%S-% %S-% Page 1 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2013 L-132aPAPI .n2_A Lump 1 35,000.00 53,333.33 75,000.00 26,561,061 09 Safety Area Install Approach Sum 123,000.00 50,000.00 75,000.00 35,000.00 Improvements/ Nome Lighting Aids-PAPI 0.38% 0.19% 0.24% 0.08% Apron Improvements

(41524/61413/60558/4708) 3 Bids Tendered 2013 Nome Airport Runway L-132aPAPI .n2_A Each 4.0 8,750.00 13,333.33 18,750.00 26,561,061 09 Safety Area Install Approach (Alt) 30,750.00 12,500.00 18,750.00 8,750.00 Improvements/ Nome Lighting Aids-PAPI 0.38% 0.19% 0.24% 0.08% Apron Improvements (41524) 3 Bids Tendered 2013 Nome Airport Runway L-132aREIL .n2_A Lump 1 35,000.00 41,000.00 50,000.00 26,561,061 09 Safety Area Install Approach Sum 66,500.00 50,000.00 38,000.00 35,000.00 Improvements/ Nome Lighting Aids-REIL, 0.20% 0.19% 0.12% 0.08% Apron Improvements RW3

(41524/61413/60558/4708) 3 Bids Tendered 2013 Nome Airport Runway L-132aREIL .n2_A Each 2.0 17,500.00 20,500.00 25,000.00 26,561,061 09 Safety Area Install Approach (Alt) 33,250.00 25,000.00 19,000.00 17,500.00 Improvements/ Nome Lighting Aids-REIL, 0.20% 0.19% 0.12% 0.08% Apron Improvements RW3 (41524) 3 Bids Tendered 2013 Nome Airport Runway L-132bREIL .n2_A Each 2.0 5,000.00 5,833.33 7,500.00 26,561,061 09 Safety Area Remove Approach (Alt) 2,250.00 5,000.00 5,000.00 7,500.00 Improvements/ Nome Lighting Aids--REIL, 0.01% 0.04% 0.03% 0.03% Apron Improvements RW 3 (41524) 3 Bids Tendered 2013 Nome Airport Runway L-132bREIL .n2_A Lump 1 10,000.00 11,666.67 15,000.00 26,561,061 09 Safety Area Remove Approach Sum 4,500.00 10,000.00 10,000.00 15,000.00 Improvements/ Nome Lighting Aids--REIL, 0.01% 0.04% 0.03% 0.03% Apron Improvements RW 3

(41524/61413/60558/4709) 3 Bids Tendered 2013 Nome Airport Runway L-132bVASI .n2_A Lump 1 10,000.00 11,666.67 15,000.00 26,561,061 09 Safety Area Remove Approach Sum 5,000.00 10,000.00 10,000.00 15,000.00 Improvements/ Nome Lighting Aids-VASI, 0.02% 0.04% 0.03% 0.03% Apron Improvements RW 3

(41524/61413/60558/4709) 3 Bids Tendered %S-% %S-% Page 2 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2013 Nome Airport Runway L-132bVASI .n2_A Each 4.0 2,500.00 2,916.67 3,750.00 26,561,061 09 Safety Area Remove Approach (Alt) 1,250.00 2,500.00 2,500.00 3,750.00 Improvements/ Nome Lighting Aids-VASI, 0.02% 0.04% 0.03% 0.03% Apron Improvements RW 3 (41524) 3 Bids Tendered

2013 Nome Airport Runway P-602a .n2_A Ton 65 1.00 800.33 1,300.00 26,561,061 09 Safety Area Prime Coat, CSS-1 470.00 1.00 1,100.00 1,300.00 Improvements/ Nome 0.09% 0.00% 0.23% 0.19% Apron Improvements

(41524/61413/60558/4855) 3 Bids Tendered 2017 FAI Taxiway B P-602a-5 Ton 2 800.00 2,208.33 4,325.00 1,907,111 08 Reconstruction & Safety Prime Coat, CSS-1 900.00 4,325.00 800.00 1,500.00 Enhancements 0.10% 0.45% 0.08% 0.15% (47105//33) 3 Bids Tendered 2013 KTN Airport Taxiway and P-603a Ton 60 630.00 876.67 1,000.00 5,547,913 12 Apron Rehabilitation & Tack Coat CSS-1 1,000.00 1,000.00 1,000.00 630.00 FY14 Various Airports 1.00% 1.08% 1.07% 0.62% Surface Preservation Maintenance (41752/67946 & 68016/0) 3 Bids Tendered 2014 Psg - Airport Apron And P-603a Ton 15 1.00 942.00 1,825.00 2,987,200 08 Taxiway Pavement Tack Coat CSS-1 1,050.00 1,000.00 1.00 1,825.00 Rehabilitation 0.42% 0.50% 0.00% 0.80% (42866/68261/2648) 3 Bids Tendered 2015 68386 P-603a Ton 154 0.01 633.34 1,000.00 12,485,667 08 Runway Pavement Tack Coat CSS-1 or 1,050.00 900.00 1,000.00 0.01 Rehabilitation STE-1 0.95% 1.11% 1.11% 0.00% AIP No. 3-02-0327-20-2015 (44790/68386/2648) 3 Bids Tendered 2015 Wrg - Airport Taxiway And P-603a Ton 23 850.00 925.00 