Remote Desktop Redirected Printer

Remote Desktop Redirected Printer

%S-% %S-% Page 1 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2013 Nome Airport Runway L-132aPAPI .n2_A Lump 1 35,000.00 53,333.33 75,000.00 26,561,061 09 Safety Area Install Approach Sum 123,000.00 50,000.00 75,000.00 35,000.00 Improvements/ Nome Lighting Aids-PAPI 0.38% 0.19% 0.24% 0.08% Apron Improvements (41524/61413/60558/4708) 3 Bids Tendered 2013 Nome Airport Runway L-132aPAPI .n2_A Each 4.0 8,750.00 13,333.33 18,750.00 26,561,061 09 Safety Area Install Approach (Alt) 30,750.00 12,500.00 18,750.00 8,750.00 Improvements/ Nome Lighting Aids-PAPI 0.38% 0.19% 0.24% 0.08% Apron Improvements (41524) 3 Bids Tendered 2013 Nome Airport Runway L-132aREIL .n2_A Lump 1 35,000.00 41,000.00 50,000.00 26,561,061 09 Safety Area Install Approach Sum 66,500.00 50,000.00 38,000.00 35,000.00 Improvements/ Nome Lighting Aids-REIL, 0.20% 0.19% 0.12% 0.08% Apron Improvements RW3 (41524/61413/60558/4708) 3 Bids Tendered 2013 Nome Airport Runway L-132aREIL .n2_A Each 2.0 17,500.00 20,500.00 25,000.00 26,561,061 09 Safety Area Install Approach (Alt) 33,250.00 25,000.00 19,000.00 17,500.00 Improvements/ Nome Lighting Aids-REIL, 0.20% 0.19% 0.12% 0.08% Apron Improvements RW3 (41524) 3 Bids Tendered 2013 Nome Airport Runway L-132bREIL .n2_A Each 2.0 5,000.00 5,833.33 7,500.00 26,561,061 09 Safety Area Remove Approach (Alt) 2,250.00 5,000.00 5,000.00 7,500.00 Improvements/ Nome Lighting Aids--REIL, 0.01% 0.04% 0.03% 0.03% Apron Improvements RW 3 (41524) 3 Bids Tendered 2013 Nome Airport Runway L-132bREIL .n2_A Lump 1 10,000.00 11,666.67 15,000.00 26,561,061 09 Safety Area Remove Approach Sum 4,500.00 10,000.00 10,000.00 15,000.00 Improvements/ Nome Lighting Aids--REIL, 0.01% 0.04% 0.03% 0.03% Apron Improvements RW 3 (41524/61413/60558/4709) 3 Bids Tendered 2013 Nome Airport Runway L-132bVASI .n2_A Lump 1 10,000.00 11,666.67 15,000.00 26,561,061 09 Safety Area Remove Approach Sum 5,000.00 10,000.00 10,000.00 15,000.00 Improvements/ Nome Lighting Aids-VASI, 0.02% 0.04% 0.03% 0.03% Apron Improvements RW 3 (41524/61413/60558/4709) 3 Bids Tendered %S-% %S-% Page 2 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2013 Nome Airport Runway L-132bVASI .n2_A Each 4.0 2,500.00 2,916.67 3,750.00 26,561,061 09 Safety Area Remove Approach (Alt) 1,250.00 2,500.00 2,500.00 3,750.00 Improvements/ Nome Lighting Aids-VASI, 0.02% 0.04% 0.03% 0.03% Apron Improvements RW 3 (41524) 3 Bids Tendered 2013 Nome Airport Runway P-602a .n2_A Ton 65 1.00 800.33 1,300.00 26,561,061 09 Safety Area Prime Coat, CSS-1 470.00 1.00 1,100.00 1,300.00 Improvements/ Nome 0.09% 0.00% 0.23% 0.19% Apron Improvements (41524/61413/60558/4855) 3 Bids Tendered 2017 FAI Taxiway B P-602a-5 Ton 2 800.00 2,208.33 4,325.00 1,907,111 08 Reconstruction & Safety Prime Coat, CSS-1 900.00 4,325.00 800.00 1,500.00 Enhancements 0.10% 0.45% 0.08% 0.15% (47105//33) 3 Bids Tendered 2013 KTN Airport Taxiway and P-603a Ton 60 630.00 876.67 1,000.00 5,547,913 12 Apron Rehabilitation & Tack Coat CSS-1 1,000.00 1,000.00 1,000.00 630.00 FY14 Various Airports 1.00% 1.08% 1.07% 0.62% Surface Preservation Maintenance (41752/67946 & 68016/0) 3 Bids Tendered 2014 Psg - Airport Apron And P-603a Ton 15 1.00 942.00 1,825.00 2,987,200 08 Taxiway Pavement Tack Coat CSS-1 1,050.00 1,000.00 1.00 1,825.00 Rehabilitation 0.42% 0.50% 0.00% 0.80% (42866/68261/2648) 3 Bids Tendered 2015 68386 Yakutat Airport P-603a Ton 154 0.01 633.34 1,000.00 12,485,667 08 Runway Pavement Tack Coat CSS-1 or 1,050.00 900.00 1,000.00 0.01 Rehabilitation STE-1 0.95% 1.11% 1.11% 0.00% AIP No. 3-02-0327-20-2015 (44790/68386/2648) 3 Bids Tendered 2015 Wrg - Airport