Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar,

APPENDIX - I (See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the project/s Proposed Redevelopment of Building No. 54, 55, 56 of Varatk Nagar Layout 2 S. No. in the Schedule 8 (a) 3 Proposed capacity / area/ Proposed Unit length/tonnage to be handled/ command area/lease area/ number of wells to be drilled. Total Plot Area 29,57.00 m2 FSI Area 27,447.56 m2 Construction 45,226.66 Built Up Area m2

4 New / Expansion / Modernization Redevelopment Project 5 Existing Capacity/ Area etc. 6 Category of project i.e. A or B B Category 7 Does it attract the general No condition? if yes, please specify 8 Does it attract the specific No condition? If yes, please specify 9 Location At Vartak Nagar, Thane (W) Plot/Survey/ Khasra No. Redevelopment of Building No. 54, 55, 56 of Vartak Nagar on land bearing S. No.:186. 364 at village Majiwade, Tal and Dist: Thane Village Thane Tehsil Thane State 10 Nearest railway station/port along with distance in kms. Distance: 4 km approx 11 Nearest Town, city, District Thane Headquarters along with distance in kms. 12 Village Panchayat,Zilla Thane Municipal Corporation Parishad,Municipal Corporation, Local body(complete postal addresses with telephone nos. to be given) 13 Name of the applicant Thane Municipal Corporation

Ministry of Environment & Forests, New . Prior Environmental Clearance Notification 14.09.2006 1

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

14 Registered address 15 Address for correspondence: Ray Office Bldg, PR No. 2, Near Oswal Park Name Mr. Anil Patil Designation(Owner/ Partner/ CEO) Deputy City Engineer (BSUP) Address Ray Office Bldg, PR No. 2, Near Oswal Park Pin code 400606 E-mail [email protected] Telephone No. 9930301457 Fax No. 022 - 25347714 16 Details of alternative sites Village-District-State examined, if any. Location of these 1. sites should be shown on a toposheet. 2. 3. Redevelopment of existing buildings 17 Interlined projects Not Applicable 18 Whether separate application of No interlinked project has been submitted? 19 If yes, date of submission - 20 If No, Reason Stand alone construction project 21 Whether the proposal involves NO approval/clearance under: if ,yes details of the same and their status to be given a) The Forest (Conservation) Act, 1980? b) The wildlife (protection) Act, 1972? c) The CRZ Notification, 1991? 22 Whether there is any Government No Order/policy relevant/relating to the site?

23 Forest land involved ( hectares) 24 Whether there is any litigation No such litigation pending against the project pending against the project and/or land in which the project is propose to be set up? a) Name of the court b) Case No. c) Orders/ Directions of the court if any and its relevance with the proposed project.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 2

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,)

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Details thereof (with approximate quantities Sr.No. Information/Checklist Yes/No /rates, wherever possible) with source of confirmation information data 1.1 Permanent or temporary change in Land reserved for Residential Development land use, land cover or No topography including increase in intensity of land use (with respect to local land use plan)

1.2 Clearance of existing Yes Existing 3 residential buildings will be land, vegetation and demolished for redevelopment. buildings? 1.3 Creation of new land No The land is reserved for residential uses? development as per DP of TMC

1.4 Pre-construction Yes Soil samples taken within the plot premises for investigations e.g. bore geotechnical investigation houses, soil testing? 1.5 Construction works? No

1.6 Demolition works? Yes Existing 3 residential buildings will be demolished for redevelopment. About 5427 m3 of demolition waste will be generated. The waste will be disposed at designated disposal site as approved by the collector 1.7 Temporary sites used Yes Temporary sheds will be provided for workers. for construction works or Housing of construction workers? 1.8 Above ground buildings, Yes Total Excavation quantity: 3600 m3 structures or Most of the excavated soil will be used for back earthworks including filling at project site only linear structures, cut and fill or excavations 1.9 Underground works No including mining or tunneling?

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 3

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

1.10 Reclamation works? No

1.11 Dredging? No

1.12 Offshore structures? No

1.13 Production and No This is a construction project manufacturing processes?

1.14 Facilities for storage of Yes Only construction material will be stored in goods or materials? temporary storage site

1.15 Facilities for treatment Yes Solid waste will be treated by mechanical or disposal of solid composting method (Eco bio-compack). waste or liquid effluents? Sullage generated from the complex will be treated in Sullage treatment Plant. Sewage will be directly disposed off in Municipal Sewer Lines

The treated sullage will be used for flushing and Gardening.