1,000.00 1,731,700 07 Apron Overlay Tack Coat CSS-1 or 1,050.00 1,000.00 850.00 0.00 (44671/68262/2648) STE-1 1.19% 1.33% 0.96% 0.00% 2 Bids Tendered 2018 Main P-603a Ton 98 0.01 666.67 1,200.00 16,091,300 02 Runway Pavement Tack Coat CSS-1 OR 970.00 800.00 0.01 1,200.00 Rehabilitation STE-1 0.54% 0.49% 0.00% 0.58% (46143/Z556850000/2648) 3 Bids Tendered 2013 Sitka Airport Runway P-603a Ton 73 1.00 717.00 1,100.00 10,877,345 01 Overlay Tack Coat, CSS-1 1,000.00 1,050.00 1,100.00 0.00 (38111/69652/4856) 0.67% 0.70% 0.70% 0.00% 3 Bids Tendered %S-% %S-% Page 3 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2010 Petersburg Airport- P-603a TON 92 800.00 812.33 820.00 9,285,879 01 Runway Safety Area TACK COAT, CSS-1 1,100.00 800.00 820.00 817.00 Improvements (Phase III) 0.87% 0.79% 0.64% 0.64% (26553/69360/0) 3 Bids Tendered 2009 S-142 Lump 1 550,000.00 805,833.33 1,200,000.00 11,250,000 05 Resurfacing Equipment Storage Sum 800,000.00 820,000.00 790,000.00 725,000.00 (20553/62650/0) Building 6.32% 7.29% 6.72% 5.91% 6 Bids Tendered 2010 S-142.n2 Lump 1 445,000.00 769,625.82 1,300,000.00 5,989,180 06 Improvements Equipment Storage Sum 750,000.00 600,000.00 445,000.00 800,000.00 (17512/62603/0) Building (heated) 8.64% 10.02% 7.24% 12.15% 11 Bids Tendered 2011 S-142a Lump 1 600,000.00 802,142.86 1,280,000.00 6,767,130 03 Relocation, Stage I V Equipment Storage Sum 900,000.00 770,000.00 750,000.00 1,280,000.00 (32334/62325 & Building 9.10% 11.38% 10.44% 17.25% 61823/4924) 7 Bids Tendered 2011 S-142p Lump 1 660,874.00 790,616.09 910,000.00 2,104,030 04 Relocation Stage II Equipment Storage Sum 1,060,000.00 704,000.00 744,074.70 823,980.00 (33230/52637/4930) Building 41.31% 33.46% 34.97% 36.63% 8 Bids Tendered 2009 Takotna Airport Relocation S-142p Lump 1 725,300.00 958,825.00 1,200,000.00 13,296,580 07 (23792/56774/4930) Equipment Storage Sum 700,000.00 945,000.00 725,300.00 965,000.00 4 Bids Tendered Building 4.66% 7.11% 5.28% 6.57% 2009 Runway S-142p Lump 1 650,000.00 826,800.00 940,000.00 5,448,815 02 Relocation Equipment Storage Sum 740,000.00 800,000.00 940,000.00 844,000.00 (19058/57775/4930) Building 9.15% 14.68% 14.11% 12.14% 5 Bids Tendered 2009 OUZINKIE AIRPORT S-142p Lump 1 600,000.00 820,011.11 1,100,000.00 9,708,914 05 RELOCATION Equipment Storage Sum 907,347.00 920,000.00 674,000.00 700,000.00 (22632/56957/4926) Building 4.82% 9.48% 6.21% 6.42% 9 Bids Tendered 2014 Koliganek Airport S-142p Lump 1 800,000.00 988,051.20 1,200,000.00 7,994,086 09 Reconstruction Equipment Storage Sum 1,177,000.00 900,000.00 800,000.00 1,040,256.00 (43353/59276/4930) Building 16.96% 11.26% 9.34% 10.68% 5 Bids Tendered 2015 Pilot Station Airport S-142p Lump 1 850,000.00 1,026,666.67 1,200,000.00 19,784,261 08 Relocation Equipment Storage Sum 1,378,261.00 860,000.00 1,000,000.00 1,200,000.00 (44341/62581/0) Building 9.08% 4.35% 5.00% 5.54% 6 Bids Tendered 2017 Runway Shift S-142p LUMP 1 600,000.00 1,143,750.00 2,000,000.00 38,969,351 09 (47424//0) EQUIPMENT SUM 1,270,000.00 940,000.00 600,000.00 2,000,000.00 4 Bids Tendered STORAGE BUILDING 2.71% 2.41% 1.51% 4.88% 2016 S-142p Lump 1 60,000.00 138,500.00 400,000.00 8,839,335 09 Improvements (43457//0) Equipment Storage Sum 100,000.00 60,000.00 80,000.00 150,000.00 6 Bids Tendered Building, Upgrades 0.84% 0.68% 0.67% 1.13% %S-% %S-% Page 4 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2016 St. Michael Airport S-142p Lump 1 350,500.00 453,514.29 530,000.00 9,827,510 09 Rehabilitation Equipment Storage Sum 370,528.00 470,000.00 480,000.00 500,000.00 (45817/62652/0) Building, Upgrades 3.68% 4.78% 4.87% 5.05% 7 Bids Tendered

