Federal Register/Vol. 86, No. 134/Friday, July 16, 2021/Rules

Total Page:16

File Type:pdf, Size:1020Kb

Federal Register/Vol. 86, No. 134/Friday, July 16, 2021/Rules 37854 Federal Register / Vol. 86, No. 134 / Friday, July 16, 2021 / Rules and Regulations DEPARTMENT OF THE INTERIOR SUPPLEMENTARY INFORMATION: The hunting regulations that is more process for promulgating annual efficient and establishes hunting season Fish and Wildlife Service regulations for the hunting of migratory dates earlier than was possible under game birds involves the publication of the previous process. Under the current 50 CFR Part 20 a series of proposed and final process, we develop proposed hunting [Docket No. FWS–HQ–MB–2020–0032; rulemaking documents. In this final season frameworks for a given year in FF09M22000–212–FXMB1231099BPP0] rule, in addition to our normal the fall of the prior year. We then procedure of setting forth frameworks finalize those frameworks a few months RIN 1018–BE34 for the annual hunting regulations later, thereby enabling the State agencies to select and publish their Migratory Bird Hunting; Final 2021–22 (described below), we are also making season dates in early summer. We Frameworks for Migratory Bird Hunting minor changes to the permanent provided a detailed overview of the Regulations, and Special Procedures regulations that govern the migratory current process in the August 3, 2017, for Issuance of Annual Hunting bird hunting program. The annual regulations are set forth in subpart K of Federal Register (82 FR 36308). This Regulations part 20 of the regulations in title 50 of rule is the third in a series of proposed AGENCY: Fish and Wildlife Service, the Code of Federal Regulations (CFR). and final rules that establish regulations Interior. In this document, we also make minor for the 2021–22 migratory bird hunting ACTION: Final rule. changes to subpart N of 50 CFR part 20, season. as follows: SUMMARY: The U.S. Fish and Wildlife Regulations Schedule for 2021 Service (Service or we) is establishing Changes to Regulations at 50 CFR Part On October 9, 2020, we published in the final frameworks from which States 20 (Subpart N) the Federal Register (85 FR 64097) a may select season dates, limits, and The regulations governing special proposal to amend 50 CFR part 20. The other options for the 2021–22 migratory procedures for issuance of annual proposal provided a background and game bird hunting season, and making hunting regulations are at 50 CFR part overview of the migratory bird hunting a minor change to the special 20, subpart N. The rules of subpart N regulations process, and addressed the procedures for issuance of annual apply only to subpart K regarding the establishment of seasons, limits, and hunting regulations. We annually issuance of the annual regulations other regulations for hunting migratory prescribe outside limits, frameworks, establishing seasons, bag limits, and game birds under §§ 20.101 through within which States may select hunting other requirements for the seasonal 20.107, 20.109, and 20.110 of subpart K. seasons. Frameworks specify the outside hunting of migratory birds. Major steps in the 2021–22 regulatory dates, season lengths, shooting hours, In subpart N, the current regulations cycle relating to open public meetings bag and possession limits, and areas require that the Service publish a notice and Federal Register notifications were where migratory game bird hunting may of meetings of the Service’s Regulations illustrated in the diagram at the end of occur. These frameworks are necessary Committee and the Flyway Councils in the October 9, 2020, proposed rule. For to allow State selections of seasons and the process of developing frameworks this regulatory cycle, we have combined limits and to allow harvest at levels for migratory bird hunting seasons. elements of the document that is compatible with migratory game bird Specifically, notice of each meeting of described in the diagram as population status and habitat the Regulations Committee and Flyway Supplemental Proposals with the conditions. Migratory game bird hunting Council to be attended by any official of document that is described as Proposed seasons provide opportunities for the Department of the Interior will be Season Frameworks. recreation and sustenance, and aid published in the Federal Register at Further, in the October 9, 2020, Federal, State, and Tribal governments least 2 weeks before the meeting or as proposed rule we explained that all in the management of migratory game soon as practicable after the Service sections of subsequent documents birds. learns of the Flyway Council meeting. outlining hunting frameworks and In addition to or in place of guidelines would be organized under DATES: This rule takes effect on July 16, publishing a meeting notice in the numbered headings, which were set 2021. Federal Register, we add posting on the forth at 85 FR 64098. This and ADDRESSES: States should send their Service’s Migratory Bird Program subsequent documents will refer only to season selections to: Chief, Division of website as a method to notify the public numbered items requiring attention. We Migratory Bird Management, U.S. Fish