74 LOANBANK QUADRANT Govan, Glasgow G51 3HZ

Total Page:16

File Type:pdf, Size:1020Kb

74 LOANBANK QUADRANT Govan, Glasgow G51 3HZ TO LET 74 LOANBANK QUADRANT Govan, Glasgow G51 3HZ M8 MOTORWAY GLASGOW AIRPORT GLASGOW CITY CENTRE EDMINSTON DRIVE CRAIGTON ROAD HELEN STREET LOANBANK QUADRRANT Key Highlights • Detached industrial and office facility with • Close to Junctions 23 & 24 of M8 generous self-contained yard • 4 x roller shutter doors • 5,051.45 sq m / 54,373 sq ft with 1.75 acre • Eaves height range of 3.32 to 6.43 metres yard • Total site area (including building footprint) 130,000 sq ft / 3.00 acres / 1.21 hectares SAVILLS GLASGOW 163 West George Street, Glasgow G2 2JJ +44 (0) 141 248 7342 savills.co.uk Location Accommodation Ordnance Survey © Crown Copyright 2021. All Rights Reserved. The subjectsLicence number 100022432 are situated on the southmost side of Loanbank Plotted Scale - 1:1500. Paper Size - A4 AREA SQ M SQ FT Quadrant, a short distance to the West of its junction with Helen Street. Helen Street is the principal industrial and business Ground Industrial, offices, 4,821.34 51,897 corridor within the Govan / Ibrox area of Glasgow linking to the ancillary south with Edmiston Drive. The location is a very successful and First Offices, ancillary 230.00 2,476 long established industrial and business location. Motorway connectivity to the location is strong and this is TOTAL INDUSTRIAL, 5,051.45 54,373 afforded from Junctions 23 and 24 of the M8. Underground OFFICES, stations are located nearby at Ibrox Stadium and Govan ANCILLARY Cross with buses also running through the location at regular intervals. Glasgow Airport and Glasgow City Centre are both Total site area including the building 3 acres/ within 5 miles of the subjects. footprint 1.21 hectares Description Yard area excluding the building 1.75 acres/ footprint 0.71 hectares The available building comprises a detached industrial and office facility set within a self-contained environment fully Lease Terms secured with perimeter palisade fencing. The subjects are available on Full Rearing and Insuring lease Accessed from Loanbank Quadrant the property benefits from terms. Further information on quoting terms is available on a significant yard area largely covered in concrete. The building request. is of traditional portal steel construction with brick walls and an overclad roof. Rating Assessment The building provides a mixture of industrial, office and The Rateable Value for the subject is contained within a larger ancillary accommodation with the single storey main industrial individual entry under the address of 65 Craigton Road. The building connecting to a two storey office building via a link subjects will therefore require to be reassessed. section. Access to the main building is provided from the West and East Energy Performance sides from two doorways contained within each elevation. The The EPC rating is available upon request. West doors are 7.00 metres width by 4.60 metres height with the East doors narrower at 4.86 metres width by 3.36 metres Legal Costs height. The East doors are protected by a canopy. Each party will be responsible for their own legal costs incurred Internally the main building has typical finishes throughout in any transaction and this will include any Land & Buildings such as a concrete floor, painted walls with the ceiling open to Transaction Tax, Registration Dues and VAT payable thereon. the underside of the roof covering. The eaves height is 3.32 – 4.21 metres within the main area, although there is a high bay VAT section which has an eaves range of 6.12 – 6.43 metres. All figures quoted or provided are given exclusive of VAT. The office building connects via the link but also has its own independent access from the West elevation. This provides a Viewing & Further Information mixture of office, toilet, tea preparation and standard ancillary Strictly by appointment through the sole letting adviser. support accommodation over two levels. Similarly, finishes are typical with carpeted floors and plastered and painted walls and ceilings. Contact Ross Sinclair Jonathon Webster 0141 222 4145 0141 222 4114 07557 972 955 07976 910 987 [email protected] [email protected] IMPORTANT NOTICE Maps are reproduced from the Ordnance Survey Map with the permission of the Controller of H.M. Stationery Office. © Crown copyright licence number 100022432 Savills (UK) Ltd, published for the purposes of identification only and although believed to be correct accuracy is not guaranteed. Savills, their clients and any joint agents give notice that: 1. They are not authorised to make or give any representations or warranties in relation to the property either here or elsewhere, either on their own behalf or on behalf of their client or otherwise. They assume no responsibility for any statement that may be made in these particulars. These particulars do not form part of any offer or contract and must not be relied upon as statements or representations of fact. 2. Any areas, measurements or distances are approximate. The text, photographs and plans are for guidance only and are not necessarily comprehensive. It should not be assumed that the property has all necessary planning, building regulation or other consents and Savills have not tested any services, equipment or facilities. Purchasers must satisfy themselves by inspection or otherwise. Designed and Produced by Savills Marketing: 020 7499 8644 | February 2021.