2015 S-142p Lump 1 1,175,000.00 1,408,250.00 1,975,000.00 25,767,875 08 Improvements Equipment Storage Sum 1,968,950.00 1,175,000.00 1,200,000.00 1,283,000.00 (44980/57419/4930) Buildings 7.40% 4.56% 4.31% 4.43% 4 Bids Tendered 2011 ANC Runway 7R/25L S-142p Lump 1 20,000.00 63,750.00 183,000.00 32,191,812 02 Rehabilitation Phase NDB Building Sum 30,000.00 20,000.00 183,000.00 20,000.00 II/ANC Runway 7R/25L 0.07% 0.06% 0.50% 0.05% Extension (33092/52405 53201/5207) 4 Bids Tendered 2010 Relocation - S-142p(1) Lump 1 525,000.00 642,400.00 720,000.00 13,477,354 06 Phase II Equipment Storage Sum 670,000.00 625,000.00 717,000.00 625,000.00 (28834/57796/5207) Building No. 1 3.77% 4.64% 4.60% 3.70% 5 Bids Tendered 2009 Tuluksak Airport (24079) S-142p(1) Each 1.0 636,000.00 714,333.33 800,000.00 17,533,365 07 6 Bids Tendered Equipment Storage (Alt) 640,900.00 725,000.00 725,000.00 636,000.00 Building No. 1 4.10% 4.13% 3.97% 3.37% (Heated) 2009 Tuluksak Airport S-142p(1) Lump 1 636,000.00 714,333.33 800,000.00 17,533,365 07 (24079/51795/0) Equipment Storage Sum 640,900.00 725,000.00 725,000.00 636,000.00 6 Bids Tendered Building No. 1 4.10% 4.13% 3.97% 3.37% (Heated) 2009 S-142p(1) Lump 1 715,000.00 793,000.00 860,000.00 18,744,897 05 Relocation Equipment Storage Sum 665,000.00 860,000.00 765,000.00 800,000.00 (22592/59011/4930) Building No. 1, Heated 3.75% 4.59% 3.68% 3.66% 5 Bids Tendered 2010 Chefornak Airport S-142p(1) Lump 1 575,000.00 660,593.75 800,000.00 17,443,650 09 Relocation - Stage ii Equipment Storage Sum 825,000.00 594,000.00 575,000.00 760,000.00 (30873/57281/4930) Building No.1 (Heated) 3.77% 3.41% 3.28% 4.02% 8 Bids Tendered 2012 Tununak Airport S-142p(1) Lump 1 575,000.00 682,400.00 875,000.00 19,963,988 09 Relocation Equipment Storage Sum 797,636.00 650,000.00 625,000.00 687,000.00 (38596/51791/4930) Building, Heated 3.55% 3.26% 2.99% 3.17% 5 Bids Tendered 2010 Kipnuk Airport Relocation - S-142p(2) Lump 1 550,000.00 671,400.00 800,000.00 13,477,354 06 Phase II Equipment Storage Sum 640,000.00 650,000.00 707,000.00 650,000.00 (28834/57796/5208) Building No. 2 3.60% 4.82% 4.54% 3.85% 5 Bids Tendered 2009 Tuluksak Airport (24079) S-142p(2) Each 1.0 465,000.00 635,000.00 760,000.00 17,533,365 07 6 Bids Tendered Equipment Storage (Alt) 603,200.00 680,000.00 630,000.00 465,000.00 Building No. 2 3.85% 3.88% 3.45% 2.46% (Unheated) 2009 Tuluksak Airport S-142p(2) Lump 1 465,000.00 635,000.00 760,000.00 17,533,365 07 (24079/51795/0) Equipment Storage Sum 603,200.00 680,000.00 630,000.00 465,000.00 6 Bids Tendered Building No. 2 3.85% 3.88% 3.45% 2.46% (Unheated) %S-% %S-% Page 5 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2009 Akiachak Airport S-142p(2) Lump 1 655,000.00 710,000.00 750,000.00 18,744,897 05 Relocation Equipment Storage Sum 625,000.00 670,000.00 725,000.00 750,000.00 (22592/59011/4930) Building No. 2, 3.53% 3.57% 3.49% 3.43% 5 Bids Tendered Unheated 2010 Chefornak Airport S-142p(2) Lump 1 490,000.00 584,765.63 720,000.00 17,443,650 09 Relocation - Stage ii Equipment Storage Sum 725,000.00 564,000.00 545,000.00 720,000.00 (30873/57281/4930) Building No.2 3.31% 3.23% 3.11% 3.81% 8 Bids Tendered (Unheated) 2012 Tununak Airport S-142p(2) Lump 1 550,000.00 602,000.00 700,000.00 19,963,988 09 Relocation Equipment Storage Sum 709,525.00 550,000.00 590,000.00 620,000.00 (38596/51791/4930) Building, Unheated 3.15% 2.75% 2.82% 2.86% 5 Bids Tendered 2016 Golovin Airport S-142q Each 1 20,000.00 24,500.00 30,000.00 8,839,335 09 Improvements (43457//0) Door, Overhead 4,000.00 20,000.00 30,000.00 20,000.00 6 Bids Tendered 0.03% 0.23% 0.25% 0.15% 