Remote Desktop Redirected Printer

Remote Desktop Redirected Printer

Date Opene Project Name Pay Unit Eng Est EE Unit Price Low Bid 2nd Low 3rd Low Minimum Average Maximum Low Bid % % % % All Bids All Bids All Bids D-701a [Type] Pipe, [Diam.] inch Linear Foot or Meter 2018 02 Kiana Airport Improvements 590 Linear Foot Bid as:D-701a-12-024 Galvanized Corrugated Steel Pipe(CSP), 12 Gauge, 24 inch 14,108,700.00 150.00 130.00 280.00 200.00 125.00 207.43 300.00 15,596,020.00 0.63% 0.49% 0.85% 0.61% 2018 02 Kiana Airport Improvements 410 Linear Foot Bid as:D-701a-12-036 Galvanized Corrugated Steel Pipe(CSP), 12 Gauge, 36 inch 14,108,700.00 300.00 165.00 310.00 240.00 165.00 266.14 400.00 15,596,020.00 0.87% 0.43% 0.65% 0.50% 2018 02 Kiana Airport Improvements 120 Linear Foot Bid as:D-701a-12-072 Galvanized Corrugated Steel Pipe(CSP), 12 Gauge, 72 inch 14,108,700.00 800.00 485.00 610.00 420.00 325.00 531.43 900.00 15,596,020.00 0.68% 0.37% 0.38% 0.26% 2016 06 Cold Bay Airport Improvements 2016 250 Linear Foot Bid as:D-701a CPP Smooth Interior Pipe, 24 inch 14,798,424.93 150.00 125.00 200.00 100.00 100.00 141.67 200.00 13,242,749.31 0.25% 0.24% 0.36% 0.16% 2015 05 Bethel Airport Apron Rehabilitation 217 Linear Foot Bid as:D-701a (Corrugated Steel) Pipe, (36) inch, (12) Gage 2,936,511.75 250.00 400.00 550.00 0.00 400.00 475.00 550.00 4,293,430.50 1.85% 2.02% 2.02% 0.00% 2013 09 Nome Airport Runway Safety Area Improvements/ Nome Apron 930 Linear Foot Improvements Bid as:D-701a-12-018 .n2_A Galvanized Corrugated Steel Pipe(CSP),12 Gauge, 18" 32,671,751.07 165.00 250.00 110.00 170.00 110.00 176.67 250.00 26,561,061.00 0.47% 0.88% 0.33% 0.36% D-751a Manholes Each 2015 07 Wrg - Airport Taxiway And Apron Overlay 1 Each Bid as:D-751e Adjust Existing Manhole 2,031,710.00 1,200.00 1,000.00 2,200.00 0.00 1,000.00 1,600.00 2,200.00 1,731,700.00 0.06% 0.06% 0.11% 0.00% F-162a (Height) Chain-Link Fence Linear Foot or Meter 2016 06 Cold Bay Airport Improvements 2016 1,400 Linear Foot Bid as:F-162a 8-foot Chain-Link Fence 14,798,424.93 50.00 34.00 45.00 38.00 34.00 39.00 45.00 13,242,749.31 0.47% 0.36% 0.45% 0.35% F-162d (Width) Single Cantilever Gate Each 2016 06 Cold Bay Airport Improvements 2016 2 Each Bid as:F-162d 27-foot Single Cantilever Gate 14,798,424.93 30,000.00 7,500.00 12,000.00 8,500.00 7,500.00 9,333.33 12,000.00 13,242,749.31 0.41% 0.11% 0.17% 0.11% F-162f (Width) Pedestrian Gate (w/Keyless Lock) Each 2016 06 Cold Bay Airport Improvements 2016 1 Each Bid as:F-162f 4-foot Pedestrian Gate (w/Keyless Lock) 14,798,424.93 2,000.00 3,800.00 1,500.00 2,000.00 1,500.00 2,433.33 3,800.00 13,242,749.31 0.01% 0.03% 0.01% 0.01% Airport Standards Alphabetically, Bids Tendered Since: Jan 2012 No PerspectivePrinted: 9/24/2018 INDEX No Conversion G-100a Date Opene Project Name Pay Unit Eng Est EE Unit Price Low Bid 2nd Low 3rd Low Minimum Average Maximum Low Bid % % % % All Bids All Bids All Bids G-100a Mobilization and Demobilization Lump Sum 2018 02 King Salmon Airport Main Runway Pavement Rehabilitation 1 Lump Sum 17,523,870.00 