The dried sludge and compost will be used as manure for landscaping. 1.16 Facilities for long term No housing of operational workers? 1.17 New road, rail or sea No Existing road network will be used during traffic during construction and operation phase of project. construction or operation?

1.18 New road, rail, air No Existing road will be used for the transport waterborne or other purpose. transport infrastructure including new or altered routes and stations, ports, airports etc?

1.19 Closure or diversion of No existing transport routes or infrastructure leading to changes in traffic movements?

1.20 New or diverted No transmission lines or pipelines?

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 4

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

1.21 Impoundment, No damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No

1.23 Abstraction or transfers No of water form ground or surface waters? 1.24 Changes in water bodies No There will not be any changes in water bodies or the land surface or the land surface. affecting drainage or run-off? 1.25 Transport of personnel Yes Construction workers and construction or materials for material during construction phase construction, operation or decommissioning? 1.26 Long-term dismantling No or decommissioning or restoration works? 1.27 Ongoing activity during Yes Dust generation and increase in Noise levels decommissioning which during demolitions of existing buildings could have an impact on the environment? 1.28 Influx of people to an Yes Construction workers during construction area in either phase and additional residents during operation temporarily or phase permanently? 1.29 Introduction of alien No No introduction of alien species will occur as species? this is purely residential project

1.30 Loss of native species or No No threat of species loss will occur genetic diversity?

1.31 Any other actions? No No

2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply):

Sr.No. Information/checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 2.1 Land especially No No agricultural land undeveloped or agricultural land (ha) 2.2 Water (expected source & Yes Source: TMC

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 5

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

competing users) unit: Proposed Unit KLD Total Water 509 KLD Requirement The detailed water balance for operation phase of project is attached as Annexure IV 2.3 Minerals (MT) NA 2.4 construction material – Yes Stone, aggregates, sand demand will be met stone, aggregates, sand / from local open market soil (expected source – MT) 2.5 Forests and timber Yes Only door frames (if so planned) (source – MT) 2.6 Energy including Yes Source : MSEDCL electricity and fuels (source, competing users) Proposed Unit Unit: fuel (MT), energy Total Power 3.7 MW (MW) Requirement 2.7 Any other natural No resources (use appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr.No. Information/Checklist Details thereof (with approximate confirmation quantities/rates, wherever possible) with Yes/No source of information data 3.1 Use of substances or Yes Used oil from DG set will be stored materials, which are separately and will be given to authorised hazardous (as per MSIHC recyclers rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease No vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people The existing buildings are in dilapidated e.g. by changing living Yes conditions. The proposed redevelopment conditions? will give new flats to the existing tenements 3.4 Vulnerable groups of people There will be minor negative impact of who could be affected by the Yes proposed redevelopment on Hospital and project e.g. hospital patients, School buildings etc. children, the elderly etc., 3.5 Any other causes No

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 6

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

Sr.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine No wastes 4.2 Municipal waste (domestic Yes Municipal Solid Waste and or commercial wastes) Proposed Unit Total Solid 1885 kg/day Waste 4.3 Hazardous wastes (as per Yes Used oil from DG set will be given to Hazardous Waste authorised recyclers Management Rules) 4.4 Other industrial process No No, This is a redevelopment of residential wastes buildings 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other Yes 5 m3/d of sludge will be used as manure sludge from effluent treatment 4.7 Construction or demolition Yes Demolition waste: 5427 m3 wastes Construction debris during construction phase will be utilized in plot only for land levelling. The waste will be disposed at designated disposal site as approved by the collector 4.8 Redundant machinery or No Not Applicable equipment 4.9 Contaminated soils or No Not Applicable other materials 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approximate Sr.No. Information/Checklist Yes/No quantities/rates, wherever possible) with confirmation source of information data 5.1 Emissions from Yes Emission from DG sets during power failure and combustion of fossil movement of vehicle during operation phase of fuels from stationary or the project mobile sources 5.2 Emissions from No Not Applicable production processes 5.3 Emissions from Yes Fugitive emission from handling such as sand materials handling and other construction material including storage or transport

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 7

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

5.4 Emissions from Yes Transportation of construction material & construction activities handling of sand, aggregates, cement, DG sets including plant and etc. equipment The emissions from construction machinery would contain particulates, SOx, NOx and CO 5.5 Dust or odours from Yes Transportation, loading and unloading of handling of materials material will generate dust including construction materials, sewage and Odour from Solid waste management and waste sullage treatment plant area if not handled it properly 5.6 Emissions from No Not Applicable incineration of waste 5.7 Emissions from burning No Not Applicable of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any No Not Applicable other sources

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 8

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approximate Sr. No. Information/Checklist Yes/No quantities/rates, wherever possible) with confirmation source of information data with source of information data 6.1 From operation of Yes Increase in noise levels due to operations of equipment e.g. engines, construction equipments & vehicular movement ventilation plant, crushers 6.2 From industrial or No Not Applicable similar processes 6.3 From construction or Yes Increase in noise levels during construction. demolition 6.4 From blasting or piling Yes During pilling 6.5 From construction or Yes During construction and operation phase of the operational traffic project.