2014 A R F F S-142r Lump 1.0 2,733,869.00 2,996,394.00 3,258,919.00 2,733,869 09 Bay Addition With Sand Building Foundation Sum 2,507,072.00 2,733,869.00 3,258,919.00 0.00 Storage, Stage I Pad (Alt) 100.00% 100.00% 100.00% 0.00% Foundation Package (43290) 2 Bids Tendered 2014 Deadhorse Airport A R F F S-142r Lump 1 2,733,869.00 2,996,394.00 3,258,919.00 2,733,869 09 Bay Addition With Sand Building Foundation Sum 2,507,072.00 2,733,869.00 3,258,919.00 0.00 Storage, Stage I Pad 100.00% 100.00% 100.00% 0.00% Foundation Package (43290/61447/0) 2 Bids Tendered 2011 Alakanuk Airport S-143a Each 1 20,000.00 47,857.14 77,000.00 6,767,130 03 Relocation, Stage I V Fuel Tank (3000 30,000.00 58,000.00 50,000.00 77,000.00 (32334/62325 & Gallon) 0.30% 0.86% 0.70% 1.04% 61823/4931) 7 Bids Tendered 2009 Tuluksak Airport S-143a Each 1 15,000.00 19,750.00 23,500.00 17,533,365 07 (24079/51795/0) Heating Fuel Tank 20,000.00 22,000.00 23,500.00 17,000.00 6 Bids Tendered (1,000 Gallon) 0.13% 0.13% 0.13% 0.09% 2009 Akiachak Airport S-143a Each 1 15,000.00 19,920.00 22,600.00 18,744,897 05 Relocation Heating Fuel Tank 20,000.00 20,000.00 22,000.00 22,600.00 (22592/59011/4931) (1,000 gallons) 0.11% 0.11% 0.11% 0.10% 5 Bids Tendered 2010 Chefornak Airport S-143a Each 1 14,000.00 17,685.00 24,000.00 17,443,650 09 Relocation - Stage ii Heating Fuel Tank 21,300.00 17,000.00 16,800.00 24,000.00 (30873/57281/4931) (1,000 Gallons) 0.10% 0.10% 0.10% 0.13% 8 Bids Tendered 2009 Platinum Airport Runway S-143a Each 1 15,000.00 22,905.00 40,000.00 5,448,815 02 Relocation Heating Fuel Tank 20,000.00 15,000.00 21,000.00 18,525.00 (19058/57775/4931) (1000 gal) 0.25% 0.28% 0.32% 0.27% 5 Bids Tendered %S-% %S-% Page 6 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2011 Ouzinkie Airport S-143a Each 1 14,035.00 21,060.60 33,000.00 2,104,030 04 Relocation Stage II Heating Fuel Tank 21,000.00 23,000.00 18,122.80 14,035.00 (33230/52637/4931) (1000 Gallon) 0.82% 1.09% 0.85% 0.62% 8 Bids Tendered

2009 Takotna Airport Relocation S-143a Each 1 18,200.00 24,775.00 31,000.00 13,296,580 07 (23792/56774/4931) Heating Fuel Tank 21,000.00 25,900.00 18,200.00 24,000.00 4 Bids Tendered (1000 gallons) 0.14% 0.19% 0.13% 0.16% 2009 OUZINKIE AIRPORT S-143a Each 1 12,500.00 19,434.56 35,000.00 9,708,914 05 RELOCATION Heating Fuel Tank 15,000.00 22,000.00 20,000.00 15,000.00 (22632/56957/4931) (1000 Gallons) 0.08% 0.23% 0.18% 0.14% 9 Bids Tendered 2015 Hooper Bay Airport S-143a Each 1 16,800.00 25,450.00 30,000.00 25,767,875 08 Improvements Heating Fuel Tank 20,000.00 30,000.00 28,000.00 27,000.00 (44980/57419/4931) (1000 Gallons) 0.08% 0.12% 0.10% 0.09% 4 Bids Tendered 2009 Fort Yukon Airport S-143a Each 1 6,000.00 25,833.33 35,000.00 11,250,000 05 Resurfacing Heating Fuel Tank 40,000.00 30,000.00 23,000.00 31,000.00 (20553/62650/0) (3,000 gallon) 0.32% 0.27% 0.20% 0.25% 6 Bids Tendered 2010 Kipnuk Airport Relocation - S-143a Each 1 12,000.00 20,900.00 50,000.00 13,477,354 06 Phase II Heating Fuel Tank (500 20,000.00 12,500.00 50,000.00 15,000.00 (28834/57796/4931) gallons) 0.11% 0.09% 0.32% 0.09% 5 Bids Tendered 2012 Tununak Airport S-143a Each 1 10,000.00 17,300.00 20,000.00 19,963,988 09 Relocation Heating Fuel Tank, 25,000.00 10,000.00 20,000.00 20,000.00 (38596/51791/4931) 1,000 Gallons 0.11% 0.05% 0.10% 0.09% 5 Bids Tendered 2010 Nulato Airport S-143a.n2 Each 1 15,000.00 37,318.18 84,000.00 5,989,180 06 Improvements Heating Fuel Tank 25,000.00 51,500.00 26,000.00 35,000.00 (17512/62603/141) (3000 Gallons) 0.29% 0.86% 0.42% 0.53% 11 Bids Tendered 2011 Ouzinkie Airport S-143b Lump 1 10,000.00 15,707.73 37,463.80 