of these meetings. We are making this will omit those items not requiring and Wildlife Service, MS: MB, 5275 change because it will increase our attention, and remaining numbered Leesburg Pike, Falls Church, VA 22041– ability to provide more timely items may be discontinuous and appear 3803. You may inspect comments information as meeting information incomplete. received on the migratory bird hunting becomes available, and more flexibility We provided the meeting dates and regulations at http:// to inform the public of changes in locations for the Service Regulations www.regulations.gov at Docket No. meeting dates and locations should such Committee (SRC) and Flyway Council FWS–HQ–MB–2020–0032. You may changes be necessary. Greater flexibility meetings on Flyway calendars posted on obtain copies of referenced reports from has become critical when unforeseen our website at https://www.fws.gov/ the street address above, or from the exigencies require venue changes for birds/management/flyways.php. We Division of Migratory Bird these meetings. announced the April SRC meeting in the Management’s website at http:// April 9, 2020, Federal Register (85 FR www.fws.gov/migratorybirds/, or at Process for Establishing Annual 19952). The October 9, 2020, proposed http://www.regulations.gov at Docket Migratory Game Bird Hunting rule provided detailed information on No. FWS–HQ–MB–2020–0032. Regulations (Subpart K) the proposed 2021–22 regulatory FOR FURTHER INFORMATION CONTACT: As part of the Department of the schedule and announced the October Jerome Ford, U.S. Fish and Wildlife Interior’s retrospective regulatory SRC meeting. Service, Department of the Interior, review, in 2015 we developed a On February 22, 2021, we published (202) 208–1050. schedule for migratory game bird in the Federal Register (86 FR 10622) VerDate Sep<11>2014 18:35 Jul 15, 2021 Jkt 253001 PO 00000 Frm 00002 Fmt 4701 Sfmt 4700 E:\FR\FM\16JYR2.SGM 16JYR2 jbell on DSKJLSW7X2PROD with RULES2 Federal Register / Vol. 86, No. 134 / Friday, July 16, 2021 / Rules and Regulations 37855 the proposed frameworks for the 2021– Review of Public Comments and migratory bird populations and long- 22 season migratory bird hunting Flyway Council Recommendations term population goals. In regard to the regulations. We have considered all The preliminary proposed regulations process, the Flyway Council pertinent comments received through rulemaking, which appeared in the system of migratory bird management March 24, 2021, which includes October 9, 2020, Federal Register, has been a longstanding example of comments submitted in response to our opened the public comment period for State-Federal cooperative management October 9 and February 22 proposed migratory game bird hunting regulations since its establishment in 1952 in rulemaking documents and comments and described the proposed regulatory regulation development process and from the October SRC meeting. This alternatives for the 2021–22 duck bird population and habitat monitoring. document establishes final frameworks hunting season. Comments and However, as always, we continue to for migratory bird hunting regulations recommendations are summarized seek new ways to streamline and for the 2021–22 season and includes no below and numbered in the order set improve the process and ensure substantive changes from the February forth in the October 9, 2020, proposed adequate conservation of the resource. 22, 2021, proposed rule except a minor rule (see 85 FR 64098). 1. Ducks correction (see 4. Canada and Cackling We received recommendations from Geese, below). We will publish State all four Flyway Councils at the April A. General Harvest Strategy selections in the Federal Register as and October SRC meetings; all Council Recommendations: The amendments to §§ 20.101 through recommendations are from the October Atlantic, Mississippi, Central, and 20.107 and 20.109 of title 50 CFR part meeting unless otherwise noted. Some Pacific Flyway Councils recommended 20. recommendations supported adoption of the liberal regulatory Population Status and Harvest continuation of last year’s frameworks. alternative for their respective flyways. Due to the comprehensive nature of the Service Response: As we stated in the Each year we publish reports that annual review of the frameworks October 9, 2020, proposed rule, we provide detailed information on the performed by the Councils, support for intend to continue use of Adaptive status and harvest of certain migratory continuation of last year’s frameworks is Harvest Management (AHM) to help game bird species. These reports are assumed for items for which no determine appropriate duck-hunting available at the address indicated under recommendations were received. regulations for the 2021–22 season. FOR FURTHER INFORMATION CONTACT or Council recommendations for changes AHM is a tool that permits sound from our website at https:// in the frameworks are summarized resource decisions in the face of www.fws.gov/birds/surveys-and-data/ below. As explained earlier in this uncertain regulatory impacts and reports-and-publications/population- document, we have included only the provides a mechanism for reducing that status.php.