In the operation phase there will be increase in the vehicular movement because of the residents and visitors 6.6 From lighting or cooling No Not Applicable systems 6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Sr.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, No The used oil from DG sets will be given to use or spillage of authorised recyclers hazardous materials 7.2 From discharge of No Sullage generated from the complex will be sewage or other treated in Sullage treatment Plant. Sewage will effluents to water or the be directly disposed off in Municipal Sewer land (expected mode Lines and place of discharge) The treated sullage will be used for flushing and Gardening.

7.3 By deposition of No Not Applicable pollutants emitted to air into the land or into water 7.4 From any other sources No Not Applicable 7.5 Is there a risk of long No Not Applicable term build up of pollutants in the environment from these Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 9

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Sr.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 8.1 From explosions, Yes Spillage of used oil from DG sets and explosion spillages, fires etc from in Diesel storage area. Adequate fire protection storage, handling, use or measures will be taken up as per the fire NOC production of hazardous substances 8.2 From any other causes Yes  Accidents during construction phase (Slips, fall from height, falling of objects/ material on workers, fire, cut and burns, electric shock and collapse of shuttering  Fire due to short circuiting  Terrorism

8.3 Could the project be Yes The proposed structure is designed as per affected by natural Seismic Zone III standards. disasters causing environmental damage The project area doesn’t have history of flooding (e.g. floods, earthquakes, landslides, cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Sr. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data No The proposed project is a redevelopment of 9.1 Lead to development of residential buildings. The proposed site is supporting. located in an urbanised area and hence the facilities, ancillary infrastructural facilities already exist. The development or project site is accessible by 24 m wide road development stimulated by the project which could have impact on the environment e.g.:

• Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) • housing development

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 10

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

• extractive industries

• supply industries

• other

9.2 Lead to after-use of the No Not Applicable site, which could have an impact on the environment 9.3 Set a precedent for No Not Applicable later developments 9.4 Have cumulative effects No At present there is no major ongoing due to proximity to construction project of similar intensity. other existing or planned projects with similar effects

(III) Environmental Sensitivity

Sr.No. Areas Name/ Aerial distance (within 15 km.) Identity Proposed project location boundary

1 Areas protected under Yes Sanjay Gandhi National Park (yeoor side) international approx 1.49 km from the Proposed Project Site conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are Yes : 3.01km important or sensitive Upvan Lake: 1 km for ecological reasons - Tulsi lake: 4.67km Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, No important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine Yes Thane Creek: 3.01km or underground waters Upvan Lake: 1 km Tulsi lake: 4.67km

5 State, National No boundaries

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 11

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

6 Routes or facilities used No by the public for access to recreation or other tourist, pilgrim areas 7 Defence installations No 8 Densely populated or Yes Fully urbanised area built-up area 9 Areas occupied by Yes Hospitals, schools, community facilities, & places sensitive man-made of worship are present at Vartaknagar layout. land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing Yes Thane Creek: 3.01km important, high quality Upvan Lake: 1 km or scarce resources Tulsi lake: 4.67km (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected No to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to No natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 12

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

(IV). Proposed Terms of Reference for EIA studies

Not Applicable

I hereby given undertaking that the data & information given in the application & enclosures are true to the best of my knowledge & belief & I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date: 27.02.2014 Place:

Signature of the applicant With name & full address (Project proponent/Authorised signatory)

NOTE:

1) The projects involving clearance under Coastal Regulation Zone Notification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t C.R.Z(at the stage of TOR) and the recommendations of the State Coastal Zone management Authority(at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z Notification, 1991 for the activities to be located in the CRZ.

