February 2010
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Regulating Sports Gaming Data
REGULATING SPORTS GAMING DATA Ryan M. Rodenberg* I. INTRODUCTION “Congress can regulate sports gambling directly, but if it elects not to do so, each State is free to act on its own,” concluded the U.S. Supreme Court in Gov. Murphy v. NCAA.1 In the two years since the Supreme Court declared the partial federal sports betting ban in the Professional and Amateur Sports Protection Act (“PASPA”)2 unconstitutional and, in turn, opened up the legalization of sports betting nationwide, there has been one topic that has garnered considerable attention—sports gaming data. ‘Data’—a generic word that includes news and information about sports gaming—has become one of the most-discussed contemporary topics in sports gaming regulation globally.3 Indeed, since the Supreme Court case, the regulatory treatment of sports betting news, information, and data has taken a prominent role in dozens of legislative bodies, at numerous industry conferences, and in a prominent lawsuit recently filed in the United Kingdom. Industry * Associate Professor, Florida State University. This paper was completed in conjunction with a non-resident research fellowship granted by the International Center for Gaming Regulation (“ICGR”) at the University of Nevada, Las Vegas. The ICGR is an academic institute dedicated to the study of gaming regulation and policy development. The author would like to thank the ICGR for its research support and Christopher Perrigan for excellent research assistance. 1 Murphy v. Nat’l Collegiate Athletic Ass’n, 138 S. Ct. 1461, 1484–85 (2018). As of June 20, 2020, there remains a spin-off legal proceeding in the court system that is unrelated to the foci here. -
Fall Newsletter
1 The Ladies’ Auxiliary Times: Ladies Auxiliary Pennsylvania Society Sons of the American Revolution (LAPASSAR) Fall 2020 Newsletter Becky Hudson Moyer, President LAPASSAR, 2020-2022 Hello, LAPASSAR members… I hope this newsletter finds each and every one of you healthy and safe during this challenging time for our nation and world. The Coronavirus Covid-19 pandemic has forced us to cancel several of our meetings or to hold them virtually. Let us pray that the numbers of persons contracting the virus continues to diminish and that a vaccine is soon developed and is readily available to everyone. Please keep our brave medical professionals in 2 your thoughts throughout the coming weeks, and please follow local, state, and national guidelines to stay safe and avoid spreading the illness. Please pray for an end to the violence that has gripped our nation and for peace and unity for all. Protect those who are working to keep the peace and pray that our government officials are wise in their decision making. Our LAPASSAR mission is to support and assist the Pennsylvania and National Societies in furthering the objectives and patriotic activities of the Societies. At this time, we are called upon to develop ways to help PASSAR with the 2024 Congress. As part of our support, we will be holding fund raising events to assist with this objective. So…. Your new Executive Board is busy making plans for the next two years, and beyond to the 2024 Congress. Among those plans are the following: • A bake sale at the November 6th and 7th, 2020 board of management meeting in Pittsburgh-additional information is on pages six of this newsletter • Development of a committee made up of you the members of the auxiliary to assist with planning further fund raising for the 2024 Congress: additional information is on page seven. -
NORTH ALLEGHENY SCHOOL DISTRICT 200 Hillvue Lane Pittsburgh, PA 15237
