Jerry Pena Project Title: Grafton Bridge Repair Submitted To: Ms

Total Page:16

File Type:pdf, Size:1020Kb

Jerry Pena Project Title: Grafton Bridge Repair Submitted To: Ms WORLDWIDE LEADER IN COMMERCIAL DIVING FOR OVER FORTY YEARS MI-2019 Page No: 1 UCC Proposal L-2618 Date: June 27, 2019 Prepared By: (WI) Jerry Pena Project Title: Grafton Bridge Repair Submitted To: Ms. Amber Thomas Project Location: Grafton, WI Village of Grafton Proposal Basis: *Budgetary Price Based on Rates Below 675 N. Green Bay Rd. Personnel: UCC would provide: Maximum # of divers in the water at a time: Grafton, WI 53024 Five (5) Person Crew One (1) 1 Diver Supervisor 4 Diver Mechanic Amber Thomas 262-375-5325 [email protected] Proposed Services Days Per Week 5 Work Hrs/Day 8 Mileage One Way 50 Underwater Construction Corporation (UCC) appreciates the UCC has assumed The Village of Grafton or others will provide the opportunity to provide Grafton with UCC Proposal L-2618 for the following to support the previously stated services: above mentioned project. • Operation support and red tagging of equipment, as required. UCC will assist the village of Grafton with Underwater Dive • Unrestricted access to the work area. Services at the Grafton Bridge Street Dam near Grafton, WI • All permitting as required. Scope of Services: Pier #6 UCC has estimated five (5) eight (8) hour weekday to complete site • Mobilize supervision, crew and equipment to site services. • Clean and remove debris repair area • Drill no. 4 rebar 12" OC -6" embedment Invoicing for services rendered will be in accordance with the • Epoxy rebar with Hilti HIT-500 current rates below, as applied to the actual schedule of work • Fill void with SpeedCret Blue line performed, consumables used, and equipment utilized. • Demob crew and equipment from site Equipment: UCC included use of the following equipment. All equipment includes fuel. 1 Shallow Water Dive Package Rock Drill - CP9 1 6,500 Watt Generator 1 Double Diver Water Heater (Excludes Fuel) 1 Mobile Dive Station - Cargo Trailer 8’x16’ - 8'x19' 2 DOT Crew Cab 1 Ton Pickup Truck 1 Velocity Meter/Flow Meter 1 Floating Man Stretcher/Stokes Litter Basket 1 AED 1 Confined Space or Diver Extraction System 1 Outland U/W Video System w/Audio Time/Date Console Display &100 Meter Cable 2 175 CFM Ingersoll Rand Tow Behind Tool Air Compressor No. Description Rate Qty. Sub-Total 1.01 UCC's All-Inclusive Round Trip Mobilization Rate (does not include onsite services) per occurrence is: $ 1,783.00 1 $ 1,783.00 1.02 UCC's All-Inclusive Daily Rate for the first eight (8) hours worked each day, Monday-Friday is: $ 3,920.00 5 $ 19,600.00 1.03 UCC's All-Inclusive Daily Rate for the first eight (8) hours worked on Saturdays is: $ 4,846.00 $ - 1.04 UCC's All-Inclusive Daily Rate for the first eight (8) hours worked on Sundays and holidays is: $ 5,773.00 $ - 1.05 UCC's All-Inclusive Hourly Overtime Rate (applicable after eight (8) hours Monday-Saturday) is: $ 348.00 $ - 1.06 UCC's All-Inclusive Hourly Double-Time Rate (applicable after eight (8) hours Sundays and holidays) is: $ 464.00 $ - 1.07 UCC's All-Inclusive Daily Stand-by Rate for eight (8) hours each day Monday-Friday is: $ 3,052.00 $ - 1.08 UCC's Hourly Rate for report preparation (minimum four [4] hours) is: $ 51.00 $ - 1.09 Project Materials: SpeedCret Blue line, rebar, epoxy $ 2,703.00 1 $ 2,703.00 1.10 $ - $ - *Materials and Consumables that are not included will be invoiced at cost plus: 10% *TOTAL PRICE $ 24,086.00 *Third Party Services and Equipment that are not included will be invoiced at cost plus: 10% *TAXES ARE NOT INCLUDED *ADDITIONAL TERMS AND CONDITIONS APPLY *PRICING IS VALID FOR 60 DAYS Wisconsin / 5144 Douglas Ave. / Racine WI 53402 / www.uccdive.com Signed: Jerry Pena P: (877) 717-3483 / F: (262) 833-5900 / C: (269) 921-9002 / [email protected] The contents of this proposal and any attachments are confidential and are intended solely for the addressee. Any distribution, reproduction or dissemination is strictly prohibited. WORLDWIDE LEADER IN COMMERCIAL DIVING FOR OVER FORTY YEARS CT-2017 Page No: 2 UCC Proposal L-2618 Date: June 27, 2019 Prepared By: (WI) Jerry Pena Project Title: Grafton Bridge Repair Submitted To: Ms. Amber Thomas Project Location: Grafton, WI AN EQUAL OPPORTUNITY EMPLOYER The contents of this proposal and any attachments are confidential and are intended solely for the addressee. Any distribution, reproduction or dissemination is strictly prohibited. WORLDWIDE LEADER IN COMMERCIAL DIVING FOR OVER FORTY YEARS CT-2017 Page No: T&C Page 1 of 2 UCC Proposal L-2618 Date: June 27, 2019 Prepared By: (WI) Jerry Pena Project Title: Grafton Bridge Repair Submitted To: Ms. Amber Thomas Project Location: Grafton, WI TERMS AND CONDITIONS These terms and conditions are the primary overriding terms and conditions of services. Except as expressly provided herein, UCC makes no other warranty or guarantee of any kind, express