Ms Sri Shirdi Sai Stone Crusher D.No.612/1,612/5,Vijaya Cotton Centre Near Nallapadu Canal, Nallapadu (V), Guntur Dist
Total Page:16
File Type:pdf, Size:1020Kb
Application for Prior TOR (Form – 1 & Form- 2) For Road Metal Mine over an Extent of 6.912 Hectares, in Sy. No.285/A1, of Ananthavaram village,Thullur Mandal, Guntur District, Andhra Pradesh ____________________________________________________________ Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, A.P. Submitted By ________________________________________________________________________________ Ms Sri Shirdi Sai Stone Crusher D.No.612/1,612/5,Vijaya Cotton Centre Near Nallapadu Canal, Nallapadu (V), Guntur Dist. FORM 1 (I) Basic Information Sl.No. Item Details 1. Name of the project/s 6.912 Ha. Of Road Metal Mine of Ms SRI SHIRDI SAI STONE CRUSHER 2. S.No. in the schedule 1 (a) 3. Proposed capacity /area/length/tonnage to be 6.912 Ha. Of Road Metal Mine with a handled/command area/lease area/number of proposed production of 25,000 Cum/year wells to be drilled. of Road Metal 4. New/Expansion/Modernization Existing -Violation 5. Existing Capacity/Area etc. 6.912 Ha 6. Category of Project i.e. ‘A’ or ‘B’ B2 7. Does it attract the general condition? If yes, No please specify. 8. Does it attract the specific condition? If yes, No please specify. 9. Location Plot/Survey/Khasra No. Sy. No’s. 285/A1, Village Ananthavaram village, Tehsil Thullur Mandal, District Guntur District. State Andhra Pradesh. 10. Nearest railway station/airport along with The nearest Railway station is located at distance in kms. Mangalagiri at a distance of 17.5km from the applied area 11. Nearest Town, city, district Headquarters along Guntur Town is located at a distance of 11 with distance in kms. km from the applied area 12. Village Panchayats, Zilla Parishad, Municipal Smt N.PADMAVATHI Corporation, Local body (complete postal Proprietor addresses with telephone nos. to be given) Ms Sri Shirdi Sai Stone Crusher W/o N.V.Nageswar Rao Gayatri Nagar,Vijayawada A.P. Cell:9885216654 13. Name of the applicant Ms Sri Shirdi Sai Stone Crusher 14. Registered Address Smt N.PADMAVATHI Proprietor Ms Sri Shirdi Sai Stone Crusher W/o N.V.Nageswar Rao Gayatri Nagar,Vijayawada A.P. Cell:9885216654 15. Address for correspondence: Smt N.PADMAVATHI Name Proprietor Designation (Owner/Partner /CEO) Ms Sri Shirdi Sai Stone Crusher Pin code W/o N.V.Nageswar Rao E-mail Gayatri Nagar,Vijayawada A.P. Telephone No. Cell:9885216654 Fax No. 16. Details of Alternative Sites examined, if any. Village-District-State Location of these sites should be shown on a topo 1 Not Applicable sheet. 2 3 17. Interlinked Projects Nil 18. Whether separate application of interlinked Not Applicable project has been submitted? 19. If yes, date of submission Nil 20. If no, reason This a mining project and not having any interlinked projects 21. Whether the proposal involves approval/clearance Not Applicable under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, 1980? ii. The Wildlife (Protection) Act, 1972? iii. The C.R.Z. Notification, 1991? 22. Whether there is any Government Order/Policy Govt. Proceedings copy is submitted along relevant /relating to the site? with EMP report 23. Forest land involved (hectares) NO 24. Whether there is any litigation pending against No litigation about the project the project and/or land in which the project is propose to be set up? a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities /rates, wherever possible) S.No. Information/Checklist confirmation Yes/No with source of information data 1.1 Permanent or temporary change in land use, Yes The Quarry operations envisaged for land cover or topography including increase the proposed plan period & during the in intensity of land use (with respect to tenure of the lease period involves local land use plan) change in land use/topography covering an extent of 6.912 Ha. The proposed permanent/temporary change in land use or land cover for the ensuring Plan period is given in Mining Plan. 1.2 Clearance of existing land, vegetation and No There will be clearance of existing buildings? vegetation wherever required. However, as the existing vegetation density in the mine lease is only about 0.4, no heavy clearance of vegetation will be required. There are no existing buildings in the lease area and hence no proposal of clearance of existing buildings is made 1.3 Creation of new land uses? Yes The proposed Quarry activities will result in change/creation of new land use. The waste lands in this part of the region will be judiciously & scientifically explored & systematically worked so as to create a good Quarry methodology for proper utilization of the minerals. 