Non-Key Decision Request Form D PROPOSED DEVELOPMENT of CYCLING FACILITIES at MINET COUNTRY PARK and LAKE FARM COUNTRY PARK

Total Page:16

File Type:pdf, Size:1020Kb

Non-Key Decision Request Form D PROPOSED DEVELOPMENT of CYCLING FACILITIES at MINET COUNTRY PARK and LAKE FARM COUNTRY PARK To: COUNCILLOR SUSAN O’BRIEN CABINET MEMBER FOR FAMILIES, EDUCATION AND WELLBEING COUNCILLOR EDDIE LAVERY Democratic Services CABINET MEMBER FOR ENVIRONMENT, HOUSING AND REGENERATION Location: Phase II COUNCILLOR JONATHAN BIANCO Ext: 0185 CABINET MEMBER FOR PROPERTY & DDI: 01895 25 0185 INFRASTRUCTURE My Ref: LP c.c. All Members of Executive Scrutiny Committee c.c. Dan Kennedy, Director – Planning, Environment, Education and Community Services c.c. Chairman of the Residents, Education and Envirnmental Services Policy Overview Committee c.c. Ward Councillors for Botwell and Townfield c.c. Conservative and Labour Group Offices (inspection copy) Date: 2 March 2021 Non-Key Decision request Form D PROPOSED DEVELOPMENT OF CYCLING FACILITIES AT MINET COUNTRY PARK AND LAKE FARM COUNTRY PARK Dear Cabinet Member Attached is a report requesting that a decision be made by you as an individual Cabinet Member. Democratic Services confirm that this is not a key decision, as such the Local Authorities (Executive Arrangements) (Meetings and Access to Information) (England) Regulations 2012 notice period does not apply. You should take a decision on or after Wednesday 10 March 2021 in order to meet Constitutional requirements about publication of decisions that are to be made. You may wish to discuss the report with the Corporate Director before it is made. Please indicate your decision on the duplicate memo supplied, and return it to me when you have made your decision. I will then arrange for the formal notice of decision to be published. Liz Penny Democratic Services Officer Title of Report: PROPOSED DEVELOPMENT OF CYCLING FACILITIES AT MINET COUNTRY PARK AND LAKE FARM COUNTRY PARK Decision made: Reasons for your decision: (e.g. as stated in report) Alternatives considered and rejected: (e.g. as stated in report) Signed ………………………………………………………Date…………………….. Cabinet Member for Families, Education and Wellbeing / Cabinet Member for Environment, Housing and Regeneration / Cabinet Member for Property and Infrastructure PROPOSED DEVELOPMENT OF CYCLING FACILITIES AT MINET COUNTRY PARK AND LAKE FARM COUNTRY PARK Cabinet Member(s) Councillor Susan O’Brien Councillor Eddie Lavery Councillor Jonathan Bianco Cabinet Portfolio(s) Families, Education and Wellbeing Environment, Housing and Regeneration Property & Infrastructure Officer Contact(s) Priscilla Simpson, Residents Services Papers with report Appendix 1 - Hayes Cycling Facility Needs Assessment Report: Lake Farm & Minet Country Park (London Sport/Sporting Assets, April 2020) Appendix 2 - Hillingdon Council School Travel Road Safety Team Cycling programmes update HEADLINES Summary Hillingdon Council is committed to improving the health and wellbeing of its residents. The Hillingdon Local Plan (A Vision for 2026): Part 1 – Strategic Policies is consistent with the Sustainable Community Strategy and outlines a number of priorities: Improving Health and Wellbeing; Strong and Active Communities; and Protecting and Enhancing the Environment. Alongside this sits the Hillingdon Open Space Strategy (2011 – 26) which highlights that Lake Farm Country Park and Minet Country Park are considered two of the four key natural and semi-natural spaces in Hillingdon. The recommendations will increase the quantity and quality of accessible open space for residents to enjoy recreation and leisure. Lake Farm and Minet Country parks with their cycling facilities offer such an opportunity. Cycling, as a form of recreational activity, active travel and sport, offers a significant opportunity to enable residents of all ages to live an active lifestyle and take control of their own health and wellbeing. This report asks Cabinet Members to consider the summary and options suggested in the Hayes Cycling Facility Needs Assessment Report at Lake Farm and Minet Country Parks and agree to implement the preferred options as supported by British Cycling. The preferred