or implied, including any warranty of merchantability of products or for suitability of products 1 selected or requested by others for the intended purpose. Budgetary pricing has been based on the proposed man loading and assumed schedule. It is not to be construed, whether expressed or implied, as a firm-fixed price or a not-to-exceed value for a 2 specific scope of services. Budgetary pricing is provided to assist you in forecasting project costs. Pricing is typically conservative for that reason. Should these services be solicited competitively, pricing herein should not be 3 considered final, and to that end, UCC should be included in any future solicitations. Invoicing for actual services rendered shall be in accordance with UCC’s most current rates on file for your organization. Any schedule alterations, personnel changes and/or changes to scope or 4 methodology, may increase or decrease the total project cost. 5 The Standby Day Rate will apply for delays due to factors outside of UCC’s control that cause the extension of the project's operations beyond the terms included in our price. All open shop services will be invoiced based on a minimum eight (8) hour day Monday through Friday at the straight time rate. Overtime hours are billable after eight (8) hours Monday through 6 Friday and for all hours worked on Saturdays. Double-time will be invoiced for all hours worked on Sundays and Holidays as listed below. UCC-recognized company holidays are New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. Additionally, any customer holidays that differ from 7 UCC’s will be considered UCC holidays. Emergent services, defined as services requested and response required within twenty-four hours, may be subject to premium time charges (i.e., shop time, travel time, site hours [minimum eight 8 (8) hours] and travel expense). Signed manifests for time and material services or signed delay sheets are considered a customer’s formal acceptance of work performed. Signed manifests and delay sheets shall also be used for 9 final invoicing by UCC. 10 By accepting UCC’s proposal with these terms and conditions attached, you are accepting UCC’s terms and conditions as identified herein. 11 Starting time for services shall be mutually agreed upon in advance and is subject to the availability of UCC’s personnel and equipment. Unless otherwise stated in a previously established contract, services will not be provided until the customer signs and returns this quote, or issues a purchase order referencing this quote in its 12 entirety. UCC understands that for this project, no specific welding code is provided and certification of divers is not required. UCC would supply crew personnel experienced in performing Class B U/W welds 13 in accordance AWS D3.6. UCC assumes that the flow rate will allow for safe diving. If at any time the current velocity exceeds two (2) feet per second, the UCC Midwest VP and safety departments shall be contacted prior to 14 diving. Diving operations will not resume until hazardous conditions have been made safe. UCC is not responsible for project delays due to hazardous conditions. In accordance with all Federal and State OSHA Commercial Diving Rules and Regulations 1910, Subpart "T", 29 CFR 1910.425.3 and ADCI International Consensus Standards for Commercial Diving 15 and Underwater Operations, if a site hazard analysis reveals unforeseen conditions or change in configurations (i.e. differential pressure, live pumps, flow thru open valves, gates or other energized operating components) additional personnel and or equipment may be required and the project cost would increase accordingly. Such conditions will be communicated in advance to the client. The UCC Midwest VP and safety departments will solely determine whether conditions are conducive to safe diving operations per UCC’s Safe Practices Manual, Cold Weather Environment Program 16 and Warm Water Diving Procedure IOP.02.05.1 which will result in project delays and additional cost to the overall budget. Client is responsible for paying for all weather delays. 17 UCC is liable for their employees; client is responsible for any individual, including himself, herself, or any invitee or other contractors around UCC’s work site and our equipment. 18 Client is responsible for having permits in place, if required. If permits, bonding, or additional insurance are required to be supplied by UCC, additional costs would be invoiced as additional services. 19 Unless otherwise stated, UCC is not responsible for liquidated or consequential damages. UCC is not responsible for the adequacy of the performance or design criteria required by contract documents. UCC assumes that the design and drawings provided are suitable for the intended 20 purpose. UCC assumes that any design tolerances specified or implied can be achieved in the field with the templates, materials and procedures provided by Others and the tooling proposed.