2) The projects to be located within 10 km of the national Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-avis the project location and the recommendations or comments of the chief Wildlife thereon.(at the stage of EC) 3) All correspondence with the ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarifications as may be required from time to time, participation in the EAC meeting on behalf of the project proponent shall be made by the authorised signatory only. The authorised signatory should also submit a document in support of his claim of being an authorised signatory for the specific project.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 13

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

APPENDIX - II (See paragraph 6)

FORM-1 A (only for construction projects listed under item 8 of the Schedule)

CHECK LIST OF ENVIRONMENTAL IMPACTS

(Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme)

1. LAND ENVIRONMENT

(Attach panoramic view of the project site and the vicinity) 1.1 Will the existing landuse get The existing land use will not get altered from the significantly altered from the project. As per the zoning structure the area comes project that is not consistent with under residential area. the surroundings? (Proposed Proposed development is in line with D. P of landuse must conform to the Following documents are attached as supporting approved Master Plan / documents. Development Plan of the area. Change of landuse if any and the 1. Conceptual Plan and Detailed Tenement statutory approval from the statement are attached as ANNEXURE II competent authority be 2. Location Plan is attached as ANNEXURE III submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. 1.2 List out all the major project Proposed Unit requirements in terms of the land area, built up area, water Total Plot Area 2957.00 m2 consumption, power requirement, connectivity, FSI Proposed 27,447.56 m2 community facilities, parking needs, etc. Construction Area 45,226.66 m2

Water consumption Proposed Unit Total Water 509 m3/day Consumption Energy Consumption Proposed Unit

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 14

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

Total Energy 3.7 MW Consumption Parking Provided Total Parking 124 Nos. Provided

Connectivity Proposed site is accessible by- 1) 40 m wide Pokharan Road No.1 2) 24 m wide DP Road Location Plan is attached as ANNEXURE III 1.3 What are the likely impacts of the The project being a well planned activity will result proposed activity on the existing in organized open spaces and green areas. There will facilities adjacent to the proposed be minor negative impact on flora present in and site? (Such as open spaces, around the project site during construction phase community facilities, details of the mainly due to dust. existing landuse, disturbance to the local ecology). 1.4. Will there be any significant land The main reasons for erosion are overexploitation of disturbance resulting in erosion, groundwater, instable slopes, landslides etc. The subsidence & instability? (Details proposed construction will involve cutting and filling of soil type, slope analysis, operations. The project will involve construction of vulnerability to subsidence, roads and development of green areas, which would seismicity etc may be given). reduce the chances of erosion and subsidence.

Subsidence is not anticipated as ground water would not be used as a source of water supply.

As per seismic-zoning map of , the project site falls under zone III. Structural design requirements will be as per zone III. 1.5 Will the proposal involve No. There will not be any alteration of natural alteration of natural drainage drainage system. The land is flat. The natural slope of systems? (Give details on a the area is towards east side. contour map showing the natural drainage near the proposed project site) 1.6 What are the quantities of Excavation quantity will be around 3600 m3. There earthwork involved in the will not be any transport of fill materials from construction activity-cutting, outside. filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site, etc.)

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 15

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

1.7 Give details regarding water Supply Source: Water for Domestic consumption supply, waste handling etc during will be available from Thane Municipal Corporation the construction period. (TMC) whereas for Construction purpose bore well or Tanker water will be used. Storage: Water for construction will be stored in a tank constructed temporarily at site whereas Domestic water from TMC will be stored in HDPE tanks. 1.8 Will the low lying areas & No wet lands and low-lying areas on the site. wetlands get altered? (Provide Received details of how low lying and wetlands are getting modified from the proposed activity) 1.9 Whether construction debris & No health hazard is anticipated. Existing residential waste during construction cause buildings will be demolished for redevelopment. health hazard? (Give quantities of About 5427 m3 of demolition waste will be various types of wastes generated generated. The waste will be disposed at designated during construction including the disposal site as approved by the collector construction labour and the means of disposal)

2. WATER ENVIRONMENT

2.1 Give the total quantity of water Total Water requirement: 509 KLD requirement for the proposed project with the break up of Detailed water balance is enclosed as ANNEXURE requirements for various uses. How IV will the water requirement met? State the sources & quantities and furnish a water balance statement. 2.2 What is the capacity (dependable flow or yield) of the proposed The proposed water demand will be met from TMC source of water? 2.3 What is the quality of water Water supply is from TMC required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) 2.4 How much of the water Treated water from Sullage treatment Plant will be requirement can be met from the used for flushing in toilet and gardening recycling of treated wastewater? Total sewage generated 475 KLD (Give the details of quantities, sources and usage) Treated water recycled for 170 KLD flushing Sludge for composting 5 KLD Sewage to municipal Sewer 301 KLD