options from the Report are: • Option 2 - Enhanced community use, testing the potential for a multi-discipline cycle and community hub at Minet Country Park. 1 Cabinet Member Report – 2 March 2021 Classification: Public • Option 3 – Constructing a multi-discipline cycle and community hub at Minet Country Park. • Option 7 - Retaining the BMX track at Lake Farm for informal use, whilst co-locating Hayes Hawks to an enhanced multi- discipline Hillingdon Cycle Circuit. The options would be subject to a review by officers, with support from British Cycling, of the financial opportunities available now or in the future, proposed planning or any possible restrictions on the sites, and current licensing and lease arrangements with Minet Cycle Circuit and Hayes Hawks who utilise the facilities. Putting our This report supports the following Council objectives of: Our People; Residents First Our Natural Environment; Strong financial management. Financial Cost To deliver options 2, 3 & 7, additional funding will be required. British Cycling is supporting the Council to access external funding opportunities from s106 and Sport England grant to enable the project to be delivered within existing resources. Relevant Policy Residents, Education and Environmental Services Overview Committee Relevant Ward(s) Townfield and Botwell RECOMMENDATIONS That the Cabinet Members for Families, Education and Wellbeing, Environment, Housing and Regeneration and Property and Infrastructure 1. Agree the summary outline of the Hayes Cycling Facility Needs Assessment at Lake Farm and Minet Country Parks and suggested options; 2. Approve the proposal to agree to implement the preferred options (Options 2, 3 and 7) as supported by British Cycling; and 3. Approve the proposal for the development of a Hillingdon Cycling Strategy Management Plan which would incorporate and contribute to more informed decisions on where to target investment. Reasons for recommendations To consider progressing a report to implement Options 2, 3 and 7 of the Hayes Cycling Facility Needs Assessment completed in April 2020, in a staged approach. Supported by British Cycling, these options focus on a greater proportion of the local community making better use of the underutilised cycling facilities and park at Minet and Lake Farm Country Parks. The Cycle Circuit at Minet Country Park and the BMX track at Lake Farm are popular destinations for all forms of cycling activity for riders from across the country making cycling communities the 2 Cabinet Member Report – 2 March 2021 Classification: Public most active users of these parks. Whilst free and open to public use, the cycling facilities at Minet are primarily used by cycling groups and clubs for training and competitions which means casual use by local residents is limited. A significant proportion, 79%, of these cyclists come from outside of the Borough to use the cycling facilities at Minet. Implementation of the proposed options will help to increase the proportion of local residents using these local cycling facilities which could improve levels of cycling activity in the Borough and deliver a wide range of benefits in terms of physical and mental health. These opportunities for cycling will further support and enhance the Council’s School Travel Road Safety Team Cycling programmes for residents of all ages. Enhanced facility provision as suggested in these options, could help shape a wider cycling strategy management plan for the Borough that could exceed the levels of cycling participation currently seen in other areas of London. Delegated authority to Cabinet Members is recommended to give effect to the proposed Options and the development of a Hillingdon Cycling Strategy Management Plan. Alternative options considered / risk management The existing facilities could be left in place. This is not recommended as a significant proportion of cyclists using the racing track facilities come from outside the Borough. Local residents are not utilising either of the cycling facilities to their maximum potential nor making use of the park. A new cycling participation management plan is required to improve resident engagement and access to the local cycling