NORTH ALLEGHENY SCHOOL DISTRICT 200 Hillvue Lane Pittsburgh, PA 15237 FEBRUARY 25, 2015 REGULAR MEETING Visit our web site at www.northallegheny.org and click on School Board for School Board updates. NORTH ALLEGHENY SCHOOL DISTRICT SCHOOL DIRECTORS’ CALENDAR OF COMING EVENTS FEBRUARY 18, 2015 –SPECIAL MEETING/WORK SESSION – CAO BOARD ROOM 7:00 p.m. - DISTINGUISHED ACHIEVEMENT AWARDS - SPECIAL MEETING/WORK SESSION Mid-year Human Resources Update Adoption of Preliminary Budget 8:30 p.m. - EXECUTIVE SESSION FEBRUARY 25, 2015 – REGULAR MEETING – CAO BOARD ROOM 7:00 p.m. - REGULAR MEETING BWE, MES & MMS Renovation Update 8:30 p.m. - EXECUTIVE SESSION MARCH 18, 2015 – SPECIAL MEETING/WORK SESSION – CAO BOARD ROOM 7:00 p.m. - SPECIAL MEETING/WORK SESSION Approval of PlanCon F for BWE, MES & MMS 8:30 p.m. - EXECUTIVE SESSION MARCH 25, 2015 – REGULAR MEETING – CAO BOARD ROOM 5:30 p.m. - DIVERSITY CONTEST WINNERS’ RECEPTION 7:00 p.m. - REGULAR MEETING Diversity Report (written) Education Technology Update 8:30 p.m. - EXECUTIVE SESSION CURRICULUM REPORT February 25, 2015 There are 3 items For Information Only. FOR INFORMATION ONLY I. STUDENT TEACHING REQUEST – REGULAR EDUCATION The following student has requested a student teaching assignment in the North Allegheny School District during the 2014/2015 school year. Student Teacher Dates Supervising Teacher Ashley Chiaramonte 2/23/15 - 4/10/15 Danielle Omasits La Roche College English NASH Angela Winter 3/2/15 - 4/24/15 Lauren Donato Duquesne University Music FES II. STUDENT TEACHING REQUEST – SPECIAL EDUCATION The following student has requested a student teaching position in the North Allegheny School District, within the Special Education Department, during the second semester of the 2014/2015 school year. -
Jan/Feb 2007 (PDF)
THE MAGAZINE OF THE MASTER BUILDERS’ ASSOCIATION OF WESTERN PENNSYLVANIA JANUARY / FEBRUARY 2007 cov1 Contents PUBLISHER Tall Timber Group EDITOR Jeff Burd 412-366-1857 [email protected] Cover Story The Encore on PRODUCTION MANAGER Seventh Carson Publishing, Inc. Lincoln Properties, Quellé Diggs Mascaro Construction, HKS Architects ART DIRECTOR/GRAPHIC DESIGN Photo by Ed Massery Copyright 2006 Carson Publishing, Inc. Jaimee D. Greenawalt COVER PHOTO Ed Massery CONTRIBUTING PHOTOGRAPHY Carson Publishing, Inc. ADVERTISING SALES Features & Departments Tall Timber Group 412-366-1857 Dorothy Frank 3 PUBLISHER’S NOTE 30 MANAGEMENT 412-201-3222 PERSPECTIVE 4 NEWS FROM Some local leaders let us in on their More information: THE STREET resolutions for turning around 2007 BreakingGround is published by Tall More green building news, AIA Timber Group for the Master Builders’ Pittsburgh announces design awards, 33 MBE/WBE Association of Western Pennsylvania CBRE acquires Trammel Crow, COMPANY SPOTLIGHT Westinghouse nuclear is staying, the Window Treats No part of this magazine may be Pennsylvania legislature looks at a reproduced without written permission host of construction-related laws by the Publisher. All rights reserved. 34 TREND TO WATCH Home servers can help you make 7 REGIONAL sense of all the digital devices at This information is carefully gathered and MARKET UPDATE home compiled in such a manner as to ensure Local housing bubble pops, but maximum accuracy. We cannot, and do non-residential construction keeps 36 BEST PRACTICE not, guarantee either the correctness of chugging along all information furnished nor the complete Building information modeling absence of errors and omissions. Hence, responsibility for same neither can be, 9 NATIONAL 39 AWARDS AND nor is, assumed. -
The Frick Building
THE FRICK BUILDING 437 GRANT STREET | PITTSBURGH, PA HISTORIC BUILDING. PRIME LOCATION. THE FRICK BUILDING Located on Grant Street across from the Allegheny County court house and adjacent to Pittsburgh City Hall, the Frick Building is just steps away from many new restaurants & ongoing projects and city redevelopments. The Frick Building is home to many creative and technology based fi rms and is conveniently located next to the Bike Pittsburgh bike rental station and Zipcar, located directly outside the building. RESTAURANT POTENTIAL AT THE HISTORIC FRICK BUILDING Grant Street is becoming the city’s newest restaurant district with The Commoner (existing), Red The Steak- house, Eddie V’s, Union Standard and many more coming soon Exciting restaurants have signed on at the Union Trust Building redevelopment, Macy’s redevelopment, Oliver Building hotel conversion, 350 Oliver development and the new Tower Two-Sixty/The Gardens Elevated location provides sweeping views of Grant Street and Fifth Avenue The two levels are ideal for creating a main dining room and private dining facilities Antique elevator, elegant marble entry and ornate crown molding provide the perfect opportunity to create a standout restaurant in the “Foodie” city the mezzanine AT THE HISTORIC FRICK BUILDING 7,073 SF available within a unique and elegant mezzanine space High, 21+ foot ceilings Multiple grand entrances via marble staircases Dramatic crown molding and trace ceilings Large windows, allowing for plenty of natural light Additional space available on 2nd floor above, up to 14,000 SF contiguous space Direct access from Grant Street the mezzanine AT THE HISTORIC FRICK BUILDING MEZZANINE OVERALL the mezzanine AT THE HISTORIC FRICK BUILDING MEZZANINE AVAILABLE the details AT THE HISTORIC FRICK BUILDING # BIGGER. -