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 16

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

2.5 Will there be diversion of water No diversion is anticipated from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) 2.6 What is the incremental pollution The total sewage of about 475 KLD will be load from wastewater generated generated from the project. The composition of from the proposed activity? (Give waste water is given in the table indicating the details of the quantities and quality of raw waste water before treatment composition of wastewater Parameters Values Units generated from the proposed activity) pH 7-8 mg/l BOD 250-300 mg/l COD 450-600 mg/l O & G/ ABS 10-20 mg/l TSS 100-200 mg/l Mitigation measures: The sullage and Sewage will be separated at source. Sullage will be treated in the sullage Treatment plant of capacity 500 m3/day. The treated sullage water will be reused for flushing and gardening. 2.7 Give details of the water Rainwater harvesting tanks and ground water requirements met from water recharge pits will be provided harvesting? Furnish details of the facilities created. 2.8. What would be the impact of the There will not be changes in land use as this is land use changes occurring due to redevelopment project. The municipal storm water the proposed project on the runoff drains are present on site. characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way? 2.9 What are the impacts of the In the proposed development there will be no proposal on the ground water? tapping of groundwater. Water demand for the (Will there be tapping of ground construction as well as operational phase will be water; give the details of ground met from sources such as TMC. water table, recharging capacity,

and approvals obtained from The ground water table is at 4 to 5m. competent authority, if any)

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 17

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

2.10 What precautions/measures are Following measures will be taken up to prevent the taken to prevent the run-off from runoff from polluting land and ground water construction activities polluting land & aquifers? (Give details of  No excavation during monsoon season. quantities and the measures taken  Catch drainage all along the periphery of plot to to avoid the adverse impacts) prevent surface runoff.  Use of silt fence and traps to reduce the run off

2.11 How is the storm water from The project will have proper storm water drainage within the site managed?(State the facility as per Strom Water Drain Remarks by provisions made to avoid flooding concerned authority. of the area, details of the drainage The storm water drains will be provided at ground facilities provided along with a site levels. So there will not be problem of water layout indication contour levels) logging due to this project.

2.12 Will the deployment of No, the deployment of construction labourers will construction labourers particularly not lead to any unsanitary condition. The in the peak period lead to construction labourers will be provided with unsanitary conditions around the temporary shelter shades within the project project site (Justify with proper premises. The unsanitary condition will be explanation) removed by means of providing readymade Modular toilets

Solid waste will be disposed off in municipal waste disposal system. 2.13 What on-site facilities are provided Construction Phase: for the collection, treatment & safe Sewage will be treated in septic tank. The overflow disposal of sewage? (Give details of of septic tank is discharged in soak pits. the quantities of wastewater generation, treatment capacities Operation Phase: with technology & facilities for The Sullage Treatment Plant is designed to treat recycling and disposal) the raw sullage generated from the proposed project. The proposed capacity of sullage treatment plant would be 500 m3

2.14 Give details of dual plumbing Yes, The proposed development will have the dual system if treated waste used is plumbing system as the treated sullage will be used used for flushing of toilets or any for recycling. other use.

3. VEGETATION 3.1 Is there any threat of the project to There is no sensitive ecosystem present at site that the biodiversity? (Give a will be disturbed by the project description of the local ecosystem with it’s unique features, if any)

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 18

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

3.2 Will the construction involve There are no trees present on the site. extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project) 3.3 What are the measures proposed to The green belt will be developed for control of be taken to minimize the likely pollution and aesthetic view of the complex. Total impacts on important site features 30 trees will be planted in the premises. (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale)

4. FAUNA 4.1 Is there likely to be any No. The proposed site and its surroundings do not displacement of fauna- both support any habitat for any group of wild animals terrestrial and aquatic or creation of barriers for their movement? Provide the details. 4.2 Any direct or indirect impacts on No. There will be no direct or indirect impact on the the avifauna of the area? Provide avifauna of the area. details. 4.3 Prescribe measures such as Since the Proposed Project would not have any corridors, fish ladders etc to adverse impact on fauna hence mitigation measure mitigate adverse impacts on fauna not relevant

5. AIR ENVIRONMENT 5.1 Will the project increase The Project will result in marginal increase in the atmospheric concentration of atmospheric concentrations of gases due to D.G. gases & result in heat islands? operations (back up power only) and the increased (Give details of background air traffic. The proposed activity will not result in the quality levels with predicted values formation of any heat islands, as it does not involve based on dispersion models taking any significant change in the land use pattern or the into account the increased traffic concreting of areas. generation as a result of the proposed constructions) 5.2 What are the impacts on Diesel generator sets operated for back-up power generation of dust, smoke, odorous supply are identified as the only major sources of fumes or other hazardous gases? gaseous and particulate emission. Impact of Give details in relation to all the vehicular is not significant. SO2, SPM, NOX and CO meteorological parameters. emissions are expected due to fuel combustion in generator sets.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 19