Recommended publications
  • WATER ROW MASTERPLAN / Govan
    WATER ROW MASTERPLAN / Govan September 2020 Water Row – heart of Govan riverside town. An inspiring neighbourhood and destination ranged around the Govan-Partick Bridge. September 2020 Update Development proposals for Water Row have continued to be refined since the launch of the Masterplan in January 2019. This third newsletter, provides a specific update on a study examining the potential for a water sports facility at Water Row and lets you know how to get involved. It also touches on the growing relationship with Glasgow University and efforts being made to ensure Govan is at the heart of the Glasgow Riverside Innovation District (GRID) proposals. 1. What is Proposed? Planning Permission in Principle was recently granted for the mixed-use regeneration of Water Row, and included around 200 new homes as well as 3,500 square metres of commercial space and new public space. In the earlier consultations that shaped the Water Row proposals, many people expressed a desire to see Govan re-engage with the River and have new facilities delivered for use by the local community; views that reflect city-wide aspirations for greater use of the River Clyde leading to a more vibrant, healthy and prosperous city. This project is investigating options to realise these aims by testing the viability of having a water sports based facility as part of the wider Water Row development. 2. What will study consider? The study will investigate the wider constraints and opportunities for water sports activity on the Clyde, the market for water sports and related leisure activities, the needs of river users and the local Govan community, and the type of building any new facility would require.
    [Show full text]
  • Glasgow City Community Health Partnership Service Directory 2014 Content Page
    Glasgow City Community Health Partnership Service Directory 2014 Content Page About the CHP 1 Glasgow City CHP Headquarters 2 North East Sector 3 North West Sector 4 South Sector 5 Adult Protection 6 Child Protection 6 Emergency and Out-of-Hours care 6 Addictions 7 - 9 Asylum Seekers 9 Breast Screening 9 Breastfeeding 9 Carers 10 - 12 Children and Families 13 - 14 Dental and Oral Health 15 Diabetes 16 Dietetics 17 Domestic Abuse / Violence 18 Employability 19 - 20 Equality 20 Healthy Living 21 Health Centres 22 - 23 Hospitals 24 - 25 Housing and Homelessness 26 - 27 Learning Disabilities 28 - 29 Mental Health 30 - 40 Money Advice 41 Nursing 41 Physiotherapy 42 Podiatry 42 Respiratory 42 Rehabilitation Services 43 Sexual Health 44 Rape and Sexual Assault 45 Stop Smoking 45 Transport 46 Volunteering 46 Young People 47-49 Public Partnership Forum 50 Comments and Complaints 51-21 About Glasgow City Community Health Partnership Glasgow City Community Health Partnership (GCCHP) was established in November 2010 and provides a wide range of community based health services delivered in homes, health centres, clinics and schools. These include health visiting, health improvement, district nursing, speech and language therapy, physiotherapy, podiatry, nutrition and dietetic services, mental health, addictions and learning disability services. As well as this, we host a range of specialist services including: Specialist Children’s Services, Homeless Services and The Sandyford. We are part of NHS Greater Glasgow & Clyde and provide services for 584,000 people - the entire population living within the area defined by the LocalAuthority boundary of Glasgow City Council. Within our boundary, we have: 154 GP practices 136 dental practices 186 pharmacies 85 optometry practices (opticians) The CHP has more than 3,000 staff working for it and is split into three sectors which are aligned to local social work and community planning boundaries.