Recommended publications
  • Ultimate RV Dump Station Guide
    Ultimate RV Dump Station Guide A Complete Compendium Of RV Dump Stations Across The USA Publiished By: Covenant Publishing LLC 1201 N Orange St. Suite 7003 Wilmington, DE 19801 Copyrighted Material Copyright 2010 Covenant Publishing. All rights reserved worldwide. Ultimate RV Dump Station Guide Page 2 Contents New Mexico ............................................................... 87 New York .................................................................... 89 Introduction ................................................................. 3 North Carolina ........................................................... 91 Alabama ........................................................................ 5 North Dakota ............................................................. 93 Alaska ............................................................................ 8 Ohio ............................................................................ 95 Arizona ......................................................................... 9 Oklahoma ................................................................... 98 Arkansas ..................................................................... 13 Oregon ...................................................................... 100 California .................................................................... 15 Pennsylvania ............................................................ 104 Colorado ..................................................................... 23 Rhode Island ...........................................................
    [Show full text]
  • Air Quality Profile of Curtis Bay, Brooklyn and Hawkins Point, Maryland
    Air Quality Profile Of Curtis Bay, Brooklyn and Hawkins Point, Maryland © 2011, Curtis W. Wright, All Rights Reserved March 2012 Revised June 2012 About the Environmental Integrity Project The Environmental Integrity Project (EIP) is a nonpartisan, nonprofit organization dedicated to the enforcement of the nation’s anti-pollution laws and to the prevention of political interference with those laws. EIP provides objective analysis of how the failure to enforce or implement environmental laws increases pollution and harms public health. We also help local communities obtain the protection of environmental laws. Acknowledgement Environmental Integrity Project Research Analyst Robbie Orvis and Attorneys Abel Russ and Leah Kelly contributed to this report. Data Limitations EIP’s analysis of toxic emissions and potential health impacts is based on publicly available data retrieved and analyzed from EPA, state agencies and private companies. Occasionally, government data may contain errors, either because information is inaccurately reported by the regulated entities or incorrectly transcribed by government agencies. In addition, this report is based on data retrieved between August 2011 and February 2012, and subsequent data retrievals may differ slightly as some companies and agencies correct prior reports. EIP is committed to ensuring that the data we present are as accurate as possible. We will correct any errors that are verifiable. June 2012 Revision EIP revised this report in June of 2012 in order to exclude fine particulate matter (PM2.5) data recorded at the FMC Fairfield monitor in Curtis Bay during the year 2008. We did this because we were informed by the Maryland Department of the Environment that this monitor was removed in August of 2008, meaning that the average PM2.5 concentration for that year did not take into account the fall months, during which PM2.5 concentrations tend to be lower than in the summer.
