a concentrated efort to prevent forthcoming irreplaceable damages to Amaravati, the proposed capital city covers an area peoples’ lives. World Bank’s Operational Policies of 217. 23 sq. km with the seed capital in an area of framework have been employed here as AIIB has 16.94 sq.
    [Show full text]
  • National Crop Insurance Programme (NCIP) – Kharif 2015 -.:: Agriculture
    GOVERNMENT OF ANDHRA PRADESH ABSTRACT AGRICULTURE – National Crop Insurance Programme (NCIP) – Kharif 2015 –Implementation of Modified National Agricultural Insurance Scheme (MNAIS) in 4 Districts - Notification for crops and Areas (District-wise) of Andhra Pradesh State for implementation of the Scheme - Notification - Orders – Issued ============================================== AGRICULTURE & CO-OPERATION (AGRI.II) DEPARTMENT G.O.Rt.No. 462, Dated: 16.06.2015. Read the following: From the Commissioner & Director of Agriculture, Hyderabad, Letter No.Crop.Ins.(2) 9/2015, Dt:22.05.2015. *** O R D E R: The following Notification shall be published in the Andhra Pradesh State Gazette: N O T I F I C A T I O N 2. The Government of Andhra Pradesh hereby notify the following Crops and Areas (District wise) during Kharif 2015 to implement Modified National Agricultural Insurance Scheme (MNAIS) in 4 districts in the State during Kharif 2015. The main features/ Operation modalities, District wise crops Notified, Seasonality discipline are given vide Annexures I to III, Sum Insured limits, Premium rates vide Table 1 & 2, the District wise / Crop wise Mandal / Village Insurance Units vide Statements 1 to 4 along with Proforma A&B and Annexure IV to X and are appended to this order. SL. District Crops proposed No 1 East Godavari Rice (village made as insurance unit), Bajra, Cotton (UI), Sugarcane (Plant), Sugarcane (Ratoon) 2 West Godavari Rice (village made as insurance unit), Sugarcane(Plant), Sugarcane(Ratoon) 3 Krishna Rice (village made as insurance unit), Maize, Greengram, Redgram, Chilly (I),Cotton (UI), Groundnut (UI), Redgram, Sugarcane(Plant), Sugarcane(Ratoon) 4 Guntur Rice (village made as insurance unit), Blackgram, Castor, Redgram, Sugarcane(Plant), Sugarcane(Ratoon), Turmeric 3.
    [Show full text]
  • Ms Sri Shirdi Sai Stone Crusher D.No.612/1,612/5,Vijaya Cotton Centre Near Nallapadu Canal, Nallapadu (V), Guntur Dist
    Application for Prior TOR (Form – 1 & Form- 2) For Road Metal Mine over an Extent of 6.912 Hectares, in Sy. No.285/A1, of Ananthavaram village,Thullur Mandal, Guntur District, Andhra Pradesh ____________________________________________________________ Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, A.P. Submitted By ________________________________________________________________________________ Ms Sri Shirdi Sai Stone Crusher D.No.612/1,612/5,Vijaya Cotton Centre Near Nallapadu Canal, Nallapadu (V), Guntur Dist. FORM 1 (I) Basic Information Sl.No. Item Details 1. Name of the project/s 6.912 Ha. Of Road Metal Mine of Ms SRI SHIRDI SAI STONE CRUSHER 2. S.No. in the schedule 1 (a) 3. Proposed capacity /area/length/tonnage to be 6.912 Ha. Of Road Metal Mine with a handled/command area/lease area/number of proposed production of 25,000 Cum/year wells to be drilled. of Road Metal 4. New/Expansion/Modernization Existing -Violation 5. Existing Capacity/Area etc. 6.912 Ha 6. Category of Project i.e. ‘A’ or ‘B’ B2 7. Does it attract the general condition? If yes, No please specify. 8. Does it attract the specific condition? If yes, No please specify. 9. Location Plot/Survey/Khasra No. Sy. No’s. 285/A1, Village Ananthavaram village, Tehsil Thullur Mandal, District Guntur District. State Andhra Pradesh. 10. Nearest railway station/airport along with The nearest Railway station is located at distance in kms. Mangalagiri at a distance of 17.5km from the applied area 11. Nearest Town, city, district Headquarters along Guntur Town is located at a distance of 11 with distance in kms.
    [Show full text]