    [Show full text]
  • Glasgow City Health and Social Care Partnership Health Contacts
    Glasgow City Health and Social Care Partnership Health Contacts January 2017 Contents Glasgow City Community Health and Care Centre page 1 North East Locality 2 North West Locality 3 South Locality 4 Adult Protection 5 Child Protection 5 Emergency and Out-of-Hours care 5 Addictions 6 Asylum Seekers 9 Breast Screening 9 Breastfeeding 9 Carers 10 Children and Families 12 Continence Services 15 Dental and Oral Health 16 Dementia 18 Diabetes 19 Dietetics 20 Domestic Abuse 21 Employability 22 Equality 23 Health Improvement 23 Health Centres 25 Hospitals 29 Housing and Homelessness 33 Learning Disabilities 36 Maternity - Family Nurse Partnership 38 Mental Health 39 Psychotherapy 47 NHS Greater Glasgow and Clyde Psychological Trauma Service 47 Money Advice 49 Nursing 50 Older People 52 Occupational Therapy 52 Physiotherapy 53 Podiatry 54 Rehabilitation Services 54 Respiratory Team 55 Sexual Health 56 Rape and Sexual Assault 56 Stop Smoking 57 Volunteering 57 Young People 58 Public Partnership Forum 60 Comments and Complaints 61 Glasgow City Community Health & Care Partnership Glasgow Health and Social Care Partnership (GCHSCP), Commonwealth House, 32 Albion St, Glasgow G1 1LH. Tel: 0141 287 0499 The Management Team Chief Officer David Williams Chief Officer Finances and Resources Sharon Wearing Chief Officer Planning & Strategy & Chief Social Work Officer Susanne Miller Chief Officer Operations Alex MacKenzie Clincial Director Dr Richard Groden Nurse Director Mari Brannigan Lead Associate Medical Director (Mental Health Services) Dr Michael Smith
    [Show full text]
  • Overview of Allocated Funding
    Overview of allocated funding A combined total of £979,625 has been awarded to 116 community groups and workplaces through the Cycling Friendly programme with a further £821,991 awarded to registered social landlords across Scotland for improvement facilities to promote walking and cycling. More than 90,000 people will benefit from the funding. Setting Number funded Amount funded People impacted Community groups 48 £536,737 Data not collected Employers 68 £442,888 27,500 Social housing 33 £821,991 62,119 providers Total 149 £1,801,616 89,619 Kath Brough, Head of Behaviour Change at Cycling Scotland said: “We’re delighted to announce funding to 149 organisations across Scotland to encourage more people to cycle. Cycling Scotland work closely with partners to help employers, community groups and housing associations take advantage of the benefits of cycling and this round of funding will provide opportunity for over 90,000 people across Scotland to access improved cycling facilities.” Elderbank Housing Association, based in Govan, Glasgow, will receive £25,000 to install cycle parking for the 2,700 residents living across their properties, where currently there is no cycle parking. Jim Fraser, Estate Management Inspector, said “lack of storage has been a key issue for residents, especially those in older tenement buildings, so installing bike parking will remove a significant barrier to the uptake in bike ownership and cycling as a healthy activity. Govan is well established as an area of high deprivation and residents can often be found to have low household income and higher levels of household debt. This can impact greatly on people’s ability to access public transport beyond a limited geographical area and frequency due to a lack of sufficient finance.