and park facilities. Democratic compliance This matter cuts across a number of Cabinet Member portfolios, significantly sport & leisure, the use of the Borough’s parks and also relevant licenses in respect of property and land. Policy Overview Committee comments None at this stage. SUPPORTING INFORMATION 1. Increasing adult physical activity through improving health and reducing obesity levels within the Borough’s population is highlighted in Hillingdon’s Joint Strategic Needs Assessment (2019). The Hillingdon Health and Wellbeing Strategy 2018 - 2021 also identifies the need to focus on the reduction of childhood obesity and an increase in adult physical activity in the resident population. The Council’s Sport and Physical Activity Team will be setting out a new plan of action in 2021 to improve physical activity across all ages as well as reduce inactivity rates amongst Hillingdon residents. 2. This proposal to Cabinet Members seeks to improve resident utilisation of the cycling facilities and park at Minet Country Park and Lake Farm Country Park as well as to consider how the success of these facilities can sustain cycling as a sport and develop talented riders. 3 Cabinet Member Report – 2 March 2021 Classification: Public 3. The Hayes Cycling Facility Needs Assessment Report was completed in April 2020. It assessed the closed road circuit at Minet Country Park and BMX track at Lake Farm and considered the impact of
Recommended publications
  • 27-37 Station Road, Hayes, Middlesex
    27-37 Station Road, Hayes, Middlesex View this office online at: https://www.newofficeeurope.com/details/serviced-offices-27-37-station-road- hayes-middlesex Offering both boutique offices and desk space, this versatile business centre provides brand new and innovative office solutions which radiate contemporary style. Desks start from £200 per month and the office suites can accommodate up to 25 desks and come fully furnished and equipped with state-of-the-art technology. Enjoy a comfortable and relaxed atmosphere with an on-site restaurant that is perfect for entertaining business opportunities in style while the meeting rooms provide a more formal setting for hosting business discussions. With a team of dedicated staff at hand, you will benefit from professional support such as accounting, IT, graphic & creative services as well as secretarial support that allows you to focus purely on running your business. Transport links Nearest road: Nearest airport: Key features 24 hour access 24-hour security 5G wireless coverage Administrative support Bike racks Board room Central heating Comfortable lounge Conference rooms Furnished workspaces High-speed internet IT support available Kitchen facilities Lift Meeting rooms Office cleaning service Reception staff Shower cubicles Virtual office available WC (separate male & female) Wireless networking Location Situated on Station Road, this business centre enjoys a convenient position in Hayes which is just minutes away from the river, Minet Country Park and Lake Farm Country Park. This bustling street is home to an assortment of banks, eateries and shops as well as a post office and medical centre. Ideally located for commuters, Hayes & Harlington Station is just a 3 minute stroll away and there is easy access onto the M4 and a mere 11 minute drive to Heathrow Airport.
    [Show full text]
  • Buses from West Drayton
    Buses from West Drayton U1 AD Ruislip HIG FIELD RO FAIR COLHAM AVENUE H Grand Union Canal S A T L RE ST BE . School West Ruislip S E T RT EPHEN'S T R OA BENTINCK ROAD RO D U5 350 A Ickenham Uxbridge Station Road D High Road for intu Uxbridge Fairey Corner HORTON ROAD L R C O B S Swakeleys Road Cowley Road Hayes & Harlington E E L R KNOW T T S A V S West IS TATION CLOSE TO APPROA Drayton CK ROAD CH U3 Uxbridge Cowley Station Road for intu Uxbridge High Street Clayton Road for Hayes Town Medical Centre RD RD WICK ILL WAR M M HA Uxbridge Station Road Hayes OL Civic Centre Botwell Green Sports C D & Leisure Centre R S T A CHE LE T R L R I IO ORCH Y E N AR U D DV N R Hillingdon Road Brunel University Church Road Botwell Lane E O N The Greenway Cleveland Road for Lake Farm Country Park V A A D RA RS B E Buses