THE FORT PITT BLOCK HOUSE Prepared by Kelly Linn - January 2008
THE FORT PITT BLOCK HOUSE Prepared by Kelly Linn - January 2008 The Block House is just one small defensive redoubt and the only surviving structure of Fort Pitt - a key British fortification during the French and Indian War in North America (or the Seven Years War as it is known in Europe). Constructed as the second largest British fort on the colonial frontier, Fort Pitt measured about 18 acres. Crown Point in New York was the largest covering 3.5 square miles. Both of these installations date to the same military era. Fort Pitt was constructed at the Forks of the Ohio (now the Point at Pittsburgh, Pennsylvania) between 1759 and 1761. It was a classic star-shaped fort with 5 bastions projecting from the corners. The Music Bastion and the Grenadiers Bastion were on the east, or land side, of the Point, the Flag and Monongahela Bastions fronted the Monongahela River and the Ohio Bastion overlooked the Allegheny River floodplain. Only the eastern walls were faced with brick to repel cannon fire; the remaining walls of the fort were earthen ramparts covered with sod. The walls of the fort averaged a height of 15 feet above the Monongahela terrace upon which it was constructed. In January 1762 - only a few months after the fort was completed - flood waters from the Allegheny and Monongahela Rivers crested at nearly 40 feet inflicting heavy damage to the fort. Repairs were made, but in March 1763, another flood cresting at 41 feet, destroyed the Ohio Bastion entirely and heavily damaged the Monongahela Bastion a second time. -
An Analysis of the American Outdoor Sport Facility: Developing an Ideal Type on the Evolution of Professional Baseball and Football Structures
AN ANALYSIS OF THE AMERICAN OUTDOOR SPORT FACILITY: DEVELOPING AN IDEAL TYPE ON THE EVOLUTION OF PROFESSIONAL BASEBALL AND FOOTBALL STRUCTURES DISSERTATION Presented in Partial Fulfillment of the Requirements for the Degree Doctor of Philosophy in the Graduate School of The Ohio State University By Chad S. Seifried, B.S., M.Ed. * * * * * The Ohio State University 2005 Dissertation Committee: Approved by Professor Donna Pastore, Advisor Professor Melvin Adelman _________________________________ Professor Janet Fink Advisor College of Education Copyright by Chad Seifried 2005 ABSTRACT The purpose of this study is to analyze the physical layout of the American baseball and football professional sport facility from 1850 to present and design an ideal-type appropriate for its evolution. Specifically, this study attempts to establish a logical expansion and adaptation of Bale’s Four-Stage Ideal-type on the Evolution of the Modern English Soccer Stadium appropriate for the history of professional baseball and football and that predicts future changes in American sport facilities. In essence, it is the author’s intention to provide a more coherent and comprehensive account of the evolving professional baseball and football sport facility and where it appears to be headed. This investigation concludes eight stages exist concerning the evolution of the professional baseball and football sport facility. Stages one through four primarily appeared before the beginning of the 20th century and existed as temporary structures which were small and cheaply built. Stages five and six materialize as the first permanent professional baseball and football facilities. Stage seven surfaces as a multi-purpose facility which attempted to accommodate both professional football and baseball equally. -
OCR Document
