Remote Desktop Redirected Printer
Total Page:16
File Type:pdf, Size:1020Kb
%S-% %S-% Page 1 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2013 Nome Airport Runway L-132aPAPI .n2_A Lump 1 35,000.00 53,333.33 75,000.00 26,561,061 09 Safety Area Install Approach Sum 123,000.00 50,000.00 75,000.00 35,000.00 Improvements/ Nome Lighting Aids-PAPI 0.38% 0.19% 0.24% 0.08% Apron Improvements (41524/61413/60558/4708) 3 Bids Tendered 2013 Nome Airport Runway L-132aPAPI .n2_A Each 4.0 8,750.00 13,333.33 18,750.00 26,561,061 09 Safety Area Install Approach (Alt) 30,750.00 12,500.00 18,750.00 8,750.00 Improvements/ Nome Lighting Aids-PAPI 0.38% 0.19% 0.24% 0.08% Apron Improvements (41524) 3 Bids Tendered 2013 Nome Airport Runway L-132aREIL .n2_A Lump 1 35,000.00 41,000.00 50,000.00 26,561,061 09 Safety Area Install Approach Sum 66,500.00 50,000.00 38,000.00 35,000.00 Improvements/ Nome Lighting Aids-REIL, 0.20% 0.19% 0.12% 0.08% Apron Improvements RW3 (41524/61413/60558/4708) 3 Bids Tendered 2013 Nome Airport Runway L-132aREIL .n2_A Each 2.0 17,500.00 20,500.00 25,000.00 26,561,061 09 Safety Area Install Approach (Alt) 33,250.00 25,000.00 19,000.00 17,500.00 Improvements/ Nome Lighting Aids-REIL, 0.20% 0.19% 0.12% 0.08% Apron Improvements RW3 (41524) 3 Bids Tendered 2013 Nome Airport Runway L-132bREIL .n2_A Each 2.0 5,000.00 5,833.33 7,500.00 26,561,061 09 Safety Area Remove Approach (Alt) 2,250.00 5,000.00 5,000.00 7,500.00 Improvements/ Nome Lighting Aids--REIL, 0.01% 0.04% 0.03% 0.03% Apron Improvements RW 3 (41524) 3 Bids Tendered 2013 Nome Airport Runway L-132bREIL .n2_A Lump 1 10,000.00 11,666.67 15,000.00 26,561,061 09 Safety Area Remove Approach Sum 4,500.00 10,000.00 10,000.00 15,000.00 Improvements/ Nome Lighting Aids--REIL, 0.01% 0.04% 0.03% 0.03% Apron Improvements RW 3 (41524/61413/60558/4709) 3 Bids Tendered 2013 Nome Airport Runway L-132bVASI .n2_A Lump 1 10,000.00 11,666.67 15,000.00 26,561,061 09 Safety Area Remove Approach Sum 5,000.00 10,000.00 10,000.00 15,000.00 Improvements/ Nome Lighting Aids-VASI, 0.02% 0.04% 0.03% 0.03% Apron Improvements RW 3 (41524/61413/60558/4709) 3 Bids Tendered %S-% %S-% Page 2 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2013 Nome Airport Runway L-132bVASI .n2_A Each 4.0 2,500.00 2,916.67 3,750.00 26,561,061 09 Safety Area Remove Approach (Alt) 1,250.00 2,500.00 2,500.00 3,750.00 Improvements/ Nome Lighting Aids-VASI, 0.02% 0.04% 0.03% 0.03% Apron Improvements RW 3 (41524) 3 Bids Tendered 2013 Nome Airport Runway P-602a .n2_A Ton 65 1.00 800.33 1,300.00 26,561,061 09 Safety Area Prime Coat, CSS-1 470.00 1.00 1,100.00 1,300.00 Improvements/ Nome 0.09% 0.00% 0.23% 0.19% Apron Improvements (41524/61413/60558/4855) 3 Bids Tendered 2017 FAI Taxiway B P-602a-5 Ton 2 800.00 2,208.33 4,325.00 1,907,111 08 Reconstruction & Safety Prime Coat, CSS-1 900.00 4,325.00 800.00 1,500.00 Enhancements 0.10% 0.45% 0.08% 0.15% (47105//33) 3 Bids Tendered 2013 KTN Airport Taxiway and P-603a Ton 60 630.00 876.67 1,000.00 5,547,913 12 Apron Rehabilitation & Tack Coat CSS-1 1,000.00 1,000.00 1,000.00 630.00 FY14 Various Airports 1.00% 1.08% 1.07% 0.62% Surface Preservation Maintenance (41752/67946 & 68016/0) 3 Bids Tendered 2014 Psg - Airport Apron And P-603a Ton 15 1.00 942.00 1,825.00 2,987,200 08 Taxiway Pavement Tack Coat CSS-1 1,050.00 1,000.00 1.00 1,825.00 Rehabilitation 0.42% 0.50% 0.00% 0.80% (42866/68261/2648) 3 Bids Tendered 2015 68386 Yakutat Airport P-603a Ton 154 0.01 633.34 1,000.00 12,485,667 08 Runway Pavement Tack Coat CSS-1 or 1,050.00 900.00 1,000.00 0.01 Rehabilitation STE-1 0.95% 1.11% 1.11% 0.00% AIP No. 3-02-0327-20-2015 (44790/68386/2648) 3 Bids Tendered 2015 Wrg - Airport Taxiway And P-603a Ton 23 850.00 925.00 1,000.00 1,731,700 07 Apron Overlay Tack Coat CSS-1 or 1,050.00 1,000.00 850.00 0.00 (44671/68262/2648) STE-1 1.19% 1.33% 0.96% 0.00% 2 Bids Tendered 2018 King Salmon Airport Main P-603a Ton 98 0.01 666.67 1,200.00 16,091,300 02 Runway Pavement Tack Coat CSS-1 OR 970.00 800.00 0.01 1,200.00 Rehabilitation STE-1 0.54% 0.49% 0.00% 0.58% (46143/Z556850000/2648) 3 Bids Tendered 2013 Sitka Airport Runway P-603a Ton 73 1.00 717.00 1,100.00 10,877,345 01 Overlay Tack Coat, CSS-1 1,000.00 1,050.00 1,100.00 0.00 (38111/69652/4856) 0.67% 0.70% 0.70% 0.00% 3 Bids Tendered %S-% %S-% Page 3 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2010 Petersburg Airport- P-603a TON 92 800.00 812.33 820.00 9,285,879 01 Runway Safety Area TACK COAT, CSS-1 1,100.00 800.00 820.00 817.00 Improvements (Phase III) 0.87% 0.79% 0.64% 0.64% (26553/69360/0) 3 Bids Tendered 2009 Fort Yukon Airport S-142 Lump 1 550,000.00 805,833.33 1,200,000.00 11,250,000 05 Resurfacing Equipment Storage Sum 800,000.00 820,000.00 790,000.00 725,000.00 (20553/62650/0) Building 6.32% 7.29% 6.72% 5.91% 6 Bids Tendered 2010 Nulato Airport S-142.n2 Lump 1 445,000.00 769,625.82 1,300,000.00 5,989,180 06 Improvements Equipment Storage Sum 750,000.00 600,000.00 445,000.00 800,000.00 (17512/62603/0) Building (heated) 8.64% 10.02% 7.24% 12.15% 11 Bids Tendered 2011 Alakanuk Airport S-142a Lump 1 600,000.00 802,142.86 1,280,000.00 6,767,130 03 Relocation, Stage I V Equipment Storage Sum 900,000.00 770,000.00 750,000.00 1,280,000.00 (32334/62325 & Building 9.10% 11.38% 10.44% 17.25% 61823/4924) 7 Bids Tendered 2011 Ouzinkie Airport S-142p Lump 1 660,874.00 790,616.09 910,000.00 2,104,030 04 Relocation Stage II Equipment Storage Sum 1,060,000.00 704,000.00 744,074.70 823,980.00 (33230/52637/4930) Building 41.31% 33.46% 34.97% 36.63% 8 Bids Tendered 2009 Takotna Airport Relocation S-142p Lump 1 725,300.00 958,825.00 1,200,000.00 13,296,580 07 (23792/56774/4930) Equipment Storage Sum 700,000.00 945,000.00 725,300.00 965,000.00 4 Bids Tendered Building 4.66% 7.11% 5.28% 6.57% 2009 Platinum Airport Runway S-142p Lump 1 650,000.00 826,800.00 940,000.00 5,448,815 02 Relocation Equipment Storage Sum 740,000.00 800,000.00 940,000.00 844,000.00 (19058/57775/4930) Building 9.15% 14.68% 14.11% 12.14% 5 Bids Tendered 2009 OUZINKIE AIRPORT S-142p Lump 1 600,000.00 820,011.11 1,100,000.00 9,708,914 05 RELOCATION Equipment Storage Sum 907,347.00 920,000.00 674,000.00 700,000.00 (22632/56957/4926) Building 4.82% 9.48% 6.21% 6.42% 9 Bids Tendered 2014 Koliganek Airport S-142p Lump 1 800,000.00 988,051.20 1,200,000.00 7,994,086 09 Reconstruction Equipment Storage Sum 1,177,000.00 900,000.00 800,000.00 1,040,256.00 (43353/59276/4930) Building 16.96% 11.26% 9.34% 10.68% 5 Bids Tendered 2015 Pilot Station Airport S-142p Lump 1 850,000.00 1,026,666.67 1,200,000.00 19,784,261 08 Relocation Equipment Storage Sum 1,378,261.00 860,000.00 1,000,000.00 1,200,000.00 (44341/62581/0) Building 9.08% 4.35% 5.00% 5.54% 6 Bids Tendered 2017 Aniak Airport Runway Shift S-142p LUMP 1 600,000.00 1,143,750.00 2,000,000.00 38,969,351 09 (47424//0) EQUIPMENT SUM 1,270,000.00 940,000.00 600,000.00 2,000,000.00 4 Bids Tendered STORAGE BUILDING 2.71% 2.41% 1.51% 4.88% 2016 Golovin Airport S-142p Lump 1 60,000.00 138,500.00 400,000.00 8,839,335 09 Improvements (43457//0) Equipment Storage Sum 100,000.00 60,000.00 80,000.00 150,000.00 6 Bids Tendered Building, Upgrades 0.84% 0.68% 0.67% 1.13% %S-% %S-% Page 4 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref.