AIP Amendments: GEN 0.2-1
Total Page:16
File Type:pdf, Size:1020Kb
AIP MYANMAR AIRAC AMDT 02/2019-1 Contact AIS Publications AIRAC AMDT 02/2019 Post: Effective date AERONAUTICAL 05 DEC 2019 INFORMATION SERVICES Publication date Department of Civil Aviation 24 OCT 2019 ATC Operations Building Yangon International airport YANGON 11021, MYANMAR Tel: 95 1 533085 Fax: 95 1 533085/533016 AFTN: VYYYYOYX URL: www.ais.gov.mm mailto: [email protected] SIGNIFICANT CHANGES IN YANGON FIR 1 GENERAL(GEN) LIST OF HAND AMENDMENT GEN 0.5 DESIGNATED AUTHORITIES GEN 1.1 ICAO DIFFERENCES FROM SARPs GEN 1.7 SEARCH AND RESCUE GEN 3.6 2 EN-ROUTE(ENR) AIR TRAFFIC SERVICES AIRSPACE ENR 2.1 3 AERODROME(AD) • AD 2.VYDW-VOR16 • AD 2.VYKG-NDB12 • AD 2.VYMN-NDB16, AD 2.VYMN-NDB34 • AD 2.VYSW-VOR29 • Updated Manaung Airport NDB Coordinates 4 Insert the attachment replacement pages which are marked with highlighted in the checklist of pages: GEN 0.4-1 to 0.4-3. 5 Record of AIP Amendments: GEN 0.2-1. 6 Records of Current AIP Supplements: GEN 0.3-1. 7 List of Hand amendment to the AIP: GEN 0.5-1. 8 This amendment incorporates information contained in the following AIP SUP, AIC and NOTAM which are hereby cancelled: • AIP SUP: AIRAC AIP SUP 13/2018 • AIC: NIl • NOTAM: A0226/19, B0228/19, C0399, A0227/19, B0229/19, C0400, A0229/19, B0231/19, C0401/19. 9 Monthly NOTAM Lists are available on www.ais.gov.mm. 10 AIS Myanmar certified ISO 9001:2015 Quality Management System Effective From 01 JAN 2018. Amended Pages GEN 0.2-1: : replaced. GEN 0.3-1/2: : replaced. GEN 0.4-1/2: : replaced. GEN 0.4-3: : replaced. GEN 0.5-1: : replaced. GEN 1.1-1: : replaced. GEN 1.6-1/2: : replaced. Department of Civil Aviation AIRAC AMDT 02/2019 AIRAC AMDT 02/2019-2 AIP MYANMAR GEN 1.6-3/4: : replaced. GEN 1.6-SCHEDULE-I: : inserted. GEN 1.7-7: : replaced. GEN 2.5-1/2: : replaced. GEN 3.6-1/2: : replaced. GEN 3.6-3: : inserted. ENR 2.1-7/8: : replaced. ENR 4.1-1/2: : replaced. AD 0.6-1/2: : replaced. AD 0.6-5/6: : replaced. AD 0.6-7/8: : replaced. AD 0.6-9/10: : replaced. AD 2.VYAN-1/2: : replaced. AD 2.VYAN-3/4: : replaced. AD 2.VYAN-5: : replaced. AD 2.VYBG-1/2: : replaced. AD 2.VYBG-3/4: : replaced. AD 2.VYDW-1/2: : replaced. AD 2.VYDW-3/4: : replaced. AD 2.VYDW-VOR16: : replaced. AD 2.VYKG-3/4: : replaced. AD 2.VYKG-5/6: : replaced. AD 2.VYKG-NDB12: : inserted. VYKG AD 2-9: : remove. AD 2.VYKI-3/4: : replaced. AD 2.VYKL-3/4: : replaced. AD 2.VYKT-1/2: : replaced. AD 2.VYKT-3/4: : replaced. AD 2.VYLK-3/4: : replaced. AD 2.VYLS-3/4: : replaced. AD 2.VYLS-5/6: : replaced. AD 2.VYMD-1/2: : replaced. AD 2.VYMD-3/4: : replaced. AD 2.VYMD-5/6: : replaced. AD 2.VYMD-7/8: : replaced. AD 2.VYMK-3/4: : replaced. AD 2.VYMM-3/4: : replaced. AD 2.VYMN-1/2: : replaced. AD 2.VYMN-3/4: : replaced. AD 2.VYMN-5: : replaced. AD 2.VYMN-NDB16: : inserted. AD 2.VYMN-NDB34: : inserted. AD 2.VYMY-3/4: : replaced. AD 2.VYNT-1/2: : replaced. AD 2.VYPN-3/4: : replaced. AD 2.VYPT-1/2: : replaced. AD 2.VYPT-3/4: : replaced. AD 2.VYPU-1/2: : replaced. AD 2.VYPU-3/4: : replaced. AD 2.VYSW-3/4: : replaced. AD 2.VYSW-VOR29: : replaced. AD 2.VYTD-3/4: : replaced. AD 2.VYTD-5: : replaced. AD 2.VYTL-3/4: : replaced. AIRAC AMDT 02/2019 Department of Civil Aviation