    [Show full text]
  • Simd Analysis: Future Projections
    SIMD ANALYSIS: FUTURE PROJECTIONS 1. Background and Introduction 1.1. This paper analyses the reasons behind the recent decline of deprivation in Glasgow, projects these trends towards 2015, and comments on their likely implications. It is based on a presentation made to the Community Planning Executive Group on 2nd June 2010, which itself came from a series of events held in autumn 2009/spring 2010, involving over 120 people from council and non- council organisations in Glasgow. 1.2. The gains Glasgow made in reducing its share of Scotland’s deprivation have been the result of long-term trends that have been operating over the last two or more decades. Identifying both the trends that led to the current situation, and those currently in operation which can reasonably be presented as being influential in Glasgow towards 2015, form the basis of the projections in this paper. The main indicator used has been the Scottish Index of Multiple Deprivation (SIMD), and the analysis of three waves (2004, 2006 and 2009) has been supported by the use of other indicators. Looking at the absence of deprivation as well as at areas defined by deprivation includes all communities and gives a rounded analysis of the city. 1.3. The trends that have shaped the city at present are long-term and have been in operation since the 1990s, if not earlier. It follows that trends that can be identified in the present day will be those that influence the city by 2015. Their general direction has been to accelerate Glasgow’s development to its current position as a representative medium-sized western European city.
    [Show full text]
  • Celebrating 20 Years of the Occupation of Govanhill Baths 2001–2021
    CELEBRATING 20 YEARS OF THE OCCUPATION OF GOVANHILL BATHS 2001–2021 Occupy20BrochureA5a.indd 1 25/02/2021 14:49 CELEBRATING 20 YEARS OF THE OCCUPATION OF GOVANHILL BATHS 2001–2021 Introduction It has been twenty years since Glasgow There were events at weekends, gala City Council threatened to close Govanhill days, marches, occupations of other Baths for good. Kingston Swimming Club Glasgow City Council buildings and every received notice of the closure which was Wednesday evening campaigners joined covered by the Evening Times on the 15th the picket line and sang the Save Our Pool of January 2001. Songs to cheer their friends inside. The campaigners were from all parts of the Residents of the community took the community: children; parents; grandpar- article as a call to action. Two days later ents; artists, professionals; academics; the on the 17th of January a meeting was unemployed, the Asian community, the organised and the now famous Southside Irish community Against Closure Save Our Pool Campaign —a real cross-section of people working was established. together to save their local baths. On the 7th August mounted police were sent to forcefully remove the group, in what has become known as The Battle of Calder Street. The Save Our Pool campaign continued and in December 2004 Govanhill Baths Community Trust was established. Since then the Trust has been campaigning and fundraising to reopen the Baths as a Well- being Centre—contractors are in place and the work is about to begin. On the 21st of March 2001, a dozen pro- To celebrate what was the beginning of testors entered the Baths and chained one of the most powerful stories of com- themselves to the cubicles (2001 was munity action in Scotland’s history, we the 30th anniversary of the Upper Clyde are hosting a series of exciting projects Shipbuilders Work-In so occupation was in throughout the year.
    [Show full text]
  • Making Contact
    Information on: Making contact Get in touch Office closure If you wish to report a repair during office hours, please call Our office is currently closed 0141 445 4418 and press option 1 due to the Scottish Government If your call is regarding another matter, please call 0141 445 restrictions imposed as a result 4418 and press option 2 of Covid19 and all telephone lines have been diverted to staff If you wish to contact us by email, please send it to who are working from home. [email protected] If you have an emergency repair out-with office hours, please contact our contractor as follows: For gas heating repairs contact Gas sure on 01294 - 468113 For all other types of emergency repairs contact Select Facilities on 0344 8718018 Making direct contact You can also make direct contact with your Customer Services Officer/Assistant. Their contact details are on the next page. 1. Find out which patch your house is in; 2. Get the patch contact details from the sheet; 3. Get in touch. Linthouse Housing Association, 1 Cressy St, Glasgow G51 4RB. Telephone: 0141 445 4418, Email: [email protected]. Linthouse Housing Association is registered with the Financial Conduct Authority, registration number 1800RS, the Scottish Housing Regulatory, registration number 149, and is a charity registered in Scotland, registration number SC028161. A copy of our Data Protection Policy is available through our website at www.linthouseha.com. Contact Patches Team member Email addresses number Patch 1 Balbeg Street Lisa Lindsay 0141 445 8402 [email protected]
    [Show full text]
  • Award for Involving All in North Glasgow