THE COFFIN CORNER: Vol. 2, Annual (1980) Latrobe LATROBE, PA.: CRADLE OF PRO FOOTBALL By Robert B. Van Atta John Kinport Brallier, who was to become nationally acknowledged as one of the first professional football players, was born at Cherry Tree, Pa., north of Indiana, Pa., Dec. 27, 1876, the son of Dr. Emanuel Brallier, a physician, and his wife, Lucy M. Kinport Brallier. His grandparents were from Alsace-Lorraine in Europe, accounting for the French-sounding name. As a boy, Brallier remembered having worked in a glass factory. His first recollection of football was in 1890, at the age of 13, when he played for the West Indiana Public School team. By 1892, he was captain and right halfback on the high school team as a sophomore, just before his 16th birthday. The year of 1893 saw the youthful athlete, while still attending the public high school, also “matriculating at Indiana Normal so I could play on the team.” The team won three of four games played that year, and among Brallier’s teammates was left guard Alex Stewart, future father of movie star Jimmy Stewart. Brallier quarterbacked the Normal team in both 1893 and 1894. His second year on the team found it winning only two of five games, but against much tougher opposition provided by college teams and teams of former college players. The fourth game that year was a 28-0 loss to Washington and Jefferson, but Brallier’s outstanding play was to have a major effect on his future. E. Gard Edwards, coach of the Wash-Jeff team, wrote from Pittsburgh to John Brallier, Dec. -
Gary's Executive Profile
Executive Profile GARY JAY SAULSON EXECUTIVE VICE PRESIDENT AND DIRECTOR CORPORATE REAL ESTATE THE PNC FINANCIAL SERVICES GROUP Gary Jay Saulson is executive vice president and director of Corporate Real Estate for The PNC Financial Services Group where he leads PNC’s Realty Services business unit. Saulson oversees all of PNC’s real estate (approx. 32 million square feet), including property management, construction, occupancy ownership strategies, leasing, and transactions. Saulson is also responsible for leading PNC's environmental strategy that has resulted in PNC having more newly constructed buildings certified by the US Green Building Council (USGBC) than any other company in the world. Major construction projects led by Saulson that have achieved or anticipate achieving the USGBC’s Leadership in Energy and ® Environmental Design (LEED ) certification include: • PNC Firstside Center, Pittsburgh: At nearly 650,000 square feet, this operations facility Title opened in 2000 as the world’s largest LEED certified building and the first building Executive Vice President certified under LEED v2.0. and Director ® Corporate Real Estate • Green Branch , trademarked the name Green Branch, Locations: PNC became the first The PNC Financial Services major US bank to apply green building standards to all newly constructed or renovated Group retail offices in 2002, achieved the first prototype certified under the LEED Volume program in 2004, and celebrated its 100th LEED certified Green Branch in 2010. Responsibilities • Three PNC Plaza, Pittsburgh: This mixed-use, green building – featuring Leads PNC’s Realty Services office space, Fairmont Pittsburgh hotel, condominiums and retail – has played a key business unit as well as role in revitalizing the city’s core and earned LEED Gold certification. -
Table of Contents
Table of Contents Acknowledgements Recommendations Oakland Strategic Visioning Process 1 i Past Planning Efforts ii The Future of Oakland: A Community Investment Strategy Summary of Issues 7 Urban Design Analysis 12 i Existing Conditions ii Institutional Master Plans iii Other Master Plans and Studies iv Concurrences, Conflicts, and Gaps v Areas of Opportunity Transportation Analysis 47 i Transportation Issues ii Transportation Guiding Principles iii Transportation Alternatives Benchmarking Summary 67 i Lessons from Benchmarking Trips ii Conclusions from Quantitative Benchmarking Recommended Projects 77 Introduction a Create a Sense of Place in Oakland b Make it Easier to Get Into and Around In Oakland c Stimulate Neighborhood Revitalization d Foster Technology Development Project Charts The Future of Oakland Acknowledgements Mayor Oakland Task Force Member Organizations Tom Murphy Carlow College