N4 Collooney to Castlebaldwin Proposed Road Development
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
N4 Collooney to Castlebaldwin, Proposed Road Development
N4 Collooney to Castlebaldwin Proposed Road Development EIS Volume 4: Appendices NN44 CCoolllloooonneeyy ttoo CCaassttlleebbaallddwwiinn,, PPrrooppoosseedd RRooaadd DDeevveellooppmmeenntt AAPPPPEENNDDIIXX NNOO.. 1122..11 NNAATTUURRAA IIMMPPAACCTT SSTTAATTEEMMEENNTT TTOO IINNFFOORRMM AAPPPPRROOPPRRIIAATTEE AASSSSEESSSSMMEENNTT PPRREEPPAARREEDD BBYY::: ECOFACT Environmental Consultants Ltd. National Road Design Department, Sligo County Council (App. 12.1) Page - 1 N4 Collooney to Castlebaldwin Proposed Road Development EIS Volume 4: Appendices Document Control Status Issued For Developed Approved Body FINAL Publication DMcD W’O’C Ecofact Ltd. National Road Design Department, Sligo County Council (App. 12.1) Page - 2 N4 Collooney to Castlebaldwin Proposed Road Development EIS Volume 4: Appendices TABLE OF CONTENTS 1 INTRODUCTION 5 1.1 Legislative Context 5 1.2 Consultation 6 2 METHODOLOGY 8 2.1 Desk study 8 2.2 Ecological surveys 8 2.3 Appropriate Assessment Methodology 8 3 IDENTIFICATION OF NATURA 2000 SITES POTENTIALLY AFFECTED 10 3.1 Description of the proposed project 10 3.2 Identification of relevant Natura 2000 sites 10 3.3 Description of Natura 2000 sites potentially affected by the Proposed Road Development 18 3.4 Assessment of potential impacts affecting the Natura 2000 sites 19 3.5 Summary of findings leading to potential for adverse effects 21 4 STAGE 2: NIS TO INFORM APPROPRIATE ASSESSMENT 22 4.1 Description of Natura 2000 Sites potentially affected 22 4.2 Impact Prediction 24 4.3 Mitigation measures 28 4.4 Impacts potentially affecting the conservation objectives of the cSAC and SPA 30 4.5 Natura Impact Statement Conclusions 30 5 PLATES 32 6 APPENDIX 12.1.1 NPWS NATURA 2000 SITE SYNOPSES 35 National Road Design Department, Sligo County Council (App. -
An Bord Pleanála
An Bord Pleanála ROADS ACTS 1993 to 2007 PLANNING AND DEVELOPMENT ACTS 2000 to 2011 Cork County Council APPLICATION by the National Roads Authority of St Martin’s House, Ballsbridge, Dublin for approval under section 51 of the Roads Act, 1993, as amended, in accordance with documentation, including an environmental impact statement and a Natura impact statement, lodged with An Bord Pleanála on the 19 th day of July, 2012. PROPOSED ROAD DEVELOPMENT: An improved interchange at the location of the existing Dunkettle Interchange at the intersection of the N8 National Primary Road, the N25 National Primary Road and the N40 National Primary Road in the townlands of Lota, Dunkettle, Inchera, Kilcoolishal and Wallingstown, County Cork comprising: (i) a series of direct road links between the N8 National Primary Road, the N25 National Primary Road and the N40 National Primary Road and links to the R623 Regional Road in Wallingstown and to Burys Bridge in Dunkettle and Kilcoolishal, (ii) one number grade separated junction arrangement at the existing N25 National Primary Road approximately 650 metres to the east of the existing Dunkettle Interchange, (iii) four number roundabouts – two number at the grade separated junction, one number at the tie-in with the existing road network in Dunkettle and Kilcoolishal and one number at the tie-in with the existing road network in Wallingstown, ______________________________________________________________ 04.HA0039 An Bord Pleanála Page 1 of 5 (iv) 43 number major structures of various forms comprising: - one number overbridge, - seven number underbridges, - two number railway bridges, - one number footbridge, - modification of the northern approach structure to the Jack Lynch Tunnel, - seven number retaining walls, and - 24 number gantries, (v) several culverts where the scheme crosses watercourses or intertidal areas, and (vi) pedestrian and cyclist facilities, together with all ancillary and consequential works associated therewith. -
309/R309405.Pdf, .PDF Format 246KB