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

5.3 Will the proposal create shortage The project will have proper entry and exit for the of parking space for vehicles? vehicles. The project site is accessed by Pokharan Furnish details of the present level Road no.1. and proposed 40 m wide D.P road . of transport infrastructure and There will not any traffic congestion due to project measures proposed for site. In proposed project provision of 124 (four improvement including the traffic wheeler) parking spaces has been made. management at the entry & exit to the project site. 5.4 Provide details of the movement Internal roads, footpaths/ pedestrian pathways patterns with internal roads, have been planned within the proposed complex bicycle tracks, pedestrian pathways, footpaths etc., with areas under each category. 5.5 Will there be significant increase in Considering the addition of vehicles due to the traffic noise & vibrations? Give proposed project with the existing roads and details of the sources and the vehicles plying on them, there will be marginal measures proposed for mitigation increase in the noise levels but will not result in an of the above. negative impact. 5.6 What will be the impact of DG sets DG set will be used in construction and operation & other equipment on noise levels phase only in case of power failure. & vibration in & ambient air The DG Sets shall be as per the guide lines laid quality around the project site? down by EPR for specific noise emission standards. Provide details. Measures shall be taken for reduction of noise by using acoustic enclosures.

Increase in noise levels are expected from various construction equipment and machinery.

6. AESTHETICS 6.1 Will the proposed constructions in The proposed land use of the site would be mainly any way result in the obstruction residential and will not result in obstruction of of a view, scenic amenity or view, scenic amenity or landscape. However, the landscapes? Are these buildings will be planned in such a way that the considerations taken into account organised open areas and landscaped areas are at by the proponents? the centre so that all can enjoy the green areas. 6.2 Will there be any adverse impacts There will not be any adverse impact from new constructions on the existing structures? What are the considerations taken into account? 6.3 Whether there are any local The Project has been designed as per the considerations of urban form & department of town planning, Government of urban design influencing the Maharashtra. design criteria? They may be explicitly spelt out.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 20

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

6.4 Are there any anthropological or No anthropological or archaeological sites or archaeological sites or artefacts artefacts are found near the site area. nearby? State if any other significant features in the vicinity of the proposed site have been considered.

7. SOCIO-ECONOMIC ASPECTS 7.1 Will the proposal result in any No. Majority of the labour will be recruited locally changes to the demographic and only minimal skilled workers would be from structure of local population? outside, which is anticipated to be very small and Provide the details. will not alter the existing demographic profile of the area. 7.2 Give details of the existing social The Project comes in Residential area and has all infrastructure around the basic infrastructural facilities as schools, medical proposed project. establishments, shops, etc within 2 to 3 km radius of project site. 7.3 Will the project cause adverse No. The Project will have positive impact on local effects on local communities, communities. disturbance to sacred sites or other cultural values? What are the safeguards proposed?

8. BUILDING MATERIALS 8.1 May involve the use of building Yes the building materials with high embodied materials with high-embodied energy will be used energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency) 8.2 Transport and handling of Adequate mitigative measures will be adopted. materials during construction may Construction equipment with idling control result in pollution, noise & public technologies will be used. Regular maintenance of nuisance. What measures are taken the equipments will be carried out. The to minimize the impacts? construction activities will be carried out during the daytime only. The constructions materials/excavated soil/construction debris will be carried thorough covered trucks. The workers exposed to high noise generating would be provided with earplugs. 8.3 Are recycled materials used in Fly ash in cement concrete. Typically 20- 25 % of fly roads and structures? State the ash is substituted in cement. extent of savings achieved? 8.4 Give details of the methods of The bio-degradable and non-bio degradable waste collection, segregation & disposal will be segregated at source of waste generation. of the garbage generated during Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 21

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

the operation phases of the project. Proposed Unit Solid 1885 kg/day waste generated

 The bio degradable waste 754 kg/day will be treated by mechanical composting method  The non-bio degradable waste 1131 kg/day will be disposed off through recyclers.

