The Synchronisation of the Baltic States' Electricity Networks

Total Page:16

File Type:pdf, Size:1020Kb

The Synchronisation of the Baltic States' Electricity Networks European Commission - Press release Energy security: The synchronisation of the Baltic States' electricity networks - European solidarity in action Brussels, 20 June 2019 On Thursday, President Jean-Claude Juncker signed, accompanied by Vice-President Maroš Šefčovič, the political Roadmap implementing the synchronisation of the Baltic States' electricity networks with the Continental European Network via Poland together with Dalia Grybauskaitė, President of Lithuania, Jüri Ratas, Prime Minister of Estonia, Mateusz Morawiecki, Prime Minister of Poland and Krišjānis Kariņš, Prime Minister of Latvia. President Jean-Claude Juncker said: "Since the beginning of our mandate, my Commission has worked to build consensus. Today's signature is clear proof that we have achieved this: synchronisation is a project where we have decided to work together. Today we can proudly acknowledge that we have accomplished all key milestones, and we are now setting the tone of the work for the future up to the end of 2025. My Commission has always been committed to have full integration of the Baltic States' grids with the rest of Europe, and we will do our utmost to facilitate decisive progress on synchronisation, and work towards implementing strategic energy infrastructure of the Baltic Sea region.” The synchronisation of the Baltic States with the Central European grid is a cornerstone and one of the most emblematic projects of the Energy Union, a concrete expression of European solidarity in energy security. Since the beginning of its term the Commission has worked to build consensus. The Roadmap we have agreed on sets the target date of 2025 for the full synchronisation. On 19 March 2019, the Connecting Europe Facility grant agreement was signed for the €323 million financing for the first phase of the synchronisation process, covering 75% of the investment needs for this phase. In May 2019, the formal extension of the continental European grid to the Baltic States' was approved within the European Network of Transmission System Operators in a process initiated by Poland. The European Commission is committed to facilitate decisive progress on the synchronisation and support the Baltic States in this mandate and working towards implementing strategic energy infrastructure of the Baltic Sea region. Background Whilst formerly an "energy island", the Baltic States region is now connected with European partners through recently established electricity lines with Poland (LitPol Link), Sweden (NordBalt) and Finland (Estlink 1 and Estlink 2). These projects were made possible and built with EU support. For historical reasons, however, the Baltic States' electricity grid is still operated in a synchronous mode with the Russian and Belarusian systems. The desynchronisation of the Baltic States' electricity grid from these systems and the synchronisation with the continental European network (CEN) is an essential political priority for the achievement of the Energy Union. The relevant grid reinforcements have been included in the third EU list of Projects of Common Interest (PCIs) adopted by the Commission on 23 November 2017. PCI are intended to help the EU achieve its energy policy and climate objectives: affordable, secure and sustainable energy for all citizens.Projects on the PCI list are also eligible to receive Connecting Europe Facility-Energy funding. For more information Political Roadmap implementing the synchronisation of the Baltic States' electricity networks with the Continental European Network via Poland Brochure: Ending energy isolation of Eastern Baltic Region Energy Union Baltic Energy Interconnection Plan (BEMIP) IP/19/3337 Press contacts: Anna-Kaisa ITKONEN (+32 2 295 61 86) Lynn RIETDORF (+32 2 297 49 59) General public inquiries: Europe Direct by phone 00 800 67 89 10 11 or by email.
Recommended publications
  • Nordic HVDC Interconnectors' Statistics 2013
    European Network of Transmission System Operators for Electricity NORDIC HVDC UTILIZATION AND UNAVAILABILITY STATISTICS 2013 03.11.2014 REGIONAL GROUP NORDIC ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • [email protected] • www.entsoe.eu European Network of Nordic HVDC Utilization and Unavailability Statistics 2013 Transmission System Operators for Electricity 1 SUMMARY ........................................................................................................ 3 2 INTRODUCTION AND BACKGROUND .................................................................... 4 3 SCOPE ............................................................................................................. 5 4 METHODS, DEFINITIONS AND CALCULATIONS ...................................................... 6 5 TECHNICAL DETAILS OF THE HVDC LINKS ........................................................ 10 6 PRESENTATION OF THE RESULTS FOR 2013 ..................................................... 11 6.1 OVERVIEW ............................................................................................................................ 12 6.2 SEPARATE PRESENTATIONS OF ALL LINKS ................................................................................ 14 6.2.1 BALTIC CABLE HVDC LINK ..................................................................................................... 15 6.2.2 ESTLINK 1 HVDC LINK ..........................................................................................................