    [Show full text]
  • Read Ebook {PDF EPUB} 1111 by Kayil York
    Read Ebook {PDF EPUB} 1111 by Kayil York 11:11 by Kayil York (2019, Trade Paperback) С самой низкой ценой, совершенно новый, неиспользованный, неоткрытый, неповрежденный товар в оригинальной упаковке (если товар поставляется в упаковке). Упаковка должна быть такой же, как упаковка этого товара в розничных магазинах, за исключением тех случаев, когда товар является изделием ручной работы или был упакован производителем в упаковку не для розничной продажи, например в коробку без маркировки или в пластиковый пакет. См. подробные сведения с дополнительным описанием товара. Complete Maryland accident reports and news. Home to the Baltimore-Washington Metro Area, Maryland sees millions of people on the road every day. While Maryland has a population of nearly 6 million on its own, the metro region, which directly impacts highway congestion, has a population topping 8 million. Both the metro area’s major biotechnology and defense contractor industries and tourists visiting the area for its rich history keep the small area’s many major roadways full: Interstate 70 starts at a Baltimore park and ride and extends all the way to Cove Fort, Utah. Interstate 81 runs through Hagerstown. Interstate 83 has its southern terminus in Baltimore, a route for travelers from there to Harrisburg, Pennsylvania.​ Interstate 95 is the east coast’s major highway, serving every major metropolitan area from Maine to Florida. It is the nation’s longest north-south interstate. ​ Interstate 97: Known as an intrastate interstate, I-97 runs entirely within the state of Maryland and connects Baltimore and Annapolis. It connects Annapolis with Baltimore-Washington International Airport (BWI). Interstate 195 : Also known as Metropolitan Boulevard, Interstate 195 is just 4.71 miles long.
    [Show full text]
  • The Case for Freight NEEDS– LOUISIANA
    GREATEST The Case for Freight NEEDS– LOUISIANA Increasing capacity on “The flow of goods to, from, and through Louisiana is heavily dependent our nation’s on the Interstate Highway System. Of course, goods movement on the transportation interstate system is accomplished by heavy trucks. Invariably, bottlenecks system will: occur in urban areas. It is imperative that Louisiana’s interstate system is • Unlock Gridlock, maintained at a level of service that will not hinder truck travel.” • Generate Jobs, —Sherri Lebas , Louisiana Department of Transportation Interim Secretary • Deliver Freight, • Access Energy, Freight Capacity Needs • Connect Communities Interstate Highway Improvements Did you know? Interstate highways are the major corridors for truck freight movement. The extension • The amount of freight of Interstate 49 from Shreveport to the Arkansas border, in conjunction with work being moved in this coun- done in Arkansas and Missouri to complete I-49 to Kansas City, will have a major impact try—from milk, tooth- on the movement of freight in this region of the country. Louisiana is also seeking to ex- paste and toilet paper tend I-49 south of Lafayette to New Orleans by upgrading the current U.S. 90 corridor. to sparkplugs, wheat In addition, existing interstate highways in Louisiana exhibit congestion in urban areas, and wind turbines—is which inhibits the movement of heavy trucks. Some of the existing interstate highways expected to double in identified as needing improvement are I-10 in Baton Rouge (Mississippi River Bridge to the next 40 years? the I-10/12 split); from the Texas border to Lake Charles; and in New Orleans (Williams • The Interstate High- Boulevard to Causeway Boulevard); I-12 from Walker to Slidell; and I-20 in Monroe and way System repre- Shreveport.