Inspector’s Report ABP-309405-21 Development Construction of a 30 metre lattice tower enclosed within a 2.4 metre high palisade fence compound. Location Corgullion Townland, Carrick on Shannon, Co Roscommon. Planning Authority Roscommon County Council Planning Authority Reg. Ref. PD/20/473 Applicant(s) Cignal Infrastructure Limited Type of Application Permission Planning Authority Decision Refuse Type of Appeal First-Party Appellant(s) Cignal Infrastructure Limited Observer(s) None Date of Site Inspection 13th April 2021 Inspector Stephen Ward ABP-309405-21 Inspector’s Report Page 1 of 19 1.0 Site Location and Description The appeal site is located is the rural townland of Corgullion, Co. Roscommon, at a distance of c. 4km southeast of Carrick-On-Shannon and c. 4km southwest of Drumsna. The Sligo – Dublin Railway line runs east to west at c. 100m to the north of the site. Further north of this is the River Shannon, which forms part of the Leitrim – Roscommon county border. The Flagford – Arva – Louth 220kv power lines also sun in an east-west direction at a distance of c. 250 metres south of the site. The wider surrounding area is otherwise characterised by undulating agricultural land interspersed by one-off houses. The site comprises a relatively flat linear section which is to be annexed along the northern boundary of a larger agricultural holding. It has a stated area of 1,104m2, with an overall length of c. 310m and a width of 3m for the vast majority of that length. The northern and western site boundaries adjoin the existing field boundaries, which are comprised of trees and hedgerows. -
Chapter 7: Infrastructure
Navan Development Plan 2009-2015 November 2009 CHAPTER 7: INFRASTRUCTURE SECTIONS IN THIS CHAPTER 7.1 Transportation-Introduction 7.2 Goals 7.3 Roads 7.4 Pedestrians and Cyclists 7.5 Public Transport 7.6 Park & Ride, Parking, Loading & Taxi Ranks 7.7 Street Furniture & Lighting 7.8 Keeping the Street Clean 7.9 Water Supply & Sewerage Treatment & Disposal 7.10 Flooding 7.11 Sustainable Urban Drainage Systems 7.12 Telecommunications 7.13 Broadband 7.14 Solid Waste Collection & Disposal 7.15 Energy 161 Navan Development Plan 2009-2015 November 2009 7.1 Transportation-Introduction The context for this chapter is provided in Chapter Two of this Development Plan. The key to Navan’s sustainable growth is the development of an integrated land use and transportation system which provides for a development pattern that protects Navan’s architectural and natural heritage while providing for growth and economic development. The integration of land use and transportation policies, both in the town centre and outer suburban areas underpins the transportation strategy as outlined below. 7.2 Goals It is the goal of Navan Town Council and Meath County Council to create vibrant urban areas with good provision of public transport, reduced traffic congestion and an attractive urban centre, which is not dominated by the car. It is the main objective of the Planning Authorities to create an integrated and environmentally sound system, with particular emphasis on: Accessibility and choice of transport for all; Strong integration between transportation planning -
Waterford Bypass
ENGINEERS IRELAND WATERFORD BYPASS WATERFORD BYPASS JOHN T. MURPHY, BE, CEng, FIEI, HDipMM, RConsEI Project Director, Mott MacDonald Ireland JOE SHINKWIN, BE, CEng, MIEI, DipMechEng Project Manager, Mott MacDonald Ireland Presented to a meeting of the Cork Region of Engineers Ireland 23rd February 2010 SYNOPSIS The N25 Waterford Bypass comprises a 16.3 km of dual carriageway bypass of Waterford City, 9.5 km of major link roads and an additional 13 km of side roads. It includes a 465 metre long dual carriageway cable-stayed bridge over the River Suir (with a 230m main span), plus a number of major viaduct and grade separated interchange structures totalling over 50 bridges. This paper describes the development of the current route for the N25 Waterford Bypass including the various phases of route selection. It deals with the project’s inclusion as a pilot PPP project and the development of the PPP contract. It follows the project through the statutory processes (including the discovery of Viking remains and the need to find a new route around the designated national monument site in Woodstown). The paper also describes the selection of the chosen bridge type for the Suir River Crossing and looks at some of the other major structures. Finally, the paper will briefly describe the construction contract and various aspects of construction. 