    ISSUE 45 HE way ng homes T works with and involves a Award for Involving all variety of people in hard to reach community groups has been recognised by a Good in North Glasgow Practice Award at TPAS Scotland’s recent Annual Conference. The Involving All award was presented to North Glasgow based ng homes who have involved a wide range of people and used their views to improve services and communities across the North of the city. In a tough category the runners up were Impact Arts and Viewpoint Housing Association. CEO of ng homes Robert Tamburrini said: “Working in partnership with others to look at ways of working ‘with and for’ our residents we are constantly looking for, and acting on, opportunities to get people and organisations together and this year we have continued to build on our commitment to further develop our relationships with minority groups.” With a multi-cultural mix of residents ng homes takes a proactive and sustained approach to ensure they meet the needs of the groups and also ensure that their voices are heard as part of influencing and delivering on services. ng homes has made positive connections with African and Chinese communities, recognising the diverse ethnic and cultural make-up of the area and they have carried out a range of Integration events. Summer supported by ng homes and attended by Cultural Officers for both the African and Chinese With 88 African families living within ng homes 1500 people. communities and their work includes building properties the association works with groups like The Chinese community in North Glasgow also relationships and connections within and across African Challenge Scotland (ACS), a community benefits from the work that ng homes does with cultures working closely with the Scottish community organisation supporting the capacity, development, 60 Chinese families currently living within their and across generations.
    [Show full text]
  • Glasgow City Council Housing Development Committee Report By
    Glasgow City Council Housing Development Committee Report by Director of Development and Regeneration Services Contact: Jennifer Sheddan Ext: 78449 Operation of the Homestake Scheme in Glasgow Purpose of Report: The purpose of this report is to seek approval for priority groups for housing developments through the new Homestake scheme, and for other aspects of operation of the scheme. Recommendations: Committee is requested to: - (a) approve the priority groups for housing developments through the new Homestake scheme; (b) approve that in general, the Council’s attitude to whether the RSL should take a ‘golden share’ in Homestake properties is flexible, with the exception of Homestake development in ‘hotspot’ areas where the Housing Association, in most circumstances, will retain a ‘golden share’; (c) approve that applications for Homestake properties should normally be open to all eligible households, with preference given to existing RSL tenants to free up other existing affordable housing options; (d) approve that net capital receipts to RSLs through the sale of Homestake properties will be returned to the Council as grant provider to be recycled in further affordable housing developments. Ward No(s): Citywide: Local member(s) advised: Yes No Consulted: Yes No PLEASE NOTE THE FOLLOWING: Any Ordnance Survey mapping included within this Report is provided by Glasgow City Council under licence from the Ordnance Survey in order to fulfil its public function to make available Council-held public domain information. Persons viewing this mapping should contact Ordnance Survey Copyright for advice where they wish to licence Ordnance Survey mapping/map data for their own use. The OS web site can be found at <http://www.ordnancesurvey.co.uk> .
    [Show full text]
  • Understanding Glasgow in a Globalised World: Social Problems and Policy Responses | University of Glasgow
    09/30/21 Understanding Glasgow in a Globalised World: Social Problems and Policy Responses | University of Glasgow Understanding Glasgow in a Globalised View Online World: Social Problems and Policy Responses This course provides an opportunity to focus on Glasgow's social problems and urban challenges and how these are tackled by public policy, including comparisons with cities in other parts of the world. Students will examine issues ranging from poverty and inequality, housing and community relations to gangs and the 'divided city', and consider how policy tries to address them, and what we know about the difference policy makes. [1] Abrahamson, M. 2004. Global cities. Oxford University Press. [2] acumfae Govan: http://www.acumfaegovan.com/index.php. [3] Acuto, M. and Steele, W. 2013. Global city challenges: Debating a concept, improving the practice. Palgrave Macmillan. [4] Atkinson, R. 2006. Padding the bunker: Strategies of middle-class disaffiliation and colonisation in the city. Urban Studies. 43, 4 (Jan. 2006), 819–832. DOI:https://doi.org/10.1080/00420980600597806. [5] 1/12 09/30/21 Understanding Glasgow in a Globalised World: Social Problems and Policy Responses | University of Glasgow Baggott, R. 2011. Public health: policy and politics. Palgrave Macmillan. [6] BBC News - Scotland’s most polluted streets revealed: http://www.bbc.co.uk/news/uk-scotland-21307075. [7] Braham, P. et al. 2002. Social differences and divisions. Blackwell. [8] Bruce, S. 2014. Sectarian Discrimination in Local Councils and Myth-Making. Scottish Affairs. 23, 4 (Nov. 2014), 445–453. DOI:https://doi.org/10.3366/scot.2014.0043. [9] Bryce, T.G.K.