    [Show full text]
  • Air Guns Are Now Legal for Most Game Species, See Each Game Section for Regulations
    Youth Waterfowl Hunt maximum age now 16 years old. | Page 39 MARYLAND GUIDE TO & 2017-2018 Air Guns Are Now Legal For Most Game Species, See Each Game Section For Regulations. Page 19 Pages 30 Pages 54 New Sunday Deer New Sunday Turkey New Apprentice Hunting Hunting For Kent & Hunting License Is Now Available Montgomery Counties For Junior Hunt and Spring For First Time Hunters with Shooting Hours Restrictions Season In Kent County Introducing… 410-756-5656 JB FARMS “The All-Natural Choice” Carroll County DEER PROCESSING CarrollTaneytown, County Maryland DEERJB PROCESSING FARMS 24-HOUR DROP-OFFTaneytown, MD “Let Us Do the Work!” All Wild Game Bears Bears • Hogs • Exotics • Wild Turkeys • Game Birds Skinned • Custom Cut • Wrapped • Frozen Hogs Deer Bologna, Deer Hot Dogs, Deer Sausage Exotics The All Natural Choice! Grass Fed Wild Turkeys Beef • Lamb • Goats • Chickens • Rabbits • Ducks Free Range Chicken Eggs! Game Birds Skinned Custom Cut WrappeD Frozen Located at: 3523“Let Harney Us Road, Do Taneytown, The Work!” MD 21787 24-HOURWebsite: DROP-OFF JBFarmsMD.com • All Wild Game The 410-756-5656All Natural Choice! Grass Fed Meats available We clean farm and wild birds! Jerky • Bologna • Hot Dogs Snack Sticks • Fresh Sausage We accept donations. You can help! Cube Steaks • Deer Burger Recycle your hide Just drop off in box! Chipped Deer • Smoked Deer Ham dnr.maryland.gov 48 30 44 37 page 8 46 12 CONTENTS 32 59 Messages ����������������������������������� 4 Small Game Hunting ����������������� 46 New Laws and Regulations Furbearer for 2017-18
    [Show full text]
  • An Investigation Into the Use of Road Drainage Structures by Wildlife in Maryland
    MD-11-SP909B4M STATE HIGHWAY ADMINISTRATION RESEARCH REPORT AN INVESTIGATION INTO THE USE OF ROAD DRAINAGE STRUCTURES BY WILDLIFE IN MARYLAND J. Edward Gates James L. Sparks, Jr. University Of Maryland Center for Environmental Science Appalachian Laboratory Project number SP808B4Q (Phase I) SP909B4M (Phase II) FINAL REPORT August 2011 Culvert Use by Wildlife MD-11-SP909B4M Page 2 of 72 The contents of this report reflect the views of the authors who are responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Maryland State Highway Administration. This report does not constitute a standard, specification, or regulation. Culvert Use by Wildlife MD-11-SP909B4M Page 3 of 72 Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. MD-11-SP909B4M 4. Title and Subtitle 5. Report Date An Investigation into the Use of Road Drainage Structures by Wildlife in August, 2011 Maryland 6. Performing Organization Code 7. Author/s 8. Performing Organization Report No. James L. Sparks, Jr. and J. Edward Gates 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) University Of Maryland Center for Environmental Science Appalachian Laboratory 11. Contract or Grant No. 301 Braddock Road Phase I: SP808B4Q Frostburg, Maryland 21532 Phase II: SP909B4M 12. Sponsoring Organization Name and Address 13. Type of Report and Period Covered Maryland State Highway Administration Office of Policy & Research Final Report 707 North Calvert Street 14. Sponsoring Agency Code Baltimore MD 21202 (7120) STMD - MDOT/SHA 15.
    [Show full text]
  • State of LA DOTD's Alternative Delivery Program
    Louisiana Department of Transportation and Development State of LA DOTD’s Alternative Delivery Program Jeffrey Burst, P.E. Project Management Director Agenda B Alternative Delivery Methods B Louisiana’s Design-Build Projects B Design-Build Challenges & Successes B DB – Resources and Opportunities for LA B Construction Management at Risk (CMAR) B Public-Private Partnerships (P3) B Future of Alternative Delivery in Louisiana B Questions? Traditional & Alternative Delivery Methods B Design-Bid-Build Method (DBB) ► Under the Design-Bid-Build method, a designer develops plans for the entire facility, and the Owner requests Bids from contractors. Everyone knows his role in this method, but the design for the entire project has to be complete before any construction starts. B Design-Build