1 MURPHY and SHINKWIN INTRODUCTION crossing of the Suir in the Waterford viii) were evaluated without area would impose costs on, and quantification while items v), vi), and vii) The need for a second river crossing of produce benefits for, the community at were derived in the process of the the River Suir in Waterford has been large. -
Burren Signage Plan
Burren Signage Plan A report commissioned by Burren Connect, a project funded by Fáilte Ireland, in partnership with Clare County Council, Shannon Development, National Parks & Wildlife Service, National Monuments Service and Burren Beo.. BURREN SIGNAGE PLAN Executive Summary The Burren Signage Plan is a component of the Burren Connect Project, a multi- agency tourism development project for the Burren. Field surveys and a public consultation programme were carried out during May and June of 2007. The signage plan is based on a set of fourteen principles that emerged from consultation, assessments of the Burren landscape and a review of practice elsewhere. The plan recommends that signage in the Burren countryside is kept to a minimum in recognition of the exceptional quality of the landscape. It recommends that primary reliance for navigation is placed on the standard directional road signs, which are in the process of being upgraded on all the national and regional roads in North Clare. The plan considers that there is a place for visitor signage in the Burren, but that signage and visitor information in general should, as far as possible, be concentrated in and near existing villages, at major junctions and at the larger established visitor sites. The plan recommends caution in deploying signage for new recreation initiatives such as looped walks and cycle routes in the remoter areas of the Burren. The Burren does not lend itself to precise geographical definition but a signage plan has to enable drivers and other visitors to be able to answer the question ‘Are we there yet?’ The plan recommends adopting the settlements that ring the area as boundary markers. -
Policy on the Provision of Tourist and Leisure Signage on National Roads
NATIONAL ROADS AUTHORITY POLICY ON THE PROVISION OF TOURIST AND LEISURE SIGNAGE ON NATIONAL ROADS REVISION 1 MARCH 2011 Index Part 1: Background. ................................................................................................................... 1 Part 2: Classification of Tourist / Leisure Destinations. ........................................................... 3 2.1.1 Tourist / Leisure Attractions. ................................................................................... 3 2.1.2 Tourist / Leisure Facilities. ....................................................................................... 3 Part 3: Tourist & Leisure Signage Policy. .................................................................................. 4 3.1 Policy Objectives. ............................................................................................................. 4 3.2 Categorisation of National Roads. ................................................................................... 4 3.3 Tourist / Leisure Destinations. ......................................................................................... 5 3.3.1 Motorways and Dual Carriageways. ........................................................................ 6 3.3.2 Other National Primary Roads. ................................................................................ 7 3.3.3 National Secondary Roads. ...................................................................................... 7 3.3.4 Continuity Signage for Tourist Destinations. ........................................................... -