2,104,030 04 Relocation Stage II Fuel Sum 12,000.00 12,000.00 37,463.80 16,260.00 (33230/52637/4932) 0.47% 0.57% 1.76% 0.72% 8 Bids Tendered 2009 Platinum Airport Runway S-143b Lump 1 5,000.00 8,280.00 14,000.00 5,448,815 02 Relocation Fuel Sum 14,000.00 12,000.00 5,000.00 5,400.00 (19058/57775/4932) 0.17% 0.22% 0.08% 0.08% 5 Bids Tendered 2009 Akiachak Airport S-143b Lump 1 5,000.00 7,740.00 12,000.00 18,744,897 05 Relocation Fuel Sum 10,000.00 5,500.00 11,000.00 5,200.00 (22592/59011/4932) 0.06% 0.03% 0.05% 0.02% 5 Bids Tendered 2011 S-143b Lump 1 3,000.00 11,333.33 27,000.00 22,758,321 06 Improvements, 2011 Fuel Sum 3,000.00 27,000.00 3,000.00 4,000.00 (33348/52739/4932) 0.01% 0.12% 0.01% 0.01% 3 Bids Tendered %S-% %S-% Page 7 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2011 Alakanuk Airport S-143b Lump 1 5,000.00 18,142.86 25,000.00 6,767,130 03 Relocation, Stage I V Fuel Sum 18,000.00 21,000.00 18,000.00 25,000.00 (32334/62325 & 0.18% 0.31% 0.25% 0.34% 61823/4932) 7 Bids Tendered

2012 Tununak Airport S-143b Lump 1 7,000.00 9,760.00 16,300.00 19,963,988 09 Relocation Fuel Sum 10,000.00 10,000.00 8,000.00 7,500.00 (38596/51791/4932) 0.04% 0.05% 0.04% 0.03% 5 Bids Tendered 2010 Chefornak Airport S-143b Lump 1 4,200.00 8,591.25 19,000.00 17,443,650 09 Relocation - Stage ii Fuel Sum 12,000.00 5,000.00 8,000.00 5,000.00 (30873/57281/4932) 0.05% 0.03% 0.05% 0.03% 8 Bids Tendered 2009 Tuluksak Airport S-143b Lump 1 10,000.00 16,716.67 28,200.00 17,533,365 07 (24079/51795/0) Fuel Sum 15,000.00 10,000.00 28,200.00 15,000.00 6 Bids Tendered 0.10% 0.06% 0.15% 0.08% 2009 OUZINKIE AIRPORT S-143b Lump 1 0.00 7,077.78 12,000.00 9,708,914 05 RELOCATION Fuel Sum 10,000.00 5,500.00 7,700.00 4,000.00 (22632/56957/4932) 0.05% 0.06% 0.07% 0.04% 9 Bids Tendered 2014 Koliganek Airport S-143b Lump 1 12,000.00 22,483.46 32,417.28 7,994,086 09 Reconstruction Fuel Sum 24,500.00 25,000.00 12,000.00 32,417.28 (43353/59276/4932) 0.35% 0.31% 0.14% 0.33% 5 Bids Tendered 2010 Kipnuk Airport Relocation - S-143b Lump 1 3,000.00 5,640.00 10,000.00 13,477,354 06 Phase II Fuel Sum 6,000.00 3,000.00 5,200.00 10,000.00 (28834/57796/4932) 0.03% 0.02% 0.03% 0.06% 5 Bids Tendered 2015 Hooper Bay Airport S-143b Lump 1 6,500.00 13,725.00 25,000.00 25,767,875 08 Improvements Fuel (1800 Gallons) Sum 12,600.00 25,000.00 6,500.00 9,000.00 (44980/57419/4932) 0.05% 0.10% 0.02% 0.03% 4 Bids Tendered 2009 Fort Yukon Airport S-143b Lump 1 12,000.00 18,333.33 25,000.00 11,250,000 05 Resurfacing Fuel (3,000 gallons) Sum 30,000.00 13,000.00 23,000.00 15,000.00 (20553/62650/0) 0.24% 0.12% 0.20% 0.12% 6 Bids Tendered 2011 Ouzinkie Airport S-143c Each 1 500.00 3,926.43 10,000.00 2,104,030 04 Relocation Stage II Manual Dispensing 3,000.00 5,000.00 587.90 4,742.50 (33230/52637/4933) System 0.12% 0.24% 0.03% 0.21% 8 Bids Tendered 2009 OUZINKIE AIRPORT S-143c Each 1 1,000.00 2,807.78 7,300.00 9,708,914 05 RELOCATION Manual Dispensing 2,000.00 6,500.00 1,500.00 1,000.00 (22632/56957/4933) System 0.01% 0.07% 0.01% 0.01% 9 Bids Tendered 2010 Chefornak Airport S-143c Each 1 400.00 1,677.50 3,500.00 17,443,650 09 Relocation - Stage ii Manual Dispensing 4,400.00 400.00 400.00 2,200.00 (30873/57281/4933) System 0.02% 0.00% 0.00% 0.01% 8 Bids Tendered %S-% %S-% Page 8 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2010 Kipnuk Airport Relocation - S-143c Each 1 2,000.00 3,940.00 10,000.00 13,477,354 06 Phase II Manual Dispensing 1,500.00 2,200.00 10,000.00 2,000.00 (28834/57796/4933) System 0.01% 0.02% 0.06% 0.01% 5 Bids Tendered 2009 Platinum Airport Runway S-143c Each 1 500.00 7,000.00 30,000.00 5,448,815 