Recommended publications
  • Underwater Inspection and Repair of Bridge Substructures
    [.Tl [•1•] NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM SYNTHESIS OF HIGHWAY PRACTICE UNDERWATER INSPECTION AND REPAIR OF BRIDGE SUBSTRUCTURES Supv ) ç J j p1 JUNO 81982 3 up2Leder I.T.D. DIV OF H!GHWAYS BRIDGE SECTION FUe_OUT MAIL TRANSPORTATION RESEARCH BOARD NATIONAL RESEARCH COUNCIL TRANSPORTATION RESEARCH BOARD EXECUTIVE COMMITTEE 1981 Officers Chairman THOMAS D. LARSON Secretary, Pennsylvania Department of Transportation Vice Chairman DARRELL V MANNING, Director, Idaho Transportation Department Secretary THOMAS B. DEEN, Executive Director, Transportation Research Board Members RAY A. BARNHART, Federal Highway Administrator, U.S. Department of Transportation (cx officio) ROBERT W. BLANCHETTE, Federal Railroad Administrator, U.S. Department of Transportation (cx officio) FRANCIS B. FRANCOIS, Executive Director, American Association of State Highway and Transportation Officials (cx officio) WILLIAM J. HARRIS, JR., Vice President—Research and lest Department, Association of American Railroad.. (ex officio) J. LYNN HELMS, Federal Aviation Administrator, U.S. Department of Transportation (cx officio) PETER G. KOLTNOW, President, Highway Users Federation for Safety and Mobility (cx officio. Past Chairman, 1979) ELLIOTT W. MONTROLL, Chairman, Co,n,nission on Sociotechnical Systems, National Research Council (cx officio) RAYMOND A. PECK, JR., National Highway Traffic Safety Administrator, U.S. Department of Transportation (cx officio) ARTHUR E. TEELE, JR., Urban Mass Transportation Administrator, U.S. Department of Transportation (cx officio) JOHN F. WING, Senior Vice President, Booz. Allen & Hamilton. Inc. (cx officio, MTRB liaison) CHARLEY V. WOOTAN. Director, Texas Transportation Institute, Texas A&M University (cx officio, Past Chairman 1980) GEORGE J. BEAN. Director of Aviation, Hilisborough County (Florida) Aviation Authority THOMAS W. BRADSHAW, JR., Secretary, North Carolina Department of Transportation RICHARD P.