N11 Corridor Review Fassaroe Junction to Kilmacanogue, County
N11 Corridor Review Fassaroe Junction to Kilmacanogue, County Wicklow March 2010 The Employer The Engineer National Roads Authority Roughan & O‟Donovan - Aecom St Martin‟s House Alliance Waterloo Road Arena House Ballsbridge Arena Road Dublin 4 Sandyford Dublin 18 Roughan & O‟Donovan - N11 Corridor Review AECOM Alliance Fassaroe to Kilmacanogue N11 Corridor Review Fassaroe to Kilmacanogue March 2010 Document No: ..................... 07.139.039.10A Made: ................................... Kevin Brennan / Eoin Ó Catháin Checked: ............................. Séamus MacGearailt Approved: ........................... Séamus MacGearailt Document No Description Made Checked Approved Date 07.139.039.10A Final KB / EOC SMG SMG Mar 2010 Ref: 07.139.039.10A March 2010 Page i Roughan & O‟Donovan - N11 Corridor Review AECOM Alliance Fassaroe to Kilmacanogue N11 Corridor Review Fassaroe to Kilmacanogue March 2010 TABLE OF CONTENTS 1. INTRODUCTION .......................................................................................................... 1 2. BACKGROUND AND CONTEXT ................................................................................. 2 2.1 National Route Context for N11 ................................................................................................ 2 2.2 Historical Development of the N11 Route ................................................................................ 2 2.3 Road Standard ......................................................................................................................... -
FREE SPEED STUDY Survey Report 2018
FREE SPEED STUDY Survey Report 2018 Research Department December 2018 FREE-SPEED SURVEY 2018 Contents Free-Speed Survey – Overview Page 3 o Study Objectives Page 3 o Methodology Page 3 o Key Findings Page 3 Speeding on Urban Roads Page 4 o Historic speeding rates by years, vehicle type and urban Road – Bar Graph Page 4 o Percentage of vehicles on urban roads by road type and degree of violation – Bar Graph Page 5 Speeding on Rural Roads Page 6 o Historic speeding rates of cars on rural roads – Line Graph Page 6 o Percentage of cars speeding on rural roads by road type and degree of violation – Bar Graph Page 7 o Percentage of vehicles speeding on rural roads by road type and degree of violation – Bar Graph Page 8 Percentage of cars speeding on Urban and Rural Roadways – Bar Graph Page 8 Who’s up and who’s down: speeding by cars Page 9 Summary & Recommendations Page 10-11 Appendix 1 Page 12-13 o Detailed Tables – Free-Speed by Road Type 2018 Appendix 2 Page 14-15 o Percentage speeding (Urban) 1999 to 2018 Appendix 3 Page 16-17 o Percentage speeding (Rural) 1999 to 2018 Appendix 4 Page 18 o Breakdown of sites by road type and speed limit,2018 Appendix 5 Page 19 o Survey details o Legal speed limits by vehicle type Page 20 Appendix 6 Page 21 o Top 9 locations – Highest volumes o Lowest 5 locations – Lowest volumes 2 FREE-SPEED SURVEY 2018 Free-Speed Survey - Overview Study Objectives: To determine the incidence of drivers of all vehicle types driving on Irish roads while speeding, and therefore presenting a road safety risk. -
Limerick City & County Council
Limerick City & County Council County Limerick Road Traffic Special Speed Limit Byelaws 2019 For National, Regional & Local Roads County Limerick Special Speed Limit Byelaws 2019 for National, Regional & Local Roads SPEED LIMIT BYE-LAWS Limerick City & County Council in exercise of the powers conferred on it by Section 9 of the Road Traffic Act, 2004 (No. 44 of 2004), hereby makes the following bye-laws in respect of the area comprising the administrative area of the County of Limerick. The maps annexed to these bye-laws are for illustrative purposes only and in the event of a conflict between the maps and the text of the Schedule hereto, the text of the Schedule shall take precedence. 1. These bye-laws may be cited as the County Limerick Road Traffic Special Speed Limits (National, Regional & Local Roads) Bye-laws, 2019. 2. These bye-laws shall come into operation on the 1st day of November, 2019. 