Remote Desktop Redirected Printer
Total Page:16
File Type:pdf, Size:1020Kb
Date Opene Project Name Pay Unit Eng Est EE Unit Price Low Bid 2nd Low 3rd Low Minimum Average Maximum Low Bid % % % % All Bids All Bids All Bids D-701a [Type] Pipe, [Diam.] inch Linear Foot or Meter 2018 02 Kiana Airport Improvements 590 Linear Foot Bid as:D-701a-12-024 Galvanized Corrugated Steel Pipe(CSP), 12 Gauge, 24 inch 14,108,700.00 150.00 130.00 280.00 200.00 125.00 207.43 300.00 15,596,020.00 0.63% 0.49% 0.85% 0.61% 2018 02 Kiana Airport Improvements 410 Linear Foot Bid as:D-701a-12-036 Galvanized Corrugated Steel Pipe(CSP), 12 Gauge, 36 inch 14,108,700.00 300.00 165.00 310.00 240.00 165.00 266.14 400.00 15,596,020.00 0.87% 0.43% 0.65% 0.50% 2018 02 Kiana Airport Improvements 120 Linear Foot Bid as:D-701a-12-072 Galvanized Corrugated Steel Pipe(CSP), 12 Gauge, 72 inch 14,108,700.00 800.00 485.00 610.00 420.00 325.00 531.43 900.00 15,596,020.00 0.68% 0.37% 0.38% 0.26% 2016 06 Cold Bay Airport Improvements 2016 250 Linear Foot Bid as:D-701a CPP Smooth Interior Pipe, 24 inch 14,798,424.93 150.00 125.00 200.00 100.00 100.00 141.67 200.00 13,242,749.31 0.25% 0.24% 0.36% 0.16% 2015 05 Bethel Airport Apron Rehabilitation 217 Linear Foot Bid as:D-701a (Corrugated Steel) Pipe, (36) inch, (12) Gage 2,936,511.75 250.00 400.00 550.00 0.00 400.00 475.00 550.00 4,293,430.50 1.85% 2.02% 2.02% 0.00% 2013 09 Nome Airport Runway Safety Area Improvements/ Nome Apron 930 Linear Foot Improvements Bid as:D-701a-12-018 .n2_A Galvanized Corrugated Steel Pipe(CSP),12 Gauge, 18" 32,671,751.07 165.00 250.00 110.00 170.00 110.00 176.67 250.00 26,561,061.00 0.47% 0.88% 0.33% 0.36% D-751a Manholes Each 2015 07 Wrg - Airport Taxiway And Apron Overlay 1 Each Bid as:D-751e Adjust Existing Manhole 2,031,710.00 1,200.00 1,000.00 2,200.00 0.00 1,000.00 1,600.00 2,200.00 1,731,700.00 0.06% 0.06% 0.11% 0.00% F-162a (Height) Chain-Link Fence Linear Foot or Meter 2016 06 Cold Bay Airport Improvements 2016 1,400 Linear Foot Bid as:F-162a 8-foot Chain-Link Fence 14,798,424.93 50.00 34.00 45.00 38.00 34.00 39.00 45.00 13,242,749.31 0.47% 0.36% 0.45% 0.35% F-162d (Width) Single Cantilever Gate Each 2016 06 Cold Bay Airport Improvements 2016 2 Each Bid as:F-162d 27-foot Single Cantilever Gate 14,798,424.93 30,000.00 7,500.00 12,000.00 8,500.00 7,500.00 9,333.33 12,000.00 13,242,749.31 0.41% 0.11% 0.17% 0.11% F-162f (Width) Pedestrian Gate (w/Keyless Lock) Each 2016 06 Cold Bay Airport Improvements 2016 1 Each Bid as:F-162f 4-foot Pedestrian Gate (w/Keyless Lock) 14,798,424.93 2,000.00 3,800.00 1,500.00 2,000.00 1,500.00 2,433.33 3,800.00 13,242,749.31 0.01% 0.03% 0.01% 0.01% Airport Standards Alphabetically, Bids Tendered Since: Jan 2012 No PerspectivePrinted: 9/24/2018 INDEX No Conversion G-100a Date Opene Project Name Pay Unit Eng Est EE Unit Price Low Bid 2nd Low 3rd Low Minimum Average Maximum Low Bid % % % % All Bids All Bids All Bids G-100a Mobilization and Demobilization Lump Sum 2018 02 King Salmon Airport Main Runway Pavement