2,160,000.00 2,040,000.00 1,850,000.00 3,500,000.00 1,850,000.00 2,463,333.33 3,500,000.00 16,091,300.00 12.33% 12.68% 9.26% 17.16% 2018 02 Kiana Airport Improvements 1 Lump Sum 14,108,700.00 1,500,000.00 1,500,000.00 2,550,000.00 3,400,000.00 1,500,000.00 2,896,642.86 3,739,000.00 15,596,020.00 10.63% 9.62% 13.09% 17.44% 2016 06 Cold Bay Airport Improvements 2016 1 Lump Sum 14,798,424.93 1,110,000.00 2,580,000.00 100,000.00 3,300,000.00 100,000.00 1,993,333.33 3,300,000.00 13,242,749.31 7.50% 19.48% 0.72% 21.44% 2015 08 68386 Yakutat Airport Runway Pavement Rehabilitation 1 Lump Sum AIP No. 3-02-0327-20-2015 17,043,063.00 1,720,000.00 745,000.00 620,000.00 1,500,000.00 620,000.00 955,000.00 1,500,000.00 12,485,667.00 10.09% 5.97% 4.46% 10.23% 2015 08 Shishmaref Airport Resurfacing 1 LUMP SUM 6,093,706.00 600,000.00 1,050,000.00 1,000,000.00 3,870,000.00 1,000,000.00 1,973,333.33 3,870,000.00 5,927,494.50 9.85% 17.71% 12.66% 38.01% 2015 07 Wrg - Airport Taxiway And Apron Overlay 1 Lump Sum 2,031,710.00 203,000.00 120,000.00 260,000.00 0.00 120,000.00 190,000.00 260,000.00 1,731,700.00 9.99% 6.93% 12.76% 0.00% 2015 05 Bethel Airport Apron Rehabilitation 1 Lump Sum 2,936,511.75 400,000.00 495,000.00 1,000,000.00 0.00 495,000.00 747,500.00 1,000,000.00 4,293,430.50 13.62% 11.53% 16.96% 0.00% 2014 08 Psg - Airport Apron And Taxiway Pavement Rehabilitation 1 Lump Sum 3,712,825.00 350,000.00 325,000.00 150,000.00 322,700.00 150,000.00 265,900.00 325,000.00 2,987,200.00 9.43% 10.88% 4.84% 9.46% 2013 09 Nome Airport Runway Safety Area Improvements/ Nome Apron 1 Lump Sum Improvements 32,671,751.07 2,100,000.00 1,000,000.00 2,790,000.00 4,135,000.00 1,000,000.00 2,641,666.67 4,135,000.00 26,561,061.00 6.43% 3.76% 8.97% 9.43% G-115a Worker Meals and Lodging, or Per Diem Lump Sum 2018 02 King Salmon Airport Main Runway Pavement Rehabilitation 1 Lump Sum 17,523,870.00 560,000.00 600,000.00 425,000.00 1,000,000.00 425,000.00 675,000.00 1,000,000.00 16,091,300.00 3.20% 3.73% 2.13% 4.90% 2018 02 Kiana Airport Improvements 1 Lump Sum 14,108,700.00 700,000.00 800,000.00 750,000.00 1,050,000.00 750,000.00 1,607,571.43 3,550,000.00 15,596,020.00 4.96% 5.13% 3.85% 5.39% 2016 06 Cold Bay Airport Improvements 2016 1 Lump Sum 14,798,424.93 400,000.00 550,000.00 200,000.00 1,000,000.00 200,000.00 583,333.33 1,000,000.00 13,242,749.31 2.70% 4.15% 1.43% 6.50% 2015 08 68386 Yakutat Airport Runway Pavement Rehabilitation 1 Lump Sum AIP No. 3-02-0327-20-2015 17,043,063.00 450,000.00 300,000.00 200,000.00 400,000.00 200,000.00 300,000.00 400,000.00 12,485,667.00 2.64% 2.40% 1.44% 2.73% 2015 08 Shishmaref Airport Resurfacing 1 LUMP SUM 6,093,706.00 180,000.00 455,000.00 1,770,000.00 85,000.00 85,000.00 770,000.00 1,770,000.00 5,927,494.50 2.95% 7.68% 22.41% 0.83% 2015 07 Wrg - Airport Taxiway And Apron Overlay 1 Lump Sum 2,031,710.00 60,000.00 20,000.00 50,000.00 0.00 20,000.00 35,000.00 50,000.00 1,731,700.00 2.95% 1.15% 2.45% 0.00% 2015 05 Bethel Airport Apron Rehabilitation 1 Lump Sum 2,936,511.75 208,000.00 500,000.00 1,675,000.00 0.00 500,000.00 