    [Show full text]
  • Link to Line Card
    DYNAMIC UNDERWATER CONSTRUCTION SERVICES “No Job Too Deep; No Task Too Daunting” Services Provided Marine Construction Support • underwater survey and video • pipeline jetting and profiling • underwater welding & burning • underwater rigging Ship Husbandry • commercial and recreational vessel • hull and propeller video inspection • cathodic protection testing • propeller obstruction removal Woman Owned, Small Business, Dams, Bridges & Docks Services Disabled • debris removal Veteran • underwater painting and coating Cert: DBE, WBE, WDVAVOB • NDT (non-destructive testing) • piling repairs Licenses (wood/steel/concrete) DUNS: 080222380 CAGE: 7LYT5 NAICS: 541990, 237990 Marine Salvage Gen. Contractor: DYNAMUC831N8 • salvage of ships, aircrafts, and motor vehicles • compartment and confined space E-mail or Call entry teams • hazmat services for FREE Quote • emergency response 253.328.4456 [email protected] Industrial Plants • trash rake cleaning and repair 10616 13th Ave. Ct S. • dredging and debris removal Tacoma, WA 98444 • traveling screen repair • video inspection, cleaning, and repair Complete online services list dynamicunderwaterconstruction.com DUCS Safety Policy Our employees are trained to know and execute DUCS extensive safety policy and approved procedures. We firmly believe in our employees right to “stop work” for safety. If work must be stopped, our employees will strive to mitigate the safety hazard in the most efficient means possible. Additionally we encourage our employees to be proactive with safety on the job site by having daily safety meeting where the days objectives are discussed to determine the safest and most expedite manner to complete said objective. Key Personnel Sherry McPherson, owner and President of DUCS, is a retired Iraq war combat veteran. She has a Bachelor Degree in Science majoring in Technology Management and has completed a year of graduate school working on a Master’s in Public Administration.
    [Show full text]
  • Supermicar Data Entry Instructions, 2007 363 Pp. Pdf Icon[PDF
    SUPERMICAR TABLE OF CONTENTS Chapter I - Introduction to SuperMICAR ........................................... 1 A. History and Background .............................................. 1 Chapter II – The Death Certificate ..................................................... 3 Exercise 1 – Reading Death Certificate ........................... 7 Chapter III Basic Data Entry Instructions ....................................... 12 A. Creating a SuperMICAR File ....................................... 14 B. Entering and Saving Certificate Data........................... 18 C. Adding Certificates using SuperMICAR....................... 19 1. Opening a file........................................................ 19 2. Certificate.............................................................. 19 3. Sex........................................................................ 20 4. Date of Death........................................................ 20 5. Age: Number of Units ........................................... 20 6. Age: Unit............................................................... 20 7. Part I, Cause of Death .......................................... 21 8. Duration ................................................................ 22 9. Part II, Cause of Death ......................................... 22 10. Was Autopsy Performed....................................... 23 11. Were Autopsy Findings Available ......................... 23 12. Tobacco................................................................ 24 13. Pregnancy............................................................
    [Show full text]
  • Attachment 3 Pre-Dive Checklist
    RP-AA-461 Revision 2 Page 20 of 23 ATTACHMENT 3 Pre-Dive Checklist Page 1 of 1 (USED FOR SUBSEQUENT DIVES AFTER CREW'S INITIAL BRIEF. MAY BE PERFORMED INANY ORDER) 1. Complete a pre-job briefing (discussion to include dive area boundaries, dose rate information and task(s)),J 2. Verify two underwater survey instruments are in calibration and source checked and are available, 3. Verify water clarity and underwater lighting adequate. 4. Verify dive site survey is performed (historical survey available for initial dive) and methodology by RP Supervision approved. 5. Verify dive suit is wet prior to diving. 6. Verify dive suyed and meets the requirements of step 4.3.5 7. asVerify plastic helmet bags dosimetry or tape, whichattached could with block wire/pdastic diver's exhalationties, when valve.applicable. Do not use material, such ! . 1. Verify diver dosimetry in proper location (e.g, EDs, TLDs, Extremity, etc.). - 9. Verify remote dosimetry equipment is operational. toOdi veWo"eratio I 17. Verify two-way voice communications are available and operational. a, M ri 11/. Verify approved method of visual contact is available. / 12. Verify survey instrumentation used by diver is operable. s y t an v c 13. Verify in-leakage test of diver suit has been performed.apsp4 14. Verify wiat Diehing air is monitored. S v e 15. Evaluate the need for vacuuming and shielding. •, 16. Ensure all prerequisites of RP-AA-461 are met prior to dive operations. raegain rs 17. Discuss immediate actions for each the following: CO alarm, High Rdd alarm, CAM alarm, diver disorientation, diver signaled to leave, failure of underwater survey instrumentation, diver reaches pre-established dose limits, radiologcical aspects of dive can NOT be maintainedror are suspect ,-•'__.