Carnegie Mellon University Pittsburgh City Council Carnegie Museums of Pittsburgh Gene Ricciardi President Carnegie Library of Pittsburgh Barbara Burns Children's Hospital Twanda Carlisle City of Pittsburgh Jim Ferlo Magee Womens Hospital Alan Hertzberg Oakland Business Improvement District Jim Motznik Oakland Community Council Bob O'Connor Oakland Planning and Development Corporation Bill Peduto Oakland Transportation Management Sala Udin Association Phipps Conservatory and Botanical Gardens Pittsburgh Board of Public Education Pittsburgh Parks Conservancy Pittsburgh Playhouse of Point Park College Port Authority of Allegheny County Public -
National Register of Historic Places Registration Form
NPS Form 10-900 OMB No. 1024-0018 (Expires 5/31/2012) United States Department of the Interior National Park Service National Register of Historic Places Registration Form This form is for use in nominating or requesting determinations for individual properties and districts. See instructions in National Register Bulletin, How to Complete the National Register of Historic Places Registration Form. If any item does not apply to the property being documented, enter "N/A" for "not applicable." For functions, architectural classification, materials, and areas of significance, enter only categories and subcategories from the instructions. Place additional certification comments, entries, and narrative items on continuation sheets if needed (NPS Form 10-900a). 1. Name of Property historic name Fourth Avenue Historic District (Boundary Increase and Additional Documentation) other names/site number N/A 2. Location Roughly bounded by Smithfield Street, Third Avenue, Market Square N/A street & number Place, and Fifth Avenue. not for publication N/A city or town Pittsburgh City vicinity state Pennsylvania code PA county Allegheny code 003 zip code 15222 3. State/Federal Agency Certification As the designated authority under the National Historic Preservation Act, as amended, I hereby certify that this nomination _ request for determination of eligibility meets the documentation standards for registering properties in the National Register of Historic Places and meets the procedural and professional requirements set forth in 36 CFR Part 60. In my opinion, the property _ meets _ does not meet the National Register Criteria. I recommend that this property be considered significant at the following level(s) of significance: national statewide local Signature of certifying official/Title Date State or Federal agency/bureau or Tribal Government In my opinion, the property meets does not meet the National Register criteria. -
Leveraging Industrial Heritage in Waterfront Redevelopment
University of Pennsylvania ScholarlyCommons Theses (Historic Preservation) Graduate Program in Historic Preservation 2010 From Dockyard to Esplanade: Leveraging Industrial Heritage in Waterfront Redevelopment Jayne O. Spector University of Pennsylvania, [email protected] Follow this and additional works at: https://repository.upenn.edu/hp_theses Part of the Historic Preservation and Conservation Commons Spector, Jayne O., "From Dockyard to Esplanade: Leveraging Industrial Heritage in Waterfront Redevelopment" (2010). Theses (Historic Preservation). 150. https://repository.upenn.edu/hp_theses/150 Suggested Citation: Spector, Jayne O. (2010). "From Dockyard to Esplanade: Leveraging Industrial Heritage in Waterfront Redevelopment." (Masters Thesis). University of Pennsylvania, Philadelphia, PA. This paper is posted at ScholarlyCommons. https://repository.upenn.edu/hp_theses/150 For more information, please contact [email protected]. From Dockyard to Esplanade: Leveraging Industrial Heritage in Waterfront Redevelopment Abstract The outcomes of preserving and incorporating industrial building fabric and related infrastructure, such as railways, docks and cranes, in redeveloped waterfront sites have yet to be fully understood by planners, preservationists, public administrators or developers. Case studies of Pittsburgh, Baltimore, Philadelphia/ Camden, Dublin, Glasgow, examine the industrial history, redevelopment planning and approach to preservation and adaptive reuse in each locale. The effects of contested industrial histories,