AIP MYANMAR GEN 0.2-1 ~~~eaip-amdt~~~ver-date-2019-10-02T05-18-15-38205 DEC 2019 GEN 0.2 RECORD OF AIP AMENDMENTS AIP AMENDMENT NR/Year Publication date Date inserted Inserted by 01/2016 24 JUN 2016 08 JUL 2016 02/2017 02 MAR 2017 15 MAR 2017 01/2019 01 JAN 2019 14 JAN 2019 AIRAC AIP AMENDMENT NR/Year Publication date Effective date Inserted by 02/2016 13 OCT 2016 10 NOV 2016 01/2017 03 AUG 2017 14 SEP 2017 01/2018 07 DEC 2017 04 JAN 2018 02/2018 01 MAR 2018 29 MAR 2018 03/2018 16 AUG 2018 13 SEP 2018 04/2018 22 NOV 2018 03 JAN 2019 01/2019 23 MAY 2019 20 JUN 2019 02/2019 24 OCT 2019 05 DEC 2019 Department of Civil Aviation AIRAC AMDT 02/2019 PAGE INTENTIONALLY LEFT BLANK AIP MYANMAR GEN 0.3-1 03 JAN 2019 GEN 0.3 RECORD OF CURRENT AIP SUPPLEMENTS NR/Year Subject AIP section(s) Period of validity Cancellation record affected 01/2003 RVSM Policy and Procedures in Yangon FIR ENR From 27 NOV 2003 UFN 05/2004 Implementation of RNP10 Airspace in Yangon ENR From 01 SEP 2004 FIR UFN 06/2004 Implementation of Lateral Offset Procedure ENR From 14 OCT 2004 UFN 03/2005 Airspace Structure within Yangon FIR ENR From 01 SEP 2005 UFN 31/2009 Bypass procedure to alleviate bunching of ENR From 07 DEC 2009 flights on L759 over the Bay of Bengal during UFN the ATFM period. 02/2011 Yangon FIR - Landing Clearance GEN From 30 MAY 2011 UFN 03/2011 Yangon FIR - Ground Handling Service GEN From 30 MAY 2011 UFN 04/2011 Yangon FIR - Arrival Visa Counter GEN From 30 MAY 2011 UFN 01/2013 Yangon Airport - Vacating Runway AD From 01 AUG 2013 UFN 02/2013 Yangon Airport - Departure Procedure AD From 01 AUG 2013 UFN 03/2013 Yangon Airport - ACFT Taxi AD From 01 AUG 2013 UFN 04/2013 Yangon Airport - ATC Procedure ENR From 01 AUG 2013 UFN 05/2013 Yangon Airport - Helicopter Taxi Procedure AD From 01 AUG 2013 UFN 06/2013 Yangon Airport - Push back/ Start/ Taxi AD From 01 AUG 2013 Procedure UFN 07/2013 Yangon FIR - AFTN Address ENR From 01 AUG 2013 UFN 08/2013 Yangon FIR - Mach Capability ENR From 01 AUG 2013 UFN 09/2013 Yangon FIR - Contingency Routes ENR From 01 AUG 2013 UFN 10/2013 Yangon FIR - Over Flight Clearance GEN From 01 AUG 2013 UFN 13/2013 Yangon FIR - New Flight plan Format GEN From 01 AUG 2013 UFN 14/2013 Bagan Airport - ACFT Stand AD From 01 AUG 2013 UFN 15/2013 Mandalay Airport - ATC Procedure ENR From 01 AUG 2013 UFN 16/2013 Mandalay Airport - PSR AD From 01 AUG 2013 UFN 17/2013 Mandalay Airport - High Tension AD From 01 AUG 2013 UFN 18/2013 Naypyitaw Airport - New Terminal/Apron AD From 01 AUG 2013 UFN 02/2015 Implementation of RNP10 Operations (50 NM AD From 12 NOV 2015 Longitudinal Separation) on RNAV Routes UFN L759, M770, L301, N895, P646, L507, M626, M502, P762, L515 01/2017 Establishment of the Area Navigation Routes ENR From 02 FEB 2017 RNP10 Within Yangon FIR UFN 02/2017 Revision ATS Routes Within Yangon FIR ENR From 02 FEB 2017 UFN Department of Civil Aviation AIRAC AMDT 04/2018 GEN 0.3-2 AIP MYANMAR 05 DEC 2019~~~eaip-amdt~~~ver-date-2019-10-02T05-18-15-382 NR/Year Subject AIP section(s) Period of validity Cancellation record affected 03/2017 Operating Procedures For RNP10 Operations ENR From 02 FEB 2017 On ATS Routes L507, P646, N895, L524, UFN M506 And L301 04/2017 