    [Show full text]
  • Annual Report 2012
    Annual Report 2012 Aastaaruanne 2012 Kaane kujundus alles tuleb Creating New Energy! We will release the Group’s consolidated interim reports for the financial year 2013 as follows: Corporate • 1st quarter – 30 April 2013 Social Responsibility 2012 • 2nd quarter – 31 July 2013 • 3rd quarter – 31 October 2013 The audited results for the financial year 2013 will be released on 28 February 2014 Click here to read the Corporate Social Responsibility Report www.energia.ee/en/investor Contents Address by the Chairman of the Management Board 5 In Brief 7 Strategy 11 Business Environment 15 Financial Results 22 Environment 45 Corporate Governance 49 Consolidated Financial Statements 71 Consolidated Financial Statements Consolidated Income Statement 71 23 Trade and Other Payables 131 24 Deferred Income 131 Consolidated Statement of Comprehensive Income 72 25 Provisions 132 26 Revenue 134 Consolidated Statement of Financial Position 73 27 Other Operating Income 134 Consolidated Statement of Cash Flows 74 28 Raw Materials and Consumables Used 135 29 Payroll Expenses 135 Consolidated Statement of Changes in Equity 75 30 Other Operating Expenses 136 31 Net Financial Income (-expense) 136 Notes to the Consolidated Financial statements 76 32 Corporate Income Tax 136 1 General Information 76 33 Cash Generated From Operations 137 2 Summary of Principal Accounting and Reporting Policies 76 34 Off-balance Sheet Assets, Contingent Liabilities and Commitments 137 3 Financial risk management 97 35 Assets and Liabilites of Disposal Group Classified as Held
    [Show full text]
  • Methodology for Calculating Nordic System Price
    Nordic System Price Methodology for calculation Nordic System Price Methodology REVISION HISTORY: REVISION DATE DESCRIPTION OF CHANGES REQUESTED BY NO. 1.0 1.1.2020 Initial release Camilla Berg 1.1 1.5.2020 Added sections on review and on procedure for cessation 1.2 15.8.2020 Updated with new name Nord Pool EMCO 1.3 5.11.2020 Updated with Nord Link Cable Hans Randen 2 Nordic System Price Methodology Table of Contents 1. INTRODUCTION .......................................................................................................................4 1.1 PURPOSE AND SCOPE ............................................................................................................4 1.2 REVISIONS ...........................................................................................................................4 2. DETERMINATION OF SYSTEM PRICE.....................................................................................5 2.1. THE RELATED DAY-AHEAD MARKET AND RELEVANT REGULATION.............................5 2.2. DEFINITION AND DESCRIPTION ..........................................................................................5 2.3. CURRENCY ...........................................................................................................................6 2.4. INPUT DATA FOR NORDIC SYSTEM PRICE ........................................................................7 2.5. SYSTEM PRICE CALCULATION ...........................................................................................8 3. DAILY PROCEDURE FOR CALCULATION
    [Show full text]
  • Interstate DC Line Performance Assessment Methods
    Interstate DC Line Performance Assessment Methods Mario Turcik, Artjoms Obushevs, Irina Oleinikova Institute of Physical Energetics, Laboratory of Power System Mathematical Simulation market and ensure process of market development. Abstract--The Article is focused on interconnection of power Furthermore, Nordel provide opportunity for cooperation systems via High Voltage Direct Current (HVDC) submarine between TSOs in Nordic and transmission system operators cables, its transmission capacity allocation and utilization. out of Association what makes a contribution to a numbers of Sufficiency of transmission capability on market formation and physical interconnections between the Nordel region and operation are investigated as well as role of Power Exchange (PX) and trading principles for HVDC interconnections. Model of neighboring countries. Due to harmonization of rules and Nordic power system and PX data are used for legislation in different counties associated in Nordel was technical/economic calculation and analysis based on market formulated common code for Nordic grid – The Nordic Grid areas price differences and power flows through inter-state Code (NGC). The NGC consists of four main Articles: 1) connections. Planning Code, 2) Operational Code (System Operation Agreement), 3) Connection Code 4) Data Exchange Code Index Terms-- Electricity market, HVDC technology, power flow. (Data Exchange Agreement between the Nordic transmission system operators (TSOs) The purpose of the Nordic Grid Code is to achieve coherent and coordinated Nordic operation and I. INTRODUCTION planning between the companies responsible for operating the transmission systems, in order to establish the best possible Cooperation between Transmission System Operators conditions for development of a functioning and effectively 1 (TSOs) of interconnected countries Norway, Sweden, Finland integrated Nordic power market.