3. In these bye-laws: “the Act of 1993” means the Roads Act, 1993 (No. 14 of 1993); “the Act of 1994” means the Road Traffic Act, 1994 (No. 7 of 1994); "the Act of 2001" means Local Government Act 2001; “the Act of 2004” means the Road Traffic Act, 2004 (No. 44 of 2004); ‘’The Act of 2010’’ means the Road Traffic Act, 2010 (No. 25 of 2010); “built-up area” has the meaning assigned to it in the Local Government Act 2001; “distance” means distance measured along the centre line of a road; “the Minister” means the Minister for Transport; “local road” has the meaning assigned to it by the Act of 1993; “regional road” has the meaning assigned to -
IDA NDP Review Letter
AN GHNÍOMHAIREACHT INVESTMENT AND INFHEISTÍOCHTA AGUS FORBARTHA DEVELOPMENT AGENCY TRÍ, PLÁS NA PÁIRCE THREE PARK PLACE SRÁID HAISTE UACHTARACH HATCH STREET UPPER BAILE ÁTHA CLIATH 2 ÉIRE DUBLIN 2 IRELAND www.idaireland.com +353 1 603 4000 @IDAIRELAND Department of Public Expenditure and Reform Government Buildings Upper Merrion Street Dublin 2 D02 R583 19th February 2021 Re: ‘Review to Renew’ – IDA submission to the review of the National Development Plan Dear Sir / Madam, IDA Ireland welcomes the opportunity to input into the review of the National Development Plan (NDP). The NDP’s identification of thematic strategic investment priorities to underpin the delivery of a set of national strategic outcomes is an innovative and progressive step for sustainable and plan-led development that will improve Ireland’s competitiveness and enhance the country’s attractiveness as a place to do business. Notwithstanding the foregoing, there are areas where policy or legislative change could significantly aid project delivery, and in doing so assist IDA to deliver upon its mandate to attract, develop and retain foreign direct investment, as we set out to implement our new four year strategy, Driving Recovery and Sustainable Growth 2021-2024. The importance of an efficient planning system to Ireland’s economic competitiveness Multinational investors require certainty not only in relation to the timelines for delivery of their own capital projects, but also on the timelines for delivery of the associated public infrastructure upon which their investments depend. This includes energy, transport, telecommunications and water services. Any avoidable delay in the provision of such infrastructure erodes our competitiveness and makes Ireland a less attractive place in which to do business. -
Annual Environmental Report for Intel Ireland Ltd
Annual Environmental Report for Intel Ireland 2014 Ltd. This Annual Environmental Report was generated using excel template documents provided by the Environmental Protection Agency. The report provides summary information on key environmental emissions and management practices associated with Intel Ireland Ltd's Industrial Emissions Licence P0207-04. Table of Contents Facility Summary Information 3 Air Emissions 4 Waste/Wastewater (Sewer) Emissions 9 Bund testing 13 Groundwater Emissions 14 Environmental Liability Risk Assessment 50 Environmental Management Programme 2014 progress update 51 Environmental Management Programme 2015 Plan 53 Noise Emissions 54 Resource and Energy Consumption 56 Intel Ireland Energy Efficiency Audit 2014 58 Complaints and Incidents 62 Waste 63 Other Reports required under Schedule D: Report on the assessment of the efficiency of use of raw materials in processes 64 Proposed PRTR Parameters for 2015 67 PRTR 2014 69 3 1 AIR-summary template Lic No: P0207-04 Year 2014 Answer all questions and complete all tables where relevant Additional information Does your site have licensed air emissions? If yes please complete table A1 and A2 below for the current reporting year and 1 answer further questions. If you do not have licenced emissions and do not complete a solvent management plan (table A4 and A5) you do not need to complete the tables Yes Periodic/Non-Continuous Monitoring 2 Are there any results in breach of licence requirements? If yes please provide brief details in the comment section of TableA1 below