Method (DB) ► In the Design-Build method, the Owner contracts with one team to design and build the facility. This facilitates communication among team members, but the agency loses a level of control and commits all its monetary resources to one entity. Because the design and construction units work together as a team, construction proceeds in one area while another section is still being designed. B Construction Manager at Risk (CMAR) Method ► This method allows the general contractor to participate as an adviser during the design process. This improves communication between the two parties because the general contractor provides input on the availability and cost of suggested materials and equipment, and also collaborates on other and possibly cheaper alternatives
    [Show full text]
  • Baltimore Gateway 3700 Koppers Street Baltimore, MD 21227
    Baltimore Gateway 3700 Koppers Street Baltimore, MD 21227 SJPI.COM | 410.788.0100 Building Features: Five-Story Class 'A' Office • Five story, 100,000 sq. ft. office building 3700 Koppers Street 100,000 SF • Exterior: steel construction with brick masonry Five-Story Specifications and ribbon glass • Abundant, free on-site parking LEED Gold | Core & shell • LEED Gold certified Ceiling Height 9 ft. clear minimum • Visible to 195,000+ vehicles per day along I-95 Suite Sizes 1,500 up to 100,000 SF • Proximate to I-695, MD-295, and I-895 Elevator Yes • On-site deli, catering and fitness center Walls Brick on steel • Baltimore City Enterprise Zone tax credits Office Build to suit available to tenants Parking 5 spaces per 1,000 SF • Located in Baltimore City HubZone HVAC Gas, VAV with zone control • Three elevators serve all five floors Heat Gas Pictured Clockwise From Top Right: Exterior glass line and landscaping of 3700 Koppers Street; lobby interior; tenant exclusive on-site fitness center Visit sjpi.com/baltimoregateway to learn more Baltimore Gateway Local Amenities MARYLAND 372 WILKENS AVE CATON AVE 95 50B 1 Baltimore 50A ALT 95 Gateway 1 JOH AVE CATON HOUSE 97 RESTAURANT 95 CATON PARK RESEARCH CENTER 95 AVENUE 648 CAFE II 97 372 648 144 372 195 144 395 195 295 395 695 295 895 695 895 H A M M O N D ALT WASHINGTON BLVD 695 S F E R 1 R Y R D 95 97 648 372 144 HOLLINS FERRY RD 195 395 295 695 895 26 CHARLES VILLAGE 140 40 DOWNTOWN 40 BALTIMORE CITY GWYNNS FALLS FELLS POINT CANTON WASHINGTON BLVD RIVERSIDE WILKENS AVE Baltimore Gateway 95 95 295 ALT r sco Rive 1 W PATAPSCO AVE Patap CHERRY HILL 69595 895 97 648 895 2 BROOKLYN 372 Distances144 to: Baltimore, MD (Downtown) .......................................................
    [Show full text]
  • Driving Directions to Southern University and A&M College Baton
    Driving Directions to Southern University and A&M College Baton Rouge, LA Traveling South on Interstate 49 1. Traveling on I-49 South. 2. Take I-10 East exit towards Baton Rouge, LA. 3. Merge on I-10 East. 4. Take the I-110 North exit towards Business District/Metro Airport, exit #155B. 5. Merge on I-110 North. 6. Take the Metro Airport/Southern University exit, exit #6. 7. Turn left at the light onto Harding Blvd. 8. Continue straight ahead on Harding Blvd. 9. Go through the traffic light at Scenic Highway. 10. Once you cross Scenic Highway, continue straight over the overpass, on the right you will see the F. G. Clark Activity Center, tennis courts, and Lacumba's quarters and Subway on the left. 11. At the traffic light, make a right turn onto Elton C. Harrison Dr. Turn left at the University Bookstore, follow the curve to the right. 12. Office of Admissions & Recruitment is located in T.H. Harris Annex Hall which is directly in front of the Smith-Brown Memorial Student Union. Traveling East on Interstate 10 1. Traveling on I-10 East. 2. Take the I-110 North exit towards Business District/Metro Airport, exit #155B. 3. Merge on I-110 North. 4. Take the Metro Airport/Southern University exit, exit #6. 5. Turn left at the light onto Harding Blvd. 6. Continue straight ahead on Harding Blvd. 7. Go through the traffic light at Scenic Highway. 8. Once you cross Scenic Highway, continue straight over the overpass, on the right you will see the F.