    [Show full text]
  • Imagine Govan a Manifesto
    imagine govan a manifesto June 2017 yellow book 39/2 Gardner’s Crescent Edinburgh EH3 8DG 07957 363513 www.yellowbookltd.com imagine govan a manifesto June 2017 Glasgow City Council Section 1 Introduction 1 Section 2 Govan economy and society 7 Section 3 Listening to the community 11 Section 4 A place of great potential 13 Section 5 A virtuous circle 15 Section 6 Sources of inspiration 17 Section 7 The Imagine Govan Action Plan 22 Section 8 Delivering change 41 yellow book with WMUD, Nick Wright Planning, Creative Space Management, Architecture 00, Steven Tolson 1. Introduction Summary The Central Govan Action Plan (CGAP) Steering Group commissioned yellow book consultants to carry out a review of conditions and prospects in Govan a decade after the original action plan was launched – and to propose a strategy and action plan for the next 10 years.1 CGAP was launched in 2006 as a development framework to guide the physical regeneration of central Govan. It developed into a governance, partnership and investment structure headed by a Steering Group of local residents, community organisations, elected members and partner agencies, including Glasgow City Council as lead partner. The Steering Group is a consultative, lobbying and decision-making structure that guides the implementation of the CGAP programme and agrees an annual investment plan. Since its introduction, the CGAP Partnership has made significant progress toward its objective of making Govan a more attractive, vibrant and prosperous place. It has made Govan a better place to live, work and visit, and helped to restore the confidence of the community.
    [Show full text]
  • UNIT 3A, MOORPARK CENTRAL 21 Dava Street, Glasgow, G51 2JA
    TO LET UNIT 3A, MOORPARK CENTRAL 21 Dava Street, Glasgow, G51 2JA Key Highlights • Detached modern warehouse with offices • 2 x roller shutter door access • 3,188.10 sq m (34,318 sq ft) • 18 car parking spaces • Total site area – 6,855 sq m / 73,787 sq ft / • Eaves height of 6.5m 1.70 acres • Close to J23 and J24 of the M8 Motorway SAVILLS GLASGOW 163 West George Street, Glasgow G2 2JJ +44 (0) 141 248 7342 savills.co.uk Location Description The subjects are situated on Dava Street which forms The subject comprises a large detached industrial part of the wider Moorpark Central development warehouse with office accommodation. Accessed off undertaken by Silverbank Development Company during Dava Street the property benefits from a large concrete/ the early and mid-2000’s. Moorpark Central and Dava tarmac surfaced yard area with approximately 18 car Street are immediately to the west of Helen Street, the parking spaces. The yard area and parking extends principal industrial and business corridor within the to 8.7 acres. The building is of a steel portal frame Govan / Ibrox area of Glasgow. construction with concrete blockwork walls to dado Motorway access to the location is strong and this height with profiled metal sheet cladding. is afforded from Junctions 23 and 24 of the M8. Internally, the accommodation comprises a large Underground stations are located nearby at Ibrox workshop area with solid concrete floor. The warehouse Stadium and Govan Cross with buses running through has an eaves height of 6.5m to the underside and 8.0m the location at regular intervals.
    [Show full text]