    [Show full text]
  • Diving Safe Practices Manual
    Diving Safe Practices Manual Underwater Inspection Program U.S. Department of the Interior February 2021 Mission Statements The Department of the Interior conserves and manages the Nation’s natural resources and cultural heritage for the benefit and enjoyment of the American people, provides scientific and other information about natural resources and natural hazards to address societal challenges and create opportunities for the American people, and honors the Nation’s trust responsibilities or special commitments to American Indians, Alaska Natives, and affiliated island communities to help them prosper. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Diving Safe Practices Manual Underwater Inspection Program Prepared by R. L. Harris (September 2006) Regional Dive Team Leader and Chair Reclamation Diving Safety Advisory Board Revised by Reclamation Diving Safety Advisory Board (February 2021) Diving Safe Practices Manual Contents Page Contents .................................................................................................................................. iii 1 Introduction .............................................................................................................. 1 1.1 Use of this Manual ............................................................................................. 1 1.2 Diving Safety .....................................................................................................
    [Show full text]
  • Underwater Bridge Repair, Rehabilitation, and Countermeasures
    Underwater Bridge Repair, Rehabilitation, and Countermeasures Publication No. FHWA-NHI-10-029 Pre-Publication Edition NOTICE This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The United States Government assumes no liability for its contents or use thereof. The contents of this report reflect the views of the contractor who is responsible for the accuracy of the data presented herein. The contents do not necessarily reflect the official policy of the Department of Transportation. This report does not constitute a standard, specification, or regulation. The United States Government does not endorse products or manufacturers. Trade or manufacturers’ names appear herein only because they are considered essential to the object of this document. The conduct of underwater bridge inspections and repairs may frequently require the use of divers. While this manual contains information on diving equipment, it is neither intended to train personnel in diving nor enumerate all diving safety concerns and regulations. Actual diving operations can be extremely hazardous and should be undertaken only by personnel adequately trained to cope with the conditions that may be encountered. Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. FHWA-NHI-10-029 4. Title and Subtitle 4. Report Date April 2010 Underwater Bridge Repair, Rehabilitation, and Countermeasures 6. Performing Organization Code: 7. Author(s) 8. Performing Organization Report No. Terence M. Browne, P.E.; Thomas J. Collins, S.E., P.E.; Michael J. Garlich, S.E., P.E.; John E. O’Leary, S.E., P.E.; Katherine C.
    [Show full text]
  • Hazard Alert Poster 2000-14
    HAZARD ALERT Industry: Diving Age: 36 years Experience: 12 years Area: Central BC Diver killed during maintenance work A commercial diver was drawn into a 30" diameter aerator intake pipe while attempting to locate the screens for two fire pump intakes. The pulp mill hired a diving company to inspect and clean two intake screens in their industrial effluent pond. Both parties thought that the work had been planned and all hazards identified. The pumps for the two intakes to be worked on had been identified and locked out. The diver, after entering the water with zero visibility, thought he had located the fire pump intakes when he was drawn into a nearby aerator intake pipe. The screen for this intake pipe had broken off and the diver was pulled, head first, 80 feet up the pipe. As the aerator intake pipe had not been identified on the drawings used, the 35,000 litre per minute aerator pump had not been locked out. There were no visual markers on the surface of the pond to identify the aerator or fire pump intakes. Safe work practices: Before diving, a detailed risk assessment must be conducted by a qualified person, with specific knowledge of the worksite, to determine all hazards • Ensure there are accurate drawings (preferably on a master drawing) indicating all underwater equipment, piping, intakes, etc. for all underwater work • Ensure all underlying hazards have visual indicators (flagging or signage) on the surface • Ensure risk assessments, safe work procedures, lockout procedures, pre-work meeting documents, and accurate drawings are available and used by project co- ordinators and diving contractors working in underwater environments FATALITY 00–14 The WCB has a wide range of health and safety information.