9. ENERGY CONSERVATION 9.1 Give details of the power Source of power supply: MSEDCL requirements, source of supply, DG Set will be provided as emergency backup. backup source etc. What is the Proposed Unit energy consumption assumed per square foot of built-up area? How Total Energy 3.7 MW have you tried to minimize energy Consumption consumption? 9.2 What type of, and capacity of, DG Set will be provided as emergency backup for power back-up to you plan to lighting in common areas, one lift per building and provide? fire pump in each building. The total D.G. set capacity will be 750 kVA

9.3 What are the characteristics of the Double glazed glass for Residential buildings glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation? 9.4 What passive solar architectural The building structure will be designed in such a features are being used in the way that solar light can be utilised maximum for building? Illustrate the day time. applications made in the proposed project. 9.5 Does the layout of streets & Solar street lights are proposed in areas such as buildings maximise the potential open spaces, pathways, RG etc. for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 22

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

9.6 Is shading effectively used to The proposed residential building will have shading reduce cooling/heating loads? arrangement. What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected? 9.7 Do the structures use energy- Yes. The rooms will be so dimensioned that effective efficient space conditioning, air conditioning can be carried out. Public areas will lighting and mechanical systems? be cooled by natural ventilation. The design of the Provide technical details. Provide building will be such that maximum use of natural details of the transformers and ventilation can be achieved. The walls, roofs and motor efficiencies, lighting openings will be so designed that influx of heat is intensity and air-conditioning load minimum. assumptions? Are you using CFC and HCFC free chillers? Provide specifications. 9.8. What are the likely effects of the Heat emission from the proposed construction can building activity in altering the be from the following sources: micro-climates? Provide a self Heat absorbed from the concrete structures, heat assessment on the likely impacts of generated from equipments/ appliances, and due to the proposed construction on increased population in the proposed development. creation of heat island & inversion However the heat generated will not be significant effects? and will be dissipated in the lush greens and open areas provided within. Hence it can be concluded that the heat island effect shall not be a concern for the proposed project. 9.9. What are the thermal U value in Watts/hr/m2/C characteristics of the building 2 envelope? (a) roof; (b) external Roof 0.409 Watts/hr/m /C walls; and (c) fenestration? Give details of the material used and the 2 U-values or the R values of the Wall 0.352 Watts/hr/m /C individual components. 9.10 What precautions & safety The fire fighting system shall compromise of measures are proposed against fire hydrant system and portable extinguishers. Smoke hazards? Furnish details of detectors will be provided along with manual call emergency plans. points. External yard hydrants shall be installed around all buildings in the complex in galvanized steel fire hose cabinet (weather proof). All external yard hydrants shall be at one meter height from finished ground level as per National Building Code. External fire hydrants shall be located such that no portion of any building is more than 45 m from a hydrant, and the external hydrants are not vulnerable to mechanical or vehicular damage. 9.11 If you are using glass as wall Not Applicable material provides details and specifications including emissivity and thermal characteristics. Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 23

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

9.12 What is the rate of air infiltration The following measures will be adopted to mitigate into the building? Provide details the effects of infiltration: of how you are mitigating the  Aluminium windows with rubber gasket, so that effects of infiltration. the windows are sealed, will be provided.  Summer cross section ventilation will be maximum. 9.13 To what extent the non- Not Applicable conventional energy technologies are utilised in the overall energy consumption? Provide details of the renewable energy technologies used.

10. Environment Management Plan

The Environment Management Enclosed as Annexure V Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 24

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

ANNEXURE I

TENEMENT STATEMENT

TENEMENT STATEMENT

Sr. No. Building Details Bo. Of Floors Tenements 1 Wing A & Wing B St + 28 421 2 Rehab St + 28 333 3 Total 754

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 25

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

ANNEXURE II CONCEPTUAL PLAN

7.68

6.29

6.16

3.75

3.74 12.00 M. WIDE 12.00ROAD WIDE M.

4.47

3.82

4.31

3.87 4.16

24.40 M. WIDE ROAD

PROPOSED REDEVELOPMENT OF BUILDING NO.54,55,56 AT VARTAK NAGAR MHADA LAYOUT. N

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 26

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

ANNEXURE III Location Plan

Project Site

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 27

Application form for Environmental Clearance Project Name: Redevelopment Project at Vartak Nagar, Thane

ANNEXURE IV

WATER BALANCE STATEMENT

Total Water No of Flats Total Water Requirement Water Particulars Occupancy Requirement/ /rooms /Cars Population Basis (in lpcd)* Demand KLD person

Domestic Flushing

Residential Rehab 333 5 1,665 90 45 135 225 Sale 421 5 2,105 90 45 135 284 Total 754 3,770 509 90 % of Domestic & 100 Sewage Generation % of Flushing 475 Requirement 1 % of Sewage Sludge 5 Generation Recycling for Flushing Residential Rehab 333 5 1,665 45 45 75 Sale 421 5 2,105 45 45 95 Total 754 3,770 170 Excess Treated Water to Municipal 301 Sewer