1,087,500.00 1,675,000.00 4,293,430.50 7.08% 11.65% 28.41% 0.00% Airport Standards Alphabetically, Bids Tendered Since: Jan 2012 No PerspectivePrinted: 9/24/2018 Page: 2 No Conversion G-115a Date Opene Project Name Pay Unit Eng Est EE Unit Price Low Bid 2nd Low 3rd Low Minimum Average Maximum Low Bid % % % % All Bids All Bids All Bids G-115a Worker Meals and Lodging, or Per Diem Lump Sum 2014 08 Psg - Airport Apron And Taxiway Pavement Rehabilitation 1 Lump Sum 3,712,825.00 130,000.00 75,000.00 55,000.00 70,500.00 55,000.00 66,833.33 75,000.00 2,987,200.00 3.50% 2.51% 1.78% 2.07% 2013 09 Nome Airport Runway Safety Area Improvements/ Nome Apron 1 Lump Sum Improvements 32,671,751.07 180,000.00 1,000,000.00 757,000.00 1,500,000.00 757,000.00 1,085,666.67 1,500,000.00 26,561,061.00 0.55% 3.76% 2.43% 3.42% G-130a Field Office Lump Sum 2018 02 King Salmon Airport Main Runway Pavement Rehabilitation 1 Lump Sum 17,523,870.00 42,000.00 40,000.00 91,000.00 50,000.00 40,000.00 60,333.33 91,000.00 16,091,300.00 0.24% 0.25% 0.46% 0.25% 2018 02 Kiana Airport Improvements 1 Lump Sum 14,108,700.00 40,000.00 70,000.00 40,000.00 80,000.00 40,000.00 80,142.86 125,000.00 15,596,020.00 0.28% 0.45% 0.21% 0.41% 2016 06 Cold Bay Airport Improvements 2016 1 Lump Sum 14,798,424.93 20,000.00 40,000.00 49,000.00 30,000.00 30,000.00 39,666.67 49,000.00 13,242,749.31 0.14% 0.30% 0.35% 0.19% 2015 08 Shishmaref Airport Resurfacing 1 LUMP SUM 6,093,706.00 25,000.00 25,000.00 23,000.00 25,000.00 23,000.00 24,333.33 25,000.00 5,927,494.50 0.41% 0.42% 0.29% 0.25% 2015 07 Wrg - Airport Taxiway And Apron Overlay 1 Lump Sum 2,031,710.00 19,000.00 20,000.00 20,000.00 0.00 20,000.00 20,000.00 20,000.00 1,731,700.00 0.94% 1.15% 0.98% 0.00% 2015 05 Bethel Airport Apron Rehabilitation 1 Lump Sum 2,936,511.75 10,000.00 15,000.00 29,000.00 0.00 15,000.00 22,000.00 29,000.00 4,293,430.50 0.34% 0.35% 0.49% 0.00% 2014 08 Psg - Airport Apron And Taxiway Pavement Rehabilitation 1 Lump Sum 3,712,825.00 30,000.00 20,000.00 10,000.00 12,850.00 10,000.00 14,283.33 20,000.00 2,987,200.00 0.81% 0.67% 0.32% 0.38% 2013 09 Nome Airport Runway Safety Area Improvements/ Nome Apron 1 Lump Sum Improvements 32,671,751.07 40,500.00 72,000.00 70,000.00 40,000.00 40,000.00 60,666.67 72,000.00 26,561,061.00 0.12% 0.27% 0.22% 0.09% G-130b Field Laboratory Lump Sum 2018 02 King Salmon Airport Main Runway Pavement Rehabilitation 1 Lump Sum 17,523,870.00 18,000.00 20,000.00 9,000.00 40,000.00 9,000.00 23,000.00 40,000.00 16,091,300.00 0.10% 0.12% 0.05% 0.20% 2018 02 Kiana Airport Improvements 1 Lump Sum 14,108,700.00 20,000.00 35,000.00 40,000.00 15,000.00 15,000.00 53,714.29 100,000.00 15,596,020.00 0.14% 0.22% 0.21% 0.08% 2016 06 Cold Bay Airport Improvements 2016 1 Lump Sum 14,798,424.93 15,000.00 30,000.00 30,000.00 5,000.00 5,000.00 21,666.67 30,000.00 13,242,749.31 0.10% 0.23% 0.22% 0.03% 2015 08 68386 Yakutat Airport Runway Pavement Rehabilitation 1 Lump Sum AIP No.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    21 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us