    [Show full text]
  • Applications of Submarine Power Cables
    Power Systems For further volumes: http://www.springer.com/4622 Thomas Worzyk Submarine Power Cables Design, Installation, Repair, Environmental Aspects 123 Thomas Worzyk 370 30 Rödeby/Sweden [email protected] Office: ABB AB High Voltage Cables 371 23 Karlskrona/Sweden [email protected] ISSN 1612-1287 e-ISSN 1860-4676 ISBN 978-3-642-01269-3 e-ISBN 978-3-642-01270-9 DOI 10.1007/978-3-642-01270-9 Springer Dordrecht Heidelberg London New York Library of Congress Control Number: 2009927023 © Springer-Verlag Berlin Heidelberg 2009 This work is subject to copyright. All rights are reserved, whether the whole or part of the material is concerned, specifically the rights of translation, reprinting, reuse of illustrations, recitation, broadcasting, reproduction on microfilm or in any other way, and storage in data banks. Duplication of this publication or parts thereof is permitted only under the provisions of the German Copyright Law of September 9, 1965, in its current version, and permission for use must always be obtained from Springer. Violations are liable to prosecution under the German Copyright Law. The use of general descriptive names, registered names, trademarks, etc. in this publication does not imply, even in the absence of a specific statement, that such names are exempt from the relevant protective laws and regulations and therefore free for general use. Cover design: deblik, Berlin Printed on acid-free paper Springer is part of Springer Science+Business Media (www.springer.com) Preface Submarine power cables have always been the unknown cousins of the submarine telecom cables. Telecom cables encircle the globe through all oceans in an enormous mesh, and have attracted public attention since the first Channel cable was laid in 1850.
    [Show full text]
  • Energy Grids and Open Energy Market
    Energy grids and open energy market Taavi Veskimägi CEO of Elering AS About Elering Electricity transmission Gas transmission network network • Electricity and gas transmission system operator with the primary task of ensuring a high-quality energy supply to Estonian consumers. We believe the best way to guarantee the SoS for our customers is through well-functioning energy market. • Elering is fully integrated. All what we did in electricity infra+market, we have copied 5-7 years later in gas and way forward is close sector coupling. Single energy market. Both, wholesale and retail market level. • We believe infrastructure (hardware) without market (software) is a waste of money. (Estlink2 and Balticconnector examples) Common offshore grid Success story : Data hub’s interlinked …. retail market harmonization the Estonian electricity FCR market is prepared Common EE_FI-LV flexibility market and gas market platvorm is coming 2021 aFRR market is prepared Sector coupling: PtoG Effective day ahead and intraday Clean energy-based, not energy market coupling carrier based subsidies HVDC link (EE-FI) Estlink 2, to the market Gas 4-TSO Market Integration Electricity data hub BALTICCONNECTOR and HVDC link (EE-FI) - ESTLINK 1, EE_FI_LV common gas market to the market Gas data hub COMMON WHOLESALE AND RETAIL ENERGY MARKET On 1st of January 2020 Regional Gas market got started • Gas market opened in Finland • Common tariff zone in Finland-Estonia-Latvia • Common balancing zone in Estonia-Latvia Market started with high activity: • Balticconnector fully utilised during the first month towards Finland. Around 1/3 of Finnish gas demand sourced from Baltics (Inčukalns storage) Final aim is the 3B+FI common gas market.
    [Show full text]
  • NIB Bulletin November 2010
    NORDIC INVESTMENT BANK NOVEMBER 2010 ENERGY: Power link CabLE Links NOrdic and BALtic coUntries PAGE 06 capitaL INCREASE: More moneY, more responsibiLitY PAGE 03, 14, 22 innovation AND services: NIB Finances PPP HospitaL PAGE 28 BALTIC economY—PAGE 16 BALtic sea—PAGE 24 MINING SCRAP HILLS—PAGE 32 Music festival turns off diesel generators and connectsIncreasing the to capacity NIB- is to attract more cargo tofinanced the environment- trans- missionfriendly railway grid. in Sweden. 12 12 Photo: Mats Hollander Photo: Kjell Stamgård/Hafslund Non-member lending: new Intelligentfocus country metering strategies.helps optimise elec- tricity use in some 350,000 INSIDEhouseholds FRONT 18 in Helsinki. 18 Photo: Søren Mortensen NIB finances Nordic Investment Bank Bulletin is the New published in English Karolinska TEAM: Director of Communications Jukka Ahonen, Nina Monsen Solna Hospital Photo: Juhani Eskelinen (editor), Dimitrijs Alehins, Kyra in Sweden. Koponen, Pamela Schönberg GRAPHIC DESIGN: Miltton Oy PRINTED BY: Erweko Painotuote Oy LAYOUT: Miltton Oy 28NEW SUBSCRIPTIONS: PUBLISHER: PRINTED BY: Erweko Painotuote Oy Phone: +358 10 618 001 NORDIC INVESTMENT BANK Nordic Investment Bank Bulletin PUBLISHER: E-mail: www.nib.int Fabianinkatu 34, P.O. Box 249 is published in English NORDIC INVESTMENT BANK CHANGE OF ADDRESS: FI-00171 Helsinki, Finland Fabianinkatu 34, P.O. Box 249 Fax +358 10 618 0723 Phone: +358 10 618 001 TEAM: Director of Communications FI-00171 Helsinki, Finland E-mail: [email protected] Jukka Ahonen, Dimitrijs Alehins Phone: +358 10 618 0725 COVER PHOTO: www.nib.int (editor), Kyra Koponen, Linda E-mail: [email protected] A train in motion at the central Lindfors, Nina Monsen, Pamela Internet: www.nib.int station in Stockholm, Sweden.