02 Relocation Manual Dispensing 5,000.00 2,500.00 1,000.00 500.00 (19058/57775/4933) System 0.06% 0.05% 0.02% 0.01% 5 Bids Tendered 2009 Tuluksak Airport S-143c Each 1 2,000.00 3,516.67 8,200.00 17,533,365 07 (24079/51795/0) Manual Fuel 5,000.00 2,500.00 8,200.00 3,000.00 6 Bids Tendered Dispensing System 0.03% 0.01% 0.04% 0.02% 2009 Takotna Airport Relocation S-143d Each 1 5,000.00 8,575.00 12,000.00 13,296,580 07 (23792/56774/4934) Electric Dispensing 15,000.00 5,000.00 7,800.00 9,500.00 4 Bids Tendered System 0.10% 0.04% 0.06% 0.06% 2012 Tununak Airport S-143d Each 1 5,300.00 11,400.00 20,000.00 19,963,988 09 Relocation Electric Dispensing 10,000.00 20,000.00 5,500.00 11,200.00 (38596/51791/4934) System 0.04% 0.10% 0.03% 0.05% 5 Bids Tendered 2015 Hooper Bay Airport S-143d Each 1 3,350.00 7,587.50 17,000.00 25,767,875 08 Improvements Electric Dispensing 15,000.00 17,000.00 5,000.00 5,000.00 (44980/57419/4934) System 0.06% 0.07% 0.02% 0.02% 4 Bids Tendered 2009 Akiachak Airport S-143d Each 1 3,500.00 6,760.00 9,300.00 18,744,897 05 Relocation Electric Dispensing 15,000.00 3,500.00 9,000.00 9,300.00 (22592/59011/4934) System 0.08% 0.02% 0.04% 0.04% 5 Bids Tendered 2010 Chefornak Airport S-143e Each 1 11,710.00 19,238.75 29,000.00 17,443,650 09 Relocation - Stage ii Motor Vehicle Fuel 20,000.00 18,000.00 18,200.00 29,000.00 (30873/57281/4935) Dispensing Tank 0.09% 0.10% 0.10% 0.15% 8 Bids Tendered (1,000 Gallons) 2009 Tuluksak Airport S-143e Each 1 27,000.00 34,333.33 47,000.00 17,533,365 07 (24079/51795/0) Motor Vehicle Fuel 30,000.00 31,000.00 47,000.00 27,000.00 6 Bids Tendered Dispensing Tank 0.19% 0.18% 0.26% 0.14% (2,000 Gallon) 2009 Akiachak Airport S-143e Each 1 15,000.00 21,800.00 26,000.00 18,744,897 05 Relocation Motor Vehicle 20,000.00 20,000.00 25,000.00 26,000.00 (22592/59011/4935) Fuel-dispensing Tank 0.11% 0.11% 0.12% 0.12% 5 Bids Tendered (1,000 gallons) 2009 Takotna Airport Relocation S-143e Each 1 20,500.00 30,125.00 40,000.00 13,296,580 07 (23792/56774/4935) Motor Vehicle 25,000.00 33,000.00 20,500.00 27,000.00 4 Bids Tendered Fuel-dispensing Tank 0.17% 0.25% 0.15% 0.18% (1,000 gallons) 2009 Platinum Airport Runway S-143e Each 1 15,000.00 27,100.00 40,000.00 5,448,815 02 Relocation Motor Vehicle 22,000.00 15,000.00 29,000.00 29,500.00 (19058/57775/4935) Fuel-dispensing Tank 0.27% 0.28% 0.44% 0.42% 5 Bids Tendered (1000 gal) 2011 Ouzinkie Airport S-143e Each 1 23,000.00 26,797.15 30,375.00 2,104,030 04 Relocation Stage II Motor Vehicle 22,000.00 30,000.00 29,591.20 30,375.00 (33230/52637/4935) Fuel-dispensing Tank 0.86% 1.43% 1.39% 1.35% 8 Bids Tendered (1000 Gallon) %S-% %S-% Page 9 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2009 OUZINKIE AIRPORT S-143e Each 1 2,246.00 20,360.67 32,000.00 9,708,914 05 RELOCATION Motor Vehicle 14,000.00 30,000.00 19,000.00 21,000.00 (22632/56957/4935) Fuel-dispensing Tank 0.07% 0.31% 0.17% 0.19% 9 Bids Tendered (1000 Gallons) 2015 Hooper Bay Airport S-143e Each 1 20,000.00 23,200.00 29,800.00 25,767,875 08 Improvements Motor Vehicle 25,000.00 20,000.00 22,000.00 21,000.00 (44980/57419/4935) Fuel-dispensing Tank 0.09% 0.08% 0.08% 0.07% 4 Bids Tendered (1000 Gallons) 2010 Kipnuk Airport Relocation - S-143e Each 1 15,000.00 16,800.00 20,500.00 13,477,354 06 Phase II Motor Vehicle 20,000.00 15,500.00 20,500.00 15,000.00 (28834/57796/4935) Fuel-dispensing Tank 0.11% 0.12% 0.13% 0.09% 5 Bids Tendered (500 gallons) 2012 Tununak Airport S-143e Each 1 18,000.00 20,260.00 25,000.00 19,963,988 09 Relocation Motor Vehicle 25,000.00 25,000.00 20,000.00 20,000.00 (38596/51791/4935) Fuel-Dispensing Tank, 0.11% 