from West Drayton R D R A Playing E O U1 222 F R Ruislip N Field Uxbridge Brunel University Church Road Hillingdon Hospital Botwell Common Road A for intu Uxbridge Kingston Lane W Primary S School West Ruislip Cowley Road Hillingdon Hospital Colham Green Road Furzeground Way Destination finder U5 350 Ickenham Uxbridge Station Road Destination Bus routes Bus stops Destination Bus routes Bus stops High Road for intu Uxbridge Fairey Corner B Hounslow Bus Station 222 ,b ,f ,h ,j Botwell Common Road 350 ,c ,e ,g ,k Hounslow Treaty Shopping Centre 222 ,b ,f ,h ,j Botwell Lane 350 ,c ,e ,g ,k Hounslow West 222 ,b ,f ,h ,j for Lake Farm Country Park SwakeleysCowley Road Cowley Road Hayes &Violet Harlington Avenue Park View Road Stockley
    [Show full text]
  • Community Mirror a Data-Driven Method for ‘Below the Radar’ Research
    Nesta Working Paper No. 15/07 Community Mirror A Data-Driven Method for ‘Below the Radar’ Research Gaia Marcus, RSA Jimmy Tidey, Royal College of Art Community Mirror A Data-Driven Method for ‘Below the Radar’ Research Gaia Marcus Jimmy Tidey RSA Royal College of Art Nesta Working Paper 15/07 May 2015 www.nesta.org.uk/wp15-07 Abstract This report presents the findings of a study undertaken between June 2014 and November 2014 with the LocalNets.org project at the Royal College of Art (RCA), using the RSA’s existing on-the-ground research conducted for the London Borough of Hounslow. This collaborative research project, Community Mirror, was carried out to understand the ways in which online data-gathering techniques compared to door-to- door research in understanding how a local community works. The study concludes that digital methodologies do offer a promising approach to mapping the ‘below the radar’ social economy assets. There was a significant amount of overlap between the community assets mapped by the two different research approaches, with 31% of the community assets surfaced in the offline research also discovered by the LocalNets online app. Acknowledgements: This paper was prepared by Gaia Marcus to report on work undertaken while at the RSA. The relevant contact at the RSA is now Matthew Parsfield. Corresponding author: Gaia Marcus, c/o Matthew Parsfield, The RSA, John Adam Street, London WC2N 6EZ; [email protected]. The Nesta Working Paper Series is intended to make available early results of research undertaken or supported by Nesta and its partners in order to elicit comments and suggestions for revisions and to encourage discussion and further debate prior to publication (ISSN 2050-9820).
    [Show full text]
  • London LOOP Section 11 Hayes and Harlington to Uxbridge
    V1 : July July 09 V1 : London LOOP Directions: Leave the station, and turn right down Station Road. Go Section 11 straight over the mini roundabout, cross the canal bridge then turn right at the end of the bridge into Western View. Take the steps on the right which Hayes and Harlington to Uxbridge lead down to the towpath of the Grand Union Canal and the London LOOP. Turn right at the bottom of the steps and go under the bridge. The picturesque Grand Union Canal links London to Birmingham, which supposedly has more canals than Venice! It’s the longest single canal in Britain stretching 135 miles. Start: Hayes & Harlington (TQ098795) Squeeze through the metal kissing gate, and keep following the towpath. Station: Hayes & Harlington Finish: Uxbridge (TQ051845) On the right is a traditional cast-iron milepost saying ‘Braunston 87 Miles.’ Station: Uxbridge The reason behind the mileposts was to tell approaching boaters the distances to the end of the canal and to assist in the collection of tolls. The Distance: 7.5 miles (12 km) G.J.C. on the mile post stands for the Grand Junction Canal, the original title of the ambitious 93 mile long canal approved by Act of Parliament in 1793 to link Braunston in Northamptonshire with Brentford in London. Introduction: A good section for enthusiasts of waterside walking, as over two-thirds follows canal, river or lake. After a few hundred yards there is another kissing gate. Go through and keep following the path under a modern brick bridge. This is an easy walk on mostly level ground with a few short climbs.