    [Show full text]
  • GIPL Gas Interconnector Between Poland and Lithuania SYNCHRONISATION BALTICCONNECTOR
    Juncker Commission ends energy isolation and increases solidarity and energy security Since the beginning of the mandate this Juncker Commission has been committed to work towards implementing strategic energy infrastructure projects and address the various aspects required to end the energy isolation of the Baltic Sea region by reinforcing its integration into the European Union energy market. The synchronisation of the three Baltic States' electricity grid with the continental European network is of key importance for the achievement of the Energy Union. This is reaffirmed by the signature of the Political Roadmap, expressing true European solidarity on energy among EU Member States. SYNCHRONISATION Finland Helsinki Gulf of Finland !( Russia Estlink 1 & 2 1,000 MW combined (2014) !( Tallinn !( Stockholm !( Estonia Baltic Sea Latvia !( Sweden Riga Lithuania !( NordBalt !( 700 MW (2015) Vilnius Belarus Russia !( In March 2018 President Juncker and the Heads of LitPol Link State or Government of the Baltic States and of Poland Poland 500MW (2015) commit to synchronise the Baltic States’ electricity grid with the continental European System by 2025. !( !( !( !( !( !( !( 0 100 200Kilomet BALTICCONNECTOR The Balticconnector pipeline will consist of three sections: 22 km Finnish onshore, 80 km offshore and 50 km Estonian onshore. It enables the transport of 7.2 million cubic metres of gas per day with flows running in both directions. Balticconnector between Estonia and Finland - Ending energy isolation of the Eastern Baltic Sea region. GIPL Gas Interconnector between Poland and Lithuania The total construction costs of the project are € 558 million. In 2014, GIPL obtained co-financing under the Connecting Europe Facility (CEF) in the form of: • a grant for studies – around € 10 million • a grant for works – around € 295 million.
    [Show full text]
  • Data Services General Terms
    Data Services General Terms Nord Pool AS GeneraGe GENERAL TERMS FOR DATA SERVICES Version 20 April 2021 GENERAL TERMS FOR DATA SERVICES 1. BACKGROUND and/or its Affiliates compliance with the contractual obligations arising out of the Data Service Agreement Nord Pool AS (“Nord Pool”) provides information and data (“Data Services”) to participants in the Audit Policy means the policy attached to these energy markets. General Terms as Appendix 3. These General Terms for Data Services set out the Business Day means a day (other than a Saturday terms and conditions upon which Nord Pool provides or Sunday) on which commercial banks in Norway Data Services to Customers. are open for general business and interbank transactions. The General Terms are supplemented by special terms and conditions (the “Special Terms”) setting Business Hours means Business Days between out the specific Products, their allowed use and the 08:00 and 16:00 CET/CEST. fees payable by the Customer. To the extent there is a conflict between the General Terms and the Confidential Information means any and all Special Terms, the relevant Special Terms will information which is now or at any time hereafter in prevail. The General Terms and such Special Terms the possession of the disclosing Party and which as are from time to time in force between Nord Pool relates to the general business affairs or Intellectual and the Customer, shall jointly be referred to as the Property Rights of the disclosing Party including “Data Service Agreement”. without limitation source codes, object codes, data, databases, know how, formulae processes, designs, drawings, technical specifications, technical modifications, samples, applications, manuals, 2.