    [Show full text]
  • A Study on Advanced Underwater Construction and It's Challenges
    International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 08 Issue: 04 | Apr 2021 www.irjet.net p-ISSN: 2395-0072 A STUDY ON ADVANCED UNDERWATER CONSTRUCTION AND IT’S CHALLENGES MS. Christeena Kurian1, MR. Mohan Das Gandhi2, MS. P. Vetri Selvi3 1ME Construction Engineering and Management, Department of Civil Engineering, RVS Technical Campus, Coimbatore-600025, India 2Assistant Professor, Department of Civil Engineering, RVS Technical Campus, Coimbatore-600025, India 3Supervisor, Department of Civil Engineering, RVS Technical Campus, Coimbatore-600025, India ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract – This article is focused on the advanced The principle fabric used for construction underwater underwater construction and it’s challenges. Underwater changed into a unique kind of steel and acrylic. The acrylic buildings are structures which are built under the water and fabric is used specifically for visibility, on the same time each constructing built has a specific motive related to it in because the steel is used for reinforcements (enables). keeping with the type of its construction. The caissons and Excessive energy steel is used as it is in particular cofferdams are the techniques used for the construction of reasonably-priced, and has its immoderate yield electricity. underwater structures. Mainly there are four types of It isn't always additionally a terrific conductor of power and underwater construction methods. They are tremie method, warmth. It’s far an excessive corrosion resistance. Acrylic pump method, toggle bags method and bag works method. fabric is used in preference to glass; it is better than glass Different case studies of underwater construction will be due to being much less dense, and it's also has higher effect analysed in this article.
    [Show full text]
  • Underwater Inspection Criteria
    NAVAL FACILITIES ENGINEERING SERVICE CENTER Port Hueneme, California 93043-4370 UNDERWATER INSPECTION CRITERIA By Shawn W. Kelly Naval Facilities Engineering Service Center 1100 23rd Avenue Port Hueneme, California 93043-4370 March 1999 Prepared for: California State Lands Commission Marine Facilities Division 330 Golden Shore, Suite 210 Long Beach, California 90802-4246 EXECUTIVE SUMMARY The Marine Facilities Division (MFD) of the California State Lands Commission (CSLC) is in the process of reviewing and formulating various design and inspection criteria for waterfront facilities. The MFD has a regulatory requirement to require a thorough examination of each marine terminal in the State to determine whether the structural integrity of the terminal, the oil transfer operations system, and the safety equipment are designed and being maintained in a safe working condition. To meet this regulatory objective the CSLC has developed a procedure for performing an in-depth structural and safety system audit of existing marine loading and discharge terminals located onshore, near-shore, and offshore California. These procedures apply to pier and wharf terminals, and offshore multi-point mooring marine terminals. The Naval Facilities Engineering Service Center (NFESC) has been tasked to provide input to the review and formulation of design and inspection criteria for waterfront facilities, based on the Navy’s extensive experience and expertise in this area. This document addresses the underwater inspection component of the overall effort. This underwater inspection criteria is intended to provide guidance to the CSLC on the inspection of the underwater components of a marine oil terminal facility with the intent on identifying structural damage or weaknesses that might affect the continued fitness-for-purpose of the terminal.
    [Show full text]
  • A Case Study on Underwater Construction
    International Journal of Scientific Research and Review ISSN NO: 2279-543X A CASE STUDY ON UNDERWATER CONSTRUCTION GOPAL MURTY (B.E): CIVIL ENGINEERING,CENTRAL COLLEGE OF SATYAM BARLE (B.E) : CIVIL ENGINEERING, CENTRAL COLLEGE OF ENGINEERING & MANAGEMENT, KABIR NAGAR,RAIPUR [C.G],INDIA. ENGINEERING & MANAGEMENT, KABIR NAGAR, RAIPUR, [C.G],INDIA. KUMAR UMANG (B.E): CIVIL ENGINEERING, CENTRAL COLLEGE OF BHUMIKA DAS (H.O.D): CIVIL ENGINEERING, CENTRAL COLLEGE OF ENGINEERING & MANAGEMENT, KABIR NAGAR, RAIPUR [C.G],INDIA. ENGINEERING & MANAGEMENT, KABIR NAGAR, RAIPUR [C.G],INDIA. SATYAM BARLE (B.E) : CIVIL ENGINEERING, CENTRAL COLLEGE OF SATYAM BARLE (B.E) : CIVIL ENGINEERING, CENTRAL COLLEGE OF . SATYAM BARLE (B.E) : CIVIL ENGINEERING, CENTRAL COLLEGE OF Abstract— Underwater construction works as observed by II. LITERATURE REVIEW the engineers and designers are considered as the most difficult work. Caissons are sunk through water or water Useful references on underwater construction technology to exclude water and semi-fluid material during the were identified from journals and government reports. Report process of excavation of foundations and which subjects included methods of excavation, tunneling, subsequently becomes an integral part of the substructure. underwater structure lining, waterproofing practices, security, In this paper, a brief description of the open caisson is survivabiiity, and cost and energy considerations. Much of the done which is constructed using under water techniques. literature presented application of different construction tremie method for concrete placement is discussed. The methods to specific structures, such as civil' defense shelters, general description of open caisson in detail, its technical subways, tunnels, schools, and libraries. The papers surveyed aspects, improvement in new techniques and also its discuss underwater construction methods used in the United advantages and disadvantages are discussed.