    [Show full text]
  • Technical Annex
    Crane Valley Partnership Strategy for the Crane Catchment 2018-2028 TECHNICAL ANNEX Final report, 9th March 2018 StrategyStrategy for for the the Crane Crane Valley Catchment, 2018-2028 2018-2028 Technical Annex Technical Annex This is the second part of the Strategy, prepared to guide the work of the Crane Valley Partnership over the period 2018-2028. It contains background material generated or collected during the preparation of the Strategy Contents Action tables for influencing and engaging to deliver the Strategy 1 Matrix of natural capital assets and ecosystem services 7 What’s important and why? - An assessment of the Crane 8 Valley’s natural capital assets Long list of projects identified in the ALGG Area Framework (No. 26 10) for the Crane Valley Agenda for the workshop held with Partners, 3rd October 2017 37 Summary of potential future governance models 39 Strategy prepared by Robert Deane and Louise Tricklebank of Rural Focus (UK) Ltd. Registered in England and Wales No. 9533053. www.rural-focus.co.uk Action tables for influencing and engaging to deliver the Strategy In order to achieve the priorities set out in Sections 6 to 8 of the main strategy report, the Partnership will need to engage with others, link in to existing policy, take advantage of funding opportunities and in-kind contributions and influence future decision making. The following tables provide a summary of the key organisations that the Partnership should prioritise working with. Thinking Spatially (Section 6 of the Strategy) Developers Engage with and influence developers to protect Funding opportunities are often available as part and enhance the central spine and look at of development proposals to deliver mutually opportunities to deliver elements of the All beneficial enhancements.
    [Show full text]
  • Phoenix Place Heston
    PHOENIX PLACE HESTON WELCOME TO PHOENIX PLACE AT PHOENIX PLACE YOU WILL FIND ATTRACTIVE HOMES IN A LANDSCAPED SETTING, WITH ALLOCATED PARKING AND INTERIOR LAYOUTS STACKED WITH POTENTIAL. There are a number of public transport options available, with the Piccadilly Line at Hounslow West tube station (1.6 miles from Phoenix Place) offering direct access into London. First Great Western services from Hayes and Harlington railway station (2.4 miles away) provide convenient routes into Paddington and out of London destinations. You’ll also find yourself only two miles from the M4, so this really is the perfect base for commuters! With a choice of 1, 2 and 3 bedroom apartments, plus 3 bedroom houses for sale, there’s a home here to suit everyone. Distances taken from Google Maps Lymington Mews showhome TRAVEL Heathrow Airport 2.6 miles Hounslow West Tube Station 1.8 miles Southall Railway Station 3.2 miles PARKS/RECREATION Avenue Park 0.9 miles Cranford Park 1.5 miles Lampton Park 2.2 miles Osterley Park 3 miles Lake Farm Country Park 3.2 miles Minet Country Park 3.5 miles SHOPPING The Blenheim Centre 3 miles Treaty Shopping Centre 3.3 miles Westfield London 13 miles GOLF Airlinks Golf Club 1 mile Wyke Green Golf Club 3.5 miles West Middlesex Golf Club 4 miles Distances taken from Google Maps Southall Park Heathrow Airport IT’S ALL ABOUT LOCATION At Phoenix Place, you’re of courses can be found and Junior schools never far from an open within five miles. are found within a mile space or parkland.
    [Show full text]
  • School at Lake Farm Botwell Common Road, Hayes in the London Borough of Hillingdon Planning Application No.68911/APP/2012/2983
    planning report PDU/3092/01 16 January 2013 School at Lake Farm Botwell Common Road, Hayes in the London Borough of Hillingdon planning application no.68911/APP/2012/2983 Strategic planning application stage 1 referral (new powers) Town & Country Planning Act 1990 (as amended); Greater London Authority Acts 1999 and 2007; Town & Country Planning (Mayor of London) Order 2008 The proposal New 3 Form of Entry Primary School (630 students) plus a nursery (45 students) and a Special Resource Provision Unit for approximately 12 pupils, associated car parking, hard and soft play areas, sports pitches, pedestrian and vehicular access routes and landscaping. The applicant The applicant is London Borough of Hillingdon Resident Services, and the architect is 9.design and landscape architects. Strategic issues Loss of Green Belt, education use, urban design, access, sustainable development, and transport are the strategic issues relevant to this scheme. Recommendation That Hillingdon Council be advised that the application does not comply with the London Plan, for the reasons set out in paragraph 52 of this report; but that the possible remedies set out in that paragraph of the report could address these deficiencies. The application does not need to be referred back to the Mayor if the Council resolves to refuse permission, but it must be referred back if the Council resolves to grant permission. Context 1 On 6 December 2012 the Mayor of London received documents from Hillingdon Council notifying him of a planning application of potential strategic importance to develop the above site for the above uses. Under the provisions of The Town & Country Planning (Mayor of London) Order 2008 the Mayor has until 16 January 2013 to provide the Council with a statement setting out whether he considers that the application complies with the London Plan, and his reasons for taking that view.