    [Show full text]
  • ENTSO-E HVDC Utilisation and Unavailability Statistics 2019 System Operations Committee
    ENTSO-E HVDC Utilisation and Unavailability Statistics 2019 System Operations Committee European Network of Transmission System Operators for Electricity ENTSO-E HVDC Utilisation and Unavailability Statistics 2019 Copyright © 2020 ENTSO-E AISBL Report rendered June 12, 2020 Executive Summary The HVDC links are important components for a stable op- maintenance outages as well as limitations. The unavail- eration of the Nordic and Baltic power system while sup- able technical capacity includes disturbance outages, limi- porting the commercial power trade in the European energy tations, unplanned and planned maintenance outages and markets. Furthermore, the HVDC links can provide other other outages. important functions like voltage and emergency power sup- port to the HVAC grid. Hence, the advantages of keeping The most significant unavailabilities in 2019 occurred for the HVDC links in operation as much as possible are indis- Baltic Cable, EstLink 2, Konti-Skan 1–2, NorNed, Skager- putable. The ENTSO-E HVDC Utilisation and Unavailabil- rak 1–4 and SwePol. Baltic Cable limitations were mainly due ity Statistics 2019 report aims to provide an overview of the to wind and solar energy feeds and EstLink 2 had 3 more se- Nordic and Baltic HVDC links as well as a detailed view of vere disturbances caused by a cooling water leakage, another each individual link. The executive summary concludes the by a faulty capacitor and faulty thyristors in the valve hall most important parts of the report into one chapter. and the last by a faulty DC voltage divider. Konti-Skan 1–2 had their HVDC conductor lines (in Denmark) and their con- trol systems replaced.
    [Show full text]
  • ENTSO-E HVDC Utilisation and Unavailability Statistics 2020 Publication Date: 24 June 2021 System Operations Committee
    ENTSO-E HVDC Utilisation and Unavailability Statistics 2020 Publication Date: 24 June 2021 System Operations Committee European Network of Transmission System Operators for Electricity ENTSO-E HVDC Utilisation and Unavailability Statistics 2020 Copyright © 2021 ENTSO-E AISBL Report rendered 28 June 2021 European Network of Transmission System Operators for Electricity Executive Summary The HVDC links are important components for a stable op- The most utilised electricity market connection was the one eration of the Nordic and Baltic power system while sup- between Finland and Sweden (FI–SE3, HVDC links Fenno- porting the commercial power trade in the European energy Skan 1 and 2), with 85 % of the technical capacity being used markets. Furthermore, the HVDC links can provide other for transmission, as shown in Table ES.1. No other market important functions like voltage and emergency power sup- connection reached such a high utilisation percentage, and port to the HVAC grid. Hence, the advantages of keeping only seven of the thirteen market connections showed a util- the HVDC links in operation as much as possible are indis- isation percentage of more than 60 %. However, the utili- putable. The ENTSO-E HVDC Utilisation and Unavailabil- sation percentage of all HVDC links in 2020 was still at its ity Statistics 2020 report aims to provide an overview of the all-time highest value since 2012. The market connections Nordic and Baltic HVDC links as well as a detailed view of with most unavailability were the ones between Denmark each individual link. The executive summary concludes the and Netherlands (DK1–NL, HVDC link COBRAcable) and most important parts of the report into one chapter.
    [Show full text]
  • Baltic Energy Systems: Synchronisation by 2025 Lithuania, Latvia and Estonia Joined the European Union in 2004, but Their Grids
    Baltic energy systems: synchronisation by 2025 Lithuania, Latvia and Estonia joined the European Union in 2004, but their grids are still synchronised with Russia and Belarus. Now they have agreed a target date to become a part of the continental Europe’s energy system At the end of June 2018 the Baltic countries and Poland came to a political agreement for synchronising the Baltic States' electricity grid with the continental European network by 2025. The power systems of Lithuania, Latvia and Estonia historically were a part of the Soviet Union “unified energy system”. In 1992, when the USSR fell apart, the technical problem of separating the power systems arose. At that time a range of factors (limited options and high reliability of the Soviet network) spoke in favour of keeping the energy systems integrated. In 2001 the existing synchronisation of Baltic countries’ grids with Russia and Belarus was reflected in the BRELL agreement, which focused on technical aspects of the power exchange. “It was a technical agreement signed at a time when no other conditions were available,” said Dangiras Mikalajunas, the former CEO of Lietuvos Energija (Lithuanian energy company). At present, the power systems of the Baltic States are tightly interconnected with Russian and Belarussian power systems with AC 330 kV lines. They import electricity produced in Russia, have access to the other countries’ power reserves, and participate in dispatch and regulation. Lithuania, Latvia and Estonia have always considered their dependence on Moscow as a threat, and their concerns have increased since the crisis in Ukraine. However, cutting this “umbilical cord” has been an uphill struggle.
    [Show full text]