0.13% 0.10% 0.09% 5 Bids Tendered 1,000 Gallons 2010 Nulato Airport S-143e.n2 Each 1 15,000.00 44,776.36 89,040.00 5,989,180 06 Improvements Motor Vehicle 25,000.00 57,000.00 45,000.00 20,000.00 (17512/62603/141) Fuel-dispensing Tank 0.29% 0.95% 0.73% 0.30% 11 Bids Tendered (3000 Gallon) 2010 Chefornak Airport S-143f Lump 1 1,000.00 5,685.63 11,385.00 17,443,650 09 Relocation - Stage ii "Spill Prevention Sum 5,000.00 3,000.00 1,000.00 5,500.00 (30873/57281/4936) Control and 0.02% 0.02% 0.01% 0.03% 8 Bids Tendered Countermeasure Plan" 2011 Ouzinkie Airport S-143f Lump 1 2,323.00 6,182.80 16,260.00 2,104,030 04 Relocation Stage II Spill Prevention Sum 5,400.00 6,000.00 5,879.40 16,260.00 (33230/52637/4936) Control and 0.21% 0.29% 0.28% 0.72% 8 Bids Tendered Countermeasure Plan 2009 Tuluksak Airport S-143f Lump 1 5,000.00 7,983.33 10,000.00 17,533,365 07 (24079/51795/0) Spill Prevention Sum 10,000.00 10,000.00 7,600.00 9,000.00 6 Bids Tendered Control and 0.06% 0.06% 0.04% 0.05% Countermeasure Plan 2011 Kodiak Airport S-143f Lump 1 5,000.00 6,666.67 10,000.00 22,758,321 06 Improvements, 2011 Spill Prevention Sum 5,000.00 5,000.00 5,000.00 10,000.00 (33348/52739/4936) Control and 0.02% 0.02% 0.02% 0.04% 3 Bids Tendered Countermeasure Plan 2009 Takotna Airport Relocation S-143f Lump 1 4,000.00 7,500.00 11,000.00 13,296,580 07 (23792/56774/4936) Spill Prevention Sum 7,500.00 7,500.00 7,500.00 11,000.00 4 Bids Tendered Control and 0.05% 0.06% 0.05% 0.07% Countermeasure Plan 2010 Kipnuk Airport Relocation - S-143f Lump 1 1,000.00 5,500.00 11,000.00 13,477,354 06 Phase II Spill Prevention Sum 5,000.00 11,000.00 3,000.00 10,000.00 (28834/57796/4936) Control and 0.03% 0.08% 0.02% 0.06% 5 Bids Tendered Countermeasure Plan 2014 Koliganek Airport S-143f Lump 1 4,233.60 9,246.72 15,000.00 7,994,086 09 Reconstruction Spill Prevention Sum 8,000.00 15,000.00 10,000.00 4,233.60 (43353/59276/4936) Control and 0.12% 0.19% 0.12% 0.04% 5 Bids Tendered Countermeasure Plan %S-% %S-% Page 10 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2009 Akiachak Airport S-143f Lump 1 4,000.00 7,100.00 10,000.00 18,744,897 05 Relocation Spill Prevention Sum 5,000.00 4,000.00 10,000.00 7,500.00 (22592/59011/4936) Control and 0.03% 0.02% 0.05% 0.03% 5 Bids Tendered Countermeasure Plan 2009 OUZINKIE AIRPORT S-143f Lump 1 2,246.00 4,827.33 7,500.00 9,708,914 05 RELOCATION Spill Prevention Sum 5,000.00 7,000.00 5,000.00 5,000.00 (22632/56957/4936) Control and 0.03% 0.07% 0.05% 0.05% 9 Bids Tendered Countermeasure Plan 2009 Platinum Airport Runway S-143f Lump 1 5,000.00 12,360.00 30,000.00 5,448,815 02 Relocation Spill Prevention Sum 5,000.00 5,000.00 11,000.00 5,800.00 (19058/57775/4936) Control and 0.06% 0.09% 0.17% 0.08% 5 Bids Tendered Countermeasure Plan 2015 Hooper Bay Airport S-143f Lump 1 5,880.00 9,470.00 12,000.00 25,767,875 08 Improvements Spill Prevention Sum 8,000.00 10,000.00 12,000.00 10,000.00 (44980/57419/4936) Control and 0.03% 0.04% 0.04% 0.03% 4 Bids Tendered Countermeasure Plan 2012 Tununak Airport S-143f Lump 1 5,000.00 12,200.00 28,000.00 19,963,988 09 Relocation Spill Prevention Sum 7,500.00 5,000.00 11,000.00 8,000.00 (38596/51791/4936) Control and 0.03% 0.03% 0.05% 0.04% 5 Bids Tendered Countermeasure Plan 2018 Anc Miscellaneous S-143h Each 3 6,128.67 14,414.34 22,700.00 890,550 08 Repairs - Fleet Fueling Fuel Tank Turbine 15,000.00 22,700.00 6,128.67 0.00 Facility and Outlet Control Sump & Cover 7.65% 7.65% 1.87% 0.00% Structure (48503//5365) 2 Bids Tendered 2018 Anc Miscellaneous S-143i Each 12 790.42 1,045.21 1,300.00 890,550 08 Repairs - Fleet Fueling Fuel Tank 600.00 