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 28

Application form for Environmental Clearance Project Name: Project Name: Redevelopment of Varatk Nagar ANNEXURE V Environmental Management Plan during Construction Phase

Sr. Environmental Probable Predicted Mitigation No. Components source of Remarks Impacts Measures Impact CONSTRUCTION PHASE Dust reduction Impacts are measures such as temporary road watering. during Dust emissions Periodic construction from Negative maintenance of phase. Impacts excavation, air impact inside construction will be emissions construction equipment. Use of confined to Ambient Air from 1. site premises. good quality fuels. short Quality machinery and No negative Use of Personal distances, as other impact Protective coarse construction outside site. Equipments particles will activities at settle within site. the short distance from activities. 2. Noise Negative Use of well impact near maintained noise equipment. generation Noise Heavy construction Temporary sources inside generated activity limited to impacts during from day- premises. No construction time hours only. construction significant activities and Use of noise phase. No impact on operation of mufflers in and blasting or construction construction other high vehicle. noise activities envisaged. ambient noise equipment and levels in the DG sets surrounding Use of area. earplugs/muffs by construction staff. Surface runoff Labour will be from project employed to Silt fences to site. Oil/fuel reduce size of reduce run-off and waste labour camps. Secondary No significant spills. No perennial containment and 3. Water negative Improper surface water dykes in material impact. debris resource storage areas. disposal. adjacent to Sewage treatment Discharge of site. No in septic tanks. sewage from excavation labour camp. work will be 4. Land Minor Excavation, Reutilization and negative Construction recycling of impact debris, waste construction debris

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 29 Application form for Environmental Clearance Project Name: Project Name: Redevelopment of Varatk Nagar Sr. Environmental Probable Predicted Mitigation No. Components source of Remarks Impacts Measures Impact from labour Waste from labour - camp. camps will be collected and composted on site. Non compostable waste will be transported to landfill site. Topsoil will be conserved and used for landscaping in functional phase. The impacts will be Short term compensated by impact Minor Construction extensive tree restricted only 5. Aesthetics negative activities and plantation and in the initial impacts Excavation gardening in the stages of use phase. construction.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 30 Application form for Environmental Clearance Project Name: Project Name: Redevelopment of Varatk Nagar Environmental Management Plan during Functional Phase

Sr. Environmen Predicted Probable Source Mitigation No tal Remarks Impacts Of Impact Measures . Components

FUNCTIONAL PHASE Use of low sulphur good fuel Particulate and Periodic Minor gaseous Ambient Air maintenance of DG DG sets will be 1. Negative emissions from Quality sets used. impact DG sets and vehicle movement Use of CNG/LPG as a fuel should be encouraged. Housing of DG sets in buildings with appropriate acoustics. Traffic Noise from Minor vehicle movement management negative and operation of measures to 2. Noise impact -- diesel generator reduce noise inside sets during power premises. Appropriate trees failure. which will act as noises barriers will be planted in the premises and along roadside. Sewage water will be treated and recycled. Oil/ fuel and Rainwater waste spills in harvesting and vehicle parking Recycled water No recharge of area. will be used for significant groundwater 3. Water Discharge of gardening and adverse aquifer is sewage. flushing impact Discharge of proposed. purpose. contaminated Good storm water housekeeping and storm water management will be followed. Storage and Segregation of No negative Treatment and 4. Land disposal of solid dry and wet impact reuse of sewage wastes. garbage before Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 31 Application form for Environmental Clearance Project Name: Project Name: Redevelopment of Varatk Nagar Sr. Environmen Predicted Probable Source Mitigation No tal Remarks Impacts Of Impact Measures . Components Discharge of water. will be done sewage. Integrated waste before disposal. Fuel and material management and spills. spill control plan Dry garbage will be sent for recycling and wet garbage will be composted. Green spaces inside the premises will help Landscaping will to compensate the help in reducing Overall Habitat earlier effect from any adverse 5. Biological Positive disturbance vegetation. impacts on air impact Landscaping and and noise extensive quality. plantation in the premises. Increased job Overall opportunity in Socio- Positive and long 6. positive household -- economic term impact- impact maintenance and ancillary services. FUNCTIONAL PHASE Traffic Management The complex is likely to add practises will be No Traffic moderately to the employed. 7. significant Pattern traffic flow Adequate parking Impact considered during space will be peak hour. provided in the premises.

Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 32