Implementation of The Operating Procedures ENR From 02 FEB 2017 For Uni-Directional Air Traffic Flow Within UFN Yangon FIR 05/2017 Implementation of Air Traffic Flow ENR From 02 FEB 2017 Management Procedures Over Bay of Bengal, UFN South Asia and Pakistan Through KABUL FIR 06/2017 Re-Sectorization of YANGON ACC ENR From 20 JUL 2017 UFN 08/2017 Establishment of Conventional and RNAV ENR From 07 DEC 2017 Holding Procedures at Yangon International UFN Airport 04/2018 Establishment of New Aerodrome AD From 29 MAR 2018 VYCZ/CHANMYATHAZI UFN 08/2018 Establishment of Performance Based AD From 08 NOV 2018 Navigation(PBN) Procedures At Yangon UFN International Airport 09/2018 Establishment of Performance Based AD From 08 NOV 2018 Navigation(PBN) SID & STAR Procedures UFN At Yangon International Airport 10/2018 Yangon International Airport, RNAV1(GNSS) AD From 08 NOV 2018 SIDs and STARs Operating Procedure UFN 11/2018 Establishment of Performance Based AD From 06 DEC 2018 Navigation(PBN) SID & STAR Procedures UFN At Mandalay International Airport 12/2018 Establishment of Performance Based AD From 06 DEC 2018 Navigation(PBN) Procedures At Mandalay UFN International Airport 14/2018 Establishment of Performance Based AD From 03 JAN 2019 Navigation(PBN) Procedures At Naypyitaw UFN International Airport 15/2018 Establishment of Instrument Landing AD From 03 JAN 2019 System(ILS) Approach Procedure At UFN Naypyitaw International Airport 16/2018 Establishment of Performance Based AD From 03 JAN 2019 Navigation(PBN) Procedures At UFN Bagan/Nyaung U Airport 17/2018 Establishment of Performance Based AD From 03 JAN 2019 Navigation(PBN) Procedures At Heho Airport UFN 18/2018 Establishment of Performance Based AD From 03 JAN 2019 Navigation(PBN) Procedures At Sittwe UFN Airport 01/2019 Establishment of PBN SID And STAR AD From 23 MAY 2019 Procedures At Sittwe Airport UFN 02/2019 Sittwe Airport RNP1 (GNSS) SIDs And AD From 23 MAY 2019 STARs Operating Procedure UFN 03/2019 Establishment of PBN SID And STAR AD From 23 MAY 2019 Procedures At Heho Airport UFN 04/2019 Heho Airport RNP1 (GNSS) SIDs And AD From 23 MAY 2019 STARs Operating Procedure UFN 05/2019 Mandalay International Airport, AD From 10 OCT 2019 RNAV1(GNSS) SIDs and STARs Operating UFN Procedure AIRAC AMDT 02/2019 Department of Civil Aviation AIP MYANMAR GEN 0.4-1 ~~~eaip-amdt~~~ver-date-2019-10-02T05-18-15-38205 DEC 2019 GEN 0.4 CHECKLIST OF AIP PAGES GEN 3.4-4 14 SEP 2017 ENR 3.1-2 03 JAN 2019 Part 1 – General (GEN) GEN 3.4-5 14 SEP 2017 ENR 3.1-3 13 SEP 2018 GEN 0 GEN 3.4-Telegraph 20 JUN 2019 ENR 3.1-4 03 JAN 2019 GEN 3.4-Telephone 20 JUN 2019 ENR 3.1-5 04 JAN 2018 GEN 0.1-1 10 NOV 2016 GEN 3.5-1 04 JAN 2018 ENR 3.1-6 03 JAN 2019 GEN 0.1-2 14 JAN 2019 GEN 3.5-2 04 JAN 2018 ENR 3.1-7 03 JAN 2019 GEN 0.1-3 01 JAN 2015 GEN 3.5-3 01 JAN 2013 ENR 3.1-8 03 JAN 2019 GEN 0.2-1 05 DEC 2019 GEN 3.6-1 05 DEC 2019 ENR 3.1-9 03 JAN 2019 GEN 0.3-1 03 JAN 2019 GEN 3.6-2 05 DEC 2019 ENR 3.1-10 04 JAN 2018 GEN 0.3-2 05 DEC 2019 GEN 3.6-3 05 DEC 2019 ENR 3.1-11 03 JAN 2019 GEN 0.4-1 05 DEC 2019 GEN 3.6-SAR 20 JUN 2019 ENR 3.1-12 03 JAN 2019 GEN 0.4-2 05 DEC 2019 ENR 3.1-13 03 JAN 2019 GEN 4 GEN 0.4-3 05 DEC 2019 ENR 3.1-14 04 JAN 2018 GEN 0.5-1 05