Taxiway And P-603a Ton 23 850.00 925.00 1,000.00 1,731,700 07 Apron Overlay Tack Coat CSS-1 or 1,050.00 1,000.00 850.00 0.00 (44671/68262/2648) STE-1 1.19% 1.33% 0.96% 0.00% 2 Bids Tendered 2018 King Salmon Airport Main P-603a Ton 98 0.01 666.67 1,200.00 16,091,300 02 Runway Pavement Tack Coat CSS-1 OR 970.00 800.00 0.01 1,200.00 Rehabilitation STE-1 0.54% 0.49% 0.00% 0.58% (46143/Z556850000/2648) 3 Bids Tendered 2013 Sitka Airport Runway P-603a Ton 73 1.00 717.00 1,100.00 10,877,345 01 Overlay Tack Coat, CSS-1 1,000.00 1,050.00 1,100.00 0.00 (38111/69652/4856) 0.67% 0.70% 0.70% 0.00% 3 Bids Tendered %S-% %S-% Page 3 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 115 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2010 Petersburg Airport- P-603a TON 92 800.00 812.33 820.00 9,285,879 01 Runway Safety Area TACK COAT, CSS-1 1,100.00 800.00 820.00 817.00 Improvements (Phase III) 0.87% 0.79% 0.64% 0.64% (26553/69360/0) 3 Bids Tendered 2009 Fort Yukon Airport S-142 Lump 1 550,000.00 805,833.33 1,200,000.00 11,250,000 05 Resurfacing Equipment Storage Sum 800,000.00 820,000.00 790,000.00 725,000.00 (20553/62650/0) Building 6.32% 7.29% 6.72% 5.91% 6 Bids Tendered 2010 Nulato Airport S-142.n2 Lump 1 445,000.00 769,625.82 1,300,000.00 5,989,180 06 Improvements Equipment Storage Sum 750,000.00 600,000.00 445,000.00 800,000.00 (17512/62603/0) Building (heated) 8.64% 10.02% 7.24% 12.15% 11 Bids Tendered 2011 Alakanuk Airport S-142a Lump 1 600,000.00 802,142.86 1,280,000.00 6,767,130 03 Relocation, Stage I V Equipment Storage Sum 900,000.00 770,000.00 750,000.00 1,280,000.00 (32334/62325 & Building 9.10% 11.38% 10.44% 17.25% 61823/4924) 7 Bids Tendered 2011 Ouzinkie Airport S-142p Lump 1 660,874.00 790,616.09 910,000.00 2,104,030 04 Relocation Stage II Equipment Storage Sum 1,060,000.00 704,000.00 744,074.70 823,980.00 (33230/52637/4930) Building 41.31% 33.46% 34.97% 36.63% 8 Bids Tendered 2009 Takotna Airport Relocation S-142p Lump 1 725,300.00 958,825.00 1,200,000.00 13,296,580 07 (23792/56774/4930) Equipment Storage Sum 700,000.00 945,000.00 725,300.00 965,000.00 4 Bids Tendered Building 4.66% 7.11% 5.28% 6.57% 2009 Platinum Airport Runway S-142p Lump 1 650,000.00 826,800.00 940,000.00 5,448,815 02 Relocation Equipment Storage Sum 740,000.00 800,000.00 940,000.00 844,000.00 (19058/57775/4930) Building 9.15% 14.68% 14.11% 12.14% 5 Bids Tendered 2009 OUZINKIE AIRPORT S-142p Lump 1 600,000.00 820,011.11 1,100,000.00 9,708,914 05 RELOCATION Equipment Storage Sum 907,347.00 920,000.00 674,000.00 700,000.00 (22632/56957/4926) Building 4.82% 9.48% 6.21% 6.42% 9 Bids Tendered 2014 Koliganek Airport S-142p Lump 1 800,000.00 988,051.20 1,200,000.00 7,994,086 09 Reconstruction Equipment Storage Sum 1,177,000.00 900,000.00 800,000.00 1,040,256.00 (43353/59276/4930) Building 16.96% 11.26% 9.34% 10.68% 5 Bids Tendered 2015 Pilot Station Airport S-142p Lump 1 850,000.00 1,026,666.67 1,200,000.00 19,784,261 08 Relocation Equipment Storage Sum 1,378,261.00 860,000.00 1,000,000.00 1,200,000.00 (44341/62581/0) Building 9.08% 4.35% 5.00% 5.54% 6 Bids Tendered 2017 Aniak Airport Runway Shift S-142p LUMP 1 600,000.00 1,143,750.00 2,000,000.00 38,969,351 09 (47424//0) EQUIPMENT SUM 1,270,000.00 940,000.00 600,000.00 2,000,000.00 4 Bids Tendered STORAGE BUILDING 2.71% 2.41% 1.51% 4.88% 2016 Golovin Airport S-142p Lump 1 60,000.00 138,500.00 400,000.00 8,839,335 09 Improvements (43457//0) Equipment Storage Sum 100,000.00 60,000.00 80,000.00 150,000.00 6 Bids Tendered Building, Upgrades 0.84% 0.68% 0.67% 1.13% %S-% %S-% Page 4 of 11 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    11 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us