Rehabilitation 1 Lump Sum 17,523,870.00 2,160,000.00 2,040,000.00 1,850,000.00 3,500,000.00 1,850,000.00 2,463,333.33 3,500,000.00 16,091,300.00 12.33% 12.68% 9.26% 17.16% 2018 02 Kiana Airport Improvements 1 Lump Sum 14,108,700.00 1,500,000.00 1,500,000.00 2,550,000.00 3,400,000.00 1,500,000.00 2,896,642.86 3,739,000.00 15,596,020.00 10.63% 9.62% 13.09% 17.44% 2016 06 Cold Bay Airport Improvements 2016 1 Lump Sum 14,798,424.93 1,110,000.00 2,580,000.00 100,000.00 3,300,000.00 100,000.00 1,993,333.33 3,300,000.00 13,242,749.31 7.50% 19.48% 0.72% 21.44% 2015 08 68386 Yakutat Airport Runway Pavement Rehabilitation 1 Lump Sum AIP No. 3-02-0327-20-2015 17,043,063.00 1,720,000.00 745,000.00 620,000.00 1,500,000.00 620,000.00 955,000.00 1,500,000.00 12,485,667.00 10.09% 5.97% 4.46% 10.23% 2015 08 Shishmaref Airport Resurfacing 1 LUMP SUM 6,093,706.00 600,000.00 1,050,000.00 1,000,000.00 3,870,000.00 1,000,000.00 1,973,333.33 3,870,000.00 5,927,494.50 9.85% 17.71% 12.66% 38.01% 2015 07 Wrg - Airport Taxiway And Apron Overlay 1 Lump Sum 2,031,710.00 203,000.00 120,000.00 260,000.00 0.00 120,000.00 190,000.00 260,000.00 1,731,700.00 9.99% 6.93% 12.76% 0.00% 2015 05 Bethel Airport Apron Rehabilitation 1 Lump Sum 2,936,511.75 400,000.00 495,000.00 1,000,000.00 0.00 495,000.00 747,500.00 1,000,000.00 4,293,430.50 13.62% 11.53% 16.96% 0.00% 2014 08 Psg - Airport Apron And Taxiway Pavement Rehabilitation 1 Lump Sum 3,712,825.00 350,000.00 325,000.00 150,000.00 322,700.00 150,000.00 265,900.00 325,000.00 2,987,200.00 9.43% 10.88% 4.84% 9.46% 2013 09 Nome Airport Runway Safety Area Improvements/ Nome Apron 1 Lump Sum Improvements 32,671,751.07 2,100,000.00 1,000,000.00 2,790,000.00 4,135,000.00 1,000,000.00 2,641,666.67 4,135,000.00 26,561,061.00 6.43% 3.76% 8.97% 9.43% G-115a Worker Meals and Lodging, or Per Diem Lump Sum 2018 02 King Salmon Airport Main Runway Pavement Rehabilitation 1 Lump Sum 17,523,870.00 560,000.00 600,000.00 425,000.00 1,000,000.00 425,000.00 675,000.00 1,000,000.00 16,091,300.00 3.20% 3.73% 2.13% 4.90% 2018 02 Kiana Airport Improvements 1 Lump Sum 14,108,700.00 700,000.00 800,000.00 750,000.00 1,050,000.00 750,000.00 1,607,571.43 3,550,000.00 15,596,020.00 4.96% 5.13% 3.85% 5.39% 2016 06 Cold Bay Airport Improvements 2016 1 Lump Sum 14,798,424.93 400,000.00 550,000.00 200,000.00 1,000,000.00 200,000.00 583,333.33 1,000,000.00 13,242,749.31 2.70% 4.15% 1.43% 6.50% 2015 08 68386 Yakutat Airport Runway Pavement Rehabilitation 1 Lump Sum AIP No. 3-02-0327-20-2015 17,043,063.00 450,000.00 300,000.00 200,000.00 400,000.00 200,000.00 300,000.00 400,000.00 12,485,667.00 2.64% 2.40% 1.44% 2.73% 2015 08 Shishmaref Airport Resurfacing 1 LUMP SUM 6,093,706.00 180,000.00 455,000.00 1,770,000.00 85,000.00 85,000.00 770,000.00 1,770,000.00 5,927,494.50 2.95% 7.68% 22.41% 0.83% 2015 07 Wrg - Airport Taxiway And Apron Overlay 1 Lump Sum 2,031,710.00 60,000.00 20,000.00 50,000.00 0.00 20,000.00 35,000.00 50,000.00 1,731,700.00 2.95% 1.15% 2.45% 0.00% 2015 05 Bethel Airport Apron Rehabilitation 1 Lump Sum 2,936,511.75 208,000.00 500,000.00 1,675,000.00 0.00 500,000.00 1,087,500.00 1,675,000.00 4,293,430.50 7.08% 11.65% 28.41% 0.00% Airport Standards Alphabetically, Bids Tendered Since: Jan 2012 No PerspectivePrinted: 9/24/2018 Page: 2 No Conversion G-115a Date Opene Project Name Pay Unit Eng Est EE Unit Price Low Bid 2nd Low 3rd Low Minimum Average Maximum Low Bid % % % % All Bids All Bids All Bids G-115a Worker Meals and Lodging, or Per Diem Lump Sum 2014 08 Psg - Airport Apron And Taxiway Pavement Rehabilitation 1 Lump Sum 3,712,825.00 130,000.00 75,000.00 55,000.00 70,500.00 55,000.00 66,833.33 75,000.00 2,987,200.00 3.50% 2.51% 1.78% 2.07% 2013 09 Nome Airport Runway Safety Area Improvements/ Nome Apron 1 Lump Sum Improvements 32,671,751.07 180,000.00 1,000,000.00 757,000.00 1,500,000.00 757,000.00 1,085,666.67 1,500,000.00 26,561,061.00 0.55% 3.76% 2.43% 3.42% G-130a Field Office Lump Sum 2018 02 King Salmon Airport Main Runway Pavement Rehabilitation 1 Lump Sum 17,523,870.00 42,000.00 40,000.00 91,000.00 50,000.00 40,000.00 60,333.33 91,000.00 16,091,300.00 0.24% 0.25% 0.46% 0.25% 2018 02 Kiana Airport Improvements 1 Lump Sum 14,108,700.00 40,000.00 70,000.00 40,000.00 80,000.00 40,000.00 80,142.86 125,000.00 15,596,020.00 0.28% 0.45% 0.21% 0.41% 2016 06 Cold Bay Airport Improvements 2016 1 Lump Sum 14,798,424.93 20,000.00 40,000.00 49,000.00 30,000.00 30,000.00 39,666.67 49,000.00 13,242,749.31 0.14% 0.30% 0.35% 0.19% 2015 08 Shishmaref Airport Resurfacing 1 LUMP SUM 6,093,706.00 25,000.00 25,000.00 23,000.00 25,000.00 23,000.00 24,333.33 25,000.00 5,927,494.50 0.41% 0.42% 0.29% 0.25% 2015 07 Wrg - Airport Taxiway And Apron Overlay 1 Lump Sum 2,031,710.00 19,000.00 20,000.00 20,000.00 0.00 20,000.00 20,000.00 20,000.00 1,731,700.00 0.94% 1.15% 0.98% 0.00% 2015 05 Bethel Airport Apron Rehabilitation 1 Lump Sum 2,936,511.75 10,000.00 15,000.00 29,000.00 0.00 15,000.00 22,000.00 29,000.00 4,293,430.50 0.34% 0.35% 0.49% 0.00% 2014 08 Psg - Airport Apron And Taxiway Pavement Rehabilitation 1 Lump Sum 3,712,825.00 30,000.00 20,000.00 10,000.00 12,850.00 10,000.00 14,283.33 20,000.00 2,987,200.00 0.81% 0.67% 0.32% 0.38% 2013 09 Nome Airport Runway Safety Area Improvements/ Nome Apron 1 Lump Sum Improvements 32,671,751.07 40,500.00 72,000.00 70,000.00 40,000.00 40,000.00 60,666.67 72,000.00 26,561,061.00 0.12% 0.27% 0.22% 0.09% G-130b Field Laboratory Lump Sum 2018 02 King Salmon Airport Main Runway Pavement Rehabilitation 1 Lump Sum 17,523,870.00 18,000.00 20,000.00 9,000.00 40,000.00 9,000.00 23,000.00 40,000.00 16,091,300.00 0.10% 0.12% 0.05% 0.20% 2018 02 Kiana Airport Improvements 1 Lump Sum 14,108,700.00 20,000.00 35,000.00 40,000.00 15,000.00 15,000.00 53,714.29 100,000.00 15,596,020.00 0.14% 0.22% 0.21% 0.08% 2016 06 Cold Bay Airport Improvements 2016 1 Lump Sum 14,798,424.93 15,000.00 30,000.00 30,000.00 5,000.00 5,000.00 21,666.67 30,000.00 13,242,749.31 0.10% 0.23% 0.22% 0.03% 2015 08 68386 Yakutat Airport Runway Pavement Rehabilitation 1 Lump Sum AIP No.