1.4 Pre-construction investigations e.g. bore Yes The area has been studied for houses, soil testing? estimation of Road Metal reserves by Geological Mapping. Accordingly reserves have been calculated & Mine Plan Prepared & approved by Department of Mines & Geology vide Lr No:2274/MP/RM/GNT/2017 Dt:28.06.2017. 1.5 Construction works? No Since this is a Existing quarry, construction/erection of temporary structures for mines office, rest shelter, first aid station, sanitation etc., are there in non-mineralized areas of Quarry lease. 1.6 Demolition works? No No demolition works involved 1.7 Temporary sites used for construction works No No major housing for construction or housing of construction workers? workers is envisages at the mines 1.8 Above ground buildings, structures or No Nil earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or No Nil tunneling? 1.10 Reclamation works? Yes As the Quarry activities are expected to continue further & only a small portion of the lease area is exposed for Quarry, proposed reclamation programme involves only Afforestation works and other Environmental Protection measures. 1.11 Dredging? No Nil 1.12 Offshore structures? No Nil 1.13 Production and manufacturing processes? Yes About 25,000 Cum/Year of Road Metal will be extraction by operations such as drilling, Wire Saw Cutting, loading and unloading 1.14 Facilities for storage of goods or materials? No Not applicable – The Road Metal is transported directly to requirements of the user industry/buyers for shipment. 1.15 Facilities for treatment or disposal of solid Yes There will be no liquid effluent waste or liquid effluents? generated from the proposed Quarry activities. Hence no treatment is proposed. Externally dumps are to be stabilized with afforestation. The quarry pit shall also help in storage/ collection of rain water. 1.16 Facilities for long term housing of No Nil operational workers? 1.17 New road, rail or sea traffic during Yes Haul roads and approach roads are construction or operation? there .No new rail network or sea route is proposed for the mining project. 1.18 New road, rail, air waterborne or other Yes Approach road is there transport infrastructure including new or altered routes and stations, ports, airports No other major road, rail, air or etc? waterborne transport network is envisaged for the mining project. 1.19 Closure or diversion of existing transport No No such diversions are envisaged. routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No No such diversions are envisaged. pipelines? 1.21 Impoundment, damming, culverting, No No such diversions are envisaged. realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No No streams exist 1.23 Abstraction or transfers of water form No Part of the water required for the ground or surface waters? mining activities will be sourced from Near by Village 1.24 Changes in water bodies or the land surface No The rainwater constitutes the drainage affecting drainage or run-off? system of the area. Except this no other perennial watercourses exist in this area. 1.25 Transport of personnel or materials for Yes The mined out minerals will be construction, operation or decommissioning? transported to consumers by trucks directly manually. 1.26 Long-term dismantling or decommissioning No No dismantling works are envisaged. or restoration works? 1.27 Ongoing activity during decommissioning Yes Temporary change in land use pattern which could have an impact on the occurs. The existing scanty vegetative environment? land will be converted into lush green cover. 1.28 Influx of people to an area in either No No major influx is envisaged due to temporarily or permanently? the mining project, as the total manpower required during operational stage will be only 29 including labour & will be met from the local area only. 1.29 Introduction of alien species? No Not envisaged 1.30 Loss of native species or genetic diversity? No Not envisaged 1.31 Any other actions? No --- 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply): Details thereof (with approximate quantities /rates, wherever S.No. Information/checklist confirmation Yes/No possible) with source of information data 2.1 Land especially undeveloped or Yes Present Lease area is Road Metal agricultural land (ha) deposit area, it is a govt land (6.912 Hect) 2.2 Water (expected source & competing Yes Total water requirement of the users) unit: KLD mining operations including dust suppression is about 6.0 KLD and majority of this is proposed to be met from the bore well.