    [Show full text]
  • PDU Case Report XXXX/YY Date
    planning report PDU/2581/01 3 March 2010 The former grounds of Hayes Football Club in the London Borough of Hillingdon planning application no.4327/APP/2009/2737 Strategic planning application stage 1 referral (new powers) Town & Country Planning Act 1990 (as amended); Greater London Authority Acts 1999 and 2007; Town & Country Planning (Mayor of London) Order 2008 The proposal Redevelopment of site to provide 185 residential dwellings, comprising houses and flats, with associated amenity space, landscaping, new access road and car parking. The applicant The applicant is Barratt (Southern Counties), and the architects are Acanthus LW. Strategic issues The principal issues to consider are the loss of a playing field/community facility; the types, density, mix of unit sizes and quality of housing; the proportion and tenure of affordable housing; the provision of children’s play space, urban design & architectural quality, inclusive access provisions, climate change mitigation and adaptation (including energy provisions); transport & parking issues. Recommendation That Hillingdon Council be advised that whilst the application is generally acceptable in strategic planning terms, it does not fully comply with the London Plan, for the reasons set out in paragraph 105 of this report; but that the possible remedies set out in paragraph 107 of this report could address these deficiencies. Context 1 On 26 January 2010, the Mayor of London received documents from Hillingdon Council notifying him of a planning application of potential strategic importance to develop the above site for the above uses. Under the provisions of The Town & Country Planning (Mayor of London) Order 2008 the Mayor has until 8 March 2010 to provide the Council with a statement setting out whether he considers that the application complies with the London Plan, and his reasons for taking that view.
    [Show full text]
  • Land at Blyth Road, Hayes London Borough of Hillingdon
    Wessex Archaeology Land at Blyth Road, Hayes London Borough of Hillingdon Archaeological Desk-based Assessment Ref: 66170.01 July 2007 LAND AT BLYTH ROAD, HAYES LONDON BOROUGH OF HILLINGDON Archaeological Desk-based Assessment Prepared for Ballymore Properties Ltd Pointe North 3 Greenwich Place London E14 9NN by Wessex Archaeology in London Unit 113 The Chandlery 50 Westminster Bridge Road London SE1 7QY Report reference: 66170.01 July 2007 © Wessex Archaeology Limited 2007 all rights reserved Wessex Archaeology Limited is a Registered Charity No. 287786 Ballymore Properties Ltd. Land at Blyth Road, Hayes, London Borough of Hillingdon LAND AT BLYTH ROAD, HAYES LONDON BOROUGH OF HILLINGDON Archaeological Desk-based Assessment Contents Summary...........................................................................................................................ii Acknowledgements………………………………………………………………………………iii 1 INTRODUCTION......................................................................................1 1.1 Project Background ....................................................................................1 1.2 Landscape and Geology.............................................................................1 2 METHODOLOGY.....................................................................................1 2.1 Scope .........................................................................................................1 2.2 Research ....................................................................................................2
    [Show full text]
  • Hillingdon May 2018
    Traffic noise maps of public parks in Hillingdon May 2018 This document shows traffic noise maps for parks in the borough. The noise maps are taken from http://www.extrium.co.uk/noiseviewer.html. Occasionally, google earth or google map images are included to help the reader identify where the park is located. Similar documents are available for all London Boroughs. These were created as part of research into the impact of traffic noise in London’s parks. They should be read in conjunction with the main report and data analysis which are available at http://www.cprelondon.org.uk/resources/item/2390-noiseinparks. The key to the traffic noise maps is shown here to the right. Orange denotes noise of 55 decibels (dB). Louder noises are denoted by reds and blues with dark blue showing the loudest. Where the maps appear with no colour and are just grey, this means there is no traffic noise of 55dB or above. London Borough of Hillingdon 1 1. Barra Hall Park 2. Bessingby Park, Pine Gardens, Cavendish Recreation Ground 3. Breakspear Crematorium 2 4. Cowley Recreation Ground 5. Cranford Park, Avenue Park 6. Eastcote House Gardens 3 7. Elephant Park 8. Hayes End Community Park 9. Hillingdon Court Park 4 10. Hogs Back Open Space 11. Lake Farm Country Park 12. Minet Country Park 5 13. Northwood Recreation Ground 14. Philpot’s Farm Open Space 15. Ruislip Woods and Ruislip Lido 6 16. The Closes Recreation Ground, The Green 17. Uxbridge Common 18. Warren Park 7 19. Warrander Park 20. Willow Tree Open Space 21.