    [Show full text]
  • UNDERWATER INSPECTION and CONSTRUCTION SERVICES Underwater Inspections
    Underwater services UNDERWATER INSPECTION AND CONSTRUCTION SERVICES Underwater Inspections 294187 3425 INSPECTIONS Our team of over 30 ADCI certified divers have the latest technologies to aid them in gathering information in various types of underwater conditions. Whether the conditions are extreme temperatures, poor visibility or strong currents, we have the tools and personnel to respond to a wide range of challenges. » Bridges » Piers and dock facilities » Dams (FERC Part 12 and USCOE) » Pipelines Acoustic Imagery » Industrial facilities » Vessels When underwater visibility is limited, acoustic imagery can help clear things up. This technology uses » Intakes and outfalls acoustics to create an underwater image of the structure to help detect structural problems and scour issues. Typically these images can be combined with above water digital photography or CAD drawings to create a pictorial reference of the entire structure. Detailed Reporting We understand that an inspection is only as good as the information communicated. Brennan divers can investigate, record, and effectively report critical information. These reports contain detailed descriptions, CAD drawings, images, and underwater video documentation to help identify any structural concerns. Remotely Operated Vehicles Our ROV's can be used to gather information when underwater conditions are unknown. They can be outfitted with HD video systems and sonar imaging equipment to navigate and collect valuable information. These vehicles are ideal for pipeline penetrations, or deployment in conditions unsafe for diver entry. Bathymetric Surveys Brennan has a full time survey department with licensed hydrographers capable of providing georeferenced, 3-dimensional models of subaqueous structures and surfaces. This ability combined with a detailed dive inspection will leave little to the imagination.
    [Show full text]
  • Job Safety Analysis
    Bridge College BRIDGE 101 General Session Bridge Types & Nomenclature Overview Definition of a Bridge & Minor Span Who owns/maintains the bridges Who inspects the bridges Bridge types & nomenclature What to look for Breakout Sessions Bridge Preservation Techniques Bearings and Beam Ends Reinforcing Steel Wearing Surface Maintenance Bridge Rail Bridge Joints The hardest thing in life to learn is which bridge to cross and which to burn. What is a Bridge? Federal definition – A structure that provides passage on a public way that is 20 feet in span or longer measured along the centerline. State definition – A structure that provides passage on a public way that is 10 feet or greater in span measured along the centerline. Structures 10 feet to less than 20 feet are referred to as minor spans while structures 20 feet or greater are referred to as bridges. Skew Centerline Roadway SPAN Who Owns and Maintains these Bridges? MaineDOT owns and maintains all bridges and minor spans on state and state aide highways. MaineDOT owns and maintains all bridges on the local network that are not Low Use or Redundant Bridges (LURB). Check with the Region Management staff if you’re not sure of ownership. These bridges will require you to travel on local roadways that you normally wouldn’t travel. Municipalities own and maintain all minor spans and LURBs on the local system. Bridges & Minor Spans Deck Area Region Number % Million SF % 1 565 20.7 3.81 31.3 2 572 21.0 3.06 25.0 3 630 23.0 1.43 11.8 4 624 22.9 2.58 21.2 5 338 12.4 1.30 10.7 Total 2729 12.18 Total Bridges & Minor Spans 2395 Conventional Bridges 334 Metal Pipes 11 Ferry Transfer Bridges 8 Movable Bridges 9 Covered Bridges 2 Suspension Bridges 220 Railroad Bridges Bridges and Structures Maintenance Division Who are they? What do they do? John Buxton, P.E.
    [Show full text]