1,300.00 790.42 0.00 Facility and Outlet Control Appurtenance Cover 1.22% 1.75% 0.96% 0.00% Structure (48503//5365) 2 Bids Tendered 2018 Anc Miscellaneous S-143j Linear 450 51.67 115.84 180.00 890,550 08 Repairs - Fleet Fueling Dispenser Fuel Piping Foot 110.00 180.00 51.67 0.00 Facility and Outlet Control 8.42% 9.10% 2.36% 0.00% Structure (48503//0) 2 Bids Tendered 2010 Fairbanks International S-145 Lump 1 1,276,800.00 1,418,316.33 1,689,000.00 1,337,149 03 Airport A R F F Building ARFF Building Reroof Sum 1,500,000.00 1,289,149.00 1,276,800.00 1,689,000.00 Reroof (26313/63137/0) 97.72% 96.41% 95.31% 96.57% 3 Bids Tendered 2012 Tununak Airport S-145a Lump 1 3,000.00 2,145,600.00 4,000,000.00 19,963,988 09 Relocation Bridge Sum 2,113,276.00 4,000,000.00 3,000.00 1,850,000.00 (38596/51791/0) 9.39% 20.04% 0.01% 8.54% 5 Bids Tendered 2010 Fairbanks International S-146 Each 10,000 0.77 0.87 1.00 1,337,149 03 Airport A R F F Building Deck Fastener 2.00 0.77 0.83 1.00 Reroof (26313/63137/0) 1.30% 0.58% 0.62% 0.57% 3 Bids Tendered %S-% %S-% Page 11 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2010 Fairbanks International S-147 Each 10,000 4.03 4.83 5.45 1,337,149 03 Airport A R F F Building Deck Seam Splice 1.50 4.03 5.45 5.00 Reroof (26313/63137/0) 0.98% 3.01% 4.07% 2.86% 3 Bids Tendered

2017 S-150a Lump 1 70,000.00 168,998.10 277,000.00 2,947,832 03 Lake Hood Lakeshore Cofferdam Sum 30,000.00 148,000.00 135,000.00 77,980.98 Taxilane Reconstruction 0.82% 5.02% 4.50% 2.59% (46714//4938) 10 Bids Tendered 2017 Lake Hood Seaplane Base S-150b Each 60 1,200.00 1,707.52 3,500.00 2,947,832 03 Lake Hood Lakeshore Float Plane Ramp 1,150.00 1,300.00 1,450.00 1,358.17 Taxilane Reconstruction Plank 1.88% 2.65% 2.90% 2.70% (46714//0) 10 Bids Tendered 2016 Homer Beluga Float Plane S-150b Lump 1 50,000.00 89,285.71 150,000.00 1,754,971 09 Facilities Improvements Floating Dock System Sum 50,000.00 90,000.00 105,000.00 70,000.00 (46154//0) and Gangway 2.14% 5.13% 5.17% 3.29% 7 Bids Tendered 2017 Lake Hood Seaplane Base S-155a Lump 1 18,000.00 36,689.38 90,000.00 2,947,832 03 Lake Hood Lakeshore Float Plane Dock Sum 19,900.00 23,000.00 34,000.00 20,393.80 Taxilane Reconstruction 0.54% 0.78% 1.13% 0.68% (46714//0) 10 Bids Tendered 2010 Lake Hood Seaplane Base S-160a Square 37,200 10.60 16.04 22.00 2,111,536 09 Lake Hood Bank Sheet Pile, Vinyl Foot 12.00 15.00 11.90 14.00 Stabilization 20.84% 26.43% 17.22% 19.57% (31333/50920/0) 8 Bids Tendered 2009 FIA Access Control S-160a(1) Lump 1 214,000.00 239,666.67 270,000.00 2,572,350 08 (24615/61434/0) Van Horn Road Sum 199,300.00 214,000.00 235,000.00 270,000.00 3 Bids Tendered Gateway 8.48% 8.32% 8.32% 9.36% 2009 FIA Access Control S-160a(2) Lump 1 575,000.00 680,000.00 810,000.00 2,572,350 08 (24615/61434/0) South University Sum 474,700.00 575,000.00 655,000.00 810,000.00 3 Bids Tendered Avenue Gateway 20.21% 22.35% 23.20% 28.07% 2018 Anc Miscellaneous S-161a Lump 1 79,800.00 102,700.00 125,600.00 890,550 08 Repairs - Fleet Fueling Outlet Control Sum 50,000.00 79,800.00 125,600.00 0.00 Facility and Outlet Control Structure 8.50% 8.96% 12.74% 0.00% Structure (48503//4939) 2 Bids Tendered 2018 Anc Miscellaneous S-161b Lump 1 10,000.00 45,900.00 81,800.00 890,550 08 Repairs - Fleet Fueling Cofferdam Sum 15,000.00 10,000.00 81,800.00 0.00 Facility and Outlet Control 2.55% 1.12% 8.30% 0.00% Structure (48503//4939) 2 Bids Tendered 2017 Aip U-200z LUMP 1 2,500.00 2,850.00 3,200.00 9,826,116 03 Drainage Improvements SANITARY SEWER SUM 2,000.00 3,200.00 2,500.00 0.00 (46769/69436/0) AS-BUILT PLANS 0.02% 0.03% 0.02% 0.00% 2 Bids Tendered