    [Show full text]
  • The Pavilions
    C 10 0 75 0 G G 37 B 49 K K K K C THE PAVILIONS A DELIGHTFUL SELECTION OF 1, 2, 3 AND 4 BEDROOM HOMES SET IN AN ESTABLISHED RESIDENTIAL AREA WOOD END GREEN ROAD, HAYES, MIDDLESEX UB3 2SL AN EXCEPTIONAL CHOICE OF 27 ECO-FRIENDLY APARTMENTS AND HOUSES The Pavilions is the very latest development by Clearview Homes which proves that it is not necessary to be a long range commuter to move into a new, eco-friendly home that is close to pleasant green spaces. Prepare to be stunned by the selection of 2, 3 and 4 bedroom houses and 1 and 2 bedroom apartments at The Pavilions, and by the development’s enviable location! Situated in a mature residential area of Hayes End, the development is approximately 1.7 miles from Hayes & Harlington station (the bus taking 15-20 minutes). The fast rail services include London Paddington in approximately 22 minutes, Heathrow Airport in about 12, and to other centres of employment such as Reading, Maidenhead and Oxford. The A4020 (for the M25) is nearby while Junction 3 of the M4 is also only a few minutes’ drive away. Schools within about a mile include Grange Park Infants’ and Junior, Wood End Park Community (primary) and Rosedale College which offers schooling from the age of 3 to 18. Shopping in Hayes town is enhanced by a cosmopolitan offering of coffee shops and restaurants, with nearby Uxbridge town centre having excellent shopping facilities to include The Chimes and The Pavilions retail centres and also the convenience of Uxbridge underground station serving both the Metropolitan and Piccadilly Line.
    [Show full text]
  • All London Green Grid River Colne and Crane Area Framework
    All River Colne and Crane London Area Framework Green Grid 10 Contents 1 Foreword and Introduction 2 All London Green Grid Vision and Methodology 3 ALGG Framework Plan 4 ALGG Area Frameworks 5 ALGG Governance 6 Area Strategy 8 Area Description 12 Strategic Context 14 Vision 18 Objectives 22 Opportunities 23 Project Identification 28 Clusters 30 Projects Map 34 Rolling Projects List 44 Phase One Early Delivery 46 Project Details 66 Forward Strategy 68 Gap Analysis 70 Recommendations 72 Appendices 74 Baseline Description 76 ALGG SPG Chapter 5 GGA10 Links 78 Group Membership Note: This area framework should be read in tandem with All London Green Grid SPG Chapter 5 for GGA10 which contains statements in respect of Area Description, Strategic Corridors, Links and Opportunities. The ALGG SPG document is guidance that is supplementary to London Plan policies. While it does not have the same formal development plan status as these policies, it has been formally adopted by the Mayor as supplementary guidance under his powers under the Greater London Authority Act 1999 (as amended). Adoption followed a period of public consultation, and a summary of the comments received and the responses of the Mayor to those comments is available on the Greater London Authority website. It will therefore be a material consideration in drawing up development plan documents and in taking planning decisions. The All London Green Grid SPG was developed in parallel with the area frameworks it can be found at the following link: http://www.london.gov.uk/publication/all-london- green-grid-spg . This part of London is endowed with high quality green space including the spectacular countryside Foreword on the edge of the city in the Colne Valley, the ancient Ruislip Woods and in the Crane Valley, the emerging Crane Park and Yeading Brook Meadows, an extensive area of countryside now entirely encapsulated by the expansion of London.
    [Show full text]