    [Show full text]
  • Click on Directory to Download
    2021.directory.pages_Layout 1 10/13/20 10:45 AM Page 5 We hope you find this edion of the Directory of Maryland Community Colleges useful. The Maryland Associaon of Community Colleges (MACC) staff makes every effort to keep this informaon accurate and up­to­date. Please help us maintain this valuable resource; if your college’s informaon changes during the year, please send your updates to Jane Thomas at: [email protected] or contact her at 410­974­8117. Throughout the year, your changes will be made to the online PDF version of the directory that is posted on the MACC website at www.mdacc.org. We appreciate your support and look forward to a successful year ahead for our colleges and the students we serve. i 2021.directory.pages_Layout 1 10/13/20 10:45 AM Page 6 ii 2021.directory.pages_Layout 1 10/13/20 10:46 AM Page 7 Foreword..................................................................................................................... i Purpose, Philosophy, and Mission ............................................................................1 Staff of the Maryland Associaon of Community Colleges.....................................3 Direcons to the MACC office ...................................................................................4 Execuve Commiee .................................................................................................5 Board of Directors ......................................................................................................6 Affinity Groups and Chief Officers.............................................................................7
    [Show full text]
  • The Interstate Highway System Turns 60
    The Interstate Highway System turns 60: Challenges to Its Ability to Continue to Save Lives, Time and Money JUNE 27, 2016 202-466-6706 tripnet.org Founded in 1971, TRIP ® of Washington, DC, is a nonprofit organization that researches, evaluates and distributes economic and technical data on surface transportation issues. TRIP is sponsored by insurance companies, equipment manufacturers, distributors and suppliers; businesses involved in highway and transit engineering and construction; labor unions; and organizations concerned with efficient and safe surface transportation. Executive Summary Sixty years ago the nation embarked on its greatest public works project, the construction of the Interstate Highway System. President Dwight D. Eisenhower provided strong support for the building of an Interstate Highway System that would improve traffic safety, reduce travel times and improve the nation’s economic productivity. Serving as the most critical transportation link in the nation’s economy, the Interstate Highway System has significantly improved the lives of U.S. residents and visitors. Throughout the nation, the Interstate system allows for high levels of mobility by greatly reducing travel times and providing a significantly higher level of traffic safety than other routes. But 60 years after President Eisenhower articulated a vision for the nation’s transportation system, the U. S. again faces a challenge in modernizing its aging and increasingly congested Interstate highway system. If Americans are to continue to enjoy their current level of personal and commercial mobility on Interstate highways and bridges, the nation will need to make a commitment to identifying a long-term funding source to support a well-maintained Interstate Highway System able to meet the nation’s need for additional mobility.
    [Show full text]
  • Board of Trustees Members Board Staff Secretary-Treasurer Student
    Board of Trustees Lawrence W. Ulvila, Jr., Chair Sandra E. Moore, Vice Chair Members Paula J. Darrah, J.D. 410-544-1020 [email protected] Walter J. Hall 410-255-4948 [email protected] Dr. James H. Johnson, Jr. 410-263-8283 [email protected] Rev. Dr. Diane R. Dixon-Proctor 202-543-1318 [email protected] Jerome W. Klasmeier 410-923-3231 [email protected] Secretary-Treasurer Dr. Dawn Lindsay, President 410-777-1177 [email protected] Student Member Tamela “Van” Mason 443-226-0020 [email protected] Board Staff Ms. Tracie M. Thomas 410-777-2880 [email protected] Executive Assistant to the Board of Trustees Anne Arundel Community College Fax: 410-777-4222 17 Anne Arundel Commyunity College 101 College Parkway Arnold, Maryland 21012-1895 410-777-2222 • www.aacc.edu President Dr. Dawn Lindsay 410-777-1177 [email protected] Executive Assistant to the President Vacant 410-777-1177 [email protected] Special Assistant to the President Ms. Monica Rausa Williams 410-777-2500 [email protected] Executive Secretary to Board Ms. Tracie M. Thomas 410-777-2880 [email protected] of Trustees VP for Learning Dr. Michael H. Gavin 410-777-2332 [email protected] VP for Learner Support Services Dr. Felicia Patterson 410-777-2718 fl[email protected] VP for Learning Resources Ms. Melissa Beardmore 410-777-2532 [email protected] Management Additional MACC Contacts: Administrative Services Mr. Maurice L. Chaput 410-777-2324 [email protected] Business & Financial Resources Mr. Andrew Little 410-777-2227 [email protected] Information Technology Ms.
    [Show full text]